Loading...
Ordinance 4014ORDINANCE NO. 4014 AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING THE BUDGET FOR FISCAL YEAR COMMENCING JANUARY 1, 2016; ADOPTING AMENDMENTS TO THE CAPITAL FACILITIES PLAN ELEMENT OF THE COMPREHENSIVE PLAN; AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE WHEREAS, on or before the first business day in the third month prior to the beginning of the fiscal year of 2016, the Finance Director submitted to the Mayor the estimates of revenues and expenditures for the next fiscal year as required by law; and, WHEREAS, the Mayor reviewed the estimates and made such revisions and/or additions as deemed advisable and prior to sixty days before January 1, 2016, filed the said revised preliminary budget with the City Clerk together with a budget message, as recommendation for the final budget; and WHEREAS, the City Clerk provided sufficient copies of such preliminary budget and budget message to meet the reasonable demands of taxpayers therefore and published and posted notice of filing and the availability of said preliminary budget together with the date of a public hearing for the purpose of fixing a final budget, all as required by the law; and WHEREAS, the City Council scheduled hearings on the preliminary budget for the purpose of providing information regarding estimates and programs; and WHEREAS, the City Council did meet on November 2, 2015 which was on or before the first Monday of the month next preceding the beginning of the ensuing fiscal year, for 2016 Budget Ordinance Page 1 the purpose of fixing a final budget at which hearing all taxpayers were heard who appeared for or against any part of said budget; and WHEREAS, the city council also held budget hearings on November 24, 2015 and December 1, 2015; and WHEREAS, following the conclusion of said hearing the City Council made such adoptions and changes as it deemed necessary and proper; WHEREAS, on September 22, 2015, City Council reviewed the proposed 2016- 2021 Capital Facilities Plan and Capital Improvement Program; and WHEREAS, the Capital Facilities Plan and Capital Improvement Program were presented and a Public Hearing was held before the Planning Board on October 14, 2015; and WHEREAS, on October 27, 2015, a Public Hearing on the Capital Facilities Plan Update for 2016-2021 to the City's Comprehensive Plan and Capital Improvement Program was held; and WHEREAS, on November 24, 2015, City Council discussed the Capital Facilities Plan Update for 2016-2021 to the City's Comprehensive Plan and Capital Improvement Program; and WHEREAS, the City Council expressly finds that, consistent with RCW 36.70A.130, the adoption of these amendments to the Capital Facilities Plan concurrently with the adoption of the City's 2016 budget meets one of the permissible exceptions to the general rule requiring concurrent review of all amendments to the City's Comprehensive Plan, NOW, THEREFORE; THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO ORDAIN AS FOLLOWS: 2016 Budget Ordinance Page 2 Section 1. Attached hereto and identified as Exhibit A, in summary form, are the totals of estimated revenues and appropriations for each separate fund and the aggregate totals for all such funds combined, and by this reference said Exhibit A is incorporated herein as if set forth in full and the same is hereby adopted in full. The Finance Director is authorized to update year-end fund balances in the final budget document as projected prior to printing the final budget document. Section 2. A complete copy of the final budget for 2016, which is also hereby adopted by this reference, together with a copy of this adopting ordinance shall be transmitted by the City Clerk to the Division of Municipal Corporations of the Office of the State Auditor and to the Association of Washington Cities. Section 3. The Capital Facilities Plan element of the Edmonds Comprehensive Plan is hereby amended to read as set forth in Exhibit B, which is attached hereto and incorporated herein by this reference as if fully set forth herein. Section 4. This ordinance is a legislative act delegated by statute to the City Council of the City of Edmonds, is not subject to referendum and shall take effect five (5) days after passage and publication of an approved summary thereof consisting of the title. API OVED: YOR, DAVID O. EARLING ATTESTIAUTHE. ATE: CIT ERK, S D SEY APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY: 2016 Budget Ordinance Page 3 BY CITY XTTORNEY, JEFFREY TARADAY FILED WITH THE CITY CLERK: December 11, 2015 PASSED BY THE CITY COUNCIL: December 8, 2015 PUBLISHED: , December 13, 2015 EFFECTIVE DATE: December 18, 2015 ORDINANCE NO. 4014 2016 Budget Ordinance Page 4 SUMMARY OF ORDINANCE NO.4014 of the City of Edmonds, Washington On the 8th day of December, 2015, the City Council of the City of Edmonds, passed Ordinance No. 4014. A summary of the content of said ordinance, consisting of the title, provides as follows: AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING THE BUDGET FOR FISCAL YEAR COMMENCING JANUARY 1, 2016; ADOPTING AMENDMENTS TO THE CAPITAL FACILITIES PLAN ELEMENT OF THE COMPREHENSIVE PLAN; AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE The full text of this Ordinance will be mailed upon request. DATED this 9th day of December, 2015. Cl LERK, SCO T Z6.%KEY 2016 Budget Ordinance Page 5 EXHIBIT "A" 2016 BUDGET SUMMARY BY FUND Fund No. Fund Description Revenue Expenditure Difference (Rev - Exp) * 001 General Fund $ 39,266,670 $ 39,733,780 $ (467,110) 009 LEOFF Medical Insurance Reserve Subfund 278,770 279,480 (710) 011 Risk Management Reserve Subfund 6,660 - 6,660 012 Contingency Reserve Subfund 28,110 800,000 (771,890) 014 Historic Preservation Gift Fund 5,000 5,400 (400 016 Building Maintenance Subfund 1,680,000 1,754,000 (74,000) 104 Drug Enforcement Fund 153,000 76,030 76,970 111 Street Fund 1,760,500 1,712,370 48,130 112 Street Construction Fund 5,290,850 5,311,460 (20,610) 117 Municipal Arts Acquisition Fund 102,410 181,380 (78,970) 118 Memorial Tree Fund 110 - 110 120 Hotel/Motel Tax Fund 82,150 149,650 (67,500) 121 Employee Parking Permit Fund 21,390 26,880 (5,490) 122 Youth Scholarship Fund 5,550 3,000 2,550 123 Tourism Promotional Arts Fund 27,530 31,500 (3,970) 125 REET 2 1,108,000 1,523,650 (415,650) 126 Special Capital/Parks Acquisition 1,102,000 1,934,390 (832,390) 127 Gifts Catalog Fund 46,900 44,950 1,950 129 Special Projects Fund 280 - 280 130 Cemetery Maintenance/imp. Fund 177,260 210,370 (33,110) 132 Parks Construction Fund 2,037,240 2,100,000 (62,760) 136 Parks Trust Fund 630 - 630 137 Cemetery Maintenance Fund 19,880 - 19,880 138 Sister City Commission Fund 12,010 12,500 (490) 139 Transportation Benefit District Fund 682,500 682,500 - 211 LID Control Fund 14,400 14,400 - 213 LID Guaranty Fund 14,400 - 14,400 231 2012 LTGO Debt Service Fund 677,380 677,380 - 232 2014 De bt Se rvi ce Fund 949,540 949,540 421 Wa te r Uti I ity Fu nd 8,429,970 12,323,960 (3,893,990) 422 Water Utility Fund 4,131,780 6,612,170 (2,480,390) 423 Water Utility Fund 12,414,120 17,172,110 (4,757,990) 424 Water Utility Fund 1,989,900 1,990,920 (1,020) 511 Equipment Rental Fund 1,579,570 1,955,820 (376,250) 617 Firemen's Pension Fund 64,840 59,610 5,230 Totals $ 84,161,300 $ 98,329,200 $ (14,167,900) *Amount represents a contribution of (use of) fund balance 2016 Budget Ordinance Page 6 CITY OF EDMONDS CAPITAL FACILITIES PLAN 2016-2021 x�p DRAFT 1 CFP GENERAL i� Current Grant Project (2016-2021) Project Name Purpose Opportunity Phase Total Cost Revenue Source 2016 2017 2018 2019 2020 2021 2022-2035 Aquatic Facility Meet citizen needs for an Aquatics $0 Public Vote Center (Feasibility study complete Unknown Conceptual $0 G.O. Bonds August 2009). $0 $0 Total $5-$23 M Cultural Arts Facility Needs Study Initiate feasibility study of providing $0 Community and promoting Cultural / Arts Unknown Conceptual $0 Partnerships facilities for the City of Edmonds. $0 REET $0 Total Unknown Civic Playfield Acquisition and/or development Edmonds School District $0 Public Vote (City has lease until 2021). RCO Land Conceptual $3,100,000 REET 1 / Grants $100,000 $3,000,000 Acquisition $0 G.O. Bonds $3,100,000 Total $100,000 $3,000,000 Community Park / Athletic Complex - In cooperation with ESD#15 develop $0 Capital Campaign Old Woodway High School: Phase 2 and 3 a community park and athletic RCO Phase1 $0 REET 2 complex. Complete $0 School District $0 Foundation $0 Grants $0 Total $0 $0 $0 $0 $0 6-8M Parks & Facilities Maintenance & Operations Replace / Renovate deteriorating $0 Public Vote Building building in City Park. Unknown Conceptual $0 G.O. Bonds $0 $0 Total $3 - $4M Senior Center Grounds Rehabilitate grounds, parking, $1,050,000 REET / Grants $25,000 $525,000 $500,000 beach access and area around Unknown Conceptual $0 G.O. Bonds Senior Center. $0 Private Partnership $1,050,000 Total $25,000 $525,000 $500,000 Edmonds Crossing WSDOT Ferry / Mutimodal Relocate ferry terminal to Marina EIS $0 Federal (Unsecured) Facility Beach. US DOT Completed $0 State Funds $0 Total Unknown Public Market (Downtown Waterfront) Acquire and develop property for a year round public market. Unknown Conceptual $0 Grants $0 Total Downtown Public Restroom Locate, construct, and maintain a public restroom downtown. Unknown Conceptual $0 Grants $0 Total $300,000 $0 Edmonds Waterfront Analysis Develop alternatives to improve General Local Funds $66,670 emergency access and safety Unknown Conceptual $0 Grants $383,330 $130,000 improvements. $0 Total $450,000 $130,000 Total CFPJ 1 $4,150,000 1 Annual CFP Totals 1 $875,000 1 $655,000 1 $500,000 1 $0 1 $0 $3,000,000 PROJECT NAME: Aquatic Facility ESTIMATED PROJECT COST: $5,000,000 — $23,000,000 PROJECT DESCRIPTION: Implement recommendations of the Aquatics Feasibility Study completed in 2009. Six scenarios were presented and the plan recommended by the consultants was a year round indoor pool with an outdoor recreational opportunity in the summer. The project is dependent upon a public vote. PROJECT BENEFIT/RATIONALE: The current Yost Pool, built in 1972, is nearing the end of its life expectancy. The comprehensive study done in 2009 assessed the needs and wants of Edmonds citizens in regard to its aquatic future as well as the mechanical condition of the current pool. SCHEDULE: 2021-2035 COST BREAKDOWN PROJECT COST 2015 2016 2017 2018 2019 2020 2021-2035 Planning/Study Eng. & Admin. Construction 1 % for Art TOTAL $5m - $23m x all or part of this Project may qualify for 1 % for the Arts 7 PROJECT NAME: Cultural Arts Facility ESTIMATED PROJECT COST: Unknown Needs Study J PROJECT DESCRIPTION: Initiate feasibility study of providing and promoting Cultural / Arts facilities for the City of Edmonds. The need for visual and performing arts facilities is a high priority stated in the adopted updated Community Cultural Arts Plan 2001 and in the 2008 update process. PROJECT BENEFIT/RATIONALE: The City of Edmonds desires to secure and provide for public Cultural Arts facilities in the community. The emphasis on the arts as a high priority creates the need to study performance, management and long term potential for arts related facilities. SCHEDULE: COST BREAKDOWN PROJECT COST 2015 2016 2017 2018 2019 2020 2021 Planning/Study Eng. & Admin. Construction 1 % for Art TOTAL 'all or part of this Project may qualify for 1 % for the Arts PROJECT NAME: Civic Playfield Acquisition ESTIMATED PROJECT COST: $4,950,000 and/or Development 6th Street N. and Edmonds Street, Edmonds City limits, Snohomish County 8.1 acres / property owned and leased from Edmonds School District until 2021; Community Park/Zoned Public PROJECT DESCRIPTION: Acquire Civic field from School District. Develop this 8.1 acre property for continued use as an important community park, sports tourism hub and site of some of Edmonds largest and most popular special events in downtown Edmonds. PROJECT BENEFIT/RATIONALE: Gain tenure and control in perpetuity over this important park site for the citizens of Edmonds. SCHEDULE: 2015-2035 COST BREAKDOWN PROJECT COST 2015 2016 2017 2018 2019 2020 2021 Acquisition $1,950,000 Planning/Study Eng. & Admin. Construction $3,000,000 1 % for Art TOTAL $1,950,000 $0 $0 $0 $0 $0 $3,000,000 * all or part of this project may qualify for 1% for the Arts !r CITY OF EDMONDS CAPITAL FACILITIES PLAN DESCRIPTION PROJECT NAME: Community Park / Athletic ESTIMATED PROJECT COST: $10-12M Complex at the Former Woodway High School ra CIA HOGAN rC)R lER WOODWAY HIGH SCHOOL ATHLETIC FIELD IMPROVEMENTS PRE PAnto fOX THE E DMON DS SCHOOL DISH ICT MAY FOV PROJECT DESCRIPTION: Develop community park and regional athletic complex with lighted or unlighted fields and recreational amenities in partnership with Edmonds School District, community colleges, user groups, and other organizations. Development dependent upon successful regional capital campaign. $10m - $12M project for all 3 phases. PROJECT BENEFIT/RATIONALE: The site is currently an underutilized and undermaintained facility with great potential as community multi -use active park. Site has existing controlled access, greenbelt, parking and 4-court tennis facility with substandard fields. Highly urbanized area with 150,000 residents within 5-mile radius. Future maintenance supported by user fees. Phase 1 will be complete in 2015 for $4.2M, Phases 2 & 3 will be completed in the future for an additional $6-8M. SCHEDULE: 2015-2026 COST BREAKDOWN PROJECT 2015 2016 2017 2018 2019 2020 2021- COST 2026 Planning/Study Engineering & Administration Construction 1 % for Art TOTAL 1 $4.2 M $6-8M " all or a portion of this project may quality for 1 % for the Arts 10 PROJECT NAME: Parks & Facilities ESTIMATED PROJECT COST: $3-$4 Million Maintenance & Operations Building Existing Building Outline Yard Fu Mo 4 0 o , L adirtgIFNew One�Bu'Iding 1,600 sf 6,600 sf Driveway — 15,800� Yard Functions � 111910 11 Perimefer zone — 4,200 sf Existing Fence Line PROJECT DESCRIPTION: The 40 year old maintenance building in City Park is reaching the end of its useful life and is in need of major renovation or replacement. PROJECT BENEFIT/RATIONALE: Parks and Facilities Divisions have long outgrown this existing facility and need additional work areas and fixed equipment in order to maintain City parks and Capital facilities for the long term. SCHEDULE: Contingent on finding additional sources of revenue from general and real estate taxes. COST BREAKDOWN PROJECT COST 2015 2016 2017 2018 2019 2020 2021-2035 Planning/Study Eng. & Admin. Construction 1 % for Art TOTAL $3m - $4m all or part of this Project may qualify for 1 % for the Arts 11 PROJECT NAME: Senior Center Park and ESTIMATED PROJECT COST: $1,050,000 surrounding areas, beach access Possible Shoreline Restoration Concept "'WOTe Edmonds Senior & Community Center enviro n me nta WORKS Comm unity aesig n Center PROJECT DESCRIPTION: Work with Sr. Center to renovate surrounding park and parking lot when the center is rebuilt. Rebuilt center will be available as a community center in the evenings and weekends. PROJECT BENEFIT/RATIONALE: Improvements to retain capital assets and provide safety and better accessibility for Seniors, and be available for the whole community. One of the top priorities in the PROS plan is to open up beachfront access. SCHEDULE: Work with Senior Center on timing of construction and grounds rehab. COST BREAKDOWN PROJECT COST 2015 2016 2017 2018 2019 2020 2021 Planning/Study $25,000 $25,000 Eng. & Admin. Construction $500,000 $500,000 1 % for Art TOTAL $0 $25,000 $525,000 $500,000 $0 $0 $0 * all or part of this Project may qualify for 1 % for the Arts 12 PROJECT NAME: Edmonds Crossing ESTIMATED PROJECT COST: Unknown WSDOT Ferry / Multimodal Facility PROJECT DESCRIPTION: Edmonds Crossing is multimodal transportation center that will provide the capacity to respond to growth while providing improved opportunities for connecting various forms of travel including rail, ferry, bus, walking and ridesharing. NOTE: The design of Marina Beach Park is a separate project. PROJECT BENEFIT/RATIONALE: To provide an efficient point of connection between existing and planned transportation modes. SCHEDULE: 2021-2035 COST BREAKDOWN PROJECT COST 2015 2016 2017 2018 2019 2020 2021- 2035 Engineering & Administration of Way —Right Construction 1 % for Art TOTAL Unknown all or part of this project may qualify for 1 % for the Arts 13 PROJECT NAME: Public Market (Downtown ESTIMATED PROJECT COST: Unknown Waterfront) PROJECT DESCRIPTION: Work with community partners to establish a public market, year around, on the downtown waterfront area. PROJECT BENEFIT/RATIONALE: The project will help to create a community gathering area, boost economic development, bring tourists to town, and will be a valuable asset to Edmonds. SCHEDULE: This project depends on the ability to secure grant funding, and community partners willing to work with the city to establish this. This potentially can be accomplished by 2017. COST BREAKDOWN PROJECT COST 2015 2016 2017 2018 2019 2020 2021-2035 Planning/Study Eng. & Admin. Construction 1 % for Art TOTAL Unknown * all or part of this project may qualify for 1 % for the Arts. 14 PROJECT NAME: Downtown Restroom ESTIMATED PROJECT COST: $300,000 PROJECT DESCRIPTION: Work with community partners to locate, construct and maintain a downtown public restroom. PROJECT BENEFIT/RATIONALE: The project satisfies goals in the Strategic Action Plan and the PROS plan. It is being supported by the Economic Development Commission and Planning Board. This will help to provide a much needed downtown amenity, boost economic development, bring tourists to town, and will be a valuable asset to Edmonds. SCHEDULE: This project depends on the ability of funds. COST BREAKDOWN PROJECT COST 2015 2016 2017 2018 2019 2020 2021-2035 Planning/Stud Eng. & Admin. Construction 1 % for Art TOTAL $300,000 * all or part of this project may qualify for 1 % for the Arts. 15 PROJECT NAME: Edmonds Waterfront ESTIMATED PROJECT COST: $680,000 Analysis PROJECT DESCRIPTION: 1) Waterfront access issues emphasizing and prioritizing near term solutions to providing emergency access, also including, but not limited to, 2) At grade conflicts where Main and Dayton Streets intersect BNSF Rail lines, 3) Pedestrian/bicycle access, and 4) Options to the Edmonds Crossing Multimodal Terminal Project (Identified as Modified Alternative 2) within the 2004 Final Environmental Impact Statement. PROJECT BENEFIT/RATIONALE: Improve waterfront access. SCHEDULE: 2016-2017 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 2022-2035 Planning/Study $450,000 $130,000 Engineering & Administration Construction 1 % for Art TOTAL $450,000 $130,000 16 CFP TRANSPORTATION 17 in; Grant (2016-2021) Project Name Purpose Opportunity Pro'ectPhase Total Cost Fundin Source 111�201 2017 2018 2019 2020 2021 2022-2035 Safcfv / Canarily Analvcic 212th St SW @ 84th Ave W Intersection improvements to $8,650 (Federal or State secured) $8,650 (5corners) Intersection Improvements improve intersection delay and level of service. $0 (Federal or State unsecured) Construction $0 (Unsecured) $1,350 (Local Funds) $1,350 $10,000 Total $10,000 228th St. SW Corridor Safety Realign highly skewed intersection to $397,874 (Federal or State secured) $397,874 Improvements address safety and improve $0 (Federal or State unsecured) operations; create new east -west corridor between SR-99 and 1-5. Construction $0 (Unsecured) $49,203 (Local Funds) $49,203 $447,077 Total $447,077 228th St. SW from Hwy 99 to 95th PI. Install two-way left turn lanes and $0 (Federal or State secured) W sidewalks to improve capacity and $50,000 (Federal or State unsecured) $50,000 $8,690,000 pedestrian safety (project split with Snohomish County) Possible Grant Conceptual $0 (Unsecured) $50,000 (Local Funds) $50,000 $1,356,000 $100,000 Total $100,000 $10,046,000 76th Av. W @ 212th St. SW Intersection improvements to $3,134,910 (Federal or State secured) $3,134,910 Intersection Improvements improve intersection delay and level $0 State of service (LOS). ROW / (Federal or unsecured) Construction $0 (Unsecured) $1,842,630 (Local Funds) $1,842,630 $4,977,540 Total $4,977,540 Highway 99 Gateway / Revitalization Install gateway elements and safety $0 (Federal or State secured) improvements along SR-99 Corridor. $10,000,000 (Federal or State unsecured) $500,000 $4,500,000 $5,000,000 State Conceptual $0 (Unsecured) Appropriation $0 (Local Funds) $10,000,000 Total $500,000 $4,500,000 $5,000,000 SR 524 (196th St. SW) / 88th Ave W Improve intersection safety by $0 (Federal or State secured) Intersection Improvements converting a stop controlled intersection for NB and SB $744,500 (Federal or State unsecured) $122,000 $87,500 $535,000 movements to a signalized Possible Grant Conceptual $0 (Unsecured) 17 intersection. $158,500 (Local Funds) $71,000 $87,500 $903,000 Total $193,000 $175,000 $535,000 Main St. and 9th Ave S Install traffic signal to improve $0 (Federal or State secured) intersection delay and Level of Service (mini roundabout is an $894,000 (Federal or State unsecured) $118,000 $776,000 alternative solution). Possible Grant Conceptual $0 (Unsecured) $17,000 (Local Funds) $17,000 $911,000 Total $135,000 $776,000 76th Ave. W @ 220th St. SW Convert split phasing operation for $0 (Federal or State secured) Intersection Improvements EB and WB movements to $4,284,000 (Federal or State unsecured) $206,000 $1,127,000 $2,951,000 concurrent through movements, with protected / permissive LT phasing. Possible Grant Conceptual $0 (Unsecured) 17 $30,000 (Local Funds) $30,000 $4,314,000 Total $236,000 $1,127,000 $2,951,000 Hwy 99 @ 212th St SW Intersection Widen 212th St. SW to add a $0 (Federal or State secured) Improvements westbound left turn lane for 200' storage length and an eastbound left $2,783,000 (Federal or State unsecured) $152,000 $1,091,000 $1,540,000 turn lane. Possible Grant Conceptual $0 (Unsecured) $23,000 (Local Funds) $23,000 $2,806,000 Total $175,000 $1,091,000 $1,540,000 Grant (2016-2021) Project Name Purpose Opportunity Pro'ectPhase Total Cost Funding Source 2016 2017 2018 2019 2020 2021 2022-2035 Hwy. 99 @ 216th St. SW Intersection Widen 216th St. SW to add a left $0 (Federal or State secured) Improvement turn lane for eastbound and $2,313,000 (Federal or State unsecured) $142,000 $334,000 $1,837,000 westbound movements. Possible Grant Conceptual $0 (Unsecured) $22,000 (Local Funds) $22,000 $2,335,000 Total $164,000 $334,000 $1,837,000 Hwy. 99 @ 220th St. SW Intersection Widen 220th St. SW and Hwy 99 to $0 (Federal or State secured) Improvement add a westbound right turn lane (for 325' storage length) and a soutbound $3,192,000 (Federal or State unsecured) $152,000 $1,085,000 $1,955,000 left turn lane (for 275' storage Possible Grant Conceptual $0 (Unsecured) length). $23,000 (Local Funds) $23,000 $3,215,000 Total $175,000 $1,085,000 $1,955,000 SR-104 @ 226th St. SW / 15th St. SW Extend left turn storage area for W B $0 (Federal or State secured) Intersection Improvements movement on SR-104 w/ various $179,000 (Federal or State unsecured) $15,000 $164,000 bicycle and pedestrian improvements. Possible Grant Conceptual $0 (Unsecured) $15,000 (Local Funds) $15,000 $194,000 Total $30,000 $164,000 SR-104 @ 95th PI. W Intersection Convert EB and W B LT along SR- $0 (Federal or State secured) Improvements 104 to protected LT phasing; $485,000 (Federal or State unsecured) $65,000 $420,000 upgrade ADA curb ramps; and add C-Curb for access management Possible Grant Conceptual $0 (Unsecured) $10,000 (Local Funds) $10,000 $495,000 Total $75,000 $420,000 SR-104 @ 238th St. SW Intersection Install traffic signal to improve $0 (Federal or State secured) Improvements vehicular and pedestrian safety; N revise geometry to allow for safer $1,311,000 (Federal or State unsecured) $173,000 $1,138,000 C-) turns. Possible Grant Conceptual $0 (Unsecured) $27,000 (Local Funds) $27,000 $1,338,000 Total $200,000 $1,138,000 Olympic View Dr. @ 76th Ave. W Install traffic signal to reduce the $0 (Federal or State secured) Intersection Improvements intersection delay and improve Level of Service. $0 (Federal or State unsecured) Conceptual $0 (Unsecured) 1 $1,183,000 $0 (Local Funds) $0 Total $1,183,000 84th Ave. W (212th St. SW to 238th Install two-way left turn lanes and $0 (Federal or State secured) St. SW) sidewalk to improve capacity and $0 (Federal or State unsecured) pedestrian safety (split with Snohomish County) Conceptual $0 (Unsecured) $15,441,000 $0 (Local Funds) $0 Total $15,441,000 N Grant (2016-2021) 1 Project Name Purpose Opportunity Pro'ectPhase Total Cost Funding Source 2016 201 018 2019 2020 2021 2022-2035 SR-104 @ 100th Ave. W Intersection / Implement Westgate Circulation $0 (Federal or State secured) Westgate Area Improvements Access Plan, midblock pedestrian $0 (Federal or State unsecured) $1,017,468 crossings along 100th Ave. W, and rechannelization with bike lanes / Conceptual $0 (Unsecured) sharrows along 100th Ave. W. $0 (Local Funds) $0 Total $1,017,468 SR-104 @ 76th Ave. W Intersection Add a 2nd W B left turn lane (split $0 (Federal or State secured) Improvements with Shoreline). $0 (Federal or State unsecured) $3,017,000 Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total E3,017,000 Olympic View Dr. @ 174th St. SW Install traffic signal to improve Level $0 (Federal or State secured) Intersection Improvements of Service and intersection delay. $0 (Federal or State unsecured) Conceptual $0 (Unsecured) $610,000 1 $0 (Local Funds) $0 Total $610,000 Non -motorized Pedestrian /Bicvcle Projects Sunset Ave. Walkway from Bell St. to Provide walkway on the west side of $44,000 (Federal or State secured) $44,000 Gaspers St. Sunset Ave, with various utility Possible $1,090,650 (Federal or State unsecured) $8,650 $1,082,000 upgrades. RCO / TIB Grant Design $0 (Unsecured) for construction $1,151,350 (Local Funds) $1,350 $133,000 $1,017,000 $2,286,000 Total $10,000 $177,000 $2,099,000 Dayton St. between 7th Ave. S to 8th Provide safe sidewalk along short $0 (Federal or State secured) Ave. S Walkway missing link. $37,500 (Federal or State unsecured) $37,500 Possible Grant Conceptual $0 (Unsecured) $37,500 (Local Funds) $37,500 $75,000 Total $75,000 232nd St. SW from 100th Ave. W to Improve pedestrian safety along $0 (Federal or State secured) SR-104 232nd St. SW from 100th Ave. to SR-104. $1,205,000 (Federal or State unsecured) $100,000 $1,105,000 Possible Grant Conceptual $0 (Unsecured) $100,000 (Local Funds) $100,000 $1,305,000 Total $200,000 $1,105,000 238th St. SW from 100th Ave. W to Improve pedestrian safety along $34,954 (Federal or State secured) $34,954 104th Ave. W 238th St. SW from 100th Ave. to 104th Ave. $0 (Federal or State unsecured) Construction $0 (Unsecured) $113,181 (Local Funds) $113,181 $148,135 Total $148,135 236th St SW from Edmonds Way Improve pedestrian safety along $391,356 (Federal or State secured) $391,356 (SR-104) to Madrona Elementary 236th St. SW, creating a safe pedestrian connection from $0 (Federal or State unsecured) SR-104 to Madrona school. Construction $0 (Unsecured) $202,109 (Local Funds) $202,109 $593,465 Total $593,465 236th St SW from Edmonds Way Improve pedestrian safety along $0 (Federal or State secured) (SR-104) to 97th Ave. W 236th St. SW, creating a safe $1,288,500 (Federal or State unsecured) $106,500 $1,182,000 pedestrian connection from SR-104. Possible Grant Conceptual $0 (Unsecured) $106,500 (Local Funds) $106,500 $1,395,000 Total $213,000 $1,182,000 N N Grant dh (2016-2021) Project Name Purpose Opportuni L3rojectPhase Total Cost Funding Source 2016 201 2020 2021 2022-2035 84th Ave. W from 238th St. SW to Improve pedestrian safety along 84th $0 (Federal or State secured) 234th St. SW Ave. W. from 238th St. SW to 234th St. SW. $90,000 (Federal or State unsecured) $90,000 $495,000 Possible Grant Conceptual $0 (Unsecured) $0 (Local Funds) $90,000 Total $90,0001 $495 000 80th Ave. W from 206th St. SW to Improve pedestrian safety along 80th $0 (Federal or State secured) 212th St. SW Ave. W, within proximity to Edmonds $833,000 (Federal or State unsecured) $30,000 $37,000 $766,000 Woodway High School. Possible Grant Conceptual $0 (Unsecured) $67,000 (Local Funds) $30,000 $37,000 $900,000 Total $60,000 $74,000 $766,000 2nd Ave. S from James St. to Main St. Provide safe sidewalk along short $0 (Federal or State secured) Walkway missing link. $0 (Federal or State unsecured) Conceptual $0 (Unsecured) $30,000 (Local Funds) $30,000 $30,000 Total $30,000 Maplewood Dr. from Main St. to 200th Provide safe sidewalk, connecting to $0 (Federal or State secured) St. SW ex. sidewalk along 200th St. SW $1,938,000 (Federal or State unsecured) $170,000 $1,768,000 (direct link to Maplewood Elementary School). Possible grant Conceptual $0 (Unsecured) 17 $170,000 (Local Funds) $170,000 $2,108,000 Total $340,000 $1,768,000 218th St. SW from 76th Ave. W to Provide safe sidewalk along a $0 (Federal or State secured) 84th Ave. W missing link of 218th St. SW. from 76th Ave. to 84th Ave. $978,000 (Federal or State unsecured) $100,000 $878,000 Possible Grant Conceptual $0 (Unsecured) $327,000 (Local Funds) $100,000 $227,000 $1,305,000 Total $200,000 $1,105,000 Walnut St from 3rd Ave. S to 4th Ave. Provide short missing link. $0 (Federal or State secured) S Walkway $105,000 (Federal or State unsecured) $105,000 Possible Grant Conceptual $0 (Unsecured) $0 (Local Funds) $105,000 Total $105,000 216th St. SW Walkway from Hwy. 99 Provide sidewalk on north side of $137,000 (Federal or State secured) $137,000 to 72nd Ave W 216th St. SW from Hwy. 99 to 72nd $0 (Federal or State unsecured) Ave W (completing missing link) Possible Grant Conceptual $0 (Unsecured) $20,000 (Local Funds) $20,000 $157,000 Total $157,000 238th St. SW from SIR-1 04 to Hwy. 99 Provide sidewalk on north side of $0 (Federal or State secured) 238th St. SW from SR-104 to Hwy. $372,300 (Federal or State unsecured) $372,300 99 (completing missing link) Possible Grant Conceptual $0 (Unsecured) $118,700 (Local Funds) $118,700 $491,000 Total $491,000 Minor Sidewalk Program Complete short sidewalk stretches $0 (Federal or State secured) throughout the City (annual program) $0 (Federal or State unsecured) Conceptual $0 (Unsecured) $300,000 (Local Funds) $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $300,000 Total $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 Grant (2016-2021) I Project Name Purpose Opportunity Project Phase Total Cost Funding Source 2016 2017 2018 2019 2020 2021 2022-2035 191st St. SW from 80th Ave. W to Provide sidewalk on one side of $0 (Federal or State secured) 76th Ave. W 191 th St. SW from 80th Ave. to 76th $0 (Federal or State unsecured) $630,000 Ave. (completing missing link) Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total $630,000 95th PI. W from 224th St. SW to 220th Provide sidewalk on one side of 95th $0 (Federal or State secured) St. SW PI. W from 224th St. SW to 220th St. $0 (Federal or State unsecured) $585,000 SW completing missing link) Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total $585,000 104th Ave. W / Robinhood Lane from Provide sidewalk on west side of $0 (Federal or State secured) 238th St. SW to 106th Ave. W 104th Ave. from 238th St. SW to $0 (Federal or State unsecured) $990,000 106th Ave. W (completing missing link) Conceptual $0 (Unsecured) I $0 (Local Funds) $0 Total S990 000 Elm Way from 8th Ave. S to 9th Ave. Provide sidewalk on one side of Elm $0 (Federal or State secured) S Way from 8th Ave. S to 9th Ave. S $0 (Federal or State unsecured) $225,000 Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total $225,000 80th Ave. W from 218th St. SW to Provide sidewalk on one side of 80th $0 (Federal or State secured) 220th St. SW Ave. W from 218th St. SW to 220th $0 (Federal or State unsecured) $315,000 N St. SW (completing missing link) W Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total $315,000 84th Ave. W from 188th St. SW to Provide sidewalk on one side of 84th $0 (Federal or State secured) 186th St. SW Ave. W from 188th St. SW to 186th $0 (Federal or State unsecured) $315,000 St. SW Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total $315,000 236th St. SW from Hwy. 99 to 76th Provide sidewalk on one side of $0 (Federal or State secured) Ave. W 236th St. SW from Hwy. 99 to 76th $0 (Federal or State unsecured) $765,000 Ave. W Conceptual $0 (Unsecured) 1 $0 (Local Funds) $0 Total $765,000 238th St. SW from Hwy. 99 to 76th Provide sidewalk on one side of $0 (Federal or State secured) Ave. W 238th St. SW from Hwy. 99 to 76th $0 (Federal or State unsecured) $1,170,000 Ave W Conceptual $0 (Unsecured) 1 $0 (Local Funds) $0 Total $1,170,000 80th Ave. W / 180th St. SW from Provide sidewalk on one side of 80th $0 (Federal or State secured) 188th St. SW to OVD Ave. W / 180th St. SW from 188th $0 (Federal or State unsecured) $1,350,000 St. SW to OVD Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total $1,350,000 189th PI. SW from 80th Ave. W to Provide sidewalk on one side of $0 (Federal or State secured) 76th Ave. W 189th PI. SW from 80th Ave. W to $0 (Federal or State unsecured) $585,000 76th Ave. W Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total $585,000 Ferry/Railroad Grant dh (2016-2021) 1 1 Project Name Purpose Opportuni projectPhase Total Cost Funding Source 2016 2017 2018 2019 2020 2021 2022-2035 Ferry Storage Improvements from Improve ferry queueing by extending $0 (Federal or State secured) Pine St. to Dayton St. ferry storage area along SR-104 $357,000 (Federal or State unsecured) $357,000 (striping changes). Possible Grant Conceptual $0 (Unsecured) $0 (Local Funds) $357,000 Total $357,000 Traffic Plannina Proiects Trackside Warning System at Dayton Install wayside horns at both $0 (Federal or State secured) St. and Main St. Railroad Crossings crossings to reduce noise from train horns. $0 (Federal or State unsecured) Conceptual $0 (Unsecured) $300,000 (Local Funds) $300,000 $300,000 Total $300,000 Total CFP $43,991,217 1 Annual CFP Totals 1 $6,536,217 1 $227,000 1 $80,000 1 $5,490,000 1 $12,856,000 1 $18,802,000 1 $35,139,468 Revenue Summary by Year Totals Source 2016 1 2017 1 2018 1 2019 1 2020 1 2021 1 2022-2035 $581,006 Total Federal & State (Secured) $3,967,744 $44,000 $0 $137,000 $0 $0 $0 $16,943,150 Total Federal & State (Unsecured) $8,650 $0 $0 $3,735,302 $12,311,500 $18,475,000 $20,149,468 $0 Unsecured $0 $0 $0 $0 $0 $0 $17,234,000 $2,795,309 Local Funds $2,559,823 $183,000 $80,0001 $1,617,700 $544,5001 $327,000 $1,356,000 N PROJECT NAME: 212" St. SW @ 84" Ave. ESTIMATED PROJECT COST: $4,305,000 W (5-Corners) Intersection Improvements M PROJECT DESCRIPTION: Construct roundabout and new water and stormwater facilities at the intersection of 84t" Ave and 212t" St. PROJECT BENEFIT/RATIONALE: Improve the intersection Level of Service and pedestrian safety. SCHEDULE: Construction complete. Project close-out will be completed in 2016. COST BREAKDOWN PROJECT COST 2016 2017 2018 2018 2019 2020 Planning/Study Engineering & Administration & ROW Construction $10,000 1 % for Art TOTAL $10,000 25 PROJECT NAME: 228 th St. SW Corridor ESTIMATED PROJECT COST: $7,300,000 Safety Improvements PROJECT DESCRIPTION: 1) Extend 228th St across the unopened right-of-way to 761h Avenue West 2) Signalize the intersection of 2281h St SW @ SR99 and 2281h St. SW @ 761h Ave. West 3) Construct a raised median in the vicinity of 76th Avenue West. 4) Add illumination between 2241h St SW and 228th St SW on SR 99 5) Overlay of 2281h St. SW from 801h Ave. W to — 2,000' east of 76th Ave. W. PROJECT BENEFIT/ RATIONALE: The project will improve access / safety to the 1-5 / Mountlake Terrace Park & Ride from SR99. This east / west connection will reduce demand and congestion along two east - west corridors (220th Street SW and SR104). Roadway safety will also be improved as SR 99/ 228th Street SW will become a signalized intersection. 228th St. SW is being overlaid from 801h PI. W to — 1,000 LF east of 72nd Ave. W. as well as 761h Ave. W from 2281h St. SW to Hwy. 99. The project consists of various utility upgrades. SCHEDULE: Construction began in 2015 and is scheduled to be completed in 2016. Federal and State grants were secured for the construction phase. This project is combined into one construction contract with the Hwy. 99 (Phase 3) Lighting project. COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering, Administration, and ROW Construction $447,077 1 % for Art TOTAL $477,077 All or a portion of this project may qualify for 1 % for the arts 26 PROJECT NAME: 228 th St. SW from Hwy. ESTIMATED PROJECT COST: $10,146,000 99 to 95t" PI. W PROJECT DESCRIPTION: Widen 228 th St. SW from Hwy. 99 to 95 th PI. W to three lanes (with two-way left turn lane), with curb and gutter, sidewalk, and bike lanes. PROJECT BENEFIT/RATIONALE: flow along this corridor. This project would improve pedestrian safety and traffic SCHEDULE: 2021-2035 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 2022-2035 Planning/Study Engineering & Administration $100,000 $1,400,000 Construction $8,646,000 1 % for Art TOTAL $100,000 $10,046,000 27 PROJECT NAME: 76 Ave W @ 212 St. SW ESTIMATED PROJECT COST: $5,470,000 Intersection Improvements 0 EDMONDS-WOODWAY HIGH SCHOOL K:w ..irlq 7301 PROJECT DESCRIPTION: Add a northbound and southbound left -turn lane to convert the signal operation for those approaches from split phasing to protected -permissive phasing. Add a right - turn lane for the westbound, southbound, and northbound movements. The project also consists of various utility upgrades and conversion of overhead utilities to underground. PROJECT BENEFIT/RATIONALE: Reduce the intersection delay and improve the existing level of service from LOS D (LOS F by 2015) to LOS C. SCHEDULE: Federal grants have been secured for all project phases. Design started in 2012 and is scheduled for completion in January 2016. Right-of-way acquisition is anticipated to be completed in January 2016. Construction is scheduled to be completed in 2016. COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & $150,000 Administration & ROW Construction $4,824,230 1 % for Art 3,310 TOTAL 1 $4,977,540 9.1 PROJECT NAME: Highway 99 Gateway / ESTIMATED PROJECT COST: $10,000,000 Revitalization PROJECT DESCRIPTION: The project would include, among other features, wider replacement sidewalks or new sidewalk where none exist today, new street lighting, center medians for access control and turning movements, etc., attractive and safe crosswalks, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. PROJECT BENEFIT/RATIONALE: Improve aesthetics, safety, user experience, and access management along this corridor. In addition, economic development would be improved. SCHEDULE: The design phase is scheduled for 2019. The construction phase is scheduled for 2020 and 2021. COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & $500,000 Administration & ROW Construction $4,500,000 $5,000,000 1 % for Art TOTAL 500,000 $4,500,000 $5,000,000 29 PROJECT NAME: SR-524 (196t" St. SW)/ 88t" ESTIMATED PROJECT COST: $903,000 Ave. W Intersection Improvements 40 M13� 196TH ST SW 1 , Z D OQ a CO)� 0 w J 0 m a! � � a mum to w a m SEVEN DAY ADVENTST CHURCH 196TH ST SW PROJECT DESCRIPTION: Install traffic signal at the intersection of 196 th St. SW @ 88 th Ave. W. The modeling in the 2009 Transportation Plan indicated that restricting northbound and southbound traffic to right -turn -only (prohibiting left -turn and through movements) would also address the deficiency identified at this location through 2025. This is same alternative as one concluded by consultant in 2007 study but not recommended by City Council. This could be implemented as an alternate solution, or as an interim solution until traffic signal warrants are met. The ex. LOS is F (below City Standards: LOS D). This project was ranked #6 in the Roadway Project Priority in the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: Improve traffic flow characteristics and safety at the intersection. The improvement would modify LOS to A, but increase the delay along 196t" St. SW. SCHEDULE: The intersection LOS must meet MUTCD traffic signal warrants and be approved by WSDOT since 196t" St. SW is a State Route (SR524). No funding is currently allocated to this project (pending grant funding). COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & $193,000 $175,000 Administration & ROW Construction 535,000 1 % for Art TOTAL $193,000 $175,000 $535,000 30 PROJECT NAME: Main Stand 9th Ave. S ESTIMATED PROJECT COST: $911,000 W a x Mimi MR 7111 BELL 5T -JJ IP W a x MAIN sT J � W J Z DAYTON ST Z- WADE JAMES THEATER PROJECT DESCRIPTION: Installation of a traffic signal (or mini -roundabout is an alternative solution). PROJECT BENEFIT/RATIONALE: The existing intersection is stop -controlled for all approaches and the projected intersection LOS in 2035 is LOS F (below the City's concurrency standards: LOS D). The installation of a traffic signal would improve the intersection delay to LOS B. The project ranked #4 in the Roadway Project Priority of the 2015 Transportation Plan. SCHEDULE: All phases are scheduled between 2019 and 2021 (unsecured funding) COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & Administration $135,000 Construction $776,000 1 % for Art TOTAL $135,000 $776,000 31 PROJECT NAME: 220" St SW @ 76t" Ave W ESTIMATED PROJECT COST: Intersection Improvements $4,316,000 I 219TH ST SW 21919 J � JI I _ 3 I LU I a I F I J J 221STPLSW F71 -I-- TOP FOODS 22GTH ST SW l ----JIOO LYNWOOD HONDA STARBUCKS J PROJECT DESCRIPTION: Reconfigure eastbound lanes to a left turn lane and through / right turn lane. Change eastbound and westbound phases to provide protected -permitted phase for eastbound and westbound left turns. Provide right turn overlap for westbound movement during southbound left turn phase. (ROADWAY ROJECT PRIORITY #1 in 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: Reduce the intersection delay and improve the LOS. The LOS would be improved from LOS E to LOS C. SCHEDULE: Engineering, ROW, and construction scheduled between 2019 and 2021 (unsecured funding). COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & ROW $238,000 $1,127,000 Administration Construction $2,951,000 1 % for Art TOTAL $238,000 $1,127,000 $2,951,000 All or a portion of this project may qualify for 1 % for the arts 32 PROJECT NAME: Hwy. 99 @ 212 St. SW ESTIMATED PROJECT COST: $2,806,000 intersection improvements Paul I 21 OT}�ST Parking a z 7313 n 3 Edmonds Edmonds Family Clinic ADN Public LYorks 'n Q KENNEL f Arbor Apt. = Q Gas m Yilla Oln = 2"11n2 Pumps I� st 212TH Para 7�7..5.• cuPlc B" a 'leg 7303 "3" Pool n � only "1 7342 "2" PARK & RIDE 47,114 STW W U W W PLANT 0 Q AEGIS SWEDISH m MONNS CAMPUS ' ALLIED / ROOFING / / / B&M / CON ST 21414 / 21448 / / / NIC nON ALd 0( / IALUE / ALLAGE / 16TH ST/SW PROJECT DESCRIPTION: Widen 212 th St. SW to add a westbound left turn lane for 200' storage length and an eastbound left turn lane for 300' storage length. Provide protected left turn phase for eastbound and westbound movements. (ROADWAY PROJECT PRIORITY in 2015 Transportation Plan: #4) PROJECT BENEFIT/RATIONALE: Improve intersection efficiency and reduce delay. SCHEDULE: All phases are scheduled between 2019 and 2021 (unsecured funding).The project cost is split between Lynnwood and Edmonds since half the project is in Lynnwood. COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering, $175,000 $1,091,000 ROW, & Administration Construction $1,540,000 1 % for Art TOTAL $175,000 $1,091,000 $1,540,000 33 PROJECT NAME: Hwy. 99 @ 216 St. SW ESTIMATED PROJECT COST: $2,335,000 intersection improvements IY-o 21412 21408 21405 12 214a1 r Ce } 21420 21431 MCDOHALD' +n an z 150 00 04 215 AEG15 �1558 1g15 VALUE 7 VILLA ST SW � 216TH ST SW 21600{ 21619 KRUGER ,q CLINIC 21632 PROJECT DESCRIPTION: Widen 216t St. SW to add a westbound left turn lane for and an eastbound left turn lane. Provide protected -permissive left turn phases for eastbound and westbound movements. This project ranked #3 in the Roadway Project Priority in the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: Improve intersection efficiency and reduce delay. SCHEDULE: All phases are scheduled between 2019 and 2021 (unsecured funding). COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & ROW & Administration $164,000 $334,000 Construction $1,837,000 1 % for Art TOTAL $164,000 $334,000 $1,837,000 34 PROJECT NAME: Hwy. 99 @ 220 St. SW ESTIMATED PROJECT COST: $3,215,000 intersection improvements TOP FOODS 19TH ST SW / 21919 STARBU 5 / / 220TH ST SW • 7914 �221STPLSW FUNTASIA LYNWOOD HONOA a UG'S TRAYE LLE R'S IN N j w .F O 7223 'U' Ift td w —.2222 A .O. 7301 'H' r _ tim ass H M � a a x Ir 7 4 m �i 224TH ST SW IJ I� PROJECT DESCRIPTION: Widen 220thSt. SW to add Westbound right turn lane for 325' storage length. Widen SR-99 to add 21,d Southbound left turn lane for 275' storage length. (ROADWAY PROJECT PRIORITY in 2015 Transportation Plan: #1). PROJECT BENEFIT/RATIONALE: Reduce intersection delay and improve traffic flow and safety. SCHEDULE: All Phases are scheduled between 2019 and 2021 (unsecured funding for all phases). COST BREAKDOWN PROJECT 2016 2017 2018 2019 2020 2021 COST Planning/Study Engineering & Administration & ROW $175,000 $1,085,000 Construction $1,955,000 1 % for Art TOTAL $175,000 $1,085,000 $1,955,000 35 PROJECT NAME: SR-104 @ 226 1h St. SW / ESTIMATED PROJECT COST: $194,000 15t" St. SW Intersection Improvements 0 k/� k 226TH ST SW r 1 uJ 226TH PL SW IF L 1 L!]Er ' F --' 14TH WAY SW PROJECT DESCRIPTION: Extend the left turn lane for the westbound movement on SR-104. Complete various pedestrian and bicycle intersection improvements. This project was identified in the SR-104 Complete Streets Corridor Analysis (completed in 2015). PROJECT BENEFIT/RATIONALE: Improve non -motorized transportation safety at the intersection and improve traffic flow along the SR-104 corridor. SCHEDULE: 2019-2020 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & Administration & ROW $30,000 Construction $164,000 1 % for Art TOTAL $30,000 $164,000 36 PROJECT NAME: SR-104 @ 95" PI. W ESTIMATED PROJECT COST: $495,000 Intersection Improvements r W 06 a Ln al en Cn 'H ST SW 1 WESTGATI C APE PARKING ■ 1 WESTGATE CHAPEL PROJECT DESCRIPTION: Convert LT phasing for EB and SB to protected LT phasing; upgrade all ADA Curb Ramps; and add C-Curb for access management. PROJECT BENEFIT/RATIONALE: Improve intersection safety for pedestrians and vehicles. SCHEDULE: 2019-2020 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & Administration & ROW $75,000 Construction $420,000 1 % for Art TOTAL $75,000 $420,000 37 PROJECT NAME: SR-104 @ 238 St. SW ESTIMATED PROJECT COST: $1,338,000 Intersection Improvements . f L 238TH ST SW F1 PROJECT DESCRIPTION: Install traffic signal. The warrants are met for such an installation. This project was identified in the SR-104 Complete Street Corridor Analysis (completed in 2015). PROJECT BENEFIT/RATIONALE: Improve vehicular and pedestrian safety. SCHEDULE: 2019-2020 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & Administration & ROW $200,000 Construction $1,138,000 1 % for Art TOTAL $200,000 $1,138,000 PROJECT NAME: Olympic View Dr. @ 76 Ave. ESTIMATED PROJECT COST: W Intersection Improvements $1,183,000 I SEAVIEW PARK 3 a r F n PLSW 186TH ST SW ml I m-I POST 1 OFFICE J 4 I� I I I I I TOLEFSON-S --- o[Y,4*p7�,, ,ARKET 7519 PERRI VILLE PROJECT DESCRIPTION: Install traffic signal (the intersection currently stop controlled for all movements). (ROADWAY ROJECT PRIORITY in 2015 Transportation Plan: #11). PROJECT BENEFIT/RATIONALE: The improvement will reduce the intersection delay. The projected Level of Service is LOS F in 2035, which is below the City's concurrency standards (LOS D). The project will improve the Level of Service to LOS B. SCHEDULE: Engineering and Construction are scheduled between 2022 and 2035 (unsecured funding). COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 2022-2035 Planning/Study Engineering & Administration $200,000 Construction $983,000 1 % for Art TOTAL $1,183,000 39 PROJECT NAME: 84" Ave. W (212 St. SW ESTIMATED PROJECT COST: $15,441,000 to 238t" St. SW) PROJECT DESCRIPTION: Widen 84 th Ave. W to (3) lanes with curb, gutter, bike lanes, and sidewalk on each side of the street. (part of this project was ranked #6 in the Long Walkway list of the 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: Improve overall safety of the transportation system along this collector street: 1) the sidewalk and bike lanes would provide pedestrians and cyclists with their own facilities and 2) vehicles making left turn will have their own lane, not causing any back-up to the through lane when insufficient gaps are provided. SCHEDULE: Engineering and Construction are scheduled between 2022 and 2035 (unsecured funding). The project cost is split between Snohomish County and Edmonds since half the project is in Esperance. COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 2022-2035 Planning/Study Engineering & $2,000,000 Administration Construction $13,441,000 1 % for Art TOTAL $15,441,000 all or part of this project may qualify for 1 % for the Arts. PROJECT NAME: SR-104 @ 100t Ave. W ESTIMATED PROJECT COST: $1,017,468 Intersection Improvements • h0 __ L_ EDMONDS WAY PROJECT DESCRIPTION: Implement Westgate Circulation Access Plan, install mid -block pedestrian crossing along 100th Ave. W, and re -striping of 100th Ave. W with the potential addition of bike lanes. This project was identified in the SR-104 Completed Streets Corridor Analysis (completed in 2015). PROJECT BENEFIT/RATIONALE: Improve access and safety at the intersection and improve non -motorized transportation safety. SCHEDULE: 2022-2035 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 2022-2035 Planning/Study Engineering & Administration $150,000 Construction $867,468 1 % for Art TOTAL $1,017,468 41 PROJECT NAME: SR-104 @ 76t Ave. W ESTIMATED PROJECT COST: $3,017,000 Intersection Improvements W ---EnULOUD&16AY----------_LAKCEBALLKNGiERWAY____ -_-_ PROJECT DESCRIPTION: Add a 2"d left turn lane along SR-104. This project was identified in the SR-104 Complete Street Corridor Analysis (completed in 2015). PROJECT BENEFIT/RATIONALE: Improve access and safety at the intersection and improve non -motorized transportation safety. SCHEDULE: 2022-2035. The project cost would be split between Shoreline and Edmonds since half the intersection is in Shoreline. COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 2022-2035 Planning/Study Engineering & Administration $453,000 Construction $2,564,000 1 % for Art TOTAL $3,017,000 42 PROJECT NAME: Olympic View Dr. @ 174 St. ESTIMATED PROJECT COST: $610,000 SW Intersection Improvements PROJECT DESCRIPTION: Widen Olympic View Dr. to add a northbound left turn lane for 50' storage length. Shift the northbound lanes to the east to provide an acceleration lane for eastbound left turns. Install traffic signal to increase the LOS and reduce intersection delay. ROADWAY ROJECT PRIORITY in 2015 Transportation Plan: #13 PROJECT BENEFIT/RATIONALE: Improve intersection efficiency and safety of drivers accessing either street. SCHEDULE: Engineering and Construction are scheduled between 2022 and 2035 (unsecured funding). COST BREAKDOWN PROJECT 2016 2017 2018 2019 2020 2021 2022-2035 COST Planning/Study Engineering & $100,000 Administration Construction $510,000 1 % for Art TOTAL $610,000 43 PROJECT NAME: Sunset Ave Walkway ESTIMATED PROJECT COST: $2,350,000 from Bell St to Caspers St. MUNDVIEWAPTS ,�%�� i�► 111101■� ♦ � �� I■� 11111■� 1 PROJECT DESCRIPTION: Provide a walkway on the west side of the street, facing waterfront (— 1/2 mile / more recent project). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Temporary improvements have been installed to evaluate the alignment of the proposed walkway. The final design phase is on -hold until the evaluation period is completed. COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study $10,000 Engineering & Administration $177,000 Construction $2,099,000 1 % for Art TOTAL $10,000 $177,000 $2,099,000 * all or part of this project may qualify for 1 % for the Arts. PROJECT NAME: Dayton St between 7 Ave. ESTIMATED PROJECT COST: $75,000 S and 8t" Ave. S Walkway MAIM Sr Ix NO -ISLE FRANCES ANDERSON m W a � D• x � Q � 660 701 L DAYTON ST T-1 J E w MAPLE Sr a-F7 F-F-FT k PROJECT DESCRIPTION: Dayton St. between 7t" Ave. 2015 Transportation Plan). Construct a missing link of sidewalk (approximately 250') on S and 8t" Ave. S (ranked #2 in Short Walkway Project list in PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Engineering & Construction scheduled for 2019 (unsecured funding). COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & Administration Construction $75,000 1 % for Art TOTAL $75,000 * all or part of this project may qualify for 1 % for the Arts. 45 PROJECT NAME: 232 nd St. SW Walkway ESTIMATED PROJECT COST: $1,305,000 from 100t" Ave. W to SR-104 EDM f?N DR urnv 2 PROJECT DESCRIPTION: Install sidewalk along 232"d St. SW from 1 00Ave. W to SR-104. This project ranked #3 in the Long Walkway List of 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2020-2021 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & Administration $200,000 Construction $1,105,000 1 % for Art TOTAL $200,000 $1,105,000 PROJECT NAME: 238 St. SW from 100 ESTIMATED PROJECT COST: $1,677,000 Ave. W to 104th Ave. W Walkway and Stormwater Improvements d V 2 ❑ ww 00 F Comm U Z LIBRARY 00 C R BASEBALL 23r FIELD 23 TO 42 OLD WOODWAY HIGH SCHOOL 236TH PL SW HICKMAN PARK a 0 0 0 z 3 a14 a a 3 J w a 4 N r Y ✓� ❑ ❑ 237TH PLSW FF H 238 H 5 W � z U 0 7 U U 3 w 4 Z ry ❑ LL N C7� n w a Q w a Q ❑ w 238 TH ST SW PROJECT DESCRIPTION: Installation of -- 1,200' of sidewalk on the north side of 238 thSt. SW from 100th Ave. W to 104th Ave. W. as well as sharrows. Stormwater improvements will also be incorporated into the project. PROJECT BENEFIT/RATIONALE: Improve pedestrian safety and create a safe pedestrian connection between 100th Ave. W and 104th Ave. W. SCHEDULE Construction is scheduled to be completed in 2016. Funding was secured for the completion of the design and construction phases (through Safe Routes to School program). Stormwater improvements are funded by the Stormwater Utility Fund 422. COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & Administration Construction $148,135 1 % for Art TOTAL $148,135 * all or part of this project may qualify for 1 % for the Arts 47 PROJECT NAME: 236t" St. SW from ESTIMATED PROJECT COST: $665,000 Edmonds Way to Madrona Elementary School 9700 MADRONA TRACK SCHOOL BALL FIELD V.4N PROJECT DESCRIPTION: Construct an — 800' sidewalk on the south side of 236 th St. SW from SR-104 to Madrona Elementary as well as the addition of sharrows along that stretch. (This is only part of a stretch of Walkway project, which ranked #1 in the Long Walkway list in the 2009 Transportation Plan) PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route near Madrona Elementary School and along 236t" St. SW. SCHEDULE: Construction is scheduled to be completed in 2016. The project is funded through the Safe Routes to School Grant program. COST BREAKDOWN PROJECT 2016 2017 2018 2019 2020 2021 COST Planning/Study Engineering & Administration & ROW Construction $593,465 1 % for Art TOTAL $593,465 PROJECT NAME: 236 th St. SW Walkway ESTIMATED PROJECT COST: $1,395,000 from Edmonds Way to 97th Ave. W PROJECT DESCRIPTION: Install sidewalk with curb and gutter along 236nd St. SW from Edmonds Way to 97th Ave. W. This project ranked #4 in Long Walkway list of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2019-2020 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & Administration $213,000 Construction $1,182,000 1 % for Art TOTAL $213,000 $1,182,000 i• PROJECT NAME: 84 1h Ave. W Walkway ESTIMATED PROJECT COST: $585,000 From 238t" St. SW to 234t" ST. SW PARK� nHIRL EUMOHUS GALL APTS m w w LL CH RIST LU TH E RAN CHURCH PART{ & RIDE OFFICE 236:1 ,4 23603 SAFEWAY 6 23605 Wn L NJIHG R 23607 SUNSET 23619 0 P Q 711 R AURORA S NLkRHETPLACE T N FAMILY RA NCAKE U '7-77" 239TH ST SW WZ L A 2 TRAVEL LODGE 0" NORTH ry HAVEN z n MANOR w a � R p r~ } n•1L LO'N 13ROCK N PROJECT DESCRIPTION: Install sidewalk along 84 th Ave. W from 238 th St .SW to 234 th St. SW, with curb and gutter. This project ranked #5 in the Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: Begin design in 2021 (unsecured funding) COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 2022-2035 Planning/Study Engineering & Administration $90,000 Construction $495,000 1 % for Art TOTAL $90,000 $495,000 50 PROJECT NAME: 801Ave. W Walkway ESTIMATED PROJECT COST: $900,000 from 206t" St. SW to 212t" ST. SW PROJECT DESCRIPTION: Install sidewalk along 80t Ave. W from 206 th St. SW to SW with curb and gutter. This project ranked #1 in Long Walkway List of the 2015 Transportation Plan. 212 th St. PROJECT BENEFIT/RATIONALE: The improvements will improve non -motorized transportation safety. SCHEDULE: 2019-2021 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & Administration & ROW $60,000 $74,000 Construction $766,000 1 % for Art TOTAL $60,000 $74,000 $766,000 51 PROJECT NAME: 2nd Ave. S from James St. ESTIMATED PROJECT COST: $30,000 to Main St. Walkway :4 4ft '0 NG 4 Xx 0 i1 * all or part of this project may qualify for 1 % for the Arts PROJECT DESCRIPTION: 2nd Ave. S between Main St. 2015 Transportation Plan). Construct a missing link of sidewalk (approximately 100') on and James St. (Ranked #2 in Short Walkway Project list in PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: 2019 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & Administration Construction $30,000 1 % for Art TOTAL $30,000 52 PROJECT NAME: Maplewood Dr. Walkway ESTIMATED PROJECT COST: $2,108,000 from Main St. to 200th St. SW PROJECT DESCRIPTION: Construct sidewalk on Maplewood Dr. from Main St. to 200t St. SW (- 2,700'). A sidewalk currently exists on 200th St. SW from Main St. to 76th Ave. W, adjacent to Maplewood Elementary School (rated #22 in the Long Walkway list of the 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: Create pedestrian connection between Maplewood Elementary School on 200th St. SW and Main St., by encouraging kids to use non -motorized transportation to walk to / from school. SCHEDULE: Engineering scheduled for 2020 and construction in 2021 (funding unsecured). COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & Administration $340,000 Construction $1,768,000 1 % for Art TOTAL $340,000 $1,768,000 * all or part of this project may qualify for 1 % for the Arts. 53 PROJECT NAME: 21 8thSt. SW Walkway ESTIMATED PROJECT COST: $1,305,000 from 76t" Ave. W to 84t" Ave. W MENNEN 11111111101111 PROJECT DESCRIPTION: Install sidewalk along 218t St. SW from 76t Ave. W to 84 th Ave. W with curb and gutter. This project ranked #2 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: The improvements will improve pedestrian safety. SCHEDULE: 2020-2021 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & Administration & ROW $200,000 Construction $1,105,000 1 % for Art TOTAL $200,000 $1,105,000 54 PROJECT NAME: Walnut from 3r Ave. S to 4 th ESTIMATED PROJECT COST: $105,000 Ave. S Walkway ARTS W ENTER a Z UNDOW NE N ALDER ALDER ST 346 1 414 412 410 1 arking UJ a o SOUND VIEW o: HOWELL WAY W a x v BAN r 409 530Pancak 407 540 Hausm 403 405 546 o 401 w a DAYTON ST OLD MILLTOWN MAPLE ST TRIC fl ALDER ST N W aFBECKWT'S z K WALNUT Sr GREGORY e H 525 PROJECT DESCRIPTION: Construct a missing link of sidewalk (approximately 350') on Walnut St. between 3rd Ave. S and 4t" Ave. S (ranked #3 in Short Walkway Project list in 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Engineering & Construction scheduled for 2019 (unsecured funding). COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & Administration $10,000 Construction $95,000 1 % for Art TOTAL $105,000 * all or part of this project may qualify for 1 % for the Arts 01 PROJECT NAME: 216 th St. SW Walkway from ESTIMATED PROJECT COST: $157,000 Hwy. 99 to 72nd Ave. W 7200 PARK & RIDE 7309 STE VE N S MAN DR o AO r J IL ❑ 2021 nSTEVEN CO U RT 21527 216TJ 121 :V EH5 F I LION lL o C1 � r W N LU J N 21500 AEGIS ST S 21600 KRUGER CLINIC 21400f B&M CONS I 21410 21d08 21401 2141204 { r 21420 2$431 MC�ONAL�' ❑ 2150 SAS 21558 VALUE VILLA /! 21619 PROJECT DESCRIPTION: Install 150' sidewalk on north side of 216 thSt. SW from Hwy. 99 to 72nd Ave. W (completing a missing link on north side of stretch). This project ranked #4 in the Short Walkway List (from 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Engineering & Construction scheduled for 2019 (unsecured funding). COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & Administration $30,000 Construction 1 $127,000 1 % for Art TOTAL $157,000 * all or part of this project may qualify for 1 % for the Arts 56 PROJECT NAME: 238 St. SW from Hwy. 99 to ESTIMATED PROJECT COST: $491,000 SR-104 Walkway No MEN MEN I■� I ■ IIIN .�i■I - - I� PROJECT DESCRIPTION: Ranked #12 in Long Walkway list from 2015 Transportation Plan. Install 5' sidewalk on the north side of 238t" St. SW. PROJECT BENEFIT/RATIONALE: Improve pedestrian safety along that stretch and creating safe pedestrian connection between Hwy. 99 and 76t" Ave. W. SCHEDULE: Engineering and Construction are scheduled in 2019 (unsecured funding). COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 2022-2035 Planning/Study Engineering & Administration $91,000 Construction $400,000 1 % for Art TOTAL $491,000 * all or part of this project may qualify for 1 % for the Arts. 57 PROJECT NAME: Minor Sidewalk Program ESTIMATED PROJECT COST: $300,000 PROJECT DESCRIPTION: Complete missing sidewalk along short segments throughout the City. PROJECT BENEFIT/RATIONALE: Improve pedestrian safety. SCHEDULE: 2016-2021 annual program) COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & Administration & ROW $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 Construction $45,000 $45,000 $45,000 $45,000 $45,000 $45,000 1 % for Art TOTAL $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 PROJECT NAME: 191th St. SW from 80th ESTIMATED PROJECT COST: $630,000 Ave. W to 76t" Ave. W ►z z a 192ND PL 5W Sp �' Sw PROJECT DESCRIPTION: Install sidewalk along 191th St. SW from 80t Ave. W to 76t Ave., with curb and gutter. This project ranked #8 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2022-2035 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 2022-2035 Planning/Study Engineering & Administration $90,000 Construction $540,000 1 % for Art TOTAL $630,000 59 PROJECT NAME: 95 1h PI. W Walkway from ESTIMATED PROJECT COST: $585,000 2241h ST. SW to 220th St. SW M L PROJECT DESCRIPTION: Install sidewalk along 95th PI. W from 224th ST. SW to 220th ST. SW, with curb and gutter. This project ranked #9 in the Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2022-2035 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 2022-2035 Planning/Study Engineering & Administration $85,000 Construction $500,000 1 % for Art TOTAL $585,000 We PROJECT NAME: 104 th Ave. W Walkway ESTIMATED PROJECT COST: $990,000 from 238t" St. SW to 106t" Ave. W PROJECT DESCRIPTION: Install sidewalk along 104 Ave. W from 238t ST. SW to 106t Ave. W, with curb and gutter. This project ranked #10 in the Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2022-2035 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 2022-2035 Planning/Study Engineering & Administration $150,000 Construction $840,000 1 % for Art TOTAL $990,000 61 PROJECT NAME: Elm Way Walkway from ESTIMATED PROJECT COST: $225,000 8t" Ave. S to 9t" Ave. S W Of f�� f PROJECT DESCRIPTION: Install sidewalk along Elm Way from 8t Ave. S to 9t Ave. S. This project ranked #6 in the Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2022-2035 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 2022-2035 Planning/Study Engineering & Administration $40,000 Construction $185,000 1 % for Art TOTAL $225,000 62 PROJECT NAME: 801h Ave. W from 218 th St. ESTIMATED PROJECT COST: $315,000 SW to 2201h St. SW I L cn n 5TEVE Golden n , HEAL Leaves i TEVENS A K — LEGEND WE x ESTATES ISL 111111' J ' 1 218TH ST S W ■ 7a n Ion M 219TH 5T SW E r � � m u� ---------�T----- ------;L --- r-r-—ST SW — PROJECT DESCRIPTION: Install sidewalk along 80t Ave. W from 218t ST. SW to 220t ST. SW, with curb and gutter. This project ranked #7 in the Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2022-2035 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 2022-2035 Planning/Study Engineering & Administration $55,000 Construction $260,000 1 % for Art TOTAL $315,000 63 PROJECT NAME: 84 1h Ave. W from 188 th St. ESTIMATED PROJECT COST: $315,000 SW to 1861h St. SW Jr ir do F b A SW MMI 186TH 5T W m i ■-116 OF- L J L , la- r OF ■ W F■ 18 TH 5 5W ■ 01 Es 188TH 5T SW , ' F Z W _ ` 0 r I SFAlfiFW - PROJECT DESCRIPTION: Install sidewalk along 84th Ave. W from 188th St. SW to 186th St. SW., with curb and gutter. This project ranked #5 in Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2022-2035 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 2022-2035 Planning/Study Engineering & Administration $60,000 Construction $255,000 1 % for Art TOTAL $315,000 64 PROJECT NAME: 236 th St. SW from Hwy 99 ESTIMATED PROJECT COST: $765,000 to 76t" Ave. W - _I rnti.�r�ti. rnrc i -I -E FFICE C N ' 322s 'D' ■ n i PARK EDNIONDS SAL eA�� ' ■ 1 APTS F1 , 661t m LL NORTH = y CH RIST LU TH E RAN CH U RCH N HAVEN zm ti MANOR W PARK & RIDE L R a — I OFFICE ~ 7 ■ 236THH 236 7 N4N T 171 }1 ■ I E I "FM • 23111 03 SAFEJIHG 236WAY 05 L KJIHG PROJECT DESCRIPTION: Install sidewalk along 236t St. SW from Hwy 99 to 76t Ave. W. This project ranked #11 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2022-2035 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 2022-2035 Planning/Study Engineering & Administration $115,000 Construction $650,000 1 % for Art TOTAL $765,000 65 PROJECT NAME: 238 th St. SW from Hwy 99 ESTIMATED PROJECT COST: $1,170,000 to 76t" Ave. W NJ PARK .•nrIRL ■ ' ■ NA LN ' , . EOMONUs BALL ■ ; " ' ' APTS NORTH _ ' ` CH RIST LH THE RAN CHURCHv H PARK .�. N� �, 4 ' & RIDE OFFICE d R , 7 • i r 2 TH T 1 a 23667 LY d 23663 SAFE AY , I ■ 1 , , ■ 23606 N4N L HJIHG FC.� ' I ' ! ■ ■ 23667 SUNSET L • . 23679 O p '•n•1L LO'•n� J Q 5 BROOK >. � R AURORAIL - ` S MARKETPLACE T • _ H FA ILVPANCAKE V 7-�7 " i NEW 238TH ST 5W • ` ` , , IL ` r LY SEOUL ■ , ■ Q23821 PLAZA DG' ► , `■ ■ 23827 ' ' * . • . ill TRAVEL LOE ST. FRANCIS -M IS ISON TA Ca TIM MOTEL . . . - ■ 239 MM ■ K& E MOTEL WHSE , PROJECT DESCRIPTION: Install sidewalk along 238t St. SW from Hwy. 99 to 76t Ave. W This project ranked #12 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2022-2035 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 2022-2035 Planning/Study Engineering & Administration $175,000 Construction $995,000 1 % for Art TOTAL $1,170,000 PROJECT NAME: 80 Ave. W / 180" St. ESTIMATED PROJECT COST: $1,350,000 SW from 188t" St. SW to OVD PROJECT DESCRIPTION: Install sidewalk along 80th Ave. W from 188 th St. SW to OVD. This project ranked #13 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2022-2035 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 2022-2035 Planning/Study Engineering & Administration $270,000 Construction $1,080,000 1 % for Art TOTAL $1,350,000 67 PROJECT NAME: 189" PI. SW from 80t ESTIMATED PROJECT COST: $585,000 Ave. W to 76t" Ave. W PROJECT DESCRIPTION: Install sidewalk along 189thPl. SW from 80th Ave. W to 76 th Ave. W. This project ranked #14 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2022-2035 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 2022-2035 Planning/Study Engineering & Administration $115,000 Construction $470,000 1 % for Art TOTAL $585,000 .: PROJECT NAME: Ferry Storage ESTIMATED PROJECT COST: $357,000 Improvements from Pine St. Dayton St. PROJECT DESCRIPTION: storage for ferry users. Modify existing lane channelization on SR104 to add vehicle PROJECT BENEFIT/RATIONALE: Reduce conflicts between ferry storage and access to local driveways. SCHEDULE: 2019 (unsecured funding) COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & Administration $50,000 Construction $307,000 1 % for Art TOTAL $357,000 We PROJECT NAME: Trackside Warning System ESTIMATED PROJECT COST: $350,000 @ Dayton and Main St. RR Crossing PROJECT DESCRIPTION: Install Trackside Warning System or Quiet Zone @ Dayton and Main St. Railroad Crossings. PROJECT BENEFIT/RATIONALE: Reduce noise from train horns at both intersections. SCHEDULE: Construction is scheduled for 2016. COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Engineering & Administration 300,000 Construction 1 % for Art TOTAL $300,000 * all or part of this project may qualify for 1 % for the Arts. 70 CFP STORMWATER 71 72 Project Name Purpose Grant Opportunity Grant/Date Current Project Phase (2016-2021) Total Cost Revenue Source 2016 2017 2018 2019 2020 2021 Dayton St and Hwy 104 Drainage Add lift station and other new infrastructure to reduce $0 (Federal or State secured) Improvements. intersection flooding. Design $0 (Federal or State unsecured) $2,252,700 (DebUStormwater Fees) $302,700 $1,900,000 $50,000 52,252,700 Total $302,700 $1,900,000 $50,000 $0 $0 $0 Willow Creek/Daylighting Daylight channel to allow better connnectivity with the Puget RCO SRF Grant 1 $157,331 (Federal or State secured) $157,331 Sound to benefit fish and reduce flooding. Possible Grant(TBD Study $4,200,000 (Federal or State unsecured) $225,000 $225,000 $1,800,000 $1,950,000 $1,467,869 (DebUStormwater) $47,869 $75,000 $75,000 $600,000 $650,000 $20,0( $5,825,200 Total $205,200 $300,000 $300,000 $2,400,000 $2,600,000 $20,000 Perrinville Creek High Flow Find solution to high peak stream flows caused by excessive Ecology Grant $633,750 (Federal or State secured) $123,375 $510,375 Reduction/Management Project - stormwater runoff that erodes the stream, causes flooding Possible Grant/TBD Design $1,087,500 (Federal or State unsecured) $337,500 $375,000 $375,000 Seaview Park Infiltration Facility and has negative impacts on aquatic habitat. $623,750 (DebUStormwater Fees) $41,125 $170,125 $112,500 $125,000 $125,000 $50,000 $2,345,000 Total $164,500 $680,500 $450,000 $500,000 $500,000 $50,000 Total CFP $10,422,900 Annual CFP Totals $672,400 1 $2,880,500 1 $800,000 1 $2,900,000 1 $3,100,000 r $70,000 Revenue Summary by Year Totals Source 2016 2017 1 2018 1 2019 1 2020 2021 $791,081 Total Federal& State(Secured) $280,706 $510,375 $0 $0 $0 $0 $5,287,500 Total Federal & State (Unsecured) $0 $225,000 $562,500 $2,175,000 $2,325,000 $0 $4,344,319 Debt tormwater Feesl $391,6941 $2,145,1251 $237,5001 $725,0001 $775,0001 $70,000 74 PROJECT NAME: Dayton St and Hwy 104 ESTIMATED PROJECT COST: $2,252,700 Drainage Improvements 9@ 31 -a i i. e 200 GQ !Tqk 146 1 PROJECT DESCRIPTION: Add lift station in the Beach Place parking lot and other new infrastructure. PROJECT BENEFIT/RATIONALE: To reduce flooding at the intersection of Dayton St and State Hwy 104. SCHEDULE: 2016-2021 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Eng. & Admin. $302,700 Construction $1,881,000 $50,000 1% for Art $19,000 TOTAL $302,700 $1,900,000 $50,000 75 PROJECT NAME: Willow Creek Daylighting ESTIMATED PROJECT COST: $5,825,000 Edmonds Marsh as seen from the viewing platform. Previously restored section of Willow Creek. Source: www.unocaledmonds.info/clean-u /n aaliery.php PROJECT DESCRIPTION: Building on the studies completed in 2013 and 2015 that assessed the feasibility of daylighting the Willow Creek channel, this project will likely construct a new tide gate and 1,100 linear ft of new creek channel lined with an impermeable membrane. Funds will be used for design and construction but exact breakdown cannot be assessed at this time. PROJECT BENEFIT/RATIONALE: The daylighting of Willow Creek will help reverse the negative impacts to Willow Creek and Edmonds Marsh that occurred when Willow Creek was piped in the early 1960s. This project will provide habitat for salmonids, including rearing of juvenile Chinook. This project, along with its companion CIP projects "Edmonds Marsh Channel Improvements" and "Dayton Street Pump Station," will also help reduce the flooding problem at the intersection of SR-104 and Dayton Street. SCHEDULE: 2016-2021 COST BREAKDOWN PROJECT COST 2016 2017 2018 2019 2020 2021 Planning/Study Eng. & Admin. $205,200 $300,000 $300,000 Construction $2,400,000 $2,600,000 $20,000 1 % for Art TOTAL $205,000 $300,000 $300,000 $2,400,000 $2,600,000 $20,000 76 PROJECT NAME: Perrinville Creek High Flow ESTIMATED PROJECT COST: $2,345,000 Reduction/Management Project Talhot Frederick a C n m 1 4t 185th 00 M U 87th 04 1 AQ7aL 172n �� I i; w 173 d Nc I Perrinville d4 Creek th :i 78th - 77th' 1 78th -w 1 Oth m 181s to m a �RRfL n n t Perrinville Creek Channel illustrating the channel incision that will be addressed by restoration. PROJECT DESCRIPTION: A flow reduction study for the Perrinville Creek basin was completed in 2014. This study recommended a number of flow control and water quality projects to improve the conditions in Perrinville Creek. The City applied for and won a grant from the Department of Ecology for $633,750 to design and construct a stormwater infiltration facility in Seaview Park. The 2016 and 2017 budgets are for that facility. The dollars allocated in the out years are to implement additional water quality and flow control projects in the Perrinville Creek basin as recommended by the Flow Reduction Study. PROJECT BENEFIT/RATIONALE: Urbanization of the Perrinville Creek Basin has increased flows in the creek, incision of the creek, and sedimentation in the low -gradient downstream reaches of the creek. Before any habitat improvements can be implemented, the flows must be controlled or these improvements will be washed away. SCHEDULE: 2016-2021 COST BREAKDOWN PROJECT 2016 2017 2018 2019 2020 2021 COST Planning/Study Eng. & Admin. $164,500 $450,000 $50,000 Construction $673,695 $495,000 $495,000 1% for Art $6,805 $5,000 $5,000 TOTAL $164,500 $680,500 $450,000 $500,000 $500,000 $50,000 77 Everett Daily Herald Affidavit of Publication State of Washington } County of Snohomish } ss Kathleen Landis being first duly sworn, upon oath deposes and says: that he/she is the legal representative of the Everett Daily Herald a daily newspaper. The said newspaper is a legal newspaper by order of the superior court in the county in which it is published and is now and has been for more than six months prior to the date of the first publication of the Notice hereinafter referred to, published in the English language continually as a daily newspaper in Snohomish County, Washington and is and always has been printed in whole or part in the Everett Daily Herald and is of general circulation in said County, and is a legal newspaper, in accordance with the Chapter 99 of the Laws of 1921, as amended by Chapter 213, Laws of 1941, and approved as a legal newspaper by order of the Superior Court of Snohomish County, State of Washington, by order dated June 16, 1941, and that the annexed is a true copy of EDH673320 ORD. 4013, 4014 as it was published in the regular and entire issue of said paper and not as a supplement form thereof for a period of 1 issue(s), such publication commencing on 12/13/2015 and ending on 12/13/2015 and that said newspaper was regularly distributed to its subscribers during all of said period. The amount of the fee for such publication is $46.44. { Subscribed and sworn before me on this day of , IF Notary Public in and for the State of Washington. City of Edmonds - LEGAL ADS 1 14101416 SCOTT PASSEY RECEIVED DEC 16 2015 I',D,yj;t1'','Ds CITY CLERK Fm�LAUBREY KNAPP Notary Public State of Washington y Commission Expires July 30, 2018 ,.--�=�r-�.-••.-t...�_--- SUMMARY OF ORDINANCE$ d" City d dmorMe. W89t fnittpn On the "' day o1 Deoembor, 2015, tNe 01, ounCEl O1 the Clly of Edmonds, p.saed Itte 1pilawing Ordina 1WL Siimmarles of the content of said ordinances consisting of titles are prrrvlded as follows: ��p�ANC p gp AN ORDINANCo= O THE E CITl'�OF EDMONDS WASHINGTON, PROHIBITING FOR EIGHTEEN MONTHS THE INSTALLATION OF STYRENE-BUTADIENE RUBBER UALSO KNOWN AS SBA OR "CRUMB RUBBER'jj ON BLICLY--OWNED ATHLETIC FIELDS WITHIN THE CITY OF EDMONDS: AND DIRECTING.THAT ADDITIONAL ANALYSIS BE CONDUCTED ON THE POSSIBLE NEGATIVE IMPACTS FROM SUCH INSTALLATIONS OF SBR UPON HUMAN HEALTH AND THE ENVIRONMENT AN ❑RDiNANCC-O-F—THE CITY OF EDMONDS. WASHINGTON, ADOPTING THE BUDGET FOR FISCAL YEAR COMMENCING JANUARY 1, 2016; ADOPTING AMENDMENTS TO THE CAPITAL FACILITIES PLAN ELEMENT OF THE COMPREHENSIVE PLAN; AND FIXING ATIME WHEN THE SAME SHALL BECOME EFFECTIVE The full text of illase Drdnances wUl ha ma6ed upon request DATED ih15 9th day of December, 2015. CITY CLERK, SCOTT PASSEY IF uNoed: December 13, 2015. EDH67332T