Loading...
Ordinance 4055ORDINANCE NO.4055 AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING THE CITY OF EDMONDS COMPREHENSIVE PLAN; ADOPTING VARIOUS AMENDMENTS TO THE PARKS, RECREATION, AND OPEN SPACE AND CAPITAL FACILITIES ELEMENTS OF THE CITY'S COMPREHENSIVE PLAN AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. WHEREAS, the Planning Board held a public hearing on this year's various plan text amendments on November 9, 2016; and WHEREAS, the City Council held a review session on November 22, 2016; and WHEREAS, the Capital Facilities Plan (CFP) was heard separately by the Planning Board on October 12, 2016, and the City Council held its public hearing on November 1, 2016; and WHEREAS, the City Council approved the CFP for inclusion in the adopting ordinance on November 22, 2016; and WHEREAS, on December 6, 2016, the City Council held a public hearing on the 2016 Comprehensive Plan amendments; NOW THEREFORE THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. The 2016 City of Edmonds Comprehensive Plan is hereby amended as follows: a) the recently adopted Marina Beach Master Plan, which is contained in Exhibit A hereto, is hereby added as a new Appendix D to the Parks, Recreation, and Open Space (PROS) -1- Plan, which is an element of the Comprehensive Plan; b) the discussion of Marina Beach in Appendix A to the PROS Plan, page A-39, is hereby amended to read as set forth in Exhibit A hereto; c) page 4-8 of the Action Plan in Chapter 4 of the PROS Plan is hereby amended to read as set forth in Exhibit A hereto; d) the Performance Measures discussion on page 144 of the Capital Facilities Element of the Comprehensive Plan is hereby amended to read as set forth in Exhibit A hereto. Exhibit A, which is attached hereto, is fully incorporated herein by this reference as if it were set forth in full. Section 2. The 2017-2022 Capital Facilities Plan, which is an element of the Comprehensive Plan, is hereby adopted to read as set forth in Exhibit B, which is attached hereto and incorporated herein by this reference as if fully set forth herein. Exhibit B completely replaces the 2016-2021 Capital Facilities Plan. Section 3. Effective Date. This ordinance, being an exercise of a power specifi- cally delegated to the City legislative body, is not subject to referendum, and shall take effect five (5) days after passage and publication of an approved summary thereof consisting of the title. ATTEST/AUTHENTICATED: C CLERK, OTT4KSSEY APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY: AP RO ED: MAYOR DAVE EARLING -2- BY JEFF TARADAY FILED WITH THE CITY CLERK: December 2, 2016 PASSED BY THE CITY COUNCIL: December 6, 2016 PUBLISHED: December 11, 2016 EFFECTIVE DATE: December 16, 2016 ORDINANCE NO. 4055 -3- SUMMARY OF ORDINANCE NO.4055 of the City of Edmonds, Washington On the 6th day of December, 2016, the City Council of the City of Edmonds, passed Ordinance No. 4055. A summary of the content of said ordinance, consisting of the title, provides as follows: AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING THE CITY OF EDMONDS COMPREHENSIVE PLAN; ADOPTING VARIOUS AMENDMENTS TO THE PARKS, RECREATION, AND OPEN SPACE AND CAPITAL FACILITIES ELEMENTS OF THE CITY'S COMPREHENSIVE PLAN AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. The full text of this Ordinance will be mailed upon request. DATED this 71h day of December, 2016. CI ERK, SCOTT PAS Y APPENDIX D: MARINA BEACH MASTER PLAN A Gti EDMONDS PARKS, RECREATION AND CULTURAL SERVICES [Include Adopted Marina Beach Master Plan here] City of Edmonds Parks, Recreation and Open Space Plan Marina Beach Park Regional Park 200 400 Feet Park Features • 3.37 Acres • 0.5 Miles walking trail • Playground • Sand volleyball court • Small boat launch (ramp) • View point • Portable restrooms (3) • Shoreline access, gravel beach • Off -leash dog area Site considerations _ _ ' `'I ...- • Zoned Commercial Waterfront - r "--- _g • Marine Protected Area • 31 additional parking stalls provided by Port of Edmonds under SEPA/SMP approval permit Replace with: "See Appendix D, Marina Beach Master Plan" • Likely to be improved by creek daylighting Planned Improvements Replace with: "Implement Master Plan" • Site master plan and implementation • Restroom (large) • Replace play area (large) • Continued maintenance Appendix A: Existing System A-39 City of Edmonds Parks, Recreation and Open Space Plan 3.J Use the opportunity of upgrades and maintenance at the Senior Center site to integrate the property more completely with the rest of the waterfront. 3.K Secure ongoing funding for the Beach Ranger program, recognizing the important role in tourism, building a connection to the shoreline and expanding appreciation for natural resources and habitat conservation. Goal 4: Natural Resource and Habitat Conservation 4.A Inventory and classify natural resources and habitat areas within of the park system. 4.B Conduct a city tree inventory and map to create a baseline of information to enhance tree canopy. 4.0 Connect new generations of residents and visitors to natural resources in Edmonds through Discovery Programs utilizing ranger naturalists. 4.D Collaborate on public information programs to help property owners (including the City) identify and remove invasive vegetation. 4.E Collaborate with various organizations in invasive plant removal and native vegetation planting in accord with landscaping plans for parks within the city limits. Suggest park maintenance projects that would be good candidates for the annual Arbor Day event sponsored by the Tree Board. 4.F Provide low impact access to natural resource areas to allow for enjoyment and interaction with nature. 4.G Steward the urban forest using appropriate maintenance of street and park trees, clear removal and replacement policies and providing information about urban forestry to property owners. 4. H Relocate incompatible uses from sensitive areas (i.e. waterfront dog park at Marina Beach Park). 4.1 Consider expanding the function and facilities around the Willow Creek Hatchery to create a more expansive interpretive center that includes the Edmonds Marsh. 4.H Ensure uses in environmentally sensitive areas are consistent with critical area regulations and the Shoreline Master Program. 4-8 Chapter 4: Action Plan Implementation Actions and Performance Measures Implementation actions are steps that are intended to be taken within a specified timeframe to address high priority sustainability goals. In addition, the Comprehensive Plan contains a small number performance measures (no more than one per element) that can be used to monitor and annually report on the implementation and effectiveness of the Comprehensive Plan. The Comprehensive Plan contains a small number performance measures (no more than one per element) that can be used to monitor and annually report on the implementation and effectiveness of the Comprehensive Plan. Performance measures, as identified in the Comprehensive Plan, are specific, meaningful, and easily obtainable items that relate to sustainability and can be reported on an annual basis. They are intended to help assess progress toward achieving the goals and policy direction of each major Comprehensive Plan element. The measure identified below is specifically called out as matching the above criteria and being important to capital facilities goals and will be reported annually, along with performance measures for other Comprehensive Plan elements. It is not intended to be the only measure that the City may use for capital facilities purposes. Implementation Action: Develop level of service standards for key public facilities by the end of 2017 and consider including the standards in the Comprehensive Plan. Performance Measure: Project delivery results - based on comparing projects in the Capital Facilities Plan to what is actually done on the projects. Capital Facilities 144 Following is a list ofpublicly-owned facilities in Edmonds and other nearby areas. QIFm H Q m N Name m' o Name m' o Elm St Park 1.85 CoE Frances Anderson Center Field 1.94 CoE Haines Wharf 0.69 CoE Hickman Park 5.61 CoE Hummingbird Hill Park 1.22 CoE Mathay Ballinger Park 0.51 CoE Pine Street Park 1.47 CoE Seaview Park 6.05 CoE Sierra Park 5.52 CoE Subtotal 24.86 Civic Center Playfield Boys and Girls Club Stadium Skate Park City Park Yost Memorial Park Pool Subtotal 7.92 13.96 44.14 66.02 CoE 6,856 CoE 7,140 CoE 6,000 CoE CoE CoE 4,808� 24,804 Regional Parks 144 Railroad Ave Tidelands 0.9 CoE Brackett's Landing North 5.11 CoE Brackett's Landing South 2.22 CoE Marina Beach Park 3.37 CoE Olympic Beach 2.82 CoE Senior Center 2.63 CoE Subtotal 17.05 Special Use Parks Centennial Plaza 0.08 CoE Dayton Street Plaza _ 0.1 CoE Edmonds Library and Plaza Room 1.29 CoE Edmonds Memorial Cemetery and Columbarium 6.63 CoE Anderson Center Field 1.62 CoE Hazel Miller Plaza 0.09 CoE Interurban Trail _ 4.88 CoE Lake Ballinger Access 0.19 CoE Meadowdale Community Clubhouse 0.99 3,232 CoE Ocean Ave Viewpoint 0.2 CoE Point Edwards Scenic Overlook (easement) 0.1 CoE Richard F. Anway Park 0.17 CoE Stamm Overlook 0.36 CoE Sunset Ave 1.14 CoE Willow Creek Hatchery 1.68 CoE Subtotal 19.52 3.232 Edmonds Marsh 23.37 CoE Edmonds Marsh Open Space 0.85 CoE Haines Tidelands _ 0.44 CoE Hutt Park _ 4.53 CoE Maplewood Hill Park 9.96 CoE Meadowdale Natural Areas 1.07 CoE Olympic View Open Space 0.49 CoE Pine Ridge Park 23.78 CoE Seaview Reservoir 1.31 CoE Shell Creek Open Space 1.04 CoE Wharf Street 0.12 CoE Willow Creek Park 2.25 CoE Subtotal 69.21 Marina Waterfront Businesses Harbor Square Business Complex Subtotal 8.1 14.22 15.11 37.43 PoE PoE PoE Ither City Owned Facilities Log Cabin Visitor Center/Chamber of Commerce 372 CoE City Hall _0.03 _0.59 34,074 CoE Edmonds Historical Museum 0.12 2,084 CoE Edmonds Library and Plaza Room 3.03 19,520 CoE Fire Station #16 10,700 CoE Fire Station #17 _ 9,800 CoE Fire Station #20 6,400 CoE Fishing Pier Ranger Station 1,200 CoE Fishing Pier Restroom 918 CoE Frances Anderson Center 55,000 CoE Karlsten House 0.22 2,250 CoE 'Old' Public Works 3.94 14,100 CoE Sewage Treatment Plant 115,200 CoE Public Safety Complex 2.61 30,940 CoE Public Works Operation and Maintenance Center 4.35 28,000 CoE Wade James Theatre 2.34 6,289 CoE Subtotal 17.23 336.847 Chase Lake Elementary 10.26 57,697 ESD 15 Edmonds Elementary School 8.58 34,726 ESD 15 Edmonds-Woodway High School 30.19 208,912 ESD 15 Former Woodway High School 39.75 148,740 ESD 15 Edmonds Homeschool Resource (K-12) ESD 15 Schriber Lake High School ESD 15 Madrona School (K-8) 31.3 85,505 ESD 15 Maplewood Parent Cooperative (K-8) 7.41 76,554 ESD 15 Maplewood Center (K-12) ESD 15 Seaview Elementary 8.28 49,420 ESD 15 Sherwood Elementary 13.19 43,284 ESD 15 Westgate Elementary 8.34 44,237 ESD 15 Woodway Elementary 9.89 37,291 ESD 15 Subtotal 167.19 786,366 Chase Lake Natural Area College Place Elementary College Place Middle School Lynndale Elementary School Meadowdale High School Meadowdale Middle School Meadowdale Elementary School Meadowdale Playfields 10.8 ESD 15 9 48,180 18.7 87,031 10 39,043 39.56 197,306 ESD 15 19.38 102,925 ESD 15 8.78 57,111 ESD 15 24.09 ESD 15 Subtotal 140.31 531,596 Edmonds Center for the Arts 2.54 PFD Edmonds Conference Center 0.33 11,252 EDCC Edmonds Fishing Pier 0.61 WDFW Edmonds Underwater Park and Higgins Trails 33.21 DNR Olympic View Water District Maintenance Facility 0.83 7,480 OVWD Public Utility Water District #1 0.68 PUD Subtotal 38.2 18,732 Ballinger Playfield and Former Golf Course Esperance County Park Meadowdale Beach County Park South County Park Figure 43: List of Publicly -owned Capital Facilities 52.59 MLT 9.59 SnoCo 144.34 SnoCo 118.55 SnoCo Subtotal 325.07 Capital Facilities 140 City of Edmonds Parks, Recreation and Open Space Plan Civic Center Playfields & Skate Park Other Parks and Facilities Park Features • 7.92 Acres • 0.3 miles of walking trail • Playground • Basketball courts (2) • Tennis courts (2) • Football field (1 youth) • Soccer fields (1 adult, 1 youth) Site considerations • Owned by Edmonds School District • Operated by City of Edmonds • Zoned Public Use 100 200 � Feet • Skate park • Portable restrooms (2) • Petanque courts (4) • Cinder track (.25 miles) • Stadium • This site used for 4t" of July Fireworks display, Taste of Edmonds, Wenatchee Youth Circus Planned Improvements • Acquisition, master planning and development • Add large play area • Continued maintenance A-20 Appendix A: Existing System Exhibit B Capital Facilities Plan CITY OF EDMONDS CAPITAL FACILITIES PLAN 2017-2022 x�p DRAFri CFP GENERAL Cn Current Grant Project (2017.2022) Project Name Purpose Opportunity Phase Total Cost Revenue Source 2017 2018 2019 2020 2021 2022 2023-2037 Aquatic Facility Meet citizen needs for an Aquatics $0 Public Vote Center (Feasibility study complete Unknown Conceptual $0 G.O. Bonds August 2009). $0 $0 Total 5-$23 M Civic Center Development City master plan in progress $0 Public Vote RCO Land Conceptual $135,000 REET 1 / Grants $135,000 Acquisition $0 G.O. Bonds $135000 Total $135,000 $1,500,000 $1,500,000 $3,135,000 Community Park / Athletic Complex - In cooperation with ESD#15 develop $0 Capital Campaign Old Woodway High School: Phase 2 and 3 a community park and athletic ROO Phasel $0 REET 2 complex. Complete $0 School District $0 Foundation so Grants $0 Total Unknown Parks & Facilities Maintenance & Operations Replace / Renovate deteriorating $0 Public Vote Building building in City Park. Unknown Conceptual $0 G.O. Bonds $0 $0 Total $3-4M Waterfront Redevlopment/Walerfront Walkway Rehabilitate grounds, parking, beach $1,600,000 REET / Grants $1,600,000 Completion access and area around Senior Unknown Conceptual $0 G.O. Bonds Center, walkway access. $500,000 Park Impact Fees $500,000 $0 Private Partnership $2,100,000 Total $2,100,000 Edmonds Crossing WSDOT Ferry / Mutimodal Relocate ferry terminal to Marina EIS $0 Federal (Unsecured) Facility Beach. US DOT Completed $0 Stale Funds $0 Total Unknown Public Market (Downtown Waterfront) Acquire and develop property for a year round public market. Unknown Conceptual SO Grants s0 Total Unknown Total CFP $2,235,000 Annual CFP Totals $2,100,000 $0 $0 $0 1 $1,500,000 1 $1,500,000 PROJECT NAME: Aquatic Facility ESTIMATED PROJECT COST: $5,000,000 — $23,000,000 PROJECT DESCRIPTION: Implement recommendations of the Aquatics Feasibility Study completed in 2009. Six scenarios were presented and the plan recommended by the consultants was a year round indoor pool with an outdoor recreational opportunity in the summer. The project is dependent upon a public vote. PROJECT BENEFIT/RATIONALE: The current Yost Pool, built in 1972, is nearing the end of its life expectancy. The comprehensive study done in 2009 assessed the needs and wants of Edmonds citizens in regard to its aquatic future as well as the mechanical condition of the current pool. SCHEDULE: 2021-2037 COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Eng. & Admin. Construction 1 % for Art TOTAL $5m - $23m x all or part of this Project may quality for 1% for the Arts F PROJECT NAME: Civic Center Development ESTIMATED PROJECT COST: $3,135,000 / Stadium Demolition PROJECT DESCRIPTION: Civic Center Development / Stadium Demolition. As part of the Master planning process for Civic, and in consideration of the current condition of the stadium, it is being recommended to demolish the current stadium. The City also has some grant funds available to assist with this. In addition, develop a signature downtown park at this site. PROJECT BENEFIT/RATIONALE: Civic Center Development / Stadium Demolition. The Civic Master plan will be complete by early 2017. Funds will be set aside, and grant funds applied for in order to develop the master plan. This is a high priority in the PROS plan. SCHEDULE: 2017 - 2022 COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Construction $135,000 $0 $0 $0 $1,500,000 $1,500,000 TOTAL $135,000 $0 $0 $0 $1,500,000 $1,500,000 CITY OF EDMONDS CAPITAL FACILITIES PLAN DESCRIPTION PROJECT NAME: Community Park / Athletic ESTIMATED PROJECT COST: Unknown Complex at the Former Woodway High School ra CIA HOGAN rC)R lER WOODWAY HIGH SCHOOL. ATHLETIC FIELD IMPROVEMENTS PRE PAnto fOX THE E DMON DS SCHOOL DISH ICT MAY FOV PROJECT DESCRIPTION: Develop community park and regional athletic complex with lighted or unlighted fields and recreational amenities in partnership with Edmonds School District, community colleges, user groups, and other organizations. Development dependent upon successful regional capital campaign. $10m - $12M project for all 3 phases. PROJECT BENEFIT/RATIONALE: The site is currently an underutilized and under maintained facility with great potential as community multi -use active park. Site has existing controlled access, greenbelt, parking and 4-court tennis facility with substandard fields. Highly urbanized area with 150,000 residents within 5-mile radius. Future maintenance supported by user fees. Phase 1 was completed in 2015 for $4.2M, Phases 2 & 3 will be completed in the future for an additional $6-8M. SCHEDULE: 2017-2037 COST BREAKDOWN PROJECT 2017 2018 2019 2020 2021 2022 2023- COST 2037 Planning/Study Engineering & Administration Construction 1 % for Art TOTALI I I Unknown " all or a portion of this project may quality for 1 % for the Arts 9 PROJECT NAME: Parks & Facilities ESTIMATED PROJECT COST: $3-$4 Million Maintenance & Operations Building Existing Building Outline Yard Fu Mo 4 0 o , 100 L adirtgIFNew One�Bu'iding 1,600 sf 6,600 sf Driveway — 15,800� Yard Functions � 11,910 If Perimefer zone — 4,200 st Existing Fence Line PROJECT DESCRIPTION: The 40 year old maintenance building in City Park is reaching the end of its useful life and is in need of major renovation or replacement. PROJECT BENEFIT/RATIONALE: Parks and Facilities Divisions have long outgrown this existing facility and need additional work areas and fixed equipment in order to maintain City parks and Capital facilities for the long term. SCHEDULE: Contingent on finding additional sources of revenue from general and real estate taxes. COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Eng. & Admin. Construction 1 % for Art TOTAL $3m - $4m 'all or part of this Project may qualify for 1 % for the Arts 10 PROJECT NAME: Waterfront Redevelopment ESTIMATED PROJECT COST: $2,100,000 / Waterfront Walkway Completion • rn To Bncn }_- �-------------- ®R.--� � kYr�4 Prapvwd Rmw4 W arerlront Ganrer j ;I ;rrra5: r �Mw ww r 1 _ - ftioge.ed oaF�.s "Fnr rw rarer. raecnrwr tdnn ~ BFa Wa � �y! 4�IFY w'�trlir ��aewa wwe.rr s a��vo..d ww tl.MW - mEy�.rw trnn 4' � PiSi1Ntl a4ClEKM rl.EYO . PROJECT DESCRIPTION: Work with Sr. Center to renovate surrounding park, parking lot and walkway. Remove creosote pier, reintroduce habitat for fish and wildlife. Increase access to the waterfront. Connect waterfront walkway from Brackett's Landing South to Olympic Beach, including completion in front of the Ebb tide condominiums. PROJECT BENEFIT/RATIONALE: Provide anew Senior and Community Center and provide a new beachfront walkway. One of the top priorities in the PROS plan is to open up beach -front access. SCHEDULE: 2017-2022 COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Eng. & Admin. $100,000 Construction $2,000,000 $0 $0 $0 1 % for Art TOTAL $2,100,000 $0 $0 $0 $0 all or part of this Project may qualify for 1 % for the Arts IF PROJECT NAME: Edmonds Crossing ESTIMATED PROJECT COST: Unknown WSDOT Ferry / Multimodal Facility 011114*�M* Modified Pt. Edwards Alternative p - uHacu paf of�'s„y,� �.r ym ee mnmaol A1r4r IMrJ� yQy„ w,nvwr �� mom am •.w Edw��.ls .e+.s..nm PROJECT DESCRIPTION: Edmonds Crossing is multimodal transportation center that will provide the capacity to respond to growth while providing improved opportunities for connecting various forms of travel including rail, ferry, bus, walking and ridesharing. NOTE: The design of Marina Beach Park is a separate project. PROJECT BENEFIT/RATIONALE: To provide an efficient point of connection between existing and planned transportation modes. SCHEDULE: 2023-2037 COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023- 2037 Engineering & Administration of Way —Right Construction 1 % for Art TOTAL Unknown all or part of this project may qualify for 1 % for the Arts 12 PROJECT NAME: Public Market (Downtown ESTIMATED PROJECT COST: Unknown Waterfront) PROJECT DESCRIPTION: Work with community partners to establish a public market, year around, on the downtown waterfront area. PROJECT BENEFIT/RATIONALE: The project will help to create a community gathering area, boost economic development, bring tourists to town, and will be a valuable asset to Edmonds. SCHEDULE: This project depends on the ability to secure grant funding, and community partners willing to work with the city to establish this. This potentially can be accomplished by 2018. COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Eng. & Admin. Construction 1 % for Art TOTAL Unknown * all or part of this project may qualify for 1 % for the Arts. 13 CFP TRANSPORTATION 14 15 City of Edmonds Capital Facilities Plan (CFP) Transportation Projects (2017-2022) Grant (2017-2022) Project Name Pu se Opportunity Project Phase Total Cost Funding Source 2017 2018 2019 2020 2021 2022 2023-2037 Safetv / Capacity Analvsis 228th St. SW Corridor Safety Realign highly skewed intersection to $25,000 (Federal or State secured) $25,000 Improvements address safety and improve $0 (Federal or Stale unsecured) operations; create new east -west corridor between SR-99 and 1-5. Construction $0 (Unsecured) $0 (Local Funds) $0 Total 228th St. SW from Hwy 99 to 95th PI. Install two-way left turn lanes and $0 (Federal or State secured) W sidewalks to improve capacity and $375,000 (Federal or State unsecured) $75,000 $300,000 $8,690,00 pedestrian safety (project split with Snohomish County) Possible Grant Conceptual $0 (Unsecured) $0 (Local Funds) $1,356,00 $375,000 Total $75,000 $300,000 $10,046,00 76th Av. W @ 212th St. SW Intersection improvements to improve $3,006,500 (Federal or State secured) $2,920,000 $86,500 Intersection Improvements intersection delay and level of service $0 (Federal or State unsecured) (LOS). Construction $0 (Unsecured) $2,086,663 (Local Funds) $2,073,163 $13,500 $5,093,163 Total $4,993,163 $100,000 Highway 99 Gateway / Revitalization Install gateway elements and safety $10,000,000 (Federal or State secured) $5,000,000 $5,000,00 improvements along SR-99 Corridor. $2,600,000 (Federal or State unsecured) $1,600,000 $1,000,000 $72,400,00 State Conceptual $0 (Unsecured) Appropriation $300,000 (Local Funds) $300,000 $12,900,000 Total $300,000 $6,600,000 $6,000,000 $72,400,00 SR 524 (196th St. SW) / 88th Ave W Improve intersection safety by $0 (Federal or State secured) Intersection Improvements converting a stop controlled 0) intersection for NB and SB $744,500 (Federal or State unsecured) $122,000 $87,500 $535,000 movements to a signalized Possible Grant Conceptual $0 (Unsecured) intersection. $158,500 (Local Funds) $71,000 $87,500 $903,000 Total $193,000 $175,000 $535,000 Main St. and 9th Ave S Install traffic signal to improve $0 (Federal or State secured) intersection delay and Level of Service $894,000 (Federal or State unsecured) $118,000 $776,000 (mini roundabout is an alternative solution). Possible Grant Conceptual $0 (Unsecured) $17,000 (Local Funds) $17,000 $911,000 Total $135,000 $776,000 76th Ave. W @ 220th St. SW Convert split phasing operation for EB $0 (Federal or State secured) Intersection Improvements and WB movements to concurrent $5,637,450 (Federal or Stale unsecured) $285,450 $1,557,000 $3,795,00 through movements, with protected / permissive LT phasing. Possible Grant Conceptual $0 (Unsecured) $287,550 (Local Funds) $44,550 $243,000 $5,925,000 Total $330,000 $1,800,000 $3,795,00 Hwy 99 @ 212th St SW Intersection Widen 212th St. SW to add a $0 (Federal or Stale secured) Improvements westbound left turn lane for 200' $2,783,000 (Federal or Stale unsecured) $152,000 $1,091,000 $1,540,00 storage length and an eastbound left turn lane. Possible Grant Conceptual $0 (Unsecured) $23,000 (Local Funds) $23,000 $2,806,000 Total $175,000 $1,091,000 $1,540,00 City of Edmonds Capital Facilities Plan (CFP) Transportation Projects (2017-2022) Grant (2017-2022) 1 Project Name Purpose Opportunity Project Phase Total Cost Funding Source 2017 2018 2019 2020 2021 2022 2023-2037 Hwy. 99 @ 216th St. SW Intersection Widen 216th St. SW to add a left turn $0 (Federal or State secured) Improvement lane for eastbound and westbound movements. $2,313,000 (Federal or State unsecured) $142,000 $334,000 $1,837,000 Possible Grant Conceptual $0 (Unsecured) $22,000 (Local Funds) $22,000 $2,335,000 Total $164,000 $334,000 $1,837,00 Hwy. 99 @ 220th St. SW Intersection Widen 220th St. SW and Hwy 99 to $0 (Federal or State secured) Improvement add a westbound right turn lane (for 325'storage length) and a soutbound $3,192,000 (Federal or State unsecured) $152,000 $1,085,000 $1,955,00 left turn lane (for 275' storage length). Possible Grant Conceptual $0 (Unsecured) $23,000 (Local Funds) $23,000 $3,215,000 Total $175,000 $1,085,000 $1,955,00 SR-104 @ 226th St. SW / 15th St. SW Extend left turn storage area for WB $0 (Federal or State secured) Intersection Improvements movement on SR-104 w/ various bicycle and pedestrian improvements. $179,000 (Federal or State unsecured) $15,000 $164,000 Possible Grant Conceptual $0 (Unsecured) $15,000 (Local Funds) $15,000 $194,000 Total $30,000 $164,000 SR-104 @ 95th PI. W Intersection Convert EB and WB LT along SR-104 $0 (Federal or State secured) Improvements to protected LT phasing; upgrade ADA $485,000 (Federal or State unsecured) $65,000 $420,000 curb ramps; and add C-Curb for access management Possible Grant Conceptual $0 (Unsecured) $10,000 (Local Funds) $10,000 $495,000 Total $75,000 $420,000 SR-104 @ 238th St. SW Intersection Install traffic signal to improve $0 (Federal or State secured) Improvements vehicular and pedestrian safety; revise geometry to allow for safer turns. $1,311,000 (Federal or State unsecured) $173,000 $1,138,000 Possible Grant Conceptual $0 (Unsecured) $27,000 (Local Funds) $27,000 $1,338,000 Total $200,000 $1,138,000 Olympic View Dr. @ 76th Ave. W Install traffic signal to reduce the $0 (Federal or State secured) Intersection Improvements intersection delay and improve Level of Service. $0 (Federal or State unsecured) $1,183,000 Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total $1,183,000 84th Ave. W (212th St. SW to 238th St. Install two-way left turn lanes and $0 (Federal or State secured) SW) sidewalk to improve capacity and pedestrian safety (split with $0 (Federal or State unsecured) $15,441,000 Snohomish County) Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total $15,441,000 City of Edmonds Capital Facilities Plan (CFP) Transportation Projects (2017-2022) Grant (2017-2022) 1 Project Name Purpose Opportunity Project Phase Total Cost Funding Source 2017 2018 2019 2020 2021 2022 2023-2037 SR-104 @ 100th Ave. W Intersection / Implement Westgate Circulation $0 (Federal or State secured) Westgate Area Improvements Access Plan, midblock pedestrian $0 (Federal or State unsecured) $1,017,468 crossings along 100th Ave. W, and rechannelization with bike lanes / Conceptual $0 (Unsecured) sharrows along 100th Ave. W. $0 (Local Funds) $0 Total $1,017,468 SR-104 @ 76th Ave. W Intersection Add a 2nd WB left turn lane (split with $0 (Federal or State secured) Improvements Shoreline). $0 (Federal or State unsecured) $3,017,000 Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total $3,017,000 Olympic View Dr. @ 174th St. SW Install traffic signal to improve Level of $0 (Federal or State secured) Intersection Improvements Service and intersection delay. $0 (Federal or State unsecured) Conceptual $0 (Unsecured) $610,000 $0 (Local Funds) $0 Total $610,000 Non -motorized Pedestrian /Bicycle Projects Sunset Ave. Walkway from Bell St. to Provide walkway on the west side of $157,121 (Federal or State secured) $157,121 Caspers St. Sunset Ave, with various utility upgrades. Possible $1,870,000 (Federal or State unsecured) $1,870,000 RCO / TIB Grant Design $0 (Unsecured) for construction $751,129 (Local Funds) $26,129 $725,000 $2,778,250 Total $183,250 $2,595,000 Dayton St. between 7th Ave. S to 8th Provide safe sidewalk along short $0 (Federal or State secured) OD Ave. S Walkway missing link. $37,500 (Federal or State unsecured) $37,500 Possible Grant Conceptual $0 (Unsecured) $37,500 (Local Funds) $37,500 $75,000 Total $75,000 232nd St. SW from 100th Ave. W to SR Improve pedestrian safety along $0 (Federal or State secured) 104 232nd St. SW from 100th Ave. to SR-104. $1,205,000 (Federal or State unsecured) $100,000 $1,105,00 Possible Grant Conceptual $0 (Unsecured) $100,000 (Local Funds) $100,000 $1,305,000 Total $200,000 $1,105,00 238th St. SW from 100th Ave. W to Improve pedestrian safety along 238th $12,000 (Federal or State secured) $12,000 104th Ave. W St. SW from 100th Ave. to 104th Ave. $0 (Federal or State unsecured) Construction $0 (Unsecured) $0 (Local Funds) $12,000 Total $12,000 236th St SW from Edmonds Way (SR- Improve pedestrian safety along 236th $50,600 (Federal or State secured) $50,600 104) to Madrona Elementary St. SW, creating a safe pedestrian $0 (Federal or State unsecured) connection from SR-104 to Madrona school. Construction $0 (Unsecured) $38,000 (Local Funds) $38,000 $88,600 Total $88,600 236th St SW from Edmonds Way Improve pedestrian safety along 236th $0 (Federal or State secured) (SR-104) to 97th Ave. W St. SW, creating a safe pedestrian connection from SR-104. $1,288,500 (Federal or State unsecured) $106,500 $1,182,000 Possible Grant Conceptual $0 (Unsecured) $106,500 (Local Funds) $106,500 $1,395,000 Total $213,000 $1,182,000 to City of Edmonds Capital Facilities Plan (CFP) Transportation Projects (2017-2022) Grant (2017-2022) Project Name Purpose Opportunity Project Phase Total Cost Funding Source 2017 2018 2019 2020 2021 2022 2023-2037 84th Ave. W from 238th St. SW to Improve pedestrian safety along 84th $0 (Federal or State secured) 234th St. SW Ave. W. from 238th St. SW to 234th $90,000 State $90,000 $495,000 St SW. (Federal or unsecured) Possible Grant Conceptual $0 (Unsecured) $0 (Local Funds) $90,000 Total $90,0001 $495,000 80th Ave. W from 212th St SW to 206th Improve pedestrian safety along 80th $0 (Federal or State secured) St. SW Ave. W, within proximity to Edmonds- Woodway High School. $1,439,000 (Federal or State unsecured) $210,000 $1,229,000 Possible Grant Conceptual $0 (Unsecured) $0 (Local Funds) $1,439,000 Total $210,000 $1,229,000 2nd Ave. S from James St. to Main St. Provide safe sidewalk along short $0 (Federal or State secured) Walkway missing link. $0 (Federal or State unsecured) Conceptual $0 (Unsecured) $30,000 (Local Funds) $30,000 $30,000 Total $30,000 Maplewood Dr. from Main St. to 200th Provide safe sidewalk, connecting to $0 (Federal or State secured) St. SW ex. sidewalk along 200th St. SW (direct link to Maplewood Elementary $1,591,000 (Federal or State unsecured) $230,000 $681,000 $650,000 School). Possible grant Conceptual $0 (Unsecured) $0 (Local Funds) $1,591,000 Total $230,000 $681,000 $680,000 95th PI. W from 224th St. SW to 220th Provide sidewalk on one side of 95th $0 (Federal or State secured) St. SW PI. W from 224th St. SW to 220th St. $409,000 (Federal or State unsecured) $84,000 $325,000 SW completing missing link) Possible Grant Conceptual $0 (Unsecured) $141,000 (Local Funds) $21,000 $120,000 $550,000 Total $105,000 $445,000 218th St. SW from 76th Ave. W to 84th Provide safe sidewalk along a missing $0 (Federal or State secured) Ave. W link of 218th St. SW. from 76th Ave. to $978,000 (Federal or State unsecured) $100,000 $878,000 84th Ave. Possible Grant Conceptual $0 (Unsecured) $327,000 (Local Funds) $100,000 $227,000 $1,305,000 Total $200,000 $1,105,00 Walnut St from 3rd Ave. S to 4th Ave. S Provide short missing link. $0 (Federal or State secured) Walkway $105,000 (Federal or State unsecured) $105,000 Possible Grant Conceptual $0 (Unsecured) $0 (Local Funds) $105,000 Total $105,000 216th St. SW Walkway from Hwy. 99 to Provide sidewalk on north side of $0 (Federal or State secured) 72nd Ave W 216th St. SW from Hwy. 99 to 72nd $137,000 (Federal or State unsecured) $137,000 Ave W (completing missing link) Possible Grant Conceptual $0 (Unsecured) $20,000 (Local Funds) $20,000 $157,000 Total $157,000 238th St. SW from SR-104 to Hwy. 99 Provide sidewalk on north side of $316,800 (Federal or State secured) $316,800 238th St. SW from SR-104 to Hwy. 99 $0 (Federal or State unsecured) (completing missing link) Design $0 (Unsecured) $96,200 (Local Funds) $96,200 $413,000 Total $413,000 15th St. SW from 8th Ave. S to 9th Ave. Provide sidewalk on south side of 15th $0 (Federal or State secured) S St. SW from 8th Ave. S to 9th Ave. S (completing missing link) $200,000 (Federal or State unsecured) $200,000 Conceptual $0 (Unsecured) $30,000 (Local Funds) $30,000 $230,000 Total $30,000 $200,000 City of Edmonds Capital Facilities Plan (CFP) Transportation Projects (2017-2022) Grant (2017-2022) 1 Project Name Purpose Opportunity Project Phase Total Cost Funding Source 2017 2018 2019 2020 2021 2022 2023-2037 Elm Way from 8th Ave. S to 9lh Ave. S Provide sidewalk on one side of Elm $0 (Federal or State secured) Way from 8th Ave. S to 9th Ave. S $789,000 (Federal or State unsecured) $156,000 $633,000 Possible Grant Conceptual $0 (Unsecured) $0 (Local Funds) $789,000 Total $156,000 $633,000 Minor Sidewalk Program Complete short sidewalk stretches $0 (Federal or State secured) throughout the City (annual program) $0 (Federal or State unsecured) Conceptual $0 (Unsecured) $320,000 (Local Funds) $70,000 $50,000 $50,000 $50,000 $50,000 $50,000 $700,000 $320,000 Total $70,000 $50,000 $50,000 $50,000 $50,000 $50,000 $700,000 191st St. SW from 80th Ave. W to 76th Provide sidewalk on one side of 191th $0 (Federal or State secured) Ave. W St. SW from 80th Ave. to 76th Ave. $0 (Federal or State unsecured) $630,000 (completing missing link) Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total $630,000 104th Ave. W / Robinhood Lane from Provide sidewalk on west side of $0 (Federal or State secured) 238th St. SW to 106th Ave. W 104th Ave. from 238th St. SW to 106th $0 (Federal or State unsecured) $990,000 Ave. W (completing missing link) Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total $990,000 N O 80th Ave. W from 218th St. SW to Provide sidewalk on one side of 80th $0 (Federal or State secured) 220th St. SW Ave. W from 218th St. SW to 220th St. SW (completing missing link) $0 (Federal or State unsecured) $315,000 Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total $315,000 84th Ave. W from 188th St. SW to Provide sidewalk on one side of 84th $0 (Federal or State secured) 186th St. SW Ave. W from 188th St. SW to 186th St. $0 (Federal or State unsecured) $315,000 SW Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total $315,000 236th St. SW from Hwy. 99 to 76th Ave. Provide sidewalk on one side of 236th $0 (Federal or State secured) W St. SW from Hwy. 99 to 76th Ave. W $0 (Federal or State unsecured) $765,000 Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total $765,000 238th St. SW from Hwy. 99 to 76th Ave. Provide sidewalk on one side of 238th $0 (Federal or State secured) W St. SW from Hwy. 99 to 76th Ave W $0 (Federal or State unsecured) $1,170,000 Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total $1,170,000 City of Edmonds Capital Facilities Plan (CFP) Transportation Projects (2017-2022) Grant (2017-2022) 1 Project Name Purpose Opportunity Project Phase Total Cost Funding Source 2017 2018 2019 2020 2021 2022 2023-2037 80th Ave. W / 180th St. SW from 188th Provide sidewalk on one side of 80th $0 (Federal or State secured) St. SW to OVD Ave. W / 180th St. SW from 188th St. $0 (Federal or State unsecured) $1,350,000 SW to OVD Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total $1,350,000 189th PI. SW from 80th Ave. W to 76th Provide sidewalk on one side of 189th $0 (Federal or State secured) Ave. W PI. SW from 80th Ave. W to 76th Ave. $0 (Federal or State unsecured) $585,000 W Conceptual $0 (Unsecured) $0 (Local Funds) $0 Total $585,000 Ferrv/Railroad Ferry Storage Improvements from Pine Improve ferry queueing by extending $0 (Federal or State secured) St. to Dayton St. ferry storage area along SR-104 (striping changes). $357,000 (Federal or State unsecured) $357,000 Possible Grant Conceptual $0 (Unsecured) $0 (Local Funds) $357,000 Total $357,000 Traffic Plannina Proiects Trackside Warning System at Dayton Install wayside horns at both crossings $0 (Federal or State secured) St. and Main St. Railroad Crossings to reduce noise from train horns. $0 (Federal or State unsecured) Design / $0 (Unsecured) Construction $10,000 (Local Funds) $10,000 $10,000 Total $10,000 Edmonds Street Overpass Install grade -separated overcrossing $23,820,000 (Federal or State unsecured) $350,000 $500,000 $500,000 $500,000 $2,470,OOC $19,500,000 over the railroad tracks as an extension of Edmonds Street Conceptual $0 (Unsecured) connecting to Brackett's Landing North $150,000 (Local funds) $150,000 park. $23,970,000 Total $500,000 $500,000 $500,000 $500,000 $2,470,000 $19,500,000 ir Total CFP $49,300,013 1 Annual CFP Totals 1 $6,570,013 1 $650,000 1 $50,000 1 $6,260,000 1 $18,778,000 1 $21,462,000 1 $130,529,468 Revenue Summary by Year Totals Source 2017 T2018 1 2019 1 2020 1 2021 2022 1 2023-2037 $13,568,021 Total Federal & State (Secured $3,481,521 $86,500 $0 $0 $5,000,000 $5,000,0001 $0 $30,809,950 Total Federal & State Unsecured $350,0001 $500,0001 $0 $5,017,4501 $13,077,5001 $16,185,0001 $127,863,468 $0 Unsecured $0 $01 $0 $01 $0 $0 $610,000 $4,947,042 LocalFundsl $2,763,4921 $63,5001 $50,0001 $1,242,5501 $700,5001 $277,0001 $2,056,000 PROJECT NAME: 228 th St. SW Corridor ESTIMATED PROJECT COST: $7,300,000 Safety Improvements PROJECT DESCRIPTION: 1) Extend 2281h St across the unopened right-of-way to 76th Avenue West 2) Signalize the intersection of 2281h St SW @ SR99 and 2281h St. SW @ 761h Ave. West 3) Construct a raised median in the vicinity of 761h Avenue West. 4) Add illumination between 2241h St SW and 2281h St SW on SR 99 5) Overlay of 228th St. SW from 801h Ave. W to — 2,000' east of 76th Ave. W. PROJECT BENEFIT/ RATIONALE: The project will improve access / safety to the 1-5 / Mountlake Terrace Park & Ride from SR99. This east / west connection will reduce demand and congestion along two east -west corridors (220th Street SW and SR104). Roadway safety will also be improved as SR 99/ 228th Street SW will become a signalized intersection. 228th St. SW is being overlaid from 80th Pl. W to — 1,000 LF east of 72"d Ave. W. as well as 76th Ave. W from 228th St. SW to Hwy. 99. The project consists of various utility upgrades. SCHEDULE: Construction began in 2015 and substantial completion was obtained in May 2016. Physical completion is scheduled to be reached in October 2016. The only remaining task in 2017 is the completion of the Federal documentation. Federal and State grants were secured for the construction phase. This project was combined into one construction contract with the Hwy. 99 (Phase 3) Lighting project. COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering, Administration, and ROW Construction $25,000 1 % for Art TOTAL $25,000 All or a portion of this project may qualify for 1 % for the arts 22 PROJECT NAME: 228 th St. SW from Hwy. ESTIMATED PROJECT COST: $10,421,000 99 to 95th PI. W PROJECT DESCRIPTION: Widen 228 th St. SW from Hwy. 99 to 95 th PI. W to three lanes with two-way left turn lane), with curb and gutter, sidewalk, and bike lanes. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety and traffic flow along this corridor. SCHEDULE: The design phase is scheduled to begin in 2021 (pending funding). COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Engineering & Administration $75,000 $300,000 Construction $9,821,000 1 % for Art TOTAL $75,000 $300,000 $9,821,000 23 PROJECT NAME: 76 Ave W @ 212 St. SW ESTIMATED PROJECT COST: $6,500,000 Intersection Improvements 1 EDMONDS-WOODWAY HIGH SCHOOL I OFFICE W a R .. G" 1301 PROJECT DESCRIPTION: Add a northbound and southbound left -turn lane to convert the signal operation for those approaches from split phasing to protected -permissive phasing. Add a right -turn lane for the westbound, southbound, and northbound movements. The project also consists of various utility upgrades and conversion of overhead utilities to underground. PROJECT BENEFIT/RATIONALE: Reduce the intersection delay and improve the existing level of service to LOS C. SCHEDULE: Design was completed in May 2016. The project was advertised in June 2016 but the lowest bid was rejected since it was - approx. $1.3 Million over budget. The project is scheduled to be re -advertised in early 2017. A TIB grant to cover the possible shortfall was submitted in August 2016. COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration & ROW Construction $4,993,163 $100,000 1 % for Art TOTAL $4,993,163 $100,000 24 PROJECT NAME: Highway 99 ESTIMATED PROJECT COST: $85,000,000 Gateway/Revitalization PROJECT DESCRIPTION: The project would include, among other features, wider replacement sidewalks or new sidewalk where none exist today, new street lighting, center medians for access control and turning movements, etc., attractive and safe crosswalks, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. PROJECT BENEFIT/RATIONALE: Improve aesthetics, safety, user experience, and access management along this corridor. In addition, economic development would be improved. SCHEDULE: The design phase is scheduled to begin in 2017 (pending approval of the 2017 decision package).An HSIP grant was also submitted in July 2016 for this project. The construction phase is scheduled to begin in 2021 (pending additional funding / $10M from Connecting Washington allocation has been secured). COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Engineering & $300,000 $6,600,000 Administration & ROW Construction $6,000,000 $72,400,000 1 % for Art TOTAL $300,000 $6,600,000 $6,000,000 $72,400,000 25 PROJECT NAME: SR-524 (196t" St. SW)/ 88t" ESTIMATED PROJECT COST: $903,000 Ave. W Intersection Improvements PROJECT DESCRIPTION: Install traffic signal at the intersection of 196 th St. SW @ 88 th Ave. W. The modeling in the 2009 Transportation Plan indicated that restricting northbound and southbound traffic to right -turn -only (prohibiting left -turn and through movements) would also address the deficiency identified at this location through 2025. This is same alternative as one concluded by consultant in 2007 study but not recommended by City Council. This could be implemented as an alternate solution, or as an interim solution until traffic signal warrants are met. The ex. LOS is F (below City Standards: LOS D). This project was ranked #6 in the Roadway Project Priority in the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: Improve traffic flow characteristics and safety at the intersection. The improvement would modify LOS to A, but increase the delay along 196t" St. SW. SCHEDULE: The intersection LOS must meet MUTCD traffic signal warrants and be approved by WSDOT since 196t" St. SW is a State Route (SR524). No funding is currently allocated to this project (pending grant funding). COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & $193,000 $175,000 Administration & ROW Construction $535,000 1 % for Art TOTAL $193,000 $175,000 $535,000 26 PROJECT NAME: Main Stand 9th Ave. S :1 ESTIMATED PROJECT COST: $911,000 BELL Sr I � LLF -� �' W a _ a MAIN St I _ I WADE JAM ES _ — THEATER W ' a J S H - DAYTON 5 , PROJECT DESCRIPTION: Installation of a traffic signal (or mini -roundabout is an alternative solution). PROJECT BENEFIT/RATIONALE: The existing intersection is stop -controlled for all approaches and the projected intersection LOS in 2035 is LOS F (below the City's concurrency standards: LOS D). The installation of a traffic signal would improve the intersection delay to LOS B. The project ranked #4 in the Roadway Project Priority of the 2015 Transportation Plan. SCHEDULE: All phases are scheduled between 2020 and 2021 (unsecured funding) COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration $135,000 Construction $776,000 1 % for Art TOTAL $135,000 $776,000 27 PROJECT NAME: 220" St SW @ 76t" Ave W ESTIMATED PROJECT COST: Intersection Improvements $5,925,000 2,9rH sr sw J 21919 J J J 3 14 I' Lri ,a Ui in J _J 1 2215TPLSW ll!�U QIM TOP FOODS JSTARBU KS J 220TH ST SW - 1 r LYNWOOD HONDA PROJECT DESCRIPTION: Reconfigure eastbound lanes to a left turn lane and through / right turn lane. Change eastbound and westbound phases to provide protected -permitted phase for eastbound and westbound left turns. Provide right turn overlap for westbound movement during southbound left turn phase. (ROADWAY ROJECT PRIORITY #1 in 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: Reduce the intersection delay and improve the LOS. The projected LOS in 2035 would be improved from LOS F to LOS D. SCHEDULE: Engineering, ROW, and construction scheduled between 2020 and 2022 (unsecured funding). COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & ROW $330,000 $1,800,000 Administration Construction $3,795,000 1 % for Art TOTAL $330,000 $1,800,000 $3,795,000 ' All or a portion of this project may quality for 1 % for the arts 28 PROJECT NAME: Hwy. 99 @ 212 St. SW ESTIMATED PROJECT COST: $2,806,000 intersection improvements 21 g sw:T I i W W Paalung sign Shop / n 7313 P.U.B 3 Edmonds Edmonds / W Family Clinic ei ADD Publm%Torks KENNEL 21 1 21114 / f Arbor Apt Q �az 211 / ofNlla Ramps 21109 / n he Box / 212TH ST Sw 7,.5�• a T'2"215TH LTW 9RI PLANT AEGIS W SWEDISH k�MDNnSCAM— ' ALLIED / ROOFING / / / B&M / CON ST 21414 / 21448 / / / NCOONRLD' Q( / 01 1ALUE / PILLAGE / 16TH ST/SW PROJECT DESCRIPTION: Widen 212 th St. SW to add a westbound left turn lane for 200' storage length and an eastbound left turn lane for 300' storage length. Provide protected left turn phase for eastbound and westbound movements. (ROADWAY PROJECT PRIORITY in 2015 Transportation Plan: #4) PROJECT BENEFIT/RATIONALE: Improve intersection efficiency and reduce delay. SCHEDULE: All phases are scheduled between 2020 and 2022 (unsecured funding).The project cost is split between Lynnwood and Edmonds since half the project is in Lynnwood. COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering, ROW, & Administration $175,000 $1,091,000 Construction $1,540,000 1 % for Art TOTAL $175,000 $1,091,000 $1,540,000 29 PROJECT NAME: Hwy. 99 @ 216 St. SW ESTIMATED PROJECT COST: $2,335,000 intersection improvements 13�8w 21410 21d0 214021412 21405 2 N I{ 04 LU U2> 1420L< MCDUHA6' C 21431 un � anz 150 215 AEGIS 21558 VALUE JJ VILLAGE ST SW -me/ � 21BTI-� ST SW 21600 {� 21619 KRUGER f CLINIC 21632 01 �� PROJECT DESCRIPTION: Widen 216t St. SW to add a westbound left turn lane for and an eastbound left turn lane. Provide protected -permissive left turn phases for eastbound and westbound movements. This project ranked #3 in the Roadway Project Priority in the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: Improve intersection efficiency and reduce delay. SCHEDULE: All phases are scheduled between 2020 and 2022 (unsecured funding). COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & ROW & Administration $164,000 $334,000 Construction $1,837,000 1 % for Art TOTAL $164,000 $334,000 $1,837,000 30 PROJECT NAME: Hwy. 99 @ 220 St. SW ESTIMATED PROJECT COST: $3,215,000 intersection improvements 19TH ST SW 21919 f,ill 7514 221 ST PL SW I I I 13 -- a n I FEi FZ/ TOP FOODS 220TH Sr SW LYNWOOD HONDA a _ iL FUNTASIA H'S IN N L7 w .F 7223'J' A.dy's � td .D. 7301 R A a S H ¢ nm PROJECT DESCRIPTION: Widen 220th St. SW to add Westbound right turn lane for 325' storage length. Widen SR-99 to add 2nd Southbound left turn lane for 275' storage length. (ROADWAY PROJECT PRIORITY in 2015 Transportation Plan: #1). PROJECT BENEFIT/RATIONALE: Reduce intersection delay and improve traffic flow and safety. SCHEDULE: All Phases are scheduled between 2020 and 2022 (unsecured funding for all phases). COST BREAKDOWN PROJECT 2017 2018 2019 2020 2021 2022 COST Planning/Study Engineering & Administration & ROW $175,000 $1,085,000 Construction $1,955,000 1 % for Art TOTAL $175,000 $1,085,000 $1,955,000 31 PROJECT NAME: SR-104 @ 226 1h St. SW / ESTIMATED PROJECT COST: $194,000 15t" St. SW Intersection Improvements 14TH WAY SW 226TH ST SW uJ 226TH PL SW 'N' M PROJECT DESCRIPTION: Extend the left turn lane for the westbound movement on SR-104. Complete various pedestrian and bicycle intersection improvements. This project was identified in the SR-104 Complete Streets Corridor Analysis (completed in 2015). PROJECT BENEFIT/RATIONALE: Improve non -motorized transportation safety at the intersection and improve traffic flow along the SR-104 corridor. SCHEDULE: 2020-2021 (unsecured funding) COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration & ROW $30,000 Construction $164,000 1 % for Art TOTAL $30,000 $164,000 32 PROJECT NAME: SR-104 @ 95" PI. W ESTIMATED PROJECT COST: $495,000 Intersection Improvements r W 06 a Ln al en Cn 'H ST SW 1 WESTGATI C APE PARKING ■ 1 WESTGATE CHAPEL PROJECT DESCRIPTION: Upgrade all ADA Curb Ramps; and add C-Curb for access management. PROJECT BENEFIT/RATIONALE: Improve intersection safety for pedestrians and vehicles. SCHEDULE: 2020-2021 unsecured funding) COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration & ROW $75,000 Construction $420,000 1 % for Art TOTAL $75,000 $420,000 33 PROJECT NAME: SR-104 @ 238" St. SW ESTIMATED PROJECT COST: $1,338,000 Intersection Improvements To Hwy 99 PROJECT DESCRIPTION: Install traffic signal. The warrants are met for such an installation. This project was identified in the SR-104 Complete Street Corridor Analysis (completed in 2015). PROJECT BENEFIT/RATIONALE: Improve vehicular and pedestrian safety. SCHEDULE: 2020-2021 (unsecured funding) COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration & ROW $200,000 Construction $1,138,000 1 % for Art TOTAL $200,000 $1,138,000 34 PROJECT NAME: Olympic View Dr. @ 76 Ave. ESTIMATED PROJECT COST: W Intersection Improvements $1,183,000 N SEAVIEW PARK 3 PLSW 186TH ST SW ml I m—I PROJECT DESCRIPTION: Install traffic signal (the intersection currently stop controlled for all movements). (ROADWAY ROJECT PRIORITY in 2015 Transportation Plan: #11). PROJECT BENEFIT/RATIONALE: The improvement will reduce the intersection delay. The projected Level of Service is LOS F in 2035, which is below the City's concurrency standards (LOS D). The project will improve the Level of Service to LOS B. SCHEDULE: Engineering and Construction are scheduled between 2023 and 2037 (unsecured funding). COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Engineering & Administration $200,000 Construction $983,000 1 % for Art TOTAL $1,183,000 35 PROJECT NAME: 84" Ave. W (212 St. SW ESTIMATED PROJECT COST: $15,441,000 to 238t" St. SW) PROJECT DESCRIPTION: Widen 84 th Ave. W to (3) lanes with curb, gutter, bike lanes, and sidewalk on each side of the street. (part of this project was ranked #6 in the Long Walkway list of the 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: Improve overall safety of the transportation system along this collector street: 1) the sidewalk and bike lanes would provide pedestrians and cyclists with their own facilities and 2) vehicles making left turn will have their own lane, not causing any back-up to the through lane when insufficient gaps are provided. SCHEDULE: Engineering and Construction are scheduled between 2023 and 2037 (unsecured funding). The project cost is split between Snohomish County and Edmonds since half the project is in Esperance. COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Engineering & $2,000,000 Administration Construction $13,441,000 1 % for Art TOTAL $15,441,000 * all or part of this project may qualify for 1 % for the Arts. 36 PROJECT NAME: SR-104 @ 100t Ave. W ESTIMATED PROJECT COST: $1,017,468 Intersection Improvements 7 EDMONDS WAY PROJECT DESCRIPTION: Implement Westgate Circulation Access Plan, install mid -block pedestrian crossing along 100t" Ave. W, and re -striping of 100t" Ave. W with the potential addition of bike lanes. This project was identified in the SR-104 Completed Streets Corridor Analysis (completed in 2015). PROJECT BENEFIT/RATIONALE: Improve access and safety at the intersection and improve non -motorized transportation safety. SCHEDULE: 2023-2037 (unsecured funding) COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Engineering & Administration $150,000 Construction $867,468 1 % for Art TOTAL $1,017,468 37 PROJECT NAME: SR-104 @ 76 Ave. W ESTIMATED PROJECT COST: $3,017,000 Intersection Improvements x M1 M1 } W dM1 - P^1 --En&WW Dri 1ELA.Y-_--------_LAKE BALLING €RWAY PROJECT DESCRIPTION: DESCRIPTION: Add a 2 nd left turn lane along SR-104. This project was identified in the SR-104 Complete Street Corridor Analysis (completed in 2015). PROJECT BENEFIT/RATIONALE: Improve access and safety at the intersection and improve non -motorized transportation safety. SCHEDULE: 2023-2037. The project cost would be split between Shoreline and Edmonds since half the intersection is in Shoreline. COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Engineering & Administration $453,000 Construction $2,564,000 1 % for Art TOTAL $3,017,000 38 PROJECT NAME: Olympic View Dr. @ 174t" St. ESTIMATED PROJECT COST: $610,000 SW Intersection Improvements ti4 J I� —L_-jJ- 7027 7003 LI Meadowdale Middle School r� ------------ '�� Parking sso' St. Thomas Moore °ffp Catholic School I B Ilfield y I-" PROJECT DESCRIPTION: Widen Olympic View Dr. to add a northbound left turn lane for 50' storage length. Shift the northbound lanes to the east to provide an acceleration lane for eastbound left turns. Install traffic signal to increase the LOS and reduce intersection delay. (ROADWAY ROJECT PRIORITY in 2015 Transportation Plan: #13) PROJECT BENEFIT/RATIONALE: Improve intersection efficiency and safety of drivers accessing either street. SCHEDULE: Engineering and Construction are scheduled between 2023 and 2037 (unsecured funding). COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Engineering & Administration $100,000 Construction $510,000 1 % for Art TOTAL $610,000 39 PROJECT NAME: Sunset Ave Walkway ESTIMATED PROJECT COST: $3,000,000 from Bell St to Caspers St. ���% �iii■■■ 1 44b' ���:�a�MAW s UIIDVIEwavrs ♦ ♦ �� I■� 11111■� I PROJECT DESCRIPTION: Provide a walkway on the west side of the street, facing waterfront (— 1/2 mile / more recent project). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Temporary improvements have been installed to evaluate the alignment of the proposed walkway. Additional modification to the temporary improvements will be completed in 2017 (since construction isn't scheduled to occur until 2019 / 2020 when utility improvements are scheduled along this stretch). No grant funding has yet been secured for the construction phase. The design phase will be completed in 2017. COST BREAKDOWN PROJECT 2017 2018 2019 2020 2021 2022 COST Planning/Study Engineering & $183,250 Administration Construction $2,595,000 1 % for Art TOTAL $183,250 $2,595,000 * all or part of this project may qualify for 1 % for the Arts. 40 PROJECT NAME: Dayton St Walkway ESTIMATED PROJECT COST: $75,000 between 7t" Ave. S and 8t" Ave. S L MAIM ST z NO -ISLE FRANCES ANDERSON 4v0 tA W ❑ Q � 660 701 DAYTOM 5T w MAPLE 57 I T k PROJECT DESCRIPTION: Construct a missing link of sidewalk (approximately 250') on Dayton St. between 7t" Ave. S and 8t" Ave. S (ranked #2 in Short Walkway Project list in 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Engineering & Construction scheduled for 2020 (unsecured funding). COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration Construction $75,000 1 % for Art TOTAL $75,000 * all or part of this project may qualify for 1 % for the Arts. 41 PROJECT NAME: 232 nd St. SW Walkway ESTIMATED PROJECT COST: $1,305,000 from 100t" Ave. W to SR-104 EDMONDS WAY W SAME iwnRs LLI L ! Ell 2 . ■ ■ Qy - 1 �i IF Al. 10 UUT H ' CHURCH, (jr ■ ■ ■ , Uj 7 , ■ AW �I o �0 c� 2 ODW' ' I ESTATES AY OLy I _ PR RK \29 9 Dorn 98 7 6 5 ' 30 2 15 3 14 7• J \32 45 32 ■ r jr `2q 7 1 nm (0) 1 � ■ � e PROJECT DESCRIPTION: Install sidewalk along 232"d St. SW from 100t Ave. W to SR-104. This project ranked #3 in the Long Walkway List of 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2021-2022 (unsecured funding) COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration $200,000 Construction $1,105,000 1 % for Art TOTAL $200,000 $1,105,000 42 PROJECT NAME: 238 St. SW Walkway from ESTIMATED PROJECT COST: $1,400,000 100th Ave. W to 104th Ave. W and Stormwater Improvements d ❑ z 2 � wn Pp COMM m Z LIBRARY m a C BASEBALL 235 FIELD 23 TO 42 HICKMAN PARK J 0 0 a } Q a J Y 23 OLD WOODWAYHIGH SCHOOL 236TH PL SW F 3 a z 0 3 3 J w a � F Q V1 O O 238 H 5 W E � 3 = w V Q G LL ❑ ka o� z U = O = U F LL 4 � M 23ST11 ST SW PROJECT DESCRIPTION: Installation of -- 1,200' of sidewalk on the north side of 238t St. SW from 100th Ave. W to 104th Ave. W. as well as sharrows. Stormwater improvements will also be incorporated into the project. PROJECT BENEFIT/RATIONALE: Improve pedestrian safety and create a safe pedestrian connection between 100th Ave. W and 104th Ave. W. SCHEDULE: Construction is complete. The project was funded by the Safe Routes to School grant program. Stormwater improvements were funded by the Stormwater Utility Fund 422. COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Engineering & Administration Construction $12,000 1 % for Art TOTAL $12,000 * all or part of this project may qualify for 1 % for the Arts 43 PROJECT NAME: 236t" St. SW Walkway from ESTIMATED PROJECT COST: $900,000 Edmonds Way to Madrona Elementary School PROJECT DESCRIPTION: Construct an — 800' sidewalk on the south side of 236 th St. SW from SR-104 to Madrona Elementary as well as the addition of sharrows along that stretch. (This is only part of a stretch of Walkway project, which ranked #1 in the Long Walkway list in the 2009 Transportation Plan) PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route near Madrona Elementary School and along 236t" St. SW. SCHEDULE: Construction is scheduled to start in Fall 2016 and be completed by Spring 2017. The project is funded through the Safe Routes to School Grant program, Fund 422 for stormwater improvements, and REET funds for the pavement reconstruction. COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration & ROW Construction $88,600 1 % for Art TOTAL $88,600 44 PROJECT NAME: 236 th St. SW Walkway ESTIMATED PROJECT COST: $1,395,000 from Madrona Elementary to 97t" Ave. W 4 a. ■ r a� 232NO PL SW . 1W. 233Mill i ■ , Jr ■ ■ u, a ��r Ym x�,4TH,PL 9W ! ■ ' 7 234TFiT5T'SW= ■ T , Fill w ■ ��- 9 `Qs ■ 3 ON ■ I I �m� ` 235fH:Sr SWoil F b' a _ . -PC9W � ■ ■ 7 1, 7 ryIN IN 236TH Si SW m - •. �..� � 2 4NH-9i_9W IIr , I' - 2367H PL Sw 1 ■ _ a � 237-rH PL SW a PROJECT DESCRIPTION: Install sidewalk with curb and gutter along 236 nd St. SW from Madrona Elementary to 97t" Ave. W. This project ranked #4 in Long Walkway list of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2020-2021 (unsecured funding) COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration $213,000 Construction $1,182,000 1 % for Art TOTAL $213,000 $1,182,000 45 PROJECT NAME: 841Ave. W Walkway ESTIMATED PROJECT COST: $585,000 from 238th St. SW to 234th ST. SW L PARK LL EonnoNos SALGALL APTS m w w LL CH RIST LNTH E RAN CH N RCH O PARK & RIDE OFFICE 236:1 4SUHSET 23603 SAFEWAY $23605 WH L KJIHG R23607 23619 0 P ���R AURORAS MARKETPLACET N 239TH ST SW W SEOUL 23821 PLAZA 2 23827 TRAVEL LODGE 0" NORTH ry HAVEN z n MANOR w a � R p r~ } n•1L LO'N 13ROCK PROJECT DESCRIPTION: Install sidewalk along 84 th Ave. W from 238 th St .SW to 234 th St. SW, with curb and gutter. This project ranked #5 in the Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: Begin design in 2022 (unsecured funding) COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Engineering & Administration $90,000 Construction $495,000 1 % for Art TOTAL $90,000 $495,000 46 PROJECT NAME: 801Ave. W Walkway ESTIMATED PROJECT COST: $1,439,000 from 206t" St. SW to 212t" ST. SW PROJECT DESCRIPTION: Install sidewalk along 80th Ave. W from 206 th St. SW to 212 th St. SW with curb and gutter. This project ranked #1 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: The improvements will improve non -motorized transportation safety. SCHEDULE: 2020-2022 (funding unsecured). A Pedestrian and Bicycle Program grant to fund the design phase was submitted in May 2016 (response scheduled for Spring 2017). COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration & ROW $210,000 Construction $1,229,000 1 % for Art TOTAL $210,000 $1,229,000 47 PROJECT NAME: 2nd Ave. S Walkway from ESTIMATED PROJECT COST: $30,000 James St. to Main St. 4t <1 NG 4 F5 PROJECT DESCRIPTION: 2nd Ave. S between Main St. 2015 Transportation Plan). Construct a missing link of sidewalk (approximately 100') on and James St. (Ranked #2 in Short Walkway Project list in PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: 2020 COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration Construction $30,000 1 % for Art TOTAL $30,000 * all or part of this project may qualify for 1 % for the Arts 48 PROJECT NAME: Maplewood Dr. Walkway ESTIMATED PROJECT COST: $1,591,000 from Main St. to 200th St. SW PROJECT DESCRIPTION: Construct sidewalk on Maplewood Dr. from Main St. to 200t St. SW (- 2,700'). A sidewalk currently exists on 200th St. SW from Main St. to 76th Ave. W, adjacent to Maplewood Elementary School (rated #22 in the Long Walkway list of the 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: Create pedestrian connection between Maplewood Elementary School on 200th St. SW and Main St., by encouraging kids to use non -motorized transportation to walk to / from school. SCHEDULE: Engineering scheduled for 2020 and construction in 2022 (funding unsecured). A grant application through Safe Routes to School Program was submitted in May 2016 for design funding (response scheduled for Spring 2017). COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & $230,000 Administration Construction $681,000 $680,000 1 % for Art TOTAL 1 $230,000 $681,000 $680,000 * all or part of this project may qualify for 1 % for the Arts. 49 PROJECT NAME: 95 1h PI. W Walkway from ESTIMATED PROJECT COST: $550,000 2241" ST. SW to 220t" St. SW PROJECT DESCRIPTION: Install sidewalk along 95 th PI. W from 224 th ST. SW to 220th ST. SW, with curb and gutter. This project ranked #9 in the Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: Engineering scheduled for 2020 and construction in 2021 (funding unsecured). A TIB grant application was submitted in August 2016 to fund this project (response scheduled for November 2016). COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2036 Planning/Study Engineering & Administration $105,000 Construction $445,000 1 % for Art TOTAL $105,000 $445,000 50 PROJECT NAME: 21 8thSt. SW Walkway ESTIMATED PROJECT COST: $1,305,000 from 76t" Ave. W to 84t" Ave. W ■■■■N� ���■■ mom oENT ER PROJECT DESCRIPTION: Install sidewalk along 218t St. SW from 76t Ave. W to 84 th Ave. W with curb and gutter. This project ranked #2 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: The improvements will improve pedestrian safety. SCHEDULE: 2021-2022 (unsecured funding) COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration & ROW $200,000 Construction $1,105,000 1 % for Art TOTAL $200,000 $1,105,000 51 PROJECT NAME: Walnut St. Walkway from 3r ESTIMATED PROJECT COST: $105,000 Ave. S to 4t" Ave. S ARTS W ENTER a Z UNDOW NEI N ALDER ALDER ST 346 414 412 410 arking 5 5 LA UJ o SOUND VIEW o: HOWELL WAY W a x v DAYTON ST OLD MILLTOWN MAPLE ST TRIC ALDER ST N W a FBECKWT'S z BAN K T- 409 530Pancak 407 540 Hau s 4003 546 0 401 w a WALNUT Sr --F GREGORY e H 525 PROJECT DESCRIPTION: Construct a missing link of sidewalk (approximately 350') on Walnut St. between 3rd Ave. S and 4t" Ave. S (ranked #3 in Short Walkway Project list in 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Engineering & Construction scheduled for 2020 (unsecured funding). COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration $10,000 Construction $95,000 1 % for Art TOTAL $105,000 all or part of this project may qualify for 1 % for the Arts 52 PROJECT NAME: 216 St. SW Walkway from ESTIMATED PROJECT COST: $157,000 Hwy. 99 to 72"d Ave. W 7200 PARK & RIDE 7309 5TEVEN .IAN J M1 2140 U 214G7 21507 W W 21511 a IL~ 0 21521 N M STEVEN 21500 COURT AEGIS 21527 �1B7H ST SVIf 120 EVENS 21600 tILION KRUGER CLINIC 210 B &M40 CONS 21410 2140$ 0. 21401 21412 r 21420 21�MCDONALD' Ln Ilk i4 21558 VALUE VILLAGE 216 TIl { 21619 PROJECT DESCRIPTION: Install 150' sidewalk on north side of 216 th St. SW from Hwy. 99 to 72nd Ave. W (completing a missing link on north side of stretch). This project ranked #4 in the Short Walkway List (from 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Engineering & Construction scheduled for 2020 (unsecured funding). COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration $30,000 Construction $127,000 1 % for Art TOTAL $157,000 * all or part of this project may qualify for 1 % for the Arts 53 PROJECT NAME: 238 St. SW Walkway from ESTIMATED PROJECT COST: $491,000 Hwy. 99 to SR-104 i 1 L PROJECT DESCRIPTION: Ranked #12 in Long Walkway list from 2015 Transportation Plan. Install 5' sidewalk on the north side of 238t" St. SW. PROJECT BENEFIT/RATIONALE: Improve pedestrian safety along that stretch and creating safe pedestrian connection between Hwy. 99 and 76t" Ave. W. SCHEDULE: The design phase is underway and will be completed by early 2017. Construction is scheduled for 2017. A TIB grant was secured to fund the design and construction phases. COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Engineering & Administration Construction $413,000 1 % for Art TOTAL $413,000 * all or part of this project may qualify for 1 % for the Arts. 54 PROJECT NAME: 15 St. SW Walkway from 8 ESTIMATED PROJECT COST: $240,000 Ave. S to 9th Ave. S ` — -- 7/ <F C 723 8" 811 L -vial M1 4 t,39 807 BO' P 144 1445 m in a• � 98- v \ 9911, 982 1452 9906 9832 2260 9910 + '9909 7 981a Q 9916 p 220i5. Edmonds Memorial Cemetery 7,�Amd n 9826 9 PROJECT DESCRIPTION: Add missing sidewalk link along 15 St. SW from 8t Ave. S to 9t Ave S PROJECT BENEFIT/RATIONALE: Improve pedestrian safety along that stretch and providing pedestrian connection from 9th Ave. S. SCHEDULE: The design phase will be completed in 2017. COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration $30,000 Construction $200,000 1 % for Art TOTAL $30,000 $200,000 all or part of this project may quality for 1 % for the Arts. 55 PROJECT NAME: Elm Way Walkway from ESTIMATED PROJECT COST: $789,000 8t" Ave. S to 9t" Ave. S 4 �^ I 220TH 5T c L L� PROJECT DESCRIPTION: Install sidewalk along Elm Way from 8t Ave. S to 9t Ave. S. This project ranked #6 in the Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2020-2021 (funding unsecured). A Safe Routes to School grant application was submitted in May 2016 to fund the design and construction phases of this project (response scheduled for Spring 2017. COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration $156,000 Construction $633,000 1 % for Art TOTAL $156,000 $633,000 56 PROJECT NAME: Minor Sidewalk Program ESTIMATED PROJECT COST: varies PROJECT DESCRIPTION: Complete missing sidewalk along short segments throughout the City. PROJECT BENEFIT/RATIONALE: Improve pedestrian safety. SCHEDULE: annual program COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration & ROW $10,000 $5,000 $5,000 $5,000 $5,000 $5,000 Construction $60,000 $45,000 $45,000 $45,000 $45,000 $45,000 1 % for Art TOTAL $70,000 $50,000 $50,000 $50,000 $50,000 $50,000 57 PROJECT NAME: 191th St. SW Walkway ESTIMATED PROJECT COST: $630,000 from 80th Ave. W to 76th Ave. W PROJECT DESCRIPTION: Install sidewalk along 191th St. SW from 80th Ave. W to 76 th Ave., with curb and gutter. This project ranked #8 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2023-2037 COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Engineering & Administration $90,000 Construction $540,000 1 % for Art TOTAL $630,000 58 PROJECT NAME: 104 th Ave. W Walkway ESTIMATED PROJECT COST: $990,000 from 238t" St. SW to 106t" Ave. W PROJECT DESCRIPTION: Install sidewalk along 104 th Ave. W from 238 th ST. SW to 106t Ave. W, with curb and gutter. This project ranked #10 in the Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2023-2037 COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Engineering & Administration $150,000 Construction $840,000 1 % for Art TOTAL $990,000 59 PROJECT NAME: 801h Ave. W Walkway ESTIMATED PROJECT COST: $315,000 from 218t" St. SW to 220t" St. SW ■ Golden n , STEVE HEAL i EVENS A K ;Leaves LEGENDWES1 ESTATESISLE a 218TH ST SW FL ■ 7a ' . 219TH ST SW r m Ll ----- �— �T------------ ------228THSTSW— PROJECT DESCRIPTION: Install sidewalk along 80t Ave. W from 218t ST. SW to 220t ST. SW, with curb and gutter. This project ranked #7 in the Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2023-2037 COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Engineering & Administration $55,000 Construction $260,000 1 % for Art TOTAL $315,000 PROJECT NAME: 841Ave. W Walkway ESTIMATED PROJECT COST: $315,000 From 188th St. SW to 186th St. SW r`T Jr K, r 5■■ i r .} F i L '■ ■ r r r ri 186TH ST W m w i-� ■ ■ --. r 18 TH 5 5W ■ 188TH 5T 5W LE ram ■ a r •; _ L r r SFASAF W - AL PROJECT DESCRIPTION: Install sidewalk along 84 th Ave. W from 188 th St. SW to 186 th St. SW., with curb and gutter. This project ranked #5 in Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2023-2037 COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Engineering & Administration $60,000 Construction $255,000 1 % for Art TOTAL $315,000 PROJECT NAME: 236 th St. SW Walkway ESTIMATED PROJECT COST: $765,000 from Hwy 99 to 76t" Ave. W ■ 236TH T W 23607 23603 SAFEN 23605 E KJI 23607 NON PROJECT DESCRIPTION: Install sidewalk along 236t St. SW from Hwy 99 to 76t Ave. W. This project ranked #11 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2023-2037 COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Engineering & Administration $115,000 Construction $650,000 1 % for Art TOTAL $765,000 62 PROJECT NAME: 238thSt. SW Walkway ESTIMATED PROJECT COST: $1,170,000 from Hwy 99 to 76t" Ave. W 1 PARK r .•nrIRL NA LN ' , ■ ' EOMONOs APTS BALL ' • • 1 ��r� W w Ov NORTH m CH RIST LH THE RAN CHURCH S N PARK & RIDE R n - 2 TH T OFFICE ■ d `� ,4 , W r SAFEWAY � L KJIHG FC,� I ' L • . SUNSET '•n•1L LO•n: CEj BROOK ■ AURORA- MARKETPLACE FAMILYPANCAKE j7' � 1 ■ 238TH 5T 5W "' ■ ■ ■ 23827 seouL PLAZAMEN ' ■ ► 1 Will x 11 ■ 23827, TRAVEL LODGE 2397 ■ -MISISON TACO TIM ■ ST. FRA NCIS MOTEL WHSE ■ME . . . - ■ ■ ■ _+ K&EMOTEL 1 1 ■ ■ � I, 1:11 RIl RIl III F 1 ■ ■ ■ � , IN ■ ■ :yA ■ ■ PROJECT DESCRIPTION: Install sidewalk along 238t St. SW from Hwy. 99 to 76t Ave. W This project ranked #12 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2023-2037 COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Engineering & Administration $175,000 Construction $995,000 1 % for Art TOTAL $1,170,000 63 PROJECT NAME: 80 Ave. W / 180 St. ESTIMATED PROJECT COST: $1,350,000 SW Walkway from 188" St. SW to OVD PROJECT DESCRIPTION: Install sidewalk along 801h Ave. W from 188 th St. SW to OVD. This project ranked #13 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2023-2037 COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Engineering & Administration $270,000 Construction $1,080,000 1 % for Art TOTAL $1,350,000 64 PROJECT NAME: 189thPI. SW Walkway ESTIMATED PROJECT COST: $585,000 from 80t" Ave. W to 76t" Ave. W PROJECT DESCRIPTION: Install sidewalk along 189t PI. SW from 80th Ave. W to 76 th Ave. W. This project ranked #14 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2023-2037 COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study Engineering & Administration $115,000 Construction $470,000 1 % for Art TOTAL $585,000 65 PROJECT NAME: Ferry Storage ESTIMATED PROJECT COST: $357,000 Improvements from Pine St. Dayton St. PROJECT DESCRIPTION: Modify existing lane channelization on SR104 to add vehicle storage for ferry users. PROJECT BENEFIT/ RATIONALE: Reduce conflicts between ferry storage and access to local driveways. SCHEDULE: 2020 (unsecured funding) COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration $50,000 Construction $307,000 1 % for Art TOTAL $357,000 PROJECT NAME: Trackside Warning System ESTIMATED PROJECT COST: $350,000 @ Dayton and Main St. RR Crossing PROJECT DESCRIPTION: Install Trackside Warning System @ Dayton and Main St. Railroad Crossings. PROJECT BENEFIT/RATIONALE: Reduce noise from train horns at both intersections. SCHEDULE: Construction is scheduled to be completed by late 2016 or early 2017. COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Engineering & Administration Construction $10,000 1 % for Art TOTAL $10,000 * all or part of this project may qualify for 1 % for the Arts. 67 PROJECT NAME: Edmonds Street Overpass ESTIMATED PROJECT COST: $24,000,000 ld. PROJECT DESCRIPTION: This project builds a grade -separated overcrossing over the railroad tracks as an extension of Edmonds Street connecting to Brackett's Landing north park. PROJECT BENEFIT/RATIONALE: Provide access for emergency vehicles, pedestrians, and bicycles. The overpass could be utilized to offload passenger vehicles from a ferry during an extended closure of the railroad track crossings. SCHEDULE: 2017-2037 COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 2023-2037 Planning/Study $500,000 $500,000 Engineering & Administration $500,000 $500,000 $770,000 Right of Way / Environment Mitigation $1,700,000 Construction $19,500,000 TOTAL $500,000 $500,000 $500,000 $500,000 $2,470,000 $19,500,000 10 et CFP STORMWATER 70 71 Project Name Purpose Grant Opportunity Grant/Date Current Project Phase (2017-2022) Total 2017 2019 2019 2020 2021 2022 Dayton St and Hwy 104 Drainage Add lift station and other new infrastructure to reduce $0 (Federal or State secured) Improvements. intersection flooding. Design $0 (Federal or State unsecured) $1,950,000 (DebUStormwater Fees) $1,900,000 $50,000 $1,950,000 Total $1,900,000 $50,000 Willow Creek/Daylighting Daylight channel to allow better connnectivity with the Puget RCO SRF Grant $0 (Federal or State secured) Sound to benefit fish and reduce flooding. Possible Grant/TBD Study $4,200,000 (Federal or State unsecured) $225,000 $225,000 $1,800,000 $1,950,000 $1,420,000 (DebUStormwater) $75,000 $75,000 $600,000 $650,000 $20,000 $5,620,000 Total $300,000 $300,000 $2,400,000 $2,600,000 $20,000 Perrinville Creek High Flow Find solution to high peak stream flows caused by excessive Ecology Grant 1 $510,375 (Federal or State secured) $5101,375 Reduction/Management Project - stormwater runoff that erodes the stream, causes flooding Possible Grant/TBD Design $1,087,500 (Federal or State unsecured) $337,500 $375,000 $375,000 Seaview Park Infiltration Facility and has negative impacts on aquatic habitat. $582,625 (DebUStormwater Fees) $170,125 $112,500 $125,000 $125,000 $50,000 $2,180,500 Total $680,500 $450,000 $500,000 $500,000 $50,000 Total CFP I NJ $9,750,500 1 Annual CFP Totals $2,880,500 1 $800,000 1 $2,900,000 1 $3,100,000 $0 $70,000 Revenue Summary by Year Totals Source 2017 1 2018 1 2019 1 2020 1 2021 1 2022 $510,375 Total Federal& State (Secured) $510,375 $0 $0 $0 $0 $0 $5,287,500 Total Federal & State (Unsecured) $225,000 $562,500 $2,175,000 $2,325,000 $0 $0 $3,952,625 Debt/ Stormwater Fees $2,145,125 $237,500 $725,000 $775,000 $0 $70,000 73 PROJECT NAME: Dayton St and Hwy 104 ESTIMATED PROJECT COST: $2,227,700 Drainage Improvements �ZtG` d�4 o° 9@ 31 e nn°°I C. 146 PROJECT DESCRIPTION: Add lift station in the Beach Place parking lot and other new infrastructure. PROJECT BENEFIT/RATIONALE: To reduce flooding at the intersection of Dayton St and State Hwy 104. SCHEDULE: 2017-2019 COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Eng. & Admin. $100,000 Construction $1,800,000 $50,000 1% for Art $10,000 TOTAL $1,900,000 $50,000 74 PROJECT NAME: Willow Creek Daylighting ESTIMATED PROJECT COST: $5,825,000 Edmonds Marsh as seen from the viewing platform. Previously restored section of Willow Creek. Source: www.unocaledmonds.info/clean-u /n aallery_php PROJECT DESCRIPTION: Building on the studies completed in 2013 and 2015 that assessed the feasibility of daylighting the Willow Creek channel, this project will likely construct a new tide gate and 1,100 linear ft of new creek channel lined with an impermeable membrane. Funds will be used for design and construction but exact breakdown cannot be assessed at this time. PROJECT BENEFIT/RATIONALE: The daylighting of Willow Creek will help reverse the negative impacts to Willow Creek and Edmonds Marsh that occurred when Willow Creek was piped in the early 1960s. This project will provide habitat for salmonids, including rearing of juvenile Chinook. This project, along with its companion CIP projects "Edmonds Marsh Channel Improvements" and "Dayton Street Pump Station," will also help reduce the flooding problem at the intersection of SR-104 and Dayton Street. SCHEDULE: 2017-2025 COST BREAKDOWN PROJECT COST 2017 2018 2019 2020 2021 2022 Planning/Study Eng. & Admin. $459,278 $300,000 $300,000 $300,000 $300,000 $300,000 Construction 1 % for Art TOTAL $459,278 $300,000 $300,000 $300,000 $300,000 $300,000 75 PROJECT NAME: Perrinville Creek High Flow ESTIMATED PROJECT COST: $2,532,950 Reduction/Management Project Talhot Frederick a C n m 1 4t 185th 00 M U 87th cv 1 AQ7aL 172n w � t 73 d a Perrinville d4 Creek th 78th - 77th' 1 78th -w 1 Oth m 181s to m a �RRfL n n t Perrinville Creek Channel illustrating the channel incision that will be addressed by restoration. PROJECT DESCRIPTION: A flow reduction study for the Perrinville Creek basin was completed in 2014. This study recommended a number of flow control and water quality projects to improve the conditions in Perrinville Creek. The City applied for and won a grant from the Department of Ecology for $633,750 to design and construct a stormwater infiltration facility in Seaview Park. The 2017 budget is for that facility. The dollars allocated in the out years are to implement additional water quality and flow control projects in the Perrinville Creek basin as recommended by the Flow Reduction Study. PROJECT BENEFIT/RATIONALE: Urbanization of the Perrinville Creek Basin has increased flows in the creek, incision of the creek, and sedimentation in the low -gradient downstream reaches of the creek. Before any habitat improvements can be implemented, the flows must be controlled or these improvements will be washed away. SCHEDULE: 2017-2022 COST BREAKDOWN PROJECT 2017 2018 2019 2020 2021 2022 COST Planning/Study Eng. & Admin. $35,000 $50,000 50000 50000 $50,000 $50,000 Construction $944,000 $400,000 $450,000 $450000 1% for Art $3,950 $1,125 $1,250 $1,250 TOTAL $982,950 $451,125 $501,250 $501,250 $50,000 $50,000 76 Everett Daily Herald Affidavit of Publication State of Washington } County of Snohomish } ss Kathleen Landis being first duly sworn, upon oath deposes and says: that he/she is the legal representative of the Everett Daily Herald a daily newspaper. The said newspaper is a legal newspaper by order of the superior court in the county in which it is published and is now and has been for more than six months prior to the date of the first publication of the Notice hereinafter referred to, published in the English language continually as a daily newspaper in Snohomish County, Washington and is and always has been printed in whole or part in the Everett Daily Herald and is of general circulation in said County, and is a legal newspaper, in accordance with the Chapter 99 of the Laws of 1921, as amended by Chapter 213, Laws of 1941, and approved as a legal newspaper by order of the Superior Court of Snohomish County, State of Washington, by order dated June 16, 1941, and that the annexed is a true copy of EDH735066 ORDINANCE SUMMARY as it was published in the regular and entire issue of said paper and not as a supplement form thereof for a period of 1 issue(s), such publication commencing on 12/11/2016 and ending on 12/11/2016 and that said newspaper was regularly distributed to its subscribers during all of said period. The amount of the fee for such publication is $49.88. Subscribed and sworn before me on this j 3 day of ILJ� _ � r Notary Public in and for the State of Washington. City of Edmonds -LEGAL ADS 114101416 SCOTT PASSEY DEBRA ANN GRIGG Notary Public State of Washington My Commission Expires October 31, 2017 ORDINANCE SUMMAnY I of the City of Edmonds, Wsftg-Ion On the 6th day of December, 2016, Ute Clly Councll of Iho City of Edmonds, passed the following Ordinances, the summaries of the content of said ordtnanCes consisting 01 lltlea are provided as follows: ORDINANCE NO.4054 AN ORDINANCE OF THE CITY OF EDMONDS. WASHINGTON, RELATING.TO THE BUDGET FOR FISCAL YEAR COMMENCING JANUARY 1, $017 AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE ORDINANCE NO.4055 AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING THE CITY OF EDMONDS COMPREHENSIVE PLAN; ADOPTING VARIOUS AMENDMENTS TO THE PARKS, RECREATION, AND OPEN SPACE AND CAPITAL FACILITIES ELEMENTS OF THE CITY'S COMPREHENSIVE PLAN AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE ORDINANCE NO.4056 AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING ORDINANCE NO. 4045 AS A RESULT OF UNANTICIPATED TRANSFERS AND EXPENDITURES OF VARIOUS FUNDS, AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE The full text of these Ordlnancdawlll be mailed upon reques6 DATED this 11 th day of December, 2016. CITY CLERK. SCOTT PASSEY ubllshed: December 11, 2016. EDH73506T-