Ordinance 4137ORDINANCE NO.4137 AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING AMENDMENTS TO THE CAPITAL FACILITIES PLAN ELEMENT OF THE COMPREHENSIVE PLAN; AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. WHEREAS, on October 10, 2018, Planning Board reviewed the proposed 2019- 2024 Capital Facilities Plan and Capital Improvement Program; and WHEREAS, the Capital Facilities Plan was presented and a Public Hearing was held before the Planning Board on October 24, 2018; and WHEREAS, on November 13, 2018, the proposed 2019-2024 Capital Facilities Plan and Capital Improvement Program were presented to the Council for review and discussion; and WHEREAS, on November 20, 2018, a Public Hearing on the Capital Facilities Plan Element Update for 2019-2024 to the City's Comprehensive Plan and Capital Improvement Program was held; and WHEREAS, the City Council expressly finds that, consistent with RCW 36.70A.130, the adoption of these amendments to the Capital Facilities Plan concurrently with the adoption of the City's 2019 budget meets one of the permissible exceptions to the general rule requiring concurrent review of all amendments to the City's Comprehensive Plan, NOW THEREFORE -1- THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. The Capital Facilities Plan element of the Edmonds Comprehensive Plan is hereby amended to read as set forth in Exhibit A, which is attached hereto and incorporated herein by this reference as if fully set forth herein. Section 2. Effective Date. This ordinance, being an exercise of a power specifi- cally delegated to the City legislative body, is not subject to referendum, and shall take effect five (5) days after passage and publication of an approved summary thereof consisting of the title. APPROVED: ATTEST/AUTHENTICATED: CLERK, SCQ ASSEY APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY: BY JEFF TARADAY r FILED WITH THE CITY CLERK: December 7, 2018 PASSED BY THE CITY COUNCIL: December 11, 2018 PUBLISHED: December 14, 2018 EFFECTIVE DATE: December 19, 2018 ORDINANCE NO. 4137 -2- CITY OF EDMONDS CAPITAL FACILITIES PLAN 2019-2024 � OF EDP RWA CFP GENERAL City of Edmonds Capital Facilities Plan (CFP) Parks, General, and Regional Projects (2019-2024) Current Grant Project (2019-2024) 1 Project Name Purpose Opportunity Phase Total Cost Revenue Source 2019 2020 2021 2022 20 2024 2025-2039 Civic Center Development Develop the recently adopted master $4,350,000 Grants $4,350,000 plan for Civic Park. Develop plan $1,815,985 REET 1/2 $1,815,985 $0 adding amenities and recreation components, restrooms to RCO Local Parks Design $500,000 Park Impact Fees $500,000 accommodate increased growth. $2,000,000 GF $2,000,000 $3,334,185 G.O. Bonds or Vote $3,334,185 $12,000,170 Total $0 $12,000,170 $0 $12,000,170 Community Park / Athletic Complex - In cooperation with ESD#15 develop $0 Capital Campaign Old Woodway High School: Phase 2 and 3 a community park and athletic RCO Phasel $0 REET 2 complex. Complete $0 School District $0 Foundation $0 Grants $0 Total Sill Parks & Facilities Maintenance & Operations Replace / Renovate deteriorating $0 Public Vote Building building in City Park. Unknown Conceptual $0 G.O. Bonds $0 $0 Total $3-4M Waterfront Redevlopment/Waterfront Walkway Work with Sr. Center to renovate $2,913,431 REET $2,072,398 $841,033 Completion surrounding park, parking lot and RCO WWRP Design $1,875,000 Grants $1,125,000 $750,000 walkway. Remove creosote pier, reintroduce habitat for fish and ALEA Permitting $1,100,000 Park Impact Fees $1,100,000 wildlife. Increase access to the Construction $933,868 Private Partnership $933,868 waterfront to accommodate increased growth. Connect waterfront walkway from Brackett's Landing South to Olympic Beach, including completion in front of the Ebb tide condominiums. $6,822,299 Total $5,231,266 $1,591,033 $6,822,299 Edmonds Crossing WSDOT Ferry / Mutimodal Relocate ferry terminal to Marina EIS $0 Federal (Unsecured) Facility Beach. US DOT Completed $0 State Funds I $0 Total Unknown (Downtown Waterfront) Acquire and develop property for a [7arket year round public market. Unknown Conceptual $0 Grants I $0 Total Unknown Edmonds Marsh Restoration Please see CFP Storm Total CFP $18,822,469 1 Annual CFP Totals 1 $5,231,266 1 $13,591,203 1 $0 1 $0 I $0 I$0 This page intentionally left blank PROJECT NAME: Civic Center Development I ESTIMATED PROJECT COST: $12,000,170 PROJECT DESCRIPTION: Civic Park Development Develop the recently adopted master plan for Civic Park. Develop plan adding amenities and recreation components, restrooms to accommodate increased growth. PROJECT BENEFIT/ RATIONALE: Civic Center Development. The acquisition and development of Civic Center is a high priority in the PROS plan. SCHEDULE: 2018 - 2023 COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Design, permitting, construction management 2,000,000 Construction 10,000,170 TOTALI 1 12,000,170 CITY OF EDMONDS CAPITAL FACILITIES PLAN DESCRIPTION PROJECT NAME: Community Park / Athletic ESTIMATED PROJECT COST: $6-8 M Complex at the Former Woodway High School ra CIA HOGAN rC)R lER WOODWAY HIGH SCHOOL. ATHLETIC FIELD IMPROVEMENTS PRE PAnto fOX THE E DMON DS SCHOOL DISH ICT MAY FOV PROJECT DESCRIPTION: Develop community park and regional athletic complex with lighted or unlighted fields and recreational amenities in partnership with Edmonds School District, community colleges, user groups, and other organizations. Development dependent upon successful regional capital campaign. $10m - $12M project for all 3 phases. PROJECT BENEFIT/RATIONALE: The site is currently an underutilized and under maintained facility with great potential as community multi -use active park. Site has existing controlled access, greenbelt, parking and 4-court tennis facility with substandard fields. Highly urbanized area with 150,000 residents within 5-mile radius. Future maintenance supported by user fees. Phase 1 was completed in 2015 for $4.2M, Phases 2 & 3 will be completed in the future for an additional $6-8M. SCHEDULE: 2018-2038 COST BREAKDOWN PROJECT 2019 2020 2021 2022 2023 2024 2025- COST 2038 Planning/Study Engineering & Administration Construction 1 % for Art TOTAL $6-8M " all or a portion of this project may quality for 1 % for the Arts 9 PROJECT NAME: Parks & Facilities ESTIMATED PROJECT COST: $3-$4 Million Maintenance & Operations Building Existing Building Outline Yard F 0 0 Ldading 1,�00 sf New One St Building 5,600 sf — 15, Yard Functions � 111,910 If I ; I Pedmeter zone — 4,200 Sf Existing Fence Line a PROJECT DESCRIPTION: The 40 year old maintenance building in City Park is reaching the end of its useful life and is in need of major renovation or replacement. PROJECT BENEFIT/RATIONALE: Parks and Facilities Divisions have long outgrown this existing facility and need additional work areas and fixed equipment in order to maintain City parks and Capital facilities for the long term. SCHEDULE: Contingent on finding additional sources of revenue from general and real estate taxes. COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 2025-2038 Planning/Study Eng. & Admin. Construction 1 % for Art TOTAL $3m - $4m 'all or part of this Project may qualify for 1 % for the Arts 10 PROJECT NAME: Waterfront Redevelopment ESTIMATED PROJECT COST: $5,889,299 / Waterfront Walkway Completion •...•�q� .1iC R�.� � � _ � � o _ tAAOG�pi1��M1�.n r �. �" rxFp11KAV y .... t rre.w x•,. a•�oc�aww..rr ��. A� R...,1.- w,3ur,.f leer avaa ne�rar pa" Pra00$44 FdrrrO+rti5 W nufront Gan[er �1 r� r �Mw ww . -:• .rx. �.� .ra+ nsr sc.ac..o.�wrr rr w n. r PROJECT DESCRIPTION: Work with Sr. Center to renovate surrounding park, parking lot and walkway. Remove creosote pier, reintroduce habitat for fish and wildlife. Increase access to the waterfront to accommodate increased growth. Connect waterfront walkway from Brackett's Landing South to Olympic Beach, including completion in front of the Ebb tide condominiums. PROJECT BENEFIT/RATIONALE: Provide anew Senior and Community Center and provide a new beachfront walkway. One of the top priorities in the PROS plan is to open up beach -front access. SCHEDULE: 2018-2023 COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study 263,581 150000 Eng. & Admin. 130,000 70000 Construction 3,904,685 1,371,033 1 % for Art TOTAL $4,298,266 1,591,033 0 0 0 * all or part of this Project may qualify for 1% for the Arts is `v: I WAMAKV oral I AMU t pr. I -t, Im I' `( 1 If 41�\I- - 1 ��'Y'i v City of Edmonds Capital Facilities Plan (CFP) Transportation Projects (2019-2024) Grant Project (2019.2024) Project Name Purpose opportunity Phase Total Cost Funding Source 2019 2020 2021 2022 2023 2024 1 2025-2 RA _N / ('-it' Anal-k SW from Hwy 9910 95th PI. Installtwo-way left turn lanes and $0 (Federal or State secured) �228lhSI, W. sidewalks to improve capacity and pedestrian safety (project split with $375,000 (Federal or State unsecured) $75,000 $300,000 $8,690,000 Snohomish County) Possible Grant Conceptual $0 (Local Funds) $1,356,000 $375,000 Total §0 §0 §0 §0 §75,000 $300,000 $10,046,000 A, W @ 212th St. SW Intesection improvements to $10,000 (Federal or State secured) $10,000 �71th Intersection Improvements improve intersection delay and level of service (LOS). $0 (Federal or State unsecured) Construction $0 (Local Funds) $10,000 Total $10,000 $0 $0 $0 $0 $0 $0 Highway 99 Gateway/Revitalization Installgatewayelomentsand safety $9,437,376 (Federal or State secured) $437,376 $3,000,000 $6,000,000 improvements along SR-99 Cordtlor. State $28,000,000 (Federal or State unsecured) $1,250,000 $000:000 $9,000,000 $15,000,000 $2,000,000 $137,000,000 Appropriation Design $290,000 (Local Funds) $290,000 $37,727,376 Total $437,376 §7,540,000 $3,750,000 $15,000,000 $15,000,000 $2,000,000 $137,000,000 Hwy 99 @ 212th St SW Intersection Widen 212th St. SW to add a (Federal or State secured) Improvements westbound left turn lane for 200' storage length and an eastbound left (Federal or State unsecured) turn lane. Possible Grant Conceptual (Local Funds) Total Project Costs included in Hwy. 99 Revitalization / Gateway project costs Hwy. 99 @ 216th St. SW Intersection n 216th St. SW to add a left (Federal or State secured) Improvement �Wid turn we for eastbound and westbound movements. (Federal or State unsecured) PossibleGrant Conceptual (Local Funds) Total Project Costs included in Hwy. 99 Revitalization / Gateway pro act costs Hwy. 99 @ 220th St. SW Intersection Widen 220th St. SW and Hwy 99 to (Federal or State secured) Improvement add,a westbound right turn lane (for 325'storage length) and a (Federal or State unsecured) soutbound left turn lane (for 275' Possible Grant Conceptual (Local Funds) storage length). Total Project Costs included in Hwy. 99 Revitalization /Gatewa project costs Hwy 99 @ 234th St. SW Traffic Signal Install new traffic signal at Hwy. 99 @ (Federal or State secured) 234th St. SW to provide safer vehicular / pedestrian crossings, (Federal or State unsecured) combined with corner widenings. Possible Grant Conceptual (Local Funds) Total Project Costs included in Hwy. 99 Revitalization / Gateway pro act costs SR 524 (196th St. SW) / 88th Ave W Improve intersection safety by $0 (Federal or State secured) Intersection Improvements converting a stop controlled intersection for NB and SB $744,500 :158,500 (Federal or State unsecured) $122,000 $87,500 $535,000 movements to a signalized Possible Grant Conceptual (Local Funds) $71,000 $87,500 intersection. §903,000 Total §0 SO $0 $193,000 $175,000 $535,000 $0 Main St and 91h Ave S Install traffic signal to improve $0 (Federal or State secured) intersection delay and Level of Service (mini roundabout's an $896,000 (Federal or State unsecured) $120,000 $776,000 alternative solution). Possible Grant Conceptual $0 (Local Funds) §896,000 Total $0 $0 $0 $120,000 $776,000 $0 $0 Ave. W @ 220th St. SW Convert split phasing operation for $702,000 (Federal or State secured) $400,000 $302,000 �76th Intersection Improvements EB and W B movements to concurrent through movements, with $7,173,000 (Federal or State unsecured) $473,000 $3,000,000 $3,700,000 protected / permissive LT phasing. Conceptual $251,000 (Local Funds) $133,000 $118,000 $8,125,000 Total §0 $O $533,000 $892,000 $3,000,000 $3,700,000 $0 SR-104 @ 226th St. SW / 15th St. Extend left turn storage area for W B $0 (Federal or State secured) SW Intersection Improvements movement on SR-104 w/various $179,000 (Federal or State unsecured) $15,000 $164,000 bicycle rowonents. Irian mprovemants. Possible Grant Conceptual P $15,000 Local Funds ( ) $15,000 §794,000 Total §0 §0 §0 §30,000 $164,000 §0 §0 951h PI. W Intersection Convert EB and W B LT along SR- $0 (Federal or State secured) Improvements 10410 protected LT phasing; $495,000 (Federal or State unsecured) $75,000 $420,000 �SR-104@ upgrade ADA curb ramps; and add for access management$0 Possible JtConceptualC-Curb (Local Funds) $495,000 Total $0 §0 $0 $75,000 $420,000 $0 $0 City of Edmonds Capital Facilities Plan (CFP) Transportation Projects (2019-2024) Grant Project (2019-2024) Project Name Purpose Opportunity Phase Total Cost Funding Source 2019 2020 2021 2022 2023 2024 1 2025-20 S13-104 @ 238th S1. SW Intersection Install traffic signal to improve $0 (Federal or State secured) Improvements vehicular and pedestrian safety; revise geometry to allow for safer $1,311,000 (Federal or State unsecured) $173,000 $1,138,000 turns. Possible Grant Conceptual $27,000 (Local Funds) $27,000 $1,338,000 Total $0 $0 $0 $200"000 §7,138,000 $0 $0 Olympic View Dr. @ 76th Ave. W Install traffic signal to reduce the $0 (Federal or State secured) Intersection Improvements intersecton delay and improve Level of Se-* e. $0 (Federal or State unsecured) J $1,183,000 Conceptual $0 (Local Funds) $0 Total $0 $0 $0 $0 $0 $1,183,000 841h Ave. W (212th S1. SW to 2381h Install two-way left turn lanes and $0 (Federal or State secured) St. SW) sidewalk to improve capacity and pedestrian safety(split with $0 (Federal or State unsecured) $15,44.1,000 Snohomish County) Conceptual $0 (Local Funds) $0 Total §0 §0 §0 §0 §0 $0 $15A41,000 @ 100th Ave. W Intersection Implement Westgate Circulation $0 (Federal or State secured) �SR-104 Improvements Access Plan, midblock pedestrian crossings along 100th Ave. W, and $1,017,468 (Federal or State unsecured) $150,000 $867,468 rechannelization with bike lanes / Possble Gran[ Conceptual $0 (Local Funds) .harrows along 100th Ave. W. $11017,468 Total $0 $0 $0 $150,000 $867,468 $0 $0 SR-104 @ 76th Ave. W Intersecion Ad Add a 2nd We left turn lane (split $0 (Federal or State secured) Improvements Shoreline). $0 (Federal orSra[e unsecured) $3,017,000 Conceptual $0 (Local Funds) $0 Total §0 §0 §0 §0 §0 §0 §3,017,000 Olympic View Dr. @ 174th St. SW Install traffic signal to improve Level $0 (Federal or State secured) Intersection Improvements of Service and intersection delay. $0 (Federal or State unsecured) Conceptual $0 (Local Funds) $610,000 $0 Total §0 $O $0 $0 $0 $0 $6,0,000 Non -motorized Pedestrian / Bicycle Projects Sunset Ave. Walkway from Bell St. to provide walkway on the west side of $140,195 (Federal or State secured) $140,195 Gaspers St. Sunset Ave, with various utility upgrades. possible $1,870,000 (Federal or State unsecured) $1,870,000 RCO/TIB Grant Design $879,805 (Local Funds) $154,605 $725,000 for construction $2,890,000 Total $0 $0 $0 $295,000 $2,595,000 $0 $0 SL SW from 1001h Ave. W to Improve pedestdan safety along $0 (Federal or State secured) �212nd SR-104 232nd St. SW from 100th Ave. to SR-104. $1,305,000 (Federal or State unsecured) $200,000 $1,105,000 Possible Grant Conceptual $0 (Local Funds) §7,305,000 Total $0 $0 $0 $0 $200,000 §7,105,000 §0 236th St SW from Madrona Improve pedestrian safety along $0 (Federal or State secured) Elementary to 97th Ave. W 2361h St. SW, creating a safe pedestrian connection from $1,286,500 (Federal or State unsecured) $106,500 $1,162,000 Madrona Elementary Possible Grant Conceptual $106,500 (Local Funds) $106.500 $1,395,000 Total $0 $0 $0 $213,000 $1,182,000 $0 $0 84Ih Ave. W from 238Ih St. SW to Improve pedestrian safety along 84th $0 (Federal or State secured) 234th St. SW Ave. W. from 238th St. SW to 234th St. SW. $90,000 (Federal or State unsecured) $90.000 $495.000 Possible Grant Conceptual $0 (Local Funds) $90,000 Total $0 $0 $0 $0 $0 §%,.0 $495,000 80th Ave. W from 212th St SW to Improve pedestrian safety along 80th $0 (Federal or State secured) 206th St. SW Ave. W, within proximity to Edmonds- $1,199,000 (Federal or State unsecured) $200,000 $999,000 Woodway High School. possible Gran[ Conceptual $797,000 (Local Funds) $133,000 $664,000 §7,9%,000 Total §0 $0 $0 EO $333,000 $1,663,000 $0 Ave. S from James St. to Main St. Provide safe sidewalk along short $0 (Federal or State secured) �2nd Walkway missing link. $0 (Federal or State unsecured) J Conceptual $30,000 (Local Funds) $30,000 §30,000 Total $0 $0 $30,000 §0 §0 §0 City of Edmonds Capital Facilities Plan (CFP) Transportation Projects (2019-2024) Grant Project (2019-2024) Project Name Purpose Opportunity Phase Total Cost Funding Source 2019 2020 2021 2022 2023 2024 1 2025-20 St. SW from 7111 Ave. W to provide safe sidewalk along a $0 (Federal or State secured) 84th Ave. W missing link of 2181h St SW. from $650,000 (Federal or State unsecured) $100,000 $550,000 �2181h 76th Ave. to 84th Ave. Possible Grant Conceptual $655,000 (Local Funds) J J J J $100,000 $555,000 $1,305,000 Total $200,000 $1,105,000 $0 Walnut St from 3rd A- S to 41h Ave- Provide short missing link. $0 (Federal or State secured) S Walkway $105,000 (Federal or State unsecured) $105,000 Possible Grant Conceptual $0 (Local Funds) 5105,000 Total $J $J $J $105,000 $J $0 $0 Inh St. SW Walkway from Hwy. 99 Provide sidewalk on north side of $0 (Federal or State secured) to 72nd Ave W 216th S1. SW from Hwy. 99 to 72nd $137,000 (Federal or State unsecured) $137,000 �21 Ave W (completing missing link) Possble Grant Conceptual $20,000 (Local Funds) $20,000 $157,000 Total $0 $0 $0 $157,000 §0 $0 $0 St. SW from SR-104 to Hwy. Provide sidewalk on north side of $4,000 (Federal or State secured) $4,000 99 2381h St. SW from SR-104 to Hwy. $0 (Federal or State unsecured) �238th 99 (completing missing link) Construction $1,750 (Local Funds) $1,750 $5,750 Total $5,750 $0 $0 $0 $0 $0 $0 Elm W ay from 81h Aw;. S to 91h Aw;. Provide sidewalk on one skle of Elm $0 (Federal or State secured) S Way,mm 8th Ave. S to 9th Ave. S $637,000 (Federal or State unsecured) $137,000 $500,000 Possble Gran[ Conceptual $193,000 (Local Funds) $38,000 $155,000 E830,000 Total $J $J $J $175,000 $655,000 EO EO Dr, From Main St. to Provide sate sidewalk, connecting ro $0 (Federal or State secured) �lawold h St. SW ex. Sidewalk along 200th St. SW (direct link to Maplewood Elementary $2,330,000 (Federal or State unsecured) $436,000 $947,000 $947,000 SchooQ. Possble Grant Conceptual $0 (Local Funds) $2,330,000 Total §0 §0 §0 $436,000 $947,000 $947,000 §0 Dayton St. from 3rd Ave. to 91h Aw. Complete missing link along Dayton $0 (Federal or State secured) St. from 3rd Ave. to 91h Ave. $250,000 (Federal or State unsecured) $250,000 Construction $2,500 (Local Funds) $2,500 $252,500 Total $252,500 $J $J $J $J $0 $ 951h PI, W 11, 2241h St SW to Provide sidewalk on one side of 95th $0 (Federal or State secured) 220th St. SW PI. W from 224th St. SW to 220th St. $585,000 (Federal or State unsecured) $100,000 $485,000 SW completing missing link. Possible Grant Conceptual $0 (Local Funds) :100,000 $585,000 Total $0 $0 $0 $485,000 §0 §0 Railroad St. Sidewalk from Dayton St. I Reconstruct and widen existing $0 (Federal or State secured) to Main St. / SR-104 sidewalk along Railroad St, Possible Grant $746,400 (Federal or State unsecured) $138,400 $608,0"0 Conceptual $115,600 (Local Funds) $21,600 $94,000 $862,000 Total $J $J $J $160,000 $702,000 $0 $0 Eztend bike lanes within proximity of $0 (Federal or State secured) Motonzed Transportation intersection and install new ADA possible Grant $1'160,000 (Federal or State unsecured) $174,000 $986,000 �SR-104976thA..WNon- Improvements compliant curb ramps Conceptual $50,000 (Local Funds) $50,000 $1,210,000 Total §0 §0 §0 $224,000 $986,000 §0 §0 191 atSt. SW from 801h Ave. W to Provide sidewalk on one side of $0 (Federal or State secured) 76th Ave. W 1911h St. SW from 80th Ave. to 76th Ave. (completing missing link) $0 (Federal or State unsecured) $630,000 Conceptual $0 (Local Funds) $0 Total EO EO EO EO EO EO $630,000 City of Edmonds Capital Facilities Plan (CFP) Transportation Projects (2019-2024) Grant Project (2019-2024) Project Name Purpose Opportunity Phase Total Cost Funding Source 2019 2020 2021 2022 2023 2024 1 2025-20 104th Ave. W / Robinhood Lane from Provide sidewalk on west side of $0 (Federal or State secured) 238th St. SW to 106th Ave. W 104th Ave. from 106th Ave. 238th St. SW to (completing missing W $0 (Federal or State unsecured) $990,000 link) Conceptual $0 (Local Funds) $0 Total $0 $0 $0 $0 $0 $0 $990,000 80th Ave. W from 218th St. SW to Provide sidewalk on one side of 80th $0 (Federal or State secured) 2201h St. SW Ave. W from 2181h St. SW to 220th St. SW (completing missing link) $0 (Federal or State unsecured) Conceptual $0 (Local Funds) :315,000 $0 Total $0 EO EO EO EO EO $315,000 84th Ave. W from 188th St. SW to Provide sidewalk on one side of 84th $0 (Federal or State secured) 186th St. SW Ave. W from 188th St. SW to 186th St. SW $0 (Federal or State unsecured) Conceptual $0 (Local Funds) :315,000 $0 Total $0 §0 §0 §0 §0 §0 315,000 St. SW from Hwy. 99 to 76th Provide sidewalk on one side of $0 (Federal or State secured) �236th Ave W 2361h St. SW from Hwy. 99 to 76th Ave. W $0 (Federal or State unsecured) $765,000 Conceptual $0 (Local Funds) $0 Total $0 EO EO EO EO EO $765,000 238th St. SW from Hwy. 99 to 761h Provide sidewalk on one side of $0 (Federal or State secured) Ave. W 238th St. SW from Hwy. 99 to 76th Ave W $0 (Federal or State unsecured) $1,170,000 Conceptual $0 (Local Funds) $0 Total $0 $0 $0 $0 $0 $0 §7,170,000 80th Ave. W from 188th St. SW to Improve pedestrian safety along 80th $0 (Federal or State secured) Olympic View Dr. Ave. W, within proximity to Seaview Elementary and Seaview Park. $1,506,000 (Federal or State unsecured) $315,000 $1,191,000 Possible Grant Conceptual $629,000 (Local Funds) $125,000 $504,000 $2,135,000 Total EO EO EO $440,000 E7,695,000 $0 $0 18911 PI. SW from 8011 Ave. W to Provid. sidewalk on one side of $0 (Federal or State secured) 76th Ave. W 189th PI. SW from 80th Ave. W to 76[h Ave. W $0 (Federal or State unsecured) $585,000 Conceptual $0 (Local Funds) $0 Total §0 §0 §0 §0 §0 §0 $585,000 Ferry/Railroad Ferry Storage Improvements from Improve ferry queueing by extending $0 (Federal or State secured) Pine St. to Dayton St. ferry storage area along SR-104 (striping changes). $357,000 (Federal or State unsecured) $357,000 Conceptual $0 (Local Funds) §357,000 Total $0 $0 $0 $357,000 $0 $0 §0 Traffic Planning Projects Edmonds St. Waterfront Connector Install a gmde-sepamted $6,000,000 (Federal or State secured) $3,000,000 $3,000,000 overcrossing over the railroad tracks as an extension of Edmonds Street $21,000,000 (Federal or State Unsecured) $12,000,000 $9,000,000 J connecting to Brackatt's Landing Possible Grant Conceptual $500,000 (Local funds) $500,000 North park. $27,500,000 Total §3,000,000 $3,000,000 $12500,000 $9,000,000 $0 $0 Total UP 1 1 $96,421,094 1 Annual UP Totals 1 $3,705,626 1 $4,540,000 1 $16,783,000 1 $28,352,000 1 $31,595,468 1 $11,445,000 $172,562,000 Revenue Summary by Year Totals Source 2019 2020 2021 2022 2023 2024 2025.2039 $16,293,571 Total Federal-, State, CDBG (Secured $3,451,376 $3,000,000 $3,400,000 $6,442,195 $0 $0 $0 $75,406,868 Total Federal& State (Unsecured) $250,OF $1,250,000 $12,750,000 $21,133,900 $29,796,968 $10,226,000 $170,596,000 $4,721,655 Local Funds $4,250 $290,000 $633,000 $776,905 $1,798,500 $1,219,000 $1,966,000 PROJECT NAME: 228t" St. SW from Hwy. 99 ESTIMATED PROJECT COST: $10,421,000 to 95t" PI. W PROJECT DESCRIPTION: Widen 228t" St. SW from Hwy. 99 to 95t" Pl. W to three lanes (with two-way left turn lane), with curb and gutter, sidewalk, and bike lanes. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety and traffic flow along this corridor. SCHEDULE: The design phase is scheduled to begin in 2023 (pending funding). These project costs would be split between Snohomish County and Edmonds since half the project is within Esperance. COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 2025-2039 Planning/Study Engineering, Administration, & ROW $75,000 $300,000 $1,200,000 Construction $8,846,000 1 % for Art TOTAL $75,000 $300,000 $10,046,000 18 PROJECT NAME: 761h Ave W @ 2121h St. SW ESTIMATED PROJECT COST: $7,700,000 Intersection Improvements 1 EDMONDS-WOODWAY HIGH SCHOOL - l OFFICE W a R 1 C6 1301 PROJECT DESCRIPTION: Add a northbound and southbound left -turn lane to convert the signal operation for those approaches from split phasing to protected -permissive phasing. Add a right -turn lane for the westbound, southbound, and northbound movements. The project also consists of various utility upgrades and conversion of overhead utilities to underground. PROJECT BENEFIT/RATIONALE: Reduce the intersection delay and improve the existing level of service to LOS C. SCHEDULE: Substantial completion will be reached in October 2018 and the remaining Federal documentation will be completed in 2019. Federal and State transportation grants were secured to complete the different project phases (through CMAQ and TIB secured grants). COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & Administration & ROW Construction $10,000 1 % for Art TOTAL $10,000 19 PROJECT NAME: Highway 99 ESTIMATED PROJECT COST: $175,000,000 Gateway/Revitalization PROJECT DESCRIPTION: The project would include, among other features, wider replacement sidewalks or new sidewalk where none exist today, new street lighting, center medians for access control and turning movements, etc., attractive and safe crosswalks, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. PROJECT BENEFIT/RATIONALE: Improve aesthetics, safety, user experience, and access management along this corridor. In addition, economic development would be improved. SCHEDULE: The conceptual phase began in September 2017 and should be completed by November 2018. The design phase for the stretch from 224t" St SW to 220t" St. SW is scheduled to begin in 2019 (pending additional funding). A HSIP grant application was submitted to fund a portion of the design / ROW phases (pending response). $10M from Connecting Washington allocation has been secured, of which $91VI isn't available until 2021. COST BREAKDOWN PROJECT 2019 2020 2021 2022 2023 2024 2025-2039 COST Planning/Study Engineering & $437,376 $1,540,000 $3,750,000 $2,000,000 $2,000,000 $16,000,000 Administration & ROW Construction $15,000,000 $13,000,000 $121,000,000 1 % for Art TOTAL $437,376 $1,540,000 $3,750,000 $15,000,000 $15,000,000 $2,000,000 $137,000,000 20 PROJECT NAME: Hwy. 99 @ 212t" St. SW ESTIMATED PROJECT COST: $2,806,000 intersection improvements a a z 7313 n Edmonds - Edmonds Family Clinic ei ADX Public 17-ks KENNEL Q 21192 p, Z1 St Rau 212TH 7307-er CUPIC a 7303"3' ^ n n Pool 7W4 "1" 7302 "2" PARK & RIDE 215TH W ST SW o: W 0 EIE a PLANT AEGIS Sweuise m MDNNS CRM PllS ' ALLIED / ROOFING / / / B&M / CON ST 21414 / 21448 / / / NCOONAL�• / VALUE / 1ILLAGE / 16TH STISW PROJECT DESCRIPTION: Widen 21211 St. SW to add a westbound left turn lane for 200' storage length and an eastbound left turn lane for 300' storage length. Provide protected left turn phase for eastbound and westbound movements. (ROADWAY PROJECT PRIORITY in 2015 Transportation Plan: #4). The cost for the intersection improvements are included within the Hwy. 99 Revitalization / Gateway project costs. PROJECT BENEFIT/RATIONALE: Improve intersection efficiency and reduce delay. SCHEDULE: All phases are scheduled between 2022 and 2024 (unsecured funding).The project cost is split between Lynnwood and Edmonds since half the project is within Lynnwood. COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering, $175,000 $1,091,000 ROW, & Administration Construction $1,540,000 1 % for Art TOTAL $175,000 $1,091,000 $1,540,000 `A PROJECT NAME: Hwy. 99 @ 216th St. SW ESTIMATED PROJECT COST: $2,335,000 intersection improvements 21d1.02!1 13�d08w 214021d12 { 21405 04 LU N U> 2120L< 2i431MC�UHA6' un � anz 150 � r 2150021558EGIS VALUE � # VILLAGE ST SVU — 21BTlM 21600 {� 21619 KRUGER CLINIC f 21632 � � - ��I16e 2 PROJECT DESCRIPTION: Widen 216th St. SW to add a westbound left turn lane and an eastbound left turn lane. Provide protected -permissive left turn phases for eastbound and westbound movements. This project ranked #3 in the Roadway Project Priority in the 2015 Transportation Plan. The cost for the intersection improvements are included within the Hwy. 99 Revitalization / Gateway project costs. PROJECT BENEFIT/RATIONALE: Improve intersection efficiency and reduce delay. SCHEDULE: All phases are scheduled between 2022 and 2024 (unsecured funding). COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & ROW & Administration $204,000 $334,000 Construction $1,837,000 1 % for Art TOTAL $204,000 $334,000 $1,837,000 22 PROJECT NAME: Hwy. 99 @ 220th St. SW ESTIMATED PROJECT COST: $3,215,000 intersection improvements TOP FOODS v �, 19TH sr SW / 21919 STARBU S / / 220TH ST SW I I I I 1221 I I I I I 13 _I � � l4 n III •0. 7301 W U O e S C m .M. PROJECT DESCRIPTION: Widen 220th St. SW to add Westbound right turn lane for 325' storage length. Widen SR-99 to add 2nd Southbound left turn lane for 275' storage length. (ROADWAY PROJECT PRIORITY in 2015 Transportation Plan: #2). The cost for the intersection improvements are included within the Hwy. 99 Revitalization / Gateway project costs. PROJECT BENEFIT/RATIONALE: Reduce intersection delay and improve traffic flow and safety. SCHEDULE: All Phases are scheduled between 2022 and 2024 (unsecured funding for all phases). COST BREAKDOWN PROJECT 2019 2020 2021 2022 2023 2024 COST -Planning/Study Engineering & Administration & ROW $175,000 $1,085,000 Construction $1,955,000 1 % for Art TOTAL $175,000 $1,085,000 $1,955,000 23 PROJECT NAME: Hwy. 99 @ 234th St. SW ESTIMATED PROJECT COST: $3,300,000 intersection improvements ESPE&ANCE ' I3IiN � FS 1 i711 21202 17 S-IMO PL W ircn �• �I 21]31 �33Rf1 Pt ] S'e 1'i L M1 1,03 1312 812: � •71J7C'. _ — : i31'• !911 ]y0! 7731 !$ ff -- �34TFS ST.SW _.—. } 23 a'•• 3]406■�� 1 DIM ]l1 1 1712 1� 2341� wul _ Y3U] € 7i.ti11' 131*1 !salt nb tit � �77 PROJECT DESCRIPTION: Install traffic signal at the intersection of Hwy. 99 @ 234t" St. SW to provide safer crossing of Hwy. 99 for vehicles and non -motorized transportation (project identified in Hwy. 99 Sub Area Plan). These intersection improvements are included as part of the Hwy. 99 Revitalization / Gateway project. The cost for the intersection improvements are included within the Hwy. 99 Revitalization / Gateway project costs. PROJECT BENEFIT/RATIONALE: Improve intersection safety and pedestrian conditions along the corridor. SCHEDULE: All Phases are scheduled between 2022 and 2024 (unsecured funding for all phases). COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & Administration & ROW $300,000 $300,000 Construction $1,200,000 $1,500,000 1 % for Art TOTAL $300,000 $1,500,000 $1,500,000 24 PROJECT NAME: 196th St. SW (SR-524) @ ESTIMATED PROJECT COST: $903,000 88th Ave. W Intersection Improvements 1em 3 ILU _ a_ .~a I m :VEN DAY WENTIST :HURCH 4 1eeTM sr sw PROJECT DESCRIPTION: PROJECT DESCRIPTION: Install traffic signal at the intersection of 196th St. SW @ 88th Ave. W. The modeling in the 2009 Transportation Plan indicated that restricting northbound and southbound traffic to right -turn -only (prohibiting left -turn and through movements) would also address the deficiency identified at this location through 2025. This is same alternative as one concluded by consultant in 2007 study but not recommended by City Council. This could be implemented as an alternate solution, or as an interim solution until traffic signal warrants are met. The ex. LOS is F (below City Standards: LOS D). This project was ranked #6 in the Roadway Project Priority in the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: Improve traffic flow characteristics and safety at the intersection. The improvement would modify LOS to A, but increase the delay along 196th St. SW. SCHEDULE: All project phases are scheduled between 2022 and 2024 (unsecured funding). In order to allow the installation of a traffic signal, the MUTCD traffic signal warrants must be met and the installation must be approved by WSDOT (since 196th St. SW is a State Route / SR-524). COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & $193,000 $175,000 Administration Construction $535,000 1 % for Art TOTAL $193,000 $175,000 $535,000 25 PROJECT NAME: Main St and 9t" Ave. S ESTIMATED PROJECT COST: $896,000 J __J1 MH BELL ST I - H P MAIN ST WADE JAMES _J -TH EATE R L � W� � a S H oavraN n PROJECT DESCRIPTION: Installation of a traffic signal or mini -roundabout. PROJECT BENEFIT/RATIONALE: The existing intersection is stop -controlled for all approaches and the projected intersection LOS in 2035 is LOS F (below the City's concurrency standards: LOS D). The installation of a traffic signal would improve the intersection delay to LOS B. The project ranked #4 in the Roadway Project Priority of the 2015 Transportation Plan. In Fall 2018, turn lanes will be added to the intersection to improve safety and traffic flow through the intersection. SCHEDULE: The design phase is scheduled to begin in 2022 and construction in 2023. unsecured funding). COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering, $120,000 Administration & ROW Construction $776,000 1 % for Art TOTAL $120,000 $776,000 26 PROJECT NAME: 7611 Ave. W @ 22011 St. SW ESTIMATED PROJECT COST: Intersection Improvements $8,125,000 2,9rH sr sw J 21919 J J JI 3 14 I ; ,a r—i i J � � 2215TPLSW ll!�U QIM TOP FOODS IsTARBILIll KS J 220TH ST SW - 1 r LYNWOOD HONDA PROJECT DESCRIPTION: Reconfigure eastbound lanes to a left turn lane and through / right turn lane. Change eastbound and westbound phases to provide protected -permitted phase for eastbound and westbound left turns. Provide right turn overlap for westbound movement during southbound left turn phase. (ROADWAY ROJECT PRIORITY #1 in 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: Reduce the intersection delay and improve the LOS. The projected LOS in 2035 would be improved from LOS F to LOS D. SCHEDULE: A STP Federal grant was secured in 2018 for the Design Phase (funds not available until 2021). The ROW phase is scheduled to be completed in 2022 and construction in 2024 (pending additional funds). COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & ROW $533,000 $892,000 Administration Construction $3,000,000 $3,700,000 1 % for Art TOTAL $533,000 $892,000 $3,000,000 $3,700,000 "All or a portion of this project may qualify for 1 % for the arts 27 PROJECT NAME: SR-104 @ 22611 St. SW / ESTIMATED PROJECT COST: $194,000 15' St. SW Intersection Improvements 14TH WAY SW 226TH ST SW uJ 226TH PL SW Ma M PROJECT DESCRIPTION: Extend the left turn lane for the westbound movement on SR-104. Complete various pedestrian and bicycle intersection improvements. This project was identified in the SR-104 Complete Streets Corridor Analysis (completed in 2015). PROJECT BENEFIT/RATIONALE: Improve non -motorized transportation safety at the intersection and improve traffic flow along the SR-104 corridor. SCHEDULE: 2022-2023 (unsecured funding) COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & Administration & ROW $30,000 Construction $164,000 1 % for Art TOTAL $30,000 $164,000 28 PROJECT NAME: SR-104 @ 95t" pl. W ESTIMATED PROJECT COST: $495,000 Intersection Improvements W H r ST S a CC rn cl WESTGATE CHAPEL PROJECT DESCRIPTION: Upgrade all ADA Curb Ramps; and add C-Curb for access management. This project was identified in the SR-104 Complete Streets Corridor Analysis completed in 2015). PROJECT BENEFIT/RATIONALE: Improve intersection safety for pedestrians and vehicles. SCHEDULE: 2022-2023 unsecured funding COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & Administration & ROW $75,000 Construction $420,000 1 % for Art TOTAL $75,000 $420,000 29 PROJECT NAME: SR-104 @ 238t" St. SW ESTIMATED PROJECT COST: $1,338,000 Intersection Improvements ■ To Hwy 99 i 10 239TH ST SW PROJECT DESCRIPTION: Install traffic signal. The warrants are met for such an installation. This project was identified in the SR-104 Complete Street Corridor Analysis (completed in 2015). PROJECT BENEFIT/RATIONALE: Improve vehicular and pedestrian safety. SCHEDULE: 2022-2023 unsecured funding) COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & Administration & ROW $200,000 Construction $1,138,000 1 % for Art TOTAL $200,000 $1,138,000 30 PROJECT NAME: Olympic View Dr. @ 76th Ave. ESTIMATED PROJECT COST: W Intersection Improvements $1,183,000 N SEAVIEW PARK 3 PLSW 186TH ST SW ml I m—I PROJECT DESCRIPTION: Install traffic signal (the intersection currently stop controlled for all movements). (ROADWAY ROJECT PRIORITY in 2015 Transportation Plan: #11). PROJECT BENEFIT/RATIONALE: The improvement will reduce the intersection delay. The projected Level of Service is LOS F in 2035, which is below the City's concurrency standards (LOS D). The project will improve the Level of Service to LOS B. SCHEDULE: Engineering and Construction are scheduled between 2025 and 2039 (unsecured funding). COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 2025-2039 Planning/Study Engineering, Administration, & ROW $200,000 Construction $983,000 1 % for Art TOTAL $1,183,000 31 PROJECT NAME: 84th Ave. W (212th St. SW ESTIMATED PROJECT COST: $15,441,000 to 238th St. SW) PROJECT DESCRIPTION: Widen 84th Ave. W to (3) lanes with curb, gutter, bike lanes, and sidewalk on each side of the street. (part of this project was ranked #6 in the Long Walkway list of the 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: Improve overall safety of the transportation system along this collector street: 1) the sidewalk and bike lanes would provide pedestrians and cyclists with their own facilities and 2) vehicles making left turn will have their own lane, not causing any back-up to the through lane when insufficient gaps are provided. SCHEDULE: All project phases are scheduled between 2025 and 2039 (unsecured funding). The project costs would be split between Snohomish County and Edmonds since half the project is located within Esperance. COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 2025-2039 Planning/Study Engineering, $2,000,000 Administration, & ROW Construction $13,441,000 1 % for Art TOTAL $15,441,000 all or part of this project may qualify for 1 % for the Arts. 32 PROJECT NAME: SR-104 @ 100t" Ave. W ESTIMATED PROJECT COST: $1,017,468 Intersection Improvements / Access Management I EDMONDS WAY PROJECT DESCRIPTION: Implement Westgate Circulation Access Plan, install mid -block pedestrian crossing along 100t" Ave. W, improve safety to access the driveways within proximity to the intersection, and re -striping of 100t" Ave. W with the potential addition of bike lanes. This project was identified in the SR-104 Completed Streets Corridor Analysis completed in 2015). PROJECT BENEFIT/RATIONALE: Improve access and safety at the intersection and improve non -motorized transportation safety. SCHEDULE: All phases are scheduled between 2022 and 2023 (unsecured funding) COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 2025-2039 Planning/Study Engineering & Administration $150,000 Construction $867,468 1 % for Art TOTAL $150,000 $867,468 33 PROJECT NAME: SR-104 @ 76t" Ave. W ESTIMATED PROJECT COST: $3,017,000 Intersection Improvements 4 240TM PL SW 'I o'IS 111 sW �o- a 7 N l}' MOY.65 Wqy� �gtV OF`R4MP - - LAKEBALLINGEAEp N40NDS WAY 202NDPL SW -1 2438N Pr, SW ai PNoS RFC1Ntr — 7RKp 84CL&GC9'WAY ' PROJECT DESCRIPTION: Add a 2nd left turn lane along SR-104. This project was identified in the SR-104 Complete Street Corridor Analysis (completed in 2015). PROJECT BENEFIT/RATIONALE: Improve access and safety at the intersection and improve non -motorized transportation safety. SCHEDULE: 2025-2039. The project costs would be split between Shoreline and Edmonds since half the intersection is located within Shoreline. COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 2025-2039 Planning/Study Engineering & Administration $453,000 Construction $2,564,000 1 % for Art TOTAL $3,017,000 34 PROJECT NAME: Olympic View Dr. @ 17411 St. ESTIMATED PROJECT COST: $610,000 SW Intersection Improvements ti4 J I� -L_-jJ- 7027 7003 LI Meadowdale Middle School r� ------------ J-/, Parking b ssoi St. Thomas Moore —� arrre I Catholic School Ballfieltl y / SanctuarY PROJECT DESCRIPTION: Widen Olympic View Dr. to add a northbound left turn lane for 50' storage length. Shift the northbound lanes to the east to provide an acceleration lane for eastbound left turns. Install traffic signal to increase the LOS and reduce intersection delay. (ROADWAY ROJECT PRIORITY in 2015 Transportation Plan: #13) PROJECT BENEFIT/RATIONALE: Improve intersection efficiency and safety of drivers accessing either street. SCHEDULE: Engineering and Construction are scheduled between 2025 and 2039 (unsecured funding). COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 2025-2039 Planning/Study Engineering & Administration $100,000 Construction $510,000 1 % for Art TOTAL $610,000 35 PROJECT NAME: Sunset Ave Walkway ESTIMATED PROJECT COST: $3,050,000 from Bell St to Caspers St. ♦0%�— F � �iii■■■ 1 44b' ���:�a�MAW s UHDVIEwavrs ♦ ♦ �� I■� 11111■� I � ���' IIIIIII :�1■�■1 ■ PROJECT DESCRIPTION: Provide a walkway on the west side of the street, facing waterfront (— 112 mile / more recent project). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Temporary improvements were installed in 2017 through striping, in order to evaluate the alignment of the proposed walkway and parking alternatives The design phase is scheduled to be completed in 2022. Construction isn't scheduled to occur until 2023 when utility improvements are scheduled to be completed along this stretch. No grant funding has been secured for the construction phase. COST BREAKDOWN PROJECT 2019 2020 2021 2022 2023 2024 COST Planning/Study Engineering & $295,000 Administration Construction $2,595,000 1 % for Art TOTAL $295,000 $2,595,000 * all or part of this project may qualify for 1 % for the Arts. 36 PROJECT NAME: 23211d St. SW Walkway ESTIMATED PROJECT COST: $1,305,000 from 100th Ave. W to SR-104 EDMONDS WAY W SAME iwnRs LLI L ! Ell 2 . ■ ■ Qy - 1 �i IF Al. 10 UUT H ' CHURCH, (jr ■ ■ ■ , Uj 7 , ■ AW �I o �0 c� 2 ODW' ' I ESTATES AY OLy I _ PR RK \29 9 Dorn 98 7 6 5 ' 30 2 15 3 14 7• J \32 45 32 ■ r jr `2q 7 1 nm (0) 1 � ■ � e PROJECT DESCRIPTION: Install sidewalk along 232nd St. SW from 100th Ave. W to SR-104. This project ranked #3 in the Long Walkway List of 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2023-2024 (unsecured funding) COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & Administration $200,000 Construction $1,105,000 1 % for Art TOTAL $200,000 $1,105,000 37 PROJECT NAME: 2361" St. SW Walkway ESTIMATED PROJECT COST: $1,395,000 from Madrona Elementary to 97t" Ave. W S Q PROJECT DESCRIPTION: Install sidewalk with curb and gutter along 236nd St. SW from Madrona Elementary to 97t" Ave. W. This project ranked #4 in Long Walkway list of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2022-2023 (unsecured funding) COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & Administration $213,000 Construction $1,182,000 1 % for Art TOTAL $213,000 $1,182,000 38 PROJECT NAME: 84th Ave. W Walkway ESTIMATED PROJECT COST: $585,000 from 238th St. SW to 234th ST. SW - PARK LL EonnoNos SALGALL APTS m w w LL CH RIST LN TH E RAN CH N RCH O PARK & RIDE OFFICE 23601 4 23603 SAFEWAY $ 23605 Wn L KJIHG R 23607 SUNSET 23619 0 P Q ��� R AURORA S MARKETPLACE T N FAMILY RA NCAKE U '7-77" 73$TH 5T 5w W SEOUL � 23827 PLAZA 2 23827 IL DGE 0" NORTH ry HAVEN z n MANOR w a � R p r~ } n•1L LO'N 13ROOK PROJECT DESCRIPTION: Install sidewalk along 84th Ave. W from 238th St .SW to 234th St. SW, with curb and gutter. This project ranked #5 in the Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: Begin design in 2024 (unsecured funding) COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 2025-2039 Planning/Study Engineering & Administration $90,000 Construction $495,000 1 % for Art TOTAL $90,000 $495,000 39 PROJECT NAME: 801h Ave. W Walkway ESTIMATED PROJECT COST: $1,199,000 from 206th St. SW to 212th ST. SW �IIIIIr1 �� PROJECT DESCRIPTION: Install sidewalk along 80th Ave. W from 206th St. SW to 212th St. SW with curb and gutter. This project ranked #1 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: The improvements will improve non -motorized transportation safety including for school kids due to proximity of several schools). SCHEDULE: 2022-2023 (funding unsecured). COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & Administration & ROW $333,000 Construction $1,663,000 1 % for Art TOTAL $333,000 $1,663,000 40 PROJECT NAME: 2nd Ave. S Walkway from ESTIMATED PROJECT COST: $30,000 James St. to Main St. 4t <1 NG 4 ►. PROJECT DESCRIPTION: Construct a missing link of sidewalk (approximately 100') on 2nd Ave. S between Main St. and James St. (Ranked #2 in Short Walkway Project list in 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: 2022 COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 -Planning/Study Engineering & Administration Construction 30,000 1 % for Art TOTAL $30,000 * all or part of this project may qualify for 1 % for the Arts 41 PROJECT NAME: 21811 St. SW Walkway ESTIMATED PROJECT COST: $1,305,000 from 76th Ave. W to 84th Ave. W WOM �ZTl7 ■�M■■EM N■N�■ ■■ � 0 Tsoer' rsos ••x• R AXT m uw osa eu>o� ER 2HOG ar EVExe NE LT CENT ER PROJECT DESCRIPTION: Install sidewalk along 218th St. SW from 76th Ave. W to 84th Ave. W with curb and gutter. This project ranked #2 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE: The improvements will improve pedestrian safety. SCHEDULE: 2023-2024 unsecured funding COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & Administration & ROW $200,000 Construction $1,105,000 1 % for Art TOTAL $200,000 $1,105,000 42 PROJECT NAME: Walnut St. Walkway from 3rd ESTIMATED PROJECT COST: $105,000 Ave. S to 4th Ave. S ARTS W ENTER a Z UNDOW NEI N ALDER ALDER ST 346 414 412 410 arking 5 5 LA UJ o SOUND VIEW o: HOWELL WAY W a x v DAYTON ST OLD MILLTOWN MAPLE ST TRIC ALDER ST N W a FBECKWT'S z BAN K T- 409 530Pancak 407 540 Hau s 4003 546 0 401 w a WALNUT Sr --F GREGORY e H 525 PROJECT DESCRIPTION: Construct a missing link of sidewalk (approximately 350') on Walnut St. between 3rd Ave. S and 4th Ave. S (ranked #3 in Short Walkway Project list in 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Engineering & Construction scheduled for 2022 (unsecured funding). COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Stud Engineering & Administration $10,000 Construction $95,000 1 % for Art TOTAL $105,000 " all or part of this project may qualify for 1 % for the Arts 43 PROJECT NAME: 216th St. SW Walkway from ESTIMATED PROJECT COST: $157,000 Hwy. 99 to 72nd Ave. W 21400 � JJ 7200 B&M PARK & RIDE CONS E ar- w 21410 21408 0. MAN J � o � 21401 21412 � v M1 2140 U v 214G7 W � �507 w � W / 21511 j 21431 M DONAL6' { IL y o Y N 0 21521 N I M STEVEN 21500 E T AEGIS 215587 VALUE VILLAGE 21BTH $T Z 120 16 TJ1 :VEN5 21600 { 21619 ci' tILION KRUGER *Aq CLINIC , .01 PROJECT DESCRIPTION: Install 150' sidewalk on north side of 216th St. SW from Hwy. 99 to 72nd Ave. W (completing a missing link on north side of stretch). This project ranked #3 in the Short Walkway List (from 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Engineering & Construction scheduled for 2022 (unsecured funding). COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & Administration $30,000 Construction $127,000 1 % for Art TOTAL $157,000 * all or part of this project may qualify for 1 % for the Arts 44 PROJECT NAME: 238th St. SW Walkway from ESTIMATED PROJECT COST: $712,000 Hwy. 99 to SR-104 i 1 L PROJECT DESCRIPTION: Ranked #10 in Long Walkway list from 2015 Transportation Plan. Install 7' sidewalk on the north side of 238th St. SW. PROJECT BENEFIT/RATIONALE: Improve pedestrian safety along that stretch and creating safe pedestrian connection between Hwy. 99 and 76th Ave. W. SCHEDULE: The construction phase began in May'18 and was completed in August '18. Documentation will be completed in 2019. A TIB grant was secured to fund the design and construction phases. COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & Administration Construction $5,750 1 % for Art TOTAL $5,750 * all or part of this project may qualify for 1 % for the Arts. 45 PROJECT NAME: Elm Way Walkway from ESTIMATED PROJECT COST: $830,000 8t" Ave. S to 9t" Ave. S 4 �^ I r. 220TH 5T c I L L PROJECT DESCRIPTION: Install sidewalk along Elm Way from 8t" Ave. S to 9t" Ave. S. This project ranked #6 in the Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2022-2023 (funding unsecured). A Safe Routes to School grant was submitted in April 2018 to fund the design and construction phases (pending response). COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & Administration $175,000 Construction $655,000 1 % for Art TOTAL $175,000 $655,000 Erg, PROJECT NAME: Maplewood Dr. Walkway ESTIMATED PROJECT COST: $2,330,000 from Main St. to 2001h St. SW PROJECT DESCRIPTION: Construct sidewalk on Maplewood Dr. from Main St. to 200th St. SW (- 2,700'). A sidewalk currently exists on 200th St. SW from Main St. to 76th Ave. W, adjacent to Maplewood Elementary School (rated #18 in the Long Walkway list of the 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: Create pedestrian connection between Maplewood Elementary School on 200th St. SW and Main St., by encouraging kids to use non -motorized transportation to walk to / from school. SCHEDULE: Engineering scheduled for 2022 and construction in 2023 / 2024 (funding unsecured). A Pedestrian and Bicycle Program grant application was submitted in 2018 to fund the design phase (response pending). COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & $436,000 Administration Construction $947,000 $947,000 1 % for Art TOTAL $436,000 $947,000 $947,000 * all or part of this project may qualify for 1 % for the Arts. 47 PROJECT NAME: Dayton St Walkway ESTIMATED PROJECT COST: $252,500 between 7t" Ave. S and 8t" Ave. S FMONM 5f S2 � vT r USr= — — }. •l��lt III IYI * �j .... ----------------------- MAIM S7 �: • -- .T �-ice � �I '���11 I�,� --------------------- _ k-1I d Fr �� _a■: �i�I1�lEleiil'Isi�l 011' I01t0141 ALDOL§ � Vj- LNli I Y' PROJECT DESCRIPTION: Construct a missing link of sidewalk Dayton St. between 7tn Ave. S and 8t" Ave. S and additional sidewalk improvements along the rest of the stretch (ranked #1 in Short Walkway Project list in 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Construction is scheduled for 2019 (as part of the Dayton St. Utility Improvements project). A Complete Streets grant is reasonably expected to be secured in 2019 to fund the construction of this project. COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & Administration Construction $252,500 1 % for Art TOTAL $252,500 * all or part of this project may qualify for 1 % for the Arts. 48 PROJECT NAME: 951h PI. W Walkway from ESTIMATED PROJECT COST: $585,000 224th ST. SW to 220th St. SW PROJECT DESCRIPTION: Install sidewalk along 95th PI. W from 224th ST. SW to 220th ST. SW, with curb and gutter. This project ranked #8 in the Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: Engineering scheduled for 2022 and construction in 2023 (funding unsecured). COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & Administration $100,000 Construction $485,000 1 % for Art TOTAL $100,000 $485,000 49 PROJECT NAME: Railroad Ave. Sidewalk from ESTIMATED PROJECT COST: $862,000 Dayton St. to SR-104 bt. 4fi P❑�tio-� W NAY TON 5T a ? Fo �ONn. ea a - 041� DAYTON ST PROJECT DESCRIPTION: Install new and wider sidewalk along Railroad St. from Dayton St. to SR-104. PROJECT BENEFIT/RATIONALE: Improve non -motorized transportation safety along Railroad St. from Dayton St. to SR-104, key stretch since connects to various destination points such as Senior Center, Port of Edmonds, Downtown Edmonds... . SCHEDULE: All Phases are scheduled in 2022 and 2023 (unsecured funding for all phases). COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & Administration & ROW $160,000 Construction $702,000 1 % for Art TOTAL $160,000 $702,000 50 PROJECT NAME: SR-104 @ 76th Ave. W non- I ESTIMATED PROJECT COST: motorized transportation safety improvements $1,210,000 mr— Ra In a. IqN r� w MS. -V ��19 kd,jdN95 WAraFFRq .. _ � LAKE BA LINGER WAY ----- - Tm0F 0N0S WAY PLO a ,.fir r s� sw zr --�dND5 RFLIIVF LAKi iiAL1.IN PROJECT DESCRIPTION: Extend bike lanes within proximity of the intersection in northbound and southbound directions. Install APS on all corners and new ADA curb ramps. PROJECT BENEFIT/RATIONALE: Improve non -motorized transportation safety along this section of the Interurban Trail. SCHEDULE: All Phases are scheduled in 2022 and 2023 (unsecured funding for all phases). This intersection is shared with Shoreline and they own the traffic signal. COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & Administration & ROW $224,000 Construction $986,000 1 % for Art TOTAL $224,000 $986,000 51 PROJECT NAME: 191th St. SW Walkway ESTIMATED PROJECT COST: $630,000 from 80th Ave. W to 76th Ave. W 1� 192ND PL 5W PROJECT DESCRIPTION: Install sidewalk along 191th St. SW from 80th Ave. W to 76th Ave., with curb and gutter. This project ranked #8 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2025-2039 COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 2025-2039 Planning/Study Engineering & Administration $90,000 Construction $540,000 1 % for Art TOTAL $630,000 52 PROJECT NAME: 10411 Ave. W Walkway ESTIMATED PROJECT COST: $990,000 from 238th St. SW to 106th Ave. W PROJECT DESCRIPTION: Install sidewalk along 104th Ave. W from 238th ST. SW to 106th Ave. W, with curb and gutter. This project ranked #10 in the Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2025-2039 COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 2025-2039 Planning/Study Engineering & Administration $150,000 Construction $840,000 1 % for Art TOTAL $990,000 53 PROJECT NAME: 801h Ave. W Walkway ESTIMATED PROJECT COST: $315,000 from 218th St. SW to 220th St. SW --------�-ITT---------------220THSTSW- PROJECT DESCRIPTION: Install sidewalk along 80th Ave. W from 218th ST. SW to 220th ST. SW, with curb and gutter. This project ranked #7 in the Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2025-2039 COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 2025-2039 Planning/Study Engineering & Administration $55,000 Construction $260,000 1 % for Art TOTAL $315,000 54 PROJECT NAME: 84th Ave. W Walkway ESTIMATED PROJECT COST: $315,000 from 188th St. SW to 186th St. SW ■■ , i T r �. 5wUJ 186TH ST W m l I ' �MM mm� Ir"lam rl w F■ i-� r ■ --. 18 TH 5 5W ■ 1 L A F A 188TH 5T 5W LE 4 ■r7 ■ P ' L ' U r •; a _ L r ■ o J r ir , r SFAMF W PROJECT DESCRIPTION: Install sidewalk along 84th Ave. W from 188th St. SW to 186th St. SW., with curb and gutter. This project ranked #5 in Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2025-2039 COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 2025-2039 Planning/Study Engineering & Administration $60,000 Construction $255,000 1 % for Art TOTAL $315,000 55 PROJECT NAME: 23611 St. SW Walkway ESTIMATED PROJECT COST: $765,000 from Hwy 99 to 76th Ave. W ■ 236TH T W 23607 23603 SAFEN 23605 E KJI 23607 NON PROJECT DESCRIPTION: Install sidewalk along 236th St. SW from Hwy 99 to 76th Ave. W. This project ranked #10 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2025-2039 COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 2025-2039 Planning/Study Engineering & Administration $115,000 Construction $650,000 1 % for Art TOTAL $765,000 56 PROJECT NAME: 23811 St. SW Walkway ESTIMATED PROJECT COST: $1,170,000 from Hwy 99 to 76th Ave. W 1 PARK r .•nrIRL NA LN ' , ■ ' EOMONOs APTS BALL ' • • 1 ��r� W w Ov NORTH m CH RIST LH THE RAN CHURCH S N PARK & RIDE R n - 2 TH T OFFICE ■ d `� ,4 , W r SAFEWAY � L KJIHG FC,� I ' L • . SUNSET '•n•1L LO•n: CEj BROOK ■ AURORA- MARKETPLACE FAMILYPANCAKE j7' � 1 ■ 238TH ST SW "' ■ ■ ■ 23821 seouL PLAZA ' ■ ► 1 23827, TRAVEL LODGE 2397 ■ -MISISON TACO TIM ■ ST. FRA NCIS MOTEL WHSE ■ . . . - ■ ■ ■ _+ K&EMOTEL 1 1 ■ ■ RT_II I F 1 ■ ■ ■ , IN ■ ■ :yA PROJECT DESCRIPTION: Install sidewalk along 238th St. SW from Hwy. 99 to 76th Ave. W This project ranked #10 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2025-2039 COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 2025-2039 Planning/Study Engineering & Administration $175,000 Construction $995,000 1 % for Art TOTAL $1,170,000 57 PROJECT NAME: 801h Ave. W / 180th St. ESTIMATED PROJECT COST: $2,135,000 SW Walkway from 188th St. SW to OVD PROJECT DESCRIPTION: Install sidewalk along 80th Ave. W from 188th St. SW to OVD. This project ranked #13 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2022-2023 (unsecured funding). A Safe Routes to School grant application was submitted in April 2018 to fund the design and construction phases (pending response). COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 2025-2039 Planning/Study Engineering, ROW, & Administration $440,000 Construction $1,695,000 1 % for Art TOTAL $440,000 $1,695,000 58 PROJECT NAME: 189th PI. SW Walkway ESTIMATED PROJECT COST: $585,000 from 80th Ave. W to 76th Ave. W PROJECT DESCRIPTION: Install sidewalk along 189th PI. SW from 80th Ave. W to 76th Ave. W. This project ranked #14 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2025-2039 COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 2025-2039 Planning/Study Engineering & Administration $115,000 Construction $470,000 1 % for Art TOTAL $585,000 59 PROJECT NAME: Ferry Storage ESTIMATED PROJECT COST: $357,000 Improvements from Pine St. Dayton St. PROJECT DESCRIPTION: Modify existing lane channelization on SR104 to add vehicle storage for ferry users. PROJECT BENEFIT/RATIONALE: Reduce conflicts between ferry storage and access to local driveways. SCHEDULE: 2022 (unsecured funding) COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Engineering & Administration $50,000 Construction $307,000 1 % for Art TOTAL $357,000 60 PROJECT NAME: Edmonds Street Waterfront ESTIMATED PROJECT COST: $29,885,000 Connector .{ PROJECT DESCRIPTION: This project builds a grade -separated overcrossing over the railroad tracks as an extension of Edmonds Street connecting to Brackett's Landing north park (project identified in Edmonds Waterfront Alternatives Access Study completed in 2016). PROJECT BENEFIT/RATIONALE: Provide access for emergency vehicles, pedestrians, and bicycles. The overpass could be utilized to offload passenger vehicles from a ferry during an extended closure of the railroad track crossings. SCHEDULE: 2019-2022. A State Appropriation for $700,000 was secured in 2017. In 2018, an additional State Appropriation for $6,000,000 was secured. BUILD, FMSIB, TIGER, FASTLANE, and Pedestrian and Bicycle Program grants were submitted in 2018 to fund the remaining costs to complete the project (pending response). In 2019, RCO and Ecology grants will be submitted. COST BREAKDOWN PROJECT 2019 2020 2021 2022 2023 2024 2025-2039 COST Planning/Study Engineering & $3,000,000 $3,000,000 Administration Right of Way / $12,500,000 $9,000,00 Environment Mitigation Construction TOTAL $3,000,000 $3,000,000 $12,500,00 $9,000,000 61 62 City of Edmonds Capital Facilities Plan (CFP) Stormwater Projects (2019-2024) Project Name Purpose Grant Opportunity Grant/Date Current Project Phase (2019-2024) Total Cost Revenue Source 2019 2020 2021 2022 2023 2024 Dayton St and Hwy 104 Drainage Add lift station and other new infrastructure to reduce County (12/2017) $545,000 (Federal or State secured) $545,000 Improvements. intersection flooding. FEMA (1/2019) Design $500,000 (Federal or State unsecured) $500,000 $877,000 (DebUStormwater Fees) $877,000 $1,922,000 Total $1,922,000 $0 $0 $0 $0 $0 Edmonds Marsh / Willow Creek/Daylighting Daylight Willow Creek through the Edmonds Marsh, across Marina Beach to the Puget Sound, thus increasing connectivity RCO SRF Grant $9,090,000 (Federal or State unsecured) $200,000 $4,445,000 $4,445,000 to upstream spawning habitat for salmonid species and other aquatic life. Excavate tidal channels within the marsh and possible GranUTBD Study $100,000 (BEET) $25,000 $25,000 $25,000 $25,000 clean out SR104 culverts to improve hydrology and reduce $1,910,000 (Debt/Stormwater) $75,000 $775,000 $530,000 $530,000 flooding during high flows. $11,100,000 Total $100,000 $1,000,000 $5,000,000 $5,000,000 $0 $0 Perrinville Creek High Flow Find solution to high peak stream flows caused by excessive Ecology Grant $0 (Federal or State secured) Reduction/Management Project - stormwater runoff that erodes the stream, causes flooding and Possible Grant/TBD Study $510,450 (Federal or State unsecured) $510,450 Seaview Park Infiltration Facility has negative impacts on aquatic habitat. $363,625 (DebUStormwater Fees) $76125 $125,000 $125,000 $12,500 $12,500 $12,500 $874,075 Total $76:125' $125,000 $125:000 $522,950 $12:500 $12,500 Total CFP $13,896,075 IT Annual CFP Totals $2,098,125 1 $1,125,000 1 $5,125,000 1 $5,522,950 1 $12,500 $12,500 Revenue Summary by Year Totals Source 2019 1 2020 1 2021 1 2022 1 2023 1 2024 $9,635,000 Total Federal 8 State (Secured) $545,000 $200,000 $4,445,000 $4,445,000 $0 $0 $1,110,450 Total a era ae (Unsecured) $525,000 $25,000 $25,000 $535,450 $0 $0 $3,150,625 e t tormwater ees $1,028,125 $900,000 $655,0001 $542,500 $12,500 $12,500 PROJECT NAME: Dayton St and Hwy 104 ESTIMATED PROJECT COST: $2.41VI Drainage Improvements �2�1 o O S ■ram • �gr v° T GJ �200 200 _Qqp ECM❑ w�Sl -?ql 1461 Q PROJECT DESCRIPTION: Add lift station in the Beach Place parking lot and other new stormwater infrastructure. PROJECT BENEFIT/RATIONALE: To reduce flooding at the intersection of Dayton St and State Hwy 104. SCHEDULE: Construction scheduled for 2019. COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Eng. & Admin. $23,000 Construction $1,884,000 1 % for Art $15,000 TOTAL $1,922,000 65 PROJECT NAME: Edmonds Marsh / Willow Creek ESTIMATED PROJECT COST: TBD Daylighting Edmonds Marsh as seen from the viewing platform. Previously restored section of Willow Creek. Source: www.unocaledmonds.info/clean-u /p gallery_php PROJECT DESCRIPTION: Daylight Willow Creek through the Edmonds Marsh, across Marina Beach to the Puget Sound, thus increasing connectivity to upstream spawning habitat for salmonid species and other aquatic life. Excavate tidal channels within the marsh and clean out SR104 culverts to improve hydrology and reduce flooding during high flows. PROJECT BENEFIT/RATIONALE: The daylighting of Willow Creek and subsequent redevelopment of Marina Beach park will help reverse the negative impacts to Willow Creek and Edmonds Marsh that occurred when Willow Creek was piped in the early 1960s. This project will provide habitat for salmonids, including rearing of juvenile Chinook. This project, along with its companion CIP projects "Edmonds Marsh Channel Improvements" and "Dayton Street Pump Station," will also help reduce the flooding problem at the intersection of SR-104 and Dayton Street. This project is a priority in the Edmonds Comprehensive Plan. SCHEDULE: 2019 - 2024 COST BREAKDOWN PROJECT COST 2019 2020 2021 2022 2023 2024 Planning/Study Eng. & Admin. $100,000 $1,000,000 $5M $5M Construction 1 % for Art TOTAL $100,000 $1,000,000 $5M $5M 66 PROJECT NAME: Perrinville Creek High Flow ESTIMATED PROJECT COST: $21VI to $10M Reduction/Management Project ue �d 172 n y 4 °' 173 d T31t]Ot PerrinvilleN„ Frederick Creek th ti M 77t 1 7 h 78th 79th a Z H 180 1 Oth c°7o h `m 181s 2nd 18 nd 4` c a4t 1 00 a�' a Q�r at , 185th °O 85th o u* N 87th 4 Q,., 18 h 1-- t r f. c i Pcrrinville Creek Channel illustrating the channel incision that will be addressed by restoration. PROJECT DESCRIPTION: A flow reduction study for the Perrinville Creek basin was completed in 2014. This study recommended a number of flow control and water quality projects to improve the conditions in Perrinville Creek. The City applied for and won a grant from the Department of Ecology for $633,750 to design and construct a stormwater infiltration facility in Seaview Park. This facility is being constructed and will be completed by the end of 2018. The dollars allocated in the out years are to implement additional water quality and flow control projects in the Perrinville Creek basin as recommended by the Flow Reduction Study. PROJECT BENEFIT/RATIONALE: Urbanization of the Perrinville Creek Basin has increased flows in the creek, incision of the creek, and sedimentation in the low -gradient downstream reaches of the creek. Before any habitat improvements can be implemented, the flows must be controlled or these improvements will be washed away. SCHEDULE: Construction at Seaview park taking place in 2018. Other open sites to be determined in the future. COST BREAKDOWN PROJECT 2019 2020 2021 2022 2023 2024 COST Planning/Study Eng. & Admin. $10,000 $125,000 $125,000 $12,500 $12,500 $12,500 Construction $65,000 $510,450 1% for Art $1,125 TOTAL $76,125 $126,250 $126,250 $12,500 $12,500 $12,500 67 68 SUMMARY OF ORDINANCE NO.4137 of the City of Edmonds, Washington On the 11 th day of December, 2018, the City Council of the City of Edmonds, passed Ordinance No. 4137. A summary of the content of said ordinance, consisting of the title, provides as follows: AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING AMENDMENTS TO THE CAPITAL FACILITIES PLAN ELEMENT OF THE COMPREHENSIVE PLAN; AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. The full text of this Ordinance will be mailed upon request. DATED this 12th day of December, 2018. - <: --� 7 '1 - CI E , SCOTT ASSEY -3- Everett Daily Herald Affidavit of Publication State of Washington } County of Snohomish } ss Dicy Sheppard being first duly sworn, upon oath deposes and says: that he/she is the legal representafivc of the Everett Daily Herald a daily newspaper. The said newspaper is a legal newspaper by order of the superior court in the county in which it is published and is now and has been for more than six months prior to the date of the fast publication of the Notice hereinafter referred to, published in the English language continually as a daily newspaper in Snohomish County, Washington and is and always has been printed in whole or part in the Everett Daily Herald and is of general circulation in said County, and is a legal newspaper, in accordance with the Chapter 99 of the Laws of 1921, as amended by Chapter 213, Laws of 1941, and approved as a legal newspaper by order of the Superior Court of Snohomish County, State of Washington, by order dated June 16, 1941, and that the annexed is a true copy of EDH837962 4136, 4137, 4138 as it was published in the regular and entire issue of said paper and not as a supplement form thereof for a period of 1 issue(s), such publication commencing on 12/14/2018 and ending on 12/14/2018 and that said newspaper was regularly distributed to its subscribers during all of said period. The a aunt of the fee for such publication is $44.72. Subscribed and sworn before me on this day ofG —61JA4 A— .� Notary Pubii in and for the State of Washington. City of Edmonds - LEGAL ADS 114101416 SCOTT PASSEY RECEIVED DEC 2 0 7018 EDMONDS CITY CLERK AUBREY KNAPP Notary Public State of Washington My Commission Expires July 30, 2022 Classified Proof ORDINANCE SUMMARY of Ihs City. vS Edmonds, WasningWn On The 11 th day of Ilecornber, Pk1e, the City Cuurie ll of the City at Edmonds, passed the fa8i7vrtn@ Ordiriancea, Lhe bumrneflea a! said Crdlnn11C08 Cdnil Sting of u@BS are proyldeq.rre Td1I0HlS: ORDINANCE HO- 4138 AN ORDINANCE OF THE CITY OF EDMONDS! WASHINOTON, RELATING TOTHE BUDGET FOR FISCAL YEAR COMMENCING 4ANUARY 1, 2052 AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE ORDINANCE No. 4137 AN ORDINANCE OF THE CITY OF EDMONDS. WASHINGTON, ADOPTING AMENDMENTS TO THE CAPITAL FACILITIES PLAN ELEMENT OF THE COMPREHENSIVE PLAN: AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. ORDINANCE NO, 4t38 AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING ORDINANCE NO, 4120 AS A RESULT OF UNANTICIPATED TRANSFERS AND EXPENDITURES OF VARIOUS FUNDS, AND FIXING A TIME WHEN TWE SAME SMALL BECOME EFFECTIVE. The Wil lex[ of these Oddaanees will be mailed upon request. DATED this t2lAday ofDecember, TpCLERK SCOTT PASSEY PubmbhCd: December 14; 2Q19: EOH837952 RECEIVED DEC 2 0 2018 EDMONDS CITY CLERX Proofed by Sheppard, Dicy, 12/14/2018 08:16:51 am Page: 2