Loading...
Ordinance 3906AN ORDINANCE OF THE CITY OF EDMONDS ' WASHINGTON, ADOPTING AMENDMENTS TO THE CAPITAL FACILITIES PLAN ELEMENT OF THE COMPREHENSIVE PLAN; AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. WHEREAS, on September 11, 20129 the Planning, Parks and Public Works Committee reviewed the proposed 2013-2018 Capital Facilities Plan and Capital Improvement MU-IM and Capital Improvement Program were presented to the Council for review and discussion; ang FUZITINS Wrpdatc for 2013-2018 to the City's Comprehensive Plan and Capital Improvement WHEREAS, the City Council is considering the proposed amendments to the Capital Facilities Plan in conjunction with all Comprehensive Plan amendments docketed for Imam WHEREAS, the City Council expressly finds that, consistent with the 1111111 IIIHN1111 III iii�i��ill��l��'i� have been considered by the City Council concurrently, that the City Council ascertained n cumulative effect of the various proposals, that the City Council finds the changes to be internally consistent, and that their cumulative effect is consistent with the purpose and intent of — IMETTOTORM Section 1. The Capital Facilities Plan element of the Edmonds Comprehensive Nffl�hereby amended to read as set forth in Exhihit A, which is attached hereto and �)ection 2. Effective Date. This ordinance, being an exercise of a power R IT= M. NOW LM I I) -'aww" GMGMGM W."W"41 M FILED WITH THE CITY CLERK: 12 -14 -2012 PASSED BY THE CITY COUNCIL: 12 -18 -2012 PUBLISHED, 12 -23- 2012 EFFECTIVE DATE: 12 -28 -2012 ORDINANCE NO. 3906 m On the 18th day of December, 2012, the City Council of the City of Edmonds, passed Ordinance No. 3906. A summary of the content of said ordinance, consisting of the title, provides as follows: AN ORDINANCE • THE CITY OF EDMONDS, WASHINGTON, ADOPTING AMENDMENTS TO THE CAPITAL FACILITIES PLAN ELEMENT OF THE COMPREHENSIVE PLAN; AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. The full text of this Ordinance will be mailed upon request. DATED this 19th day of December, 2012. M CITY OF EDMONDS CAPITAL FACILITIES PLAN ELEMENT 2013-2018 2 WHO ol IkL?Al 0 d LL a U v c p c m. O d V d N o Li 0 Y 10 0. e m � 0 U O z � d W � 0 0 0 0 a G U c c U N C O w N ®'c O � U C L O E r ,LU sue.- E E d O v 0 N Q d U U 4 U D PE O IW 7i A LL U Y o v c c, w �r r ® °o °o 0 � w w d a O O O 9 L d w d N } W ® E G D CJ CJ G7 f- c 3 I � � t0 N G O C N A O O g Y � N a E � C � U A � p EZ G � i N t0 C N � O U � d E 4 U D PE O IW 7i A LL U Y " all or part of this Project may qualify for 1 % for the Arts 5 CITY OF EDMONDS CAPITAL FACILITIES PLAN DESCRIPTION PROJECT NAME: Art Center / Art Museum ESTIMATED PROJECT COST: $5,000,000 6 CITY OF EDMONDS DESCRIPTION CAPITAL FACILITIES PLAN F ROJECT NAME: Boys Z • Building i • 111111 CITY OF EONS CAPITAL FACILITIES PLAN DESCRIPTION PROJECT NAME: Civic Playfield Acquisition ESTIMATED PROJECT COST: $5 and/or Development 6" Street N. and Edmonds Street, Edmonds City limits, Snohomish County 8.1 acres / property owned and leased from Edmonds School District until 2021 Community Park/Zoned Public PROJECT DESCRIPTION: Acquire or work with the School District to develop this 8.1 acre property for continued use as an important community park, sports tourism hub and site of some of Edmonds largest and most popular special events in downtown Edmonds. PROJECT BENEFIT/ RATIONALE: Gain tenure and control in perpetuity over this important park site for the citizens of Edmonds. SCHEDULE 2013-2025 COST BREAKDOWN PROJECT COST 2013 2014 2015 2016 2017 2018 2019-2025 Plannin /Stud En . & Adin. Construction 1 %® for Art TOTAL Unknown all or part ofthis project may qualify for l % for the Arts 8 CITY OF EDMONDS CAPITAL FACILITIES PLAN DESCRIPTION PROJECT NAME: Edmonds /Sno -Isle Library ESTIMATED PROJECT COST: Unknown CITY OF EDMONDS CAPITAL FACILITIES PLAN DESCRIPTION PROJECT NAME: Community Park / Athletic ESTIMATED PROJECT COST: $6,000,000 - Complex at the Former Woodway High School $8,000,000 10 CITY OF EDNS CAPITAL FACILITIES PLAN DESCRIPTION PROJECT NAME: Parks & Facilities ESTIMATED PROJECT COST: $3 -$4 Million Maintenance & Operations Building Perimeter zone = 4,200 sf * all or part of this project may qualify for 1% for the Arts. 12 all or part of this project may qualify for 1 % for the Arts 13 CITY of EDMONDS CAPITAL FACILITIES PROJECT DESCRIPTION PROJECT NAME: Public Market (Downtown ESTIMATED PROJECT COST: $5,000,000 Waterfront ' all or part of this project may qualify for 1 % for the Arts. 14 LCU i N 4exil-loo wei ta rm"I N- 1-930 ER ro ° v v � j � U — � a 19 LL LL V ® m r n 4 C v N U m 16 o ua vs ry r ni m m r n � o 0 0 o., R W: � v all � U W � G 9 � m`m LL v u LL O � N ut � � w O C 41 C A U' a 0 d O ^• � N L d O o d C d `o C J a d� a L O D d y E m °m a a � U u ca N, s m L o W Q N co d tV R d N 1C N N O' N C N i m Eo N. m � N h tNa N r n v y '� O, LL C.. N. do U7 } 4n an O a iy o a 0 IL Y v LL E w c o' 'O 97 O N lO � O 'v c m O �+ LL . fp U N 0 m U N G C 0 � G O ® 0 O p 49 r ry N 9 U E O OI O U 7 a of O O C � J v C v <E +. uJE � L G N � ro ° v v � j � U — � a 19 LL LL V ® m r n 4 C v N U m 16 o ua vs ry r ni m m r n � o 0 0 o., R W: � v all � U W � G 9 � m`m LL v u LL O � N ut � � w O C 41 C A U' a 0 d O ^• � N L d O o d C d `o C J a d� a L O D d y E m °m a a � U u ca as a � c} s m L o w N i m Eo C� x CB O c � N U7 } 4n an O a iy o a E U- AL 0 E IL `.§§.m Lu = osr- #LL CL 0 B t; 17 o b o O o O r r m m N N Kl N O O O O O O ® o N N � M a ` p p W a d C p LL a ro m` d a lL W v v 0 0 0 0 � w v 0 U so � N p W a � d 0 " a o m U c +�. E. o4pii c � o W ro c c p `so pv a ro w E Ew t co CO an o > a o CS b 0 9 N N M M w w a as d � U fU 3 & p y4 N v C W A n" a, a, a LL � 0 0 0 0 a o m n v a U m i7 e 0 a 0 irn 'o Y 3 a v a c o a c 0 N E A E D 1b O O 4 O: m rn' ex w o °o m ca ci m w w' d QF G D � v V v �^ tL 0 0 b.!ri o o -u5 F!3 ® w fA w 0 4 m ti m ae U' d Q '^ U 0 w a m 0 e a y c o Q at ro v a u o v is b A E 3 4 � � a ul1 -C] 6 N tf! ti O N 8 N N 8 N O N m V m n o o m � � � N u} G LL a .o u L ro a _ W ._9 Q.a a '..LL d v � N c o V W �+ '2 M i0 0 _ ..0 0 O m O N IL.0 .... °� 4 0 a U N a m on ow m ry C W U m! 0 m w U •C O w ro c 0 � � ip a c o ` � a Ll 7 wU u d• w m -aoc$ o b o O o O r r m m N N Kl N O O O O O O ® o N N � M a ` p p W a d C p LL a ro m` d a lL W v v 0 0 0 0 � w v 0 U so � N p W a � d 0 " a o m U c +�. E. o4pii c � o W ro c c p `so pv a ro w E Ew t co CO an o > a o CS b 0 9 N N M M w w a as d � U fU 3 & p y4 N v C W A n" a, a, a LL � 0 0 0 0 a o m n v a U m i7 e 0 a 0 irn 'o Y 3 a v a c o a c 0 N E A E D 1b O O 4 O: m rn' ex w o °o m ca ci m w w' d QF G D � v V v �^ tL 0 0 b.!ri o o -u5 F!3 ® w fA w 0 4 m ti m ae U' d Q '^ U 0 w a m 0 e a y c o Q at ro v a u o v is b A E 3 4 � � a ul1 -C] E, LL c m o o a a E N c L1 N 0 = m O .0 A 0 0 0 «. LL Q N U � c m U 19 E U � N v � � .. �..'2 O 0. d O E w r- = D 2 N LLJ_'�M O 'Z3 �+ lL a N A m H m U a ® p 9 9t N J � U tU J 65.E `p a :S J n v w v LL LL 0 0 00 as vs vs ur � a m U O cy C � SO O ep N w O E E Y (® 10 W UL. � 10 9D d O C ILL � t i� it O W OD ai O � Y j� im 61 RV Q a ®' Q v N N w m N N 4 W d U i5 Q3 p � y � m ro d LL � v LL a o' o a m n a» er m a w O U w O (9 L � � C OD p tS a 0 d - o a O @Y U � p G� _ C Y 40 3 'p � U N O m d ® C 0. a p >A p C 9 !Al 4 � Q L r W 1. 20 PROJECT NAME: 212 St. SW -6-8-4-"' Ave. ESTIMATED PROJECT COST: $3,604,260 W (5- Corners) Intersection Improvements jflkY q� r� 22 ffi G w' i �;S CAPITAL FACILITIES PROJECT DESCRIPTION PROJECT NAME: 76 Ave W @ 212 St. SW ESTIMATED PROJECT COST: $2,923,000 Intersection Improvements r i N Y ## m�U4 Ic C INIC' m� r Arbor r{ , T to } f- w %AIla anx a t 2127H ST S HIGH SCHOOL 212th St Plaza ' OFFICE' ARTS s 24 CITY of EDMONDS CAPITAL FACILITIES PROJECT DESCRIPTION PROJECT NAME: 220 St SW @ 76 Ave W ESTIMATED PROJECT COST: $173,000 �i PROJECT DESCRIPTION: 1) Extend 228" St across the unopened right -of -way to 76th Avenue West 2) Signalize the intersection of 228th St SW @ SR99 and 228th St. SW @ 76th Ave. West 3) Construct a raised median in the vicinity of 76th Avenue West. 4) Add illumination between 224th St SW and 228th St SW on SR 99 - 5) Overlay of 228th St. SW from 80th Ave. W to — 2,000' east of 76th Ave. W. (ROADWAY ROJECT PRIORITY in 2009 Transportation Plan: #1), PROJECT BENEFIT/ RATIONALE: The project will improve access/ safety to the 1 -5 / Mountlake Terrace Park & Ride from SR99. This east /west connection will reduce demand and congestion along two east- west corridors (220th Street SW and SR104). Roadway safety will also be improved as SR 99/ 228th Street SW will become a signalized intersection. The accident -prone left turns from SR99 to 76th Ave. W. will be restricted with the addition of a raised center island. SCHEDULE: Engineering and ROW acquisition scheduled for completion by 2014. Construction scheduled to start in 2014. In 2010, federal grant was secured for the completion of design and ROW acquisition. In 2012, a federal grant was secured for construction. COST BREAKDOWN PROJECT COST 2013 2014 2015 2016 2017 2018 Plannin /Stud Engineering, $719,700 $255,275 Administration, and ROW Construction $3,818,000 1 % for Art TOTAL $719,700 $4,073,275 *All or a portion of this project may qualify for 1 %o for the arts 26 PROJECT DESCRIPTION: Install traffic signal (the intersection currently stop controlled for all movements). (ROADWAY ROJECT PRIORITY in 2009 Transportation Plan: #9). PROJECT BENEFIT / RATIONALE: The improvement will reduce the intersection delay. By 2015, the Level of Service will be F, which is below the City's concurrency standards (LOS D) The improvement would modify the Level of Service to LOS B. 27 K 184f,H ST SW SEAVIEW' PARK POST OFFICE TOLEFSON' ®-- (85TH sT;�ty Z � � "* MARKET °7519, pC 185TH PL S`M I; c 0 ' ,iVILLE PERR €N 186TH 5T SW PROJECT DESCRIPTION: Install traffic signal (the intersection currently stop controlled for all movements). (ROADWAY ROJECT PRIORITY in 2009 Transportation Plan: #9). PROJECT BENEFIT / RATIONALE: The improvement will reduce the intersection delay. By 2015, the Level of Service will be F, which is below the City's concurrency standards (LOS D) The improvement would modify the Level of Service to LOS B. 27 tngineering & PL,U'FL,UUU Administration Construction $8,169,000 1 % for Art TOTAL $10,211,000 all or part of this project may qualify for 1 % for the Arts. 28 { PROJECT DESCRIPTION: Widen 220 St. SW to add Westbound right turn Kane for 325' storage length. Widen SR-99 to add 2"d Southbound left turn lane for 275 storage length. (ROADWAY ROJECT PRIORITY in 2009 Transportation Plan: #10), PROJECT BENEFIT/ RATIONALE: Improve intersection delay from 72 seconds (w/o improvement) to 62 seconds (w/ improvement) in 2015. SCHEDULE: Engineering and Construction are scheduled between 2019 and 2025 (unsecured funding). COST BREAKDOWN PROJECT - 2013 2014 2015 2016 2017 2018 2019-2025 COST Planning/Study Engineering & $786,000 Administration Construction $3,146,000 1 % for Art TOTAL $3,932,000 29 30 31 CITY OF EDMONDS 32 DAYT >. 32 33 lu � < \ /& w.00 m� \ \ \\ \ u\ CEDAR ST 33 34 CITY OF EDMONDS CAPITAL FACILITIES PROJECT DESCRIPTION NAME: Main St. Pedestrian Lighting ESTIMATED PROJECT COST: =PROJECT ve. to 6th Ave. $1,714,600 elf SPRAGUE ST Boy's & Girls Skate Park Club r civic Center A W PUBLIC �' SAFETY Grandstand COMPLEX J BELL ST �v 514 529 'N ST r 1u's SNO4SLE N 111 UORARY 660 DAYTON ST �< 34 CITY OF EDMONDS TBD PROJECT DESCRIPTION 35 CITY OF 1 t 1 $32,000 37 CITY OF EDONDS CAPITAL FACILITIES PROJECT DESCRIPTION PROJECT NAME: Maple St. from 7 Ave. ESTIMATED PROJECT COST: $63,000 S to 8th Ave. S Walkway 38 PROJECT DESCRIPTION: Construct a missing link (approximately 250') on Dayton St. 39 PUBLIC ...SAFETY lot e Park C yWd 40 alt or part of this project may quarry ror 7% ror the Arts; 41 CITY OF EDMONDS CAPITAL FACILITIES PROJECT DESCRIPTION CITY OF EDONDS CAPITAL FACILITIES PROJECT DESCRIPTION PROJECT NAME: Walnut from Ave. S to 4 ESTIMATED PROJECT COST: $220,000 Ave. S Walkway ' all or part of this project may qualify for ? 1 for the Arts. 44 3 HE MA RINGR t.. .... _ ALDER ST BECK'S , CO D ORE W LU INK WALNUT 5i Now 502 504 GREGORY 30 „gPancake` fi Baus HOLLYDR 40 46 0 '- UJ 525 HOWELL WA UJ ' all or part of this project may qualify for ? 1 for the Arts. 44 45 CITY OF EDMONDS CAPITAL FACILITIES PROJECT DESCRIPTION PROJECT NAME: 238 St. SW from 100 ESTIMATED PROJECT COST: $436,000 Ave. W to 104th Ave. W E � W 0: COMM N LIBRARY 23 ,5P'LW BASEBALL - I FIELD 23 TO 42 X36R11 px,s4i OLD WOODWAY HIGH SCHOOL i 236TH PL SW HICKMAN PARK' _ 0 a I y a. �I 23 " 237TH PL S17 ji ' 238TH si Sw d� o 23ST11 ST SW ' all or part of this project may quality for 1 % for the Arts 46 CITY OF r • r CAPITAL • DESCRIPTION 47 CITY OF EDMONDS CAPITAL FACILITIES PROJECT DESCRIPTION PROJECT NAME: 189 PI. W from 80 Ave. W ESTIMATED PROJECT COST: $175,000 to 78th Ave. W Walkway 48 4 IBM PL SY✓ U f 186TH ST SW 187TH PL SW � C 187TH ST W J I } 1ST ST Sw i i uj FL w i p SEAVIEW ELEMENTARY Ego CITY OF EDMONDS CAPITAL FACILITIES PROJECT DESCRIPTION PROJECT NAME: 2381 St. SW from Hwy. 99 to ESTIMATED PROJECT COST: $1,050,000 76th Ave. W Walkway zrtiCPd $YC75 EPdOOK ' # Q - 2360 v R AURORA 23637 S MARKETPLACE Ir U S. FAIT LY PAIICANE V 238TH ST SW s I oft SEOUL PLAZA r I tea TRAVEL LODGE � ST. FRANCI51 ILAC0TIST£ HOTEL C h7 s i j i HSE K B E..MOTEI I LOTTE GIFTS u.r v Nui� yr .. ..v Nr �........uy yu,.r..� .... ........ .. ...... .... 50 CITY OF EDMONDs CAPITAL FACILITIES PROJECT DESCRIPTION PROJECT NAME: Residential Neighborhood ESTIMATED PROJECT COST: Varies Traffic Calmin PROJECT DESCRIPTION: The traffic calming program is designed to assist residents and City staff in responding to neighborhood traffic issues related to speeding, cut -through traffic and safety. PROJECT BENEFITI RATIONALE: Allows traffic concerns to be addressed consistently and traffic calming measures to be efficiently developed and put into operations. SCHEDULE: annual program COST BREAKDOWN PROJECT COST 2013 2014 2015 2016 2017 2018 Planning/Study Engineering & $1,000 $1,000 $1,000 $2,000 $2,000 $2,000 Administration Construction $9,000 $9,000 $9,000 $23,000 $23,000 $23,000 1 % for Art TOTAL $10,000 $10,000 $10,000 1 $25,000 $25,000 �$25,000 all or part of this project may qualify for 1 % for the Arts. 51 CITY OF EDMONDS CAPITAL FACILITIES PROJECT DESCRIPTION PROJECT NAME: 15 St. SW from Edmonds ESTIMATED PROJECT COST: $371,000 Way _to 8th Ave. S all or part of this project may qualify for 1% for the Arts 52 i 226TH ST SW 47 '. 157'F$ ST S1+d 226i}9 PL SW - f EDMONDS MEMORIAL CEMETERY ' ROSEWOOD CT i SUNRISE TACO BELL ANTIQUES BLOCKBUSTER ' BALLFIELDS I PARKING tat PARKING : SHERWOOD QFC ELEM. SCHOOL y Cao Z Y PARKING y9t_ a all or part of this project may qualify for 1% for the Arts 52 m i r-I p N' Q a N N Q O -- m w 15 `oo' LL c `o to o g m "Eo..o w o w LL V Y N r.. iN ii i0 Q N N e7 a» a»ao O'O O° � m s» co �o i0 Q a» esco 13 R d o E rnac W Q1 N m 5 cc E m iL ®. °3 GO O U CO & , CL ca U D� d e d47 c � 3 J C no .. U I& E ® u N 6L da G O O OD N YJ� n N Ud U °muc a= o lof E n do vo c ws ,_,.cn u m c ro L o o cof c o:U in 3. Future expenses reflect the following annual inflation rates: 2013 4 %; 2014 4 %; 2015 4 %; 20164 %; 2017 4% ;2018 -3% 55 2. Total costs are in 2012 dollars. 3. Future expenses reflect the following annual inflation rates: 2013 4 %; 2014 4 %; 20154 %0; 2016 4 %; 2017 4% 2018 -3% 56 1 1 1 1 Project area along 93`d Pl W, south of 2201 St SW 57 CITY of EDMON S CAPITAL FACILITIES PLAN DESCRIPTION PROJECT NAME: Lake Ballinger Associated ESTIMATED PROJECT COST: $700,000 Proiects — SSWCPI Proiect 7 2. Total costs are in 2012 dollars. 3. Future expenses reflect the following annual inflation rates: 2013 4 %;2014 4 %; 2015 4 %; 2016 4 %; 2017 4 %; 2018 -3 % 58 CITY OF EDMONDS CAPITAL FACILITIES PLAN DESCRIPTION PROJECT NAME: Edmonds Marsh /Shellabarger ESTIMATED PROJECT CC Cr/Willow Cr — SSWCP' Projects 12 & 13 Edmonds Marsh as seen from the viewing platform. $8,931,000 www.tinocatedmoi,ids,info/clean-un/gaiterv.t)ht), Perrinville Creek Channel illustrating the channel incision that will be addressed by restoration. STATE OF WASHINGTON COUNTY OF SNOHOMIS S.S. The undersigned, being first duly sworn on oath deposes and says that she is Principal Clerk of THE HERALD, a daily newspaper printed and published in the City of Everett, County of Snohomish, and State of Washington; that said newspaper is a newspaper of general circulation in said County and State; that said newspaper has been approved as a legal newspaper by order of the Superior Court of Snohomish County and that the notice Sura mary of Ordinance No. „3906 a printed copy of which is hereunto attached, was published in said newspaper proper and not in supplement form, in the regular and entire edition of said paper on the following days and times, namely: December 23, 2012 and that said newspaper was regularly distributed to its subscribers during all of saidperiod. Subscribed and sworn to before me this 24th day of December, 2012 r Notary Public in and for the State or Washint on, residing at Everett, Snohomish County. Account Name: City of Edmonds Account Number: 101416 Order Number: 0001505397