Ordinance 37730006.900000
WSS /gjz
12/3/09
ORDINANCE NO. 3773
AN ORDINANCE OF THE CITY OF EDMONDS,
WASHINGTON, AMENDING THE COMPREHENSIVE PLAN
TO UPDATE THE CAPITAL FACILITIES ELEMENT FOR
2010 - 2015 AND FIXING A TIME WHEN THE SAME SHALL
BECOME EFFECTIVE.
WHEREAS, public participation programs were adopted for the 2009
Comprehensive Plan amendments by:
• Adoption of a public participation plan for the transportation plan as a part
of the City Council's approval of consultant contracts and scope of work;
• By Resolution No. 1206 adopting a public participation program for the
sustainability and capital facilities elements.
WHEREAS, the amendment to the Capital Facilities Plan 2010 -2015 (CFP) was
considered at public hearings before the Planning Board on November 4, 2009 and a public
hearing before the City Council on December 1, continued to December 15, and
WHEREAS, the City Council finds that both individually and collectively, the
proposed amendments to the Comprehensive Plan (including the adoption of the Community
Sustainability element as a new element to the Plan):
• Are consistent with the provisions of the Comprehensive Plan and are in
the public interest.
• Would not be detrimental to the public interest, health, safety or welfare of
the City;
{WSS752594.DOC;1 \00006.900000\ } - I -
• Would not impact or do not affect the appropriate balance of land uses
within the City.
• The City Council further finds that because the amendments do not amend
the map, the findings required by ECDC 20.01.001(D) are not applicable;
NOW, THEREFORE,
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO
ORDAIN AS FOLLOWS:
Section 1. The Edmonds Comprehensive Plan is hereby amended by the
adoption of the Capital Facilities Plan as amended.
Section 2. A copy of the amendment is attached hereto as Exhibits A and
incorporated by this reference as fully as if herein set forth.
Section 3. Effective Date. This ordinance, being an exercise of a power specifi-
cally delegated to the City legislative body, is not subject to referendum, and shall take effect
five (5) days after passage and publication of an approved summary thereof consisting of the
title.
ATTEST /AUTHENTICATED:
,'� '�d
CITY CLERK, SANDRA S. CHASE
APPROVED AS TO FORM:
OFFICE OF THE C1 1Y ATTORNEY:
BY
W. SCOTT SNYDER
APPRO ED:
MA OR IRY HAAKENSON
{WSS752594.DOC;1 \00006.900000\ } - 2 -
FILED WITH THE CITY CLERK: 12 -11 -09
PASSED BY THE CITY COUNCIL: 12 -15 -09
PUBLISHED: 12 -23 -09
EFFECTIVE DATE: 12 -28 -09
ORDINANCE NO. 3773
{WSS752594.DOC;1 \00006.900000\ } -3 -
SUMMARY OF ORDINANCE NO. 3773
of the City of Edmonds, Washington
On the 15th day of December, 2009, the City Council of the City of Edmonds,
passed Ordinance No. 3773. A summary of the content of said ordinance, consisting of the title,
provides as follows:
AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING THE
COMPREHENSIVE PLAN TO UPDATE THE CAPITAL FACILITIES ELEMENT FOR 2009
- 2015, AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE.
The full text of this Ordinance will be mailed upon request.
DATED this 16th day of December, 2009.
CITY CLERK, SANDRA S. CHASE
{WSS752594.DOC;1 \00006.900000\ } - 4 -
Affidavit of Publication
STATE OF WASHINGTON,
COUNTY OF SNOHOMISH } S.S.
F
„n
The undersigned, being first duly sworn on oath deposes and says that she is Principal Clerk of
THE HERALD, a daily newspaper printed and published in the City of Everett, County of
Snohomish, and State of Washington; that said newspaper is a newspaper of general
circulation in said County and State; that said newspaper has been approved as a legal
�o� t g90 newspaper by order of the Superior Court of Snohomish County and that the notice
On the 15th day of December, 2009, the City Council of the City
of Edmonds, passed Ordinance No. 3773. A summary of the con- Summary Of Ordinance
tent of said ordinance, consisting of the title, provides as follows:
AN ORDINANCE:OF THE CITY OF EDMONDS, WASHINGTON,
AMENDING THE COMPREHENSIVE PLAN TO UPDATE THE No. 3773
CAPITAL FACILITIES ELEMENT FOR 2009 - 2015, AND FIXING
A TIME WHEN THE SAME -SHALL BECOME EFFECTIVE.
The full fait of this Ordinance will be mailed upon request.
DATED this 16th day-of December, 2009.
CITY CLERK, SANDRA S. CHASE
Published: December 23, 2009.
VE
DEC 3 12009
Ax
Account Name: City of Edmonds
a printed copy of which is hereunto attached, was published in said newspaper proper and not
in supplement form, in the regular and entire edition of said paper on the following days and
times, namely:
December 23, 2009
and that said newspaper was regularly distributed to
Subscribed and sworn to before me this
day of December, 2009
c
during all of said period.
23rd
Notary Public in and for te Sta of 3 tas mo'``tet `R'"` o- t v� tt nohomish
County. max�VF�.i .
R3p`�.
, y <P'
Account Number. 101416 ; ^�9 {i,'_ geZdumber. 0001679505
n-T
6A 4A 0
... . . .... --- -, r- , i �g - - m - .
WD F — P
ny e9 'A io) A VI
rz
F GZx Y+9
td
�m vt Ln
14 C,
on
Ipg
tZ
z4
NIQ _a I,
1-4
vi
s
L9
12
72
L41
is
36 d A
IA t
2009-412-200 SW Edmonds 2 Robin hooddoc
MY OF EDMONDS
CAPITAL FACILITIES PROJECT DESCRIPTION
2009-412-200 SW Edmonds 3 238
CITY OF EDMONDS
CAPITAL F A,CltxrJES PROJECT E I
t
Pine St
.,
2009 12,- 204, diitot5 arslilOOyr,Hoodplaiii
200-4 1 2-200,FdiiioiidsMzrshCli�innel.Iiiiprov
��. �r�ts {i }t}tf
ti�,�4S i }iti�ti } S7a
s?,��}�
�,i�71��s.ir /��tlsz�7
2009 -4 t; -200 Daylight Willlow Creek iii it arina Beat h [park,'
CITY OF EDMONDS
CAPITAL FACILITIES PROJECT DESCRIPTION
u W : l rr nv-ill CreekHigh I$4,899
Flow Diversion and Habitat Resoration
ififIT
a
j
Prdi.ea.
#k
pCr
I ly
7"DESCRIPTION: Divert storm flow, via a storm drain system with direct discharge t
Puget Sound. Flows above base flow of the crash near the intersection of 7610 Ave West and
Olympic View Drive are to be directed to a 42" diameter storm drain that will travel: ti r1 1
north on 76"' Ave+i t to the entrance road of the I-ynnwood Treatment Pleat, and then travel
west along that road out to Puget Sound r ti ro : North alum I r�rpi i w rive, then
through the South County Park, across private property to Talbot Rd., connecting to an existing
diversion pipe for a direct discharge to Puget Sound,
rm PROJECT
IT RATIONALE: �The basin study report cites that sedimentation in the
upper reaches of the crash is caused by severe erosion frorn development -induced high peak
flows, especially in the County Park. By diverting storm flows directly to Puget Sound these
erosion and sedimentation impacts will be minimized. The lower stream channel,will b
improved for fish passage.
SCHEDULE: 1 - gt
COST BREAKDOWN
®2011u m rn
Plannin to
grigineerh', &Administration_ .. ..,_
Construction... n��
11for Art _
CITY
CAPITAL FACILITIES PROJEC DESCRIPTION
/� 2009412-20ON ell \(Wa /
ui
e-
O
N
C
O an
N v+
U
Y9 m O
Ewa
v« c
U
N
Q
m
U
iy� V 4
of N
h c+
4 w
N
I V
N
N
i ti 4
ti �i N
N M Yr UI
ft
O
L 4 dl � ✓3 !f �.
P�
A � � (( v �. ✓� t i a ei
!J rr 1 i
n
y t
r
y }
J
lw
t�
72
U
1
r
LL
>
iM
All
V1
� r
a�7 "3]
2
u E-lu"w iula ass
' ± a
e« ar
NO
47
T
r
,ll t
t9
Ll
i i bi :Ei [rl
i� --
;
rz F—
EM
Ul
t�
tl
Ja
54 1
y y�
� +� xa � .� •.� ;x `� crx , ; a � ;-'3 crs cr `, a >;, .-s � ',A
a
d m ra
Lj ca � � �. � �a ' cri
lid
lu
r
3
Z , -
73 3
Idt
5
� r.
w
NO
w
J •'• �s G
a�
6
Z, f`
IR a
Po
H�aai.
a�
CITY F EDMONDS
CAPITALFACILITIES PROJECT DESCRIPTION
CITY OF EDMONDS
CAPITAL FACILITIES PROJECT DESCRIPTION
CITY OF EDMONDS
CAPITAL FACILIVES PROJECT DESCRIPTION
-
q_
CITY OF EDMONDS
CAPITAL I ES PROJECT DESCRIPTION
i
CITY
CAPITAL FACILITIES PROJECT DESCRIPTION
T F EDMONDS
CAPITAL FACI[Lrrtus PROJECT DESCRIPTION
sir,, and ,Ti m T PROJEGT T. `,
Signal
BELL ST
MIN S T
rH r I E R
..__.
T
PROJECT DESCRIPTION, Install a serni-actuated traffic i n l with rnast arm supports at the W
intersection. Revise corner radii and provide new curb ramps. 1" Ave and Main St. are both
classified as: Minor Arterials. Deficiencies could also be addressed by removal f parking
along the entire length of 9th Avenue between the northbound approach of'' lnut and the
southbound approach of Main, and restriping so that this section of 9th`would be 4 lease wide.
This world result in two lease of traffic at the northbound and southbound stop -controlled
approaches of both intersections, This uld be implemented as an alternate solution, or as an
interim solution until traffic signal warrants are met,
m,.m.n �'°` O�..w_ LE' h int r ti rr i ntr ll d t p i n and -the
existing intersection LOS i (below the City's concurrencyCity' standards) and by 2015, The
installation will improve the t b 2025.
�s r in ring scheduled for 2014 and construction for 2015,
2025
la mint ter
Engineering
Administration
0
Construction
..�
% for Art
TOTAL , ,00
all or patt of this project may qualify for for the Arts,
�dr r tr-fir l � trrr°-it�iir�-�t3t i�rrt�1
* 'gV OF EDMONDS
CAPffAL FACILITIES C,DESCRIPTION
PROJECT NAME: 212 St. M (ij f6FA�ESTIMATED PROJECT COST: $2,314,000
VV
Int r tl n Irn n� 21t ._
212
.. --
PROJECT DESCRIPTION* Widen � Av. W to add a northbound left tram lane for '
storage length th and a southbound left turn lane for 1 x storage length. Provide protected left
tarn phase for northbound and southbound movements. Widen 212th to add a westbound right
turn leas for ' storage length.
PROJFGT G BENEFITI _T O L. Reduce the delay t the signalized intersection and
improve the LOS at the Intersection. The hint intersection LOS is D and F (below City'
concurrency standards) by 2015,
SCHEDULE Engineering scheduled for 2015, project is dependent upon
...receiving SWOT
2015 2016--
nnln 1 _t
Engineering
n r. ,000
Administration „w T
n tru ti y y
1 % for Art
TOTAL
All or a portion of this roje t may quality for'°k% for the arty
CITY OF EDMONDS
2009 -2015 132 Int rUrba 1 "1 rail
20M:2015 Madmia Ele School
CITY OF EDMONDS
CAPITAL FACILITIES PRA J, CT DESCRIPTION
CITV OF EDMONDS
CAPITAL FACILITIES PROJECT DESCRIPTION
CITY F EDMONDS
CAPITAL FACILITJES PROJECT DESCRIP110N
®l l rrl tt ri x i`1 : $73,000
k" 1
l t t between A. and a
FIB
Y ' I" lam" o, r) c 1 s A n d t''r or} C e n : ),,
<
qq.
IV m_
I
MAPLE ST
.. � DESCRIPTION., ... Construct missing link (approximately 250') n i ton
between ttz v. n t" , S (ranked #2 in Short Walkway Project list in 2009 Transportation
In
...0 . ,....T provide a safe and ,. desirable lkin route.
.,
ngineering scheduled for 2014 and construction for 2015
COST BREAKDOWN
PROJECT COST 2010 2011 2012 2013 2014 2015
2,016-
m
Engineering & $10,000
Administration
Construction ,
TOTAL $10,000 $613,000
all or pad of this ro t n7ay qualify for 1 % for tha Arts.
2010-2015 Dayton St Walkway
2010-2015 2261,h St, SW Walkway
all or part of this Project may qualify for IV. for tile ArtS
2009-2015 132 4th Avenue Cultural Corridor
CITY OF EDMONDS
CAPITAL FACILITIES PROJECT DESCRIPTION
Corridor: Planning
; J t�7" CRI-P 0 : -Begin 11h Avenue site design phase 2 for public right of play to build on
phase 1 2009 design and implementation plan to minirnum30% engineering.
Construction phase to start 2015.
4W BENEFIT/ RATIONALE: w_ The corridorimprovements in the public right of way will
encourage pedestrian traffic & provide a strong visual connection along t" Ave. Improvements will
enhance connectivity as an attractive walking corridor & contributet ► the economic vitality in the
downtown by encouraging the flog of visitors between the downtown retail & the Edmonds Center for
the Arts. Timing for % design glues is crucial as the City addresses Utility projects in the area & will
assist the City in the process of identifying & acquiring funding urc for the project Implementation
COST BREAKDOWN
PROJECTCOST 1 2012 2013 2014 20160
2
Engineering nn
Administration
Con ruction $1000,000 $4,175,000
r rt
all or part of this r j ttt y tllr lif for 1 for the Atli
2009-2015 132 4th Avenue Cultural Corridor Plai riing
o
0
MEL
hA
V1
.. ..
.. ...... ...
l
S
hr
.
.. ...
.........
.. .....
....
... ........
.. . .
......
�
Iz
.
. . .
..........
!fl
0
C,
C,
C11
0
0
0
0
0
Q
41
711
J2
CL
. .
....
. ...
CL
1
E
2010-2025 CFP AqLlatiC CClItCl'
CITY
CA11TAL147ACILITIES PLAN DESCRIPTION
2010-202i UP Art Center,Art Museum
2010-2025 CFP boys Girts Club Huildio
60
p
a
*all or p rt of this project may qualify tear` 1 for the Arts,
2010-2025 CFP Edniorid&Snolsic f,ibrar
ltd- 025 CFP 1; rm rWoodwayfl ,Improv ment
CITY EDMONDS
,I- all or part, of ti-ll r j r t may qualify for I c r the Arts;
*1 all or part of this project may qualify for 1 for the Ails,
viz., r
.
lq� a arn4
MAN
e�y
Pubp n.ma
o-�
d
I viv LW rice. I