Loading...
HomeMy WebLinkAboutResolution 1415 Page 1 of 12 FEES ASSOCIATED WITH DEVELOPMENT FEES ASSOCIATED WITH DEVELOPMENT Building – Engineering - Planning 121 5th Ave N, Edmonds WA 98020 425.771.0220 Effective July 1, 2018 Page 2 of 12 ICC VALUATION TABLE August 2017 Adopted by City of Edmonds effective Jan, 1 2018 Square Foot Construction Costs a, b, c a. Private Garages use Utility, miscellaneous f. Sunroom (unheated) = $28.00 b. For shell only buildings deduct 20 percent g. Deck Ramp, Stairs, Trellis, Porch = $20.00 per sq. ft. c. N.P. = not permitted h. Dock = $35.00 per sq. ft. d. Unfinished basements (Group R-3) = $21.00 per sq. ft. i. Unheated Storage = $25.00 per sq. ft. e. Carport = $25.00 per sq. ft. Group (2015 International Building Code) IA IB IIA IIB IIIA IIIB IV VA VB A-1 Assembly, theaters, with stage 233.95 225.89 220.42 211.39 198.92 193.15 204.70 181.63 174.97 A-1 Assembly, theaters, without stage 214.40 206.35 200.88 191.84 179.53 173.76 185.16 162.23 155.58 A-2 Assembly, nightclubs 182.86 177.56 173.06 166.05 156.54 152.22 160.22 141.73 136.94 A-2 Assembly, restaurants, bars, banquet halls 181.86 176.56 171.06 165.05 154.54 151.22 159.22 139.73 135.94 A-3 Assembly, churches 216.47 208.41 202.95 193.91 181.79 176.02 187.23 164.50 157.85 A-3 Assembly, general, community halls, libraries, museums 180.57 172.51 166.04 158.00 144.89 140.11 151.32 127.59 121.94 A-4 Assembly, arenas 213.40 205.35 198.88 190.84 177.53 172.76 184.16 160.23 154.58 B Business 186.69 179.79 173.86 165.19 150.70 145.02 158.70 132.31 126.48 E Educational 197.52 190.73 185.77 177.32 165.32 156.97 171.23 144.39 140.26 F-1 Factory and industrial, moderate hazard 111.86 106.71 100.58 96.68 86.77 82.81 92.61 72.75 68.09 F-2 Factory and industrial, low hazard 110.86 105.71 100.58 95.68 86.77 81.81 91.61 72.75 67.09 H-1 High Hazard, explosives 104.68 99.53 94.40 89.50 80.80 75.84 85.43 66.78 N.P. H234 High Hazard 104.68 99.53 94.40 89.50 80.80 75.84 85.43 66.78 61.12 H-5 HPM 186.69 179.79 173.86 165.19 150.70 145.02 158.70 132.31 126.48 I-1 Institutional, supervised environment 187.63 181.26 176.01 168.60 155.33 151.11 168.69 139.15 134.82 I-2 Institutional, hospitals 314.17 307.27 301.34 292.67 277.18 N.P. 286.18 258.79 N.P. I-2 Institutional, nursing homes 217.67 210.77 204.84 196.17 182.68 N.P. 189.68 164.29 N.P. I-3 Institutional, restrained 212.42 205.52 199.59 190.92 177.93 171.25 184.43 159.54 151.71 I-4 Institutional, day care facilities 187.63 181.26 176.01 168.60 155.33 151.11 168.69 139.15 134.82 M Mercantile 136.25 130.95 125.45 119.44 109.43 106.11 113.60 94.63 90.83 R-1 Residential, hotels 189.35 182.99 177.74 170.33 156.80 152.58 170.42 140.62 136.29 R-2 Residential, multiple family 158.84 152.48 147.23 139.81 127.05 122.83 139.91 110.87 106.54 R-3 Residential, one- and two-family d 148.17 144.14 140.42 136.90 131.89 128.41 134.60 123.40 116.15 R-4 Residential, care/assisted living facilities 187.63 181.26 176.01 168.60 155.33 151.11 168.69 139.15 134.82 S-1 Storage, moderate hazard 103.68 98.53 92.40 88.50 78.80 74.84 84.43 64.78 60.12 S-2 Storage, low hazard 102.68 97.53 92.40 87.50 78.80 73.84 83.43 64.78 59.12 U Utility, miscellaneous 80.38 75.90 71.16 67.61 60.99 57.00 64.60 48.23 45.92 Page 3 of 12 BUILDING PERMIT FEES CONSTRUCTION BUILDING PERMIT FEES: TABLE 1 Total Valuation** Residential Commercial $1 to $500 $100 Base fee + $30 $120 Base fee + $36 $501 to $2,000 $100 Base fee + $30 for the first $500 + $3 for each additional $100, or fraction thereof to and including $2,000 $100 Base fee + $36 for the first $500 + $3.60 for each additional $100, or fraction thereof to and including $2,000 $2,001 to $25,000 $100 Base fee + $75 for the first $2,001 + $14 for each additional $1,000, or fraction thereof to and including $25,000 $100 Base fee + $90 for the first $2,001 + $16.80 for each additional $1,000, or fraction thereof to and including $25,000 $25,001 to $50,000 $100 Base fee + $400 for the first $25,001 + $10 for each additional $1,000, or fraction thereof to and including $50,000 $100 Base fee + $480 for the first $25,001 + $12 for each additional $1,000, or fraction thereof to and including $50,000 $50,001 to $100,000 $100 Base fee + $650 for the first $50,001 + $7 for each additional $1,000, or fraction thereof to and including $100,000 $100 Base fee + $780 for the first $50,001 + $8.40 for each additional $1,000, or fraction thereof to and including $100,000 $100,001 to $500,000 $100 Base fee + $1,000 for the first $100,001 + $6 for each additional $1,000, or fraction thereof to and including $500,000 $100 Base fee + $1,200 for the first $100,001 + $7.20 for each additional $1,000, or fraction thereof to and including $500,000 $500,001 to $1,000,000 $100 Base fee + $3,400 for the first $500,001 + $5 for each additional $1,000, or fraction thereof to and including $1,000,000 $100 Base fee + $4,080 for the first $500,001 + $6 for each additional $1,000, or fraction thereof to and including $1,000,000 $1,000,001 and up $100 Base fee + $5,900 for the first $1,000,000 + $4 for each additional $1,000, or fraction thereof $100 Base fee + $7,080 for the first $1,000,000 + $4.80 for each additional $1,000, or fraction thereof The determination of value or valuation shall be based on the Building Valuation Data, published in January of each year in the Building Safety Journal published by the International Code Council, on file with the City Building Official. **See Valuation Table located on previous page. TABLE 1 - VALUATION BASED APPLICABLE PERMITS: Commercial Structures: New, Additions & Remodels Garages & Carports Residential Structures: New, Additions & Remodels Swimming Pools (In-Ground) Accessory Structures (Greenhouse/Shed) Cell Communications/ Cellular Facilities Deck, Stairs, Ramps Other permits types as determined Commercial: Hot/Tub and Spas, Solar/ Photovoltaic Systems, Re-roofs & Tenant Improvements Plus: $6.50 Residential State Surcharge Fee per permit and $2 per each dwelling unit $25.00 Commercial State Surcharge Fee per permit and $2 per each dwelling unit Page 4 of 12 GENERAL DEVELOPMENT SERVICES PERMIT FEES Building / Planning / Engineering City Technology Fee for each permit issuance ......................................................................................... $35.00 Credit Card Transaction Fee ............................................................................................................................. 3% Recording Fee (for recording documents with County) ............................................. Recording Cost + $100.00 Development Review Committee Meeting .................................................................................................... $0 Pre-Application Meeting ...................................................................................................................... $1,000.00 (50% applied toward future plan check fee for that specific project only) Residential State Building Code Surcharge Fee ........................................................................................ $6.50 ...................................................................................................................... Each additional dwelling unit $2.00 Commercial State Building Code Surcharge Fee ..................................................................................... $25.00 ...................................................................................................................... Each additional dwelling unit $2.00 (not applicable to all permits such as plumbing, mechanical, re-roof) PLAN REVIEW & INSPECTION FEES: Plan review is calculated at 85% of the building permit fee and includes up to 3 reviews per division/ department. After the 3rd review is complete on a permit application, additional reviews are charged per reviewing division/ department. ....................................................................................... $100.00/hr (1 hr min.) Commercial/ Multi-family: Plan review fee includes Building, Planning & Engineering reviews. Residential: Plan review fee includes Building & Planning reviews. Additional plan review required by changes, additions or revisions to approved plans. Per reviewing department/division ............................................................................ $100.00/hr (1 hr min.) Additional plan review for re-submittal after the 3rd review ............................................................ $100.00/hr Structural Review Fee Consultant Fees ............................................................................................ $100.00/hr Development Project Peer Review ..................................................................................................... $100.00/hr + cost of consultant review fee charged for outside consultant peer review services when City staff lacks the expertise to review a specific project or aspect of a project. General Building Inspection Fee ......................................................................................................... $100.00/ea Re-Inspection Fee ................................................................................................................................ $100.00/ea SIGNS: Sign (Per sign excluding specific sign categories listed below) ................................................................ $150.00 Blade Sign (Includes all blade signs in proposal) ............................................................................................... $0 Pedestrian Sign (Includes all pedestrian signs in proposal) ....................................................................... $75.00 Pole Sign ..................................................................................................................................................... $750.00 Planning ADB Design Review (For consideration of departure from sign standard, per code) .............. $880.00 Planning Review Fee for General Signs ............................................................................................................. $0 ESLHA DESIGNATED PROPERTIES: Additional fees associated with development in the North Edmonds Earth Subsidence Landslide Hazard Area ESLHA Administrative Fee .................................................................................................................... $2,385.00 ESLHA Consultant Review ...................................................................... Full cost of review is paid by applicant. Deposit at Application for Peer Completeness Review ..................................................................... $500.00 Deposit at Full Application .............................................................................................................. $2,500.00 Deposit at Re-submittal if additional Peer Review is needed ....................................................... $1,500.00 ESLHA Minor Project Administrative Processing Fee .............................................................................$300.00 ESLHA Submittal Packet ............................................................................................................................. $15.00 Page 5 of 12 MECHANICAL PERMITS: BASE PERMIT FEE: ...................................................................................................................................... $40.00 UNIT FEE SCHEDULE: For the installation or relocation of each: FURNACE - Forced-air or gravity-type, including ducts and appliance vents: Up to and including 100,000 Btu/h (29.3kW) .................................................................................... $20.00 Over 100,000 Btu/h (29.3kW) ............................................................................................................. $30.00 AIR HANDLER - Including ducts (Diffusers, blowers, etc.) Up to and including 10,000 cfm (4719 L/s) ........................................................................................ $20.00 Over 10,000 cfm (4719 L/s) including ducts ...................................................................................... $30.00 HEATER - Suspended, recessed wall or floor-mounted unit ................................................................... $25.00 HYDRONIC HEATING SYSTEM .................................................................................................................. $135.00 APPLIANCE VENT - (Type B, BW, L gas vent, etc.) .................................................................................... $10.00 EVAPORATIVE COOLER - (Other than portable) ....................................................................................... $15.00 INCINERATOR Domestic .............................................................................................................................................. $20.00 Commercial or Industrial ..................................................................................................................... $50.00 VENTILATION AND EXHAUST Fan connected to single duct (Bath, laundry, kitchen exhaust, etc.) ................................................ $10.00 Each system which is not a portion of any heating or air-conditioning system .............................. $10.00 HOOD - Type 1,Type 2, Fume Hood including ducts .............................................................................. $100.00 For the repair, alteration or addition to each: Heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls ......................... $15.00 GAS PIPING: (New or relocated) Gas-Piping systems of 1 to 5 outlets ........................................................................................................ $24.00 Each additional outlet over 5 ...................................................................................................................... $2.00 BOILER OR COMPRESSOR Up to and including 3 horsepower (10.6 kW) .......................................................................................... $20.00 Over 3 HP (10.6 kW) up to and including 15 HP (52.7 kW) ..................................................................... $30.00 Over 15 HP (52.7 kW) up to and including 30 HP (105.5 kW) ................................................................. $40.00 Over 30 HP (105.5 kW) up to and including 50 HP (176 KW) ................................................................. $60.00 Over 50 HP (176 kW) ................................................................................................................................. $95.00 ABSORPTION SYSTEM, AIR CONDITIONING SYSTEM OR HEAT PUMP Up to and including 100,000 Btu/h (29.3 kW) ......................................................................................... $20.00 Over 100,000 Btu/h (29.3 kW) up to and including 500,000 Btu/h (146.6 kW) .................................... $30.00 Over 500,000 Btu/h (146.6 kW) up to and including 1,000,000 Btu/h (293.1 kW) ............................... $40.00 Over 1,000,000 Btu/h (293.1 kW) to and including 1,750,000 Btu/h (512.9 kW) ................................. $60.00 Over 1,750,000 Btu/h (512.9 kW) ............................................................................................................ $95.00 OTHER FEES: Re-inspection ........................................................................................................................................... $100.00 Inspections for which no fee is specifically indicated ............................................................................ $100.00 Plan review fee for both initial and subsequent revisions (1hr/Min) ............................................$100.00/hr Each appliance or piece of equipment regulated by the IMC for which no other fee is listed (Fire dampers, ductless mini- split systems, etc.) ............................................................ $20.00 Page 6 of 12 PLUMBING PERMITS: BASE PERMIT FEE: ..................................................................................................................................... $40.00 UNIT FEE SCHEDULE: For the installation, alteration, repair, addition or relocation of each: ......................................................... $12.00 Plumbing fixture (on one trap or a set of fixtures on one trap) Drain w/in footprint of building (rainwater systems, roof deck drains, etc.) Water Heater (includes expansion tank) Re-pipe - Drain, vent or water piping (each fixture served) For the installation, alteration, repair, addition or relocation of each: Water treating equipment (water softener) ............................................................................................. $30.00 Backflow protective device - 2" and smaller ............................................................................................ $30.00 Backflow protective device - Over 2" ....................................................................................................... $40.00 Graywater system or reclaimed water system (in addition to fixture fee) ............................................. $60.00 Non-grease waste pre-treatment interceptor (oil/water separator, etc.) ...........................................$100.00 Medical gas piping system serving 1 to 5 inlet/outlet(s) for a specific gas ..........................................$100.00 Each additional medical gas inlet/outlet ............................................................................................... $12.00 Grease Trap ..............................................................................................................................................$200.00 Grease Interceptor (Inside Building) ........................................................................................................$700.00 Water Service Line ...................................................................................................................................$112.00 OTHER FEES: Re-inspection ............................................................................................................................................$100.00 Inspections for which no fee is specifically indicated .............................................................................$100.00 Plan review fee for both initial and subsequent revisions (1hr min) ............................................... $100.00/hr IMPACT FEES PARK IMPACT FEES: Single-Family .......................................................................................................... $2,734.05 per Dwelling Unit Multi-Family ........................................................................................................... $2,340.16 per Dwelling Unit Non-Residential Development ........................................................................................ $1.34 per square foot Residential Administrative Fee .................................................................................................................. $50.00 Commercial Administrative Fee .............................................................................................................. $100.00 TRANSPORTATION IMPACT FEES: Refer to City Code & Handouts to calculate impact fee. The following applies in addition to impact fee: Residential Administrative Fee .................................................................................................................. $50.00 Commercial Administrative Fee .............................................................................................................. $100.00 Independent Calculation Review Fee ..................................................................................................... $240.00 + Plus Transportation Engineer Review Fee of Independent Fee Calculation when adopted fee categories do not apply. Page 7 of 12 FIRE FIRE SPRINKLER PERMITS: Residential IRC Structures New Residential Fire Suppression Systems (fee includes plan review) ................................................ $300.00 Residential Fire Suppression System Alteration (fee includes plan review) .........................................$200.00 Commercial & Multi-Family Fire Suppression Systems New systems ........................................................................................................................... $300.00 + TABLE 1 Modifications: 1 to 5 sprinklers ........................................................................................................................................$200.00 6 to 25 .................................................................................................................................... $100.00 + TABLE 1 26 or more .............................................................................................................................. $150.00 + TABLE 1 Additional inspections/plan review as required ............................................................................... $100.00/hr FIRE ALARM PERMITS: New fire alarm system .......................................................................................................... $300.00 + TABLE 1 Distributed Antenna Radio System (DAS) ............................................................................ $100.00 + TABLE 1 Modifications: 1 to 5 initiating devices .......................................................................................................................... $225.00 6 to 25 .................................................................................................................................... $100.00 + TABLE 1 26 or more .............................................................................................................................. $150.00 + TABLE 1 Additional inspections/plan review as required ............................................................................... $100.00/hr TANK PERMITS: Underground fill or remove 600 gallons or less ....................................................................................$100.00 Underground fill or remove 601 gallons or more ..................................................................................$300.00 Underground install 600 gallons or less .................................................................................................$150.00 Underground install 601 gallons or more ..............................................................................................$300.00 OTHER FIRE PERMITS: Fire Suppression Systems (including cooking systems, hoods and standpipes) ...................................$315.00 Fire Connection ........................................................................................................................................$500.00 Fire Operational ......................................................................................................................................... $60.00 Firework Display ........................................................................................................................................ $30.00 Fire Inspection Fee ............................................................................................................................ $100.00/hr Fire Plan Review Fee ......................................................................................................................... $100.00/hr Page 8 of 12 MISCELLANEOUS PERMIT FEES: Accessory Dwelling Unit Compliance (ADU) ............................................................................................. $405.00 Adult Family Home ..................................................................................................................................... $500.00 Appeal of Building Official Interpretation ................................................................................................. $810.00 Change of Use............................................................................................................................................. $510.00 Demolition (Primary Structure) ................................................................................................................. $300.00 Demolition (Secondary Structure) ............................................................................................................. $150.00 Dock/Marina/Floats ................................................................................................................. $200.00 + TABLE 1 Fence ............................................................................................................................................................. $60.00 Hot Tub/Spa (Single-Family) ...................................................................................................................... $200.00 Manufactured Coach Installation - Commercial (Federal HUD Label) .................................................... $500.00 Manufactured Home Installation (Federal HUD Label) ............................................................................ $550.00 Parking Lot ................................................................................................................................ $200.00 + TABLE 1 Relocate a Building ..................................................................................... $500.00 + $100.00/hr outside of City Re-roof (Commercial) ...................................................Valuation based on square footage & fee from TABLE 1 Re-roof (Residential - includes sheathing) ................................................................................................ $100.00 Retaining Wall (Commercial) ............................................................................................ $675.00 + Peer Review Retaining Wall (Residential) .............................................................................................. $265.00 + Peer Review Solar/Photovoltaic (Residential) ................................................................................................................ $120.00 Solar/Photovoltaic (Commercial) - Valuation does not include cost of solar panels or inverters ......... TABLE 1 Swimming Pool (Pre-manufactured, above ground) ................................................................................ $120.00 Swimming Pool (In-Ground) ....................................................................................................................... TABLE 1 Violation Compliance Fee ................................................................................... $240.00 or up to 5x Permit Fee Window Replacement (Residential) .......................................................................................................... $150.00 Page 9 of 12 GRADING PERMIT FEES PLAN REVIEW: CUBIC YARDS PLAN REVIEW FEE 50 cubic yards or less (when located in a designated critical area) $30.00 51 to 100 cubic yards $60.00 101 to 1,000 cubic yards $120.00 1,001 to 10,000 cubic yards $240.00 10,001 to 100,000 cubic yards $240.00 for the first 10,000 cubic yards, plus $100.00 for each additional 10,000 yards or fraction thereof. 100,001 to 200,000 cubic yards $1,140.00 for the first 100,000 cubic yards, plus $100.00 for each additional 10,000 cubic yards or fraction thereof. 200,001 cubic yards or more $2,040.00 for the first 200,000 cubic yards, plus $100.00 for each additional 10,000 cubic yards or fraction thereof. Other Fees: Additional plan review required by changes, additions or revisions to approved plans….$100.00/hr (1hr min.) PERMIT FEE: CUBIC YARDS PERMIT FEE Base Permit Fee $30.00 50 cubic yards or less (when located in a designated critical area) $60.00 51 to 100 cubic yards $60.00 101 to 1,000 cubic yards $120.00 for the first 100 cubic yards, plus $20.00 for each additional 100 cubic yards, or fraction thereof. 1,001 to 10,000 cubic yards $300.00 for the first 1,000 cubic yards, plus $40.00 for each additional 1,000 cubic yards, or fraction thereof. 10,001 to 100,000 cubic yards $660.00 for the first 10,000 cubic yards, plus $60.00 for each additional 10,000 cubic yards or fraction thereof. 100,001 cubic yards or more $1,200.00 for the first 100,000 cubic yards, plus $90.00 for each additional 10,000 cubic yards or fraction thereof. Other Inspections & Fees: Inspections outside of normal business hours ........................................................................... $100.00/hr (1hr min.) Re-inspection fees assessed under provisions of UBC Section 108.8 ....................................... $100.00/hr (1hr min.) Inspections for which no fee is specifically indicated ................................................................ $100.00/hr (1hr min.) Page 10 of 12 PLANNING FEES GENERAL: Type I (Staff decisions, no notice) .............................................................................................................. $250.00 Type II A or B (Staff decisions with notice) ................................................................................................ $880.00 Type IIIA (Hearing Examiner) ........................................................................ Hearing Examiner Cost + $1,820.00 Type IIIA (Outdoor dining, amateur radio)................................................................................................ $250.00 Type IIIB (ADB / Hearing Examiner) ............................................................. Hearing Examiner Cost + $1,820.00 Type IVA (Subdivision/ PRD final approval) ........................................................................................... $3,720.00 Type IVB (Rezone) ................................................................................................................................... $6,350.00 Type V (Plan & Edmonds Community Development Code Amendments) ............................................ $6,350.00 Lot Line Adjustment ................................................................................................................................... $950.00 Short Subdivision Preliminary Approval ................................................................................................. $2,930.00 Short Subdivision Final Approval ............................................................................................................ $1,440.00 Subdivision Preliminary Approval ................................................................. Hearing Examiner Cost + $5,920.00 Subdivision Final Approval ..................................................................................................................... $3,720.00 Modification Request................................................................................................................................. $880.00 Minor Change to Approved Plat ........................................................................................................... $100.00/hr Major Change to Approved Plat ....................................................................... Same as Original Application Fee PRD Preliminary Approval ....................................................................................................................... $5,920.00 PRD Final Approval .................................................................................................................................. $3,720.00 ADB Design Review – Signs ........................................................................................................................ $880.00 Staff Design Review if project exceeds SEPA threshold ........................................................................... $880.00 Landscape Plan Inspection Fee ..................................................................................................... 1% of Estimate SEPA Review ............................................................................................................................................... $670.00 EIS Review......................................................................................................................................................... Cost Critical Areas Checklist Application ........................................................................................................... $100.00 Critical Areas Checklist Update ................................................................................................................... $50.00 Critical Areas Variance / Reasonable Use Application ................................ Hearing Examiner Cost + $6,945.00 Critical Areas Study Admin ..................................................................................................... $100/hr (min. 1 hr) Critical Areas Contingent Review (See ECDC 23.40.195 for more detail on fees) .................................. $880.00 Planning Fee not categorized ............................................................................................................... $100.00/hr Recording Fee (for recording documents with County) ..............................................Recording Cost + $100.00 Request for Reconsideration ..................................................................................................................... $250.00 Note: When an application is heard by the Hearing Examiner (HE), the cost of the hearing is billed to the applicant. APPEALS: Appeal of Staff Decision (Type I, II or Hearing Examiner) ........................................................................ $400.00 Appeal of Type IIIB Decision to City Council ............................................................................................. $500.00 Appeal of Notice of Civil Violation ............................................................................................................. $880.00 ADB = Architectural Design Board EIS = Environmental Impact Statement HE = Hearing Examiner PRD = Planned Residential Development SEPA = State Environmental Policy Act Page 11 of 12 ENGINEERING FEES MISCELLANEOUS FEES: Backflow Prevention Compliance Fee ..............................$125.00 Developers Agreements ...................................................$300.00 + $100.00/hr Staff time + City Attorney Fees Development Project Peer Review .................................. $300.00 + Cost of Peer Review Fire/ Aid Sign Address Fabrication Fee .............................. $75.00 Private Drive Sign Fabrication Fee....................................$175.00 Water and Sewer Availability Letters ........................... $60.00/ea Latecomers Agreement ....................................................$300.00 + $100.00/hr + City Attorney Fees LID Sewer Fees (Outside of LID Map) .............................. $300.00 + $100.00/hr + City Attorney Fees GENERAL FACILITY CHAR GES: Water GFC’s are based on meter size: Water and sewer GFC’s shall be paid by each new customer connecting to the utility systems. Storm GFC’s shall be paid by the applicant for ESU’s added or created by development. Meter Size General Facility Charge ¾” $5,050.00 1” $12,624.00 11/2 “ $25,248.00 2” $40,397.00 GFC’s for Single Family Residences only: Fee is based on meter size required for domestic demand (typically ¾”). GFC shall not be based on meter upsizing for fire sprinkler system. Sewer Utility GFC ............................................................. $4,417.00 per ERU A single family residential development = 1.0 ERU per dwelling unit A multifamily residential development = .67 ERU per dwelling unit Applicants for non-residential development shall pay a GFC equal to the ERU determination that is made by the Public Works Director. Stormwater Management GFC ......................................... $799.00 per ESU A single family residential development with up to $5,000 sf impervious surface are = 1.0 ESU All other construction calculated according to a ratio of 1.0 ESU per 3,000 sq ft of new, replaced or new plus replaced impervious surface area. RIGHT-OF-WAY FEES: Right-of-Way Construction Permit ................................... $300.00 + Inspection Fees Right-of Way Minor Construction Permit ....................... $100.00 + Inspection Fees Street Restoration for Water Meter Installation ......... $1,000.00 + Street Cut Penalty Fee if applicable (Excluding Private Development Projects) Street Cut Penalty Fee .....................................................$200.00 + ROW Permit Fee + Add’l per SQYD charge times overlay cut multiplier Encroachment Permit ...................................................... $300.00 + Recording Fees Street Use Permit ..............................................................$100.00 + Bistro Dining Fees if applicable Bistro Dining Fees ............................................................... $30.00 Annual Fee + Monthly ROW Use Fee @ $0.50/ SQ FT x 12.84% (leasehold tax) Alley, Sidewalk, Street Disruption/ Closure Fees .............$200.00 + ROW Permit + Monthly Closure Fees Closure fees charged for any activity that occupies or closes, sidewalks, parking spaces(s), parking lanes(s) or other paved area of a street/road for more than 72 hours. Monthly portion of Fee [$ per month] = 1% of assessed value per square foot of abutting property x right of way area [SF] disrupted/closed. If disruption/closure affects any portion of the area of a parking space, the area of disruption closure is calculated based upon the area of a full parking space. Page 12 of 12 SEWER FEES: New Commercial & Multi-Family .....................................$200.00 + Inspection Fees New Single Family .............................................................$100.00 + Inspection Fees Repair Only (Res, Com & Multi) ........................................$100.00 + Inspection Fees Sewer Discharge Permit (Pool/ Hot tub) ............................ $50.00 Special Conditions (Grinder Pumps, Ejectors) ..................$200.00 + Side Sewer Fee + Utility Engineer Review Drainage Permit (Pool, Hot Tub, Jacuzzi) ........................... $50.00 STORMWATER FEES: Stormwater Permit ...........................................................$300.00 + Engineering Inspection Fees *Refer also to General Facility Charges WATER METER FEES: Meter Size Meter Fee General Facility Charge Installation of New Service & Meter 3/4” $2,920.00 $5,050.00 1” $2,970.00 $12,624.00 1½” $6,220.00 $25,248.00 2” $6,390.00 $40,397.00 *Refer also to General Facility Charges SUBDIVISION FEES: Civil Construction Plan Review Short Subdivision (4 or less lots) ................................. $2,785.00 + Engineering Inspection Fees Subdivision (5 or more lots) ........................................ $4,265.00 + Engineering Inspection Fees GENERAL INSPECTION & REVIEW FEES: Engineering Inspection Fee .......................................... $100.00/ea Applies to Single Family, Existing Commercial / Multi-Family & Right of Way Permits Engineering Inspection Fee .................................................... 3.3% of Value of Improvements Applies to Civil Site Improvements, such as Subdivisions, Commercial & Multi-Family Permits Engineering Inspection Fees are charged for each on-site inspection not specifically covered or included in a separate permit or inspection fee. Fee is charged per inspection and is in addition to the applicable Building Permit or other permit fees. Re-Inspection Fee ......................................................... $100.00/ea Plan Review/ Revision Fee ............................................. $100.00/hr Utility Engineer Review Fee .......................................... $120.00/hr Transportation Engineer Review Fee............................ $120.00/hr Stormwater Engineer Review Fee ................................. $120.00/hr GFC = General Facility Charge ESU = Equivalent Service Unit ROW = Right of Way ERU = Equivalent Residential Unit Refer also to General Facility Charges