Loading...
DOE Grant Amend #1 - Perrinville Creek G1400022DEPARTMENT OF ECOLOGY State of Washington NATIONAL ESTUARY PROGRAM (NEP) WATERSHED PROTECTION AND RESTORATION GRANT AMENDMENT NO. 1 TO GRANT AGREEMENT NO. G1400022 BETWEEN THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY AND THE CITY OF EDMONDS PURPOSE: To amend the above -referenced grant agreement between the Department of Ecology [ECOLOGY] and THE CITY OF EDMONDS [RECIPIENT] for the project: PERRINVILLE CREEK STORMWATER FLOW REDUCTION RETROFIT STUDY AND PRE -DESIGN REPORT This amendment is needed to change the end date of the agreement, replace the deliverables table, and add new language to the General Terms and Conditions. IT IS MUTUALLY AGREED that the grant agreement is amended as follows: PART I. GENERAL INFORMATION- This section will be modified as follows: The Expiration Date is changed from June 30, 2014 to June 30, 2015. 6-19-A'176 Department of Ecology National Estuary Program Watershed Protection and Restoration Grant The City of Edmonds- Perrinville Creek Storinwater Flow Reduction Retrofit Study and Pre - Design Report G1400022 -Amendment No. 1 Page 2 of 4 PART IV. SCOPE OF WORK a. The following table will be deleted: Task Number Deliverable Description Due Date 1 Quarterly progress reports and financial vouchers Quarterly 1 FEATS status reports Semiannually 1 Final project summary report 7/31/14 2A QAPP for hydrologic model, including review of flow data 6/30/13 2A Hydrologic model of existing conditions 8/31/13 2A Technical memorandum summarizing data, model construction, and results 8/31/13 2B QAPP for collection and review of pebble count data 6/30/13 2B Technical memorandum of target flow conditions in Perrinville Creek 9/30/13 2C Technical memorandum prioritizing subbasins and identifying opportunities for significant flow interception and reduction, and identifying stream channel stabilization locations QAPP for geologic/soils data collection and interpretation 9/30/13 2D 6/30/13 2D Technical memorandum summarizing results of records research, geologic/geotechnical investigations, interpretations of infiltrative capacities, and geotechnical design recommendations 10/31/13 2E QAPP for use of BMP Assessment Module 9/30/13 2E Technical memorandum summarizing individual project analyses and estimated hydrologic/sediment mobilization/peak discharge performance of alternative combinations of pr9jects 1/31/14 2F Edmonds City Council and neighborhood presentation materials 5/31/14 2G Draft Perrinville Creek Stormwater Flow Reduction Retrofit Study report 3/31/14 2G Final Perrinville Creek Stormwater Flow Reduction Retrofit Study re ort 5/30/14 2H QAPP for flow monitoring data collection 8/31/13 2H Technical memorandum summarizing flow monitoring 3/31/14 3 Draft Pre -Design Re ort 5/31/14 3 Final Pre -Design Report 6/30/14 Department of Ecology National Estuary Program Watershed Protection and Restoration Grant The City of Edmonds- Perrinville Creek Stoilnwater Flow Reduction Retrofit Study and Pre - Design Report G1400022 -Amendment No. 1 Page 3 of 4 b. The following table will be added: Summary Table of Deliverables by Task Task Number Deliverable Description Due Date 1 Quarterly progress reports and financial vouchers Quarterly 1 FEATS status re orts Semiannually 1 Final 2roject summary report 11/30/2014 2A QAPP for hydrologic model, including review of flow data 6/30/2013 2A Hydrologic model of existing conditions 8/31/2013 2A Technical memorandum summarizing data, model construction, and results 8/31/2013 2B QAPP for collection and review of pebble count data 6/30/2013 2B Technical memorandum of target flow conditions in Perrinville Creek 9/30/2013 2C Technical memorandum prioritizing subbasins and identifying opportunities for significant flow interception and reduction, and identifying stream channel stabilization locations 9/30/2013 2D QAPP for geologic/soils data collection and interpretation 6/30/2013 21) Technical memorandum summarizing results of records research, geologic/geotechnical investigations, interpretations of infiltrative capacities, and geotechnical design recommendations 5/13/2014 2E QAPP for use of BMP Assessment Module 11/30/2013 2E Technical memorandum summarizing individual project analyses and estimated hydrologic/sediment mobilization/peak discharge performance of alternative combinations of projects 6/17/2014 2F Edmonds City Council and neighborhood presentation materials 6/30/2014 2G Draft Perrinville Creek Stormwater Flow Reduction Retrofit Study report 8/6/2014 2G Final Perrinville Creek Stormwater Flow Reduction Retrofit Study report 9/25/2014 2H QAPP for flow monitoring data collection 11/30/2013 2H Technical memorandum summarizing flow monitoring 4/22/2014 3 Draft Pre -Design Report 9/9/2014 3 Final Pre -Design Report 11/30/2014 Department of Ecology National Estuary Program Watershed Protection and Restoration Grant The City of Edmonds- Pei7inville Creek Stormwater Flow Reduction Retrofit Study and Pre - Design Report G1400022 -Amendment No. 1 Page 4 of 4 ATTACHMENT III. ECOLOGY'S GENERAL TERMS AND CONDITIONS will be modified as follows: The following condition is added: W. FUNDING AVAILABILITY. ECOLOGY's ability to make payments is contingent on availability of funding. In the event funding from state, federal, or other sources is withdrawn, reduced, or limited in any way after the effective date and prior to completion or expiration date of this agreement, ECOLOGY, at its sole discretion, may elect to terminate the agreement, in whole or part, or renegotiate the agreement, subject to new funding limitations or conditions. ECOLOGY may also elect to suspend performance of the agreement until ECOLOGY determines the funding insufficiency is resolved. ECOLOGY may exercise any of these options with no notification restrictions. FURTHER, this amendment shall be effective upon signature of ECOLOGY's Shorelands and Environmental Assistance Program Manager. Except as expressly provided by this amendment, all other terms and conditions of the original grant agreement and all amendments remain in full force and effect. IN WITNESS WHEREOF: these parties have signed this amendment. STATE OF WASHINGTON DEPARTMENT OF ECOLOGY 44 119-01-1-1 GO ON WHITE DAYE PROGRAM MANAGER, SHORELANDS AND ENVIRONMENTAL ASSISTANCE Approved as to Form Only Assistant Attorney General (Revised 05/05/09) CITY OF EDMONDS IK DAVID O.`EARlJNG MAYOR 107 - sim,