Ordinance 3878iiiiiiiiiii�illillillillillill �:1 6 1
wozomor,mi
works construction projects with an estimated cost of Two Hundred Fifty Thousand Dollars
are more appropriate for public works construction projects that are estimated to cost more an
the $300,000 dollar amount threshold for small works roster contracts, as that amount is
subcontractors, be completed by contractors when submitting their bid documents;
wo =6
Utilization Plan form to be submitted by the successful bidder after the contract award has been
no
WHEREAS, ECDC MK050(B)(3) currently requires that the Apmenticesh
Utilization Form include the identification of individual apprentices by name and Washington
State Apprenticeship registration number, an estimate of the total number of apprentice labor
hours, and the identification of apprentice hours to be worked by minorities, women, persons
at the beginning of the public works project, it is more appropriate to include this information in
the Monthly Apprentice Utilization Report, to be submitted • the contractor at the conclusion •
WHEREAS, the City wishes to clarify the intent • the Failure to Meet Utilization
rgp���� � I I � � � 1 11 � I � I � I � �� 1 1 � � � � �� � I � 1 � � I a
t M I I I I CHIP I
WHEREAS, the City wishes to clarify that the provisions of this ordinance shaa
not apply to the extent that they are deemed to be in conflict with state or federal grant funding
requirements; NOW, THEREFORE,
.1
aection 1. Section l&00.050 • the ECDC Apprentice Requirements is hereby
18.00.050 Apprentice Requirements.
This section is intended to supplement, and to • followed in conjunction with, the City
of Edmonds Purchasing Policies and Procedures, dated January 201209, or as amended�
A. Definitions.
1. "Apprentice" means an apprentice enrolled in a state-approved apprenticeship training
program.
2. "Contractor" means a person, corporation, partnership, limited liability company, •
joint venture entering into a contract with the city to construct a public work.
G .
3 � "Labor hours" refers to the total number of hours worked by workers receiving an
hourly wage who are directly employed on the site of the public work and who are
subject to state or federal prevailing wage requirements. "Labor hours" shall also include
lillip
OTIMIRP, lime,
IN m =1 �
c. The reasonable . • necessary requirements of • . render p -
utilization • le at the required
members d. In order to meet the requirement, the contractor will be forced to displace
of i •
Section 2. Severabilijy. If any section, sentence, clause or phrase of this
Section 3. Effective Date, This ordinance, being an exercise of a power
APPROVED:
M110 0 MA,
ItITY CLERK, SANDRA S. CHASE
BY
JEFFREY B. TA DAY
FILED WITH THE CITY CLERK: 03-30-2012
PASSED BY THE CITY COUNCIL: 04-03-2012
PUBLISHED: 04-08-2012
EFFECTIVE DATE: 04-13-2012
ORDINANCE NO..3878
On day of r ril, 2012, the City Council of of • • •
passed Ordinance No. ; of • of . • ordinance, • of
the title, provides as f• •.
0
CITY CLERK, SANDRA S. CHASE
STATE OF •
COUNTY OF • ..
The undersigned, being first duly sworn on oath deposes and says that she is Principal Clerk of
THE HERALD, a daily newspaper printed and published in the City of Everett, County of
Snohomish, and State of Washington; that said newspaper is a newspaper of general
circulation in said County and State; that said newspaper has been approved as a legal
newspaper by order of the Superior Court of Snohomish County and that the notice
SA mmory of Ordinance No 3878
a printed copy of which is hereunto attached, was published in said newspaper proper and not
in supplement form, in the regular and entire edition of said paper on the following days and
times, namely:
April 08, 2012
and that said newspaper was regularly distributed to its subscribers during all of said period >
_tea
I'ratrclpa `Ncrlt
Subscribed and sworn to before me this 9th
day of April, 2_012
Notary Public in for the State of Washington, reSullup 1 t l tieG tt, Ss�taltWinod
County.
r
Account Name: City of Edmonds Account Number 101416 Order Number. 0001773883