Loading...
Ordinance 4092ORDINANCE NO.4092 AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING THE 2017 AMENDMENTS TO THE CITY OF EDMONDS COMPREHENSIVE PLAN; AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. WHEREAS, the most recent significant update of the Comprehensive Plan occurred in 2015; and WHEREAS, in 2017 several minor amendments to the City's Comprehensive Plan were proposed; and WHEREAS, the proposed amendments are summarized in Exhibit A and include minor amendments to the PROS Plan, the addition of references and descriptions into the discussion of the Highway 99 Activity Center to align it with the approved Highway 99 Subarea Plan, and updates to the completion dates for plan actions for certain plan elements; and WHEREAS, in addition to the amendments included in Exhibit A, the Planning Board also previously reviewed proposed updates to the Capital Facilities Plan, the Comprehensive Water System Plan, and a private application for a plan designation change for a specific property which have already been acted upon by the City Council; WHEREAS, the Planning Board held various public hearings on this year's various plan text amendments on November 8, 2017 (PROS plan amendments), November 16, 2016 (Civic Center Master Plan), and May 10, 2017 (Highway 99 subarea plan); and WHEREAS, the City Council held a review session on November 6, 2017; and - 1 - WHEREAS, the Capital Facilities Plan (CFP) was heard separately by the Planning Board on October 25, 2017, and the City Council held its public hearing on November 21, 2017; and WHEREAS, the City Council approved/adopted the 2017 Comprehensive Water System Plan on November 6, 2017; and WHEREAS, on December 5, 2017, the City Council held a public hearing on the 2017 Comprehensive Plan amendments; NOW THEREFORE THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. The 2017 City of Edmonds Comprehensive Plan is hereby amended as follows: a) adding the Veteran's Plaza as a park, as reflected in Exhibit A, hereto; b) adopting the Civic Center Master Plan as an appendix to the PROS plan and revise page A-20, as reflected in Exhibit A, hereto; c) modify certain references to the Highway 99 subarea and related statements in the Comprehensive Plan to acknowledge and reference the approved Subarea Plan for Highway 99, as reflected in Exhibit A, hereto; d) change the referenced completion dates for the updates to the Street Tree Plan and Urban Forest Management Plan to 2018, as reflected in Exhibit A, hereto; e) change the implementation date in the Capital Facilities Plan Element for the development of level of service standards for key public facilities to the end of 2019, as reflected in Exhibit A, hereto. Exhibit A, which is attached hereto, is fully incorporated herein by this reference as if it were set forth in full. Section 2. The 2018-2023 Capital Facilities Plan, which is an element of the Comprehensive Plan, is hereby adopted to read as set forth in Exhibit B, which is attached hereto -2- and incorporated herein by this reference as if fully set forth herein. Exhibit B completely replaces the 2017-2022 Capital Facilities Plan. Section 3. The city council hereby acknowledges the November 6, 2017 adoption of the 2017 Comprehensive Water System Plan and hereby incorporates that separate document by reference into the city's Comprehensive Plan. City staff is hereby authorized to update the Comprehensive Plan such that all existing references to the 2010 Comprehensive Water System Plan shall be changed to reference the 2017 Comprehensive Water System Plan. Section 4. Effective Date. This ordinance, being an exercise of a power specifi- cally delegated to the City legislative body, is not subject to referendum, and shall take effect five (5) days after passage and publication of an approved summary thereof consisting of the title. ATTEST/AUTHENTICATED: dff CLERK, SCO ASSEY APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY: BY JEFF TARADAY FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: PUBLISHED: EFFECTIVE DATE: ORDINANCE NO.: December 1, 2017 December 5, 2017 December 10, 2017 December 15, 2017 4092 -3- SUMMARY OF ORDINANCE NO. 4092 of the City of Edmonds, Washington On the 5th day of December, 2017, the City Council of the City of Edmonds, passed Ordinance No. 4092. A summary of the content of said ordinance, consisting of the title, provides as follows: AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING THE 2017 AMENDMENTS TO THE CITY OF EDMONDS COMPREHENSIVE PLAN; AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE The full text of this Ordinance will be mailed upon request. DATED this 6th day of December, 2017. CIT CLERK, SCOT'I' ASSEY -4- Everett Daily Herald Affidavit of Publication State of Washington } County of Snohomish } ss Dicy Sheppard being first duly sworn, upon oath deposes and says: that he/she is the legal representative of the Everett Daily Herald a daily newspaper. The said newspaper is a legal newspaper by order of the superior court in the county in which it is published and is now and has been for more than six months prior to the date of the first publication of the Notice hereinafter referred to, published in the English language continually as a daily newspaper in Snohomish County, Washington and is and always has been printed in whole or part in the Everett Daily Herald and is of general circulation in said County, and is a legal newspaper, in accordance with the Chapter 99 of the Laws of 1921, as amended by Chapter 213, Laws of 1941, and approved as a legal newspaper by order of the Superior Court of Snohomish County, State of Washington, by order dated June 16, 1941, and that the annexed is a true copy of EDH788588 ORDINANCE 4089-4092 as it was published in the regular and entire issue of said paper and not as a supplement form thereof for a period of 1 issue(s), such publication commencing on 12/10/2017 and ending on 12/10/2017 and that said newspaper was regularly distributed to its subscribers during all of said period. The amount of the fee for such publication is $55.0 I Subscribed and sworn re me on this day of , 0= � 1_1 '_�2 "_�I Notary Public in and for the State of Washington. City of Edmonds -LEGAL ADS 114101416 SCOTT PASSEY Lire - " R %rV phflfips Notary pubtic State of washinglon MY APPOIninj nt j��Vjres Ca'2,9. A. . _ CLASSIFIED ADVERTISING UHUi NANCE S UMMARY of the City of Edmond$, WaOinggllaan On the 5th day at December, 2017, ilia City C-ouncll of the city ul Edmonds, passed the following Ordinances, the summaries of the content of 6aid ordinances consisting at lilles.are provided as follows: ORDINANCE NO.4089 AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, RELATING TO THE BODGET FOR FISCAL YEAR COMMENCING JANUARY 1, 2058 AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE ORDINANCE NO.4090 AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING THE TIMING OF THE ELECTION FOR COUNCIL PRESIDENT AND PRESIDENT PROTEMPORE ORDINANCE NO.4091 AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING ORDINANCE NO, 4086 AS A RESULT OF UNANTICIPATED TRANSFERS AND EXPENDITURES OF VARIOUS FUNDS, AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE ORDINANCE NO.4092 AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING THE 2017 AMENDMENTS TO THE CITY OF EDMONDS COMPREHENSIVE PLAN; AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE The full text of these Ordinances will be mailed upon request. DATED this 6th day of December, 2017. CITY CLERK, SCOTT PASSEY ublished: December 10, 2017. EDH78858� 2017 Comprehensive Plan Amendments 1. Parks, Recreation & Open Space (PROS) Plan amendments. a. Adding the Veteran's Plaza as a park, includes: • P. 2-22, under the heading Special Use Parks, add: "Veteran's Plaza/.2 acre/Excellent/amenities include gathering place/fit = 1/no additional capacity." • In Appendix A, p. A-5 : Add Veteran's Plaza under "Special Use Parks." • In Appendix A, after page 56, add a page for Veteran's Plaza (see attached). b. Adopt the Civic Center Master Plan as an appendix in the PROS plan. • In addition, on page A-20, change Planned Improvements to include: Develop Master Plan, Continued Maintenance. 2. Highway 99 Subarea Plan a. Modify certain references and statements in the Comprehensive Plan to acknowledge and reference the approved Subarea Plan for Highway 99. See the attachment for the specific changes proposed. 3. Urban Forest Master Plan a. The current Comprehensive Plan Contains the following actions: Action 1: Develop an update to the Street Tree Plan by the end of 2016. Action 2: Develop an Urban Forest Management Plan by the end of 2017. Although both of these plans are in various stages of development, per the original target dates, the update process will not be completed until 2018. The proposed amendment is to change the referenced dates to 2018, reflecting the final completion dates for both plans. 4. Capital Facilities Element a. The current Comprehensive Plan Contains the following action: Implementation Action: Develop level of service standards for key public facilities by the end of 2017 and consider including the standards in the Comprehensive Plan. Due to staff resource constraints, this action is unlikely to be completed until 2019. The implementation date should therefore be changed to "the end of 2019" to reflect this reality. City of Edmonds Parks, Recreation and Open Space Plan Table 2-5: Park Condition and Ca M % y a L U v Q 0 H Observed M 19 Condition ° Neishborhood Park .. Close -to -Home Amenities a In � v t — C U a � d LL O O C O N Yf E +� i+ O fV u a)LL a Q 11 i Q Q L } Q 3 Q oa v fJ�O y U O y 0 O f�6 U +T+ u Elm Street Park 1.85 Good N Y N N N N 1 Potentially Frances Anderson Center Field 1.94 Fair Y N Y Y Y N 3 Potentially Haines Wharf 0.69 Excellent Y Y N Y N P 2 No Hickman Park 5.60 Excellent Y Y Y Y Y P 3 Potentially Hummingbird Hill Park 1.22 Good Y N Y N Y P 3 Yes Mathay Ballinger Park 0.51 Good Y N Y N Y N 3 Potentially Pine Street Park 1.47 Fair Y N Y N Y P 3 Yes Seaview Park 6.05 Good Y N Y Y Y Y 3 Yes Sierra Park 5.52 Fair Y Y Y N Y P 3 Potentially Community Park ���i City Park 13.96 Good Y N Y Y Y Y 2 Potentially Yost Memorial Park & Pool 1 44.14 Good Y Y N Y Y Y 2 Potentially Reeional Parks 144 Railroad Avenue Tidelands 0.90 Excellent N N Brackett's Landing North 5.11 Excellent N Y N Y N Y 3 Potentially Brackett's Landing South 2.22 Excellent N Y Y Y N N 2 Potentially Edmonds Senior Center 2.63 Good N Y N Y N N 1 No Marina Beach Park 3.37 Good Y Y Y Y Y P 2 Potentially Olympic Beach Park 2.82 Good N Y N Y N Y 2 Potentially Special Use Parks Centennial Plaza 0.08 Good N N N Y N N 3 No Dayton Street Plaza 0.35 Poor N N Edmonds Library & Plaza Room 1.29 Good N N N Y N Y 2 Potentially Edmonds Memorial Cemetery and Columbarium 6.63 Good N N N N N Y 1 No Frances Anderson Center 1.62 Good Y N N Y N Y 2 Potentially Hazel Miller Plaza 0.09 Excellent N N N Y N N 1 No Interurban Trail 4.88 Excellent N N N N N N 1 No Lake Ballinger Access 0.19 Good N Y N N N N 1 No Meadowdale Community Clubhouse 0.99 Good Y N N N N Y 2 Yes Richard F. Anway Park 0.17 Good N N N Y N Y 2 Yes 2-22 Chapter 2: Parks, Recreation and Open Space System Ownership a ^ E. ? \ Sports Courts Sports Fields i m v E L 7 !6 c = T O d oO N 7 E 0 � 6 N O d O oO N U *' 7 E U° 6 O 76 O U 3 > (6 N V a N O O a) N f6 O O z m c >° c L O o �° c� ° °n �p Q m wD v°> p u�i >° Neighborhood Park Elm Street Park CoE 1.85 Frances Anderson Center Field CoE 1.94 1 1 1 Haines Wharf CoE 0.69 1 1 Hickman Park CoE 5.60 1 0.2 1 1 1 1 Hummingbird Hill Park CoE 1.22 1 1 1 Mathay Ballinger Park CoE 0.51 1 2 Pine Street Park CoE 1.47 1 1 1 Seaview Park CoE 6.05 1 0.5 1 2 1 1 1 Sierra Park CoE 5.52 1 0.5 1 1 1 1 Subtotal 24.85 8 1.2 5 0 2 0 0 4 0 0 5 0 0 0 0 0 0 1 1 5 Community Park City Park CoE 13.96 2 1 1 1 1 3 2 Yost Memorial Park & Pool CoE 44.14 1 1.0 1 2 1 1 Subtotal 58.10 3 1.0 1 0 2 0 0 1 0 0 1 0 0 2 0 0 0 3 3 0 Regional Parks 144 Railroad Avenue Tidelands CoE 0.90 Brackett's Landing North CoE 5.11 0.5 1 1 Brackett's Landing South CoE 2.22 0.5 1 Edmonds Senior Center CoE 2.63 0.5 1 1 Marina Beach Park CoE 3.37 1 0.5 1 1 1 3 Olympic Beach Park CoE 2.82 0.5 1 1 Subtotal 17.05 1 2.5 0 1 0 0 0 0 0 0 0 0 1 0 0 0 1 5 0 2 3 Special Use Parks Centennial Plaza/Public Safety Complex CoE 0.08 Dayton Street Plaza CoE 0.10 Edmonds Library & Plaza Room CoE 1.29 1 1 Edmonds Memorial Cemetery and Columbarium CoE 6.63 1 Frances Anderson Center CoE 1.62 1 1 1 8 Hazel Miller Plaza CoE 0.09 1 Interurban Trail CoE 4.88 1.2 Lake Ballinger Access CoE 0.19 1 Meadowdale Community Clubhouse CoE 0.99 1 1 1 Richard F. Anway Park CoE 0.17 1 Ocean Avenue Viewpoint CoE 0.20 1 Point Edwards Scenic Overlooks CoE (easement) 0.10 1 Stamm Overlook Park CoE 0.36 1 Sunset Avenue Overlook CoE 1.14 0.5 1 Willow Creek Hatchery & Interpretive Center CoE 1.68 0.0 Subtotal 19.52 1 1.7 0 0 0 0 0 0 0 0 0 0 1 0 1 2 5 0 12 0 Open Space Edmonds Marsh/Walkway CoE 23.37 0.5 1 Edmonds Marsh East CoE 0.85 H.O. Hutt Park CoE 4.53 0.5 Haines Tidelands CoE 0.44 Maplewood Hill Park CoE 9.96 1 0.5 Meadowdale Natural Area CoE 1.07 Olympic View Open Space CoE 0.49 Pine Ridge Park CoE 23.78 1.0 Seaview Reservoir CoE 1.31 Shell Creek Open Space CoE 1.04 Wharf Street CoE 0.12 1 Willow Creek Park CoE 2.25 Subtotal 69.21 1 2.5 1 0 1 0 1 0 0 0 0 0 0 1 0 1 0 1 0 0 1 0 1 0 0 2 0 0 0 Other Parks and Facilities in the Edmonds System Chase Lake Elementary School ESD 10.26 Chase Lake Environmental Ed./ESD Natural Area ESD/ Sno Co 10.80 0.2 Civic Center Playfields & Skate Park ESD 7.92 1 0.3 2 2 1 1 1 1 2 Edmonds Center for the Arts PFD 2.54 1 Edmonds Elementary School ESD 8.58 Edmonds Fishing Pier WDFW 0.61 1 1 1 1 1 1 1 1 1 1 1 1 1 Edmonds Underwater Park & Higgins Trails DNR 33.21 Edmonds Woodway High School ESD 30.19 Former Woodway High School ESD 39.75 Log Cabin Visitor Center CoE 0.03 Lynndale Skate Park CoL 4.77 1 1 1 1 Madrona School ESD 31.30 Maplewood Parent Cooperative ESD 7.41 Meadowdale Playfields ESD 24.09 1 1 1 2 1 Seaview Elementary ESD 8.28 Sherwood Elementary School ESD 13.19 South County Historical Museum CoE 0.09 Southwest County Park Sno Co 118.55 2.0 Wade James Theatre CoE 2.34 Westgate Elementary School ESD 8.34 Woodway Elementary School ESD 9.89 Subtotal 372.14 3 2.5 4 0 2 1 2 11 0 2 0 2 0 0 1 0 0 0 0 3 2 Other Parks and Facilities Near Edmonds Ballinger Playfield and Former Golf Course MLT 52.59 1 1 1 1 Esperance County Park Sno Co 9.59 1 0.2 1 1 Meadowdale Beach County Park Sno Co 144.34 2.0 Meadowdale Elementary School ESD 8.78 Meadowdale High School ESD 39.56 Meadowdale Middle School ESD 19.38 Subtotal 274.24 1 2 1 2.2 1 0 0 1 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 Veteran's Plaza Special Use Park Park Features 0.2 Acres Veteran's recognition elements Donor recognition elements Wall fountain Reflection garden Seating elements Drinking fountain Site considerations Entrance to Maxwell/McGinness Safety Complex Planned Improvements Continued maintenance City of Edmonds Parks, Recreation and Open Space Plan Civic Center Playfields & Skate Park Other Parks and Facilities Park Features • 7.92 Acres • 0.3 miles of walking trail • Playground • Basketball courts (2) • Tennis courts (2) • Football field (1 youth) • Soccer fields (1 adult, 1 youth) Site considerations • Owned by ESD • Operated by City of Edmonds • Zoned Public Use 100 200 � Feet • Skate park • Portable restrooms (2) • Petanque courts (4) • Cinder track (.25 miles) • Stadium • This site used for 4t" of July Fireworks display, Taste of Edmonds, Wenatchee Youth Circus Planned Improvements • Acquisition, master planning and development • Add large play area • Develop Master Plan • Continued maintenance A-20 Appendix A: Existing System Comprehensive Plan - Elements Elements Adopted The Comprehensive Plan consists of the following nine plan elements. Most of the goals and policies of the various elements are included in the main comprehensive plan document (this document). Some elements also have additional specific plans adopted by reference (as indicated below). Plan Element 1. Community Sustainability 2. Land Use 3. Housing 4. Economic Development Additional Plans) Adopted by Reference (Note that these are entirely separate documents) Highway 99 Subarea Plan 5. Community Culture and Urban Design Community Cultural Plan (2014) 6. Utilities 7. Capital Facilities 8. Transportation 9. Parks, Recreation, and Open Space Appendices Parks, Recreation, and Open Space Plan (2014) Streetscape and Street Tree Plan (2015) General Background 17 Land Use Element Land Use Map Whenever there are references in this plan to categories of land use, they shall apply to areas shown on the Comprehensive Plan Map as follows: Plan Map Designation Land Use Type Compatible Zoning Density Classifications Units/Acre Activity Center Corridor Development Designated Park or School Site Single Family, Resource Single Family, Urban 3 Single Family, Urban 2 Single Family, Urban 1 ............................................................................................ Multi Family - High Density Multi Family - Medium Density ........................................................................................... Mixed Use Commercial Community Commercial Neighborhood Commercial Highway 99 Corridor Edmonds Way Corridor Westgate Corridor (Planned Business) Hospital / Medical Master Plan Development Public Use or Park/Open Space Mix of uses; refer to specific See appropriate category below; plan designations within activity also refer to specific activity center center discussion in plan Mixed use development See appropriate category below; corridor; refer to specific plan also refer to specific corridor designations within corridor discussion in plan Public Facility P-zone or appropriate R-zone ................................................................................................_............................................................................................................_.............................. compatible with neighborhood. Single family RSW-12, RS-12, RS-20 < 4 RS-10 < 4.4 RS-8 < 5.5 ................................................................................................_............................................................................................................_.............................. RS-6, RS-8 5-8 Multi family RM-1.5, RM-2.4 18-30 RM-2.4, RM-3.0 < 18 ................................................................................................_............................................................................................................_.............................. Commercial Mixed Use Commercial or mixture of zones WMU, BC, BN, or equivalent BN or equivalent based on neighborhood plan CG-,02t-2; may include transitional zones as appropriate BP, BN, BC, or similar commercial zone; RM zones BP, BN Special Use District Hospital or Medical zone Master Plan Master Plan Overlay or equivalent classification Public or Parks P, OS, or equivalent classification Land Use 37 Other Public Facilities, 1.1% Parks, 5.8% Commercial/ Mixed Use*, 7.2% Multi -Family, 5.9% Single -Family, 61.0% Figure 12: General Zoning Categories by percent of City Land Area Source: City of Edmonds GIS, June-201 S *Some commercial properties include residential development as a type of mixed use. Note: Measurement of acreage may vary depending on the methodology used and the date data was retrieved. Population and Employment Capacity The 2012 Buildable Lands Report (BLR) shows Edmonds to have an additional housing capacity of 2,646 units through the year 2035, which would be needed to accommodate a total population of 45,550 residents. Since the BLR was finalized in 2012, some of the assumptions regarding buildable lands have changed. During the 2015 Comprehensive Plan update, city staff considered how these changes affected capacity projections. For example, recent plans by the City to encourage mixed -use development in the Neighborhood Business zoned areas of Westgate and Five Corners, plus the removal of restrictions on first and second floor residential development in rezones along the Highway 99 corridor, should provide the city with additional housing, employment, and population capacities not considered in the 2012 BLR. In total, the City conservatively estimates these actions can increase the land capacity by approximately 267 additional net housing units by applying the same methodology used in the Buildable Lands Report. With these adjustments, the City estimates a total capacity of 3,039 additional housing units by the year 2035. The projected housing need to accommodate the targeted population growth is 2,790 housing units as determined by the Countywide Planning Policies. This represents an increase of 15 percent from the estimate of 18,396 housing units in 2011.The land capacity analysis, combined with the goals and policies in the Comprehensive Plan, indicate that the 2035 targets for population and Land Use 41 Highway 99 Corridor Highway 99 Corridor Vision. Highway 99 occupies a narrow strip of retail and commercial uses bounded by residential neighborhoods. Historically, the corridor has developed in a patchwork of uses, without a clear focus or direction. To improve planning for the future of the corridor, the City established a task force in 2003-2004, resulting in the Highway 99 Enhancement Report and a related economic analysis. , preliminary survey with the residepAs, the City invited business owners to participate in two charrette This resulted in identifying ! a series of focus areas providing identity and a clustering of activity along the corridor, providing opportunities for improved economic development while also improving linkages between the corridor and surrounding residential areas. More recently, the City undertook a subarea planning process, resulting. in the adoption of a Highway 99 Subarea Plan. Supported by an extensive public participation process, this plan refined the district concepts for the corridor and provided more in-depth plans for transportation and the built environment, especially its design and relationships to surrounding residential areas. L t .r �i ..s =,L } ! 'ti; . : ;+:' •_k �.�Ilii 1 zmtiA sc5ta:_ ../. i= 2i2thst8 �Ec 'L .Lr` G f� Edmonds 1 '' r'' , ,i WaoAldeHealth Health ` High School 6 Rehabhab CenteT Swedish District �J,�• _ : �p J I,- 'r'` 3 Hospital 4 UW Wdtdri. �^ �degionat Heart I �"` � � 1 fi I � = el Center �__ ..� .•. loll. u -t 220th StSW � � � A � r � � � f lh f • �rt���� Ati viLLmrree �224thStSw of-� International 228th St 5 W 1�. 23Oth St SW 8r .a PLLbliC 99 Rartch 15 ric 1 Storage Marl ---..- 236th 5t SW 7 Gateway •E'�•238th St SW"-"'-' District 240th St SW 242rd St S/ 244th St SW way Lanci Figure 19: Highway 99 Corridor Theme Districts 61 Highway 99 Corridor Goals & Policies Each key goal in this element (or section) is identified by an alphabet letter (for example, "D"). Goals are typically followed by associated policies and these are identified by the letter of the goal and a sequential number (for example, "D.2") The following goals and policies are intended to achieve the framework goals for the Highway 99 Corridor: Highway 99 Corridor Goal A. Improve access and circulation. Access to businesses for both pedestrians and automobiles is difficult along major portions of the corridor. The inability of pedestrians to cross the street and for automobiles to make safe turns is a critical limitation on enhanced development of the corridor into a stronger economic area. Better pedestrian crossings are also needed to support transit use, especially as Highway 99 becomes the focus of future high capacity transit initiatives. A.1 Provide for pedestrian access and circulation within development focus areas, while coordinating with high -capacity transit along the Highway 99 corridor. A.2 Use traffic signals, access management, and rechannelization to facilitate pedestrian, business, and residential access while maintaining traffic capacity along SR 99. The City should work collaboratively with WSDOT on these issues, and to develop a circulation management plan. In some cases the impacts of the traffic signals can be enhanced by access management, rechannelization and other measures. A.3 Make the corridor more attractive and pedestrian -friendly (e.g., add trees and landscaping) through a combination of development requirements and — when available — public investment. A.4 Route auto traffic to encourage efficient access to new and existing development while minimizing impacts to surrounding residential neighborhoods. Highway 99 Corridor Goal B. The City should consider the different sections along the corridor and emphasize their unique opportunities rather than view the corridor as an undifferentiated continuum. Street improvements and, in some cases regulatory measures can encourage these efforts. Focus on specific nodes or segments within the corridor. Identity elements such as signage should indicate that the corridor is within the City of Edmonds, and show how connections can be made to downtown and other Edmonds locations. B.1 New development should be high -quality and varied — not generic — and include amenities for pedestrians and patrons while encouraging sustainable practices. B.2 The City will encourage the retention of commercial uses which provide high economic benefit to the city, such as new auto dealerships, and encourage these types of uses to locate within the Highway 99 Corridor. When these uses are proposed to be located within one of the corridor's districts, these uses should also comply with the goals and policies design standards outlined for each feetis are district. Land Use 62 B.3 Provide a system of "districts" along the corridor which provide opportunities for clusters of development, or themed development areas. Providing focus points for development is intended to help encourage segmentation of the long Highway 99 corridor into distinct activity nodes which will encourage an Edmonds character and identity for the corridor. Concepts for the different €eeus ar-easdistricts are identified in the "Highway 99'-'effi er- Visio Subarea Plan," and include the following: Health Care District. Located approximately between SW 208th St. to SW 220th St., the Health Care District is home to variety of health care facilities and offices, most notably the Swedish Hospital Edmonds Campus. The Edmonds campus includes 34 facilities and services, 217 beds, over 450 physicians and specialists and more than 1,400 staff members. The hospital provides medical and surgical services including Level IV Trauma emergency medicine, diagnostic, treatment and support services. There are many other medical clinics and offices across Highway 99 in Lynnwood as well as schools and higher education such as Edmonds Woodway High School, Mountlake Terrace High School, and Edmonds Community College, within approximately 1.5 miles from the Health Care District core on Highway 99. The Health Care District is not onlya provider of vital health services for the region, but also a .rig incubator for medical research, partnerships, health and wellness advocacy, and education opportunities. International District. Located approximately between SW 224th St and SW 238th St, the International District is a major cluster of Asian -owned businesses, particularly Korean -American businesses, with diverse restaurants, ,grocers, and shops. The International District is already a regional destination for culture, food, and entertainment — but there is an opportunity to strengthen the identity of this district and help it thrive in the long tg erm. The SR 99 International District Enhancement Project was a key recommendation identified in the 2004 Enhancement Study and the 2006 Market Analysis to build on the growing cluster of international businesses, largely anchored by the Ranch 99 Market, Boo Han Plaza, and other specialty plazas. In 2006, the City began efforts through federal grant funds to strengthen the International District identityby improving the area's visual identity and aesthetics, and implement pedestrian -oriented improvements with new gateway elements including a new pedestrian level lighting, new district identification signage on custom light poles, resurfacing of the island on 76`h Avenue and a solar lit sculptural piece on the island as part of the . ag teway. A major transportation any on 228th and Highway 99 is planned to create safe and easy access across the highway and connect to the recently completed bicycle lane that flows to the future regional trail (Interurban Trail) and to the Mountlake Terrace Transit Center. These transportation improvements will provide a critical connection for both local residents and regional transit riders to the International District. The gag teway design potential here will also help solidify the identity of the district. Land Use 63 The Gateway District, located approximately between SW 234th and the 104 Interchange north of SW 205th St, is the first introduction to Edmonds on Highway 99. This area was identified in the Enhancement Study as "Residential Area Retail Center" and "Hotels Area Improvement". However, the Edmonds community expressed a strong desire for a "gateway" and distinct transition point in and out of Edmonds during a community workshop. A recognizable marker identifying the entry_point to the city will help unify Edmonds as a place with rich history, arts, culture, food, and sense of place. i _;}`1i11lt i251r5W.� .:'f.� '•+� li.� 2f2thStSW'•. €1�•; MY" - - — *Li, •1 �I Woodway ! Atdercrest Healdi t Health High School 6 Rehab Center H�l=';;,;Dis#riot r+ -HospitalifWMedicine f•, .., rRcgwna1 Heart Center 22oth St SW r-yf Plum Tree International r224th St SW Plaza .�; W: District ' : ! f i s -: _ . •. , -- 1 PU411c 99 Rarich - 8 an 1 ... rket 228th St SW ,� 230th St SW • i• ii�i'�' --- ;��;, 7,,,;�;_ 'tit `e 232nd St SW ■ "' �� , I• _�• 234th St SW k. a 'y 111 Y 236th St SW n��•'� _ Aurora Markrtplace Gateway La k r 238thStSW 8eflioger District ' � 240th St SW Major B ington � Transportation 242nd St S Coa actoFry� ry 0Gateway _ �gs a: 244th St S _ . �.•:�, -. . _..rr.. Figure 20: Highway 99 Corridor FeGus ^ easDistrict Concepts Land Use 64 CITY OF EDMONDS CAPITAL FACILITIES PLAN 2018-2023 01"...'Al D �sr 1!0 Eo DRAFT CFP GENERAL Current Grant Project (2018.2023) Project Name Purpose Opportunity Phase Total Cost Revenue Source 2018 2019 2020 2021 2022 2023 2024-2038 Aquatic Facility Meet citizen needs for an Aquatics $0 Public Vote Center (Feasibility study complete August 2009). Unknown Conceptual $0 G.O. Bonds $0 $0 Total 5-$23 M Civic Center Development Development of 8 acre downtown $3,000,000 Public Vote $3,000,000 signature park $5,250,000 REET 1 /Grants $750,000 $4,500,000 $0 RCO Local Parks Design $500,000 Park Impact Fees $500,000 $3,000,000 G.O. Bonds $3,000,000 $11,750,000 Total $750,000 $11,000,000 $0 $11,750,000 Community Park / Athletic Complex - In cooperation with ESD#15 develop $0 Capital Campaign Old Woodway High School: Phase 2 and 3 a community park and athletic complex. RCO Phasel $0 REET 2 Complete $0 School District $0 Foundation $0 Grants $0 Total 8M Parks & Facilities Maintenance & Operations Replace / Renovate deteriorating $0 Public Vote Building building in City Park. Unknown Conceptual $0 G.O. Bonds $0 $0 Total $3-4M Waterfront Redevlopment/Waterfront Walkway Rehabilitate grounds, parking, beach $2,945,000 REET / Grants $1,675,000 $1,170,000 Completion access and area around Senior RCO WWRP Design $0 G.O. Bonds Center, walkway access. ALEA Permitting $500,000 Park Impact Fees $750,000 Construction $0 Private Partnership $3,345,000 Total $2,425,000 $1,170,000 Edmonds Crossing WSDOT Ferry / Mutimodal Relocate ferry terminal to Marina EIS $0 Federal (Unsecured) Facility Beach. US DOT Completed $0 State Funds $0 Total Unknown Public Market (Downtown Waterfront) Acquire and develop property for a year round public market. Unknown Conceptual $0 Grants $0 Total Unknown Total CFP $15,095,000 1 Annual CFP Totals 1 $3,175,000 1 $12,170,000 1 $0 1 $0 1 $0 1 $0 PROJECT NAME: Aquatic Facility ESTIMATED PROJECT COST: $5,000,000 — $23,000,000 A6 PROJECT DESCRIPTION: Implement recommendations of the Aquatics Feasibility Study completed in 2009. Six scenarios were presented and the plan recommended by the consultants was a year round indoor pool with an outdoor recreational opportunity in the summer. The project is dependent upon a public vote. PROJECT BENEFIT/RATIONALE: The current Yost Pool, built in 1972, is nearing the end of its life expectancy. The comprehensive study done in 2009 assessed the needs and wants of Edmonds citizens in regard to its aquatic future as well as the mechanical condition of the current pool. SCHEDULE: 2024-2038 COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 2024-2038 Planning/Study Eng. & Admin. Construction 1 % for Art TOTAL $5m - $23m x all or part of this Project may quality for 1 Yo for the Arts 7 PROJECT NAME: Civic Center Development ESTIMATED PROJECT COST: $12,050,000 PROJECT DESCRIPTION: Civic Center Development / Stadium Demolition. Develop the recently adopted master plan for Civic Park, including demolition of the stadium. Develop plan adding amenities and recreation components, restrooms to accommodate increased growth. PROJECT BENEFIT/ RATIONALE: Civic Center Development. The acquisition and development of Civic Center is a high priority in the PROS plan. SCHEDULE: 2018 - 2023 COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Design 500000 1,000,000 Construction 250000 10,000,000 TOTAL 750000 11,000,000 CITY OF EDMONDS CAPITAL FACILITIES PLAN DESCRIPTION PROJECT NAME: Community Park / Athletic ESTIMATED PROJECT COST: $6-8 M Complex at the Former Woodway High School ra CIA HOGAN rC)R lER WOODWAY HIGH SCHOOL. ATHLETIC FIELD IMPROVEMENTS PRE PAnto fOX THE E DMON DS SCHOOL DISH ICT MAY FOV PROJECT DESCRIPTION: Develop community park and regional athletic complex with lighted or unlighted fields and recreational amenities in partnership with Edmonds School District, community colleges, user groups, and other organizations. Development dependent upon successful regional capital campaign. $10m - $12M project for all 3 phases. PROJECT BENEFIT/RATIONALE: The site is currently an underutilized and under maintained facility with great potential as community multi -use active park. Site has existing controlled access, greenbelt, parking and 4-court tennis facility with substandard fields. Highly urbanized area with 150,000 residents within 5-mile radius. Future maintenance supported by user fees. Phase 1 was completed in 2015 for $4.2M, Phases 2 & 3 will be completed in the future for an additional $6-8M. SCHEDULE: 2018-2038 COST BREAKDOWN PROJECT 2018 2019 2020 2021 2022 2023 2024- COST 2038 Planning/Study Engineering & Administration Construction 1 % for Art TOTAL $6-8M " all or a portion of this project may quality for 1 % for the Arts 9 PROJECT NAME: Parks & Facilities ESTIMATED PROJECT COST: $3-$4 Million Maintenance & Operations Building Existing Building Outline a. & a WANwkwl "m I WE M L adirtg New One�Bu'iding 1,600 sf 6,600 sf Driveway — 15,800� Yard Functions � 11,910 If J Perimeter zone — 4,200 st Existing Fence Line a PROJECT DESCRIPTION: The 40 year old maintenance building in City Park is reaching the end of its useful life and is in need of major renovation or replacement. PROJECT BENEFIT/RATIONALE: Parks and Facilities Divisions have long outgrown this existing facility and need additional work areas and fixed equipment in order to maintain City parks and Capital facilities for the long term. SCHEDULE: Contingent on finding additional sources of revenue from general and real estate taxes. COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 2024-2038 Planning/Study Eng. & Admin. Construction 1 % for Art TOTAL $3m - $4m 'all or part of this Project may qualify for 1 % for the Arts 10 PROJECT NAME: Waterfront Redevelopment ESTIMATED PROJECT COST: $3,595,000 / Waterfront Walkway Completion f— `� - -;o- ...fir_}.- -- -- - ---- --- -------------- Prapvwd Ftlrtrw4 W arerlront Ganrer j ;I ;rrra5: r �Mw ww r w�ww raW Fnr rw rarer. raecnrwr tdnn . - IIMp11KM NopM�d.[w. d'tlli W e..a PROJECT DESCRIPTION: Work with Sr. Center to renovate surrounding park, parking lot and walkway. Remove creosote pier, reintroduce habitat for fish and wildlife. Increase access to the waterfront to accommodate increased growth. Connect waterfront walkway from Brackett's Landing South to Olympic Beach, including completion in front of the Ebb tide condominiums. PROJECT BENEFIT/RATIONALE: Provide anew Senior and Community Center and provide a new beachfront walkway. One of the top priorities in the PROS plan is to open up beach -front access. SCHEDULE: 2018-2023 COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Eng. & Admin. Construction 1 % for Art TOTAL $2,425,000 $1,170,000 0 0 0 0 * all or part of this Project may qualify for 1% for the Arts is `v: CFP TRANSPORTATION 13 14 Project Name Grant Opportunity LojectPhasj (2018-2023) Total Cost Funding Source 2018 2019 2020 2021 2023 1 2024-2038 Safetv / Capacity Analvsis 228th St. SW from Hwy 99 to 95th PI. Install two-way left turn lanes and $0 (Federal or State secured) W. sidewalks to improve capacity and pedestrian safety (project split with $375,000 (Federal or State unsecured) $75,000 $300,000 $8,690,000 Snohomish County) Possible Grant Conceptual $0 (Local Funds) $1,356,000 $375,000 Total $75,000 $300,000 $10,046,000 76th Av. W @ 212th St. SW Intersection improvements to $296,000 (Federal or State secured) $296,000 Intersection Improvements improve intersection delay and level of service (LOS). $0 (Federal or State unsecured) Construction $57,740 (Local Funds) $57,740 $353 740 Total $353 740 $0 Highway 99 Gateway / Revitalization Install gateway elements and safety $9,576,000 (Federal or State secured) $440,000 $136,000 $5,000,000 $4,300,000 improvements along SR-99 Corridor. State $10,000,000 (Federal or State unsecured) $10,000,000 $170,000,000 Appropriation Design $300,000 (Local Funds) $290,000 $20,166,000 Total $440,000 $426,000 $5,000,000 $4,300,000 $10,000,000 $170,000,000 SR 524 (196th St. SW) / 88th Ave W Improve intersection safety by $0 (Federal or State secured) Intersection Improvements converting a stop controlled intersection for NB and SB $744,500 (Federal or State unsecured) $122,000 $87,500 $535,000 movements to a signalized Possible Grant Conceptual $158,500 (Local Funds) $71,000 $87,500 intersection. $903 000 Total $193 000 $175,000 $535 000 Main St. and 9th Ave S Install traffic signal to improve $0 (Federal or State secured) intersection delay and Level of Service (mini roundabout is an $776,000 (Federal or State unsecured) $120,000 $776,000 alternative solution). Possible Grant Conceptual $0 (Local Funds) $896,000 Total $120,000 $776,000 76th Ave. W @ 220th St. SW Convertsplit phasing operation for $0 (Federal or State secured) Intersection Improvements EB and W B movements to concurrent through movements, with $5,637,450 (Federal or State unsecured) $285,450 $1,557,000 $3,795,000 protected / permissive LT phasing. Possible Grant Conceptual $342,550 (Local Funds) $55,000 $44,550 $243,000 $5 980 000 Total $55 000 $330 000 $1 800 000 $3 795 000 Hwy 99 @ 212th St SW Intersection Widen 212th St. SW to add a $0 (Federal or State secured) Improvements westbound left turn lane for 200' storage length and an eastbound left $2,806,000 (Federal or State unsecured) $175,000 $1,091,000 $1,540,000 turn lane. Possible Grant Conceptual $23,000 (Local Funds) $2,806,000 Total $175,000 $1,091,000 $1,540,000 Hwy. 99 @ 216th St. SW Intersection Widen 216th St. SW to add a left $0 (Federal or State secured) Improvement turn lane for eastbound and westbound movements. $2,313,000 (Federal or State unsecured) $142,000 $334,000 $1,837,000 Possible Grant Conceptual $22,000 (Local Funds) $22,000 $2 335 000 Total $164 000 $334 000 $1 837 000 Hwy. 99 @ 220th St. SW Intersection Widen 220th St. SW and Hwy 99 to $0 (Federal or State secured) Improvement add a westbound right turn lane (for 326 storage length) and a soutbound $3,192,000 (Federal or State unsecured) $152,000 $1,085,000 $1,955,000 left turn lane (for 275' storage Possible Grant Conceptual $23,000 (Local Funds) $23,000 length). $3,215,000 Total $175,000 $1 085 000 $1 955 000 Grant (2018-2023) Project Name Purpose O ortunit Project Phase Total Cost Funding Source 2018 2019 2020 2021 2022 2023 2024-2038 Hwy 99 @ 234th St. SW Traffic Signal Install new traffic signal at Hwy. 99 $0 (Federal or State secured) ve 234th St. SW to provide safer de vehicular /pedestrian crossings, $3,057,000 (Federal or State unsecured) $259,500 $1,297,500 $1,500,000 combined with corner widenings. Possible Grant Conceptual $243,000 (Local Funds) $40,500 $202,500 $3,300,000 Total $300,000 $1,500,000 $1,500,000 Pedestrian Improvements (SR-104 Install pedestrian crossing $0 (Federal or State secured) Off - Ramps) improvements at the SR-104 Off $216,250 (Federal or State unsecured) $43,250 $173,000 Ramps onto Hwy. 99 Possible Grant Conceptual $33,750 (Local Funds) $6,750 $27,000 $250 000 Total $50 000 $200 000 SR-104 @ 226th St. SW / 15th St. SW Extend left turn storage area for W B $0 (Federal or State secured) Intersection Improvements movement on SR-104 w/ various $179,000 (Federal or State unsecured) $15,000 $164,000 bicycle and pedestrian improvements. Possible Grant Conceptual $15,000 (Local Funds) $15,000 $194,000 Total $30,000 $164,000 SR-104 @ 95th PI. W Intersection Convert EB and W B LT along SR- $0 (Federal or State secured) Improvements 104 to protected LT phasing; $495,000 (Federal or State unsecured) $75,000 $420,000 upgrade ADA curb ramps; and add C-Curb for access management Possible Grant Conceptual $0 (Local Funds) $495 000 Total $75 000 $420 000 SR-104 @ 238th St. SW Intersection Install traffic signal to improve $0 (Federal or State secured) Improvements vehicular and pedestrian safety; revise geometry to allow for safer $1,311,000 (Federal or State unsecured) $173,000 $1,138,000 turns. Possible Grant Conceptual $27,000 (Local Funds) $27,000 $1,338,000 Total $200,000 $1,138,000 Olympic View Dr. @ 76th Ave. W Install traffic signal to reduce the $0 (Federal or State secured) Intersection Improvements intersection delay and improve Level $0 (Federal or State unsecured) $1,183,000 of Service. 1 Conceptual $0 (Local Funds) $0 Total $1 183 000 84th Ave. W (212th St. SW to 238th Install two-way left turn lanes and $0 (Federal or State secured) St. SW) sidewalk to improve capacity and pedestrian safety (split with $0 (Federal or State unsecured) $15,441,000 1 Snohomish County) Conceptual $0 (Local Funds) $0 Total $15,441,000 SR-104 @ 100th Ave. W Intersection / Implement Westgate Circulation $0 (Federal or State secured) Westgate Area Improvements Access Plan, midblock pedestrian $1,017,468 (Federal or State unsecured) $150,000 $867,468 crossings along 100th Ave. W, and rechannelization with bike lanes / Conceptual $0 (Local Funds) sharrows along 100th Ave. W. $1 017 468 Total $150 000 $867 468 SR-104 @ 76th Ave. W Intersection Add a 2nd W B left turn lane (split $0 (Federal or State secured) Improvements with Shoreline). $0 (Federal or State unsecured) $3,017,000 Conceptual $0 (Local Funds) $0 Total $3,017,000 Olympic View Dr. @ 174th St. SW Install traffic signal to improve Level $0 (Federal or State secured) Intersection Improvements of Service and intersection delay. $0 (Federal or State unsecured) 1 Conceptual $0 (Local Funds) $610,000 $0 Total $610 000 Grant LojectPhasj (2018-2023) 1 Project Name Purpose Opportunity Total Cost Funding Source IL 2018 2019 2020 2021 2022 2023 2024-2038 Non -motorized Pedestrian / Bicvcle Proiects Sunset Ave. Walkway from Bell St. to Provide walkway on the west side of $94,100 (Federal or State secured) $140,195 Gaspers St. Sunset Ave, upgrades. with various utility Possible $2,017,000 (Federal or State unsecured) $147,000 $1,618,000 RCO / TIB Grant Design $873,000 (Local Funds) $105,705 $148,000 $977,000 for construction $2,984,100 Total $245,900 $295,000 $2,595,000 232nd St. SW from 100th Ave. W to Improve pedestrian safety along $0 (Federal or State secured) SR-104 232nd St. SW from 100th Ave. to SR-104. $1,305,000 (Federal or State unsecured) $200,000 $1,105,000 Possible Grant Conceptual $0 (Local Funds) $1,305,000 Total $200,000 $1 105 000 236th St SW from Edmonds Way (SR- Improve pedestrian safety along $7,000 (Federal or State secured) $7,000 104) to Madrona Elementary 236th St. SW, creating a safe $0 (Federal State pedestrian connection from SR-104 or unsecured) to Madrona school. Construction $0 (Local Funds) $7,000 Total $7,000 236th St SW from Madrona Improve pedestrian safety along $0 (Federal or State secured) Elementary to 97th Ave. W 236th St. SW, creating a safe $1,288,500 (Federal or State unsecured) $106,500 $1,182,000 pedestrian connection from Madrona Elementary Possible Grant Conceptual $106,500 (Local Funds) $106,500 $1 395 000 Total $213 000 $1 182 000 84th Ave. W from 238th St. SW to Improve pedestrian safety along $0 (Federal or State secured) 234th St. SW 84th Ave. W. from 238th St. SW to 234th St. SW. $90,000 (Federal or State unsecured) $90,000 $495,000 Possible Grant Conceptual $0 (Local Funds) $90,000 Total $90,000 $495,000 80th Ave. W from 212th St SW to Improve pedestrian safety along $0 (Federal or State secured) 206th St. SW 80th Ave. W, within proximity to $1,439,000 (Federal or State unsecured) $210,000 $1,229,000 Edmonds-Woodway High School. Possible Grant Conceptual $0 (Local Funds) $1 439 000 Total $210 000 $1 229 000 2nd Ave. S from James St. to Main St. Provide safe sidewalk along short $0 (Federal or State secured) Walkway missing link. $0 (Federal or State unsecured) Conceptual $30,000 (Local Funds) $30,000 $30,000 Total $30,000 218th St. SW from 76th Ave. W to Provide safe sidewalk along a $0 (Federal or State secured) 84th Ave. W missing link of 218th St. SW. from $1,305,000 (Federal or State unsecured) $200,000 $1,105,000 76th Ave. to 84th Ave. Possible Grant Conceptual $0 (Local Funds) $1,305,000 Total $200,000 $1 105 000 Walnut St from 3rd Ave. S to 4th Ave. Provide short missing link. $0 (Federal or State secured) S Walkway $105,000 (Federal or State unsecured) $105,000 Possible Grant Conceptual $0 (Local Funds) $105,000 Total $105,000 Grant LojectPhaj (2018-2023) 1 Project Name Purpose Opportunity Total Cost Funding Source 2018 2019 2020 2021 2022 2023 2024-2038 216th St. SW Walkway from Hwy. 99 Provide sidewalk on north side of $0 (Federal or State secured) to 72nd Ave W 216th St. SW from Hwy. 99 to 72nd $137,000 (Federal or State unsecured) $137,000 Ave W (completing missing link) Possible Grant Conceptual $20,000 (Local Funds) $20,000 $157,000 Total $157,000 238th St. SW from SR-104 to Hwy. 99 Provide sidewalk on north side of $300,266 (Federal or State secured) $300,266 238th St. SW from SR-104 to Hwy. $0 (Federal or State unsecured) 99 (completing missing link) Consturction $331,046 (Local Funds) $331,046 $631312 Total $631312 Elm Way from 8th Ave. S to 9th Ave. Provide sidewalk on one side of Elm $0 (Federal or State secured) S Way from 8th Ave. S to 9th Ave. S $704,000 (Federal or State unsecured) $156.000 $548,000 Possible Grant Conceptual $0 (Local Funds) $789,000 Total $156,000 $633,000 Maplewood Dr. From Main St. to Provide safe sidewalk, connecting to $0 (Federal or State secured) 200th St. SW ex. Sidewalk along 200th St. SW $1,591,000 (Federal or State unsecured) $230,000 $681,000 $680,000 (direct link to Maplewood Elementary School). Possible Grant Conceptual $0 (Local Funds) $1,591,000 Total $230,000 $681000 $680000 Dayton St. from 3rd Ave. to 9th Ave. Complete missing link along Dayton $227,500 (Federal or State secured) $27,500 $200,000 St. from 3rd Ave. to 9th Ave. $0 (Federal or State unsecured) Design $0 (Local Funds) $227,500 Total $27,500 $200,000 95th PI. W from 224th St. SW to 220th Provide sidewalk on one side of 95th $0 (Federal or State secured) St. SW PI. W from 224th St. SW to 220th St. $409,000 (Federal or State unsecured) $84,000 $325,000 SW completing missing link. Possible Grant Conceptual $141,000 (Local Funds) $21,000 $120,000 $550,000 Total $105000 $"5000 Minor Sidewalk Program Complete short sidewalk stretches $0 (Federal or State secured) throughout the City. $0 (Federal or State unsecured) Conceptual $100,000 (Local Funds) $100,000 $100,000 Total $100,000 Railroad St. Sidewalk from Dayton St. Reconstruct and widen existing $0 (Federal or State secured) to Main St. / SR-104 sidewalk along Railroad St. Possible Grant $746,400 (Federal or State unsecured) $138,400 $608,000 Conceptual $115,600 (Local Funds) $21,600 $94,000 $862,000 Total $160 000 $702 000 Grant LojectPhaj (2018-2023) 1 Project Name Purpose Opportunity Total Cost Funding Source 2018 2019 2020 2021 2022 2023 2024-2038 SR-104 @ 76th Ave. W Non- Extend bike lanes within proximity of $0 (Federal or State secured) Motorized Transportation intersection and install new ADA Improvements compliant curb ramps Possible Grant $1,160,000 (Federal or State unsecured) $174,000 $986,000 Conceptual $50,000 (Local Funds) $50,000 $1,210,000 Total $224 000 $986 000 191st St. SW from 80th Ave. W to Provide sidewalk on one side of $0 (Federal or State secured) 76th Ave. W 191 th St. SW from 80th Ave. to 76th $0 (Federal State $630,000 Ave. (completing missing link) or unsecured) 1 Conceptual $0 (Local Funds) $0 Total $630,000 104th Ave. W / Robinhood Lane from Provide sidewalk on west side of $0 (Federal or State secured) 238th St. SW to 106th Ave. W 104th Ave. from 238th St. SW to 106th Ave. W (completing missing $0 (Federal or State unsecured) $990,000 1 link) Conceptual $0 (Local Funds) $0 Total $990 000 80th Ave. W from 218th St. SW to Provide sidewalk on one side of 80th $0 (Federal or State secured) 220th St. SW Ave. W from 218th St. SW to 220th St. SW (completing missing link) $0 (Federal or State unsecured) $315,000 Conceptual $0 (Local Funds) $0 Total $315,000 84th Ave. W from 188th St. SW to Provide sidewalk on one side of 84th $0 (Federal or State secured) 186th St. SW Ave. W from 188th St. SW to 186th St. SW $0 (Federal or State unsecured) 1 $315,000 Conceptual $0 (Local Funds) $0 Total $315 000 236th St. SW from Hwy. 99 to 76th Provide sidewalk on one side of $0 (Federal or State secured) Ave. W 236th St. SW from Hwy. 99 to 76th $0 (Federal or State unsecured) $765,000 Ave W 1 Conceptual $0 (Local Funds) $0 Total $765,000 238th St. SW from Hwy. 99 to 76th Provide sidewalk on one side of $0 (Federal or State secured) Ave. W 238th St. SW from Hwy. 99 to 76th $0 (Federal or State unsecured) $1,170,000 Ave W 1 Conceptual $0 (Local Funds) $0 Total $1 170 000 Grant LojectPhaj (2018-2023) 1 Project Name Purpose Opportunity Total Cost Funding Source 2018 2019 2020 2021 2022 2023 2024-2038 80th Ave. W / 180th St. SW from Provide sidewalk on one side of 80th $0 (Federal or State secured) 188th St. SW to OVD Ave. W / 180th St. SW from 188th St. SW to OVD $0 (Federal or State unsecured) E$13 Conceptual $0 (Local Funds) $0 Total 189th PI. SW from 80th Ave. W to Provide sidewalk on one side of $0 (Federal or State secured) 76th Ave. W 189th Pl. SW from 80th Ave. W to 76th Ave. W $0 (Federal or State unsecured) 1 $585,000 Conceptual $0 (Local Funds) $0 Total $585,000 Ferry/Railroad Ferry Storage Improvements from Improve ferry queueing by extending $0 (Federal or State secured) Pine St. to Dayton St. ferry storage area along SR-104 $357,000 (Federal or State unsecured) $357,000 (striping changes). Conceptual $0 (Local Funds) $357,000 Total $357,000 Traffic Planning Proiects Edmonds St. Waterfront Connector Install a grade -separated $525,000 (Federal or State secured) $495,000 $30,000 nover the railroad tracks as an as an extension of Edmonds Street $16,000,000 (Federal or State Unsecured) $2,000,000 $2,000,000 $12,000,000 $11,000,000 connecting to Brackett's Landing Possible Grant Conceptual $650,000 (Local funds) $150,000 $500,000 North park. $140,000 (CT, Sound Transit, Port of Edmonds, BNSF) $140,000 $17 315 000 Total $785 000 $530 000 $2,000,000 $2,000,000 $12 000 000 $11 000 000 Total CFP 1 1 $76,074,120 1 Annual CFP Totals 1 $2,645,452 1 $1,156,000 1 $0 1 $11,204,000 1 $24,778,468 1 $36,442,000 $217,912,000 Revenue Summary by Year Totals Source 2018 1 2019 1 2020 1 2021 1 2022 1 2023 1 2023-2038 $11,371,961 Total Federal & State Secured $1,705,9611 $366,0001 $0 $5,000,0001 $4,300,000 $0 $0 $60,641,568 Total Federal & State (Unsecured) $0 $0 $0 $5,557,100 $18,642,468 $36,442,000 $215,946,000 $140,000 (Sound Transd, Port of Edmonds, BNSF, CT) $140,000 $0 $0 $0 $0 $0 $0 $3,987,3911 Local Funds 1 $799,4911 $790,000 $0 $646,9001 $1,751,0001 $0 $1,966,000 PROJECT NAME: 228t" St. SW from Hwy. 99 ESTIMATED PROJECT COST: $10,421,000 to 95t" PI. W PROJECT DESCRIPTION: Widen 228t" St. SW from Hwy. 99 to 95t" Pl. W to three lanes (with two-way left turn lane), with curb and gutter, sidewalk, and bike lanes. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety and traffic flow along this corridor. SCHEDULE: The design phase is scheduled to begin in 2022 (pending funding). COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 2024-2038 Planning/Study Engineering & Administration $75,000 $300,000 Construction $10,046,000 1 % for Art TOTAL $75,000 $300,000 $10,046,000 `A PROJECT NAME: 761h Ave W @ 212th St. SW ESTIMATED PROJECT COST: $6,500,000 Intersection Improvements I � �,E JJ J EDMONDS-WOODWAY HIGH SCHOOL ARTS P I OFFICE W a R 1301 PROJECT DESCRIPTION: Add a northbound and southbound left -turn lane to convert the signal operation for those approaches from split phasing to protected -permissive phasing. Add a right -turn lane for the westbound, southbound, and northbound movements. The project also consists of various utility upgrades and conversion of overhead utilities to underground. PROJECT BENEFIT/RATIONALE: Reduce the intersection delay and improve the existing level of service to LOS C. SCHEDULE: Design was completed in May 2016. The project was advertised in June 2016 but the lowest bid was rejected since it was - approx. $1.3 Million over budget. The project was re -advertised in February 2017 (under budget) and construction began in May 2017. The project is scheduled to be completed in December 2017. COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration & ROW Construction $353,740 1 % for Art TOTAL $353,740 `�: PROJECT NAME: Highway 99 ESTIMATED PROJECT COST: $190,000,000 Gateway/Revitalization PROJECT DESCRIPTION: The project would include, among other features, wider replacement sidewalks or new sidewalk where none exist today, new street lighting, center medians for access control and turning movements, etc., attractive and safe crosswalks, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. PROJECT BENEFIT/RATIONALE: Improve aesthetics, safety, user experience, and access management along this corridor. In addition, economic development would be improved. SCHEDULE: The design phase is scheduled to begin in September 2017 and should be completed between 2024 and 2038 (pending addition funding / $10M from Connecting Washington allocation has been secured). COST BREAKDOWN PROJECT 2018 2019 2020 2021 2022 2023 2024-2038 COST Planning/Study Engineering & $440,000 $426,000 $5,000,000 $4,300,000 $10,000,000 Administration & ROW Construction $170,000,000 1 % for Art TOTAL $440,000 $426,000 $5,000,000 $4,300,000 $10,000,000 $170,000,000 23 PROJECT NAME: SR-524 (19611 St. SW)/ 88'h ESTIMATED PROJECT COST: $903,000 Ave. W Intersection Improvements PROJECT DESCRIPTION: Install traffic signal at the intersection of 196'h St. SW @ 88'h Ave. W. The modeling in the 2009 Transportation Plan indicated that restricting northbound and southbound traffic to right -turn -only (prohibiting left -turn and through movements) would also address the deficiency identified at this location through 2025. This is same alternative as one concluded by consultant in 2007 study but not recommended by City Council. This could be implemented as an alternate solution, or as an interim solution until traffic signal warrants are met. The ex. LOS is F (below City Standards: LOS D). This project was ranked #6 in the Roadway Project Priority in the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: Improve traffic flow characteristics and safety at the intersection. The improvement would modify LOS to A, but increase the delay along 196'h St. SW. SCHEDULE: The intersection LOS must meet MUTCD traffic signal warrants and be approved by WSDOT since 196'h St. SW is a State Route (SR524). No funding is currently allocated to this project(pending rant funding). COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & $193,000 $175,000 Administration & ROW Construction $535,000 1 % for Art TOTAL $193,000 $175,000 $535,000 24 PROJECT NAME: Main St and 9t" Ave. S ESTIMATED PROJECT COST: $896,000 -11 Rk- L_ BELL ST WM,6 _ _J MAIN ST J J _iji I WADE JAM ES _ `J THEATER 7111 W a S ~ DAYTON ST PROJECT DESCRIPTION: Installation of a traffic signal or mini -roundabout. PROJECT BENEFIT/RATIONALE: The existing intersection is stop -controlled for all approaches and the projected intersection LOS in 2035 is LOS F (below the City's concurrency standards: LOS D). The installation of a traffic signal would improve the intersection delay to LOS B. The project ranked #4 in the Roadway Project Priority of the 2015 Transportation Plan. SCHEDULE: All phases are scheduled between 2020 and 2021 (unsecured funding) COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration $120,000 Construction $776,000 1 % for Art TOTAL $120,000 $776,000 25 PROJECT NAME: 220th St SW @ 76th Ave W ESTIMATED PROJECT COST: Intersection Improvements $5,925,000 2,9rH sr sw J 21919 J J J 3 414 I' Lri ,a Ui in J _J 1 2215TPLSW TOP FOODS JSTARBU KS J 220TH ST SW — 1 r LYNWOOD HONDA PROJECT DESCRIPTION: Reconfigure eastbound lanes to a left turn lane and through / right turn lane. Change eastbound and westbound phases to provide protected -permitted phase for eastbound and westbound left turns. Provide right turn overlap for westbound movement during southbound left turn phase. (ROADWAY ROJECT PRIORITY #1 in 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: Reduce the intersection delay and improve the LOS. The projected LOS in 2035 would be improved from LOS F to LOS D. SCHEDULE: Engineering, ROW, and construction scheduled between 2018 and 2023 (unsecured funding). COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & ROW $55,000 $330,000 $1,800,000 Administration Construction $3,795,000 1 % for Art TOTAL $55,000 $330,000 $1,800,000 $3,795,000 ' All or a portion of this project may quality for 1 % for the arts 26 PROJECT NAME: Hwy. 99 @ 212th St. SW ESTIMATED PROJECT COST: $2,806,000 intersection improvements ffl�w ME i PER I M 1■M= a a z 7313 n Edmonds - Edmonds Family Clinic ei ADX Public 17-ks KENNEL Q 21192 p, Z1 St Rau 212TH 7307-er CUPIC a 7303"3' ^ n n Pool 7W4 "1" 7302 "2" PARK & RIDE 215TH W ST SW o: W 0 EIE a PLANT AEGIS SweuiSH m MDNnS CRM Pl15 ' i Sign Shop P.11.6 / 7 / 21114 / 7 / 109 / ck / g / ALLIED / ROOFING / / / B&M / CON ST 21414 / 21448 / / / NCOONRLD• / 01 1ALUE / PILLAGE / 16TH ST/SW PROJECT DESCRIPTION: Widen 21211 St. SW to add a westbound left turn lane for 200' storage length and an eastbound left turn lane for 300' storage length. Provide protected left turn phase for eastbound and westbound movements. (ROADWAY PROJECT PRIORITY in 2015 Transportation Plan: #4) PROJECT BENEFIT/RATIONALE: Improve intersection efficiency and reduce delay. SCHEDULE: All phases are scheduled between 2021 and 2023 (unsecured funding).The project cost is split between Lynnwood and Edmonds since half the project is within Lynnwood. COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering, ROW, & Administration $175,000 $1,091,000 Construction $1,540,000 1 % for Art TOTAL $175,000 $1,091,000 $1,540,000 27 PROJECT NAME: Hwy. 99 @ 216th St. SW ESTIMATED PROJECT COST: $2,335,000 intersection improvements 21d1.02!1 13�d08w 214021d12 { 21405 04 LU N U> 2120L< 2i431MC�UHA6' un � anz 150 � r 2150021558EGIS VALUE � # VILLAGE ST S,qw — • 21 B Tli 21600 {� 21619 KRUGER CLINIC f 21632 � � - ��I16e 2 PROJECT DESCRIPTION: Widen 216th St. SW to add a westbound left turn lane and an eastbound left turn lane. Provide protected -permissive left turn phases for eastbound and westbound movements. This project ranked #3 in the Roadway Project Priority in the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: Improve intersection efficiency and reduce delay. SCHEDULE: All phases are scheduled between 2021 and 2023 (unsecured funding). COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & ROW & Administration $164,000 $334,000 Construction $1,837,000 1 % for Art TOTAL $164,000 $334,000 $1,837,000 28 PROJECT NAME: Hwy. 99 @ 220t" St. SW ESTIMATED PROJECT COST: $3,215,000 intersection improvements 19TH sT SW 21919 f,ill 7514 221 ST PL SW I I I 13 -- a n I [:Z/II TOP FOODS 220TH Sr SW LYNWOOD HONOR a iL FUN TA 91A H'S IN N L7 w .F 7223'J' A.dy's � td .D. 7301 R A a S H ¢ nm rsw TIN PROJECT DESCRIPTION: Widen 220t" St. SW to add Westbound right turn lane for 325' storage length. Widen SR-99 to add 2nd Southbound left turn lane for 275' storage length. (ROADWAY PROJECT PRIORITY in 2015 Transportation Plan: #2). PROJECT BENEFIT/RATIONALE: Reduce intersection delay and improve traffic flow and safety. SCHEDULE: All Phases are scheduled between 2021 and 2023 (unsecured funding for all phases). COST BREAKDOWN PROJECT 2018 2019 2020 2021 2022 2023 COST Planning/Study Engineering & Administration & ROW $175,000 $1,085,000 Construction $1,955,000 1 % for Art TOTAL $175,000 $1,085,000 $1,955,000 29 PROJECT NAME: Hwy. 99 @ 234th St. SW ESTIMATED PROJECT COST: $3,300,000 intersection improvements ESPEMNCE FS - 11202 S ND PL W �• �I� 2f731 .- F '1 �233RD PL '71J7tl' i _ e :331•. !9„ ]y0! 7131 - Y"i � 1 � � e'�� )7�1 *� •�� I i]406■�� I i.1 K�.. 111 , 1717 ri 411 .,. uW � 0 r sasoP� ��no, - �r7 :moo r7 PROJECT DESCRIPTION: Install traffic signal at the intersection of Hwy. 99 @ 234th St. SW to provide safer crossing of Hwy. 99 for vehicles and non -motorized transportation (project identified in Hwy. 99 Sub Area Plan). PROJECT BENEFIT/RATIONALE: Improve intersection safety and pedestrian conditions along the corridor. SCHEDULE: All Phases are scheduled between 2021 and 2023 (unsecured funding for all phases). COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration & ROW $300,000 $300,000 Construction $1,200,000 $1,500,000 1 % for Art TOTAL $300,000 $1,500,000 $1,500,000 30 PROJECT NAME: Pedestrian Improvements ESTIMATED PROJECT COST: $250,000 (SR-104 off ramps) PROJECT DESCRIPTION: Install pedestrian improvements at the two SR-104 Off ramps entering onto Hwy. 99 (project identified in Hwy. 99 Sub Area Plan). PROJECT BENEFIT/RATIONALE: Improve pedestrian conditions along the Hwy. 99 Corridor. SCHEDULE: All Phases are scheduled between 2021 and 2022 (unsecured funding for all phases). COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration & ROW $50,000 Construction $200,000 1 % for Art TOTAL $50,000 $200,000 31 PROJECT NAME: SR-104 @ 22611 St. SW / ESTIMATED PROJECT COST: $194,000 15' St. SW Intersection Improvements 14TH WAY SW 226TH ST SW uJ 226TH PL SW Ma M PROJECT DESCRIPTION: Extend the left turn lane for the westbound movement on SR-104. Complete various pedestrian and bicycle intersection improvements. This project was identified in the SR-104 Complete Streets Corridor Analysis (completed in 2015). PROJECT BENEFIT/RATIONALE: Improve non -motorized transportation safety at the intersection and improve traffic flow along the SR-104 corridor. SCHEDULE: 2021-2022 (unsecured funding) COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration & ROW $30,000 Construction $164,000 1 % for Art TOTAL $30,000 $164,000 32 PROJECT NAME: SR-104 @ 95t" pl. W ESTIMATED PROJECT COST: $495,000 Intersection Improvements W H r ST S a CC rn cl WESTGATE CHAPEL PROJECT DESCRIPTION: Upgrade all ADA Curb Ramps; and add C-Curb for access management. This project was identified in the SR-104 Complete Streets Corridor Analysis completed in 2015). PROJECT BENEFIT/RATIONALE: Improve intersection safety for pedestrians and vehicles. SCHEDULE: 2021-2022 unsecured funding COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration & ROW $75,000 Construction $420,000 1 % for Art TOTAL $75,000 $420,000 33 PROJECT NAME: SR-104 @ 238t" St. SW ESTIMATED PROJECT COST: $1,338,000 Intersection Improvements Ll i 10 ■ To Hwy 99 239TH ST SW PROJECT DESCRIPTION: Install traffic signal. The warrants are met for such an installation. This project was identified in the SR-104 Complete Street Corridor Analysis (completed in 2015). PROJECT BENEFIT/RATIONALE: Improve vehicular and pedestrian safety. SCHEDULE: 2021-2022 unsecured funding) COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration & ROW $200,000 Construction $1,138,000 1 % for Art TOTAL $200,000 $1,138,000 34 PROJECT NAME: Olympic View Dr. @ 76th Ave. ESTIMATED PROJECT COST: W Intersection Improvements $1,183,000 N SEAVIEW PARK 3 PLSW 186TH ST SW ml I m—I PROJECT DESCRIPTION: Install traffic signal (the intersection currently stop controlled for all movements). (ROADWAY ROJECT PRIORITY in 2015 Transportation Plan: #11). PROJECT BENEFIT/RATIONALE: The improvement will reduce the intersection delay. The projected Level of Service is LOS F in 2035, which is below the City's concurrency standards (LOS D). The project will improve the Level of Service to LOS B. SCHEDULE: Engineering and Construction are scheduled between 2024 and 2038 (unsecured funding). COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 2024-2038 Planning/Study Engineering & Administration $200,000 Construction $983,000 1 % for Art TOTAL $1,183,000 35 PROJECT NAME: 84th Ave. W (212th St. SW ESTIMATED PROJECT COST: $15,441,000 to 238th St. SW) PROJECT DESCRIPTION: Widen 84th Ave. W to (3) lanes with curb, gutter, bike lanes, and sidewalk on each side of the street. (part of this project was ranked #6 in the Long Walkway list of the 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: Improve overall safety of the transportation system along this collector street: 1) the sidewalk and bike lanes would provide pedestrians and cyclists with their own facilities and 2) vehicles making left turn will have their own lane, not causing any back-up to the through lane when insufficient gaps are provided. SCHEDULE: Engineering and Construction are scheduled between 2024 and 2038 (unsecured funding). The project cost is split between Snohomish County and Edmonds since half the project is in Esperance. COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 2024-2038 Planning/Study Engineering & $2,000,000 Administration Construction $13,441,000 1 % for Art TOTAL $15,441,000 * all or part of this project may qualify for 1 % for the Arts. 36 PROJECT NAME: SR-104 @ 100t" Ave. W ESTIMATED PROJECT COST: $1,017,468 Intersection Improvements / Access Management I EDMONDS WAY PROJECT DESCRIPTION: Implement Westgate Circulation Access Plan, install mid -block pedestrian crossing along 100t" Ave. W, improve safety to access the driveways within proximity to the intersection, and re -striping of 100t" Ave. W with the potential addition of bike lanes. This project was identified in the SR-104 Completed Streets Corridor Analysis completed in 2015). PROJECT BENEFIT/RATIONALE: Improve access and safety at the intersection and improve non -motorized transportation safety. SCHEDULE: All phases are scheduled between 2021 and 2022 (unsecured funding) COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 2024-2038 Planning/Study Engineering & Administration $150,000 Construction $867,468 1 % for Art TOTAL $150,000 $867,468 37 PROJECT NAME: SR-104 @ 76t" Ave. W ESTIMATED PROJECT COST: $3,017,000 Intersection Improvements If1 4 `,� 2aorH rL svuImp . J V78 LUM Yf�FI'R4MP L AKE 8 AI I INGER WAY------- EFIMONOSWAY — -- -- a+'Is I sl sw � 3 Z42NDPL sw - I438G PL SW ti � a 1 �NoS RPFC1Ntr -- —' 71LKE eACL114GEi�1fVRl' ' �-- - PROJECT DESCRIPTION: Add a 2nd left turn lane along SR-104. This project was identified in the SR-104 Complete Street Corridor Analysis (completed in 2015). PROJECT BENEFIT/RATIONALE: Improve access and safety at the intersection and improve non -motorized transportation safety. SCHEDULE: 2024-2038. The project cost would be split between Shoreline and Edmonds since half the intersection is in Shoreline. COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 2024-2038 Planning/Study Engineering & Administration $453,000 Construction $2,564,000 1 % for Art TOTAL $3,017,000 38 PROJECT NAME: Olympic View Dr. @ 17411 St. ESTIMATED PROJECT COST: $610,000 SW Intersection Improvements ti4 J I� -L_-jJ- 7027 7003 LI Meadowdale Middle School r� ------------ J-/, Parking b ssoi St. Thomas Moore —� arrre I Catholic School Ballfieltl y / SanctuarY PROJECT DESCRIPTION: Widen Olympic View Dr. to add a northbound left turn lane for 50' storage length. Shift the northbound lanes to the east to provide an acceleration lane for eastbound left turns. Install traffic signal to increase the LOS and reduce intersection delay. (ROADWAY ROJECT PRIORITY in 2015 Transportation Plan: #13) PROJECT BENEFIT/RATIONALE: Improve intersection efficiency and safety of drivers accessing either street. SCHEDULE: Engineering and Construction are scheduled between 2024 and 2038 (unsecured funding). COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 2024-2038 Planning/Study Engineering & Administration $100,000 Construction $510,000 1 % for Art TOTAL $610,000 39 PROJECT NAME: Sunset Ave Walkway ESTIMATED PROJECT COST: $3,200,000 from Bell St to Caspers St. s UHDVIEwavrs ♦ ♦ �♦ I■� 11111■� I � ���' IIIIIII :�1■�■1 ■ PROJECT DESCRIPTION: Provide a walkway on the west side of the street, facing waterfront (- 1/2 mile / more recent project). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Temporary improvements have been installed to evaluate the alignment of the proposed walkway and parking alternatives. Construction isn't scheduled to occur until 2022 when utility improvements are scheduled along this stretch. No grant funding has been secured for the construction phase. The design phase will be completed in 2021. COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration $245,900 $295,000 Construction $2,595,000 1 % for Art TOTAL $245,900 $295,000 $2,595,000 * all or part of this project may qualify for 1 % for the Arts. 40 PROJECT NAME: 23211d St. SW Walkway ESTIMATED PROJECT COST: $1,305,000 from 100th Ave. W to SR-104 EDMONDS WAY W SAME iwnRs LLI L ! Ell 2 . ■ ■ Qy - 1 �i IF Al. 10 UUT H ' CHURCH, (jr ■ ■ ■ , Uj 7 , ■ AW �I o �0 c� 2 ODW' ' I ESTATES AY OLy I _ PR RK \29 9 Dorn 98 7 6 5 ' 30 2 15 3 14 7• J \32 45 32 ■ r jr `2q 7 1 nm (0) 1 � ■ � e PROJECT DESCRIPTION: Install sidewalk along 232nd St. SW from 100th Ave. W to SR-104. This project ranked #3 in the Long Walkway List of 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2022-2023 (unsecured funding) COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration $200,000 Construction $1,105,000 1 % for Art TOTAL $200,000 $1,105,000 41 PROJECT NAME: 23611 St. SW Walkway from ESTIMATED PROJECT COST: $900,000 Edmonds Way to Madrona Elementary School PROJECT DESCRIPTION: Construct an — 800' sidewalk on the south side of 236t" St. SW from SR-104 to Madrona Elementary as well as the addition of sharrows along that stretch. (This is only part of a stretch of Walkway project, which ranked #1 in the Long Walkway list in the 2009 Transportation Plan) PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route near Madrona Elementary School and along 236t" St. SW. SCHEDULE: Construction was completed in June 2017. The project was funded through the Safe Routes to School Grant program, Fund 422 for stormwater improvements, and REET funds for the pavement reconstruction. The remaining funding is to complete the Federal Documentation. COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration & ROW Construction $7,000 1 % for Art TOTAL $7,000 Ely: PROJECT NAME: 2361" St. SW Walkway ESTIMATED PROJECT COST: $1,395,000 from Madrona Elementary to 97t" Ave. W 4 PROJECT DESCRIPTION: Install sidewalk with curb and gutter along 236nd St. SW from Madrona Elementary to 97t" Ave. W. This project ranked #4 in Long Walkway list of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2021-2022 COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration $213,000 Construction $1,182,000 1 % for Art TOTAL $213,000 $1,182,000 43 PROJECT NAME: 84th Ave. W Walkway ESTIMATED PROJECT COST: $585,000 from 238th St. SW to 234th ST. SW - PARK LL EonnoNos SALGALL APTS m w w LL CH RIST LN TH E RAN CH N RCH O PARK & RIDE OFFICE 23601 4 23603 SAFEWAY $ 23605 Wn L KJIHG R 23607 SUNSET 23619 0 P Q ��� R AURORA S MARKETPLACE T N FAMILY RA NCAKE U '7-77" 73$TH 5T 5w W SEOUL � 23827 PLAZA 2 23827 IL DGE 0" NORTH ry HAVEN z n MANOR w a � R p r~ } n•1L LO'N 13ROOK PROJECT DESCRIPTION: Install sidewalk along 84th Ave. W from 238th St .SW to 234th St. SW, with curb and gutter. This project ranked #5 in the Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: Begin design in 2023 (unsecured funding) COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 2024-2038 Planning/Study Engineering & Administration $90,000 Construction $495,000 1 % for Art TOTAL $90,000 $495,000 44 PROJECT NAME: 80th Ave. W Walkway ESTIMATED PROJECT COST: $1,439,000 from 206th St. SW to 212th ST. SW �IIIIIr1 �� PROJECT DESCRIPTION: Install sidewalk along 80th Ave. W from 206th St. SW to 212th St. SW with curb and gutter. This project ranked #1 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: The improvements will improve non -motorized transportation safety including for school kids due to proximity of several schools). SCHEDULE: 2021-2022 (funding unsecured). COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration & ROW $210,000 Construction $1,229,000 1 % for Art TOTAL $210,000 $1,229,000 45 PROJECT NAME: 2nd Ave. S Walkway from ESTIMATED PROJECT COST: $30,000 James St. to Main St. 4t <1 NG 4 ►. PROJECT DESCRIPTION: Construct a missing link of sidewalk (approximately 100') on 2nd Ave. S between Main St. and James St. (Ranked #2 in Short Walkway Project list in 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: 2021 COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration Construction $30,000 1 % for Art TOTAL $30,000 * all or part of this project may qualify for 1 % for the Arts 46 PROJECT NAME: 21811 St. SW Walkway ESTIMATED PROJECT COST: $1,305,000 from 76th Ave. W to 84th Ave. W WOM �ZTl7 ■�M■■EM N■N�■ ■■ � 0 Tsoer' rsos ••x• R AXT m uw osa eu>o� ER 2HOG ar EVExe NE LT CENT ER PROJECT DESCRIPTION: Install sidewalk along 218th St. SW from 76th Ave. W to 84th Ave. W with curb and gutter. This project ranked #2 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE: The improvements will improve pedestrian safety. SCHEDULE: 2022-2023 unsecured funding COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration & ROW $200,000 Construction $1,105,000 1 % for Art TOTAL $200,000 $1,105,000 47 PROJECT NAME: Walnut St. Walkway from 3rd ESTIMATED PROJECT COST: $105,000 Ave. S to 4t" Ave. S ARTS W ENTER a Z UNDOW NEI N ALDER ALDER ST 346 414 412 410 arking 5 5 LA UJ o SOUND VIEW o: HOWELL WAY W a x v DAYTON ST tMILLTOWN MAPLE ST RICC ALDER ST N W a BECK'S z BAN K T- 409 530Pancak 407 540 Hau s 4003 546 0 401 w a WALNUT Sr --F GREGORY e H 525 PROJECT DESCRIPTION: Construct a missing link of sidewalk (approximately 350') on Walnut St. between 3rd Ave. S and 4t" Ave. S (ranked #3 in Short Walkway Project list in 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Engineering & Construction scheduled for 2021 (unsecured funding). COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration $10,000 Construction $95,000 1 % for Art TOTAL $105,000 all or part of this project may qualify for 1 % for the Arts 48 PROJECT NAME: 216th St. SW Walkway from ESTIMATED PROJECT COST: $157,000 Hwy. 99 to 72nd Ave. W 21400 � JJ 7200 B&M PARK & RIDE CONS E ar- w 21410 21408 0. MAN J � o � 21401 21412 � v M1 2140 U v 214G7 W � �507 w � W / 21511 j 21431 M DONAL6' { IL y o Y N 0 21521 N I M STEVEN 21500 COURT AEGIS 21558 ` 21527 VALUE VILLAGE 21674 ST SW 216TJ1 120 :VEN5 21600 { 21619 tILION KRUGER *Aq CLINIC , �11 PROJECT DESCRIPTION: Install 150' sidewalk on north side of 216th St. SW from Hwy. 99 to 72nd Ave. W (completing a missing link on north side of stretch). This project ranked #4 in the Short Walkway List (from 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Engineering & Construction scheduled for 2021 (unsecured funding). COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration $30,000 Construction $127,000 1 % for Art TOTAL $157,000 * all or part of this project may qualify for 1 % for the Arts 49 PROJECT NAME: 238 th St. SW Walkway from ESTIMATED PROJECT COST: $748,000 Hwy. 99 to SR-104 i 1 L PROJECT DESCRIPTION: Ranked #12 in Long Walkway list from 2015 Transportation Plan. Install 7' sidewalk on the north side of 238t" St. SW. PROJECT BENEFIT/RATIONALE: Improve pedestrian safety along that stretch and creating safe pedestrian connection between Hwy. 99 and 76t" Ave. W. SCHEDULE: The design phase was completed in early 2017. The project was advertised in May 2017 but the lowest bid was rejected since it was over budget. The project will be re -advertised in early 2018. A TIB grant was secured to fund the design and construction phases. COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration Construction $631,312 1 % for Art TOTAL $631,312 * all or part of this project may qualify for 1 % for the Arts. 50 PROJECT NAME: Elm Way Walkway from ESTIMATED PROJECT COST: $789,000 8t" Ave. S to 9t" Ave. S ■ L PROJECT DESCRIPTION: Install sidewalk along Elm Way from 8t" Ave. S to 9t" Ave. S. This project ranked #6 in the Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2021-2022 (funding unsecured). COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration $156,000 Construction $633,000 1 % for Art TOTAL $156,000 $633,000 51 PROJECT NAME: Maplewood Dr. Walkway ESTIMATED PROJECT COST: $1,591,000 from Main St. to 2001h St. SW PROJECT DESCRIPTION: Construct sidewalk on Maplewood Dr. from Main St. to 200th St. SW (- 2,700'). A sidewalk currently exists on 200th St. SW from Main St. to 76th Ave. W, adjacent to Maplewood Elementary School (rated #22 in the Long Walkway list of the 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: Create pedestrian connection between Maplewood Elementary School on 200th St. SW and Main St., by encouraging kids to use non -motorized transportation to walk to / from school. SCHEDULE: Engineering scheduled for 2021 and construction in 2022 / 2023 (funding unsecured). COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & $230,000 Administration Construction $681,000 $680,000 1 % for Art TOTAL $230,000 $681,000 $680,000 * all or part of this project may qualify for 1 % for the Arts. 52 PROJECT NAME: Dayton St Walkway ESTIMATED PROJECT COST: $250,000 between 3R1 Ave. S and 9t" Ave. S .K uysr �° a ay T F �MFS St M� 51 1� i' i ----------------------- MAIM Si ----------------- F m dill = � —11 � ■ J a ._ �I�f �I ■I �;5 I AU*Rtr--. — f 9 _ryl �..'� PROJECT DESCRIPTION: Construct a missing link of sidewalk Dayton St. between 7tn Ave. S and 8t" Ave. S and additional sidewalk improvements along the rest of the stretch (ranked #2 in Short Walkway Project list in 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Engineering & Construction scheduled for 2018 and 2019. A TIB grant was secured for this project in 2016. COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration $27,500 Construction $200,000 1 % for Art TOTAL $27,500 1 $200,000 all or part of this project may qualify for 1 % for the Arts. 53 PROJECT NAME: 951h PI. W Walkway from ESTIMATED PROJECT COST: $550,000 224th ST. SW to 220th St. SW PROJECT DESCRIPTION: Install sidewalk along 95th PI. W from 224th ST. SW to 220th ST. SW, with curb and gutter. This project ranked #9 in the Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: Engineering scheduled for 2021 and construction in 2022 (funding unsecured). COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration $105,000 Construction $445,000 1 % for Art TOTAL $105,000 $445,000 54 PROJECT NAME: Minor Sidewalk Program ESTIMATED PROJECT COST: varies PROJECT DESCRIPTION: Complete missing sidewalk along short segments throughout the City. PROJECT BENEFIT/RATIONALE: Improve pedestrian safety. SCHEDULE: 2018 COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration & ROW $10,000 Construction $90,000 1 % for Art TOTAL $100,000 55 PROJECT NAME: Railroad Ave. Sidewalk from ESTIMATED PROJECT COST: $862,000 Dayton St. to SR-104 bt. 4� fi �tio-P W NAYTON 5T P❑ Mq�Ns e j a ? Fo �ONn. ea a --^ DAYTON ST PROJECT DESCRIPTION: Install new and wider sidewalk along Railroad St. from Dayton St. to SR-104. PROJECT BENEFIT/RATIONALE: Improve non -motorized transportation safety along Railroad St. from Dayton St. to SR-104, key stretch since connects to various destination points such as Senior Center, Port of Edmonds, Downtown Edmonds... . SCHEDULE: All Phases are scheduled in 2021 and 2022 (unsecured funding for all phases). A TAP grant application was submitted in September '17 to fund the design and construction phases (13.5% local match required). The ROW phase will be 100% funded by the City. COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration & ROW $160,000 Construction $702,000 1 % for Art TOTAL $160,000 $702,000 0: PROJECT NAME: SR-104 @ 76th Ave. W non- I ESTIMATED PROJECT COST: motorized transportation safety improvements $1,2100,000 I %it,.-01111 WAY aFFRAM. PINY LAKE UtLINGER WAY TmE)FA0N0S WAV r � � LAKL UAL1.INGER WAY - PROJECT DESCRIPTION: Extend bike lanes within proximity of the intersection in northbound and southbound directions. Install APS on all corners and new ADA curb ramps. PROJECT BENEFIT/RATIONALE: Improve non -motorized transportation safety along this section of the Interurban Trail. SCHEDULE: All Phases are scheduled in 2021 and 2022 (unsecured funding for all phases). A TAP grant application was submitted in September'17 to fund the design and construction phases. The City of Shoreline would fund the local match. The ROW phase will be 100% funded by the City. COST BREAKDOWN PROJECT COST 1 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration & ROW $224,000 Construction $986,000 1 % for Art TOTAL $224,000 $986,000 57 PROJECT NAME: 191th St. SW Walkway ESTIMATED PROJECT COST: $630,000 from 80th Ave. W to 76th Ave. W 1� 192ND PL 5W PROJECT DESCRIPTION: Install sidewalk along 191th St. SW from 80th Ave. W to 76th Ave., with curb and gutter. This project ranked #8 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2024-2038 COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 2024-2038 Planning/Study Engineering & Administration $90,000 Construction $540,000 1 % for Art TOTAL $630,000 58 PROJECT NAME: 10411 Ave. W Walkway ESTIMATED PROJECT COST: $990,000 from 238th St. SW to 106th Ave. W PROJECT DESCRIPTION: Install sidewalk along 104th Ave. W from 238th ST. SW to 106th Ave. W, with curb and gutter. This project ranked #10 in the Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2024-2038 COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 2024-2038 Planning/Study Engineering & Administration $150,000 Construction $840,000 1 % for Art TOTAL $990,000 59 PROJECT NAME: 801h Ave. W Walkway ESTIMATED PROJECT COST: $315,000 from 218th St. SW to 220th St. SW --------�-ITT---------------220THSTSW- PROJECT DESCRIPTION: Install sidewalk along 80th Ave. W from 218th ST. SW to 220th ST. SW, with curb and gutter. This project ranked #7 in the Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2024-2038 COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 2024-2038 Planning/Study Engineering & Administration $55,000 Construction $260,000 1 % for Art TOTAL $315,000 60 PROJECT NAME: 84th Ave. W Walkway ESTIMATED PROJECT COST: $315,000 from 188th St. SW to 186th St. SW ■ ■ , i T r W-lb 5w r 186TH ST w m l I ■ �MM mm� IrPlfw� rl i ■drEP,Im ` ,-.1 OF ■ w _ L MMME.1111 r 18 TH 5 5w 9-- 75Z51Tu cr c... ` LE - - ■ r 7 ■ L ' W r r ■ r °F , r J - SFAMF W _ PROJECT DESCRIPTION: Install sidewalk along 84th Ave. W from 188th St. SW to 186th St. SW., with curb and gutter. This project ranked #5 in Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2024-2038 COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 2024-2038 Planning/Study Engineering & Administration $60,000 Construction $255,000 1 % for Art TOTAL $315,000 61 PROJECT NAME: 23611 St. SW Walkway ESTIMATED PROJECT COST: $765,000 from Hwy 99 to 76th Ave. W ■ 236TH T W 23607 23603 SAFEN 23605 E KJI 23607 NON PROJECT DESCRIPTION: Install sidewalk along 236th St. SW from Hwy 99 to 76th Ave. W. This project ranked #11 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2024-2038 COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 2024-2038 Planning/Study Engineering & Administration $115,000 Construction $650,000 1 % for Art TOTAL $765,000 62 PROJECT NAME: 23811 St. SW Walkway ESTIMATED PROJECT COST: $1,170,000 from Hwy 99 to 76th Ave. W 1 PARK r .•nrIRL NA LN ' , ■ ' EOMONOs APTS BALL ' • • 1 ��r� W w Ov NORTH m CH RIST LH THE RAN CHURCH S N PARK & RIDE R n - 2 TH T OFFICE ■ d `� ,4 , W r SAFEWAY � L KJIHG FC,� I ' L • . SUNSET '•n•1L LO•n: CEj BROOK ■ AURORA- MARKETPLACE FAMILYPANCAKE j7' � 1 ■ 238TH 5T 5W "' ■ ■ ■ 23821 seouL PLAZA ' ■ ► 1 23827, TRAVEL LODGE 2397 ■ -MISISON TACO TIM ■ ST. FRA NCIS MOTEL WHSE ■ . . . - ■ ■ ■ _+ K&EMOTEL 1 1 ■ ■ RT_II I F 1 ■ ■ ■ , IN ■ ■ :yA PROJECT DESCRIPTION: Install sidewalk along 238th St. SW from Hwy. 99 to 76th Ave. W This project ranked #12 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2024-2038 COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 2024-2038 Planning/Study Engineering & Administration $175,000 Construction $995,000 1 % for Art TOTAL $1,170,000 63 PROJECT NAME: 80th Ave. W / 180th St. ESTIMATED PROJECT COST: $1,350,000 SW Walkway from 188th St. SW to OVD PROJECT DESCRIPTION: Install sidewalk along 801h Ave. W from 188th St. SW to OVD. This project ranked #13 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2024-2038 COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 2024-2038 Planning/Study Engineering & Administration $270,000 Construction $1,080,000 1 % for Art TOTAL $1,350,000 64 PROJECT NAME: 189th PI. SW Walkway ESTIMATED PROJECT COST: $585,000 from 80th Ave. W to 76th Ave. W PROJECT DESCRIPTION: Install sidewalk along 189th PI. SW from 80th Ave. W to 76th Ave. W. This project ranked #14 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2024-2038 COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 2024-2038 Planning/Study Engineering & Administration $115,000 Construction $470,000 1 % for Art TOTAL $585,000 65 PROJECT NAME: Ferry Storage ESTIMATED PROJECT COST: $357,000 Improvements from Pine St. Dayton St. PROJECT DESCRIPTION: Modify existing lane channelization on SR104 to add vehicle storage for ferry users. PROJECT BENEFIT/RATIONALE: Reduce conflicts between ferry storage and access to local driveways. SCHEDULE: 2021 (unsecured funding) COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Engineering & Administration $50,000 Construction $307,000 1 % for Art TOTAL $357,000 M. PROJECT NAME: Edmonds Street Waterfront ESTIMATED PROJECT COST: $29,000,000 Connector 11 A" PROJECT DESCRIPTION: This project builds a grade -separated overcrossing over the railroad tracks as an extension of Edmonds Street connecting to Brackett's Landing north park (project identified in Edmonds Waterfront Alternatives Access Study completed in 2016). PROJECT BENEFIT/RATIONALE: Provide access for emergency vehicles, pedestrians, and bicycles. The overpass could be utilized to offload passenger vehicles from a ferry during an extended closure of the railroad track crossings. SCHEDULE: 2018-2038. A State Appropriation for $700,000 was secured in 2017. Community Transit, Sound Transit, BNSF, and the Port of Edmonds are contributed $140,000 to get this project started (Unsecured funding for Design and Construction Phases). COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 2024-2038 Planning/Study $785,000 $530,000 Engineering & $1,000,000 $1,000,000 Administration Right of Way / $1,000,000 $1,000,000 Environment Mitigation Construction $12,000,000 $11,000,000 TOTAL $785,000 $530,000 $2,000,00 $2,000,000 $12,000,000 $11,000,000 67 68 CFP STORMWATER 69 70 Project Name Purpose Grant Opportunity Grant/Date Current Project Phase (2018.2023) Total Cost Revenue Source 2018 2019 2020 2021 2022 2023 Dayton St and Hwy 104 Drainage Add lift station and other new infrastructure to reduce $0 (Federal or State secured) Improvements. intersection flooding. Design $975,000 (Federal or State unsecured) $950,000 $25,000 $1,015,000 (DebUStormwater Fees) $990,000 $25,000 $1,990,000 Total $1,940,000 $50,000 Willow Creek/Daylighting Daylight channel to allow better connnectivity with the Puget RCO SRF Grant $0 (Federal or State secured) Sound to benefit fish and reduce flooding. Possible Grant/TBD Study $675,000 (Federal or State unsecured) $225,000 $225,000 $225,000 $450,000 (DebUStormwater) $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 $1,125,000 Total $75,000 $75,000 $75,000 $300,000 $300,000 $300,000 Perrinville Creek High Flow Find solution to high peak stream flows caused by excessive Ecology Grant $546,750 (Federal or State secured) $546,750 Reduction/Management Project - stormwater runoff that erodes the stream, causes flooding Possible Grant/TBD Design $450,000 (Federal or State unsecured) $375,000 $37,500 $37,500 Seaview Park Infiltration Facility and has negative impacts on aquatic habitat. $728,575 (DebUStormwater Fees) $376,200 $76,125 $126,250 $125,000 $12,500 $12,500 $1,725,325 Total $922,950 $76,125 $126,250 $500,000 $50,000 $50,000 Total CFP 1 1 $4,840,325 1 Annual CFP Totals 1 $2,937,950 1 $201,125 1 $201,250 1 $800,000 1 $350,000 1 $350,000 JIL Revenue Summary by Year Totals Source 12018 2019 2020 2021 2022 2023 $546,750 Total Federal& State (Secured) $546,750 $0 $0 $0 $0 $0 $2,100,000 Total Federal & State (Unsecured) $950,000 $25,000 $0 $600,000 $262,500 $262,500 $2,193,575 Debt/ Stormwater Fees 1 $1,441,200 $176,125 $201,250 $200,000 $87,500 $87,500 72 PROJECT NAME: Dayton St and Hwy 104 ESTIMATED PROJECT COST: $2.41VI Drainage Improvements �2�1 o O S ■ram • �gr v° T GJ �200 200 _Qqp ECM❑ w�Sl -?ql 1461 Q PROJECT DESCRIPTION: Add lift station in the Beach Place parking lot and other new infrastructure. PROJECT BENEFIT/RATIONALE: To reduce flooding at the intersection of Dayton St and State Hwy 104. SCHEDULE: Construction scheduled for 2018 though may be pushed back due to possible delayed release of grant funds. COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Eng. & Admin. $100000 Construction $1830000 $50,000 1% for Art $10000 TOTAL $1,940,000 $50,000 73 PROJECT NAME: Willow Creek Daylighting ESTIMATED PROJECT COST: $5M to $10M Edmonds Marsh as seen from the viewing platform. Previously restorcd scction of Willow Creek. Source: www.unocaledmonds.info/clean-u /n aallery.php PROJECT DESCRIPTION: Building on the studies completed in 2013 and 2015 that assessed the feasibility of daylighting the Willow Creek channel, this project will likely construct a new tide gate and 1,100 linear ft of new creek channel lined with an impermeable membrane. Funds will be used for design and construction but exact breakdown cannot be assessed at this time. PROJECT BENEFIT/RATIONALE: The daylighting of Willow Creek will help reverse the negative impacts to Willow Creek and Edmonds Marsh that occurred when Willow Creek was piped in the early 1960s. This project will provide habitat for salmonids, including rearing of juvenile Chinook. This project, along with its companion CIP projects "Edmonds Marsh Channel Improvements" and "Dayton Street Pump Station," will also help reduce the flooding problem at the intersection of SR-104 and Dayton Street. Approximately $65,000 of the $157,331 grant from the Recreation and Conservation Office RCO remains and will be used to pay for the 2018 expenditures. SCHEDULE: 2017-2025 COST BREAKDOWN PROJECT COST 2018 2019 2020 2021 2022 2023 Planning/Study Eng. & Admin. $75,000 $75,000 $75,000 $300,000 $300,000 $300,000 Construction 1 % for Art TOTAL $75,000 $75,000 $75,000 $300,000 $300,000 $300,000 74 PROJECT NAME: Perrinville Creek High Flow ESTIMATED PROJECT COST: $21VI to $10M Reduction/Management Project ue �d 172 n y 4 °' 173 d Talbot PerrinvilleN `r Frederick-4 Creek th � rr M 77t 1 7 h 78th 79th a Z 180 1 Oth c°7o h `m 181s 2nd 18 nd 4` 'E Cnn 185th °O 85th o u* ev 87th 40.7 18 h _r r Pcrrinville Creek Channel illustrating the channel incision that will be addressed by restoration. PROJECT DESCRIPTION: A flow reduction study for the Perrinville Creek basin was completed in 2014. This study recommended a number of flow control and water quality projects to improve the conditions in Perrinville Creek. The City applied for and won a grant from the Department of Ecology for $633,750 to design and construct a stormwater infiltration facility in Seaview Park. The dollars allocated in the out years are to implement additional water quality and flow control projects in the Perrinville Creek basin as recommended by the Flow Reduction Study. PROJECT BENEFIT/RATIONALE: Urbanization of the Perrinville Creek Basin has increased flows in the creek, incision of the creek, and sedimentation in the low -gradient downstream reaches of the creek. Before any habitat improvements can be implemented, the flows must be controlled or these improvements will be washed away. SCHEDULE: 2018-2023 Construction at Seaview park to take place in 2018. Open sites to be determined. COST BREAKDOWN PROJECT 2018 2019 2020 2021 2022 2023 COST Planning/Study Eng. & Admin. $35,000 $10,000 $20,000 $50,000 $50,000 $50,000 Construction $886,825 $65,000 $105,000 $450,000 1% for Art $3950 $1125 $1,250 $1,250 TOTAL $925,775 $76,125 $126,250 $501,250 $50,000 $50,000 75