HomeMy WebLinkAbout2015.12.15 CC Agenda Packet
AGENDA
EDMONDS CITY COUNCIL
Council Chambers ~ Public Safety Complex
250 5th Avenue North, Edmonds
BUSINESS MEETING
DECEMBER 15, 2015
7:00 P.M. - CALL TO ORDER / FLAG SALUTE
1.(5 Minutes)Roll Call
2.(5 Minutes)Approval of Agenda
3.(5 Minutes)Approval of Consent Agenda Items
A.AM-8192 Approval of draft City Council Meeting minutes of December 8, 2015.
B.AM-8190 Approval of claim checks #217509 through #217611 dated December 10, 2015 for
$1,414,663.37.
C.AM-8187 Acknowledge receipt of Claims for Damages from Brandon Mar ($1,353.00) and
William Wilson ($22,903.62).
D.AM-8183 Approval of Resolution Thanking Councilmember Joan Bloom for her Service as a
Councilmember.
E.AM-8181 Approval of Resolution Thanking Councilmember Lora Petso for her service as a
Councilmember.
F.AM-8185 Approval of Resolution thanking Ferrari “Ari” Girouard for her service as a Student
Representative.
4.Audience Comments (3 minute limit per person)*
*Regarding matters not listed on the Agenda as Closed Record Review or as Public
Hearings
5.PRESENTATIONS/REPORTS
Packet Page 1 of 564
A.(5 Minutes)
AM-8184
Presentation of Resolution and Plaque thanking Councilmember Bloom for her service
as an Edmonds City Councilmember.
B.(5 Minutes)
AM-8182
Presentation of Resolution and Plaque Thanking Councilmember Lora Petso for Her
Service on the Edmonds City Council.
C.(5 Minutes)
AM-8186
Presentation of Resolution and Plaque to Ferrari “Ari” Girouard for her service as
Student Representative
D.(20 Minutes)
AM-8188
Hearing Examiner Annual Report
6.ACTION ITEMS
A.(10 Minutes)
AM-8116
Review and Adoption of Comprehensive Emergency Plan and Debris Management Plan
7.STUDY ITEMS
A.(10 Minutes)
AM-8166
Presentation of an Agreement with the State of Washington Department of Ecology for
a Municipal Stormwater Capacity Grant
B.(60 Minutes)
AM-8191
Review and Potential Action on the Critical Area Regulations Update
8.(15 Minutes)Reports on Outside Board and Committee Meetings
9.(5 Minutes)Mayor's Comments
10.(15 Minutes)Council Comments
11.Convene in executive session regarding pending or potential litigation per RCW
42.30.110(1)(i).
12.Reconvene in open session. Potential action as a result of meeting in executive session.
ADJOURN
Packet Page 2 of 564
AM-8192 3. A.
City Council Meeting
Meeting Date:12/15/2015
Time:Consent
Submitted By:Scott Passey
Department:City Clerk's Office
Type: Action
Information
Subject Title
Approval of draft City Council Meeting minutes of December 8, 2015.
Recommendation
Review and approve meeting minutes.
Previous Council Action
N/A
Narrative
Attachment 1 - Draft Council Meeting Minutes
Attachments
Attachment 1 - 12-08-15 Draft Council Meeting minutes
Form Review
Form Started By: Scott Passey Started On: 12/11/2015 08:25 AM
Final Approval Date: 12/11/2015
Packet Page 3 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 1
EDMONDS CITY COUNCIL DRAFT MINUTES
December 8, 2015
The Edmonds City Council meeting was called to order at 7:00 p.m. by Mayor Earling in the Council
Chambers, 250 5th Avenue North, Edmonds. The meeting was opened with the flag salute.
ELECTED OFFICIALS PRESENT
Dave Earling, Mayor
Adrienne Fraley-Monillas, Council President
Diane Buckshnis, Councilmember
Kristiana Johnson, Councilmember
Lora Petso, Councilmember
Joan Bloom, Councilmember
Thomas Mesaros, Councilmember
Michael Nelson, Councilmember
ALSO PRESENT
Ari Girouard, Student Representative
STAFF PRESENT
Al Compaan, Police Chief
R. Speer, Police Officer
Phil Williams, Public Works Director
Carrie Hite, Parks, Rec. & Cult. Serv. Dir.
Patrick Doherty, Econ. Dev & Comm. Serv. Dir.
Shane Hope, Development Services Director
Scott James, Finance Director
Deb Anderson, Accountant
Rob English, City Engineer
Jeff Taraday, City Attorney
Scott Passey, City Clerk
Jerrie Bevington, Camera Operator
Jeannie Dines, Recorder
1. ROLL CALL
City Clerk Scott Passey called the roll. All elected officials were present.
2. APPROVAL OF AGENDA
COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCIL PRESIDENT FRALEY-
MONILLAS, TO APPROVE THE AGENDA IN CONTENT AND ORDER. MOTION CARRIED
UNANIMOUSLY.
3. APPROVAL OF CONSENT AGENDA ITEMS
Councilmember Buckshnis requested Item A be removed from the Consent Agenda.
COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCIL PRESIDENT FRALEY-
MONILLAS, TO APPROVE THE CONSENT AGENDA AS AMENDED. MOTION CARRIED
UNANIMOUSLY. The agenda items approved are as follows:
B. APPROVAL OF CLAIM CHECKS #217395 THROUGH #217508 DATED DECEMBER 3,
2015 FOR $547,158.83. APPROVAL OF PAYROLL DIRECT DEPOSIT AND CHECKS
#61974 THROUGH #61985 FOR $495,324.94, BENEFIT CHECKS #61986 THROUGH
#61993 AND WIRE PAYMENTS OF $546,088.13 FOR THE PAY PERIOD NOVEMBER
16, 2015 TO NOVEMBER 30, 2015
C. ACKNOWLEDGE RECEIPT OF A CLAIM FOR DAMAGES FROM WILLIAM
MARTENSON ($1,000.00)
Packet Page 4 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 2
ITEM A: APPROVAL OF DRAFT CITY COUNCIL MEETING MINUTES OF NOVEMBER 20TH,
NOVEMBER 24TH, AND DECEMBER 1ST, 2015
Councilmember Buckshnis pulled this item to abstain from the vote on the November 24, 2015 minutes
due to her absence from the meeting.
COUNCIL PRESIDENT FRALEY-MONILLAS MOVED, SECONDED BY COUNCILMEMBER
JOHNSON, TO APPROVE ITEM A. MOTION CARRIED (6-0-1), COUNCILMEMBER
BUCKSHNIS ABSTAINING.
4. AUDIENCE COMMENTS
Roger Hertrich, Edmonds, asked whether the Council was having a public hearing on the budget
tonight. Mayor Earling said there is nothing on the agenda for a public hearing on the budget. Mr.
Hertrich referred to “several attempted hearings” on the budget and the CFP combined. In the past, there
have been separate hearings on the budget and the CFP, allowing citizens three minutes to comment on
each. This year the public is allowed only three minutes to comment on both. He expressed concern that
combining the hearings reduced the opportunity for public participation and did not give the public
enough opportunity to present their concerns or the Council the ability to hear from citizens. He
recommended the Council adopt a policy to have separate public hearings on the budget and the CFP so
citizens have ample opportunity to speak.
5. PUBLIC HEARING
A. PUBLIC HEARING* AND POTENTIAL ACTION ON ORDINANCE BANNING
INSTALLATION OF CRUMB RUBBER ON PUBLICLY OWNED ATHLETIC FIELDS
WITHIN CITY LIMITS FOR ONE YEAR (*PUBLIC COMMENTS WILL BE LIMITED
TO 2-MINUTES PER PERSON)
Mayor Earling advised as there have been several public hearings on this issue, a decision was made to
limit comments to two minutes. He described the procedure for the two minute timing.
Councilmember Petso commented typically a change in the rules would be done via a vote of the Council.
As there did not seem to be an extraordinary number of people in the audience to comment, she suggested
the time limit be the usual three minutes.
Council President Fraley-Monillas explained a decision was made to limit comments to 2 minutes due to
the assumption there would be 25-50 people present to comment. Councilmember Petso said as there are
not, it would be reasonable to allow speakers three minutes.
COUNCILMEMBER BLOOM MOVED, SECONDED BY COUNCILMEMBER PETSO, TO
REVERT TO THREE MINUTES AS USUAL FOR THE COMMENT PERIOD. MOTION
CARRIED UNANIMOUSLY.
Development Services Director Shane Hope said the City Council is aware of concerns raised about
crumb rubber/SBR, a material used for sports field surfaces and other uses. Citizens have spoken both for
and against the use of crumb rubber over the past several months. The Council has reviewed and
discussed the issue a number of times. At this time the City does not have evidence that crumb rubber on
sports fields causes cancer or other serious health conditions; however, the City is aware the current
information is not conclusive and that the issue will be studied further. Therefore, the Council wishes to
take a cautious approach in the interim and at its December 1, 2015 meeting directed the City Attorney to
prepare an ordinance that would the installation of ban crumb rubber on publicly owned playfields within
Packet Page 5 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 3
Edmonds for one year. During that period of time, the City will review information including any new
studies about the impacts of SBR and, depending on what is learned, the Council can extend the ban,
make it permanent, lift it or change it.
The City Attorney prepared an ordinance that provides for a one year ban while further analysis on the
effects of crumb rubber on human health and the environment is conducted. In addition to the ordinance
included in the Council packet, the City Attorney prepared an alternative draft that adds more specific
language stating that during the ban crumb rubber cannot be installed on existing fields that have crumb
rubber if substantial renovations are done. Following tonight’s public hearing the Council can discuss,
take action to adopt the original ordinance in the packet or the alternative ordinance, and make any
amendments.
Councilmember Bloom referred to the revised draft ordinance and asked if that could be posted or made
available to the public or could the changes be described. City Attorney Jeff Taraday explained after the
original draft was sent to Council, he requested Council feedback. The revisions to the ordinance are
intended to address some of the Council feedback. He summarized the changes:
• Added a whereas clause that references the EPA Q&A on its website, one particular Q&A that
responds to the question, What advice does EPA have for communities who are concerned about
tire crumb?
• Amended the definition of SBR to clarify it is not solely used for infill material but also can be
used as a base layer.
• Add paragraph C to Section 2 that reads, “Install SBR on existing publicly-owned SBR athletic
fields within the City of Edmonds as part of a substantial renovation of such existing SBR fields,
provided that for maintenance purposes, infill top dressing of existing SBR fields shall be allowed
as needed to keep an appropriate amount of the fiber exposed and to maintain property infill
depth.”
Councilmember Buckshnis expressed concern with the lack of compilation of literature and
documentation to support a decision. She observed the ordinance referred to monitoring the status of
ongoing and new research and asked about the compilation of details to support a decision in case a
lawsuit occurs. With her background in regulatory issues, she wanted to ensure all bases were covered.
Mr. Taraday referred to Section 3 of the Ordinance that outlines in addition to the monitor provision in
3A, a report will be provided to the Council sometime in 2016. As far as the defensibility of this
ordinance, he said time will tell but felt the whereas clauses were strong enough to support a one year
ban. Councilmember Buckshnis agreed.
Councilmember Johnson asked if the Council should encourage speakers testifying at the public hearing
to cite their references or submit reports to add to the testimony. Mr. Taraday responded Councilmembers
may refer to studies during their deliberation, there has already been a lot of that discussion and citizens
have provided detailed information and cited studies; all of that is part of the legislative record. He
summarized it did not hurt for the public to cite specific things but it was not required.
Mayor Earling opened the public participation portion of the public hearing.
Laura Johnson, Edmonds, commented this has been a learning experience for everyone; she has learned
a lot about turf, science, marketing, and politics and has been given many chances to improve her public
speaking. Today she attended a presentation on turf safety and options. The presentation was attended by
about 40 burly guys and industry representatives, some of them second generation turf lineage and a few
big names in the turf industry. She was surprised to learn they were all there for the same reason,
concerns about crumb rubber and the desire to provide the safest fields. Field maintenance guys, school
facility representatives being proactive about parent concerns, industry guys; their concerns included
Packet Page 6 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 4
possible toxicity of crumb rubber, extreme heat in the summer on crumb rubber fields and certain
physical injuries increased by crumb rubber fields. She learned a lot about concussions and advances
made in turf safety. Heat is a huge issue; on an 80 degree day, the field can reach 140 degrees, a
dangerous temperature especially for children. It was a great presentation; she made wonderful contacts
and brought back many samples to share. They offered to provide a similar presentation for Edmonds and
she suggested inviting local cities, parks and recreation, and school districts. She thanked the Council for
doing their due diligence on the matter of turf safety and for looking at the big picture. She encouraged
the Council to approve a one-year or longer ban on the use of SBR crumb rubber on children’s
playgrounds and athletic fields.
Steve Margo, Edmonds, recalled he spoke to the Council in July about his son playing goalkeeper and
his experience as a soccer coach. As most of son’s games with SnoKing would be on crumb rubber fields,
they elected not to have him play soccer, the only sport he enjoys. There are a few fields like Civic Field
that are not crumb rubber. He thanked everyone for fighting against crumb rubber and the Council for
listening. He was encouraged the City was on the right track.
Jen Carrigan, Edmonds, commented it has been a long nine months. She thanked the Council for
listening and being willing to learn and be informed along with citizens throughout the process. She
would not be here if she did not believe based on emerging evidence that real lives will be impacted by
the Council’s decision. She was grateful for the Council hearing them and appreciated their willingness to
take a stand for children’s safety and the wellbeing of the environment via a ban on crumb rubber in
Edmonds for one year or longer. She was proud of decision-makers and was proud to part of the
community in Edmonds.
David Anderson, PhD in Toxicology from the University of Washington who did studies on the effect of
nuclear power plan effluence looking at multiple toxins, said he was here primarily because a
grandmother, Senator Maralyn Chase, asked him to come because she could not understand the science.
She asked him to find a paper she could understand. Dr. Anderson cited an Italian study he found that said
a person eating a certain food with a carcinogen in it gives the body a dose. The objective of the study
was to determine how much a person inhaled on a turf field and compare that to the dose a person would
get if they ate the product. Combining all the carcinogens in a toxic equivalence found a person was
getting 1,000 times the acceptable level if they ate the carcinogens. The study said it is not negligible if it
is breathed above the field surface if it was the normal temperature; the temperature makes a difference.
He also attended the same presentation Ms. Johnson attended and learned Allied Parks & Recreation are
installing fields that do not have infill or crumb rubber; NYC Parks & Recreation and Montgomery
County, Maryland are not installing SBR; University of Nebraska and University of San Francisco are
installing GeoTurf’ and Yale is requesting bids to replace a 3-year old crumb rubber field with GeoTurf
or an organic infill. He summarized Edmonds is not the first to determine crumb rubber is a bad idea;
others are doing it and there are materials to address the problem.
Cassie Goforth, Edmonds, and her son Jeff, thanked the Council for taking this step, being willing to
entertain it and being willing to look at the possibility of a ban on crumb rubber. She did not understand
how the School District could think it was a good idea to use this substance when so many benign
substances were available. She found it frustrating to write letters without a satisfactory reply. She was
encouraged there was a governing body willing to look at the data and listen to toxicologists and PhDs
share their expertise. She understood there was a possibility of a one year or longer ban, commenting in
her experience longitudinal studies provide the best data. She encouraged the Council to consider a three-
year ban when data will available from a study being done in California. She thanked the Council for
taking the time and process to benefit the community. She was proud Edmonds was on the forefront of
this important issue and protecting children.
Packet Page 7 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 5
Senator Maralyn Chase, Edmonds, said it was important to continue to bring the latest information
forward. She provided a November 17, 2015 report from the EPA, Tire Crumb Q&A which is consistent
with the action the Council is proposing to take. The EPA recommends communities look at alternatives
for playfields until the science is in. She appreciated Dr. Anderson’s comments about her inability to
understand the science. The EPA report references the California study; there is a lot of hope riding on
that study across the country including from Congress. She felt it was important for Edmonds to take a
stand until the latest science is available. The EPA report makes it clear that state and local governments
are responsible for governing crumb rubber. She could not propose to her colleagues in Olympia that the
science was in; it is not and the state must wait until the latest information is available. Another issue that
hasn’t been address is what happens to people working on the fields when it gets very hot; her
understanding was there had only been one death attributed to overheating. She was hopeful the
California study will provide the necessary information in one year but recognized it may be three years.
She thanked the Council for their diligence and said she was proud to live in Edmonds.
Emma Johnson, Edmonds, said toxins are really bad and we really don’t know if it is safe to put them
on fields. She thanked the Council for taking measures to keep the public safe and said we shouldn’t be
experimenting on children with regard to things this serious.
Alexandra Markiel, Brier, said her mom’s PhD is in health service research so she has some knowledge
about the risks associated with using surrogate endpoints in clinical trials. She cited a drug that was
approved based on observed improvements and ECG tests. A postmark test comparing the efficiency of
new drugs to older drugs had to be discontinued prematurely when monitoring indicated the drug
significant increased mortality. It was estimated over 80,000 patients died as a result of the use of the
drugs. The relevance is no computer model or risk assessments can fully predict how the human body will
react to a chemical or chemical mixture. The only way to truly estimate the safety of crumb rubber is
trials on live animals. Since millions of children have already been exposed, data on their health should
be collected. To calculate the blood cancer risks in 15-24 year old goalies it is necessary to have a
complete accounting of all the 15-24 year old goalies who have developed cancer over a given time
period. This allows for a calculation of the incidence of blood cancer in this group which can then be
compared to the incidence of blood cancer of 15-24 years olds in the general population. If there is no
difference, it can be concluded that crumb rubber does not increase the risk of blood cancer in this age
group. She relayed numbers her mom ran to demonstrate precisely how much data would need to be
reviewed assuming the incidence of blood cancer in 15-24 year olds is 20 cases per 100,000 individuals.
She urged the Council to vote for kids, be bold and remember citizens voted them into office to represent
their interests and citizens have made their opinions very clear on this issue.
Christie Davis, Brier, reiterated it is up to Council to determine what to do. A bunch of data would be
needed to determine whether crumb rubber safe. The Council’s job is to protect citizens. The federal
government has already failed citizens; it was their job to determine whether crumb rubber full of
carcinogens was safe before it got on the market. Crumb rubber has been on the market for over 15 years;
scientists, doctors and citizens have all raised concerns but they have yet to mount a study on human
safety. As a result citizens like Ms. Johnson and she have spent countless hours doing research about
crumb rubber, looking at potential risks, researching alternate infills and presenting this information in
three minute segments to the Council, gathering signatures, written letter to newspapers, written opinion
pieces, given interviews, organized community presentations and peaceful protests, all of which have
taken time away from their families. She urged the Council to extend the ban to three years as no new
data proving the safety of crumb rubber will be available in the next year because a study of 100,000 or
more will be needed to prove it is safe. She urged the Council to hire a health effects researcher; if the
Council hired an industrial hygienist or an industry toxicologist, she feared everyone would be back again
in a year to debunk what they did. She submitted written materials to the City Clerk.
Packet Page 8 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 6
Kortney Hamilton, Edmonds, thanked the Council for their attention on crumb rubber infill. She hoped
the Council would pass the resolution so that more data could be collected and reviewed and in the
meantime no more crumb rubber infill would be installed. She understood the need for sports, having
been an athlete as a child, but she recommended the City pursue non-toxic alternatives. The Council’s
vote to practice precautionary principle via adoption of the resolution is a vote for the health of humans
and the environment. She supported a ban of at least one year if not more.
Roger Hertrich, Edmonds, complimented Councilmembers for the attention they have given to all
speakers, commenting everyone has learned a lot about crumb rubber. He urged the Council to speak with
great enthusiasm regarding a motion to ban crumb rubber. He preferred a three-year ban because it would
allow time for more studies. If the Council adopted a one-year ban, he recommended a public hearing at
the end of one year in order to renew the ban. He relayed talking to a man this week who used to play
soccer on crumb rubber fields. On a 70 degree day, he was taking break on a knee and breathed in the
fumes from the field and has had bronchial problems ever since. Whether they were directly related, the
man felt they were because he had never had a problem before that. He summarized that is an example of
what a ban will prevent.
Dave Page, Edmonds, commented the Council knows where he stands on crumb rubber. He made Mr.
Wambolt a $100 bet there would never be crumb rubber in Edmonds and had to pay on the bet; he would
like a chance to get his money back. He appreciated the Council’s attention and assumed
Councilmembers had made their decision. He summarized there was no need for further debate unless the
Council wanted a ban longer than one year.
Hearing no further comment, Mayor Earling closed the public participation portion of the public hearing.
Councilmember Mesaros suggested the following revisions to the ordinance:
• Revise the first whereas to read, “…the lack of full scientific certainty is not a reason for
postponing measures to prevent the any potential damage; and”
• Revise second to last whereas on the first page, “…these chemicals may have synergistic effects
and are present in levels that may pose a health risk; and”
Councilmembers agreed with the above revisions.
Council President Fraley-Monillas asked what would be required to extend the ban if at the end of one
year the Council did not have concise or complete information. Mr. Taraday answered another ordinance
would be required to extend the duration. Observing the ordinance has a sunset clause in Section 4,
Council President Fraley-Monillas asked if an automatic review could be added prior to the sunset date so
there is notification of the upcoming sunset date because if the ordinance was not extended, as written the
ban would expire as of the sunset date. Mr. Taraday said a possibility would be to add a subsection D to
Section 3 establishing a month within which a public hearing would be held. Council President Fraley-
Monillas observed the ban begins January 11 and extends through January 2017. She suggested a review
on December 1. Mr. Taraday clarified the ordinance takes effect 30 days after final passage; if adopted
tonight, the effective date would not be January 11. He preferred to have a specific date for expiration
rather than a year from the effective date. Council President Fraley-Monillas suggested the ordinance
require notification one month before the ordinance is due to expire.
Council President Fraley-Monillas asked what happens if the City miraculously learns something one way
or the other in six months, such as the EPA says crumb rubber is not allowed anywhere or says it’s safe
and can exist anywhere. She asked whether the Council could then lift the ban or make it permanent. Mr.
Taraday responded like any ordinance, this ordinance can be amended at any time. If something definitive
Packet Page 9 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 7
is revealed much earlier than expected, the Council could take action in response and that could occur
before expiration of the ordinance.
Councilmember Buckshnis asked whether the City had ever done a moratorium for 18 months so that it
expired in the summer instead of the end of the year. She was concerned with jamming everything into
end of the year. She supported gathering data to ban crumb rubber indefinitely. Mr. Taraday reiterated
this is not a GMA moratorium and the Council is not bound by the time limits on GMA moratoria. The
duration of the ban was the result of Council deliberation and voting at the last meeting; if the Council
wants an 18 month ban instead of 12 months, that is entirely up to the City Council.
Councilmember Bloom referred to the definition of publicly-owned athletic fields in the ordinance, noting
there is not a definition of athletic field. She asked whether the definition of publicly-owned athletic fields
included playgrounds. Mr. Taraday answered no, if by playground she meant things that little kids would
play on that have slides and climbing structures, athletic field does not include playgrounds. Since the
Council can change the ordinance at any time, Councilmember Bloom observed the Council could decide
at any time to increase it to three years, make it permanent or eliminate it. Mr. Taraday answered yes.
COUNCILMEMBER PETSO MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO
ADOPT ORDINANCE NO. 4013 WITH THE CHANGES SUGGESTED BY COUNCILMEMBER
MESAROS AND ALTERING THE TIMING SO THAT THE ORDINANCE IS EFFECTIVE
THROUGH JULY 11, 2017 AND ADDING A REQUIREMENT FOR A PUBLIC HEARING IN
JUNE OF 2017.
Councilmember Bloom referred to the requirement to hire someone to do the review and asked whether
that could be delineated in the ordinance to ensure an appropriate person was hired. Councilmember Petso
said she heard three titles mentioned during public comment; it was suggested the City was not looking
for an industry toxicologist or industrial hygienist; a health effects researcher may have been the title
suggested. She was uncertain that level of detail was necessary in the ordinance and trusted everyone
would recognize the review would be a waste of money if the right person was not hired and would make
every effort to hire the right person.
As the Council’s intent was to ban SBR, Councilmember Bloom asked why playgrounds were not
included. Councilmember Mesaros agreed with Councilmember Bloom that athletic field limits the intent.
He was concerned playground was a very loose definition. Mr. Taraday recommended keeping athletic
fields and playgrounds separate. If the Council wanted to ban the use of SBR on both, he recommended
doing it separately in different sections of the ordinance. Councilmember Mesaros asked whether that
could be done at later date Mr. Taraday answered yes.
MOTION CARRIED UNANIMOUSLY.
Mayor Earling declared a brief recess.
Mr. Taraday clarified the alternative ordinance will be amended to reflect:
• The public hearing amendment offered by Councilmember Petso will be placed in Section 3D and
read, “Conduct a public hearing in June 2017 to determine whether this ordinance should be
extended.”
• Sunset date changed from January to July
• The amendments proposed by Councilmember Mesaros are included
6. ACTION ITEMS
Packet Page 10 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 8
A. CONTINUED DELIBERATIONS AND ADOPTION OF 2016 BUDGET, INCLUDING
THE CAPITAL FACILITIES PLAN (CFP) ELEMENT OF THE COMPREHENSIVE
PLAN
Mayor Earling explained several agenda items scheduled tonight were moved to next week so that the
Council could discuss and hopefully pass the budget tonight. If not, an additional meeting has been
scheduled on December 22 for further budget deliberations.
Finance Director Scott James referred to a PowerPoint he provided Councilmembers summarizing the
remaining issues. He reviewed staff recommended changes to 2016 budget:
Item # Descriptions Cash Increase
(Decrease)
GENERAL FUND
1 Students Saving Salmon Club for Stream Testing ($5,000)
2 Reduce PFD Contingency Reserve to $135,000 from
$180,000
$45,000
3 Increase Funding for Prosecutor Contract (DP 39) ($12,000)
4 Include “Ongoing” Transfer to Sister City Fund 138 ($5,000)
Impacts to General Fund Ending Cash $23,000
Fund 112 Street Construction
5 Reduce Stormwater Funding ($187,500)
Impacts to Fund 112 Ending Cash ($187,500)
Fund 421 Water Utility Fund
5 Increase Stormwater Funding $187,500
Impacts to Fund 412 Ending Cash $187,500
COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER JOHNSON,
TO ADOPT THESE 5 AMENDMENTS RECOMMENDED BY STAFF TO THE 2016 BUDGET.
MOTION CARRIED UNANIMOUSLY.
Mr. James introduced 20 Council requested changes to the 2016 budget and the Council discussed and
took action on each:
Item # Description Cash Increase
(Decrease) Submitter
GENERAL FUND
1 Council Legislative Asst (DP 1). Move expense from
salaries and benefits to professional services
$0 Buckshnis
Councilmember Buckshnis explained the legislative assistant was included with videotaping in the
budget. She was moving this expense to the correct funding source.
COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER PETSO, TO
MOVE THE EXPENSE FOR THE COUNCIL LEGISLATIVE ASSISTANT FROM SALARIES
AND BENEFITS TO PROFESSIONAL SERVICES.
Councilmember Petso asked whether the intent was for this person to be an employee receiving salary and
benefits. Mr. James said Decision Package 1 included salary and benefits, but the thinking was this would
be a contract employee paid from professional services. Councilmember Buckshnis recalled she requested
this be a contract position rather than an employee because an employee would be under the supervision
of the Mayor; the Council’s executive assistant is a contract position and the intent is for this position to
be the same.
Packet Page 11 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 9
Council President Fraley-Monillas encouraged Council to support this change.
MOTION CARRIED UNANIMOUSLY.
Item # Description Cash Increase
(Decrease) Submitter
GENERAL FUND
2 Increase Council Contingency Funding by $10,000 ($10,000) Buckshnis
COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER MESAROS,
TO INCREASE COUNCIL CONTINGENCY FUNDING BY $10,000.
Councilmember Buckshnis commented although the Council has not spent this fund in its entirety in the
past, she felt it was important to keep the funding amount consistent. An amendment can be passed if
additional funding is necessary but that is a much more extensive process versus increasing the Council
Contingency budget. There is little impact on budget from restoring this fund to its normal level.
Council President Fraley-Monillas explained the budget for the Contingency Fund has been $25,000
every year; in 2012 the Council spent $660; $22,000 in 2013 which included the Council hiring its own
attorney for a situation; $8,400 in 2014; and nothing in 2015. She reduced it this year from $25,000 to
$10,000 because in her career in government there was never extra money just floating around; working
for the state there had to be specifics provided regarding how funds would be expended. She was okay
with increasing it to $25,000.
Councilmember Johnson asked whether Councilmember Buckshnis had any ideas for the funding.
Councilmember Buckshnis referred to Councilmember Johnson’s interest in $10,000 for a publication
regarding the alternatives study. She also hoped the Veterans Plaza will begin construction next year and
she would like the Council to make a donation to show their respect to veterans. Mayor Earling
commented City Attorney Jeff Taraday and Parks & Recreation Director Carrie Hite have urged caution
with regard to providing funds for the Veterans Plaza; funds for design are closer to being permissible
rather than just donation. Councilmember Buckshnis agreed.
MOTION CARRIED UNANIMOUSLY.
Item # Description Cash Increase
(Decrease) Submitter
GENERAL FUND
3 Reduce Council Travel Budget by $2,500 $2,500 Bloom
Councilmember Bloom asked the total amount of the Council travel budget, whether it had been increased
from $2,500 to $6,700, an increase of $4,200. Mr. James answered that is accurate; page 33 of the budget
book identifies $6,700 for travel. Councilmember Bloom asked whether travel also included lodging.
Council President Fraley-Monillas answered she increased the amount to cover travel, lodging, airfare,
trains, mileage, etc. Training occurs through the state and some Councilmembers do not have the fiscal
ability to attend. For example she recently authorized Councilmember Johnson to attend training; the City
paid for the training but she paid for the mileage and hotel. The intent was $950-$1000 for each
Councilmember to provide them the ability to attend training which ultimately is beneficial to citizens.
Councilmember Bloom asked if it covered airfare. Council President Fraley-Monillas answered
potentially, for example AWC meets in Spokane and a Councilmember may not want to drive in the
winter. The intent is $950 for each Councilmember; how Councilmembers chose to spend it was up to the
Packet Page 12 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 10
individual. Councilmember Bloom asked if it was only for in-state training. Council President Fraley-
Monillas answered not necessarily; for example AWC recently had training in Portland. She noted $1000
would not get a Councilmember very far or allow them to stay very long. Councilmember Bloom asked
whether the intent was for each Councilmember to have a certain amount and they either used it or lost it.
Council President Fraley-Monillas answered yes; it is intended for development for each Councilmember.
Councilmember Bloom withdrew her request, commenting she did not support Councilmembers flying
across the country for travel.
Item # Description Cash Increase
(Decrease) Submitter
GENERAL FUND
4 Reduce Council Training Budget by $2,250 $2,250 Bloom
Councilmember Bloom commented this seemed like a reasonable request, reducing the Council training
budget to $1,000 per Councilmember or $7,000.
COUNCILMEMBER BLOOM MOVED, SECONDED BY COUNCILMEMBER PETSO, TO
REDUCE THE COUNCIL TRAINING BUDGET BY $2,250.
For Councilmember Petso, Mr. James identified the Miscellaneous line item on page 33 of the budget
book, a budget amount of $9,250 for 2016. Councilmember Petso asked why it was labelled
Miscellaneous if it was intended as training. Mr. James answered registrations for conferences are
budgeted in that line item.
Council President Fraley-Monillas found reducing the training budget acceptable but reminded there are
costs for training.
Councilmember Johnson asked whether there was anything in Miscellaneous other than training. Council
President Fraley-Monillas recalled the Council Executive Assistant indicated there were other
miscellaneous expenditures. Mr. James was not aware of other expenditures included in that line item.
Council President Fraley-Monillas commented if there was a problem, funds from the Council
Contingency Fund could be used.
MOTION CARRIED UNANIMOUSLY.
Item # Description Cash Increase
(Decrease) Submitter
GENERAL FUND
5 Add Tree Board Funding for Staff Support & Supplies ($9,000) Bloom
COUNCILMEMBER BLOOM MOVED, SECONDED BY COUNCILMEMBER PETSO, TO ADD
$9,000 FOR TREE BOARD STAFF SUPPORT AND SUPPLIES.
Councilmember Bloom commented this is consistent with funds allocated in the budget for the Diversity
Commission; $6,000 to hire a contract person and $3,000 for supplies such as the Arbor Day celebration
and retaining the City’s Tree City USA status to apply for grants for matching funds to purchase trees for
the right-of-way, in parks, etc.
Council President Fraley-Monillas commented the reason the Diversity Commission was allocated that
much was they needed startup funds; it was her understanding that was not a permanent amount but a
temporary amount for them to get started. Councilmember Bloom responded a consultant is necessary for
Packet Page 13 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 11
the City to maintain its Tree City USA status which allows the City to apply for grants for matching funds
to purchase trees. To maintain Tree City USA status this year, the consultant gathered data regarding per
capita expenditures; that was previously done by a Tree Board Member but it is very time consuming and
difficult to do. The consultant would also organize Arbor Day events which also support the Tree City
USA status. A consultant is necessary because there is not a staff member to provide support to the Tree
Board.
Council President Fraley-Monillas asked what would be done with $9,000 and whether it was a request
from the department. Development Services Director Shane Hope answered this was prepared at
Councilmember Bloom’s request. She explained $3,000 was budgeted in 2015 for temporary consultant
assistance; approximately $2,000 has been used this year and conceivably the remaining $1,000 could be
carried forward. The proposed assistance via a contract person would be to attend monthly Tree Board
meetings, respond to questions that arise at meetings, coordinate with City departments about questions or
ideas, be a primary contact for and prepare the City’s annual Tree City USA application, identify grant
opportunities and develop grant applications, help organize Arbor Day and other events, facilitate
outreach and education about trees, an help with other activities within the scope and time available.
Supplies could be items needed for Arbor Day or other events, purchasing trees or publishing information
about trees.
Council President Fraley-Monillas observed $1,000 remained from the $3,000 budgeted in 2015. Ms.
Hope responded the $3,000 was not allocated until September and covered 4 months; approximately
$2,000 has been spent in 4 months. Council President Fraley-Monillas asked whether that was intended as
temporary or permanent assistance; Councilmember Bloom’s request appears to be for permanent
assistance for the Tree Board. Ms. Hope answered that is up to the City Council.
Councilmember Johnson referred to Decision Package #36, advanced planner, relaying the description
states support boards and commissions. She asked whether that planner would support the Tree Board.
Ms. Hope answered she originally proposed a full-time planner who would be able to provide more
support to boards and commissions; even a halftime planner would be able to provide some level of
support to the Tree Board and other boards and commissions but not a huge amount. Councilmember
Johnson said in theory she did not support the use of consultants for boards and commissions and
preferred to use staff for that function. She understood there are times that cannot be done but requested
administration see how it could be done within current staffing levels.
Councilmember Petso pointed out the list of Council requested changes includes a proposal to eliminate
the position Councilmember Johnson just referenced.
Councilmember Mesaros asked whether support of boards and commissions is done primarily by staff
and this would be an exception to that. Ms. Hope answered yes, in the past boards and commissions have
been solely supported by staff or board members other than consultant help for special projects. For the
first time at the end of 2015, funds were provided for consultant assistance for the Diversity Commission
and the Tree Board. Councilmember Mesaros said one of his concerns with the use of a consultant is
unintentional drift from what is going on in the City.
Councilmember Bloom reminded the Council has discussed this many times. The Tree Board had an
average of 12 hours/months of support when the Tree Code was being written; prior to that, when she was
on the Tree Board as a resident, there was no staff support other than the council assistant who posted
things online, there was no minute taker, no one to prepare the agenda, etc. When the Tree Board was
formed, Council was informed there was no staff support available so the Tee Board has limped along
without staff support. When Councilmember Buckshnis was Council President, funds were provided for a
minute taker and a door monitor; she recently learned those are not in budget which means the Tree Board
Packet Page 14 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 12
is back to square one without these funds. She acknowledged the budget is not the time to address this for
all boards and commissions; that should have been done via the subcommittee on boards and
commissions. The Tree Board needs support; without this funding the City will be unable to maintain its
Tree City USA certification. The consultant was enormously helpful in attaining that this year.
Councilmember Buckshnis commented this is like deja-vu; the reason there is a consultant for the
Diversity Commission is that requires someone that understands diversity, ethics, etc. If there is no staff
support for the Tree Board, there needs to be a consultant. Without this funding, the City will lose its Tree
City USA status and will continue to lose Tree Board Members.
Council President Fraley-Monillas commented the loss of board members has nothing to do with funding
or consultants.
COUNCIL PRESIDENT FRALEY-MONILLAS MOVED, SECONDED BY COUNCILMEMBER
PETSO, TO AMEND THE MOTION TO CHANGE THE AMOUNT TO $5,000.
Council President Fraley-Monillas said $5,000 plus $2,000 that was not used this year would provide
$7000 for 2016. She agreed the Tree Board needed funds to get up and running but doubted they needed a
permanent consultant. The Tree Board Chair determined that minutes are not needed and notes could be
taken which would reduce the expense. Providing $1,000 for supplies could be accomplished within a
$5,000 budget and $2,000 rolled over from 2015.
Councilmember Petso asked whether unspent amounts automatically roll over into the next year. Mr.
James answered typically unspent funds are not reallocated unless there is a budget amendment. A
carryforward amendment is traditionally done in February, usually for projects, not operating expenses.
He clarified the unused amount in 2015 was $1,000, not $2,000. He asked how the $5,000 would be
allocated.
Councilmember Mesaros asked whether Development Services will provide support to the Tree Board if
this request is not approved. Ms. Hope answered there would be some support from Development
Services as well as Parks & Recreation. Councilmember Mesaros asked if that assistance would fulfill
what Councilmember Bloom and Buckshnis requested such as maintaining the City’s Tree City USA. Ms.
Hope answered it could; it was great to have the consultant coordinate Tree City USA this year, however,
all the information came from staff. Councilmember Mesaros asked whether Ms. Hope recommended
including funds in the budget to utilize a consultant again for that coordinating role. Ms. Hope answered it
would helpful to have some funding; the full amount may not be needed.
Councilmember Johnson recalled this year there was a fund from which money for individual boards and
commissions could be allocated for specific projects. She asked whether that practice was continued in
this budget or should funds be specifically allocated for items such as saving salmon, historic
preservation, Tree Board, etc. Mr. James recommended the Council use the budget process for direct
allocations. He recalled discussion about procedures for boards/commissions to make requests from that
fund but was uncertain whether any funds had been allocated for boards and commissions this year.
Councilmember Johnson supported a dollar amount to assist the Tree Board with projects but preferred to
have staff provide support.
Councilmember Bloom did not envision that staff had the ability to provide support. She recalled Ms.
Hope saying staff could provide some support such as Tree City USA and asked whether staff could
organize an Arbor Day event. Ms. Hope answered not without more staffing; however, Parks &
Recreation did provide staff assistance during the most recent event. Councilmember Bloom asked
whether staff would be able to assist with educational events sponsored by the Tree Board. Ms. Hope
answered probably not much without additional staffing. Councilmember Bloom asked whether staff
Packet Page 15 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 13
would be able to do events such as the tree planting in right-of-way where a water project was constructed
that was coordinated by the Tree Board and the consultant. Ms. Hope answered she was not certain, but
recalled Public Works and Parks & Recreation were involved with that effort. Councilmember Bloom
said it was coordinated by the Tree Board in conjunction with Public Works; she asked whether Ms. Hope
had a staff member to do that type of coordination. Ms. Hope answered no.
Councilmember Bloom said her concern is all the things the Tree Board has tried to do have been
handicapped by the lack of a consistent person to provide support and answer citizens’ questions at
meetings about trees. The consultant hired this year was a certified arborist and was able to answer
questions that arose. She did not think there was sufficient staff to provide that support even if the
Council approves a half-time advance planner because that person will be providing assistance to other
boards and commissions such as the Planning Board.
Councilmember Nelson said he would oppose the amendment as he wanted to fully support the Tree
Board as stated in Councilmember Bloom’s motion.
AMENDMENT FAILED (2-5), COUNCIL PRESIDENT FRALEY-MONILLAS AND
COUNCILMEMBER JOHNSON VOTING YES.
MOTION CARRIED (5-2), COUNCIL PRESIDENT FRALEY-MONILLAS AND
COUNCILMEMBER JOHNSON VOTING NO.
Item # Description Cash Increase
(Decrease) Submitter
GENERAL FUND
6 Remove Council Legislative Asst (DP 1) from the Budget $42,160 Petso
COUNCILMEMBER PETSO MOVED, SECONDED BY COUNCILMEMBER BLOOM, TO
REMOVE THE COUNCIL LEGISLATIVE ASSISTANT FROM THE BUDGET.
Councilmember Mesaros observed Councilmember Petso had ten requests and asked what her intent was.
Councilmember Petso said she had two concerns when she reviewed the 2016 budget; one is the loss of
sustainability in the General Fund. In recent years, there were large, one-time capital expenditures such as
road paving in the General Fund that could be removed if times got tough, allowing the City to tighten its
belt without laying off staff. This budget is filling the General Fund with as many ongoing salary
expenses as possible; salaries expenses are the hardest to cut once a person has been hired, whether it is a
legislative assistant which the Council has never had before, or a police officer or an arts assistant. She
did not want to hire every person proposed to be hired in this budget in order to leave a margin; if the
entire General Fund is expended on salaries and benefits and they go up 5% a year and property taxes can
only increase 1%/year, there will be a big problem within a few years or citizens will be asked to support
a levy. One of her themes with this year’s budget was finding ways to minimize extra hiring so if the
economy does not continue to increase, the City will not have to lay off staff.
Councilmember Bloom observed this is a part-time position; she asked how many hours were envisioned
and if there would be a separate halftime Council executive assistant position. Council President Fraley-
Monillas answered the legislative assistant was budgeted for 20 hours and the budget includes 16 hours
for an administrative assistant to assist with things like the Tree Board, salaries, etc. the current executive
assistant works daytime hours; she envisioned the legislative assistant would work afternoons, evenings
and weekends.
Council President Fraley-Monillas explained this was a research position. The Council is a legislative
body; having someone to research issues would be helpful. She and Councilmembers Nelson, Mesaros,
Packet Page 16 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 14
and Johnson have experience working with legislative aids in their employment. One of the job
requirements for this position will be the ability to work evenings and potentially weekends; the person
may need to observe meetings, go to Olympia, report to the Council, provide testimony, etc. There are
many things a legislative aid could do to assist the Council with regard to legislation versus the assistance
provided by an administrative assistant. She plans to request this person work afternoons so there is
coverage in the Council office; currently the administrative assistant works 8:00 a.m. to 11:45 a.m.; calls
outside those hours go to voicemail. Having better coverage in the afternoons and potentially evenings
and weekends would be beneficial to the Council. She recommended trying this position for a year via a
contract person rather than an ongoing expense.
Councilmember Petso clarified the decision package says ongoing; it would be great if that were changed
although it may limit who the Council was able to hire.
Councilmember Johnson expressed support for the legislative assistant position, recalling this proposal
was developed by the Council President, considered by the Mayor and Directors and included in the
budget proposal so it has been properly vetted. There will be a year-to-year contract the same as there is
for the executive assistant so there is no danger of being wedded to this idea if it does not work out or the
person leaves. A legislative assistant will help the Council do its job and staff will benefit from
coordinated questions rather than individual Councilmembers trying to get same information.
Council President Fraley-Monillas commented there will be four Councilmembers who work and a
couple with children/grandchildren at home. Being a Councilmember is a difficult job at best;
employment and family obligations make doing adequate research difficult.
COUNCILMEMBER BUCKSHNIS CALLED FOR THE QUESTION, SECONDED BY
COUNCILMEMBER MESAROS. CALL FOR THE QUESTION CARRIED (5-2),
COUNCILMEMBERS PETSO AND BLOOM VOTING NO.
MOTION FAILED (1-6), COUNCILMEMBER PETSO VOTING YES.
Mayor Earling commented most of items considered thus far affected the Council. The following requests
will degrade the philosophy in the budget approach. He did not support the following requests,
commenting the budget was thoroughly vetted by staff and staff has negotiated amongst themselves. He
summarized it is a good budget and several of the expenses are one-time expenditures.
Item # Description Cash Increase
(Decrease) Submitter
GENERAL FUND
7 Remove Staff Accountant Position (DP 11) from the Budget $67,020 Petso
Fund 421 Water Utility Fund
7 Remove Staff Accountant Position (DP 11) from the Budget $13,300 Petso
Fund 422 Storm Utility Fund
7 Remove Staff Accountant Position (DP 11) from the Budget $7,390 Petso
Fund 423 Sewer Fund
7 Remove Staff Accountant Position (DP 11) from the Budget $16,240 Petso
COUNCILMEMBER PETSO MOVED, SECONDED BY COUNCILMEMBER BLOOM, TO
REMOVE THE STAFF ACCOUNTANT POSITION FROM THE BUDGET.
Councilmember Petso relayed her concern with the amount of hiring. On her personal hiring priority list,
police were at the top and a staff accountant and legislative assistant were further down.
Packet Page 17 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 15
Councilmember Bloom said she has the same concerns as Councilmember Petso regarding the number of
staff added in the budget. She felt too many staff were added in this budget, a commitment that would
burden the City in the future. She supported the motion.
Council President Fraley-Monillas said she did not see a lot of new staff that was just hiring to be hiring.
She inquired about the Finance Department FTE five years ago compared to now, relaying her
understanding that many of the positions were making up for staff that was let go in the past or not hired.
Mr. James responded when he left the City in 2005, there were 10 FTE in Finance; there are now 7. After
he left, the BID billing/collection was added, and many announcements that are very complex and
demanding of staff time. He requested this position last year because he felt there was a huge need for it;
when the FD1 surprise bill arrived, he voluntarily pulled this request as did other staff. After serving as
the Finance Director for over 1½ years he feels this position is needed; the decision package speaks for
itself.
Council President Fraley-Monillas commented at some point Council needed to depend on staff telling
them they can get by or they need more. Councilmembers do not work in the departments and do not
know what is happening so must depend on the department director to tell them. She did not have a
problem with adding this staff member in view of the fact that the department has 3 fewer staff now than
when Mr. James left in 2005 and the department is doing more work.
Councilmember Petso recalled this would be the second accountant hired since 2010. Mr. James answered
there is currently one staff accountant, this would be the second. Councilmember Petso asked what
position was hired a few years ago. Mr. James answered there was a shift in staff; there were two staff
accountants; the director at the time wanted a supervisor to help manage staff so one staff accountant was
promoted to the accounting supervisor position. Councilmember Petso asked for clarification whether an
additional person was hired during the past five years. Mr. James said he was not aware of any new hires.
Accountant Deb Sharp said Sarah Mager was hired as a staff accountant and promoted to the accounting
supervisor position. Councilmember Petso Peso concluded staffing had increased, the position name was
changed and this was a request to increase it again. Ms. Sharp agreed.
COUNCILMEMBER BUCKSHNIS CALLED FOR THE QUESTION, SECONDED BY
COUNCILMEMBER MESAROS. CALL FOR THE QUESTION CARRIED UNANIMOUSLY.
MOTION FAILED (2-5), COUNCILMEMBERS PETSO AND BLOOM VOTING YES.
Item # Description Cash Increase
(Decrease) Submitter
GENERAL FUND
8 Move Expense for Downtown Restroom Contribution
from REET 1 Fund 126 to General Fund
($90,000) Petso
Fund 126 REET 1
8 Move Expense for Downtown Restroom Contribution
from REET 1 Fund 126 to General Fund
$90,000 Petso
COUNCILMEMBER PETSO MOVED, SECONDED BY COUNCILMEMBER BLOOM, TO
MOVE $90,000 FOR THE DOWNTOWN RESTROOM CONTRIBUTION FROM THE REET 1
FUND 126 TO THE GENERAL FUND.
Councilmember Petso said this related to the second theme in her concerns about the budget, overly
aggressively depleting the 126 Fund. In addition to a variety of individual expenses, $900,000 is being
allocated from the fund to pave roads. Fund 126 is the capital fund the City is permitted to use to acquire
property. If an opportunity to acquire property for parks or open space is presented to City, these funds
Packet Page 18 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 16
are available to start making a payment toward that purchase. Instead of depleting this fund and assuming
the City would bond for the purchase if an opportunity arises, she preferred the Council establish a
balance they are comfortable having in this fund. As that discussion has never occurred, she pulled 2-3
items to restore the balance in Fund 126.
Council President Fraley-Monillas questioned of all things, the downtown restroom, noting it was in the
SAP and people have been talking about the need for a restroom for years. Councilmember Petso clarified
her request was not to eliminate the expenditure, just to change the funding source. Council President
Fraley-Monillas questioned why this expenditure would not be appropriate for Fund 126 when it is a
parks project. If it is funded from the General Fund, an additional $90,000 in cuts would be required.
Councilmember Petso agreed.
Councilmember Johnson commented expenditures from REET 1 are allowed for special capital projects
and park acquisition, so technically this expenditure can be made from that fund. She agreed with
Councilmember Petso that the Council should establish a policy with regard to an amount to retain in the
park acquisition fund, probably in the range of $1 million. It is not enough to rely on bonding capacity;
there have been many opportunities over the past 5-6 years where $1-2 million has been needed for a
purchase with not much lead time.
Councilmember Nelson was supportive of a long term policy with regard to park acquisition but was
confident if something came up in the next year, it could be acquired via bonding. He did not support the
motion.
Councilmember Buckshnis emphasized the REET 1 and 2 have a balance of $2.3 million. She was tired
of the doom and gloom coming from certain people and said it did not make sense to shift $90,000 from
the General Fund. She agreed with establishing a policy in the future.
MOTION FAILED (2-5), COUNCILMEMBERS PETSO AND BLOOM VOTING YES.
Roger Hertrich asked when there would be an opportunity for public comment on the budget. Mayor
Earling advised two public hearing on the budget were held at past meetings.
Item # Description Cash Increase
(Decrease) Submitter
GENERAL FUND
9 Remove Community Relations Consultant (DP 27) from the
Budget
$30,000 Petso
COUNCILMEMBER PETSO MOVED, SECONDED BY COUNCILMEMBER BLOOM, TO
REMOVE COMMUNITY RELATIONS CONSULTANT FROM THE BUDGET.
Councilmember Petso explained she made this request because she did not see that this position has
fulfilled the purpose for which it was included in the budget.
Councilmember Bloom explained this position was originally intended to facilitate two-way
communication between elected officials and citizens. The committee that interviewed and made a hiring
recommendation chose a firm that was subsequently rejected by Mayor Earling when Stephen Clifton
resigned. The position has turned into more public/community relations, communicating what is being
done by the Mayor and staff, press releases related to town hall meetings, etc. The purpose of the original
position in the 2014 budget was facilitation of information received from citizens to improve
transparency. She did not see that that has happened and therefore will strongly support the motion to
remove this position from the budget.
Packet Page 19 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 17
Councilmember Johnson inquired about the Mayor’s authority with regard to the budget amount he can
spend for this position. Mr. James answered the Mayor has the ability to contract up to $100,000.
MOTION FAILED (2-5), COUNCILMEMBERS BLOOM AND PETSO VOTING YES.
Item # Description Cash Increase
(Decrease) Submitter
10 Remove Increase to Annual Business Attraction Advertising
Expense (DP 30) from the Budget
$26,000 Petso
COUNCILMEMBER PETSO MOVED, SECONDED BY COUNCILMEMBER BLOOM, TO
REMOVE THE ADDITIONAL $26,000 FOR ANNUAL BUSINESS ATTRACTION
ADVERTISING FROM THE BUDGET
Councilmember Petso said she was pleased with the focus on attracting businesses to Edmonds, a key
component of economic development, but did not see a need to increase it from the prior funding level of
$24,000.
Councilmember Johnson relayed her understanding the previous amount covered a six month period.
Economic Development & Community Services Director Doherty said the 2015 budget includes $24,000
for advertising, an amount that has been included in the budget for a couple years. Starting business
attraction advertising mid-year, he chose the region’s #1 magazine, Seattle Business Monthly, and a small
presence in the Puget Sound Business Journal. The entire budget was used over a 6 month period for the
smallest ad that makes sense, 1/3 page. Having that same level of presence in the marketplace for the
upcoming year will require double the expenditure. A six month presence in the marketplace is not
enough to create regional awareness of Edmonds and he believed the City should continue and increase
the level of advertising.
MOTION FAILED (1-6), COUNCILMEMBER PETSO VOTING YES.
Item # Description Cash Increase
(Decrease) Submitter
GENERAL FUND
11 Remove Permit Coordinator Position (DP 35) from Budget $25,720 Petso
Fund 421 Water Utility Fund
11 Remove Permit Coordinator Position (DP 35) from Budget $2,720 Petso
Fund 422 Storm Utility Fund
11 Remove Permit Coordinator Position (DP 35) from Budget $2,720 Petso
Fund 423 Sewer Fund
11 Remove Permit Coordinator Position (DP 35) from Budget $2,720 Petso
COUNCILMEMBER PETSO MOVED, SECONDED BY COUNCILMEMBER BLOOM, TO
REMOVE THE PERMIT COORDINATOR POSITION FROM THE BUDGET.
Councilmember Petso said this request is related the too many new hires theme.
Councilmember Johnson relayed her understanding this was a key position that would enable the
Development Services Department to be open five days a week. She commented on the importance of
having the department open five days a week. Ms. Hope explained the building inspector, permit
coordinator and halftime planner positions will enable the department to be open five days a week to
provide service to the community.
Packet Page 20 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 18
MOTION FAILED (1-6), COUNCILMEMBER PETSO VOTING YES.
Item # Description Cash Increase
(Decrease) Submitter
GENERAL FUND
12 Remove Advance Planner Positions (DP 36) from Budget $38,530 Petso
COUNCILMEMBER PETSO MOVED, SECONDED BY COUNCILMEMBER BLOOM, TO
REMOVE THE ADVANCE PLANNER POSITIONS FROM THE BUDGET.
Councilmember Petso commented this request had the same rationale, too many new hires.
MOTION FAILED (2-5), COUNCILMEMBERS PETSO AND BLOOM VOTING YES.
Item # Description Cash Increase
(Decrease) Submitter
GENERAL FUND
13 Move Expense of Purchase of John Deere Gator Utility
Tractor to the Equipment Rental Fund (DP 42)
$14,400 Petso
Fund 511 Equipment Rental Fund
13 Move expense of purchase of John Deere Gator
Utility Tractor to the Equipment Rental Fund (DP 42)
($14,400) Petso
Councilmember Petso explained she requested this change as it was described in the decision package as
a new acquisition and there is an extremely healthy balance in the 511 Fund.
COUNCILMEMBER PETSO MOVED, SECONDED BY COUNCILMEMBER BLOOM, TO
MOVE EXPENSE OF PURCHASE OF JOHN DEERE GATOR UTILITY TRACTOR TO THE 511
FUND.
Councilmember Buckshnis asked whether the Fund 511 was only for cars. Mr. James advised Fund 511 is
the Equipment Rental Fund which funds various equipment including tractors. Councilmember Buckshnis
asked why this expense was not funded out of Fund 511 in the budget. Mr. James answered staff may not
have been as creative as Councilmember Petso.
Councilmember Johnson asked Mr. James his recommendation for funding this purchase. Mr. James
agreed with the motion as stated.
MOTION CARRIED UNANIMOUSLY
Item # Description Cash Increase
(Decrease) Submitter
GENERAL FUND
14 Remove Construction Inspector Position (DP 44) from the
Budget
$11,380 Petso
Fund 421 Water Utility Fund
14 Remove Construction Inspector Position (DP 44) from the
Budget
$34,140 Petso
Fund 422 Storm Utility Fund
14 Remove Construction Inspector Position (DP 44) from the $34,140 Petso
Packet Page 21 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 19
Budget
Fund 423 Sewer Fund
14 Remove Construction Inspector Position (DP 44) from the
Budget
$34,140 Petso
COUNCILMEMBER PETSO MOVED, SECONDED BY COUNCILMEMBER BLOOM, TO
REMOVE THE CONSTRUCTION INSPECTOR POSITION FROM THE BUDGET
Councilmember Petso commented in addition to the usual theme, it was her understanding there were
other ways pay for this position such as fees or hiring a consultant on a contract basis rather than a
salaried employee.
MOTION FAILED (2-5), COUNCILMEMBERS BLOOM AND PETSO VOTING YES.
Item # Description Cash Increase
(Decrease) Submitter
GENERAL FUND
15 Move Trackside Warning System Project to General Fund ($300,000) Petso
Fund 126 REET 1
15 Move Trackside Warning System to Project General Fund $300,000 Petso
COUNCILMEMBER PETSO MOVED, SECONDED BY COUNCILMEMBER BLOOM, TO
MOVE $300,000 FOR THE TRACKSIDE WARNING SYSTEM PROJECT FROM FUND 126 TO
THE GENERAL FUND.
Councilmember Petso said the rationale is the same as her earlier comments; she is trying to create a
residual balance in the Fund 126 in case an opportunity arises next year.
MOTION FAILED (2-5), COUNCILMEMBERS BLOOM AND PETSO VOTING YES.
Item # Description Cash Increase
(Decrease) Submitter
GENERAL FUND
16 Remove Expense for Community Survey (DP 29) from the
Budget
$19,000 Bloom
COUNCILMEMBER BLOOM MOVED, SECONDED BY COUNCILMEMBER PETSO, TO
REMOVE THE EXPENSE FOR COMMUNITY SURVEY OF $19,000 FROM THE BUDGET.
Councilmember Bloom said she did not understand the purpose of the survey, recalling from Mr.
Doherty’s description that the survey seemed very vague without a lot of questions and the City recently
did a strategic action plan. She preferred to allocate these funds to support the Invisio tracking system for
the SAP rather than initiating a community survey that is being done on a national level.
Councilmember Petso expressed support for motion; if the City is not going to “say goodbye to the
strategic action plan” then the survey needs to be updated as well as broadened to include public safety
items such as police and fire. This expenditure does not further that goal.
Councilmember Johnson asked if this survey is tied to a particular year like a census or would this
opportunity be available next year. Mr. Doherty answered it is a not a census-tied survey nor is it a survey
that is conducted at same time nationwide. It is a survey conducted by a survey research agency
nationwide whenever participants wish to conduct it. Every year there is some tweaking of the
Packet Page 22 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 20
standardized questions that address issues related to municipal services, policy issues, etc. and a city has
the opportunity to customize several questions that are of interest to their city. This survey arose out of a
lot of discussion with Councilmembers, the Mayor and others. It could have a role in reengaging the
public on the SAP because it would be a statistically significant source of information.
Councilmember Buckshnis commented some people think the SAP is the do-all end-all, but it really is
just a tool. A survey is a report card on things the City is doing and determining direction. Mr. Doherty
agreed it is sort of like a report card; wording on the survey agency’s website refers to a national report
card. It could be used in tandem with the interest the Council expressed earlier this year to reengage the
public related to the SAP. One possibility would be to do the survey early in the year and use that
information to reengage the public in open houses related to the SAP.
MOTION FAILED (2-5), COUNCILMEMBERS BLOOM AND PETSO VOTING YES.
Item # Description Cash Increase
(Decrease) Submitter
GENERAL FUND
17 Increase Transfer to Historic Preservation Fund ($5,000) Johnson
Fund 014 Historic Preservation
17 Historic Preservation Commission 2017 Calendar ($5,000)
Mr. James noted this item was included in the 2015 budget via an amendment but the $5,000 was not
carried forward for an unknown reason.
Councilmember Johnson explained the Historic Preservation Commission (HPC) Chair encouraged her to
make this request to fund the HPC calendar. The HPC had a grant to print the calendar the first year but
has since relied on funding provided in the budget.
COUNCILMEMBER JOHNSON MOVED, SECONDED BY COUNCILMEMBER PETSO, TO
ALLOCATED $5,000 FOR THE HISTORIC PRESERVATION CALENDAR. MOTION CARRIED
UNANIMOUSLY.
Item # Description Cash Increase
(Decrease) Submitter
Fund 126 REET 1
18 Move $100,000 of Annual Street Preservation Expense to
the REET 2 Fund 125
$100,000 Petso
Fund 125 REET 2
18 Move $100,000 of Annual Street Preservation Expense to
the REET 2 Fund 125
($100,000) Petso
Councilmember Petso withdrew the amendment, relaying that after speaking with Ms. Hite, there is no
need for it.
Item # Description Cash Increase
(Decrease) Submitter
Fund 421 Water Utility Fund
19 Remove Water Department Position from the Budget (DP
59)
$67,080 Bloom
Packet Page 23 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 21
COUNCILMEMBER BLOOM MOVED, SECONDED BY COUNCILMEMBER PETSO, TO
REMOVE THE WATER DEPARTMENT POSITION FROM THE BUDGET.
Councilmember Bloom said this is related to her and Councilmember Petso’s concerns about the large
number of positions added to the budget. Public Works is adding four positions which she felt was
excessive and she could not support.
Council President Fraley-Monillas asked what fund pays for this position. Mr. James answered Fund 421,
the Water Utility Fund. Council President Fraley-Monillas said she will support this position.
UPON ROLL CALL, MOTION FAILED (3-4), COUNCILMEMBERS BLOOM, JOHNSON AND
PETSO VOTING YES; AND COUNCIL PRESIDENT FRALEY-MONILLAS AND
COUNCILMEMBERS BUCKSHNIS, MESAROS AND NELSON VOTING NO.
Item # Description Cash Increase
(Decrease) Submitter
Fund 422 Storm Utility Fund
20 Replace Stormwater Employee ($60,880) (DP 44) with
Contract Position
$0 Bloom
COUNCILMEMBER BLOOM MOVED, SECONDED BY COUNCILMEMBER PETSO, TO
REPLACE STORMWATER EMPLOYEE, DECISION PACKAGE 44, WITH A CONTRACT
POSITION,
Councilmember Bloom recalled in questioning Mr. Williams last week, he said this position will do an
assessment of the stormwater system; 40% will be completed in 2016 yet the position is scheduled to last
5 years and will be vested after 5 years. The salary for the position increases from $60,000 in 2016 to
$74,000 in 2020. She preferred to have that work done via hiring a contract position. Mr. Williams
explained this is a stormwater maintenance worker, not a technical position or an engineering consultant.
This position will assist with new stormwater regulations that are addressed by the operations group.
Many of the duties, plans, studies and evaluations, are being done by the engineering division but there
are a lot of new operations and maintenance responsibilities under the new regulations which will
continue forever. One of the focuses in the first 12 months is to meet the requirement to have 40% of the
lineal footage of the stormwater system evaluated prior to the end of 2016; this person can assist with that
effort. The stormwater utility has 15 employees: 1 supervisor, 2 leads and 12 staff; that staffing level has
been in place for the past 25 years. With the new requirements, many more things need to be done; what
is needed is more boots on ground in stormwater and that is the purpose of this position.
Councilmember Petso commented the decision package is very specific with regard to video assessment.
She will support the motion based on decision package’s description.
Councilmember Nelson said he will oppose the motion based on Mr. Williams’ explanation.
MOTION FAILED (3-4), COUNCILMEMBERS PETSO, BLOOM AND JOHNSON VOTING YES.
Mr. James advised that concluded the changes requested by Council.
Councilmember Petso asked whether now was the appropriate time to propose an amendment to the CFP.
Mr. James answered yes.
Packet Page 24 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 22
Mr. Taraday explained the CFP and the budget are adopted in the same ordinance. Any amendments to
the CFP should be made now and once votes are taken on all the amendments, there can be a motion and
vote on the ordinance adopting the CFP and the budget.
COUNCILMEMBER PETSO MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO
AMEND THE CFP TO REPLACE THE PHRASE MULTIUSE WITH WALKWAY FOR THE
SUNSET AVENUE PROJECT.
Councilmember Petso said the phrase appears three times, twice in the project description and once in the
project benefit rationale.
MOTION CARRIED (5-2), COUNCILMEMBERS MESAROS AND NELSON VOTING NO.
COUNCILMEMBER JOHNSON MOVED, SECONDED BY COUNCILMEMBER BLOOM, THAT
ANY SUBSEQUENT DOCUMENTS, TIP AND CIP, BE CHANGED TO REFLECT THE ACTION
THE COUNCIL JUST TOOK. MOTION CARRIED (5-2) COUNCILMEMBERS MESAROS AND
NELSON VOTING NO.
COUNCILMEMBER BLOOM MOVED, SECONDED BY COUNCILMEMBER PETSO, TO
REMOVE THE WOODWAY FIELDS PROJECT FROM THE CIP/CFP.
Councilmember Bloom explained she has many reason for removing this project, the School District
refused to address residents and Councilmembers’ concerns about the use of crumb rubber in Woodway
Fields and pushed forward installing crumb rubber infill despite objections and appeals to negotiate the
issue; no Interlocal Agreement has been negotiated due to the School District insistence on maintaining
control on all aspects of planned future fields; there is a lawsuit pending related to the Woodway Fields
that will be heard in Superior Court in February; and the Council just banned crumb rubber for 18
months. Given the crumb rubber/SBR ban and the School District’s refusal to negotiate a reasonable ILA
to allow Edmonds a say over future fields, she felt it was prudent to remove Woodway Fields from the
CFP. Putting the Woodway Fields back on the CFP can be addressed when the School Board and
Edmonds City Council are in agreement on how to proceed with future fields which will not happen for
less than 18 months and the CFP/CIP can be updated annually.
Council President Fraley-Monillas understood Councilmember Bloom’s intent but said the Woodway
Fields are not done. She liked Ms. Hope’s comments about the potential for a joint venture on the future
fields and feared if the project was removed from the CFP/CIP, the City would lose the ability to have a
joint venture. The other fields may be a good opportunity for an alternative infill material.
Councilmember Buckshnis agreed with Council President Fraley-Monillas. The ban was a good step and
demonstrated the City’s opinion to the School District. She did not want to limit what could happen on
the Woodway Fields in the future and felt removing the project from the CFP was too drastic. She has
wanted to remove the aquatics center from the CFP since 2009 because she did not think it will ever be
funded but it has remained in the CFP. It is important to keep the project in the CFP in case an option
arises.
Councilmember Mesaros agreed with leaving the project in the CFP/CIP because it made a statement that
the City wanted to negotiate with the School District and partner with the District and other governmental
agencies. A change will be occurring in the School District administration; after June 30 will be a new
era, new leadership and opportunity to forge a new relationship.
Councilmember Petso wished the Council had more time to consider this amendment. The Council heard
recently that the field cages were locked which denies park access. If two more fields are added, they
Packet Page 25 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 23
cannot be used during school hours, during rentals or when they are locked. The City’s plans to add a lot
of new residents to the Westgate area where there is no park and the City has limited park funding. The
only open space in the area is a cemetery and these fields. She found Councilmember Bloom’s suggestion
very appealing because without the Woodway Fields project, there would be a grassy area and track for
people to play on. She acknowledged there was a horrendous shortage of athletic fields in Edmonds.
Councilmember Nelson said he supports everyone having a second chance including the School District.
Ms. Hite reminded that the Parks, Recreation and Open Space Plan completed this past year included a
very robust public process; a high priority was developing fields in Edmonds and this is one of the only
open spaces left where fields can be developed. With a ban on crumb rubber, the fields will not be crumb
rubber but they could be grass or an alternative infill. The Woodway Fields project in the CFP includes
more than just athletic fields; it is a community park and the plan includes resurfacing the tennis courts
and the basketball court, creating the space in the neighborhood that Councilmember Petso said is
lacking.
Councilmember Johnson reminded the Council the CFP is intended to be a 20 year plan. She urged the
Council to think long term, noting many things can happen in 20 years. For that reason, she will support
keeping the project in the CFP.
COUNCILMEMBER BLOOM WITHDREW THE MOTION WITH THE AGREEMENT OF THE
SECONDER.
COUNCIL PRESIDENT FRALEY-MONILLAS MOVED, SECONDED BY COUNCILMEMBER
BUCKSHNIS, TO APPROVE ORDINANCE 4014, ADOPTING THE 2016 BUDGET AS
AMENDED AND AMENDMENTS TO THE CFP/CIP.
Councilmember Petso said she will vote against the motion primarily due to the budget and her concerns
with overloading the General Fund with salaries which impacts the City’s sustainability and she was
concerned the Fund 125 has been overly depleted.
Councilmember Johnson thanked Mr. James for all work he has done coordinating with staff and Council;
he has done an exemplary job and she appreciated his efforts.
Councilmember Bloom said she will also vote against the motion; she did not support the addition of
staff.
Councilmember Buckshnis thanked the Mayor and all staff for their work. She noted as of October the
Fund 126 will only have a balance of $2 million because $390,000 was spent. She recommending trusting
the directors and understanding the City is a $95 million corporation and people are needed to do the
work.
Councilmember Nelson thanked Mayor Earling, the directors, and Mr. James for all their work and
patience answering all the Council’s questions publicly as well as via email and telephone. He looked
forward to supporting the budget.
MOTION CARRIED (5-2), COUNCILMEMBERS BLOOM AND PETSO VOTING NO.
Mr. James gave credit to staff who answered most of the questions; he was only the conduit. Mayor
Earling commented this has been a terrific process; staff has gone out of their way to think creatively,
bringing the most to table with the funds available. This is a sensible budget and he was pleased with the
work the directors and support staff in Finance did. Mr. James recognized Accountant Deb Sharp for all
Packet Page 26 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 24
her work; the department implemented a new budget module and she has been instrumental in learning
and implementing it.
B. CONTINUED DELIBERATIONS AND ADOPTION OF THE PROPOSED CAPITAL
IMPROVEMENT PROGRAM
Councilmember Petso asked about consistency between the budget and the CIP, noting page 166 of the
budget and the Fund 126 balance in the CIP have same beginning balance but different end of year
balances. The beginning balance for Fund 126 in the budget is $1.4 million and an ending balance of
$600,000; Fund 125 in the CIP has the same beginning balance but the ending balance is $383,000. Mr.
James offered to research.
Councilmember Petso recalled Councilmember Johnson’s earlier motion that all the documents be
consistent. If she votes for this CIP, she asked whether any discrepancies will be fixed under the direction
provided by that earlier motion. Mr. James answered the beginning balance can be adjusted to actuals via
a budget ordinance.
COUNCILMEMBER NELSON MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO
APPROVE THE CIP. MOTION CARRIED (6-0-1), COUNCILMEMBER PETSO ABSTAINING.
C. AUTHORIZATION TO EXECUTE PROFESSIONAL SERVICES AGREEMENT FOR
HIGHWAY 99 SUBAREA PLANNING PROJECT
Development Services Director Shane Hope advised funding for professional services for the Highway 99
project was approved in the 2015 budget. It was understood at that time that the project would not begin
until the Comprehensive Plan update and other projects were completed. An RFQ process was done for
the Highway 99 Subarea Planning Project; six qualified responses were submitted. Following review,
reference checks and interviews, Fregonese Associates was selected as the lead consultant. She requested
Council approval of the $100,000 professional services agreement. The professional services agreement
does not include additional funds for 2016; those will be handled via an addendum. This approval will
allow the Highway 99 Subarea Planning Project to begin.
COUNCIL PRESIDENT FRALEY-MONILLAS MOVED, SECONDED BY COUNCILMEMBER
NELSON, TO AUTHORIZE THE MAYOR TO SIGN THE PROFESSIONAL SERVICES
AGREEMENT FOR THE HIGHWAY 99 SUBAREA PLANNING PROJECT. MOTION CARRIED
UNANIMOUSLY.
7. MAYOR'S COMMENTS
Mayor Earling advised there will be no Council meeting on December 22 but there is a robust agenda for
next week’s meeting. He reported today’s annual staff party was fabulous, terrific organization by staff
and everyone had a great time.
8. COUNCIL COMMENTS
Council President Fraley-Monillas congratulated Megan Luttrell who was selected City of Edmonds
Employee of Year. She pointed out Councilmembers were all dressed in dark colors tonight.
Councilmember Nelson said he submitted a budget amendment on Friday regarding a traffic enforcement
officer due to his concern with increased pedestrian incidents and traffic safety in general. After further
conversation, he withdrew that amendment, understanding there will be a broader effort to address traffic
and pedestrian safety.
Packet Page 27 of 564
Edmonds City Council Draft Minutes
December 8, 2015
Page 25
Nelson said he was proud of the Council’s willingness to use its authority to take the necessary steps to
protect citizens from crumb rubber and for Edmonds to lead the way for the health and safety of
everyone. The City represents a growing trend in the county that people are sick of harmful chemicals in
products they use every day. He hoped tonight’s action sends a message to industries that produce
healthy, natural products for children to play on that they are always welcome in the City. As for tires, he
suggested they roll on by.
Councilmember Bloom asked when the Council would be discussing the Critical Areas Ordinance.
Council President Fraley-Monillas advised it is on next week’s agenda. Councilmember Bloom observed
the Hearing Examiner’s annual report is on next week’s agenda but nothing about hiring a Hearing
Examiner. It was her understanding that appointment would come to Council before the end of the year.
Mayor Earling answered only two applications were submitted so Ms. Hope and he decided to extend the
application period a couple weeks in an effort to attract more applicants. The current Hearing Examiner
will provide his report next week.
Councilmember Buckshnis was pleased the Council completed the budget. She is very serious about long
term financial planning and after meeting with the consultant to review Fire District 1’s numbers, she
looked forward to their report. She said change is coming, the numbers are looking great and she is very
hopeful for next year.
Councilmember Mesaros commented this morning’s Daybreakers Rotary meeting featured Police Chief
Al Compaan and K-9 Officer Robinson who did a fine job representing the City to the 40-50 people in
attendance. He remarked citizens are fortunate to live in a city that is relatively peaceful. The last 10 days
in the county have been difficult with regard to gun violence. He supported a ban on crumb rubber but
more people are dying from the effects of gun violence than crumb rubber. There was a lot of passion in
the room in regard to crumb rubber; he wished for the same amount of passion across the county for
people dying due to the infatuation with firearms.
Councilmember Johnson thanked Hank Landau for organizing a peaceful march last night to address
sustainability and climate change; approximately 100 people marched to Centennial Plaza where Mayor
Earling gave a welcoming speech. This may be the first of an annual march; it was organized around the
talks for climate change in Paris. She attended the TEDx conference last month provided by Sno-Isle
Library; all the speakers are available on their website. She reported a draft Zero Waste Policy will be on
the agenda for Council consideration.
9. CONVENE IN EXECUTIVE SESSION REGARDING PENDING OR POTENTIAL LITIGATION
PER RCW 42.30.110(1)(i)
This item was not needed.
10. RECONVENE IN OPEN SESSION. POTENTIAL ACTION AS A RESULT OF MEETING IN
EXECUTIVE SESSION
This item was not needed.
11. ADJOURN
With no further business, the Council meeting was adjourned at 9:59 p.m.
Packet Page 28 of 564
AM-8190 3. B.
City Council Meeting
Meeting Date:12/15/2015
Time:Consent
Submitted For:Scott James Submitted By:Nori Jacobson
Department:Finance
Review Committee: Committee Action:
Type: Action
Information
Subject Title
Approval of claim checks #217509 through #217611 dated December 10, 2015 for $1,414,663.37.
Recommendation
Approval of claim checks.
Previous Council Action
N/A
Narrative
In accordance with the State statutes, City payments must be approved by the City Council. Ordinance
#2896 delegates this approval to the Council President who reviews and recommends either approval or
non-approval of expenditures.
Fiscal Impact
Fiscal Year:2015
Revenue:
Expenditure:1,414,663.37
Fiscal Impact:
Claims $1,414,663.37
Attachments
Claim cks 12-10-15
Project Numbers 12-10-15
Form Review
Inbox Reviewed By Date
Finance Scott James 12/10/2015 04:25 PM
City Clerk Scott Passey 12/10/2015 06:41 PM
Mayor Dave Earling 12/10/2015 08:40 PM
Finalize for Agenda Scott Passey 12/11/2015 07:19 AM
Form Started By: Nori Jacobson Started On: 12/10/2015 11:03 AM
Packet Page 29 of 564
Final Approval Date: 12/11/2015
Packet Page 30 of 564
12/10/2015
Voucher List
City of Edmonds
1
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217509 12/9/2015 037376 SNO CO PUD NO 1 E7AC.PUD E7AC.PUD SERVICE CONNECTION
E7AC.PUD Service Connection
112.200.68.595.33.41.00 3,234.00
Total :3,234.00
217510 12/10/2015 073947 A WORKSAFE SERVICE INC 217283 DRUG TEST
Drug Test for new Parks Maintenance
001.000.22.518.10.41.00 52.00
Total :52.00
217511 12/10/2015 065052 AARD PEST CONTROL 360697 PM & SENIOR CENTER PEST CONTROL CUST 1-1
PM & SENIOR CENTER PEST CONTROL CUST
001.000.64.576.80.41.00 136.88
Total :136.88
217512 12/10/2015 072189 ACCESS INFORMATION MANAGEMENT 1241653 STORAGE OF DOCUMENTS 12/01/12 - 12/31/15
STORAGE OF DOCUMENTS 12/01/2015 -
001.000.25.514.30.41.00 85.00
Total :85.00
217513 12/10/2015 074919 ALDERWOOD TERRACE ROTARY 12/4 REFUND 12/4/15 REFUND DAMAGE DEPOSIT AND UNUSED
12/4/15 REFUND DAMAGE DEPOSIT AND
001.000.239.200 545.00
Total :545.00
217514 12/10/2015 069667 AMERICAN MARKETING 20723 CITY PARK BENCH PLAQUE
CITY PARK BENCH PLAQUE
127.000.64.575.50.31.00 139.03
9.5% Sales Tax
127.000.64.575.50.31.00 13.21
Total :152.24
217515 12/10/2015 069751 ARAMARK UNIFORM SERVICES 1988342168 PARKS MAINT UNIFORM SERVICE
PARKS MAINT UNIFORM SERVICE
001.000.64.576.80.24.00 35.49
FACILITIES DIVISION UNIFORMS1988342169
1Page:
Packet Page 31 of 564
12/10/2015
Voucher List
City of Edmonds
2
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217515 12/10/2015 (Continued)069751 ARAMARK UNIFORM SERVICES
FACILITIES DIVISION UNIFORMS
001.000.66.518.30.24.00 18.12
9.5% Sales Tax
001.000.66.518.30.24.00 1.72
PUBLIC WORKS OMC LOBBY MATS1988346290
PUBLIC WORKS OMC LOBBY MATS
001.000.65.518.20.41.00 1.33
PUBLIC WORKS OMC LOBBY MATS
111.000.68.542.90.41.00 5.06
PUBLIC WORKS OMC LOBBY MATS
421.000.74.534.80.41.00 5.06
PUBLIC WORKS OMC LOBBY MATS
422.000.72.531.90.41.00 5.06
PUBLIC WORKS OMC LOBBY MATS
423.000.75.535.80.41.00 5.06
PUBLIC WORKS OMC LOBBY MATS
511.000.77.548.68.41.00 5.05
9.5% Sales Tax
001.000.65.518.20.41.00 0.13
9.5% Sales Tax
111.000.68.542.90.41.00 0.48
9.5% Sales Tax
421.000.74.534.80.41.00 0.48
9.5% Sales Tax
422.000.72.531.90.41.00 0.48
9.5% Sales Tax
423.000.75.535.80.41.00 0.48
9.5% Sales Tax
511.000.77.548.68.41.00 0.48
FLEET DIVISION UNIFORMS & MATS1988346291
FLEET DIVISION UNIFORMS
511.000.77.548.68.24.00 5.28
FLEET DIVISION MATS
511.000.77.548.68.41.00 11.96
2Page:
Packet Page 32 of 564
12/10/2015
Voucher List
City of Edmonds
3
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217515 12/10/2015 (Continued)069751 ARAMARK UNIFORM SERVICES
9.5% Sales Tax
511.000.77.548.68.24.00 0.50
9.5% Sales Tax
511.000.77.548.68.41.00 1.14
Total :103.36
217516 12/10/2015 069076 BACKGROUND INVESTIGATIONS INC COE1115 PROSPECTIVE EMPLOYEE BACKGROUND CHECKS
Routine background checks for
001.000.22.518.10.41.00 55.00
Total :55.00
217517 12/10/2015 074776 BUCKSHNIS, DIANE Buckshnis Claime for Expenses - travel to SCT and
Claime for Expenses - travel to SCT and
001.000.11.511.60.43.00 51.31
Total :51.31
217518 12/10/2015 069841 BUNO CONSTRUCTION LLC E4GA.Pmt 6 E4GA.PMT 6 THRU 11/30/15
E4GA.Pmt 6 thru 11/30/15
423.000.75.594.35.65.30 115,084.51
Total :115,084.51
217519 12/10/2015 073029 CANON FINANCIAL SERVICES 15512697 WWTP-COPIER
Copier Rental- November, 2015
423.000.76.535.80.45.41 85.80
Total :85.80
217520 12/10/2015 070334 CARQUEST AUTO PARTS STORES 2523-262522 Unit 37 - Air Filter
Unit 37 - Air Filter
511.000.77.548.68.31.10 6.88
9.5% Sales Tax
511.000.77.548.68.31.10 0.65
Unit 57 - Filters2523-262829
Unit 57 - Filters
511.000.77.548.68.31.10 23.56
9.5% Sales Tax
3Page:
Packet Page 33 of 564
12/10/2015
Voucher List
City of Edmonds
4
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217520 12/10/2015 (Continued)070334 CARQUEST AUTO PARTS STORES
511.000.77.548.68.31.10 2.24
Unit 643 - Oil Filter2523-262882
Unit 643 - Oil Filter
511.000.77.548.68.31.10 3.23
9.5% Sales Tax
511.000.77.548.68.31.10 0.31
Unit 138 -- Filter2523-262885
Unit 138 -- Filter
511.000.77.548.68.31.10 19.14
9.5% Sales Tax
511.000.77.548.68.31.10 1.82
Unit 120 - Trans Fill Kit2523-262934
Unit 120 - Trans Fill Kit
511.000.77.548.68.31.10 10.07
9.5% Sales Tax
511.000.77.548.68.31.10 0.96
Unit 6 - Air Filter2523-262985
Unit 6 - Air Filter
511.000.77.548.68.31.10 6.88
9.5% Sales Tax
511.000.77.548.68.31.10 0.65
Unit 31 - Oil Filter2523-263270
Unit 31 - Oil Filter
511.000.77.548.68.31.10 19.30
9.5% Sales Tax
511.000.77.548.68.31.10 1.83
Unit 31 - V Belt2523-263439
Unit 31 - V Belt
511.000.77.548.68.31.10 17.49
9.5% Sales Tax
511.000.77.548.68.31.10 1.66
Unit 106- Filters2523-263458
Unit 106- Filters
511.000.77.548.68.31.10 66.15
4Page:
Packet Page 34 of 564
12/10/2015
Voucher List
City of Edmonds
5
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217520 12/10/2015 (Continued)070334 CARQUEST AUTO PARTS STORES
9.5% Sales Tax
511.000.77.548.68.31.10 6.28
Unit 106 - U Joint2523-263547
Unit 106 - U Joint
511.000.77.548.68.31.10 42.38
9.5% Sales Tax
511.000.77.548.68.31.10 4.03
Unit 125 - Oxy Sensor2523-263881
Unit 125 - Oxy Sensor
511.000.77.548.68.31.10 46.18
9.5% Sales Tax
511.000.77.548.68.31.10 4.39
Unit 123 - Rack & Pinion2523-264000
Unit 123 - Rack & Pinion
511.000.77.548.68.31.10 184.79
9.5% Sales Tax
511.000.77.548.68.31.10 17.56
Unit 123 - Engine Part2523-264001
Unit 123 - Engine Part
511.000.77.548.68.31.10 170.00
9.5% Sales Tax
511.000.77.548.68.31.10 16.15
Unit 46 - Filters2523-265011
Unit 46 - Filters
511.000.77.548.68.31.10 41.06
9.5% Sales Tax
511.000.77.548.68.31.10 3.90
Unit 42 - Pigtail2523-265023
Unit 42 - Pigtail
511.000.77.548.68.31.10 11.69
9.5% Sales Tax
511.000.77.548.68.31.10 1.11
Unit 35 - Oil Seal2523-265396
Unit 35 - Oil Seal
5Page:
Packet Page 35 of 564
12/10/2015
Voucher List
City of Edmonds
6
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217520 12/10/2015 (Continued)070334 CARQUEST AUTO PARTS STORES
511.000.77.548.68.31.10 87.98
9.5% Sales Tax
511.000.77.548.68.31.10 8.36
Unit 35 - Oil Seal2523-265409
Unit 35 - Oil Seal
511.000.77.548.68.31.10 43.99
9.5% Sales Tax
511.000.77.548.68.31.10 4.18
Unit 57 - Acetone2523-265439
Unit 57 - Acetone
511.000.77.548.68.31.10 7.35
9.5% Sales Tax
511.000.77.548.68.31.10 0.70
Total :884.90
217521 12/10/2015 003510 CENTRAL WELDING SUPPLY RN11151036 HELIUM TANK FOR GYMNASTICS
HELIUM TANK FOR GYMNASTICS
001.000.64.571.28.45.00 12.75
9.5% Sales Tax
001.000.64.571.28.45.00 1.21
WWTP-SUPPLIES NITROGEN. OXYGEN. CARBON MRN11151037
Nitrogen, Oxygen and Carbon Monoxide
423.000.76.535.80.31.00 74.25
9.5% Sales Tax
423.000.76.535.80.31.00 7.05
Total :95.26
217522 12/10/2015 069457 CITY OF EDMONDS E4GB.PLN20150063 E4GB.PLN20150063 - LAND USE PERMIT
E4GB.PLN20150063 - Land Use Permit
423.000.75.594.35.41.30 1,662.00
Total :1,662.00
217523 12/10/2015 022200 CITY OF MOUNTLAKE TERRACE 2928 EDMONDS PORTION OF WINTER CRAZE MAILING
EDMONDS PORTION OF WINTER CRAZE MAILING
001.000.64.571.22.42.00 7,373.35
6Page:
Packet Page 36 of 564
12/10/2015
Voucher List
City of Edmonds
7
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
(Continued)Total :7,373.3521752312/10/2015 022200 022200 CITY OF MOUNTLAKE TERRACE
217524 12/10/2015 073135 COGENT COMMUNICATIONS INC DEC-15 C/A CITYOFED00001
Dec-15 Fiber Optics Internet Connection
001.000.31.518.87.42.00 406.10
Total :406.10
217525 12/10/2015 005965 CUES INC 433056 Storm - Straight on Cover Light Head
Storm - Straight on Cover Light Head
422.000.72.531.40.31.00 281.73
9.5% Sales Tax
422.000.72.531.40.31.00 26.76
Total :308.49
217526 12/10/2015 069529 D & G BACKHOE INC E4JB.Pmt 5 E4JB.PMT 5 THRU 10/30/15
E4JB.Pmt 5 thru 10/30/15
421.000.74.594.34.65.10 260,270.99
E4JB.Retainage thru 10/30/15
421.000.223.400 -11,884.52
Total :248,386.47
217527 12/10/2015 074444 DATAQUEST LLC CIEDMONDS-20151130 INV CIEDMONDS-20151130 CREDIT CHECKS
CREDIT CHECK - BICK
001.000.41.521.10.41.00 20.00
CREDIT CHECK JENSEN
001.000.41.521.10.41.00 20.00
CREDIT CHECK JOHNSEN
001.000.41.521.10.41.00 20.00
Total :60.00
217528 12/10/2015 006626 DEPT OF ECOLOGY OIT 3972 Wastewater Operator Cert 2015 Annual
Wastewater Operator Cert 2015 Annual
423.000.75.535.80.49.00 30.00
Total :30.00
217529 12/10/2015 047450 DEPT OF INFORMATION SERVICES 2015110056 CUSTOMER ID# D200-0
Scan Services for November 2015
7Page:
Packet Page 37 of 564
12/10/2015
Voucher List
City of Edmonds
8
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217529 12/10/2015 (Continued)047450 DEPT OF INFORMATION SERVICES
001.000.31.518.88.42.00 1,231.40
Total :1,231.40
217530 12/10/2015 064531 DINES, JEANNIE 15-3610 CITY COUNCIL MINUTES 12/01/15
12/01/15 CITY COUNCIL MINUTES &
001.000.25.514.30.41.00 379.50
Total :379.50
217531 12/10/2015 075130 DOHERTY, PATRICK 20151209 EXPENSES FOR MILEAGE AND PARKING FOR DIR
Mileage and parking expenses
001.000.61.557.20.43.00 464.04
Total :464.04
217532 12/10/2015 007775 EDMONDS CHAMBER OF COMMERCE 2059 AD IN EDMONDS CHAMBER BUSINESS DIRECTORY
Ad in Edmonds Chamber 2016 Business
001.000.61.558.70.41.40 545.00
Total :545.00
217533 12/10/2015 069523 EDMONDS P&R YOUTH SCHOLARSHIP 20597 CORDOVA 20597 CORDOVA THIARA YOUTH SCHOLARSHIP
20597 CORDOVA THIARA YOUTH SCHOLARSHIP
122.000.64.571.20.49.00 75.00
Total :75.00
217534 12/10/2015 038500 EDMONDS SENIOR CENTER 2015-12-01 12/15 RECREATION SERVICES CONTRACT FEE
12/15 Recreation Services Contract Fee
001.000.39.569.10.41.00 5,000.00
Total :5,000.00
217535 12/10/2015 031060 ELECSYS INTERNATIONAL CORP 142253 RADIX MONTHLY MAINT AGREEMENT
Radix Monthly Maint Agreement - Dec
421.000.74.534.80.48.00 152.00
Total :152.00
217536 12/10/2015 008812 ELECTRONIC BUSINESS MACHINES AR23351 MK5532 CITY CLERKS METER READ 10/30-11/2
CITY CLERKS METER READ 10/30/15 -
001.000.25.514.30.45.00 492.01
8Page:
Packet Page 38 of 564
12/10/2015
Voucher List
City of Edmonds
9
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217536 12/10/2015 (Continued)008812 ELECTRONIC BUSINESS MACHINES
9.5% Sales Tax
001.000.25.514.30.45.00 46.74
COPY CHARGES FOR C5051AR23457
copier charges for C5051
001.000.61.557.20.45.00 48.96
copier charges for C5051
001.000.22.518.10.45.00 48.96
copier charges for C5051
001.000.21.513.10.45.00 48.93
9.5% Sales Tax
001.000.61.557.20.45.00 4.65
9.5% Sales Tax
001.000.22.518.10.45.00 4.65
9.5% Sales Tax
001.000.21.513.10.45.00 4.65
CUST# MK5533 C5051 GQM52286 COPIERAR23475
Overage Meter charges 10/30/15 -
001.000.31.514.23.48.00 94.47
9.5% Sales Tax
001.000.31.514.23.48.00 8.97
P&R PRINTER C1030 #A6995AR23478
P&R PRINTER C1030 #A6995
001.000.64.571.21.45.00 9.63
P&R COPIER C5051 #A7027AR23479
P&R COPIER C5051 #A7027
001.000.64.571.21.45.00 66.39
Total :879.01
217537 12/10/2015 075504 EMUAMERICAS LLC 0081971 PMT # 1 50% RONDA HD, TBL TOPS, BASES
PMT # 1 50% RONDA HD, TBL TOPS, BASES
001.000.64.571.21.31.00 2,134.59
Total :2,134.59
217538 12/10/2015 075290 EVENFLO HEATING & AIR COND BLD20151321 Permit withdrawn.
Permit withdrawn.
9Page:
Packet Page 39 of 564
12/10/2015
Voucher List
City of Edmonds
10
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217538 12/10/2015 (Continued)075290 EVENFLO HEATING & AIR COND
001.000.257.620 85.00
Total :85.00
217539 12/10/2015 009350 EVERETT DAILY HERALD EDH670614 Clear Vision Homes PLN 20150031
Clear Vision Homes PLN 20150031
001.000.62.558.60.41.40 63.64
E4FB.ADVERTISEMENT FOR BIDSEDH670621
E4FB.Advertisement for Bids
422.000.72.594.31.41.20 223.60
CITY NOTICE PROPOSED 2016 CITY BUDGET PUEDH671087
CITY NOTICE - PROPOSED 2016 BUDGET
001.000.25.514.30.41.40 36.12
CITY NOTICES RES. PKG. & MOTOR VEHICLE PEDH671088
CITY NOTICE - RESIDENTIAL PKG. & MOTOR
001.000.25.514.30.41.40 39.56
CITY ORDINANCES 4011EDH671125
CITY ORDINANCE 4011
001.000.25.514.30.41.40 30.96
CITY NOTICES - CRUMB RUBBEREDH672007
CITY NOTICES - CRUMB RUBBER
001.000.25.514.30.41.40 44.72
Total :438.60
217540 12/10/2015 009815 FERGUSON ENTERPRISES INC 0486787 WWTP-REPAIR. MAINTENANCE. MECHANICAL
COUPLING/GASKET
423.000.76.535.80.48.21 311.37
9.5% Sales Tax
423.000.76.535.80.48.21 29.58
Total :340.95
217541 12/10/2015 069469 FLINT TRADING INC 190202 Traffic - Hot Tape
Traffic - Hot Tape
111.000.68.542.64.31.00 361.92
Freight
111.000.68.542.64.31.00 174.03
10Page:
Packet Page 40 of 564
12/10/2015
Voucher List
City of Edmonds
11
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217541 12/10/2015 (Continued)069469 FLINT TRADING INC
9.5% Sales Tax
111.000.68.542.64.31.00 50.91
Total :586.86
217542 12/10/2015 011900 FRONTIER 206-188-0247 TELEMETRY MASTER SUMMARY ACCOUNT
TELEMETRY MASTER SUMMARY ACCOUNT
421.000.74.534.80.42.00 258.55
TELEMETRY MASTER SUMMARY ACCOUNT
423.000.75.535.80.42.00 258.55
LIFT STATION #6 VG SPECIAL ACCESS LINES253-003-6887
LIFT STATION #6 VG SPECIAL ACCESS LINES
423.000.75.535.80.42.00 41.81
WWTP AUTO DIALER - 1 VOICE GRADE253-012-9189
WWTP AUTO DIALER - 1 VOICE GRADE
423.000.76.535.80.42.00 41.23
WWTP TELEMETRY - 8 VOICEGRADE SPECIAL253-017-7256
WWTP TELEMETRY - 8 VOICEGRADE SPECIAL
423.000.76.535.80.42.00 223.48
MEADOWDALE PRESCHOOL PHONE & PM IP425-745-5055
MEADOWDALE PRESCHOOL PHONE
001.000.64.571.29.42.00 89.65
PARKS MAINT IP LINE (10 + TAX)
001.000.66.518.30.42.00 10.95
WWTP AUTO DIALER - 1 BUSINESS LINE425-771-5553
WWTP AUTO DIALER - 1 BUSINESS LINE
423.000.76.535.80.42.00 112.46
LIFT STATION #8 VG SPECIAL ACCESS LINES425-774-1031
LIFT STATION #8 TWO VOICE GRADE SPECIAL
423.000.75.535.80.42.00 47.12
SNO-ISLE LIBRARY ELEVATOR PHONE LINE425-776-1281
SNO-ISLE LIBRARY ELEVATOR PHONE LINE
001.000.66.518.30.42.00 52.34
425-776-5316 PARKS MAINT FAX LINE425-776-5316
425-776-5316 PARKS MAINT FAX LINE
001.000.64.576.80.42.00 96.33
11Page:
Packet Page 41 of 564
12/10/2015
Voucher List
City of Edmonds
12
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
(Continued)Total :1,232.4721754212/10/2015 011900 011900 FRONTIER
217543 12/10/2015 002500 GALLS LLC DBA BLUMENTHAL 004455588 INV#004455588 ACCT#1001074529 EDMONDS PD
21IN SIDEBREAK SCABBARD
001.000.41.521.22.31.00 47.95
AKER KEY MACE CASE HOLDER
001.000.41.521.22.31.00 20.83
9.5% Sales Tax
001.000.41.521.22.31.00 6.54
Total :75.32
217544 12/10/2015 068075 GENERAL AUTOMOTIVE SUPPLY CO 362278 INV#362278 ACCT#21086 - EDMONDS PD
20 MINUTE SPIKELESS ROAD FLARES
001.000.41.521.22.31.00 1,144.80
Total :1,144.80
217545 12/10/2015 012233 GRAYBAR ELECTRIC CO INC 982284611 WWTP-REPAIR/MAINTENANCE ELECTRIC
PDB FINGER SAFE ASSEMBLY
423.000.76.535.80.31.22 62.55
Freight
423.000.76.535.80.31.22 13.29
9.5% Sales Tax
423.000.76.535.80.31.22 7.20
Total :83.04
217546 12/10/2015 069733 H B JAEGER COMPANY LLC 165452/1 Water Inventory - W-FLNGCI-04-010 #0152
Water Inventory - W-FLNGCI-04-010 #0152
421.000.74.534.80.34.20 459.44
Freight
421.000.74.534.80.34.20 29.10
9.5% Sales Tax
421.000.74.534.80.34.20 46.41
Total :534.95
217547 12/10/2015 012560 HACH COMPANY 9631114 WWPT-LAB SUPPLIES
LAB SUPPLIES
12Page:
Packet Page 42 of 564
12/10/2015
Voucher List
City of Edmonds
13
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217547 12/10/2015 (Continued)012560 HACH COMPANY
423.000.76.535.80.31.31 638.50
9.5% Sales Tax
423.000.76.535.80.31.31 60.66
WWTP-LAB SUPPLIES9680254
lab supplies
423.000.76.535.80.31.31 491.75
Freight
423.000.76.535.80.31.31 52.77
9.5% Sales Tax
423.000.76.535.80.31.31 51.74
WWTP-LAB-SMALL EQUIPMENT9688751
LAB-SMALL EQUIPMENT
423.000.76.535.80.35.00 1,239.75
Freight
423.000.76.535.80.35.00 66.39
9.5% Sales Tax
423.000.76.535.80.35.00 124.08
Total :2,725.64
217548 12/10/2015 074814 HARRIS & ASSOCIATES INC 30303 E3DB.SERVICES THRU 11/30/15
E3DB.Services thru 11/30/15
112.200.68.595.33.41.00 4,941.14
Total :4,941.14
217549 12/10/2015 075133 HERRIN, NICOLE BID-120215 BID ADMINISTRATIVE SERVICES FOR NOVEMBER
Administrative Services for Edmonds
140.000.61.558.70.41.40 610.00
Total :610.00
217550 12/10/2015 060165 HWA GEOSCIENCES INC 26286 WWTP-CLARIFIER-C465
GROUNDWATER MONITORING
423.100.76.594.39.41.10 311.64
Total :311.64
217551 12/10/2015 073548 INDOFF INCORPORATED 2719094 Calendars -DSD
13Page:
Packet Page 43 of 564
12/10/2015
Voucher List
City of Edmonds
14
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217551 12/10/2015 (Continued)073548 INDOFF INCORPORATED
Calendars -DSD
001.000.62.524.10.31.00 26.01
Office Supplies DSD2720547
Office Supplies DSD
001.000.62.524.10.31.00 76.16
CALENDARS AND NOTEBOOKS2721180
Monthly calendar, wall calendar, and
001.000.61.557.20.31.00 54.25
9.5% Sales Tax
001.000.61.557.20.31.00 5.15
CITY CLERKS OFFICE SUPPLIES2721648
CALENDARS, ADDRESS LABELS, SPOONS,
001.000.25.514.30.31.00 173.56
9.5% Sales Tax
001.000.25.514.30.31.00 16.49
Office Supplies2721813
Office Supplies
001.000.22.521.10.31.00 93.69
9.5% Sales Tax
001.000.22.521.10.31.00 8.91
Total :454.22
217552 12/10/2015 075487 INTEGRITY SAFETY SERVICES INC 154-6050 Trenching, Excavation and Welding
Trenching, Excavation and Welding
001.000.22.518.10.49.00 3,040.00
Total :3,040.00
217553 12/10/2015 069366 ISSAQUAH HONDA KUBOTA 54085I CEMETERY WALKER MOWER BELT, ENGINE PTO
CEMETERY WALKER MOWER BELT, ENGINE PTO
130.000.64.536.50.31.00 163.94
9.5% Sales Tax
130.000.64.536.50.31.00 15.58
Total :179.52
217554 12/10/2015 075062 JAMESTOWN NETWORKS 3787 FIBER OPTICS INTERNET CONNECTION
14Page:
Packet Page 44 of 564
12/10/2015
Voucher List
City of Edmonds
15
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217554 12/10/2015 (Continued)075062 JAMESTOWN NETWORKS
Dec-15 Fiber Optics Internet Connection
001.000.31.518.87.42.00 500.00
9.5% Sales Tax
001.000.31.518.87.42.00 47.50
Total :547.50
217555 12/10/2015 015270 JCI JONES CHEMICALS INC 674989 WWTP-HYPOCHLORITE
hypochlorite solution 4586 gal
423.000.76.535.80.31.53 3,790.33
Total :3,790.33
217556 12/10/2015 072650 KCDA PURCHASING COOPERATIVE 3981621 INV#3981621 ACCT#100828 - EDMONDS PD
10 CASES MULTI USE COPY PAPER
001.000.41.521.10.31.00 242.30
HANDLING FEE
001.000.41.521.10.31.00 50.90
9.5% Sales Tax
001.000.41.521.10.31.00 23.02
Total :316.22
217557 12/10/2015 074135 LAFAVE, CAROLYN 120715 UNITED WAY CITY CAMPAIGN
United Way Campaign Bingo candy
001.000.21.513.10.49.00 27.58
United Way Campaign bake-off
001.000.21.513.10.49.00 10.93
United Way Campaign wiffleball &
001.000.21.513.10.49.00 34.02
Comprehensive Emergency Management
001.000.21.513.10.49.00 30.75
Total :103.28
217558 12/10/2015 066522 LAKESIDE INDUSTRIES INC E4CD.Pmt 2 E4CD.PMT 2 THRU 11/06/15
E4CD.Pmt 2 thru 11/06/15
112.200.68.595.33.65.00 80,977.24
15Page:
Packet Page 45 of 564
12/10/2015
Voucher List
City of Edmonds
16
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
(Continued)Total :80,977.2421755812/10/2015 066522 066522 LAKESIDE INDUSTRIES INC
217559 12/10/2015 017135 LANDAU ASSOCIATES INC 0036228 CIVIC ACQUIS PHASE I ENVIRON SITE ASSESS
CIVIC ACQUIS PHASE I ENVIRON SITE
132.000.64.594.76.41.00 5,000.00
T.O. 15-07 : GAENZ PEER REVIEW36281
T.O. 15-07: Gaenz Peer Review~
001.000.245.965 2,500.00
Total :7,500.00
217560 12/10/2015 075016 LEMAY MOBILE SHREDDING 4459755 INV #4459755 SHREDDING SERVICES
INVOICE #4459755~
001.000.25.514.30.41.00 4.56
INVOICE #4459755~
001.000.31.514.23.41.00 4.56
INV#4459957 ACCT#2185-952778-819 EDMONDS4459957
SHRED 2 TOTES @ $4.56 11/25/15
001.000.41.521.10.41.00 9.12
Total :18.24
217561 12/10/2015 074263 LYNNWOOD WINSUPPLY CO 010751-00 PM; RUBBBER COVER, NIPPLE, BRUSHES
PM; RUBBBER COVER, NIPPLE, BRUSHES
001.000.64.576.80.31.00 72.06
9.5% Sales Tax
001.000.64.576.80.31.00 6.85
PM: RUBBER COVER, BRUSH010752-00
PM: RUBBER COVER, BRUSH
001.000.64.576.80.31.00 55.52
9.5% Sales Tax
001.000.64.576.80.31.00 5.27
Total :139.70
217562 12/10/2015 020039 MCMASTER-CARR SUPPLY CO 42330478 WWTP: SUPPLIES, MECHANICAL
Stainless Steel 90 Degree Angle
423.000.76.535.80.31.21 75.31
Freight
16Page:
Packet Page 46 of 564
12/10/2015
Voucher List
City of Edmonds
17
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217562 12/10/2015 (Continued)020039 MCMASTER-CARR SUPPLY CO
423.000.76.535.80.31.21 15.53
WWTP-SUPPLIES.MECHANICAL44316453
SUPPLIES AND TOOLS
423.000.76.535.80.31.21 316.35
Freight
423.000.76.535.80.31.21 8.05
WWTP-SUPPLIES, MECHANICAL44332023
Steel Ball Valve and Stainless steel
423.000.76.535.80.31.21 165.76
Freight
423.000.76.535.80.31.21 22.16
Total :603.16
217563 12/10/2015 071011 MIDCO-WEST INC 440017736 WWTP-FORKLIFT REPAIR
FORKLIFT REPAIR
423.000.76.535.80.48.21 774.40
9.5% Sales Tax
423.000.76.535.80.48.21 73.57
WWTP-REPAIR/INSTALL PARTS440018394
INSTALL HYD DUMPSTER ON STR
423.000.76.535.80.48.21 179.75
9.5% Sales Tax
423.000.76.535.80.48.21 17.08
Total :1,044.80
217564 12/10/2015 074831 MILLER PAINT COMPANY 291407111 Traffic - Paint Truck Supplies
Traffic - Paint Truck Supplies
111.000.68.542.64.31.00 48.60
9.5% Sales Tax
111.000.68.542.64.31.00 4.62
Total :53.22
217565 12/10/2015 024001 NC MACHINERY MVCS0252598 Unit 106 - Hose
Unit 106 - Hose
511.000.77.548.68.31.10 11.67
17Page:
Packet Page 47 of 564
12/10/2015
Voucher List
City of Edmonds
18
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217565 12/10/2015 (Continued)024001 NC MACHINERY
Freight
511.000.77.548.68.31.10 6.92
9.5% Sales Tax
511.000.77.548.68.31.10 1.77
Total :20.36
217566 12/10/2015 074724 NEWMAN-BURROW LLC 50720 EDMONDS PORTION OF WTR/SPRING 2016 DIGIT
EDMONDS PORTION OF WTR/SPRING 2016
001.000.64.571.22.49.00 524.50
Total :524.50
217567 12/10/2015 072032 NORR, JULIE 20257 GINGERBREAD 20257 GINGERBREAD HOUSE INSTRUCTION
20257 GINGERBREAD HOUSE INSTRUCTION
001.000.64.571.22.41.00 124.80
20258 GINGERBREAD HOUSE INSTRUCTION20258 GINGERBREAD
20258 GINGERBREAD HOUSE INSTRUCTION
001.000.64.571.22.41.00 144.00
Total :268.80
217568 12/10/2015 061013 NORTHWEST CASCADE INC 2-1443051 HAINES WHARF PARK HONEY BUCKET
HAINES WHARF PARK HONEY BUCKET
001.000.64.576.80.45.00 218.78
WILLOW CREEK HONEY BUCKET2-1448711
WILLOW CREEK HONEY BUCKET
001.000.64.576.80.45.00 113.85
Total :332.63
217569 12/10/2015 063511 OFFICE MAX INC 509309 CEMETERY PRINTER CARTRIDGES
CEMETERY PRINTER CARTRIDGES
130.000.64.536.50.31.00 57.48
9.5% Sales Tax
130.000.64.536.50.31.00 5.47
P&R: COLORED PAPER510821
P&R: COLORED PAPER
001.000.64.571.21.31.00 34.95
18Page:
Packet Page 48 of 564
12/10/2015
Voucher List
City of Edmonds
19
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217569 12/10/2015 (Continued)063511 OFFICE MAX INC
9.5% Sales Tax
001.000.64.571.21.31.00 3.31
PM: PLANNER, HNG FLDR, TOWELETTES, BINDE514212
PM: PLANNER, HNG FLDR, TOWELETTES,
001.000.64.576.80.31.00 101.61
9.5% Sales Tax
001.000.64.576.80.31.00 9.64
PHONE REST, BATTERIES, MOUSE514664
ADMIN: SHOULDER REST
001.000.64.571.21.31.00 9.65
ARTS COMM: MOUSE, BATTERIES
117.100.64.573.20.31.00 32.59
9.5% Sales Tax
001.000.64.571.21.31.00 0.92
9.5% Sales Tax
117.100.64.573.20.31.00 3.10
Total :258.72
217570 12/10/2015 070166 OFFICE OF THE STATE TREASURER November, 2015 COURT, BLDG CODE & JIS TRANSMITTAL
Emergency Medical Services & Trauma
001.000.237.120 1,040.00
PSEA 1, 2 & 3 Account
001.000.237.130 20,469.84
Building Code Fee Account
001.000.237.150 108.00
Accessible Communities Acct
001.000.237.290 45.54
State Patrol Death Investigation
001.000.237.330 51.04
Judicial Information Systems Account
001.000.237.180 4,632.76
School Zone Safety Account
001.000.237.200 281.76
Washington Auto Theft Prevention
19Page:
Packet Page 49 of 564
12/10/2015
Voucher List
City of Edmonds
20
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217570 12/10/2015 (Continued)070166 OFFICE OF THE STATE TREASURER
001.000.237.250 2,074.08
Traumatic Brain Injury
001.000.237.260 394.32
Multi-Model Transportation
001.000.237.300 45.57
Hwy Safety Acct
001.000.237.320 81.05
Crime Lab Blood Breath Analysis
001.000.237.170 81.27
WSP Hwy Acct
001.000.237.340 289.84
Total :29,595.07
217571 12/10/2015 026200 OLYMPIC VIEW WATER DISTRICT 0054671 HICKMAN PARK IRRIGATION
HICKMAN PARK IRRIGATION
001.000.64.576.80.47.00 17.18
HICKMAN PARK DRINKING FOUNTAIN & SPRINKL0060860
HICKMAN PARK DRINKING FOUNTAIN &
001.000.64.576.80.47.00 95.02
Total :112.20
217572 12/10/2015 007800 PETTY CASH Nov17-Dec9 NOV 17 THRU DEC 9 PETTY CASH
Mileage to 2 day class in Mt
421.000.74.534.80.43.00 99.13
Foor for 11/19 Sup. Training - Mary Ann
001.000.22.518.10.49.00 30.12
Golida Brund photo props, paint brushes
001.000.22.518.10.49.00 17.07
Holiday Brunch Pineapples - Tammy
001.000.22.518.10.49.00 7.98
Holiday Brunch Decorations - Tammy
001.000.22.518.10.49.00 30.00
Holiday Brunch Leis - Tammy Rankins
001.000.22.518.10.49.00 25.00
Mileage to meetings in Everett and
20Page:
Packet Page 50 of 564
12/10/2015
Voucher List
City of Edmonds
21
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217572 12/10/2015 (Continued)007800 PETTY CASH
001.000.62.558.60.43.00 76.24
Holiday Brunch Centerpiece Paper
001.000.22.518.10.49.00 10.51
Food for 11/17 Sup. Training - Mary Ann
001.000.22.518.10.49.00 30.09
Total :326.14
217573 12/10/2015 028860 PLATT ELECTRIC SUPPLY INC I151040 City Hall - Supplies
9.5% Sales Tax
001.000.66.518.30.31.00 1.28
City Hall - Supplies
001.000.66.518.30.31.00 13.43
WWTP-SUPPLIES.ELECTRICAL-REPAIR/REPLACEI212039
ELECTRICAL SUPPLES-REPAIR AND REPLACE
423.000.76.535.80.48.22 187.42
9.5% Sales Tax
423.000.76.535.80.48.22 17.80
WWTP-REPAIR/MAINTENANCE ELECTRICI219617
HOF A30P30 Panel
423.000.76.535.80.48.22 227.25
9.5% Sales Tax
423.000.76.535.80.48.22 21.59
Total :468.77
217574 12/10/2015 070160 POETS & WRITERS INC 2016-15203 WOTS P&W AD
WOTS P&W AD
123.000.64.573.20.41.40 1,590.00
Total :1,590.00
217575 12/10/2015 075432 POINT BLANK ENTERPRISES IF-1214491 INV#IF-1214491 - BURRELL - EDMONDS PD
AXIIIA BALLISTIC VEST
001.000.41.521.22.24.00 896.00
Freight
001.000.41.521.22.24.00 5.80
21Page:
Packet Page 51 of 564
12/10/2015
Voucher List
City of Edmonds
22
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
(Continued)Total :901.8021757512/10/2015 075432 075432 POINT BLANK ENTERPRISES
217576 12/10/2015 064088 PROTECTION ONE 291104 ALARM MONITORING - PARKS MAINT./FS #16
ALARM MONITORING FOR PARKS MAINTENANCE
001.000.66.518.30.42.00 21.33
ALARM MONITORING FOR PARKS MAINTENANCE
001.000.64.576.80.42.00 21.33
ALARM MONITORING FOR FIRE STATION #16
001.000.66.518.30.42.00 130.38
ALARM MONITORING - PARKS MAINT./FS #16291104
ALARM MONITORING FOR PARKS MAINTENANCE
001.000.66.518.30.42.00 21.33
ALARM MONITORING FOR PARKS MAINTENANCE
001.000.64.576.80.42.00 21.33
Total :215.70
217577 12/10/2015 070809 PUGET SOUND EXECUTIVE 15-2204 COURT SECURITY
COURT SECURITY
001.000.23.512.50.41.00 440.00
Total :440.00
217578 12/10/2015 072162 RANKINS, TAMMY 1BD12EH00100ML HOLIDAY BRUNCH DECORATIONS
Holiday Brunch Decorations
001.000.22.518.10.49.00 65.91
9.2% Sales Tax
001.000.22.518.10.49.00 6.06
Total :71.97
217579 12/10/2015 062657 REGIONAL DISPOSAL COMPANY 0000049150 Storm Dump Fees
Storm Dump Fees
422.000.72.531.10.49.00 501.30
Total :501.30
217580 12/10/2015 061540 REPUBLIC SERVICES #197 3-0197-0800478 FIRE STATION #20 23009 88TH AVE W
FIRE STATION #20 23009 88TH AVE W
001.000.66.518.30.47.00 147.73
PUBLIC WORKS OMC 7110 210TH ST SW3-0197-0800897
22Page:
Packet Page 52 of 564
12/10/2015
Voucher List
City of Edmonds
23
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217580 12/10/2015 (Continued)061540 REPUBLIC SERVICES #197
PUBLIC WORKS OMC 7110 210TH ST SW
001.000.65.518.20.47.00 29.73
PUBLIC WORKS OMC 7110 210TH ST SW
111.000.68.542.90.47.00 112.99
PUBLIC WORKS OMC 7110 210TH ST SW
421.000.74.534.80.47.00 112.99
PUBLIC WORKS OMC 7110 210TH ST SW
423.000.75.535.80.47.10 112.99
PUBLIC WORKS OMC 7110 210TH ST SW
511.000.77.548.68.47.00 112.99
PUBLIC WORKS OMC 7110 210TH ST SW
422.000.72.531.90.47.00 112.99
FIRE STATION #16 8429 196TH ST SW3-0197-0801132
FIRE STATION #16 8429 196TH ST SW
001.000.66.518.30.47.00 158.12
CLUBHOUSE 6801 N MEADOWDALE RD3-0197-0829729
CLUBHOUSE 6801 N MEADOWDALE RD
001.000.66.518.30.47.00 69.50
Total :970.03
217581 12/10/2015 075288 RODARTE CONSTRUCTION INC E7AC.Pmt 6 E7AC.PMT 6 THRU 10/31/15
E7AC.Pmt 6 thru 10/31/15
112.200.68.595.33.65.00 777,819.33
Total :777,819.33
217582 12/10/2015 069477 ROTARY OFFSET PRESS INC 34922 EDMONDS PORTION OF PRINTING OF 2016 WINT
EDMONDS PORTION OF PRINTING OF 2016
001.000.64.571.22.49.00 4,409.06
EDMONDS PORTION OF PRINTING OF 2016
117.100.64.573.20.41.40 1,750.00
Total :6,159.06
217583 12/10/2015 071467 S MORRIS COMPANY NOV 2015 INVOICE 11/30/15 ACCT#70014 - EDMONDS PD
#180825 1 NPC - 11/12/15
001.000.41.521.70.41.00 11.71
23Page:
Packet Page 53 of 564
12/10/2015
Voucher List
City of Edmonds
24
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217583 12/10/2015 (Continued)071467 S MORRIS COMPANY
#181652 5 NPC - 11/25/15
001.000.41.521.70.41.00 58.55
Total :70.26
217584 12/10/2015 067681 SAGE CONTROL ORDNANCE INC 11952 INV#11952 CUST#EE0065 - EDMONDS PD
PROPELLING CHG - SMOKELESS
628.000.41.521.23.31.00 525.00
PROPELLING CHG-BATON LESS
628.000.41.521.23.31.00 175.00
Freight
628.000.41.521.23.31.00 45.00
Total :745.00
217585 12/10/2015 075442 SAHLSTROM, BROOKE BID-103115 ADMINISTRATIVE SERVICES FOR OCTOBER
Administrative services for Edmonds
140.000.61.558.70.41.00 169.80
Total :169.80
217586 12/10/2015 061135 SEAVIEW CHEVROLET 271045 Unit 7 - Cluster
Unit 7 - Cluster
511.000.77.548.68.31.10 320.00
9.5% Sales Tax
511.000.77.548.68.31.10 30.40
Unit 796 - Gaskets271270
Unit 796 - Gaskets
511.000.77.548.68.31.10 35.37
9.5% Sales Tax
511.000.77.548.68.31.10 3.36
Unit 127 - Parts272689
Unit 127 - Parts
511.000.77.548.68.31.10 24.04
9.5% Sales Tax
511.000.77.548.68.31.10 2.28
Svc FeesFC1509-A
Svc Fees
24Page:
Packet Page 54 of 564
12/10/2015
Voucher List
City of Edmonds
25
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217586 12/10/2015 (Continued)061135 SEAVIEW CHEVROLET
511.000.77.548.68.31.10 1.45
Svc FeesFC1510-A
Svc Fees
511.000.77.548.68.31.10 5.83
Svc FeesFC1511-A
Svc Fees
511.000.77.548.68.31.10 5.83
Total :428.56
217587 12/10/2015 074997 SEITEL SYSTEMS, LLC 28810 14108-SUPPORT NOV 2015 WORK COMPLETED
14108-Support November 10 - 24, 2015
001.000.31.518.88.41.00 1,687.50
Total :1,687.50
217588 12/10/2015 036509 SIGNATURE FORMS INC 027091 CITY CLERK BUSINESS LICENSE & RENEWAL FO
BUSINESS LICENSE RENEWAL FORMS QTY.
001.000.25.514.30.31.00 314.25
CITY BUSINESS LICENSE QTY. 5,000
001.000.25.514.30.31.00 313.75
Freight
001.000.25.514.30.31.00 56.96
9.5% Sales Tax
001.000.25.514.30.31.00 65.07
Total :750.03
217589 12/10/2015 074906 SITE WORKSHOP LLC 3761 CITY PARK SPRAYPARK LANDSCAPE ARCHITECTU
CITY PARK SPRAYPARK LANDSCAPE
132.000.64.594.76.41.00 9,258.02
CITY PARK SPRAYPARK LANDSCAPE ARCHIT SVC3854
CITY PARK SPRAYPARK LANDSCAPE ARCHIT
132.000.64.594.76.41.00 7,718.80
Total :16,976.82
217590 12/10/2015 037375 SNO CO PUD NO 1 2001-2487-3 TRAFFIC LIGHT 9933 100TH AVE W / METER 1
TRAFFIC LIGHT 9933 100TH AVE W / METER
25Page:
Packet Page 55 of 564
12/10/2015
Voucher List
City of Edmonds
26
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217590 12/10/2015 (Continued)037375 SNO CO PUD NO 1
111.000.68.542.64.47.00 38.00
LIFT STATION #8 113 RAILROAD AVE / METER2002-0291-9
LIFT STATION #8 113 RAILROAD AVE /
423.000.75.535.80.47.10 70.26
FRANCES ANDERSON CENTER 700 MAIN ST / ME2004-2241-8
FRANCES ANDERSON CENTER 700 MAIN ST /
001.000.66.518.30.47.00 1,538.91
TRAFFIC LIGHT 22000 76TH AVE W / METER 12004-9315-3
TRAFFIC LIGHT 22000 76TH AVE W / METER
111.000.68.542.64.47.00 26.42
TRAFFIC LIGHT 22400 76TH AVE W / METER 12005-9488-5
TRAFFIC LIGHT 22400 76TH AVE W / METER
111.000.68.542.64.47.00 17.49
ANWAY PARK 131 SUNSET AVE / METER 1000252006-6395-3
ANWAY PARK 131 SUNSET AVE / METER
001.000.64.576.80.47.00 264.22
DECORATIVE LIGHTING 115 2ND AVE S / METE2009-1385-3
DECORATIVE LIGHTING 115 2ND AVE S /
111.000.68.542.63.47.00 23.82
BRACKETT'S LANDING NORTH 50 RAILROAD AVE2010-5432-7
BRACKETT'S LANDING NORTH 50 RAILROAD
001.000.64.576.80.47.00 59.18
TRAFFIC LIGHT 23800 FIRDALE AVE / METER2011-0356-1
TRAFFIC LIGHT 23800 FIRDALE AVE / METER
111.000.68.542.64.47.00 36.25
TRAFFIC LIGHT 21132 76TH AVE W / METER 12011-8789-5
TRAFFIC LIGHT 21132 76TH AVE W / METER
111.000.68.542.64.47.00 24.78
PINE ST PARK2013-2711-1
PINE ST PARK
001.000.64.576.80.47.00 18.54
LIFT STATION #14 7905 1/2 211TH PL SW /2015-0127-7
LIFT STATION #14 7905 1/2 211TH PL SW /
423.000.75.535.80.47.10 21.15
LIFT STATION #7 121 W DAYTON ST / METER2015-3292-6
26Page:
Packet Page 56 of 564
12/10/2015
Voucher List
City of Edmonds
27
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217590 12/10/2015 (Continued)037375 SNO CO PUD NO 1
LIFT STATION #7 121 W DAYTON ST / METER
423.000.75.535.80.47.10 208.56
CEMETERY BUILDING2015-5730-3
CEMETERY BUILDING
001.000.64.576.80.47.00 160.57
TRAFFIC LIGHT 660 EDMONDS WAY / METER 102015-6343-4
TRAFFIC LIGHT 660 EDMONDS WAY / METER
111.000.68.542.64.47.00 28.13
PEDEST CAUTION LIGHT 23190 100TH AVE W /2017-0375-8
PEDEST CAUTION LIGHT 23190 100TH AVE W
111.000.68.542.64.47.00 30.56
STREET LIGHTING (183 LIGHTS @ 150W) / NO2017-1178-5
STREET LIGHTING (183 LIGHTS @ 150W) /
111.000.68.542.63.47.00 906.95
BRACKETT'S LANDING SOUTH 100 RAILROAD AV2021-3965-5
BRACKETT'S LANDING SOUTH 100 RAILROAD
001.000.64.576.80.47.00 26.61
CEMETERY WELL PUMP2021-6153-5
CEMETERY WELL PUMP
001.000.64.576.80.47.00 71.78
PEDEST CAUTION LIGHT 7801 212TH ST SW /2021-9128-4
PEDEST CAUTION LIGHT 7801 212TH ST SW /
111.000.68.542.63.47.00 18.54
TRAFFIC LIGHT 21530 76TH AVE W / METER 12023-5673-9
TRAFFIC LIGHT 21530 76TH AVE W / METER
111.000.68.542.64.47.00 24.69
LIFT STATION #1 105 CASPERS ST / METER 12024-9953-9
LIFT STATION #1 105 CASPERS ST / METER
423.000.75.535.80.47.10 561.94
STREET LIGHTING (303 LIGHTS @ 200W) / NO2025-2918-6
STREET LIGHTING (303 LIGHTS @ 200W) /
111.000.68.542.63.47.00 2,861.82
STREET LIGHTING (13 LIGHTS @ 400W) / NOT2025-2920-2
STREET LIGHTING (13 LIGHTS @ 400W) /
111.000.68.542.63.47.00 120.42
27Page:
Packet Page 57 of 564
12/10/2015
Voucher List
City of Edmonds
28
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217590 12/10/2015 (Continued)037375 SNO CO PUD NO 1
STREET LIGHTING (2029 LIGHTS @ 100W) / N2025-7615-3
STREET LIGHTING (2029 LIGHTS @ 100W) /
111.000.68.542.63.47.00 15,217.47
STREET LIGHTING (58 LIGHTS @ 250W) / NOT2025-7948-8
STREET LIGHTING (58 LIGHTS @ 250W) /
111.000.68.542.63.47.00 350.05
WWTP ENERGY MANAGEMENT SERVICE / NOT MET2025-7952-0
WWTP ENERGY MANAGEMENT SERVICE / NOT
423.000.76.535.80.47.61 9.14
STREET LIGHTING (1 LIGHT @ 150W) / NOT M2047-1489-3
STREET LIGHTING (1 LIGHT @ 150W) / NOT
111.000.68.542.63.47.00 4.46
STREET LIGHTING (18 LIGHTS @ 200W) / NOT2047-1492-7
STREET LIGHTING (18 LIGHTS @ 200W) /
111.000.68.542.63.47.00 99.03
STREET LIGHTING (5 LIGHTS @ 400W) / NOT2047-1493-5
STREET LIGHTING (5 LIGHTS @ 400W) / NOT
111.000.68.542.63.47.00 52.21
STREET LIGHTING (2 LIGHTS @ 100W) / NOT2047-1494-3
STREET LIGHTING (2 LIGHTS @ 100W) / NOT
111.000.68.542.63.47.00 13.27
STREET LIGHTING (26 LIGHTS @ 250W) / NOT2047-1495-0
STREET LIGHTING (26 LIGHTS @ 250W) /
111.000.68.542.63.47.00 180.24
DECORATIVE & STREET LIGHTING 226122053-0758-0
DECORATIVE & STREET LIGHTING 22612
111.000.68.542.64.47.00 231.95
Total :23,317.41
217591 12/10/2015 006630 SNOHOMISH COUNTY 67465 PARKS MAINT 5005 DUMP FEES
PARKS MAINT DUMP FEES
001.000.64.576.80.47.00 507.00
ILLEGAL DUMP BOX SPRING
422.000.72.531.10.49.00 5.00
WWTP-DEBRIS. CFL. BATTERUESMR163911
28Page:
Packet Page 58 of 564
12/10/2015
Voucher List
City of Edmonds
29
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217591 12/10/2015 (Continued)006630 SNOHOMISH COUNTY
Debris, CFL and Batteries
423.000.76.535.80.47.66 84.00
Total :596.00
217592 12/10/2015 070167 SNOHOMISH COUNTY TREASURER November 2015 Crime Victims Court Remittance
Crime Victims Court Remittance
001.000.237.140 512.42
Total :512.42
217593 12/10/2015 038300 SOUND DISPOSAL CO 103583 CIVIC CENTER 250 5TH AVE N
CIVIC CENTER 250 5TH AVE N
001.000.66.518.30.47.00 550.68
WWTP 200 2ND AVE S / RECYCLING103584
WWTP 200 2ND AVE S / RECYCLING
423.000.76.535.80.47.66 1,150.26
FRANCES ANDERSON CENTER 700 MAIN ST103585
FRANCES ANDERSON CENTER 700 MAIN ST
001.000.66.518.30.47.00 674.47
SNO-ISLE LIBRARY 650 MAIN ST103586
SNO-ISLE LIBRARY 650 MAIN ST
001.000.66.518.30.47.00 555.23
PARKS MAINT GARBAGE AND RECYCLING103587
PARKS MAINT GARBAGE AND RECYCLING
001.000.64.576.80.47.00 670.20
CITY HALL 121 5TH AVE N103588
CITY HALL 121 5TH AVE N
001.000.66.518.30.47.00 459.89
Total :4,060.73
217594 12/10/2015 038410 SOUND SAFETY PRODUCTS 21108/1 Water - Work Jeans - V Smith
Water - Work Jeans - V Smith
421.000.74.534.80.24.00 212.50
9.2% Sales Tax
421.000.74.534.80.24.00 19.55
29Page:
Packet Page 59 of 564
12/10/2015
Voucher List
City of Edmonds
30
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
(Continued)Total :232.0521759412/10/2015 038410 038410 SOUND SAFETY PRODUCTS
217595 12/10/2015 071585 STERICYCLE INC 3003242907 INV#3003242907 CUST#6076358 - EDMONDS PD
MIMIMUM MONTHLY CHARGE
001.000.41.521.80.41.00 10.00
9.5% Sales Tax
001.000.41.521.80.41.00 0.36
Total :10.36
217596 12/10/2015 040916 TC SPAN AMERICA 72128 Water Sewer - Work T's Silk Screen
Water Sewer - Work T's Silk Screen
421.000.74.534.80.24.00 21.25
Water Sewer - Work T's Silk Screen
423.000.75.535.80.24.00 21.25
9.5% Sales Tax
421.000.74.534.80.24.00 2.02
9.5% Sales Tax
423.000.75.535.80.24.00 2.02
Total :46.54
217597 12/10/2015 071666 TETRA TECH INC 35009-1A E5DB.SERVICES THRU 10/31/15
E5DB.Services thru 10/31/15
112.200.68.595.33.41.00 2,100.61
E5DB.SERVICES THRU 10/31/1535009-1B
E5DB.Services thru 10/31/15
112.200.68.595.33.41.00 4,321.20
Total :6,421.81
217598 12/10/2015 066056 THE SEATTLE TIMES 595100-101 ADVERTISING FOR HOLIDAYS
Advertising in Seattle Times online and
001.000.61.558.70.41.40 3,500.00
Advertising in Seattle Times online and
120.000.31.575.42.41.40 720.00
Total :4,220.00
217599 12/10/2015 038315 THYSSENKRUPP ELEVATOR 5000420115 Library - Repairs
30Page:
Packet Page 60 of 564
12/10/2015
Voucher List
City of Edmonds
31
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217599 12/10/2015 (Continued)038315 THYSSENKRUPP ELEVATOR
Library - Repairs
001.000.66.518.30.48.00 294.75
9.5% Sales Tax
001.000.66.518.30.48.00 28.00
Total :322.75
217600 12/10/2015 062693 US BANK 3249 POSTAGE FOR PASSPORTS
POSTAGE FOR PASSPORTS
001.000.23.512.50.42.00 45.45
AWC 2016 ACTION DAYS4697
AWC 2016 action days registration
001.000.21.513.10.49.00 150.00
Town Hall meeting refreshments
001.000.21.513.10.31.00 11.97
meeting supply rolling cart (returned)
001.000.21.513.10.31.00 38.94
mouse pad
001.000.21.513.10.31.00 5.30
meeting supply rolling cart, wireless
001.000.21.513.10.31.00 112.84
Comprehensive emergency management
001.000.21.513.10.49.00 20.45
AMAZON PRIME MEMBERSHIP CREDIT4697
credit for Amazon Prime Membership
001.000.21.513.10.49.00 -99.00
UNITED WAY CAMPAIGN BINGO4697
United Way Campaign bingo set
001.000.21.513.10.31.00 16.99
9.5% Sales Tax
001.000.21.513.10.31.00 1.61
LEGISLATIVE AGENDA DISCUSSION4697
Working lunch for legislative agenda
001.000.21.513.10.49.00 29.45
MEETING SUPPLY ROLLING CART RETURNED4697a
Wayfair - Meeting supply rolling cart
31Page:
Packet Page 61 of 564
12/10/2015
Voucher List
City of Edmonds
32
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217600 12/10/2015 (Continued)062693 US BANK
001.000.21.513.10.31.00 -33.95
VIPRE, AUTOCAD, SYMANTEC, LED HDTV, DOMA5179
Bulkregister.com - Domain name
001.000.31.518.88.49.00 29.50
Techbatterysolutions.com - APC RBC43
001.000.31.518.88.31.00 120.75
Bulkregister.com - Domain name
001.000.31.518.88.49.00 28.51
Amazon - HGST Deskstar NAS 4TB 7200RPM
001.000.31.518.88.48.00 177.49
Newegg.com - Changhong 49" Class 1080p
001.000.62.524.20.49.00 1,089.00
Newegg.com - Rosewill RHTB-14005 TV
001.000.62.524.20.49.00 71.97
Newegg.com - Insten High Speed HDMI
001.000.62.524.20.49.00 7.69
Newegg.com - ASUS VS Series VS228H-P
001.000.62.524.20.49.00 604.90
Newegg.com - Philips Extra Bass Hifi
001.000.62.524.20.49.00 21.83
Newegg.com - Lenovo Desktop Computer
001.000.62.524.20.49.00 337.53
Avangate - RSForm!Pro Multi site
001.000.31.518.88.49.00 106.66
Symantec - File Share Encryption 1 yr
001.000.31.518.88.41.00 1,533.00
DLT Solutions - Autodesk AutoCAD (Qty
421.000.74.534.80.49.00 929.94
DLT Solutions - Autodesk AutoCAD (Qty
422.000.72.531.40.49.00 929.94
DLT Solutions - Autodesk AutoCAD (Qty
423.000.75.535.80.49.00 929.93
Bulkregister.com - Domain Name
001.000.31.518.88.49.00 14.75
32Page:
Packet Page 62 of 564
12/10/2015
Voucher List
City of Edmonds
33
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217600 12/10/2015 (Continued)062693 US BANK
ThreatTrack Security - VIPRE Business
001.000.31.518.88.49.00 3,640.88
Amazon - Tech Armor Apple iPad Air 2
001.000.31.518.88.31.00 19.95
Amazon - KHOMO Dual Super Slim Carbon
001.000.31.518.88.31.00 32.72
ExpertsExchange.com - IT Solutions
001.000.31.518.88.49.00 19.95
Techbatterysolutions.com - APC RBC55
001.000.31.518.88.31.00 142.95
Newegg.com - Insten High Speed HDMI
001.000.31.518.88.31.00 38.45
Newegg.com - SanDisk 4GB microSD high
001.000.31.518.88.31.00 8.55
Newegg.com - HP LaserJet Pro M225DN
001.000.64.571.29.49.00 217.48
Newegg.com - Aukey M3H4 4-port USB 3.0
001.000.31.518.88.31.00 159.92
Amazon - Microsoft Surface 3 Cover,
001.000.31.518.88.31.00 180.51
TYLER YEAR END FORMS, UPS FREIGHT CHARGE5639
Tyler Business Forms - 1099, W-2 and
001.000.31.514.23.31.00 284.68
UPS freight charges
001.000.31.518.88.42.00 9.90
SURVEY MONKEY, SUPPLIES FOR HOLIDAY MARK5923
Supplies for Holiday Market, propane,
001.000.61.558.70.31.00 330.18
Parking for director attending Sno Co
001.000.61.557.20.43.00 3.00
Renew subscription to Survey Monkey
001.000.61.557.20.41.00 300.00
December subscription to OfficeSpace
001.000.61.558.70.41.00 100.00
33Page:
Packet Page 63 of 564
12/10/2015
Voucher List
City of Edmonds
34
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217600 12/10/2015 (Continued)062693 US BANK
Facebook ad
001.000.61.558.70.41.40 1.00
DECEMBER MAYOR'S LUNCHEON MEETING7483
December 2015 Mayor's Luncheon Meeting
001.000.21.513.10.49.00 13.00
Total :12,736.56
217601 12/10/2015 075506 US BANK 4042611 EDMLTGO07
City of Edmonds WA Limited Tax Gen
001.000.39.592.18.89.00 73.70
City of Edmonds WA Limited Tax Gen
126.000.39.592.75.89.00 33.15
City of Edmonds WA Limited Tax Gen
111.000.68.592.42.89.00 5.70
City of Edmonds WA Limited Tax Gen
421.000.74.592.34.89.00 3.83
City of Edmonds WA Limited Tax Gen
422.000.72.592.31.89.00 139.66
City of Edmonds WA Limited Tax Gen
423.000.75.592.35.89.00 3.06
City of Edmonds WA Limited Tax Gen
423.100.76.592.39.89.00 165.90
EDMLTGOREF124042613
City of Edmonds Limited General
001.000.39.592.18.89.00 313.61
City of Edmonds Limited General
126.000.39.592.75.89.00 100.34
City of Edmonds Limited General
423.100.76.592.39.89.00 11.05
EDMWATREF114042618
City of Edmonds Water and Sewer
421.000.74.592.34.89.00 254.87
City of Edmonds Water and Sewer
422.000.72.592.31.89.00 122.74
34Page:
Packet Page 64 of 564
12/10/2015
Voucher List
City of Edmonds
35
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217601 12/10/2015 (Continued)075506 US BANK
City of Edmonds Water and Sewer
423.000.75.592.35.89.00 38.85
City of Edmonds Water and Sewer
423.100.76.592.39.89.00 8.54
EDMWATSEW134042623
City of Edmonds Water and Sewer Revenue
421.000.74.592.34.89.00 150.71
City of Edmonds Water and Sewer Revenue
422.000.72.592.31.89.00 25.63
City of Edmonds Water and Sewer Revenue
423.000.75.592.35.89.00 248.66
EDMWATSEW154044241
City of Edmonds WA Water and Sewer
421.000.74.592.34.89.00 92.58
City of Edmonds WA Water and Sewer
422.000.72.592.31.89.00 61.15
City of Edmonds WA Water and Sewer
423.000.75.592.35.89.00 152.02
Total :2,005.75
217602 12/10/2015 067865 VERIZON WIRELESS 9756027661 C/A 571242650-0001
iPhone/iPad Cell Service Mayor's Office
001.000.21.513.10.42.00 -300.00
C/A 571242650-00019756027661
iPhone/iPad Cell Service Bld Dept
001.000.62.524.20.42.00 315.78
iPhone/iPad Cell Service City Clerk
001.000.25.514.30.42.00 55.87
iPhone/iPad Cell Service Econ
001.000.61.557.20.42.00 75.53
iPad Cell Service Council
001.000.11.511.60.42.00 300.10
iPhone/iPad Cell Service Court
001.000.23.512.50.42.00 75.86
35Page:
Packet Page 65 of 564
12/10/2015
Voucher List
City of Edmonds
36
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217602 12/10/2015 (Continued)067865 VERIZON WIRELESS
iPhone/iPad Cell Service Development
001.000.62.524.10.42.00 95.52
iPhone/iPad Cell Service Engineering
001.000.67.532.20.42.00 600.64
iPhone/iPad Cell Service Facilities
001.000.66.518.30.42.00 83.75
iPhone/iPad Cell Service Finance
001.000.31.514.23.42.00 95.52
iPhone/iPad Cell Service HR
001.000.22.518.10.42.00 95.52
iPhone/iPad Cell Service IS
001.000.31.518.88.42.00 292.57
iPhone/iPad Cell Service IS
001.000.31.518.88.35.00 580.34
iPhone/iPad Cell Service Mayor's Office
001.000.21.513.10.42.00 95.52
iPhone/iPad Cell Service Parks Dept
001.000.64.571.21.42.00 40.01
iPhone/iPad Cell Service Police Dept
001.000.41.521.22.42.00 915.87
Air cards Police Dept
001.000.41.521.22.42.00 800.24
iPhone/iPad Cell Service Planning Dept
001.000.62.558.60.42.00 40.01
iPhone/iPad Cell Service PW Admin
001.000.65.518.20.42.00 26.55
iPhone/iPad Cell Service PW Admin
421.000.74.534.80.42.00 7.59
iPhone/iPad Cell Service PW Admin
422.000.72.531.90.42.00 26.55
iPhone/iPad Cell Service PW Admin
423.000.75.535.80.42.00 7.59
iPhone/iPad Cell Service PW Admin
423.000.76.535.80.42.00 7.58
36Page:
Packet Page 66 of 564
12/10/2015
Voucher List
City of Edmonds
37
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217602 12/10/2015 (Continued)067865 VERIZON WIRELESS
iPhone/iPad Cell Service PW Street Dept
111.000.68.542.90.42.00 171.38
iPhone/iPad Cell Service PW Fleet
511.000.77.548.68.42.00 55.51
iPhone/iPad Cell Service PW Water/Sewer
421.000.74.534.80.42.00 120.71
iPhone/iPad Cell Service PW Water/Sewer
423.000.75.535.80.42.00 120.70
iPhone/iPad Cell Service Sewer Dept
423.000.75.535.80.42.00 178.29
iPhone/iPad Cell Service Water
421.000.74.534.80.42.00 218.30
iPad Cell Service Storm
422.000.72.531.90.42.00 148.27
iPhone/iPad Cell Service WWTP
423.000.76.535.80.42.00 189.63
C/A 772540262-000019756148703
Lift Station access
001.000.31.518.88.42.00 74.47
Total :5,611.77
217603 12/10/2015 065035 WASHINGTON STATE PATROL I16003881 INV#I16003881 EDM301 - EDMONDS PD
BACKGROUND CHECKS -NOV 2015
001.000.237.100 147.50
Total :147.50
217604 12/10/2015 067195 WASHINGTON TREE EXPERTS I15-621 Street - Remove Tree at 9126 Bowdoin Way
Street - Remove Tree at 9126 Bowdoin Way
111.000.68.542.71.48.00 950.00
9.5% Sales Tax
111.000.68.542.71.48.00 90.25
Street - Remove Trees at 1031 Main StI15-623
Street - Remove Trees at 1031 Main St
111.000.68.542.71.48.00 820.00
9.5% Sales Tax
37Page:
Packet Page 67 of 564
12/10/2015
Voucher List
City of Edmonds
38
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217604 12/10/2015 (Continued)067195 WASHINGTON TREE EXPERTS
111.000.68.542.71.48.00 77.90
Street- Remove Tree at 10202 236th PL WI15-624
Street- Remove Tree at 10202 236th PL W
111.000.68.542.71.48.00 900.00
9.5% Sales Tax
111.000.68.542.71.48.00 85.50
Street - Remove 4 Trees at 7215 175thI15-642
Street - Remove 4 Trees at 7215 175th
111.000.68.542.71.48.00 1,575.00
9.5% Sales Tax
111.000.68.542.71.48.00 149.63
Street - Remove Red Cedar at 7711 194thI15-643
Street - Remove Red Cedar at 7711 194th
111.000.68.542.71.48.00 625.00
9.5% Sales Tax
111.000.68.542.71.48.00 59.38
Street - Remove Trees at 22907 102nd PlI15-644
Street - Remove Trees at 22907 102nd Pl
111.000.68.542.71.48.00 1,100.00
9.5% Sales Tax
111.000.68.542.71.48.00 104.50
YOST PARK TREE SERVICE DEAD MAPLEI15-677
YOST PARK TREE SERVICE DEAD MAPLE
001.000.64.576.80.48.00 2,600.00
9.5% Sales Tax
001.000.64.576.80.48.00 247.00
Total :9,384.16
217605 12/10/2015 045912 WASPC INV026622 INV026622 EDMONDS PD - COMPAAN
CONFERENCE REGISTRATION - WASPC FALL
001.000.41.521.10.49.00 300.00
Total :300.00
217606 12/10/2015 071359 WASSER CORPORATION INV000007101 WWTP-SUPPLIES. MECHANICAL
MC LUSTER PAINT-SAFETY BLUE
38Page:
Packet Page 68 of 564
12/10/2015
Voucher List
City of Edmonds
39
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217606 12/10/2015 (Continued)071359 WASSER CORPORATION
423.000.76.535.80.31.21 189.00
Freight
423.000.76.535.80.31.21 43.00
9.5% Sales Tax
423.000.76.535.80.31.21 17.96
Total :249.96
217607 12/10/2015 073552 WELCO SALES LLC 6883 250 New application for employment or
250 New application for employment or
001.000.22.518.10.31.00 95.00
9.5% Sales Tax
001.000.22.518.10.31.00 9.03
Total :104.03
217608 12/10/2015 072634 WHISTLE WORKWEAR 2120 Water - Work Jeans (5) - P Rochford
Water - Work Jeans (5) - P Rochford
421.000.74.534.80.24.00 193.45
9.5% Sales Tax
421.000.74.534.80.24.00 18.38
Total :211.83
217609 12/10/2015 066678 WSDA PESTICIDE MGMT DIVISION 39844 MCGOWAN 39844 MCGOWAN PESTICIDE LICENSE RENEWAL
39844 MCGOWAN PESTICIDE LICENSE RENEWAL
001.000.64.576.80.49.00 33.00
46620 EDHOUSE PESTICIDE LICENSE RENEWAL46620 EDHOUSE
46620 EDHOUSE PESTICIDE LICENSE RENEWAL
001.000.64.576.80.49.00 33.00
53955 CURRAN PESTICIDE LICENSE RENEWAL53955 CURRAN
53955 CURRAN PESTICIDE LICENSE RENEWAL
001.000.64.576.80.49.00 33.00
63681 ROCKNE PESTICIDE LICENSE RENEWAL63681 ROCKNE
63681 ROCKNE PESTICIDE LICENSE RENEWAL
001.000.64.576.80.49.00 33.00
77744 HARRIS PESTICIDE LICENSE RENEWAL77744 HARRIS
77744 HARRIS PESTICIDE LICENSE RENEWAL
39Page:
Packet Page 69 of 564
12/10/2015
Voucher List
City of Edmonds
40
10:17:28AM
Page:vchlist
Bank code :usbank
Voucher Date Vendor Invoice PO #Description/Account Amount
217609 12/10/2015 (Continued)066678 WSDA PESTICIDE MGMT DIVISION
001.000.64.576.80.49.00 33.00
80090 BIRD PESTICIDE LICENSE RENEWAL80090 BIRD
80090 BIRD PESTICIDE LICENSE RENEWAL
001.000.64.576.80.49.00 33.00
Total :198.00
217610 12/10/2015 063008 WSDOT RE-313-ATB51116102 E1AA.GENERAL INSPECTION
E1AA.General Inspection
112.200.68.595.33.41.00 72.94
Total :72.94
217611 12/10/2015 051282 ZUMAR INDUSTRIES INC 0179473 Traffic - Sign Supplies
Traffic - Sign Supplies
111.000.68.542.64.31.00 840.00
Freight
111.000.68.542.64.31.00 42.56
9.5% Sales Tax
111.000.68.542.64.31.00 83.84
Total :966.40
Bank total : 1,414,663.37103 Vouchers for bank code :usbank
1,414,663.37Total vouchers :Vouchers in this report103
40Page:
Packet Page 70 of 564
PROJECT NUMBERS (By Project Title)
Funding Project Title
Project
Accounting
Number
Engineering
Project
Number
STM 100th Ave W/Firdale Ave/238th St. SW/Traffic Signal Upgrade c329 E0AA
STR 15th St. SW Walkway (Edmonds Way to 8th Ave)c424 E3DC
STM 190th Pl SW Wall Construction c428 E3FF
STR 2009 Street Overlay Program c294 E9CA
WTR 2010 Waterline Replacement Program c363 E0JA
STR 2011 Residential Neighborhood Traffic Calming c343 E1AB
WTR 2011 Waterline Replacement Program c333 E1JA
STM 2012 Citywide Storm Drainage Improvements c382 E2FE
SWR 2012 Sanitary Sewer Comp Plan Update c369 E2GA
SWR 2012 Sewermain-Alder/Dellwood/Beach Pl/224th St. Sewer Replacement c347 E1GA
WTR 2012 Waterline Overlay Program c388 E2CA
WTR 2012 Waterline Replacement Program c340 E1JE
STM 2013 Citywide Drainage Replacement c406 E3FA
STM 2013 Lake Ballinger Basin Study & Associated Projects c407 E3FB
SWR 2013 Sewerline Replacement Project c398 E3GA
WTR 2013 Waterline Replacement Program c397 E3JA
STR 2014 Chip Seals c451 E4CB
STM 2014 Drainage Improvements c433 E4FA
STM 2014 Lake Ballinger Associated Projects c436 E4FD
STR 2014 Overlay Program c438 E4CA
WTR 2014 Waterline Overlays c452 E4CC
WTR 2014 Waterline Replacement Program c422 E4JA
STM 2014 Willow Creek Daylighting/Edmonds Marsh Restoration c435 E4FC
STM 2015 Citywide Drainage Improvements/Rehab Projects c466 E5FA
STR 2015 Overlay Program c463 E5CA
SWR 2015 Sewerline Replacement Project c441 E4GA
STR 2015 Traffic Calming c471 E5AB
WTR 2015 Waterline Overlays c475 E5CB
WTR 2015 Waterline Replacement Program c440 E4JB
WTR 2016 Water Comp Plan Update c460 E4JC
SWR 2016-17 Sanitary Sewer Replacement Projects c469 E5GA
WTR 2016-17 Waterline Replacement Projects c468 E5JA
STR 220 7th Ave N Sidewalk c421 E3DA
STR 220th Street Overlay Project c462 E4CD
Revised 12/9/2015 Packet Page 71 of 564
PROJECT NUMBERS (By Project Title)
Funding Project Title
Project
Accounting
Number
Engineering
Project
Number
WTR 224th Waterline Relocation (2013)c418 E3JB
STR 226th Street Walkway Project c312 E9DA
STR 228th St. SW Corridor Improvements i005 E7AC
STR 236th St. SW Walkway (Edmonds Way to Madrona School)c425 E3DD
STR 238th St. SW Walkway (100th Ave to 104th Ave)c423 E3DB
STR 5th Ave Overlay Project c399 E2CC
STR 76th Ave W at 212th St SW Intersection Improvements c368 E1CA
WTR 76th Ave W Waterline Extension with Lynnwood c344 E1JB
STR 76th Avenue West/75th Place West Walkway Project c245 E6DA
STR 9th Avenue Improvement Project c392 E2AB
FAC A/V Upgrades - Council Chambers c476 E5LA
STR ADA Curb Ramp Upgrades along 3rd Ave S c426 E3DE
SWR Alder Sanitary Sewer Pipe Rehabilitation (2013 Sewer Pipe Rehab CIPP)c390 E2GB
WTR AWD Intertie and Reservoir Improvements c324 E0IA
STR Bikelink Project c474 E5DA
STR Caspers/Ninth Avenue/Puget Drive (SR524) Walkway Project c256 E6DB
PRK City Spray Park c417 E4MA
SWR Citywide CIPP Sewer Rehab Phase I c456 E4GB
STR Citywide Safety Improvements c404 E2AC
SWR City-Wide Sewer Improvements c301 E8GD
WTR Dayton St. Utility Replacement Project (3rd Ave to 9th Ave)c482 E5JB
STM Dayton Street & SR104 Storm Drainage Alternatives c374 E1FM
PM Dayton Street Plaza c276 E7MA
STM Dayton Street Storm Improvements (6th Ave - 8th Ave)c472 E5FC
STM Dayton Street Stormwater Pump Station c455 E4FE
FAC Edmonds Fishing Pier Rehab c443 E4MB
WTR Edmonds General Facilities Charge Study c345 E1JC
STM Edmonds Marsh Feasibility Study c380 E2FC
FAC Edmonds Museum Exterior Repairs Project c327 E0LA
General Edmonds Waterfront Access Analysis c478 E5DB
FAC ESCO III Project c419 E3LB
WTR Five Corners Reservoir Re-coating c473 E5KA
STR Five Corners Roundabout (212th Street SW @ 84th Avenue W)c342 E1AA
PM Fourth Avenue Cultural Corridor c282 E8MA
Revised 12/9/2015 Packet Page 72 of 564
PROJECT NUMBERS (By Project Title)
Funding Project Title
Project
Accounting
Number
Engineering
Project
Number
FAC Frances Anderson Center Accessibility Upgrades c393 E3LA
STR Hwy 99 Enhancements (Phase III)c405 E2AD
STR Interurban Trail c146 E2DB
STM Lake Ballinger Associated Projects 2012 c381 E2FD
SWR Lake Ballinger Trunk Sewer Study s011 E5GB
STM LID Retrofits Perrinville Creek Basin c434 E4FB
SWR Lift Station #1 Basin & Flow Study c461 E4GC
SWR Lift Station 2 Improvements (Separated from L/s 13 - 09/01/08)c298 E8GA
STR Main Street Lighting and Sidewalk Enhancements c265 E7AA
WTR Main Street Watermain c375 E1JK
PM Marina Beach Additional Parking c290 E8MB
STM North Talbot Road Drainage Improvements c378 E2FA
STM Northstream Pipe Abandonment on Puget Drive c410 E3FE
STM NPDES m013 E7FG
SWR OVD Sewer Lateral Improvements c142 E3GB
WTR OVD Watermain Improvements (2003)c141 E3JB
STM Perrinville Creek Culvert Replacement c376 E1FN
STM Perrinville Creek Stormwater Flow Reduction Retrofit Study c408 E3FC
STR Pioneer Way Road Repair c389 E2CB
WTR PRV Station 11 and 12 Abandonment c346 E1JD
STM Public Facilities Water Quality Upgrades c339 E1FD
FAC Public Safety Controls System Upgrades c444 E4LA
STR School Zone Flashing Beacon/Lighting Grant c420 E3AA
STM Seaview Park Infiltration Facility c479 E5FD
PM Senior Center Parking Lot & Landscaping Improvements c321 E9MA
FAC Senior Center Roof Repairs c332 E0LB
SWR Sewer Lift Station Rehabilitation Design c304 E9GA
WWTP Sewer Outfall Groundwater Monitoring c446 E4HA
SWR Sewer, Water, Stormwater Revenue Requirements Update c370 E1GB
STR Shell Valley Emergency Access Road c268 E7CB
STR SR104 Corridor Transportation Study c427 E3AB
General SR104 Telecommunications Conduit Crossing c372 E1EA
STR SR104/City Park Mid-Block Crossing c454 E4DB
General SR99 Enhancement Program c238 E6MA
Revised 12/9/2015 Packet Page 73 of 564
PROJECT NUMBERS (By Project Title)
Funding Project Title
Project
Accounting
Number
Engineering
Project
Number
UTILITIES Standard Details Updates s010 E5NA
STM Storm Contribution to Transportation Projects c341 E1FF
STM Storm Drainage Improvements - 88th & 194th c429 E3FG
STM Stormwater Development Review Support (NPDES Capacity)c349 E1FH
STM Stormwater GIS Support c326 E0FC
STR Sunset Walkway Improvements c354 E1DA
STM SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System c379 E2FB
STM SW Edmonds-105th/106th Ave W Storm Improvements c430 E3FH
STM Talbot Rd. Storm Drain Project/Perrinville Creek Mitigation c307 E9FB
STR Trackside Warning System c470 E5AA
STR Train Trench - Concept c453 E4DA
STR Transportation Plan Update c391 E2AA
STM Update Stormwater Management Code & Associated Projects c467 E5FB
STM Video Assessment of Stormwater Lines c459 E4FF
WWTP WWTP Outfall Pipe Modifications c481 E5HA
Revised 12/9/2015 Packet Page 74 of 564
PROJECT NUMBERS (By Engineering Number)
Funding
Engineering
Project
Number
Project
Accounting
Number Project Title
STM E0AA c329 100th Ave W/Firdale Ave/238th St. SW/Traffic Signal Upgrade
STM E0FC c326 Stormwater GIS Support
WTR E0IA c324 AWD Intertie and Reservoir Improvements
WTR E0JA c363 2010 Waterline Replacement Program
FAC E0LA c327 Edmonds Museum Exterior Repairs Project
FAC E0LB c332 Senior Center Roof Repairs
STR E1AA c342 Five Corners Roundabout (212th Street SW @ 84th Avenue W)
STR E1AB c343 2011 Residential Neighborhood Traffic Calming
STR E1CA c368 76th Ave W at 212th St SW Intersection Improvements
STR E1DA c354 Sunset Walkway Improvements
General E1EA c372 SR104 Telecommunications Conduit Crossing
STM E1FD c339 Public Facilities Water Quality Upgrades
STM E1FF c341 Storm Contribution to Transportation Projects
STM E1FH c349 Stormwater Development Review Support (NPDES Capacity)
STM E1FM c374 Dayton Street & SR104 Storm Drainage Alternatives
STM E1FN c376 Perrinville Creek Culvert Replacement
SWR E1GA c347 2012 Sewermain-Alder/Dellwood/Beach Pl/224th St. Sewer Replacement
SWR E1GB c370 Sewer, Water, Stormwater Revenue Requirements Update
WtR E1JA c333 2011 Waterline Replacement Program
WTR E1JB c344 76th Ave W Waterline Extension with Lynnwood
WTR E1JC c345 Edmonds General Facilities Charge Study
WTR E1JD c346 PRV Station 11 and 12 Abandonment
WTR E1JE c340 2012 Waterline Replacement Program
WTR E1JK c375 Main Street Watermain
STR E2AA c391 Transportation Plan Update
STR E2AB c392 9th Avenue Improvement Project
STR E2AC c404 Citywide Safety Improvements
STR E2AD c405 Hwy 99 Enhancements (Phase III)
WTR E2CA c388 2012 Waterline Overlay Program
STR E2CB c389 Pioneer Way Road Repair
STR E2CC c399 5th Ave Overlay Project
STR E2DB c146 Interurban Trail
STM E2FA c378 North Talbot Road Drainage Improvements
STM E2FB c379 SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System
STM E2FC c380 Edmonds Marsh Feasibility Study
STM E2FD c381 Lake Ballinger Associated Projects 2012
Revised 12/9/2015 Packet Page 75 of 564
PROJECT NUMBERS (By Engineering Number)
Funding
Engineering
Project
Number
Project
Accounting
Number Project Title
STM E2FE c382 2012 Citywide Storm Drainage Improvements
SWR E2GA c369 2012 Sanitary Sewer Comp Plan Update
SWR E2GB c390 Alder Sanitary Sewer Pipe Rehabilitation (2013 Sewer Pipe Rehab CIPP)
STR E3AA c420 School Zone Flashing Beacon/Lighting Grant
STR E3AB c427 SR104 Corridor Transportation Study
STR E3DA c421 220 7th Ave N Sidewalk
STR E3DB c423 238th St. SW Walkway (100th Ave to 104th Ave)
STR E3DC c424 15th St. SW Walkway (Edmonds Way to 8th Ave)
STR E3DD c425 236th St. SW Walkway (Edmonds Way to Madrona School)
STR E3DE c426 ADA Curb Ramp Upgrades along 3rd Ave S
STM E3FA c406 2013 Citywide Drainage Replacement
STM E3FB c407 2013 Lake Ballinger Basin Study & Associated Projects
STM E3FC c408 Perrinville Creek Stormwater Flow Reduction Retrofit Study
STM E3FE c410 Northstream Pipe Abandonment on Puget Drive
STM E3FF c428 190th Pl SW Wall Construction
STM E3FG c429 Storm Drainage Improvements - 88th & 194th
STM E3FH c430 SW Edmonds-105th/106th Ave W Storm Improvements
SWR E3GA c398 2013 Sewerline Replacement Project
SWR E3GB c142 OVD Sewer Lateral Improvements
WTR E3JA c397 2013 Waterline Replacement Program
WTR E3JB c418 224th Waterline Relocation (2013)
WTR E3JB c141 OVD Watermain Improvements (2003)
FAC E3LA c393 Frances Anderson Center Accessibility Upgrades
FAC E3LB c419 ESCO III Project
STR E4CA c438 2014 Overlay Program
STR E4CB c451 2014 Chip Seals
WTR E4CC c452 2014 Waterline Overlays
STR E4CD c462 220th Street Overlay Project
STR E4DA c453 Train Trench - Concept
STR E4DB c454 SR104/City Park Mid-Block Crossing
STM E4FA c433 2014 Drainage Improvements
STM E4FB c434 LID Retrofits Perrinville Creek Basin
STM E4FC c435 2014 Willow Creek Daylighting/Edmonds Marsh Restoration
STM E4FD c436 2014 Lake Ballinger Associated Projects
STM E4FE c455 Dayton Street Stormwater Pump Station
STM E4FF c459 Video Assessment of Stormwater Lines
Revised 12/9/2015 Packet Page 76 of 564
PROJECT NUMBERS (By Engineering Number)
Funding
Engineering
Project
Number
Project
Accounting
Number Project Title
SWR E4GA c441 2015 Sewerline Replacement Project
SWR E4GB c456 Citywide CIPP Sewer Rehab Phase I
SWR E4GC c461 Lift Station #1 Basin & Flow Study
WWTP E4HA c446 Sewer Outfall Groundwater Monitoring
WTR E4JA c422 2014 Waterline Replacement Program
WTR E4JB c440 2015 Waterline Replacement Program
WTR E4JC c460 2016 Water Comp Plan Update
FAC E4LA c444 Public Safety Controls System Upgrades
PRK E4MA c417 City Spray Park
FAC E4MB c443 Edmonds Fishing Pier Rehab
STR E5AA c470 Trackside Warning System
STR E5AB c471 2015 Traffic Calming
STR E5CA c463 2015 Overlay Program
WTR E5CB c475 2015 Waterline Overlays
STR E5DA c474 Bikelink Project
General E5DB c478 Edmonds Waterfront Access Analysis
STM E5FA c466 2015 Citywide Drainage Improvements/Rehab Projects
STM E5FB c467 Update Stormwater Management Code & Associated Projects
STM E5FC c472 Dayton Street Storm Improvements (6th Ave - 8th Ave)
STM E5FD c479 Seaview Park Infiltration Facility
SWR E5GA c469 2016-17 Sanitary Sewer Replacement Projects
SWR E5GB s011 Lake Ballinger Trunk Sewer Study
WWTP E5HA c481 WWTP Outfall Pipe Modifications
WTR E5JA c468 2016-17 Waterline Replacement Projects
WTR E5JB c482 Dayton St. Utility Replacement Project (3rd Ave to 9th Ave)
WTR E5KA c473 Five Corners Reservoir Re-coating
FAC E5LA c476 A/V Upgrades - Council Chambers
UTILITIES E5NA s010 Standard Details Updates
STR E6DA c245 76th Avenue West/75th Place West Walkway Project
STR E6DB c256 Caspers/Ninth Avenue/Puget Drive (SR524) Walkway Project
General E6MA c238 SR99 Enhancement Program
STR E7AA c265 Main Street Lighting and Sidewalk Enhancements
STR E7AC i005 228th St. SW Corridor Improvements
STR E7CB c268 Shell Valley Emergency Access Road
STM E7FG m013 NPDES
PM E7MA c276 Dayton Street Plaza
Revised 12/9/2015 Packet Page 77 of 564
PROJECT NUMBERS (By Engineering Number)
Funding
Engineering
Project
Number
Project
Accounting
Number Project Title
SWR E8GA c298 Lift Station 2 Improvements (Separated from L/s 13 - 09/01/08)
SWR E8GD c301 City-Wide Sewer Improvements
PM E8MA c282 Fourth Avenue Cultural Corridor
PM E8MB c290 Marina Beach Additional Parking
STR E9CA c294 2009 Street Overlay Program
STR E9DA c312 226th Street Walkway Project
STM E9FB c307 Talbot Rd. Storm Drain Project/Perrinville Creek Mitigation
SWR E9GA c304 Sewer Lift Station Rehabilitation Design
PM E9MA c321 Senior Center Parking Lot & Landscaping Improvements
Revised 12/9/2015 Packet Page 78 of 564
PROJECT NUMBERS (By New Project Accounting Number)
Funding
Engineering
Project
Number
Project
Accounting
Number Project Title
WTR E3JB c141 OVD Watermain Improvements (2003)
SWR E3GB c142 OVD Sewer Lateral Improvements
STR E2DB c146 Interurban Trail
General E6MA c238 SR99 Enhancement Program
STR E6DA c245 76th Avenue West/75th Place West Walkway Project
STR E6DB c256 Caspers/Ninth Avenue/Puget Drive (SR524) Walkway Project
STR E7AA c265 Main Street Lighting and Sidewalk Enhancements
STR E7CB c268 Shell Valley Emergency Access Road
PM E7MA c276 Dayton Street Plaza
PM E8MA c282 Fourth Avenue Cultural Corridor
PM E8MB c290 Marina Beach Additional Parking
STR E9CA c294 2009 Street Overlay Program
SWR E8GA c298 Lift Station 2 Improvements (Separated from L/s 13 - 09/01/08)
SWR E8GD c301 City-Wide Sewer Improvements
SWR E9GA c304 Sewer Lift Station Rehabilitation Design
STM E9FB c307 Talbot Rd. Storm Drain Project/Perrinville Creek Mitigation
STR E9DA c312 226th Street Walkway Project
PM E9MA c321 Senior Center Parking Lot & Landscaping Improvements
WTR E0IA c324 AWD Intertie and Reservoir Improvements
STM E0FC c326 Stormwater GIS Support
FAC E0LA c327 Edmonds Museum Exterior Repairs Project
STM E0AA c329 100th Ave W/Firdale Ave/238th St. SW/Traffic Signal Upgrade
FAC E0LB c332 Senior Center Roof Repairs
WtR E1JA c333 2011 Waterline Replacement Program
STM E1FD c339 Public Facilities Water Quality Upgrades
WTR E1JE c340 2012 Waterline Replacement Program
STM E1FF c341 Storm Contribution to Transportation Projects
STR E1AA c342 Five Corners Roundabout (212th Street SW @ 84th Avenue W)
STR E1AB c343 2011 Residential Neighborhood Traffic Calming
WTR E1JB c344 76th Ave W Waterline Extension with Lynnwood
WTR E1JC c345 Edmonds General Facilities Charge Study
WTR E1JD c346 PRV Station 11 and 12 Abandonment
SWR E1GA c347 2012 Sewermain-Alder/Dellwood/Beach Pl/224th St. Sewer Replacement
STM E1FH c349 Stormwater Development Review Support (NPDES Capacity)
Revised 12/9/2015 Packet Page 79 of 564
PROJECT NUMBERS (By New Project Accounting Number)
Funding
Engineering
Project
Number
Project
Accounting
Number Project Title
STR E1DA c354 Sunset Walkway Improvements
WTR E0JA c363 2010 Waterline Replacement Program
STR E1CA c368 76th Ave W at 212th St SW Intersection Improvements
SWR E2GA c369 2012 Sanitary Sewer Comp Plan Update
SWR E1GB c370 Sewer, Water, Stormwater Revenue Requirements Update
General E1EA c372 SR104 Telecommunications Conduit Crossing
STM E1FM c374 Dayton Street & SR104 Storm Drainage Alternatives
WTR E1JK c375 Main Street Watermain
STM E1FN c376 Perrinville Creek Culvert Replacement
STM E2FA c378 North Talbot Road Drainage Improvements
STM E2FB c379 SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System
STM E2FC c380 Edmonds Marsh Feasibility Study
STM E2FD c381 Lake Ballinger Associated Projects 2012
STM E2FE c382 2012 Citywide Storm Drainage Improvements
WTR E2CA c388 2012 Waterline Overlay Program
STR E2CB c389 Pioneer Way Road Repair
SWR E2GB c390 Alder Sanitary Sewer Pipe Rehabilitation (2013 Sewer Pipe Rehab CIPP)
STR E2AA c391 Transportation Plan Update
STR E2AB c392 9th Avenue Improvement Project
FAC E3LA c393 Frances Anderson Center Accessibility Upgrades
WTR E3JA c397 2013 Waterline Replacement Program
SWR E3GA c398 2013 Sewerline Replacement Project
STR E2CC c399 5th Ave Overlay Project
STR E2AC c404 Citywide Safety Improvements
STR E2AD c405 Hwy 99 Enhancements (Phase III)
STM E3FA c406 2013 Citywide Drainage Replacement
STM E3FB c407 2013 Lake Ballinger Basin Study & Associated Projects
STM E3FC c408 Perrinville Creek Stormwater Flow Reduction Retrofit Study
STM E3FE c410 Northstream Pipe Abandonment on Puget Drive
PRK E4MA c417 City Spray Park
WTR E3JB c418 224th Waterline Relocation (2013)
FAC E3LB c419 ESCO III Project
STR E3AA c420 School Zone Flashing Beacon/Lighting Grant
STR E3DA c421 220 7th Ave N Sidewalk
Revised 12/9/2015 Packet Page 80 of 564
PROJECT NUMBERS (By New Project Accounting Number)
Funding
Engineering
Project
Number
Project
Accounting
Number Project Title
WTR E4JA c422 2014 Waterline Replacement Program
STR E3DB c423 238th St. SW Walkway (100th Ave to 104th Ave)
STR E3DC c424 15th St. SW Walkway (Edmonds Way to 8th Ave)
STR E3DD c425 236th St. SW Walkway (Edmonds Way to Madrona School)
STR E3DE c426 ADA Curb Ramp Upgrades along 3rd Ave S
STR E3AB c427 SR104 Corridor Transportation Study
STM E3FF c428 190th Pl SW Wall Construction
STM E3FG c429 Storm Drainage Improvements - 88th & 194th
STM E3FH c430 SW Edmonds-105th/106th Ave W Storm Improvements
STM E4FA c433 2014 Drainage Improvements
STM E4FB c434 LID Retrofits Perrinville Creek Basin
STM E4FC c435 2014 Willow Creek Daylighting/Edmonds Marsh Restoration
STM E4FD c436 2014 Lake Ballinger Associated Projects
STR E4CA c438 2014 Overlay Program
WTR E4JB c440 2015 Waterline Replacement Program
SWR E4GA c441 2015 Sewerline Replacement Project
FAC E4MB c443 Edmonds Fishing Pier Rehab
FAC E4LA c444 Public Safety Controls System Upgrades
WWTP E4HA c446 Sewer Outfall Groundwater Monitoring
STR E4CB c451 2014 Chip Seals
WTR E4CC c452 2014 Waterline Overlays
STR E4DA c453 Train Trench - Concept
STR E4DB c454 SR104/City Park Mid-Block Crossing
STM E4FE c455 Dayton Street Stormwater Pump Station
SWR E4GB c456 Citywide CIPP Sewer Rehab Phase I
STM E4FF c459 Video Assessment of Stormwater Lines
WTR E4JC c460 2016 Water Comp Plan Update
SWR E4GC c461 Lift Station #1 Basin & Flow Study
STR E4CD c462 220th Street Overlay Project
STR E5CA c463 2015 Overlay Program
STM E5FA c466 2015 Citywide Drainage Improvements/Rehab Projects
STM E5FB c467 Update Stormwater Management Code & Associated Projects
WTR E5JA c468 2016-17 Waterline Replacement Projects
SWR E5GA c469 2016-17 Sanitary Sewer Replacement Projects
Revised 12/9/2015 Packet Page 81 of 564
PROJECT NUMBERS (By New Project Accounting Number)
Funding
Engineering
Project
Number
Project
Accounting
Number Project Title
STR E5AA c470 Trackside Warning System
STR E5AB c471 2015 Traffic Calming
STM E5FC c472 Dayton Street Storm Improvements (6th Ave - 8th Ave)
WTR E5KA c473 Five Corners Reservoir Re-coating
STR E5DA c474 Bikelink Project
WTR E5CB c475 2015 Waterline Overlays
FAC E5LA c476 A/V Upgrades - Council Chambers
General E5DB c478 Edmonds Waterfront Access Analysis
STM E5FD c479 Seaview Park Infiltration Facility
WWTP E5HA c481 WWTP Outfall Pipe Modifications
WTR E5JB c482 Dayton St. Utility Replacement Project (3rd Ave to 9th Ave)
STR E7AC i005 228th St. SW Corridor Improvements
STM E7FG m013 NPDES
UTILITIES E5NA s010 Standard Details Updates
SWR E5GB s011 Lake Ballinger Trunk Sewer Study
Revised 12/9/2015 Packet Page 82 of 564
PROJECT NUMBERS (By Project Title)
Funding Project Title
Project
Accounting
Number
Engineering
Project
Number
FAC A/V Upgrades - Council Chambers c476 E5LA
FAC Edmonds Fishing Pier Rehab c443 E4MB
FAC Edmonds Museum Exterior Repairs Project c327 E0LA
FAC ESCO III Project c419 E3LB
FAC Frances Anderson Center Accessibility Upgrades c393 E3LA
FAC Public Safety Controls System Upgrades c444 E4LA
FAC Senior Center Roof Repairs c332 E0LB
General Edmonds Waterfront Access Analysis c478 E5DB
General SR104 Telecommunications Conduit Crossing c372 E1EA
General SR99 Enhancement Program c238 E6MA
PM Dayton Street Plaza c276 E7MA
PM Fourth Avenue Cultural Corridor c282 E8MA
PM Marina Beach Additional Parking c290 E8MB
PM Senior Center Parking Lot & Landscaping Improvements c321 E9MA
PRK City Spray Park c417 E4MA
STM 100th Ave W/Firdale Ave/238th St. SW/Traffic Signal Upgrade c329 E0AA
STM 190th Pl SW Wall Construction c428 E3FF
STM 2012 Citywide Storm Drainage Improvements c382 E2FE
STM 2013 Citywide Drainage Replacement c406 E3FA
STM 2013 Lake Ballinger Basin Study & Associated Projects c407 E3FB
STM 2014 Drainage Improvements c433 E4FA
STM 2014 Lake Ballinger Associated Projects c436 E4FD
STM 2014 Willow Creek Daylighting/Edmonds Marsh Restoration c435 E4FC
STM 2015 Citywide Drainage Improvements/Rehab Projects c466 E5FA
STM Dayton Street & SR104 Storm Drainage Alternatives c374 E1FM
STM Dayton Street Storm Improvements (6th Ave - 8th Ave)c472 E5FC
STM Dayton Street Stormwater Pump Station c455 E4FE
STM Edmonds Marsh Feasibility Study c380 E2FC
STM Lake Ballinger Associated Projects 2012 c381 E2FD
STM LID Retrofits Perrinville Creek Basin c434 E4FB
STM North Talbot Road Drainage Improvements c378 E2FA
STM Northstream Pipe Abandonment on Puget Drive c410 E3FE
STM NPDES m013 E7FG
STM Perrinville Creek Culvert Replacement c376 E1FN
STM Perrinville Creek Stormwater Flow Reduction Retrofit Study c408 E3FC
Revised 12/9/2015 Packet Page 83 of 564
PROJECT NUMBERS (By Project Title)
Funding Project Title
Project
Accounting
Number
Engineering
Project
Number
STM Public Facilities Water Quality Upgrades c339 E1FD
STM Seaview Park Infiltration Facility c479 E5FD
STM Storm Contribution to Transportation Projects c341 E1FF
STM Storm Drainage Improvements - 88th & 194th c429 E3FG
STM Stormwater Development Review Support (NPDES Capacity)c349 E1FH
STM Stormwater GIS Support c326 E0FC
STM SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System c379 E2FB
STM SW Edmonds-105th/106th Ave W Storm Improvements c430 E3FH
STM Talbot Rd. Storm Drain Project/Perrinville Creek Mitigation c307 E9FB
STM Update Stormwater Management Code & Associated Projects c467 E5FB
STM Video Assessment of Stormwater Lines c459 E4FF
STR 15th St. SW Walkway (Edmonds Way to 8th Ave)c424 E3DC
STR 2009 Street Overlay Program c294 E9CA
STR 2011 Residential Neighborhood Traffic Calming c343 E1AB
STR 2014 Chip Seals c451 E4CB
STR 2014 Overlay Program c438 E4CA
STR 2015 Overlay Program c463 E5CA
STR 2015 Traffic Calming c471 E5AB
STR 220 7th Ave N Sidewalk c421 E3DA
STR 220th Street Overlay Project c462 E4CD
STR 226th Street Walkway Project c312 E9DA
STR 228th St. SW Corridor Improvements i005 E7AC
STR 236th St. SW Walkway (Edmonds Way to Madrona School)c425 E3DD
STR 238th St. SW Walkway (100th Ave to 104th Ave)c423 E3DB
STR 5th Ave Overlay Project c399 E2CC
STR 76th Ave W at 212th St SW Intersection Improvements c368 E1CA
STR 76th Avenue West/75th Place West Walkway Project c245 E6DA
STR 9th Avenue Improvement Project c392 E2AB
STR ADA Curb Ramp Upgrades along 3rd Ave S c426 E3DE
STR Bikelink Project c474 E5DA
STR Caspers/Ninth Avenue/Puget Drive (SR524) Walkway Project c256 E6DB
STR Citywide Safety Improvements c404 E2AC
STR Five Corners Roundabout (212th Street SW @ 84th Avenue W)c342 E1AA
STR Hwy 99 Enhancements (Phase III)c405 E2AD
STR Interurban Trail c146 E2DB
Revised 12/9/2015 Packet Page 84 of 564
PROJECT NUMBERS (By Project Title)
Funding Project Title
Project
Accounting
Number
Engineering
Project
Number
STR Main Street Lighting and Sidewalk Enhancements c265 E7AA
Revised 12/9/2015 Packet Page 85 of 564
PROJECT NUMBERS (By Project Title)
Funding Project Title
Project
Accounting
Number
Engineering
Project
Number
STR Pioneer Way Road Repair c389 E2CB
STR School Zone Flashing Beacon/Lighting Grant c420 E3AA
STR Shell Valley Emergency Access Road c268 E7CB
STR SR104 Corridor Transportation Study c427 E3AB
STR SR104/City Park Mid-Block Crossing c454 E4DB
STR Sunset Walkway Improvements c354 E1DA
STR Trackside Warning System c470 E5AA
STR Train Trench - Concept c453 E4DA
STR Transportation Plan Update c391 E2AA
SWR 2012 Sanitary Sewer Comp Plan Update c369 E2GA
SWR 2012 Sewermain-Alder/Dellwood/Beach Pl/224th St. Sewer Replacement c347 E1GA
SWR 2013 Sewerline Replacement Project c398 E3GA
SWR 2015 Sewerline Replacement Project c441 E4GA
SWR 2016-17 Sanitary Sewer Replacement Projects c469 E5GA
SWR Alder Sanitary Sewer Pipe Rehabilitation (2013 Sewer Pipe Rehab CIPP)c390 E2GB
SWR Citywide CIPP Sewer Rehab Phase I c456 E4GB
SWR City-Wide Sewer Improvements c301 E8GD
SWR Lake Ballinger Trunk Sewer Study s011 E5GB
SWR Lift Station #1 Basin & Flow Study c461 E4GC
SWR Lift Station 2 Improvements (Separated from L/s 13 - 09/01/08)c298 E8GA
SWR OVD Sewer Lateral Improvements c142 E3GB
SWR Sewer Lift Station Rehabilitation Design c304 E9GA
SWR Sewer, Water, Stormwater Revenue Requirements Update c370 E1GB
UTILITIES Standard Details Updates s010 E5NA
WTR 2010 Waterline Replacement Program c363 E0JA
WtR 2011 Waterline Replacement Program c333 E1JA
WTR 2012 Waterline Overlay Program c388 E2CA
WTR 2012 Waterline Replacement Program c340 E1JE
WTR 2013 Waterline Replacement Program c397 E3JA
WTR 2014 Waterline Overlays c452 E4CC
WTR 2014 Waterline Replacement Program c422 E4JA
WTR 2015 Waterline Overlays c475 E5CB
WTR 2015 Waterline Replacement Program c440 E4JB
WTR 2016 Water Comp Plan Update c460 E4JC
WTR 2016-17 Waterline Replacement Projects c468 E5JA
WTR 224th Waterline Relocation (2013)c418 E3JB
Revised 12/9/2015 Packet Page 86 of 564
PROJECT NUMBERS (By Project Title)
Funding Project Title
Project
Accounting
Number
Engineering
Project
Number
WTR 76th Ave W Waterline Extension with Lynnwood c344 E1JB
WTR AWD Intertie and Reservoir Improvements c324 E0IA
WTR Dayton St. Utility Replacement Project (3rd Ave to 9th Ave)c482 E5JB
WTR Edmonds General Facilities Charge Study c345 E1JC
WTR Five Corners Reservoir Re-coating c473 E5KA
WTR Main Street Watermain c375 E1JK
WTR OVD Watermain Improvements (2003)c141 E3JB
WTR PRV Station 11 and 12 Abandonment c346 E1JD
WWTP Sewer Outfall Groundwater Monitoring c446 E4HA
WWTP WWTP Outfall Pipe Modifications c481 E5HA
Revised 12/9/2015 Packet Page 87 of 564
AM-8187 3. C.
City Council Meeting
Meeting Date:12/15/2015
Time:
Submitted By:Linda Hynd
Department:City Clerk's Office
Type: Action
Information
Subject Title
Acknowledge receipt of Claims for Damages from Brandon Mar ($1,353.00) and William Wilson
($22,903.62).
Recommendation
Acknowledge receipt of the Claims for Damages by minute entry.
Previous Council Action
N/A
Narrative
Brandon Mar
19700 12th Avenue NW
Shoreline, WA 98177
($1,353.00)
William A. Wilson
19120 94th Avenue W.
Edmonds, WA 98020
($22,903.62)
Attachments
Mar Claim for Damages
Wilson Claim for Damages
Form Review
Inbox Reviewed By Date
Mayor Dave Earling 12/07/2015 02:40 PM
Finalize for Agenda Scott Passey 12/08/2015 08:12 AM
Form Started By: Linda Hynd Started On: 12/07/2015 01:32 PM
Final Approval Date: 12/08/2015
Packet Page 88 of 564
Packet Page 89 of 564
Packet Page 90 of 564
Packet Page 91 of 564
Packet Page 92 of 564
Packet Page 93 of 564
Packet Page 94 of 564
Packet Page 95 of 564
Packet Page 96 of 564
Packet Page 97 of 564
Packet Page 98 of 564
Packet Page 99 of 564
Packet Page 100 of 564
Packet Page 101 of 564
Packet Page 102 of 564
Packet Page 103 of 564
Packet Page 104 of 564
Packet Page 105 of 564
Packet Page 106 of 564
Packet Page 107 of 564
Packet Page 108 of 564
Packet Page 109 of 564
Packet Page 110 of 564
Packet Page 111 of 564
Packet Page 112 of 564
Packet Page 113 of 564
Packet Page 114 of 564
Packet Page 115 of 564
Packet Page 116 of 564
Packet Page 117 of 564
Packet Page 118 of 564
AM-8183 3. D.
City Council Meeting
Meeting Date:12/15/2015
Time:Consent
Submitted For:Council President Fraley-Monillas Submitted By:Jana Spellman
Department:City Council
Review Committee: Committee Action:
Type: Action
Information
Subject Title
Approval of Resolution Thanking Councilmember Joan Bloom for her Service as a Councilmember.
Recommendation
Previous Council Action
Narrative
This Resolution for Councilmember Joan Bloom has been placed on the Consent Agenda for approval.
Attachments
Councilmember Bloom Resolution
Form Review
Inbox Reviewed By Date
City Clerk Scott Passey 12/10/2015 09:07 AM
Mayor Dave Earling 12/10/2015 10:59 AM
Finalize for Agenda Scott Passey 12/10/2015 11:44 AM
Form Started By: Jana Spellman Started On: 12/04/2015 02:00 PM
Final Approval Date: 12/10/2015
Packet Page 119 of 564
Resolution
No: 1343
A Resolution of The Edmonds City Council Thanking
Councilmember Joan Bloom for Her Service to the Edmonds City Council
Whereas, Joan Bloom was elected to the City Council in November, 2011 and sworn in on January 3, 2012.
While in office, Ms. Bloom approached her appointment on the City Council with passion and an
earnest desire to serve her constituency in an open-minded, fair manner. She took her term as a City
Councilmember very seriously and came to the meetings prepared to speak on the issues that were
important to her and the citizenry of Edmonds. She was an advocate of government transparency and did
her utmost to make government more available to the citizens; and
Whereas, while on the Council she was involved with the appointment of a number of directors and worked with two
Mayors. She served on the following committees, boards, and commissions: Public Safety/Personnel,
Disability, Economic Development Commission, Lodging Tax Advisory, Seashore Transportation Forum
2012, Tree Board Liaison, Port of Edmonds, Planning, Parks/Public Works, and Snohomish County
Tomorrow, Alt.; and
Whereas, Councilmember Bloom, work ed determinedly on a number of Council matters including seeing a
Code of Ethics and a Resolution for a Code of Conduct come to fruition.
Now, Therefore, Be it Resolved, that Joan Bloom be applauded and thanked for serving as a
Councilmember. The Council wishes her well in all of her future endeavors.
Passed, Approved, and Adopted this 15th day of December, 2015.
Dave Earling, Mayor Adrienne Fraley-Monillas, Council President
Kristiana Johnson, Council President Pro Tem Mike Nelson, Councilmember
Diane Buckshnis, Councilmember Thomas Mesaros, Councilmember
Attest: City Clerk Lora Petso, Councilmember
Packet Page 120 of 564
AM-8181 3. E.
City Council Meeting
Meeting Date:12/15/2015
Time:Consent
Submitted For:Council President Fraley-Monillas Submitted By:Jana Spellman
Department:City Council
Review Committee: Committee Action:
Type: Action
Information
Subject Title
Approval of Resolution Thanking Councilmember Lora Petso for her service as a Councilmember.
Recommendation
Previous Council Action
Narrative
This Resolution for Councilmember Lora Petso has been placed on the Consent Agenda for approval.
Attachments
Councilmember Petso Resolution
Form Review
Inbox Reviewed By Date
City Clerk Scott Passey 12/10/2015 09:07 AM
Mayor Dave Earling 12/10/2015 10:58 AM
Finalize for Agenda Scott Passey 12/10/2015 11:44 AM
Form Started By: Jana Spellman Started On: 12/04/2015 01:50 PM
Final Approval Date: 12/10/2015
Packet Page 121 of 564
Resolution
NO: 1344
A Resolution of the Edmonds City Council Thanking
Councilmember Lora Petso
for Her Service to the Edmonds City Council
Whereas, Lora Petso was appointed to the City Council on July 6, 2010 and sworn in that same evening. She
was re-elected and has served on the Council for more than 5 years. During her tenure she has been a
superb advocate for all of the citizens of Edmonds and has always approached each and every issue
before the Council with understanding and intellect. She was admired by her fellow Councilmembers
for her intelligent and stimulating discussions and her outstanding investigative research into all aspects
of items on the Council agenda which Councilmembers came to rely on; and
Whereas, Lora possesses a remarkable sense of humor which those who have come to know her really
appreciate; and
Whereas, during her tenure on the Council, she worked with 2 Mayors, 4 Finance Directors, was Council
President, and served on numerous Boards and Commissions. In her capacity as a Councilmember and
former Council President, she worked on approximately 207 ordinances and 108 resolutions and did
this with her usual style of being conscientious of how her actions as a Councilmember would affect not
only the citizens of Edmonds but the City as well.
Now, Therefore, Be it Resolved, that Lora Petso be celebrated and thanked for serving as a
Councilmember. The Council wishes her well in all of her future endeavors.
Passed, Approved, and Adopted this 15th day of December, 2015.
Dave Earling, Mayor Adrienne Fraley-Monillas, Council President
Kristiana Johnson, Council President Pro Tem Mike Nelson, Councilmember
Joan Bloom, Councilmember Thomas Mesaros, Councilmember
Attest: City Clerk Diane Buckshnis, Councilmember
Packet Page 122 of 564
AM-8185 3. F.
City Council Meeting
Meeting Date:12/15/2015
Time:Consent
Submitted For:Council President Fraley-Monillas Submitted By:Jana Spellman
Department:City Council
Type: Action
Information
Subject Title
Approval of Resolution thanking Ferrari “Ari” Girouard for her service as a Student Representative.
Recommendation
Previous Council Action
Narrative
Approval of Resolution thanking Ferrari “Ari” Girouard for her service as a Student Representative.
Attachments
Ari Girouard Resolution
Form Review
Inbox Reviewed By Date
City Clerk Scott Passey 12/10/2015 09:07 AM
Mayor Dave Earling 12/10/2015 11:00 AM
Finalize for Agenda Scott Passey 12/10/2015 11:44 AM
Form Started By: Jana Spellman Started On: 12/04/2015 02:19 PM
Final Approval Date: 12/10/2015
Packet Page 123 of 564
No: 1345
A Resolution of the Edmonds City Council Commending
Ferrari “Ari” Girouard
for Her Service as a Student Representative on the Edmonds City Council
Whereas, Ferrari (Ari) Girouard, a student at Edmonds-Woodway High School, volunteered to
serve as a Student Representative of the Edmonds City Council; and
Whereas, Ari, served as a student member of the City Council from September 1 until December
15, 2015; and
Whereas, Ms. Girouard was interested in learning what issues and questions the City of
Edmonds faces today and to find out what active role she could assume surrounding
these issues; and
Whereas, she was conscientious in her attendance at meetings and very observant of the issues
before the Council;
Now, Therefore, Be It Resolved, that the City Council and the Mayor hereby extend their best wishes
to Ari in her future endeavors and express the hope that she will continue to contribute
to the democratic process of government in the City of Edmonds and elsewhere.
Now, Therefore, Be It Passed, Approved, and Adopted this 15th Day of December, 2015.
Dave Earling, Mayor
Adrienne Fraley-Monillas, Council President
Kristiana Johnson, Council President Pro Tem
Mike Nelson, Councilmember
Lora Petso, Councilmember
Joan Bloom, Councilmember
Diane Buckshnis, Councilmember
Thomas Mesaros, Councilmember
Attest: City Clerk
Packet Page 124 of 564
AM-8184 5. A.
City Council Meeting
Meeting Date:12/15/2015
Time:5 Minutes
Submitted For:Councilmember Fraley-Monillas Submitted By:Jana Spellman
Department:City Council
Review Committee: Committee Action:
Type: Information
Information
Subject Title
Presentation of Resolution and Plaque thanking Councilmember Bloom for her service as an
Edmonds City Councilmember.
Recommendation
Previous Council Action
Narrative
Presentation of Resolution and Plaque to Joan Bloom for her service as an Edmonds City
Councilmember.
Form Review
Inbox Reviewed By Date
City Clerk Scott Passey 12/10/2015 09:07 AM
Mayor Dave Earling 12/10/2015 10:59 AM
Finalize for Agenda Scott Passey 12/10/2015 11:44 AM
Form Started By: Jana Spellman Started On: 12/04/2015 02:02 PM
Final Approval Date: 12/10/2015
Packet Page 125 of 564
AM-8182 5. B.
City Council Meeting
Meeting Date:12/15/2015
Time:5 Minutes
Submitted For:Council President Fraley-Monillas Submitted By:Jana Spellman
Department:City Council
Review Committee: Committee Action:
Type: Information
Information
Subject Title
Presentation of Resolution and Plaque Thanking Councilmember Lora Petso for Her Service on
the Edmonds City Council.
Recommendation
Previous Council Action
Narrative
Presentation of Resolution and Plaque to Lora Petso for her services as an Edmonds City
Councilmember.
Form Review
Inbox Reviewed By Date
City Clerk Scott Passey 12/10/2015 09:07 AM
Mayor Dave Earling 12/10/2015 10:58 AM
Finalize for Agenda Scott Passey 12/10/2015 11:44 AM
Form Started By: Jana Spellman Started On: 12/04/2015 01:53 PM
Final Approval Date: 12/10/2015
Packet Page 126 of 564
AM-8186 5. C.
City Council Meeting
Meeting Date:12/15/2015
Time:5 Minutes
Submitted For:Council President Fraley-Monillas Submitted By:Jana Spellman
Department:City Council
Type: Information
Information
Subject Title
Presentation of Resolution and Plaque to Ferrari “Ari” Girouard for her service as Student Representative
Recommendation
Previous Council Action
Narrative
Presentation of Resolution and Plaque to Ferrari “Ari” Girouard for her service as Student Representative
Form Review
Inbox Reviewed By Date
City Clerk Scott Passey 12/10/2015 09:07 AM
Mayor Dave Earling 12/10/2015 11:00 AM
Finalize for Agenda Scott Passey 12/10/2015 11:44 AM
Form Started By: Jana Spellman Started On: 12/04/2015 02:22 PM
Final Approval Date: 12/10/2015
Packet Page 127 of 564
AM-8188 5. D.
City Council Meeting
Meeting Date:12/15/2015
Time:20 Minutes
Submitted For:Planning Submitted By:Kernen Lien
Department:Planning
Type: Information
Information
Subject Title
Hearing Examiner Annual Report
Recommendation
None
Previous Council Action
None
Narrative
The Hearing Examiner will provide his annual report to council.
Attachments
Hearing Examiner Annual Report
Form Review
Inbox Reviewed By Date
City Clerk Scott Passey 12/08/2015 01:30 PM
Mayor Dave Earling 12/08/2015 02:03 PM
Finalize for Agenda Scott Passey 12/10/2015 11:44 AM
Form Started By: Kernen Lien Started On: 12/08/2015 01:22 PM
Final Approval Date: 12/10/2015
Packet Page 128 of 564
MEMORANDUM
DATE: December 2, 2015
TO: Edmonds City Council
FROM: Phil A. Olbrechts – Hearing Examiner
RE: Annual Report
SUMMARY: The Hearing Examiner issued thirteen1 decisions over the last twelve months.
The thirteen decisions were composed of five variances, four conditional use permits, one
shoreline substantial development permit, one subdivision, one unauthorized tree removal code
enforcement case and one ECDC 20.40.100 permit “re-review”. All permit applications were
approved except for two variance applications for exceeding the height limits of the field lights
proposed for the Woodway site.
Of the thirteen decisions issued, two raised some code issues that the Council may find of
interest. The first is the Woodway decision. As the Council is no doubt aware, the Woodway
case presented some difficult jurisdictional issues because the most controversial part of the
project, artificial turf, wasn’t part of the application. This type of situation could be avoided in
the future by clarifying and/or expanding what type of school improvements would trigger a
requirement for a conditional use permit amendment.
The second decision raising code issues was the Blomenkamp request to reconsider a decision
issued by the ADB months earlier, the ECDC 20.40.100 “re-review” process. ECDC 20.40.100
is a highly unusual provision, possibly singularly unique to Edmonds, that authorizes citizens to
request the reconsideration of an approved permit at any time due to code compliance issues or
the creation of nuisances. In Mr. Blomenkamp’s situation, the developer of some duplexes
severed some tree roots on the developer’s property, thereby damaging and/or killing some 100+
foot trees on Mr. Blomenkamp’s property. Normally such a claim would be filed in the judicial
system since it involves a damages claim between property owners. However, because of ECDC
20.40.100 Mr. Blomenkamp sought redress in the City’s land use process. State law places
significant restrictions on the authority of municipalities to reconsider permit approvals once
appeal deadlines have expired. The ambiguity of several parts of ECDC 20.40.100 coupled with
these state law restrictions made it very challenging to address Mr. Blomenkamp’s claims. In
order to fully understand those challenges, the Blomenkamp decision would have to be read in
full. In short, there is considerable room and need for clarification of ECDC 20.40.100.
Each permit is addressed chronologically in more detail below:
Cascadia Art Museum (2/28/15): Approved. Conditional use permit to locate Cascadia Art
Museum within an existing building at 190 Sunset Avenue.
1 Several of the permit approvals also included design review, which is not addressed in this report. Also, the
Woodway field improvement project is treated as composed of four separate permit applications.
Packet Page 129 of 564
Examiner Annual Report - 2
Chris Schuetz and Edmonds Trees Services (3/13/15): Notice of Violation sustained.
Property owner and tree cutting business hired by property owner were issued a notice of
violation assessing $23,000 in fines for cutting and damaging ten trees within a critical area on
property located across the street from the property owner.
Woodway High School Field Improvements (4/10/15): Conditional use permit for ballfield
improvements and height variance for fencing sent to City Council with recommendation for
approval. Two height variance applications for ballfield lighting were sent to City Council with
recommendation for denial. This project was relatively unique in that the examiner only had
jurisdiction to consider portions of an overall development project. The only application
submitted to the examiner for review covered a conditional use permit for the bleachers and three
height variance applications for field lights and fencing. The public’s primary area of concern
was for the proposed replacement of grass playfields with artificial turf, which was not presented
in any part of the applications and was not subject to any discretionary permitting review. The
height variances for the proposed field lighting were denied because the traffic impacts of adding
the lights had not been adequately evaluated. Project opponents presented a traffic report by a
qualified traffic expert establishing that the night time use of the fields enabled by the proposed
lighting could potentially create significant traffic impacts. The applicant presented no evidence
to the contrary.
Seabrook Estates Preliminary Plat (4/23/15): Preliminary plat application approved.
Applicant proposed seven lot subdivisions at 860 Caspers Street.
Salish Crossing (5/12/15): Conditional use permit approved. Applicant proposed 1,500 square
foot retail pavilion along with drive-through at 190 Sunset Avenue.
Port of Edmonds Restroom Facilities (5/28/15): Shoreline substantial development permit
approved. Applicant proposed adding restrooms at the Edmonds Marina.
9/11 Memorial (6/12/15): Setback variance approved. Applicant proposed to install 9/11
memorial within the setbacks of Fallen Firefighter Memorial Park.
Sprouts Daycare (8/6/15): Conditional use permit approved. Applicant proposed to increase
number of children authorized for existing daycare center at 20919 76th Ave. from 30 to 40 with
the ability to add additional children if parking space is increased
Edmonds Public Works Noise Variance (8/26/15): Noise variance approved. Applicant
proposed variance to night time noise limits for four nonconsecutive nights for pavement
preservation project on 220th St. SW between 76th Ave. W. and the Interurban Trail.
Blomenkamp Design Review Re-Review (Final Decision issued 10/5/15, Decision Upon
Reconsideration issued 11/18/15): Re-review granted in part. Scott Blomenkamp along with
two others requested a review of the ADB approval of a five duplex project located at 23220
Edmonds Way. The ADB approved the duplex project February 14, 2014 and building permits
for the duplexes were issued on December 29, 2015. Pursuant to ECDC 20.100.040, Mr.
Blomenkamp alleged that the approved project violated several code provisions and that it
Packet Page 130 of 564
Examiner Annual Report - 3
created a nuisance. The source of the alleged violations was the fact that the project applicant
destroyed and/or damaged several trees on adjoining property during construction, including
trees on Mr. Blomenkamp’s property. City staff forwarded Mr. Blomenkamp’s nuisance claim
to the examiner, but declined to forward Mr. Blomenkamp’s code violation claims on the basis
that no violations had occurred. In the examiner decision it was determined that the severing of
tree roots on the project site during construction did in fact damage or render hazardous trees on
adjoining property as alleged by Mr. Blomenkamp. The decision determined this destruction
constituted a nuisance under ECDC 20.100.040, because the destroyed trees had been relied
upon in part by the ADB in its consideration of the adequacy of screening for the applicant’s
project. Five trees, some of which were over 100 feet tall, were damaged or potentially damaged
by the project applicant’s construction activities. The decision required a combination of
monitoring and replacement of the affected trees. For any trees determined to be hazardous, the
decision required a replacement ratio of three to one, with the replacement trees being at least ten
feet tall. Replacement heights and ratios are not specified in the ECDC for ECDC 20.100.040
“re-review” actions, so the examiner based these standards upon analogous landscaping and tree
removal code enforcement standards. Mr. Blomenkamp also requested fines to be imposed
against the project applicant for unauthorized tree removal on his property. Since Mr.
Blomenkamp did not include this request in his ECDC 20.100.040 application, the request had to
be denied. The City could not impose fines against the project applicant without providing it
with notice of the fines prior to the ECDC 20.100.040 hearing.
Packet Page 131 of 564
AM-8116 6. A.
City Council Meeting
Meeting Date:12/15/2015
Time:10 Minutes
Submitted By:Al Compaan
Department:Police Department
Type: Forward to Consent
Information
Subject Title
Review and Adoption of Comprehensive Emergency Plan and Debris Management Plan
Recommendation
Approve CEMP and Debris Plan by Resolution for Consent Agenda, December 15, 2015 meeting
Previous Council Action
Narrative
The City of Edmonds is required by state and federal law to maintain a current Comprehensive
Emergency Plan, as well as a Debris Management Plan. An update of these plans is required every four
years, and approval of the plans by City Council is required as part of the process. All associated
documents are submitted as part of the Agenda Memo, as well as a City Council Resolution denoting
approval of the two plans.
Attachments
Edmonds Comprehensive Emergency Management Plan
Debris Management Plan
Debris Plan Appendix A
Debris Plan Appendix B
Debris Plan Appendices C,D,E
Debris Plan Appendix F
Debris Plan Appendix G
Debris Plan Appendix G Hauler Agreements
Debris Plan Appendix H
Debris Plan Appendix F NCS Plan
Approval Letter from SHD
Resolution to Adopt CEMP and Debris Plan
Form Review
Inbox Reviewed By Date
City Clerk Scott Passey 11/13/2015 12:04 PM
Mayor Dave Earling 11/13/2015 12:33 PM
Finalize for Agenda Scott Passey 11/13/2015 12:34 PM
Packet Page 132 of 564
Finalize for Agenda Scott Passey 11/13/2015 12:34 PM
Form Started By: Al Compaan Started On: 11/13/2015 11:36 AM
Final Approval Date: 11/13/2015
Packet Page 133 of 564
AUGUST 2015
CITY OF EDMONDS
Comprehensive Emergency
Management Plan
Packet Page 134 of 564
Packet Page 135 of 564
i
INTRODUCTION
The City of Edmonds Comprehensive Emergency Management Plan (CEMP) describes
the basic strategies, assumptions, objectives and operational protocols which will guide
the City’s emergency management efforts through preparedness, response, recovery,
and mitigation. To facilitate effective operations, the Edmonds CEMP utilizes an
Emergency Support Function (ESF) approach. Each ESF identifies the City
Department primarily responsible for organizing response actions related to that ESF,
as well as support departments and agencies.
The Edmonds CEMP is designed to be flexible, adaptable, and scalable. It articulates
the roles and responsibilities among City Departments, contract service providers, and
community partners. The CEMP includes a Basic Plan and supplemental documents
that provide more detailed information to assist City officials and others implementing
the CEMP. The Edmonds CEMP is organized as follows:
• Basic Plan – The Basic Plan describes the process for preparedness, response,
recovery, and mitigation activities within the City of Edmonds
• Emergency Support Functions (ESFs) – The ESFs describe, in more detail,
responsibilities and processes necessary for specific response actions
• Incident Specific Annexes – Each Annex outlines the response to a specific
event or situation. The Edmonds CEMP includes annexes for Evacuation;
Damage Assessment; and Animal Protection.
Once an incident occurs within Edmonds, the CEMP is engaged at the discretion of the
City’s senior leadership. The nature of the incident will dictate which plans and
procedures are initiated, as well as which ESFs may be required.
The intent of the CEMP is to reduce the possible consequences of an emergency or
disaster, by preventing loss of life, limiting damage to infrastructure, and supporting the
City’s return to normalcy.
Packet Page 136 of 564
ii
Packet Page 137 of 564
iii
DISTRIBUTION LIST
NAME
DEPARTMENT OR AGENCY
PLAN #
Packet Page 138 of 564
iv
RECORD OF CHANGES
DATE
CHANGE MADE
LOCATION IN
PLAN
Packet Page 139 of 564
v
CITY OF EDMONDS
COMPREHENSIVE EMERGENCY MANAGEMENT PLAN
TABLE OF CONTENTS
BASIC PLAN
Section I. Mission and Situation Basic Plan - Page 1
Authority Basic Plan - Page 2
Situation Basic Plan - Page 3
Assumptions Basic Plan - Page 3
Limitations Basic Plan - Page 3
Section II. Organization and Responsibilities
Organization Basic Plan - Page 5
Emergency Management Organization Basic Plan - Page 5
Emergency Operations Board Basic Plan - Page 5
Emergency Services Coordinating Agency Basic Plan - Page 6
Snohomish County Department of Emergency Management Basic Plan - Page 6
Emergency Management Committee Basic Plan - Page 6
Sub-committees Basic Plan - Page 7
Responsibilities Basic Plan - Page 7
Law Enforcement Assistance Basic Plan - Page 18
Emergency Response and Support Teams Basic Plan - Page 18
Defense Support of Civil Authorities Basic Plan - Page 18
Section III. Concept of Operations
Concept Basic Plan - Page 19
Operations By Time Phase Basic Plan - Page 22
Packet Page 140 of 564
vi
Section IV. Administrative and Fiscal Procedures Basic Plan - Page 25
Section V. Logistics Basic Plan - Page 29
Section VI. Direction, Control and Coordination
NIMS Integration Basic Plan - Page 31
Direction and Control Basic Plan - Page 31
On-Scene Management Basic Plan - Page 33
Coordination Basic Plan - Page 34
Proclamation of Emergency Basic Plan - Page 35
Sample Emergency Proclamation Basic Plan - Page 36
Request for Emergency Assistance Basic Plan - Page 37
Demobilization Basic Plan - Page 37
Section VII. Public Information Basic Plan - Page 39
Section VIII. Training, Exercises and Education Basic Plan - Page 41
Section IX. On-Going Plan Management and Maintenance Basic Plan - Page 43
EMERGENCY SUPPORT FUNCTIONS
Transportation Emergency Support Function 1 - Page 44
Communications Emergency Support Function 2 - Page 48
Public Works and Engineering Emergency Support Function 3 - Page 55
Firefighting Emergency Support Function 4 - Page 59
Emergency Management Emergency Support Function 5 - Page 63
Mass Care, Emergency Assistance, Housing Emergency Support Function 6 - Page 67
and Human Services
Logistics and Resource Support Emergency Support Function 7 - Page 74
Packet Page 141 of 564
vii
Public Health and Medical Emergency Support Function 8 - Page 79
Search and Rescue Emergency Support Function 9 - Page 86
Hazardous Materials Emergency Support Function 10 - Page 90
Agriculture and Natural Resources Emergency Support Function 11 - Page 95
Energy Emergency Support Function 12 - Page 99
Public Safety and Security Emergency Support Function 13 - Page 103
Long-Term Community Recovery Emergency Support Function 14 - Page 108
External Affairs and Emergency Public Emergency Support Function 15 - Page 115
Information
ESF 16 through 19 Reserved for Future Use
Defense Support to Civil Authorities Emergency Support Function 20 - Page 120
SUPPORT ANNEXES
Support Annex A: Evacuation and Movement Page - 123
Command and Control Checklist Page - 138
Planning Checklist Page - 139
Operations Checklist Page - 141
Logistics Checklist Page - 143
Sample Evacuation Order Page - 144
Support Annex B: Damage Assessment Page - 147
Support Annex C: Animal Disaster Protection Page - 152
APPENDICES
Appendix 1: ESF Responsibility Matrix Page - 175
Appendix 2: Authorities and References Page - 176
Packet Page 142 of 564
Edmonds CEMP Basic Plan - 1 August 2015
CITY OF EDMONDS
COMPREHENSIVE EMERGENCY MANAGEMENT PLAN
BASIC PLAN
I. MISSION AND SITUATION
MISSION
It is the policy of the City of Edmonds, in order to protect lives, property, and the environment
in cooperation with other elements of the community, to carry out preparedness and mitigation
activities, respond to natural and man-made emergencies and disasters, and coordinate the
recovery efforts for such events.
The City of Edmonds Emergency Preparedness Goals are:
1. To coordinate the development and maintenance of the City's Comprehensive
Emergency Management Plan which provides the framework for organizational
activities during disaster operations.
2. Provide a community education and preparedness program for the residential and
business community to assist them in developing self sufficiency.
3. Provide assistance to City Departments in training activities for the development of first
responder capabilities.
4. Foster an interdepartmental cooperation within the City of Edmonds and with adjacent
jurisdictions as well as with county, state, and federal agencies.
The City of Edmonds Comprehensive Emergency Management Plan provides guidance to the
Emergency Management Organization for mitigation, preparedness, response, and recovery
operations. This includes: disaster and emergency responsibilities and procedures, and
training and community education activities.
The Plan, including its Emergency Support Functions, checklists and supporting documents,
provides for the coordination of operations during emergencies and disasters, and the best
utilization of all resources within the City of Edmonds.
The Plan establishes a mutual understanding of authority, responsibilities and functions of
local government and provides a basis for incorporating essential non-governmental agencies
and organizations into the Emergency Management Organization.
All directions contained in this Plan apply to preparedness and emergency activities
undertaken by the City of Edmonds and supporting organizations required to minimize the
effects of disaster, and facilitate recovery activities. The City of Edmonds provides on-going
Packet Page 143 of 564
Edmonds CEMP Basic Plan - 2 August 2015
training and implementation of the Incident Command System (ICS) per the National Incident
Management System (NIMS) for all natural and manmade disasters. Under the guidance of
the National Response Framework, this Plan addresses all activities related to local incident
management, including mitigation, preparedness, response, and recovery actions.
The City of Edmonds Comprehensive Emergency Management Plan supports and is
compatible with the Snohomish County, Washington State, and Federal Emergency Response
Plans. This document provides support to the Emergency Services Coordinating Agency
Hazardous Materials and Weapons of Mass Destruction Response Plan, Title III of the
Superfund and Re-authorization Act of 1986 and other plans required by the State and Federal
Governments. Any conflicts will be handled on a case by case basis.
AUTHORITY
The City of Edmonds Comprehensive Emergency Management Plan is developed under the
authority of the following local, state, and federal statutes and regulations:
1. Revised Code of Washington 38.52.070, 35.33.081 and 35.33.101
2. Washington Administrative Codes 118-30, and 296-62-41011
3. U.S. Codes 5121-5202 Disaster Relief Act of 1974, as amended
4. Title III Superfund Amendment and Re-authorization Act of 1986
5. The National Response Framework
6. Homeland Security Presidential Directives 1 - 8
7. Edmonds City Ordinance 2224
8. Edmonds Municipal Code Chapter 1.02.035
9. Edmonds Municipal Code Chapter 6.60
Packet Page 144 of 564
Edmonds CEMP Basic Plan - 3 August 2015
SITUATION
Disasters and emergencies have occurred in Edmonds and will likely occur again in the future.
Through a process of hazard vulnerability analysis it has been determined that the City of
Edmonds is vulnerable to numerous technological and natural hazards. These hazards
include: wind, rain and snow storms, earthquake, flood, landslide, tidal surge, common and
private carrier accident, search and rescue emergencies, civil disturbance, terrorist activity,
conventional and nuclear war, explosion, structural collapse, hazardous material incident,
major fire, and energy and utility system failure. Additional information on these hazards and
their associated risks may be found in the Snohomish County Hazard Identification and
Vulnerability Assessment, a separately published document.
ASSUMPTIONS
It is assumed that any of the noted situations could create significant property damage, injury,
loss of life, panic and disruption of essential services in Edmonds. These situations may also
create significant financial, psychological and sociological impact on citizens of the community
and the City governmental organization itself.
It is reasonable to assume that with impending incidents such as storms, floods and acts of
war, warnings will be issued to enable some preparation prior to the event. Other disasters will
come with no advance warning.
In the event of a widespread disaster there will not likely be any significant assistance from
nearby communities, county, state or federal agencies for 72 hours or longer. In this situation
the City will need to rely on available City resources and those of private organizations,
businesses and residents within the city for initial response operations.
The role of the individual citizen is of key importance in the response and recovery from
disasters. The immediate availability of resources to respond to the emergencies associated
with a disaster will be limited and responses will have to be prioritized. It is assumed that there
will not be enough resources to respond to every emergency need. Therefore each citizen
must be personally responsible for preparing to meet their own emergency needs for at least
seven days. These preparedness items include having a plan, stocking supplies, learning
emergency skills like first aid and CPR, and reducing hazards in the home and workplace.
Edmonds may be requested to provide support to other jurisdictions with both resources and
sheltering during emergencies and disasters not affecting this City.
LIMITATIONS
The information and procedures included in this Plan have been prepared utilizing the best
information and planning assumptions available at the time of preparation. There is no
guarantee implied by this Plan that in major emergencies and disaster situations that a perfect
Packet Page 145 of 564
Edmonds CEMP Basic Plan - 4 August 2015
response to all incidents will be practical or possible. As Edmonds response resources may
be overwhelmed and essential systems may be dysfunctional, the City can only endeavor to
make every reasonable effort to respond based on the situation, information, and resources
available at the time the situation occurs.
Packet Page 146 of 564
Edmonds CEMP Basic Plan - 5 August 2015
II. ORGANIZATION AND RESPONSIBILITIES
ORGANIZATION
The City of Edmonds operates under a Mayor/Council form of government. The Mayor leads
the executive branch and the members of the City Council make up the legislative branch of
Edmonds City government. The executive and legislative branches of the City of Edmonds are
responsible for overall policy direction within the City.
As the chief elected official, the Mayor, in cooperation with the City Council, has designated
the Police Chief to serve as the City's Disaster Coordinator.
Through Inter-local Agreement, the Emergency Services Coordinating Agency (ESCA) serves
as the City's Emergency Management agency. Effective January 1, 2016, the City will contract
with Snohomish County Department of Emergency Management (SnoCo DEM) for Emergency
Management Services.
The day-to-day organizational structure of Edmonds City Departments will be maintained as
much as practical for major emergency and disaster situations. Other public and private
organizations, school districts, and volunteer organizations may, under mutual agreement,
operate in coordination with this plan.
CONTINUITY OF GOVERNMENT
The Continuity of Government Act RCW 42.14 establishes provisions for the continuity of
government in the event its leadership is incapacitated. RCW 35A.13.020, 35A.42.030 and
42.12.070; and Edmonds Municipal Code 1.02.035 provide for filling vacancies of elected
officials in the City.
EMERGENCY MANAGEMENT ORGANIZATION
The Emergency Management Organization shall be compatible with the existing City
organization and shall provide clear lines of authority and channels of communication. It will
provide for the incorporation of existing staff having emergency response capabilities and
those having support roles.
EMERGENCY OPERATIONS BOARD
The Emergency Operations Board oversees and provides policy recommendation to the
Legislative Branch during emergency and recovery periods and provides direction for the
development and maintenance of the Comprehensive Emergency Management Plan. The
Emergency Operations Board shall oversee the activities of, and provide direction to the
Emergency Management Committee during major emergencies and disasters. The
Packet Page 147 of 564
Edmonds CEMP Basic Plan - 6 August 2015
Emergency Operation Board provides policy direction for emergency preparedness and
mitigation.
The City of Edmonds Emergency Operations Board consists of the Mayor and all City
Department Directors. The Mayor will serve as Chair of the Board.
EMERGENCY SERVICES COORDINATING AGENCY
The Director of the Emergency Services Coordinating Agency (ESCA) provides direction and
coordination for Comprehensive Emergency Management Plan development, ongoing
maintenance and related activities within the City in coordination with the Edmonds Disaster
Coordinator. The ESCA Director provides for coordination with outside agencies and
organizations involved in emergency planning. The ESCA Director manages the ESCA
Emergency Operations Center during activation and interacts with outside agencies to
coordinate emergency support activities. The ESCA Director may recommend emergency
planning related policy to the Emergency Operations Board.
SNOHOMISH COUNTY DEPARTMENT OF EMERGENCY MANAGEMENT
The Director of the Snohomish County Department of Emergency Management (SnoCo DEM)
provides technical assistance to the City of Edmonds for the development and ongoing
maintenance of the Comprehensive Emergency Management Plan and related activities within
the City in coordination with the Edmonds Disaster Coordinator. The SnoCo DEM Director
coordinates with outside agencies and organizations involved in emergency planning. The
SnoCo DEM Director manages the County Emergency Operations Center during activation
and interacts with outside agencies to coordinate emergency support activities.
EMERGENCY MANAGEMENT COMMITTEE
The Emergency Management Committee provides staff support, direction and expertise in
development of the plan and all supporting documents. The Disaster Coordinator or designee
shall serve as chair of the Committee. The Committee is comprised of key personnel
designated by each City Department Director and members of outside professional and
volunteer organizations having key roles in emergency preparedness, planning and response
activities. Members of the Emergency Management Committee will normally staff the
Edmonds Emergency Operations Center as necessary during activation and coordinate the
activities in their respective divisions or area of responsibility during major emergencies and
disasters.
The Emergency Management Committee consists of representatives from the following:
Mayor
Office of the Mayor Staff
Community Services / Economic Development Department
Packet Page 148 of 564
Edmonds CEMP Basic Plan - 7 August 2015
Courts
Development Services Department
Finance Department
Fire Marshal
Human Resources Department
Parks and Recreation Department
Police Department
Public Works Department
Snohomish County DEM Representative
SUB-COMMITTEES
Sub-committees as determined necessary by the Emergency Management Committee and the
Committee Co-chairs may include individuals from outside organizations. Sub-committees will
be chaired by a member of the Emergency Management Committee. Oversight of sub-
committee work will be the responsibility of the Disaster Coordinator, or designee.
RESPONSIBILITIES - CITY OF EDMONDS
ALL DIVISIONS LISTED BELOW, MAYOR, CITY CLERK, HUMAN RESOURCES AND
INFORMATION SERVICES
1. Develop plans for employee notification and support during disaster activities.
2. Coordinate the registration of temporary emergency workers and volunteers.
3. Provide liaison for coordination with telephone service providers for the reestablishment
of telephone services to the City government and guidance to City Departments for the
protection of telephone systems.
MAYOR
1. Proclaim local emergency.
2. Provide visible leadership to the community and makes announcements to the media.
3. The Mayor or his/her successor may proclaim special emergency orders under
Edmonds Municipal Code 6.60.
4. Provide policy direction through the Emergency Operations Board.
5. Provide overall direction and support of emergency operations as the Chair of the
Emergency Operations Board.
Packet Page 149 of 564
Edmonds CEMP Basic Plan - 8 August 2015
6. Request assistance, when necessary, from the Snohomish County Department of
Emergency Management (SnoCo DEM) and Washington State Emergency Operations
Center, and the Federal Emergency Management Agency (FEMA) through the SnoCo
DEM.
7. Provide for emergency preparedness, mitigation, response and recovery activities to be
carried out within the city.
8. Appoint Public Information Officer or Public Information Officer Group to coordinate
preparation and dissemination of information to the public and the media.
9. Issue notice of evacuation when necessary.
10. Maintain continuity of government.
11. Provide for coordination of visiting officials from other jurisdictions and levels of
government.
12. Direct Office of the Mayor Staff activities.
OFFICE OF THE MAYOR
1. Develop Standard Operating Procedures as outlined in Section III – Concept of
Operations as they relate to the Office. For disaster response purposes, the Office of
the Mayor consists of the Mayor and Senior Executive Assistant, City Clerk’s Office,
Human Resources Staff, and the Information Services.
2. Develop plans for employee notification and support during disaster activities.
3. Coordinate the registration of temporary emergency workers and volunteers.
4. Provide for the identification and preservation of essential department records.
5. Document emergency-related costs and activities.
6. Serve in a variety of staff and liaison roles during disaster operations.
Information Services
1. Chief Information Officer will provide coordination between the Information Services
Department and telephone service providers for the re-establishment of telephone
services to the City government; and guidance to City Departments for the protection of
telephone systems.
2. Develops plans for and coordinates the recovery operations of the City's telephone and
computer systems following disaster situations.
Packet Page 150 of 564
Edmonds CEMP Basic Plan - 9 August 2015
3. Assist in preparing Proclamation of Local Emergency.
4. Provide computer and telecommunications support to the Emergency Operations
Center.
5. Provide City Departments with guidance and direction for the protection of computer
hardware, software and data.
CITY COUNCIL
1. Appropriate funds to meet emergency needs.
2. Maintain continuity of government.
3. Appropriate funds to provide emergency preparedness programs and mitigation
activities within the city.
CITY COUNCIL PRESIDENT
1. Perform the duties of the Mayor in his/her absence.
SNOCO DEM DIRECTOR or DESIGNEE
1. In cooperation with the City Disaster Coordinator, provide technical assistance and
support in the development and maintenance of the City's Comprehensive Emergency
Management Plan.
2. Assist with the development of associated documents and standard operating
procedures which support the Comprehensive Emergency Management Plan.
3. Manage the SnoCo DEM Emergency Operations Center during activation.
4. Assist City with Proclamation of Local Emergency and coordinate requests for outside
assistance through county, state and federal agencies.
5. Assist responsible City staff in the preparation of disaster assistance paperwork and
submit to the appropriate agencies.
6. Provide for public information and education on emergency preparedness.
7. Coordinate dissemination of emergency warning information through the Emergency
Alert System (EAS), AlertSense, and other available County resources.
Packet Page 151 of 564
Edmonds CEMP Basic Plan - 10 August 2015
8. Assist with coordination of mitigation and preparedness activities as requested by the
Mayor.
9. Coordinate amateur radio operators during disaster operations.
10. Act as liaison between City personnel and military personnel responding to an
emergency.
11. Coordinate the establishment of disaster assistance centers to support community
recovery efforts.
DISASTER COORDINATOR
1. Coordinate the development and maintenance of the city's Comprehensive Emergency
Management Plan.
2. Chair of the Emergency Management Committee and coordinate the development of
associated documents and standard operating procedures which support the
Comprehensive Emergency Management Plan.
3. Coordinate Proclamation of Local Emergency with the Office of the Mayor and SnoCo
DEM Director.
4. Request outside assistance (other than mutual aid) through the SnoCo DEM Director.
5. Coordinate dissemination of emergency warning information through available city
resources and SnoCo DEM.
6. Coordinate mitigation and preparedness activities as appropriate.
7. Submit completed disaster assistance paperwork to the SnoCo DEM Director for
submittal to appropriate county, state and federal agencies.
SNOCOM COMMUNICATIONS CENTER
1. Develop Standard Operating Procedures as outlined in Section III - Concept of
Operations as they relate to the center.
2. Provide recommendations for Emergency Operations Center communications
equipment.
3. Provide emergency communications service to the Communications Center service
area, including dissemination of emergency messaging through the AlertSense system.
Packet Page 152 of 564
Edmonds CEMP Basic Plan - 11 August 2015
4. Provide information on emergency situations and locations to the Emergency
Operations Center during activation.
5. Coordinate re-establishment of communications system if disrupted.
6. Disseminate initial warning information to public safety agencies.
7. Provide for the identification and preservation of essential Communications Center
records.
8. Document emergency related costs and activities.
DEPARTMENT OF COMMUNITY SERVICES / ECONOMIC DEVELOPMENT
1. Serve as the lead agency for the coordination of disaster recovery issues.
2. Manage special disaster planning and recovery projects as assigned by the Mayor.
3. Serve on Office of Mayor Staff.
DEPARTMENT OF DEVELOPMENT SERVICES
All Divisions
1. Develop Standard Operating Procedures as outlined in Section III - Concept of
Operations as they relate to the department.
2. Develop emergency and evacuation plans for facilities used by the department.
3. Provide support to city-wide evacuation planning and assist in evacuation efforts as
appropriate.
4. Provide clerical staff to support administrative activities.
5. Provide for the identification and preservation of essential department records.
6. Document emergency-related costs and activities.
Building Division
1. Coordinate and compile initial damage assessment and safety evaluation of essential
city-wide buildings.
2. Provide support in the safety evaluation of structures during search and rescue
Packet Page 153 of 564
Edmonds CEMP Basic Plan - 12 August 2015
operations.
3. Determine building safety and recommend evacuation as appropriate.
4. Provide expertise and recommendation for reconstruction, demolition and structural
mitigation during recovery period.
5. Provide streamlined permit process for disaster recovery efforts.
Planning Division
1. Develop plans to deal with land use, environmental impact, and related mitigation
issues following disasters.
2. Coordinate and compile initial damage assessment and safety evaluation of essential
city-wide buildings.
3. Provide streamlined permit process for disaster recovery efforts.
PUBLIC WORKS DEPARTMENT
All Divisions
1. Develop Standard Operating Procedures as outlined in Section III - Concept of
Operations as they relate to the department.
2. Develop emergency and evacuation plans for facilities used by the department.
3. Provide support to city-wide evacuation planning and assist in evacuation efforts as
appropriate.
4. Provide clerical staff to support administrative activities.
5. Provide for the identification and preservation of essential department records.
6. Document emergency-related costs and activities.
Operational Divisions
1. Provide support in the development of plans to deal with public works related mitigation
issues following disasters.
2. Provide for the initial damage assessment of City infrastructure.
3. Coordinate debris removal, traffic control, road closures and protection of public
Packet Page 154 of 564
Edmonds CEMP Basic Plan - 13 August 2015
property.
4. Provide assessment of transportation routes, identify alternate routes and provide
temporary traffic control measures/devices and operational control of traffic signals.
5. Provide damage assessment, debris removal, emergency protective measures,
emergency and temporary repairs and/or construction for public works infrastructure.
6. Provide damage assessment, emergency repairs for City-owned vehicles, field
communications equipment, department-managed facilities, and coordinate
transportation facilities restoration (signals and street lights).
7. Provide support in initial damage assessment and safety evaluation of essential city-
wide facilities.
8. Provide light and heavy equipment, generators and supplies.
9. Coordinate with area utility providers for restoration of services.
10. Provide support to the Fire District in hazardous material incident response to City
sewers and streets.
11. Provide field communications support through existing communications equipment
when requested.
12. Provide support to determine building safety and recommend evacuation as
appropriate.
13. Provide support for reconstruction, demolition and structural mitigation activities during
recovery period.
14. Provide support to other departments in the damage assessment of City infrastructure.
15. Provide support to other departments in field activities as appropriate.
16. Provide initial interim repair and reconstruction, and coordinate permanent repair and
reconstruction of City facilities.
17. Provide support to perform or contract for major recovery work as appropriate.
Engineering Division
1. Provide support in the development of plans to deal with land use, environmental
impact, and related mitigation issues following disasters.
2. Provide support in assessment of transportation routes, identify alternate routes and
Packet Page 155 of 564
Edmonds CEMP Basic Plan - 14 August 2015
provide temporary traffic control measures/devices and operational control of traffic
signals.
3. Provide support regarding information and recommendations on traffic routes during
flooding.
4. Provide support in the initial damage assessment of City infrastructure.
5. Assist with utility restoration as appropriate.
6. Provide engineering and architectural services for transportation and municipal
infrastructure, including expertise and recommendations for reconstruction, demolition
and mitigation during the recovery period.
7. Provide support for reconstruction, demolition and structural mitigation activities during
recovery period.
8. Contract for major recovery work as appropriate.
9. Provide streamlined permit process for disaster recovery efforts.
Waste Water Treatment Plant Division
1. Provide for the continued operation of the Waste Water Treatment Facility following a
disaster.
2. Prioritize and initiate emergency repairs to the facility.
3. Provide support to other divisions as appropriate.
PARKS & RECREATION DEPARTMENT
1. Development plans for the coordination of emergency feeding and shelter for the public
during disaster activities.
2. Develop emergency and evacuation plans for municipal facilities under department
management.
3. Develop plans for, and coordinate the utilization of City facilities for temporary
emergency shelters.
4. Assist in the development of plans to coordinate emergency feeding and shelter for City
staff during disaster activities.
5. Provide support to other departments in field activities as appropriate.
Packet Page 156 of 564
Edmonds CEMP Basic Plan - 15 August 2015
6. Develop plans for emergency feeding and shelter for City staff during disaster activities.
7. Develop plans for providing limited temporary shelter which accommodates individuals
with access and functional needs.
8. Develop plans and coordinate volunteer groups to assist individuals with access and
functional needs in their homes.
9. Coordinate provision of food and water until Red Cross mass care response assets are
activated.
10. Coordinate the use of City parks for staging areas for disaster operations, mass care
and temporary housing.
11. Provide support to Public Works in debris removal, traffic control, road closures and
protection of public property.
12. Provide field communications support through existing communications equipment.
13. Provide light and heavy equipment, generators and supplies.
14. Provide information and recommendations on traffic routes during flooding situations.
15. Provide barricades for road closures and re-routing of traffic.
FINANCE DEPARTMENT
1. Develop Standard Operating Procedures as outlined in Section III - Concept of
Operations as they relate to the department.
2. Review contracts for emergency work and procurement.
3. Assist in identifying sources of disaster funds if departmental budgets are exceeded.
4. Assist other departments with the compilation of disaster related financial information.
5. Coordinate disaster related purchases and expenditures.
6. Provide for the identification and preservation of essential department records.
7. Document emergency related activities and costs.
Packet Page 157 of 564
Edmonds CEMP Basic Plan - 16 August 2015
SNOHOMISH COUNTY FIRE DISTRICT 1
The City of Edmonds contracts with Snohomish County Fire District 1 for the provision of fire
suppression and emergency medical services. The District will provide a representative to
assist in planning activities and EOC activations as deemed necessary at the time of the
incident.
1. Develop Standard Operating Procedures as outlined in Section III - Concept of
Operations as they relate to the District.
2. Develop emergency and evacuation plans for facilities under District management.
3. Provide command and control for field operations through established command posts
as appropriate.
4. Provide fire suppression services.
5. Provide hazardous materials incident command and radiological monitoring; and
coordinate with outside agencies as appropriate.
6. Provide direction and control for search and rescue activities.
7. Provide technical rescue services.
8. Provide emergency medical services with limited transportation to hospitals.
9. Support evacuation efforts as appropriate.
10. Provide support to City Departments in utility restoration efforts.
11. Provide support to the Public Information Officer in the dissemination of emergency
warning information to the public.
12. Provide support to City Departments in city-wide structural damage assessment, traffic
control, emergency warnings, road closure and protection of property.
13. Participate in initial city-wide damage assessment as appropriate, including assessment
of District facilities and waterfront reconnaissance.
14. Provide for the identification and preservation of essential District records.
15. Document emergency-related activities and costs.
Packet Page 158 of 564
Edmonds CEMP Basic Plan - 17 August 2015
POLICE DEPARTMENT
1. Develop Standard Operating Procedures as outlined in Section III - Concept of
Operations as they relate to the department.
2. Develop emergency and evacuation plans for facilities under department management.
3. Provide law enforcement activities within the city.
4. Provide command and control for field operations through established command posts
as appropriate.
5. Provide emergency traffic control.
6. Provide direction and control for evacuation efforts as appropriate.
7. Provide security at the Emergency Operations Center during activation.
8. Provide support to the Snohomish County Medical Examiner in the identification of the
deceased.
9. Provide support in the dissemination of emergency warning information to the public.
10. Participate in initial city-wide damage assessment as appropriate.
11. Provide coordination of explosive device identification, handling, and disposal through
outside agencies.
12. Provide for the identification and preservation of essential department records.
13. Document emergency related costs and activities.
RESPONSIBILITIES – STATE
Washington State Emergency Operations Center
1. Through the Washington State Comprehensive Emergency Management Plan and the
State EOC, coordinate all emergency management activities of the State.
2. Take appropriate actions to mitigate the effects of, prepare for, respond to and recover
from the impacts of emergencies or disasters.
3. Coordinate requests for various services such as specialized skills, equipment and
resources in support of State and local government emergency operations.
Packet Page 159 of 564
Edmonds CEMP Basic Plan - 18 August 2015
RESPONSIBILITIES – FEDERAL
Federal Emergency Management Agency (FEMA)
1. Provide assistance to State and local agencies to save lives and protect property, the
economy and the environment.
2. Facilitate the delivery of all types of Federal response assistance to State and local
governments.
3. Assist states in recovering from an emergency or disaster.
LAW ENFORCEMENT ASSISTANCE
The Edmonds Police Department is the agency of primary jurisdiction within the City under
normal circumstances and during emergency operations. The Washington Mutual Aid Peace
Officers Powers Act, RCW 10.93, provides law enforcement with mutual assistance
capabilities between jurisdictions. Mutual aid agreements exist with local law enforcement
agencies and various law enforcement agencies throughout the state. Requests for
supplemental law enforcement assistance should be made through SnoCo DEM.
Additional information on Law Enforcement Mutual Aid can be found in Emergency Support
Function (ESF) 13 – Public Safety and Security.
EMERGENCY RESPONSE AND SUPPORT TEAMS (FIELD LEVEL)
Incident Management Assistance Teams (IMATs) may be available to assist in incident
management, set up of response facilities and provide expertise and capability. They may
include representatives from the Federal Emergency Support Functions (ESF). They will make
preliminary arrangements for Federal field facilities and initiate establishment of the Joint Field
Office (JFO).
DEFENSE SUPPORT OF CIVIL AUTHORITIES
The Department of Defense (DOD) is authorized to deploy support to local jurisdictions during
disasters and emergencies after approval by the Secretary of Defense, or at the direction of
the President. DOD responds to requests for assistance when local, state and federal
resources are overwhelmed. When deployed to assist civil authorities, command of Federal
military assets remains with the Secretary of Defense.
Additional information can be found in Emergency Support Function (ESF) 20 – Defense
Support to Civil Authorities.
Packet Page 160 of 564
Edmonds CEMP Basic Plan - 19 August 2015
III. CONCEPT OF OPERATIONS
CONCEPT
1. It is the policy of the City of Edmonds to conduct emergency and disaster
preparedness and mitigation activities in an effort to reduce and minimize the
effects of a major emergency or disaster.
2. It is the policy of the City of Edmonds to provide vital services to the community
during emergency conditions while maintaining a concern for the safety of City
employees and their families. Should the emergency or disaster occur:
a. During non-work hours: All employees are encouraged to ensure the
safety and welfare of their families and homes. After making any
necessary arrangements, all designated employees are required to report
to work pursuant to department Standard Operating Procedures (SOPs).
b. During work hours: Departments shall make every effort to allow
employees to check promptly on the status of the families and homes,
provided that doing so does not compromise emergency response
functions as defined in this plan.
3. It is the policy of the City of Edmonds to conduct all emergency and disaster
preparedness, mitigation, response and recovery activities in accordance with
the National Incident Management System (NIMS).
4. It is the policy of the City of Edmonds that each City Department takes an active
role in emergency planning and develops Standard Operating Procedures. It is
the responsibility of the Director of each City Department and office to:
a. Serve as members of and designate alternates to the Emergency Operations
Board to actively participate in the preparation and maintenance of the City's
Comprehensive Emergency Management Plan.
b. Establish a departmental line of succession to activate and carry out
emergency and disaster responsibilities.
c. Develop the capability to continue operations during an emergency or disaster
and to carry out the responsibilities outlined in this Plan.
d. Develop departmental Standard Operating Procedures (SOP) which include
the following:
1) Department chain of command
2) Location for managing departmental emergency operations
3) Departmental responsibilities, capabilities and resources to include:
Packet Page 161 of 564
Edmonds CEMP Basic Plan - 20 August 2015
personnel, facilities, and equipment
4) Information needed to manage the department during emergency
operations and means of communication for obtaining that
information
5) Information on how the department will coordinate with the
Emergency Operations Center
6) Methods to ensure that all department staff are aware of Standard
Operating Procedures and of the concepts of the Comprehensive
Emergency Management Plan
5. It is the policy of the City of Edmonds that City Departments make staff and
resources available at the request of the Disaster Coordinator for training
activities and emergency operations assignments.
6. When a major emergency or disaster occurs, City Department management shall
use the following general checklist as a basis for managing disaster operations:
a. Report to the pre-determined site to manage department operations
b. Account for personnel
c. Assess damages to facilities and resources
d. Assess personnel and resources available
e. Assess problems and needs
f. Report situation, damages and capabilities to the Emergency Operations
Center
g. Send designated representatives to the Emergency Operations Center to
participate as members of the Emergency Preparedness Board
h. Carry out departmental responsibilities and assigned tasks
i. Continue assessment of department resources, needs and actions
j. Continue reports to the Emergency Operations Center regarding actions,
problems, needs, damages, etc.
k. Keep detailed and accurate records, document actions, costs, situations,
etc.
7. The Edmonds Emergency Operations Center (EOC) is activated by the Disaster
Coordinator at his/her discretion, or at the request of the Mayor or any City
Department Director or designee, when the level of operations requires it. The
Packet Page 162 of 564
Edmonds CEMP Basic Plan - 21 August 2015
EOC Manager will be designated by the Mayor. Designated staff report to the
EOC to coordinate response efforts and support field operations. All or part of
the Emergency Management Organization and/or the Emergency Operations
Center may be activated during a disaster. The level of activation will be
determined by the nature and extent of the disaster.
8. In the event of a regional emergency affecting a wide spread area, the SnoCo
DEM EOC will be activated by the SnoCo DEM Director. Upon request, the City
of Edmonds will send appropriate staff to the SnoCO DEM EOC to facilitate
coordination of activities and resources on behalf of the City, and will serve as
staff to the SnoCo DEM EOC.
9. The Emergency Operations Board, in coordination with the SnoCo DEM Director,
shall be responsible for evaluating a situation to determine if a Proclamation of
Emergency by the Mayor is necessary.
10. Edmonds City Departments are expected to carry out their responsibilities
outlined in this plan, utilizing their best judgment and in a coordinated manner.
The Emergency Operations Board will act as advisors to the Mayor in dealing
with problems caused by the disaster and in the coordination of the situation.
This coordination will normally be done through the Emergency Operations
Center.
11. When a major emergency or disaster occurs, it is anticipated that City
Departments and other responding organizations will organize their areas of
responsibilities into manageable units, assess damages, and determine needs.
If agency resources cannot meet the needs created by the disaster, additional
assistance may be requested through existing mutual aid or through the SnoCo
DEM Emergency Operations Center. Resources to be utilized to support City
operations may be placed at staging areas until specific assignment can be
made. (See ESF 7- Logistics and Resource Support)
12. In the event a situation is, or will become, beyond the capabilities of the
resources of the City of Edmonds and those provided through mutual aid, the
Mayor may request assistance from SnoCo DEM or from the Governor through
the SnoCo DEM Director.
13. In the event of communications failure in a disaster, any City facility or
temporarily established site may act as a remote Emergency Operations Center
for its local area until coordination can be established from the Edmonds
Emergency Operations Center. Each may serve as a command post, staging
area, triage station, communications center or in any other functional capacity
appropriate for the situation.
14. The registration of temporary emergency workers and other volunteers will be
coordinated through the Office of the Mayor. Permanent emergency worker
Packet Page 163 of 564
Edmonds CEMP Basic Plan - 22 August 2015
registration is handled through SnoCo DEM.
OPERATIONS BY TIME PHASE
In order to minimize the effects of a disaster, provide emergency response capabilities
and to facilitate recovery efforts, the various elements of the Edmonds Emergency
Management Organization and City Departments shall endeavor to provide services in
the areas of mitigation, preparedness, response and recovery from disasters to the best
of their ability during all operational time phases.
MITIGATION AND PREPAREDNESS PHASE
1. Develop and maintain the City of Edmonds Comprehensive Emergency
Management Plan.
2. Review hazard and risk analysis and develop capabilities and resources to
enhance ability to respond to disaster situations.
3. Develop appropriate contingency plans and standard operating procedures in
support of the Comprehensive Emergency Management Plan.
4. Initiate efforts toward detection and prevention of impacts to public health and
safety.
5. Identify and implement actions to reduce hazards and risks faced by first
responders in order to protect responder health and safety.
6. Report any threats, incidents and/or potential incidents using established
communications and reporting channels.
7. Immediately report any suspicious activity, terrorist threats and/or actual
incidents with a potential or actual terrorist nexus to the regional Joint Terrorism
Task Force (JTTF) in Seattle.
8. Coordinate with other local, county, state and federal agencies to assure
cohesive working relationships and compatible emergency plans.
9. Coordinate with volunteer organizations to assure cohesive working relationships
and coordinated response.
10. Conduct mitigation activities to protect City personnel, equipment, supplies,
services and properties as appropriate.
11. Conduct training activities to enhance response capabilities.
Packet Page 164 of 564
Edmonds CEMP Basic Plan - 23 August 2015
12. Conduct public education to enhance citizen self-sufficiency.
INCREASED READINESS/WARNING PHASE
1. Make appropriate notifications and initiate actions to place emergency plans into
effect.
2. Activate and staff the Emergency Operations Center as required for the situation.
3. Disseminate emergency warning as appropriate.
4. Take incident specific mitigation actions to protect public and private property.
RESPONSE PHASE
1. Initiate actions necessary to preserve life, property and the environment utilizing
available resources.
2. Carry out initial damage assessment and evaluate overall situation.
3. Coordinate response and support functions with outside agencies and volunteer
organizations.
4. Coordinate operations, logistics, and planning functions.
5. Compile event status information and report to appropriate agencies.
6. Prepare and maintain detailed documentation of events and activities.
7. Provide public information and warning as appropriate.
8. Prepare Proclamation of Local Emergency as appropriate.
RECOVERY PHASE
1. Carry out damage assessment functions and assess community needs.
2. Prioritize recovery projects and assign functions accordingly.
3. Coordinate recovery efforts and logistical needs with supporting agencies and
organizations.
4. Prepare documentation of event, including event log, cost analysis and estimated
recovery costs.
5. Facilitate the establishment of disaster assistance centers to assist private
Packet Page 165 of 564
Edmonds CEMP Basic Plan - 24 August 2015
business and citizens with individual recovery.
6. Assess special community needs and provide information and assistance where
appropriate.
7. Incorporate long range plans into recovery and restoration activities.
8. Additional information on recovery activities can be found in Emergency Support
Function (ESF) 14 – Long-term Community Recovery and in the City of Edmonds
Disaster Recovery Plan, a separately published document.
Packet Page 166 of 564
Edmonds CEMP Basic Plan - 25 August 2015
IV. ADMINISTRATIVE AND FISCAL PROCEDURES
1. It is the policy of the City of Edmonds that each City Department will assign
personnel to be responsible for documentation of disaster activities and costs
and to utilize effective administrative methods to keep accurate detailed records
distinguishing disaster operational activities and expenditures from day-to-day
activities and expenditures.
2. Financial documentation and associated reports shall be the responsibility of the
Finance Director or designee.
3. The Finance Director or designee shall develop effective methods and
procedures for documenting disaster expenditures and shall provide each City
Department with documentation forms and completion instructions.
4. The City Clerk, in coordination with other City Departments, shall identify records
which are vital for the operation of the City, in order to effectively resume normal
business after a disaster or emergency.
5. During emergency operations, non-essential administrative activities may be
suspended. Personnel not assigned to essential duties may be assigned to other
departments in order to provide support services.
6. The City of Edmonds will incur disaster expenses from currently appropriated
local funds in accordance with Chapter 38.52.070 RCW and 35A.33.080-100.
The Mayor and City Council, in coordination with the Finance Director, will be
responsible for identifying other sources of funds to meet disaster related
expenses if departmental budgets are exceeded.
7. Normal procedures for expenditures and payment processing may be modified to
accommodate the circumstances associated with the disaster.
8. The City of Edmonds will submit reports required by both state and federal
agencies in a disaster situation with information concerning nature, magnitude
and impact for use in evaluating and providing appropriate response resources
and services. These reports include but are not limited to:
-Situation Reports
-Proclamation of Emergency
-Requests for Assistance
-Damage Assessment Reports
It will be the responsibility of the Office of the Mayor to coordinate the preparation
of all required reports and ensure that they are delivered to the appropriate
agencies.
9. A streamlined plan review and permit process may be instituted within the City in
Packet Page 167 of 564
Edmonds CEMP Basic Plan - 26 August 2015
order to facilitate recovery and repair activities.
10. In instances where emergency work is performed to protect life and property,
requirements for environmental review and permits may be waived or orally
approved as provided in the State Environmental Policy Act, Hydraulics Act,
Forest Practices Act, Shoreline Management Act, and Flood Control Act.
11. Repair and restoration of damaged facilities may require environmental
assessments and appropriate permits prior to final project approval, requiring
compliance with the State Environmental Policy Act, Forest Practices Act,
Shoreline Management Act, and Flood Control Act.
12. Properties of historic significance and archeological sites are protected by law.
Non-time critical missions and recovery actions affecting these sites will be
coordinated with the state Historic Preservation Commission.
13. No services or assistance will be denied on the basis of race, color, national
origin, religion, sex, economic status, age, sexual identity, gender identity, marital
status, or disability.
14. Local activities pursuant to the Federal/State Agreement for major disaster
recovery will be carried out in accordance with RCW 49.60 -Laws Against
Discrimination and 44 CFR Section 205.16 - Nondiscrimination. Federal disaster
assistance is conditional upon compliance with this code.
15. Volunteer emergency workers used during emergencies and disaster operations
shall be registered using procedures established by Chapter 118.04 WAC
Emergency Worker Standards.
16. It is the policy of the City of Edmonds that departments utilize their personnel to
the maximum extent possible, including use of personnel not assigned
emergency responsibilities. The Office of the Mayor is the lead agency for
essential human resource activities in the City and as such, may assist other
departments in identifying and assigning employees to assist in disaster
recovery. It may be necessary to hire temporary employees to meet staffing
requirements in all departments.
17. City Departments, although retaining responsibility for the day-to-day supervision
of their work force, should coordinate their personnel needs with the Office of the
Mayor. Since non-essential activities may be canceled during an emergency,
City employees may be required to work either overtime or "out of class", and
shall be compensated in accordance with existing rules and bargaining unit
agreements. Requirements of the Fair Labor Standards Act (FLSA), existing
labor contracts and City policies and procedures shall apply.
18. The Mayor or designee shall designate an Office of the Mayor representative to
Packet Page 168 of 564
Edmonds CEMP Basic Plan - 27 August 2015
coordinate personnel needs, maintain liaison with volunteer organizations, and
assist City employees in obtaining recovery assistance.
19. Additional personnel resources may be obtained through existing mutual aid
agreements with schools, colleges, private businesses and labor organizations.
Requests for additional assistance should be coordinated through the EOC.
20. Volunteers will become an important human resource in the event of a disaster.
Staging areas should be designated and persons wishing to volunteer may be
directed there for registration and assignments. The Office of the Mayor will be
responsible for the recruitment, registration and assignment of volunteer
emergency workers. Volunteers will be registered as emergency workers and
provided identification, assignments appropriate to their qualifications, and
administrative details.
Packet Page 169 of 564
Edmonds CEMP Basic Plan - 28 August 2015
This page intentionally left blank.
Packet Page 170 of 564
Edmonds CEMP Basic Plan - 29 August 2015
V. LOGISTICS
1. The Disaster Coordinator or designee, following a Proclamation of Emergency,
has the authority to commandeer the services and equipment of citizens as
necessary in response to the disaster. Those citizens are entitled to all
privileges, benefits and immunities provided for emergency workers under state
and federal emergency management regulations, Chapter 38.52.110 RCW.
2. The Disaster Coordinator or designee is authorized to contract with any person,
firm, corporation or entity to provide construction work on an agreed upon cost
basis during emergency or disaster response operations, Chapter 38.52.390
RCW.
3. It is the policy of the City of Edmonds that all City Departments prepare and
maintain an updated list of its personnel, facilities and equipment resources as
part of their Standard Operating Procedures. Any or all of these resources may
be called upon during disaster and emergency situations.
4. The Public Works and Parks and Recreation Departments has pre-identified the
following locations within the city for use as Logistics Staging Areas and Points of
Distribution for response and relief supplies:
• Edmonds Public Works Facility - 7110 210th St SW, Edmonds
• Frances Anderson Community Center - 700 Main Street, Edmonds
Additional information on Staging Areas and Points of Distribution can be found
in Emergency Support Function (ESF) 7 – Logistics and Resource Support.
5. Additional governmental resources may be called upon for assistance through
the use of existing mutual aid agreements, SnoCo DEM and the Washington
State Emergency Operations Center through SnoCo DEM.
Packet Page 171 of 564
Edmonds CEMP Basic Plan - 30 August 2015
This page intentionally left blank.
Packet Page 172 of 564
Edmonds CEMP Basic Plan - 31 August 2015
VI. DIRECTION, CONTROL AND COORDINATION
NIMS INTEGRATION
1. The National Incident Management System (NIMS) is mandated by Homeland
Security Presidential Directive – 5, and provides a consistent, nationwide
approach for Federal, State, local and tribal governments, the private sector and
non-governmental organizations to effectively and efficiently prepare for, respond
to and recover from domestic incidents, regardless of cause, size or complexity.
2. To provide for interoperability and compatibility among Federal, State, local and
tribal capabilities, the NIMS includes a core set of concepts, principles and
terminology.
3. It is the policy of the City of Edmonds that all emergency management activities
will be conducted in accordance with NIMS.
DIRECTION AND CONTROL
1. All emergency and disaster preparedness, mitigation, response, and recovery
activities shall be conducted in accordance with the National Incident
Management System (NIMS).
2. Direction and control of emergency management activities rests with the Disaster
Coordinator. The authority for direction and control of the organization and
administration of the emergency management program is found in RCW 38.52
and Edmonds Municipal Code 6.60. Overall control during disaster response
operations will be divided into three levels.
a. Emergency Operations Board: deals primarily with policy issues brought
about by the disaster.
b. Emergency Management Committee: coordinates disaster resources,
monitors the disaster situation, and reports to the Board.
c. Field Operations: operate in field locations or command posts and will
direct and coordinate disaster field operations.
3. Overall direction, control and coordination will normally be conducted through the
Emergency Operations Center in order to support the overall community
response to the disaster and to best coordinate efforts with county, state and
federal agencies.
4. The Emergency Operations Center is currently located at the Police Department
Headquarters (250 5th Avenue North) which is operational 24 hours a day and is
Packet Page 173 of 564
Edmonds CEMP Basic Plan - 32 August 2015
equipped with alternate power supplies for use during general system failures.
5. The Emergency Operations Center may be activated to any level deemed
appropriate for the level of disaster operations. The Mayor’s designee serves as
the EOC Manager. It will be staffed by members of the Emergency Management
Board and Committee. Initial establishment of the Emergency Operations Center
following activation is the responsibility of the Mayor’s designee.
6. Individual City Departments may designate alternate locations or field command
posts for coordinating individual department operations. The individual in charge
of a command post shall be responsible for keeping the Emergency Operations
Center informed of their situation and activities and shall act in coordination with
the Emergency Operations Center.
7. The Disaster Coordinator, in coordination with the Emergency Operations Board,
is responsible for ensuring that emergency preparedness activities, response to
emergencies and disasters, and the coordination of the recovery from
emergencies and disasters are effectively carried out within the City of Edmonds.
8. The Mayor is responsible for city-wide policy decisions. The Disaster
Coordinator and Emergency Operations Board provide policy recommendations
to the Mayor during times of emergency or disaster, or in anticipation of large
scale emergencies or disasters.
9. The day-to-day organizational structure of City Departments shall be maintained
as much as practical during emergency and disaster operations. Each City
Department shall have a line of succession to the Department Director and then
to the Disaster Coordinator.
10. Overall direction, control and coordination will normally be conducted through the
Emergency Operations Center in order to support the overall community
response to the disaster and to best coordinate efforts with county, state and
Federal agencies.
11. The following list of management priorities, in order of importance, is provided to
guide policy decisions during a disaster of major magnitude.
a. Protect life, health and the environment
b. Protect public and private property
c. Develop and disseminate public information
d. Restore essential services and facilities
e. Minimize economic disruption to the community
f. Preserve existing institutions and organizations
Packet Page 174 of 564
Edmonds CEMP Basic Plan - 33 August 2015
ON-SCENE MANAGEMENT
1. In compliance with the National Incident Management System (NIMS), on-scene
management of emergencies will follow the Incident Command System (ICS) as
published by the Department of Homeland Security, National Fire Academy and
the National Emergency Management Institute. The functions of the Incident
Command System include but are not limited to:
a. Incident Commander - Directs on-scene operations and reports to
EOC via established chain of command.
b. Safety Officer - Oversees safety of operations at the scene.
c. Liaison Officer - Coordinates information with support function
groups.
d. Public Information Officer - Coordinates media relations and
emergency public information. This shall be done in cooperation
with the EOC when activated.
e. Operations Section - Implements strategic and tactical actions at
the incident scene, such as: perimeter control, evacuation, fire
suppression, rescue, clean-up, emergency medical, and
decontamination.
f. Logistics Section - Responsible for communications, transportation,
supplies and special equipment.
g. Planning Section - Responsible for situation and resource status
reports, documentation, incident planning, technical advisors, and
demobilization.
h. Intelligence – Responsible for the collection and coordination of
intelligence information.
i. Finance/Administration Section - Responsible for contracts, time
keeping, cost analysis, compensation, claims.
2. The Incident Commander is the on-scene manager responsible for direction and
control at the scene of the incident. The Incident Commander shall utilize the
positions within the Incident Command System as deemed necessary at the time
of the incident. The Incident Command System should only be activated to the
level necessary for efficient operations. It is the responsibility of the Incident
Commander to:
a. Assess the situation
Packet Page 175 of 564
Edmonds CEMP Basic Plan - 34 August 2015
b. Develop incident organization objectives, action plans and priorities
c. Ensure safety issues are addressed
d. Contact appropriate agencies, dispatch, or the Emergency
Operations Center to request necessary resources
e. Keep the Emergency Operations Center informed of field activities
3. When more than one agency is involved in response at the scene, the Incident
Commander and other responding agencies should coordinate to ensure each
agency's objectives are identified. Personnel working in support of the Incident
Commander will maintain the normal chain of command through their respective
agency and will carry out tasks through on-site command personnel or the
Emergency Operations Center when instructed.
4. In situations where more than one agency has significant on-scene
considerations involving response efforts, a Unified Command shall be
established to ensure coordination of on-scene activities.
5. WAC 296-62- 41015 requires that the Incident Command System be used in
responses to hazardous materials incidents and outlines specific requirements of
the Incident Commander.
6. The Incident Commander, in concert with the EOC and Office of the Mayor, may
appoint a Public Information Officer or Public Information Officer Group to work
with the news media at the Incident scene. This may include coordinating media
releases and arranging contacts between the media and response agencies.
When possible, information released to the media should be coordinated through
the Emergency Operations Center. The Public Information Officer shall be
responsible for communicating released information to the Emergency
Operations Center.
COORDINATION
1. Coordination of emergency activities and information among local, state, federal
and private sector agencies serving the City of Edmonds shall be done through
the Emergency Operations Center and SnoCo DEM.
2. Communications during an emergency or disaster will be through
communications systems currently established within the City organizations.
Back-up and supporting communication activities will be provided by organized
volunteer radio operators assigned through SnoCo DEM.
Packet Page 176 of 564
Edmonds CEMP Basic Plan - 35 August 2015
3. Emergency warning and public information will be communicated to citizens via
local media through the designated Public Information Officer and existing City
communications systems. The Emergency Alert System (EAS) and the
AlertSense system, which are activated by SNOCOM or SnoCo DEM, may also
be used.
PROCLAMATION OF EMERGENCY
1. The Proclamation of Local Emergency is made by the Office of the Mayor and is
the legal method which authorizes the use of extraordinary measures to
accomplish tasks associated with disaster response. The proclamation is
normally a prerequisite to state and federal disaster assistance. The
Proclamation of Local Emergency must be ratified by the City Council as soon as
practical following the emergency.
2. In the absence of the Mayor, such proclamations may be made by the City
Council President and in the absence of the City Council President, the Council
President Pro-Tem. The Mayor shall cause any proclamation made, to be
delivered to all news media within the city and shall use other methods as
necessary, to give notice of such declaration to the public.
3. The proclamation authorizes the City to take necessary measures to combat a
disaster, protect persons and property, provide emergency assistance to victims
of the disaster, and exercise the powers vested in RCW 38.52.070 without regard
to formalities prescribed by law (except mandatory constitutional requirements).
These include but are not limited to rationing of resources and supplies, curfew,
budget law limitations, competitive bidding process, publication of notices,
provisions pertaining to the performance of public work, entering into contracts,
incurring obligations, employment of temporary workers, rental of equipment,
purchase of supplies and materials, levying of taxes and the appropriation and
expenditure of public funds.
4. The Mayor, assisted by the Office of the Mayor Staff, shall be responsible for the
preparation of Emergency Proclamations.
5. The Disaster Coordinator will notify SnoCo DEM when a proclamation of local
emergency is made.
Packet Page 177 of 564
Edmonds CEMP Basic Plan - 36 August 2015
*******************
SAMPLE EMERGENCY PROCLAMATION
The Mayor of the City of Edmonds has determined that the (type of event) has/will cause (type
of damage) in the City of Edmonds, and,
(Incident Description), and,
These problems have created a threat to life and property, and
All available resources are/will be committed to disaster work, and
The City requires supplemental assistance, and
The severity of this disaster is beyond the capability of local resources:
Therefore, this event constitutes an emergency as defined by the City of Edmonds
Comprehensive Emergency Management Plan and necessitates the utilization of emergency
powers granted under Chapter 38.52.070 RCW; Therefore,
IT IS PROCLAIMED BY THE MAYOR OF THE CITY OF Edmonds:
Packet Page 178 of 564
Edmonds CEMP Basic Plan - 37 August 2015
REQUEST FOR EMERGENCY ASSISTANCE
1. In the event a situation is beyond the capability of local and pre-designated
mutual aid resources, the Disaster Coordinator will request additional resources
through SnoCo DEM for county, state and federal assistance as necessary.
2. Requests to the Governor to declare a State of Emergency are made by the
County Executive through SnoCo DEM. This declaration by the Governor is
necessary to obtain federal disaster relief funds.
DEMOBILIZATION
When the Disaster Coordinator (or designee) determines that the activation of the EOC is no
longer required, he/she will issue instructions for demobilization from emergency management
activities at the conclusion of the emergency event.
Packet Page 179 of 564
Edmonds CEMP Basic Plan - 38 August 2015
This page intentionally left blank.
Packet Page 180 of 564
Edmonds CEMP Basic Plan - 39 August 2015
VII. PUBLIC INFORMATION
Providing current and accurate information to the public is of great importance following an
emergency or disaster. The City shall strive to provide both emergency and general
information in a timely and coordinated manner. For the purposes of this Plan, the City of
Edmonds defines “emergency information” as information which has direct relevance to the
safety and/or health of the citizens of Edmonds, i.e. evacuation orders and routes; boil water
orders; shelter-in-place notices; curfews, etc. “General information” may consist of information
such as debris pick-up schedules; permit fee schedules; facility hours of operation, etc.
1. The Mayor or Disaster Coordinator shall appoint a Public Information Officer or
Public Information Officer Group who shall coordinate the dissemination of
emergency public information through the Emergency Operations Center (EOC)
(See ESF 2 - Communications).
2. All available methods may be used to relay emergency information to the public.
3. Activation of amateur radio services shall be requested through SnoCo DEM
when necessary.
4. Printed education and information materials addressing preparedness, response
and recovery are available through SnoCo DEM and Snohomish County Fire
District 1.
5. It is anticipated that in some circumstances emergency public information may
need to be released from field command posts. In this event, the individual in
charge of the location shall notify the Emergency Operations Center in a timely
manner and provide detailed information regarding information released.
6. Additional information on public information activities can be found in Emergency
Support Function (ESF) 15 – External Affairs and Emergency Public Information.
Packet Page 181 of 564
Edmonds CEMP Basic Plan - 40 August 2015
This page intentionally left blank.
Packet Page 182 of 564
Edmonds CEMP Basic Plan - 41 August 2015
VIII. TRAINING, EXERCISES AND EDUCATION
PURPOSE
To identify and establish methods of meeting the training, exercise and educational
needs of City of Edmonds employees responsible for responding to emergencies and
for community-wide educational programs geared at self-preparedness.
1. The Disaster Coordinator will be responsible for ensuring that the appropriate
staff will receive training in specific emergency management skills and
professional development through available resources.
2. Public Education programs are available from SnoCo DEM, upon request, as
resources permit, to all segments of the community. These programs are
designed to increase awareness of hazards, explain how best to safely respond,
and to promote self preparedness.
3. The City will utilize all types of exercise formats, including both tabletop and full-
scale exercises.
4. SnoCo DEM will conduct an annual training and exercise planning workshop
(TEPW) in order to develop a coordinated training and exercise calendar; and
coordinate one county-level functional exercise annually. SnoCo DEM will
provide, at a minimum, the delivery of two trainings and two exercise
opportunities annually for the City of Edmonds. In order to receive training and
exercise opportunities, the City of Edmonds must participate in the Snohomish
County TEPW.
5. Each City Department Director is responsible for ensuring that their employees
are trained in the concepts of the Comprehensive Emergency Management Plan
(CEMP) and in the Department specific standard operating procedures (SOPs).
6. The City and SnoCo DEM will use outside resources to provide specialized
training, if appropriate.
7. The Disaster Coordinator is responsible for ensuring that drills and exercises are
conducted to evaluate the effectiveness of the CEMP and to determine future
training needs.
8. The Disaster Coordinator, with assistance from SnoCo DEM, the Police
Department, and Fire District, is responsible for coordinating and implementing
drills and exercises for City employees and for the development and
maintenance of the CEMP.
Packet Page 183 of 564
Edmonds CEMP Basic Plan - 42 August 2015
RESPONSIBILITIES
1. City of Edmonds
a. City Departments
1) Develop SOPs that define employees’ operational responsibilities
during an emergency or disaster.
2) Provide necessary training to enable employees to carry out those
responsibilities in coordination with the City EOC and/or SnoCo
DEM EOC.
3) Provide assistance to the Disaster Coordinator in the design,
conduction and evaluation of drills and exercises to determine the
effectiveness of the City’s emergency management programs and
the employees’ level of training.
b. City Disaster Coordinator
With assistance from SnoCo DEM, design, conduct and evaluate drills and
exercises to determine the effectiveness of the City’s emergency
management programs and employees’ level of training.
2. Snohomish County Department of Emergency Management
a. Convene annual training and exercise planning workshop to determine
training and exercise needs,
b. Coordinate one (1) County-level exercise per year; and two training and
two exercise opportunities for the City of Edmonds each year.
c. Assist the Disaster Coordinator in the design, conduction and evaluation
of drills and exercises to determine the effectiveness of the City’s
emergency management programs and the employees’ level of training.
3. All Other Support Agencies
Participate in training and exercises, if requested and as resources allow.
Packet Page 184 of 564
Edmonds CEMP Basic Plan - 43 August 2015
IX. ON-GOING PLAN MANAGEMENT AND MAINTAINANCE
COORDINATION
Assisted by the SnoCo DEM Director or designee, the City of Edmonds Disaster Coordinator
will coordinate with and reach accord with all agencies that have a role in incident
management for the development and execution of policy, planning, training, equipping and
other preparedness activities.
PLAN MAINTAINANCE
1. The Disaster Coordinator will ensure that exercises of this plan are conducted on
an on-going, annual basis.
2. This CEMP will be updated every four years. The revised CEMP will be
submitted to the Washington State Emergency Management Division for review.
Packet Page 185 of 564
Edmonds CEMP Emergency Support Functions - 44 August 2015
EMERGENCY SUPPORT FUNCTION 1
TRANSPORTATION
PRIMARY AGENCY: City of Edmonds Public Works Department
SUPPORT AGENCIES: City of Edmonds Development Services
Washington State Department of Transportation
Washington State Ferries
Community Transit
King County Metro Transit
Sound Transit
I. INTRODUCTION
A. Purpose
To coordinate the activities and agencies involved in transportation related
operations.
B. Scope
This Emergency Support Function is designed to provide guidance in the
allocation of transportation resources, determining priority of highway
repair and in the coordination of activities carried out by transportation
agencies operating within the city.
II. POLICIES
A. Local transportation planning and emergency response shall be done in
coordination with supporting agencies in order to ensure the integrity of
the transportation system.
B. Response to restore transportation routes and services shall be prioritized
in order to provide access for emergency services, delivery of essential
resources and for the re-opening of major transportation routes.
III. SITUATION
A significant disaster may cause severe damage to the transportation
infrastructure. Secondary damage may include utility networks constructed
adjacent to or as part of roads and bridges. Damage to transportation systems,
Packet Page 186 of 564
Edmonds CEMP Emergency Support Functions - 45 August 2015
including damage to the WA State Ferries terminal located at the Port of
Edmonds, will cause major disruption of both routine and emergency services.
IV. CONCEPT OF OPERATIONS
A. The Public Works Director or designee shall be responsible for
coordinating surface transportation related activities within the city.
Priorities established for the clearing and emergency repair of City roads
shall be coordinated with the Police Department, Fire District, and
adjacent jurisdictions to ensure the timely restoration of emergency
services and the transportation network.
B. Repair and restoration of state and interstate highways will be coordinated
with the appropriate state and federal agencies. Washington State
Department of Transportation shall be the primary contact for the
coordination of these activities. The Public Works Director or designee
may authorize emergency road clearing work to be done on state and
interstate highways in order to re-establish highway systems.
C. The Public Works Department will provide an assessment of roadway
conditions and provide information to the Emergency Operations Center,
SnoCo DEM and all appropriate agencies. All appropriate agencies shall
be notified of ongoing repair and roadway status.
D. Additional resources or assistance may be obtained through existing
mutual aid agreements and/or contracts through private contractors.
Requests for additional assistance should be coordinated through the
Emergency Operations Center and SnoCo DEM.
E. The Public Works Director, or designee, in coordination with the
Emergency Operations Center and SnoCo DEM, shall coordinate the
priority use of public transportation assets. Private transportation sources
are available within the city and should be integrated into overall
emergency transportation needs.
V. PROCEDURES
A. Individual agencies responsible for managing transportation routes are
responsible for the development of transportation recovery plans and for
establishing transportation route priorities within their area. Agencies
which provide support resources for the restoration of damaged
transportation routes should be included in the overall process to ensure a
coordinated and efficient response.
Packet Page 187 of 564
Edmonds CEMP Emergency Support Functions - 46 August 2015
B. Emergency operations plans for Snohomish County, Washington State
Department of Transportation, Washington State Ferries, Community
Transit, King County Metro Transit, Sound Transit and Snohomish and
King Counties are separately published documents which provide
guidance for the overall restoration of damaged transportation routes in
the area.
C. The City of Edmonds Public Works Department will establish re-opening
and restoration priorities for the City and allocate local resources
accordingly. When appropriate, work will be coordinated with other
affected agencies and jurisdictions.
VI. RESPONSIBILITIES
A. City of Edmonds Public Works Department
1. Coordinate damage assessment, emergency road clearing and
repair activities for roadways within the city.
2. Coordinate repair and restoration activities on state and interstate
highways with appropriate agencies.
3. Provide or contract for repair and recovery work.
4. Coordinate with other City agencies and adjacent jurisdictions to
establish immediate priorities for road re-opening.
5. Coordinate with other public and private transportation service
providers to establish emergency transportation networks and
resources.
B. City of Edmonds Public Works - Engineering Division
1. Provide maps for transportation route planning.
2. Assist the Public Works Department on activities as required.
C. Snohomish and King County Transportation Divisions
1. Coordinate area-wide transportation route recovery projects with
affected agencies and jurisdictions. Provide support to the City in
re-opening emergency transportation routes.
Packet Page 188 of 564
Edmonds CEMP Emergency Support Functions - 47 August 2015
D. Community, Metro, and Sound Transit Agencies
1. Coordinate mass transportation activities within their service areas.
2. Incorporate emergency City needs into the overall emergency
transportation and system restoration program.
E. Washington State Department of Transportation and Washington State
Ferries
1. Coordinate emergency and permanent repairs of state and
interstate highways.
2. Coordinate emergency and permanent repairs of state ferry
terminal located in the Edmonds waterfront.
3. Incorporate emergency City needs into the overall emergency
transportation and system restoration program.
4. Provide assistance to the City’s repair and restoration work as
appropriate.
Packet Page 189 of 564
Edmonds CEMP Emergency Support Functions - 48 August 2015
EMERGENCY SUPPORT FUNCTION 2
COMMUNICATIONS
PRIMARY AGENCIES: City of Edmonds Police Department
Snohomish County Fire District 1
City of Edmonds Finance Dept – Information Services
SUPPORT AGENCIES: City of Edmonds Public Works Department
City of Edmonds Public Information Officers
SNOCOM Communications Center
Snohomish County DEM
Washington State Emergency Operations Center
I. INTRODUCTION
A. Purpose
To establish, organize and maintain communications capabilities
necessary to meet operational requirements during emergencies and
disasters.
B. Scope
This Emergency Support Function is designed to provide guidance in the
coordination of local communication capabilities and for the establishment
of back-up systems to support emergency and disaster operations.
II. POLICIES
A. The procedures established in local and state communications plans shall
be utilized during emergency and disaster operations.
B. Local communication procedures shall support county and state
communication plans and shall be developed in coordination with local,
county and state agencies responsible for providing communications
during emergency and disaster operations.
III. SITUATION
Emergency and disaster situations require reliable communication capabilities in
order to gather essential information, request and deploy resources and
Packet Page 190 of 564
Edmonds CEMP Emergency Support Functions - 49 August 2015
communicate information to the Emergency Operations Center, field operations
personnel and supporting agencies.
In nearly all major events, communication systems become overloaded making it
difficult to communicate essential information in a timely manner. It is anticipated
that in addition to communications needs exceeding local equipment capacity,
there will be equipment and system failures associated with events such as
windstorms, earthquakes and terrorist incidents.
In many emergency and disaster situations it is necessary to provide important
information and/or warnings to public officials and the general public. This must
be accomplished in a timely manner utilizing the most efficient means possible in
order to protect life and property at the time of the event.
There are no fixed or automatic emergency warning systems currently in place
within the city to warn the general public of emergency conditions.
IV. CONCEPT OF OPERATIONS
Communications
A. The SNOCOM Communications Center shall be the focal point for
coordinating emergency communications for emergency services
providers within the city. The facility is the central answering point for 911
calls requesting emergency assistance. The center has back-up call
receiving at SNOPAC for use in the event of facility failure or general
system disruption.
B. Calls for police, fire and emergency medical services are dispatched by
SNOCOM. During major events with resource limitations, the Fire District
and Police Department may determine that resources will be dispatched
through the Emergency Operations Center according to incident priority.
C. Various individual radio systems are utilized by other departments and
supporting agencies within the city. These departments and agencies
maintain their own dispatching and communication services.
D. Communications will be through cellular and landline telephone and
existing radio systems using established frequencies and existing
procedures.
E. During major emergency and disaster situations communications
equipment may be re-distributed in order to provide common equipment
and frequency access. This will facilitate effective communications
Packet Page 191 of 564
Edmonds CEMP Emergency Support Functions - 50 August 2015
between departments/agencies, the Emergency Operations Center and
field command posts.
F. Amateur Radio Operators may be available through Snohomish County
DEM. The amateur radio operators can provide essential, reliable
communications support between departments/agencies, the Emergency
Operations Center and field operation locations. Use of amateur radio
relieves congestion on other radio frequencies and cellular and landline
phone systems.
G. The Finance – Information Services is responsible for coordinating with
telephone service providers for the re-establishment of telephone,
computer networks and internet access service to City government
locations.
H. E-mail may be utilized internal to the City for providing information to staff
regarding disaster information.
Warning
A. The AlertSense system provides emergency information to responders
and the general public via phone, text, and/or email messaging. The
system may be activated by contacting SnoCo DEM or SNOCOM.
B. The Emergency Alert System (EAS) provides emergency information to
the public via local radio and television stations. This system may be
activated by contacting SnoCo DEM or SNOCOM.
C. The National Warning System (NAWAS) is the primary system utilized by
the federal government to disseminate warning information. Warnings
received via NAWAS are received at the Washington Warning Point which
in turn disseminates the warning to local warning points. Warning
information for Edmonds is received at SNOCOM which notifies local
emergency authorities.
D. The National Oceanographic and Atmospheric Administration (NOAA)
weather radio system may be utilized to obtain weather related warnings.
Weather warnings from NOAA are normally broadcast over EAS and local
radio and television stations.
E. Weather advisories and warnings are provided via teletype by the National
Weather Service and received at SNOCOM. Communications center
personnel monitor this information on a 24-hour basis and determine when
to notify appropriate public safety services.
Packet Page 192 of 564
Edmonds CEMP Emergency Support Functions - 51 August 2015
F. Emergency service agencies will be notified by SNOCOM when the nature
of the warning would indicate a need to increase staffing levels or warn
the public of impending danger.
G. Having no fixed or automatic emergency warning systems in place,
notifications of citizens regarding emergency information and instructions
may be through the Emergency Alert System (EAS), AlertSense
messaging, door-to-door by uniformed personnel, mobile loud speakers,
or any other means available to the command agency at the time.
Emergency Public Information
A. The Mayor or Disaster Coordinator may appoint a Public Information
Officer or Public Information Officer Group who will coordinate the
dissemination of emergency public information through SnoCo DEM and
the Emergency Operations Center. When the situation warrants, the
Public Information Officer may appoint assistants in order to provide
media briefings from multiple locations.
B. Media briefings, if held in the city, will normally take place at the Edmonds
Emergency Operations Center. In the event that this location is not
functional or communications are inadequate, an alternate site will be
identified and announced by the Public Information Officer.
C. During events where the SnoCo DEM Emergency Operations Center is
activated, area-wide information will normally be coordinated through that
location on behalf of the City. SnoCo DEM may activate a Joint
Information Center (JIC) to manage external affairs for the incident.
D. Any or all of the following methods may be utilized to relay emergency
information to the public:
* Print, radio, cable and television media
* Printed education/information materials
* City radio systems
* City of Edmonds website: www.edmondswa.gov
* Amateur radio systems
* Public address systems or mobile speakers
* Emergency Alert System
* AlertSense
* Door-to-door contact
E. SNOCOM and/or SnoCo DEM will develop Emergency Alert System
releases when necessary. Except in immediate life threatening situations,
activation of the Emergency Alert System should be coordinated with
Packet Page 193 of 564
Edmonds CEMP Emergency Support Functions - 52 August 2015
surrounding jurisdictions. SNOCOM is responsible for activation of the
Emergency Alert System.
F. SNOCOM and/or SnoCO DEM will develop Alert Sense messaging when
necessary. AlertSense may be activated by either SNOCOM or SnoCo
DEM.
G. It is anticipated that in some circumstances emergency public information
may need to be released from field command posts. In this event, the
individual in charge at the location shall notify the Emergency Operations
Center in a timely manner and provide detailed information about the
release.
H. Printed education and information materials for distribution to the public
are available through the Fire District and Police Department.
I. Additional information on Public Emergency Information can be found in
Emergency Support Function (ESF) 15 – External Affairs and Emergency
Public Information.
V. PROCEDURES
A. Emergency Communications, Warning and Public Information Procedures
are the joint responsibility of the Edmonds Police Department and Fire
District.
B. The City of Edmonds shall follow SNOCOM’s Emergency Alert System
and AlertSense Activation Procedures.
C. Response procedures are separately published documents and should be
developed in coordination with other agencies involved in this Emergency
Support Function.
VI. RESPONSIBILITIES
A. City of Edmonds Police Department and Fire District 1
1. Develop and maintain communications, warning and public
information procedures for the City.
2. Recommend relocation or redistribution of radio and cellular
telephone resources as necessary to most effectively maintain
adequate communications in emergency situations.
Packet Page 194 of 564
Edmonds CEMP Emergency Support Functions - 53 August 2015
3. Arrange for additional communication resources when necessary.
4. Provide for coordination of warning efforts and for the dissemination
of warning and emergency public information.
B. City of Edmonds Public Works Department
1. Provide communications equipment and staff to support
communication efforts.
2. Provide support in the dissemination of warning information to the
public.
C. City of Edmonds Disaster Coordinator or Public Information Officer
1. Contact SnoCO DEM when information is to be released over the
Emergency Alert System.
2. Gather and coordinate emergency public information for timely
release and provide informational briefings to City officials, news
media and the public.
3. Notify appropriate agencies to assist in the dissemination of
information.
4. Provide pre-printed educational/informational brochures available to
the public.
5. Determine appropriate location(s) for public official and news media
briefings.
6. Assist in the development of Public Information Officer procedures
and checklists for use during emergencies.
D. City of Edmonds Finance– Information Services
1. Coordinate with communication services providers for additional
emergency service or the re-establishment of disrupted services
when appropriate.
2. In coordination with the Police Department and Fire District,
develop and maintain communications, warning and public
information procedures for the City.
3. In coordination with the Police Department and Fire District,
Packet Page 195 of 564
Edmonds CEMP Emergency Support Functions - 54 August 2015
arrange for additional communication resources when necessary.
E. SNOCOM Communications Center
1. Develop procedures and provide for the release of information over
the AlertSense and Emergency Alert Systems.
2. Provide dissemination of National Warning System and National
Weather Service information to public safety agencies.
3. Coordinate back-up communication systems and the re-
establishment of disrupted 911 and communications center service.
4. Establish policy and procedures for distribution of anticipated
disaster information (e.g. adverse weather) and other impending
disaster-related notifications.
F. Snohomish County DEM
1. Assist as requested or necessary with the release of information
over the AlertSense system.
2. Activate amateur radio personnel to support City communications
as requested.
3. Provide for the release of public information through the County
Emergency Operations or Joint Information Center, when activated.
G. Washington State Emergency Operations Center
1. Provide supplemental communication equipment and assistance in
the dissemination of public information when appropriate.
Packet Page 196 of 564
Edmonds CEMP Emergency Support Functions - 55 August 2015
EMERGENCY SUPPORT FUNCTION 3
PUBLIC WORKS AND ENGINEERING
PRIMARY AGENCIES: City of Edmonds Public Works Department
City of Edmonds Engineering Division
SUPPORT AGENCIES: City of Edmonds Parks and Recreation Department
Olympic View Water District
Sound Disposal
Republic Services
Waste Management NW
WA State Department of Enterprise Services
I. INTRODUCTION
A. Purpose
To provide for the coordination of public works and engineering operations
and resources during emergencies and disasters.
B. Scope
This Emergency Support Function is designed to provide for the
coordination of departments and agencies involved in public works and
engineering activities. These activities include debris removal, repair and
restoration of facilities and systems, technical advice, structural
evaluation, engineering services and emergency contracting.
II. POLICIES
Public works and engineering activities shall be done in coordination with
departments and agencies having roles and authority within the City to provide
public works related services.
III. SITUATION
Emergencies and disasters may cause significant damage to facilities,
infrastructure and buildings. It may be necessary in some cases to carry out
reinforcement or demolition activities. Debris may make roads and highways
impassable. Utilities which have suffered damage may be partially or totally
Packet Page 197 of 564
Edmonds CEMP Emergency Support Functions - 56 August 2015
inoperable. Equipment necessary for repair and restoration activities may be
damaged or insufficient in quantity to meet emergency needs. Outside
assistance may be necessary to ensure timely and efficient response and
recovery operations.
IV. CONCEPT OF OPERATIONS
A. Public Works and Engineering are the lead agencies for day-to-day and
emergency public works and engineering services within the city. These
services include construction and maintenance of transportation routes,
coordination of solid waste collection, water and sewer services, vehicle
and equipment maintenance, right of way and construction permit
services.
B. Water and sewer services within the city are provided by separate water
and sewer districts. The Public Works Director shall ensure that
coordination of response and recovery activities takes place between
these agencies and the Public Works Department. This coordination may
include mutual support with staff and equipment and the prioritization of
restoration and recovery activities.
C. The Public Works and Engineering shall provide direction and control over
their respective resources and coordination with the Emergency
Operations Center. Personnel shall operate according to specific
directives, department procedures and by exercising reasonable personal
judgment when unusual or unanticipated situations arise and command
guidance is not available.
D. The Public Works Department shall coordinate with private utility
companies responsible for electricity, natural gas, telephone, cable and
solid waste collection to ensure recovery operations are conducted in as
orderly manner as possible.
E. In situations where roadways are damaged or blocked it will be the
responsibility of the Public Works Department to establish road clearing
and restoration priorities in coordination with the Police Department and
Fire District to ensure critical emergency operations and resource
movement can be accomplished.
F. Public Works and Engineering Division Managers or designees will report
to the Emergency Operations Center to coordinate public works field
operations and resources when it is activated.
G. Additional resources and public works and engineering assistance may be
Packet Page 198 of 564
Edmonds CEMP Emergency Support Functions - 57 August 2015
obtained through existing mutual aid agreements and/or through contracts
with private contractors.
H. Public Works and Engineering staff will be mobilized according to the
needs presented by the emergency or disaster. This will normally be done
by telephone or pager.
I. The Public Works Department will coordinate with Sound disposal,
Republic Services, and Waste Management NW for both solid waste
collection services, and disaster debris management within the city.
J. The Engineering Division will provide engineering services and contract
for major recovery work as appropriate for City-owned buildings,
operational facilities, roads and other public works infrastructure. These
services include structural inspections to determine building and
transportation route safety as appropriate.
K. See also ESF 14 – Long-Term Community Recovery, and the City of
Edmonds Disaster Recovery Plan, a separately published document.
V. PROCEDURES
A. Responding agencies are responsible for the development of response
procedures for their agency, and for training employees involved in
emergency response.
B. Response plans, agency procedures and mutual aid agreements are
separately published documents which should be developed in
coordination with other response agencies for the jurisdiction.
VI. RESPONSIBILITIES
A. City of Edmonds Public Works Department and Engineering Division
1. Clear and provide emergency repair of transportation routes.
2. Coordinate with water and sewer service providers to ensure
priority restoration of services and for emergency potable water
supplies.
3. Provide or contract for solid waste and debris removal services on
public property and right-of-ways.
Packet Page 199 of 564
Edmonds CEMP Emergency Support Functions - 58 August 2015
4. Provide or contract for engineering services.
5. Coordinate with private utility providers in the repair and re-
establishment of services to the City.
B. Olympic View Water District
1. Coordinate the prioritization of repair and restoration activities with
the Public Works department.
C. City of Edmonds Parks and Recreation Department
1. Provide staff and equipment to assist with public works operations
as requested.
D. Allied Waste, Republic Services, and Waste Management NW
1. Provide for the continuation of regularly scheduled household
waste pick-up services.
2. Coordinate with Edmonds Public Works for the collection and
management of disaster-generated debris.
E. WA State Department of Enterprise Services
1. Provide support services after the City has exhausted their supplies
and response capacity. This support may include: technical advice
and evaluations; engineering services; construction management.
Packet Page 200 of 564
Edmonds CEMP Emergency Support Functions - 59 August 2015
EMERGENCY SUPPORT FUNCTION 4
FIREFIGHTING
PRIMARY AGENCY: Snohomish County Fire District 1
SUPPORT AGENCIES: Mutual Aid Fire Agencies
City of Edmonds Police Department
City of Edmonds Public Works Department
Snohomish County DEM
Washington State Patrol - Fire Protection Bureau
Washington State Emergency Operations Center
I. INTRODUCTION
A. Purpose
To define agency responsibilities in fire response and establish policies for
the coordination of multi-agency firefighting activities.
B. Scope
This Emergency Support Function augments existing mutual aid
agreements and fire response plans existing at the local, county and state
levels. It provides guidance for the management and coordination of
firefighting activities and resources.
II. POLICIES
A. The procedures established in local and county-wide plans and mutual aid
agreements shall be utilized when responding to an emergency or
disaster.
B. The Washington State Fire Services Resources Mobilization Plan shall be
activated through SnoCo DEM and the Washington State Emergency
Operations Center when mutual aid resources have been exhausted.
III. SITUATION
Fires may occur at anytime and under many circumstances within the city. Fires
are most likely to occur in residential or commercial structures. However, it is
also common for fires to occur in transportation accidents and in open fields or
Packet Page 201 of 564
Edmonds CEMP Emergency Support Functions - 60 August 2015
wooded areas posing a threat to the surrounding community.
A significant natural disaster or technological event may result in many urban and
rural fires. Ignition sources of little concern during normal circumstances could
cause many fires following an earthquake or other natural disaster. Fire may
also result from a technological event such as an air-line crash or hazardous
material incident.
IV. CONCEPT OF OPERATIONS
A. Snohomish County Fire District 1 is the lead agency for fire suppression
activities within the city. Supporting agencies shall report to and operate
under the direction of the Incident Commander. The Fire District may
establish a unified command system with supporting agencies during large
scale incidents.
B. The Fire District has existing mutual aid agreements with numerous
agencies throughout King, Pierce and Snohomish Counties. Requests for
assistance may be through existing mutual aid agreements. In situations
when mutual aid is not available, requests for resources through the
Washington State Fire Services Resources Mobilization Plan will be
coordinated through SnoCo DEM.
C. The Police Chief or designee will allocate resources to support Fire
operations as necessary and will report to the Emergency Operations
Center to coordinate law enforcement field operations and resources
when it is activated.
D. On-scene management of emergencies shall follow the Incident
Command System in accordance with the National Incident Management
System (NIMS).
E. Communications and emergency notifications will be through established
channels (See ESF 2 – Communications).
F. The notification method used to mobilize off-duty personnel will normally
be by telephone or pager.
G. The Fire Chief, or designee, shall provide direction and control over
District resources and shall coordinate activities with the Emergency
Operations Center. District personnel shall operate according to specific
directives, District policies and procedures and by exercising reasonable
personal judgment when unusual or unanticipated situations arise and
command guidance is not available.
Packet Page 202 of 564
Edmonds CEMP Emergency Support Functions - 61 August 2015
H. Command posts may be established for the coordination of field
operations. The Incident Commander shall provide regular status reports
to the Emergency Operations Center. The coordination of resources will
normally be through the Emergency Operations Center. Co-location of
command posts will be the preferred method of field operations when
multiple departments/agencies have command posts established.
V. PROCEDURES
A. Responding agencies are responsible for the development of response
procedures for their agency, and for training employees involved in
emergency response operations.
B. Response plans, agency procedures and mutual aid agreements are
separately published documents which should be developed in
coordination with other response agencies for the jurisdiction.
VI. RESPONSIBILITIES
A. Snohomish County Fire District 1
1. Provide 24-hour response to fire emergencies.
2. Provide coordination of fire resources and direction and control at
emergency scenes.
3. Develop and maintain resource lists for equipment, personnel and
supply sources.
4. Develop policies and procedures for District operations during
emergencies and provide training for appropriate City staff.
5. Provide a representative to the City Emergency Operations Center
when activated to assist in the coordination of resources and
operational activities.
B. Mutual Aid Fire Agencies
1. Provide resources including equipment, staffing and supplies to
support emergency operations.
Packet Page 203 of 564
Edmonds CEMP Emergency Support Functions - 62 August 2015
C. City of Edmonds Police Department
1. Provide incident scene security, traffic control and evacuation
operation support.
D. City of Edmonds Public Works Department
1. Provide operational support with equipment, staffing, traffic control
and coordination of utility providers during emergencies.
E. Snohomish County DEM
1. Provide support and coordination of resource requests during major
incidents.
2. Provide coordination with Washington State Emergency Operations
Center when activated.
3. Work in coordination with the Regional Fire Mobilization
Coordinator.
F. Washington State Patrol - Fire Protection Bureau
1. Coordinate resources through the Washington State Fire Services
Resources Mobilization Plan when activated.
G. Washington State Emergency Operations Center
1. Coordinate requests for state and federal resources as appropriate.
Packet Page 204 of 564
Edmonds CEMP Emergency Support Functions - 63 August 2015
EMERGENCY SUPPORT FUNCTION 5
EMERGENCY MANAGEMENT
PRIMARY AGENCY: City of Edmonds Planning Division
SUPPORT AGENCIES: All City of Edmonds Departments
All Contract and Government Service Agencies and Districts
All Agencies Providing Human Services
I. INTRODUCTION
A. Purpose
1. To provide a method to collect, analyze and share information
about a potential or actual emergency or disaster in order to
enhance the response and recovery activities of the City.
2. To provide guidance in reporting response and recovery
information to local and state emergency management agencies.
B. Scope
This Emergency Support Function addresses the informational needs of
the City Emergency Operations Center (EOC) and involves all City
Departments, agencies which support City operations, special districts and
organizations providing support to citizens during and after emergencies
and disasters.
II. POLICIES
All City Departments, special districts, and support agencies are responsible for
providing incident information to the Emergency Operations Center. This
information will be used by assigned staff to analyze the situation and develop
appropriate action plans and obtain resources for response and recovery
activities.
III. SITUATION
Any emergency or disaster creates a need for information flow between first
response or field operations personnel and command or supervisory staff. In any
emergency or disaster event requiring the activation of the Emergency
Packet Page 205 of 564
Edmonds CEMP Emergency Support Functions - 64 August 2015
Operations Center, it is essential that information be obtained from field
personnel to assist the Emergency Operations Center in establishing response
and recovery priorities and determining potential future needs.
IV. CONCEPT OF OPERATIONS
A. Whenever any part of the city is threatened by a hazard that could lead to
an emergency or disaster, or when an emergency or disaster situation
exists, the Emergency Operations Center (EOC) will be activated at the
appropriate level to assess the situation.
All City Departments, special districts, service providers and human
service organizations involved in disaster operations and represented in
the Emergency Operations Center will work to meet the information
requirements of the Emergency Operations Center Staff and City leaders.
This will include receiving periodic reports from their field representatives.
Additionally, the Emergency Operations Center Staff may be required to
request information from liaison coordinators to the local jurisdiction,
surrounding jurisdictions or from SnoCo DEM to meet a specific
requirement.
B. The Planning Division is responsible for the management of information
received in the Emergency Operations Center. The assigned personnel
will collect, analyze, report, and display the current information. From this
information, action plans will be developed by Emergency Operations
Center Staff to meet the needs of the situation.
C. The Planning Division will develop periodic situation reports and provide
information to SnoCo DEM through the Disaster Coordinator or designee
as required by the event.
D. Each City Department is responsible for developing their own reporting
procedures. Each Department is responsible for ensuring that their field
operations personnel are aware of the reporting procedures and that they
provide reliable, timely information to the Emergency Operations Center.
E. Information will be shared by posting on boards or charts, making
announcements, holding periodic briefings, routing to other members of
the staff or through the development of situation reports.
F. The City Clerk will be responsible for maintaining a log of information
received at the Emergency Operations Center for permanent record
keeping.
Packet Page 206 of 564
Edmonds CEMP Emergency Support Functions - 65 August 2015
G. The Disaster Coordinator shall provide a copy of the Local Proclamation of
Emergency to SnoCo DEM for distribution to appropriate county, state and
federal agencies by the most expeditious means available at the time of
the event.
H. Additional information on Concept of Operations can be found in the City
of Edmonds Emergency Operations Center (EOC) Guide, a separately
published document.
V. PROCEDURES
A. Each City Department and agency involved in emergency and disaster
operations is responsible for developing reporting formats and procedures
for their department or agency. Reporting forms shall follow the approved
format of the Emergency Management Committee.
VI. RESPONSIBILITIES
A. City of Edmonds Building and Planning Divisions
1. Assist City Departments and supporting agencies in the
development of reporting formats.
2. Procure information display materials, maps and supplies.
3. Collect, display and analyze information at the Emergency
Operations Center. Share information with appropriate staff and
develop action plans to support disaster operations.
4. Request information from other local jurisdictions and outside
agencies as necessary.
B. All City of Edmonds Departments
1. Prepare reporting formats.
2. Establish departmental reporting procedures between field
personnel and the Emergency Operations Center.
3. Analyze information specific to the department and prepare, or
recommend action plans as appropriate.
4. Coordinate activities and share information with City Departments
Packet Page 207 of 564
Edmonds CEMP Emergency Support Functions - 66 August 2015
and outside agencies as appropriate.
C. All Contract and Government Service Agencies, Special Districts and
Human Service Agencies
1. Prepare reporting formats.
2. Establish reporting procedures between field personnel and the
Emergency Operations Center.
3. Analyze information specific to the organization and prepare, or
recommend action plans as appropriate.
4. Coordinate activities and share information with City Departments
and outside agencies as appropriate.
D. City Clerk
1. Maintain a log of information received at the Emergency Operations
Center for permanent record keeping.
Packet Page 208 of 564
Edmonds CEMP Emergency Support Functions - 67 August 2015
EMERGENCY SUPPORT FUNCTION 6
MASS CARE, EMERGENCY ASSISTANCE, HOUSING AND HUMAN SERVICES
PRIMARY AGENCIES: City of Edmonds Parks and Recreation Department
City of Edmonds Community Services Department
City of Edmonds Police Department/Animal Control
SUPPORT AGENCIES: American Red Cross
City of Edmonds Human Resources Department
City of Edmonds Development Services
City of Edmonds Office of the Mayor
Snohomish County DEM
Snohomish Health District
Local Human Service Agencies, Churches and Volunteer
Agencies
Local Animal Care Facilities, including PAWS
WA State Department of Social and Health Services
I. INTRODUCTION
A. Purpose
To provide a coordinated method of mass care activities including: shelter
of people and animals; feeding and first aid following an emergency or
disaster; to operate a disaster welfare information system to collect,
receive and report information about the status of victims and assist with
the reunification of family members; and to coordinate the distribution of
emergency relief supplies.
Human services may include related recovery efforts such as counseling,
benefit claims assistance, identification and postal services, financial
services and associated human services that can be delivered through
Federal Disaster Assistance Service Centers, as needed. Long-term
community recovery needs are addressed in ESF 14 – Long-term
Community Recovery and the City of Edmonds Disaster Recovery Plan, a
separately published document.
B. Scope
This ESF addresses responsibilities and priorities for mass care services
that are needed during emergencies. Mass care services are a shared
responsibility between the City of Edmonds, the Snohomish County
Chapter of the American Red Cross, Snohomish County DEM, and other
Packet Page 209 of 564
Edmonds CEMP Emergency Support Functions - 68 August 2015
community and volunteer agencies.
The National Pets Evacuation and Transportation Standards Act of 2006
(H.R. 3858-PETS) requires local and state emergency preparedness
authorities to include plans for pets and service animals in disaster plans;
grants FEMA the authority to assist states and local communities in
developing disaster plans to accommodate people with pets and service
animals; authorizes federal funds to help create pet-friendly emergency
shelter facilities; and allows FEMA to provide assistance for individuals
with pets and service animals, and the animals themselves following a
major disaster. Animal care and pet sheltering issues are addressed in
Support Annex C: Animal Disaster Protection, of this document; and more
detail can be found in the Washington State and Snohomish County
Comprehensive Emergency Management Plan(s), ESF – 11: Agriculture
& Natural Resources.
Initial response activities will focus on meeting urgent needs of victims.
Recovery assistance available through local agencies and temporary
housing, loans and grants for victims under federal disaster assistance
programs may need to be coordinated with mass care activities in order to
provide the best service to the community. A collaborative response by
the City, private and non-profit organizations will greatly benefit and
facilitate mass care services in the Edmonds area.
II. POLICIES
A. In circumstances where there is an immediate need for mass care
services, the City of Edmonds may provide limited mass care services
using available facilities and resources.
B. The American Red Cross will provide staff, supplies and shelters as
disaster conditions dictate and resources allow, in accordance with the
Robert T. Stafford Disaster Relief and Emergency Assistance Act (PL 93-
288) as amended and the National Response Framework.
C. All mass care services will be provided without regard to economic status
or racial, religious, political, ethnic or other affiliation, age, sexual identity
or disability; and will attempt, but not guarantee, to meet current
requirements for the Americans with Disabilities Act and the standards of
the American Red Cross.
D. Appropriate federal, state and city, volunteer agency and private sector
resources will be used as available.
Packet Page 210 of 564
Edmonds CEMP Emergency Support Functions - 69 August 2015
E. Disaster Welfare Information will be gathered and disseminated only by
the American Red Cross using established procedures.
F. Shelters for pets may be activated by the City of Edmonds Police
Department/Animal Control with help from local veterinary and volunteer
animal care organizations. Pet shelters may be separated from shelters
for citizens. See also Support Annex C: Animal Disaster Protection Plan
of this document.
G. The Washington State Departments of Agriculture (WSDA) and Fish and
Wildlife (WDFW) represent animal health concerns of the state. This
involves, but is not limited to: the diagnosis, prevention and control of
foreign animal diseases and diseases of public health significance, and
assistance in the disposal of dead animals in accordance with Appendix B
(State Animal Response Plan) of Emergency Support Function 11 of the
Washington State Comprehensive Emergency Management Plan.
III. SITUATION
Serious damage to the community will quickly overwhelm local resources which
have a primary function of gathering damage information and responding to
immediate life threatening situations. Damage to roads, airports,
communications and structures will hamper response efforts. Emergency
workers may be injured, involved with personal problems resulting from the
situation or be unable to reach their designated posts.
Hundreds of victims may be forced from their homes due to damage,
environmental conditions or severe weather. There may be large numbers of
dead or injured. Family members may be separated immediately following a
sudden impact event. Large numbers of transients, such as tourists and business
travelers may be stranded long distances from home and require assistance.
There may be a requirement for shelter sites for hundreds to thousands of people
and pets impacted by the disaster. Many will be separated from their families
due to impassible transportation routes and gridlock.
IV. CONCEPT OF OPERATIONS
A. The City of Edmonds Parks and Recreation Department will be the
primary City agency for establishing temporary mass care services and
facilities until Red Cross and other disaster relief agencies establish
operations. This may be as long as seven days. The Community
Services and Human Resources Departments will provide staff and
Packet Page 211 of 564
Edmonds CEMP Emergency Support Functions - 70 August 2015
resources to support Parks and Recreation Department mass care efforts
as needed.
B. Mass care activities undertaken by the City will support emergency
operations by providing food, water and rest areas for City staff working
during the emergency.
C. The Parks and Recreation Department will coordinate the use of City
facilities and parks for use as mass care locations.
D. Requests for establishment of Red Cross Mass Care Centers will be
coordinated through SnoCo DEM.
E. Once the Red Cross has established mass care operations, the City will
assist Red Cross as needed in the coordination of other local human
service agencies and volunteer groups in support of mass care operations
through SnoCo DEM.
F. Initial information to be released to the public regarding mass care facility
services and locations will be coordinated through SnoCo DEM and the
American Red Cross Public Information Officer, if appointed. The Red
Cross will normally take over the public information role for Red Cross
activities once mass care operations are established.
G. The Parks and Recreation Department will be responsible for pre-
identifying parks or other locations appropriate for recreational vehicles or
camping and for identifying appropriate shelter locations within the city
and for developing plans for shelter operation.
H. The Parks and Recreation Department, in cooperation with the
Community Services Department, is responsible for identifying and
developing resource lists of local volunteer groups and organizations that
will assist with mass care operations and assist those individuals with
special needs who require special assistance.
I. The Parks and Recreation Department, in cooperation with the Police
Department/Animal Control, and with assistance from local animal welfare
groups, is responsible for pre-identifying appropriate locations for pet
shelters within the city and developing plans for shelter operation.
J. The Human Resources Department will be the primary agency for
providing food and shelter support to City employees working during
emergency operations. Provisions will be made for employee family
members who, for safety reasons, require support at City shelters or
facilities.
Packet Page 212 of 564
Edmonds CEMP Emergency Support Functions - 71 August 2015
K. The Police Department is responsible for providing security at shelter and
mass care locations when necessary.
L. On-going mass care and recovery assistance to victims after the disaster
will be provided directly to the public through federal, state and county
programs and through private agencies and local volunteer organizations.
V. PROCEDURES
A. The Parks and Recreation Department, in coordination with the
Community Services and Human Resources Departments, is responsible
for developing policies for the use of City property and facilities for mass
care operations. These departments are also responsible for developing
resource lists and procedures for use by City staff for operating shelters
prior to the arrival of Red Cross personnel.
B. The American Red Cross and other agencies providing mass care
services have established procedures in place for providing mass care
services to the community. These are separately published documents
which are developed and maintained by the individual agencies and
organizations. Volunteers and City staff working in support of these
organizations are required to operate according to these procedures.
C. Procedures for assisting individuals with “special needs” during disasters
will be the responsibility of the Community Services Department. These
procedures will be coordinated with Snohomish Health District, SnoCo
DEM, and local human service agencies.
IV. RESPONSIBILITIES
A. City of Edmonds Parks and Recreation Department
1. Identify City property and facilities suitable for use as mass care
locations.
2. Develop policies and procedures for the operation of City facilities
as mass care centers.
3. Develop resource lists for mass care supplies and identify human
service and volunteer agencies that will provide support during
mass care operations.
4. Assign staff to the Emergency Operations Center to coordinate
Packet Page 213 of 564
Edmonds CEMP Emergency Support Functions - 72 August 2015
mass care activities and information to the public.
5. Provide staff and resources for the operation of mass care centers.
B. American Red Cross
1. Provide mass care operations according to established procedures
and policies.
2. Provide coordination of mass care information and activities with
the Emergency Operations Center.
C. City of Edmonds Human Resources Department
1. Provide assistance to the Parks and Recreation and Community
Services Departments in the development of policies and
procedures for mass care operations as appropriate.
2. Provide staff and resources for the operation of mass care centers
as appropriate.
3. Provide food and shelter for City staff working during emergency
operations.
D. City of Edmonds Community Services Department
1. Provide staff and resources for the operation of mass care centers.
2. Coordinate assistance to “special needs” individuals through local
human service agencies.
E. City of Edmonds Police/Animal Control
1. Provide volunteers, staff and resources, if available, for the
operation of pet shelters.
2. With Edmonds Parks and Recreation Department, coordinate for
pet sheltering and assistance with local animal welfare agencies.
F. Snohomish County DEM
1. Coordinate requests for shelter and mass care assistance through
the local Red Cross Chapter.
2. Coordinate with outside agencies which provide mass care services
Packet Page 214 of 564
Edmonds CEMP Emergency Support Functions - 73 August 2015
to ensure the needs of the community are met.
G. Local Human Service Agencies and Volunteer Organizations
1. Provide mass care and human services according to established
policies and procedures.
2. Coordinate activities with the Red Cross and SnoCo DEM to ensure
community needs are met.
H. Local Animal Service Agencies and Volunteer Organizations
1. Provide animal care and sheltering assistance according to
established policies and procedures.
2. Coordinate activities with SnoCo DEM to ensure community needs
are met.
I. City of Edmonds Police Department
1. Provide security and maintain order at mass care locations as
appropriate.
J. City of Edmonds Office of the Mayor
1. Register volunteer workers according to established procedures.
K. WA State Department of Social and Health Services
1. Assist with the coordination of mass care, emergency assistance,
housing and human services responses by state and non-
governmental organizations.
2. Provide guidance to local jurisdictions on mass care and related
issues.
Packet Page 215 of 564
Edmonds CEMP Emergency Support Functions - 74 August 2015
EMERGENCY SUPPORT FUNCTION 7
LOGISTICS MANAGEMENT AND RESOURCE SUPPORT
PRIMARY AGENCIES: City of Edmonds Public Works Department
Snohomish County Fire District 1
City of Edmonds Parks and Recreation Department
Office of the Mayor
SUPPORT AGENCIES: City of Edmonds Police Department
City of Edmonds Finance Department
Snohomish County DEM
WA State Department of Enterprise Services
I. INTRODUCTION
A. Purpose
To provide for the effective management of resources during emergencies
and disasters.
B. Scope
Resource support involves the provision of services, personnel, supplies
and facilities during disaster response and recovery.
II. POLICIES
A. Each City Department is responsible for developing and maintaining lists
of Department resources, including equipment, personnel and supplies for
use during emergency and disaster operations.
B. Each City Department assigned responsibilities in this emergency
operations plan is responsible for developing and maintaining lists of
equipment and service providers necessary to support the Departments'
responsibilities and functions during disaster operations.
C. Requests for resources other than contract or mutual aid from outside the
local area will be coordinated through SnoCo DEM.
Packet Page 216 of 564
Edmonds CEMP Emergency Support Functions - 75 August 2015
III. SITUATION
Disaster operations will quickly overwhelm local resources. Resources
requested from outside the local area may be unavailable for several hours or
days. It may be necessary to prioritize of the use of local resources according to
the severity of individual incidents.
The management of resources will vary greatly from incident to incident. It will
be necessary to maintain flexibility in the management of resources and adapt to
the changing situations that may be associated with the disaster.
IV. CONCEPT OF OPERATIONS
A. Locally available public resources and those available through mutual aid
shall be utilized prior to requesting resources through SnoCo DEM.
B. To the greatest extent possible, a free market economy and distribution
system shall be utilized during disaster operations. Controls over limited
and critical resources may be put into place on a county or statewide basis
when the situation warrants.
C. The City may obtain services, equipment and supplies necessary to
respond to a disaster through private sources. It will be the responsibility
of the Finance Department to issue purchase orders, vouchers, warrants
or temporary contract agreements as required at the time of the disaster.
When appropriate, pre-disaster agreements may be initiated in order to
facilitate an efficient operation.
D. When necessary, staging areas for incoming resources will be utilized.
Each staging area shall have a supervisor or manager responsible for
assigning resources as designated through the Emergency Operations
Center. Staging areas will normally be divided into two categories:
1. Response Operations - The Fire District and Public Works
Department will be responsible for pre-identifying appropriate
locations for staging equipment and supplies for disaster response
operations.
2. Human Services - The Parks and Recreation Department and
Office of the Mayor will be responsible for pre-identifying staging
areas and distribution locations for human service supplies and
donated goods. This may be done in coordination with local
volunteer and human services support agencies when appropriate.
Packet Page 217 of 564
Edmonds CEMP Emergency Support Functions - 76 August 2015
E. The City has identified locations for use as the City’s Community Points of
Distribution (CPOD) for distribution of commodities to the public. These
locations are: Edmonds Public Works Facility - 7110 210th St SW; and the
Frances Anderson Community Center - 700 Main Street.
F. SnoCo DEM shall be notified regarding the location and function of all
staging areas within the city in order to facilitate the locating of resources
arriving from outside the local area.
G. Allocation and distribution of resources from staging areas will be
coordinated through the Emergency Operations Center. Once allocated,
resources will be managed by the responsible department(s) and/or
support agencies to which they are assigned.
H. Monetary donations received by the City will be processed and managed
by the Finance Department. All monetary donations shall be allocated to
support the recovery of the community from the disaster. Allocation of
donated funds will be the responsibility of the City Council and shall take
place in an expedient manner.
I. The Police Department shall be responsible for providing security and
traffic control at staging area and resource distribution locations as
necessary.
V. PROCEDURES
A. All requests for outside resources shall be coordinated through the
Emergency Operations Center and/or SnoCo DEM.
B. Allocation of resources located at staging areas shall be done through the
Emergency Operations Center.
VI. RESPONSIBILITIES
A. City of Edmonds Public Works Department
1. Pre-identify appropriate response operations staging areas within
the city.
2. Request outside resources through the Emergency Operations
Center.
3. Provide/designate staging area supervisors or managers as
Packet Page 218 of 564
Edmonds CEMP Emergency Support Functions - 77 August 2015
appropriate.
B. Snohomish County Fire District 1
1. Pre-identify appropriate response operations staging areas within
the city.
2. Request outside resources through the Emergency Operations
Center.
3. Provide/designate staging area supervisors or managers as
appropriate.
C. City of Edmonds Office of the Mayor and Parks and Recreation
Department
1. Pre-identify appropriate human services staging and distribution
areas within the city. Parks and/or other City facilities will be
utilized. The City may also coordinate with local businesses.
2. Request outside resources through the Emergency Operations
Center.
3. Coordinate distribution activities with appropriate human service
agencies.
D. City of Edmonds Police Department
1. Provide security and traffic control at staging and distribution areas
as necessary.
E. Snohomish County DEM
1. Coordinate requests for resources from outside the area, other than
mutual aid and contract service providers.
2. Provide for the delivery and distribution of resources to designated
staging areas.
F. City of Edmonds Finance Department
1. Develop procedures for emergency procurement of supplies and
services and coordinate these activities during emergency
operations.
Packet Page 219 of 564
Edmonds CEMP Emergency Support Functions - 78 August 2015
2. Collect and manage monetary donations. Distribute donated funds
as directed by the City Council.
G. WA State Department of Enterprise Services
1. Provide resource support services when City resources and
response capacity are exhausted. This may include: emergency
relief supplies; office equipment, supplies and facilities; transportation
services; and personnel.
Packet Page 220 of 564
Edmonds CEMP Emergency Support Functions - 79 August 2015
EMERGENCY SUPPORT FUNCTION 8
PUBLIC HEALTH AND MEDICAL
PRIMARY AGENCY: Snohomish County Fire District 1
Snohomish Health District
SUPPORT AGENCIES: Snohomish County Medical Examiner
Local Hospitals and Medical Clinics
Snohomish County DEM
American Red Cross
Snohomish County Medical Reserve Corps
Local Ambulance Service Providers
City of Edmonds Police Department
Mutual Aid Agencies
WA State Department of Health
I. INTRODUCTION
A. Purpose
To provide for the coordination of emergency health and medical services
during major emergencies and disasters.
B. Scope
This Emergency Support Function is designed to provide guidance in the
allocation of available medical resources and services in order to meet the
emergency health and medical needs of the community in a major
emergency or disaster.
II. POLICIES
A. The Multiple Casualty Incident Procedures, a separately published
document, shall be utilized in order to provide timely services to those
having the most urgent medical needs and to assist in the distribution of
patients to medical facilities.
B. The mass medical care procedures established by hospitals and health
care support agencies shall be utilized during response to major events.
C. Additional resources necessary for emergency medical activities beyond
existing automatic and mutual aid agreements shall be requested through
SnoCo DEM.
Packet Page 221 of 564
Edmonds CEMP Emergency Support Functions - 80 August 2015
III. SITUATION
A significant disaster with large numbers of injuries will overwhelm existing
medical service capabilities. Much of the immediate medical attention to victims
will be administered by well-meaning volunteers at the scene who have little or
no first aid training. Such a disaster may also pose public health threats,
including problems related to food, water, wastewater, solid waste, disease
vectors and mental health.
Medical facilities may sustain damages which affect their ability to provide
services. Facilities remaining in service may be overwhelmed by the walking
wounded and more seriously injured victims who are being transported to those
locations. Medical supplies and pharmaceuticals may be in short supply.
Disruptions to local transportation, utility and communication systems may cause
delays in restocking.
Uninjured persons who require daily medication may have difficulty in obtaining
medications due to reduced mobility, damage or destruction of normal supply
locations and general shortages within the disaster area.
Major medical emergencies caused by a release of toxic or radioactive
substances or by explosion may overwhelm medical resources and facilities as
these types of incidents require specialized treatment that is only available at a
limited number of medical facilities.
IV. CONCEPT OF OPERATIONS
A. Snohomish County Fire District 1 and mutual aid agencies are the lead
agencies for providing pre-hospital medical services during emergencies
within the city.
B. The Fire Chief, or designee, shall provide direction and control over
District resources and coordination with the Emergency Operations
Center.
C. On-scene management of emergencies shall follow the Incident
Command System (ICS), in accordance with the National Incident
Management System (NIMS).
D. Notification and activation of emergency response personnel will be
through established channels and procedures.
E. In the event of structural failure or inaccessibility of medical facilities in a
disaster, any City facility or temporarily established site may serve as a
Packet Page 222 of 564
Edmonds CEMP Emergency Support Functions - 81 August 2015
remote emergency clinic, temporary hospital or morgue for its local area
until coordination of more permanent facilities can be established. The
establishment of these temporary facilities shall be coordinated with
supporting agencies, the Emergency Operations Center and SnoCo DEM.
F. Any site designated by the Incident Commander may serve as a
command post, staging area, triage or treatment area or transportation
station.
G. Mutual Aid Agreements exist with numerous agencies throughout the
Puget Sound area. Requests for assistance will be coordinated through
the Emergency Operations Center and SnoCo DEM.
H. It is anticipated that in major medical emergencies, assistance beyond
what may be available through the existing mutual aid agreements will be
necessary. In these cases, assistance and resources from state and
federal agencies may be requested through SnoCo DEM.
I. The Snohomish County Health District shall provide direction to private
and governmental service agencies and the general public in the
prevention of disease, handling of food, water, wastewater and solid
waste. The Health District will also oversee the activities in public facilities
to ensure health standards are maintained to the greatest degree
possible.
J. The Snohomish County Health District shall assist in the coordination
between city, county, state and federal agencies providing medical and
health support services within the county.
K. The Snohomish County Medical Examiner is responsible for the
identification of the deceased, body recovery, storage and transportation,
and disposition of personal effects and unclaimed bodies, and notification
of next of kin. The Medical Examiner shall coordinate with supporting
service agencies and maintain records on all deaths resulting from a
disaster.
L. Mental health services may be provided through a variety of private, public
and volunteer mental health counseling services. Coordination of these
services shall be through SnoCo DEM.
V. PROCEDURES
A. Field response agencies, medical facilities and supporting organizations
are responsible for the development of operating procedures for their
Packet Page 223 of 564
Edmonds CEMP Emergency Support Functions - 82 August 2015
specific agencies and facilities, and for training employees involved in
medical operations.
B. The Snohomish County Multiple Casualty Incident Procedures is a
separately published document which was developed by the fire
departments and emergency medical service providers in Snohomish
County to provide for coordinated operations in a mass casualty incident.
This plan is utilized by all Snohomish County Fire Districts, Departments,
and emergency medical service providers and transporters. It is updated
periodically.
VI. RESPONSIBILITIES
A. Snohomish County Fire District 1
1. Establish incident command at emergency scenes and provide
initial incident evaluation to ensure appropriate allocation and
coordination of resources.
2. Provide on scene emergency medical treatment and implement the
Multiple Casualty Incident Procedures for on-scene management.
3. Provide ongoing incident status and pertinent information to the
Emergency Operations Center or the Command Officer on duty as
appropriate.
4. Coordinate the establishment of first aid stations, temporary
medical treatment facilities and morgues as appropriate.
5. Maintain medical resource lists.
B. Snohomish County Health District
1. Provide information to appropriate agencies and the general public
regarding disease prevention and sanitation precautions.
2. Coordinate with local public works departments to determine the
potential for water contamination and sewage and solid waste
disposal system failures which may pose a health risk to the
community. Notify the appropriate agencies and the general public.
3. Coordinate and provide care and sheltering services for the
medically fragile.
Packet Page 224 of 564
Edmonds CEMP Emergency Support Functions - 83 August 2015
4. Monitor overall community support activities as they relate to the
health department and respond to situations that may pose a risk to
the public, including; food storage, handling and distribution;
contamination by toxic releases; and public shelter operations.
5. Provide necessary assistance, equipment and health related
services as appropriate, including mass immunization, infectious
disease control, medical care at health department clinics,
counseling and coordination of personnel and resource support to
area hospitals and medical facilities as required.
6. Assist the Snohomish County Medical Examiner in coordinating
mortuary services as needed.
7. Additional information can be found in the Snohomish Health
District Strategic National Stockpile Activation Plan, and the
Snohomish Health District Pandemic Flu Response Plan,
separately published documents.
C. Mutual Aid Agencies
1. Provide advanced life support services to critically injured victims.
2. Provide medical support and technical assistance to the Incident
Commander at incident scenes.
3. Provide coordination and transport of victims to medical treatment
facilities.
D. Snohomish County Medical Examiner
1. Provide for the recovery and disposition of bodies, determination of
cause of death, notification of next of kin and maintain records of
disaster related deaths.
2. Provide coordination for temporary morgue and mortuary services.
3. Provide information to the news media and the public regarding
Medical Examiner operations and status of activities.
E. Local Hospitals and Medical Facilities
1. Receive any injured person without regard to the ability to pay for
services. Maintain cost records and treatment documentation.
Packet Page 225 of 564
Edmonds CEMP Emergency Support Functions - 84 August 2015
2. Triage and provide treatment for patients according to established
mass casualty procedures. Direct ambulatory patients to alternate
care facilities when appropriate.
3. Establish and maintain communications with hospital control.
Provide information and facility status as required.
4. Provide personnel and equipment for dispatch to disaster scenes or
temporary medical facilities as required.
5. Maintain records and field assessment reports for patients treated
and transported.
F. Snohomish County DEM
1. Provide for coordination of area-wide health care related activities
through the County Emergency Operations Center.
2. Coordinate requests for, and the distribution of, resources obtained
locally and from state and federal support agencies as requested
by health care facilities and local jurisdictions.
G. American Red Cross
1. Provide nursing services and medical treatment at temporary
shelters and medical treatment centers as appropriate.
2. Coordinate requests for blood and blood by-products from Red
Cross Regional Centers.
3. Mobilize volunteers to assist in the relief efforts and provide
emergency feeding for disaster workers.
H. City of Edmonds Police Department
1. Provide security at temporary morgue facilities as required.
I. Snohomish County Medical Reserve Corps
1. Provide volunteer assistance in the set-up and operation of shelters
for the medically fragile.
J. Local Ambulance Service Providers
1. Provide basic life support services to injured victims.
Packet Page 226 of 564
Edmonds CEMP Emergency Support Functions - 85 August 2015
2. Provide transport of victims to medical treatment facilities.
K. WA Department of Health
1. Provide assistance to local governments in identifying and meeting
the public health and medical needs of victims of a major disaster
or public health emergency.
Packet Page 227 of 564
Edmonds CEMP Emergency Support Functions - 86 August 2015
EMERGENCY SUPPORT FUNCTION 9
SEARCH AND RESCUE
PRIMARY AGENCIES: City of Edmonds Police Department
Snohomish County Fire District 1
SUPPORT AGENCIES: Snohomish County Search and Rescue
Snohomish County Technical Rescue Task Force
Edmonds Public Works Division
Snohomish County DEM
WA State Department of Transportation
I. INTRODUCTION
A. Purpose
To provide for the coordinated use of available search and rescue
resources.
B. Scope
The scope of the search and rescue emergency support function is
divided into three operational areas:
• Land search and rescue - primarily utilized for locating the lost or
missing in urban, rural or wilderness areas
• Air search and rescue - locating missing or downed civil aircraft.
This is the responsibility of the Washington State Department of
Transportation, Aviation Division.
• Disaster, or urban search and rescue - encompasses searches for
individuals missing due to disasters affecting primarily urban areas
such as explosions, storms or earthquakes where severe structural
damage is incurred.
The City of Edmonds has limited capability for providing search and
rescue functions during disaster operations and will rely, when necessary,
on outside resources for providing this service.
II. POLICIES
A. Plans and procedures for search and rescue operations are separately
published documents for each operational area. The City of Edmonds
shall follow the procedures established in these plans in support of the
Packet Page 228 of 564
Edmonds CEMP Emergency Support Functions - 87 August 2015
agencies and jurisdictions providing search and rescue activities within the
city.
B. During initial operations, and until primary agencies which provide search
and rescue services arrive on scene, the Edmonds City Police Department
and Snohomish County Fire District 1 will establish a Unified Command
and will be responsible for direction and control during land and disaster,
or urban search and rescue operations. City resource support for outside
agencies providing air search and rescue will be provided to the command
agency upon request.
III. SITUATION
The City of Edmonds is primarily urban area with some areas of wild-land and
recreational area interface. Most individuals who become lost will be within a few
minutes travel from their homes. In addition to individuals becoming lost in wild-
land or recreational areas, there is a potential for children and the elderly or
confused to become lost or disoriented in the urban environment.
Earthquake poses a particularly severe threat to the City. Given the high
population density and the number of multi-story buildings, the likelihood of
structural damage with large numbers of trapped and injured individuals is very
high.
IV. CONCEPT OF OPERATIONS
A. The Edmonds Police Department is responsible for the command and
control of land search and rescue activities within the city. The primary
resource for land search and rescue is the Snohomish County Search and
Rescue Group, composed primarily of volunteers. The group is organized
under the Snohomish County Sheriff’s Department. Resource requests
will be coordinated by the Police Department.
B. Search and rescue operations for missing civil aircraft is the responsibility
of the Washington State Department of Transportation, Aviation Division.
The United States Air Force is responsible for missing military aircraft and
aircraft of international origin. The United State Coast Guard directs all
maritime search and rescue operations on or above navigable waters.
Requests for these resources will be through Snohomish County DEM.
The City of Edmonds Police Department will be responsible for
coordinating ground support of these operations upon request.
C. Snohomish County Fire District 1 will be responsible for resource requests
Packet Page 229 of 564
Edmonds CEMP Emergency Support Functions - 88 August 2015
for and the coordination of disaster and urban search and rescue
operations within the city. The City has minimal resources for carrying out
heavy rescue operations and will use the resources of the Snohomish
County Technical Rescue Task Force. Operational activities associated
with disaster search and rescue at the local level may require support from
the Police and Public Works Departments.
D. Regional and Federal Urban Search and Rescue Teams for large scale
operations are available to respond within 12 to 72 hours. The closest
urban search and rescue team is Washington Task Force 1, located within
the Puget Sound area. The Task Force should be requested through
Snohomish County DEM. However, it should be noted that in the event of
a large-scale, regional disaster, the Task Force may not be available as
members will be responding with their home agencies.
E. Search and Rescue Teams responding from outside jurisdictions will
follow established plans, guidelines and procedures while operating within
the city. City Staff and Departments will provide coordination and support
for these activities whenever necessary.
F. The search for and recovery of human remains will normally be conducted
only after the rescue of survivors has been completed and the
environment will allow for safe operation by search and recovery
personnel.
V. PROCEDURES
A. Individual agencies responsible for managing the various types of search
and rescue operations are responsible for the development of operating
procedures for their specific agencies and for training employees and
volunteers involved in these activities. The plans and procedures are
separately published documents.
B. Snohomish County Fire District 1 and City of Edmonds Departments
involved in the operations and/or support of search and rescue activities
shall establish command posts and operate according to the Incident
Command System, as defined in the National Incident Management
System (NIMS).
Packet Page 230 of 564
Edmonds CEMP Emergency Support Functions - 89 August 2015
VI. RESPONSIBILITIES
A. City of Edmonds Police Department
1. Provide direction and control for air and land search and rescue
activities within the City of Edmonds.
2. Provide support to search and rescue activities and operations
being conducted by teams responding from outside the City.
B. Snohomish County Fire District 1
1. Provide for the coordination and support of disaster and urban
search and rescue activities.
2. Provide staff and resources for disaster and urban search and
rescue activities within the capabilities of the District and City.
C. City of Edmonds Public Works Division
1. Provide staff and resources in support of search and rescue
activities as appropriate.
D. Snohomish County DEM
1. Request search and rescue resources as necessary and provide
support to the City and outside agencies as appropriate.
E. Snohomish County Technical Rescue Task Force
1. Provide expertise and equipment in disaster and urban search and
rescue situations.
F. Snohomish County Search and Rescue
1. Provide staff and resources to carry out land search and rescue
activities.
Packet Page 231 of 564
Edmonds CEMP Emergency Support Functions - 90 August 2015
EMERGENCY SUPPORT FUNCTION 10
HAZARDOUS MATERIALS
PRIMARY AGENCY: Snohomish County Fire District 1
Snohomish County Haz-Mat Team
SUPPORT AGENCIES: City of Edmonds Public Works Department
City of Edmonds Police Department
SNOCOM Communications Center
Snohomish County DEM
WA State Patrol
Snohomish County Health District
Snohomish County Sheriff’s Department
WA State Department of Ecology
WA State Department of Health
WA State Military Department/National Guard CST
WA State Emergency Operations Center
I. INTRODUCTION
A. Purpose
To define the overall responsibilities of local agencies in Hazardous Materials
Emergencies.
B. Scope
This Emergency Support Function augments the response procedures of the
local Hazardous Materials Response Team and first responder agencies. This
Emergency Support Function also provides for coordination with the Snohomish
County Local Emergency Planning Committee (LEPC) and all state, federal and
private agencies and organizations that may have a role in hazardous materials
response and recovery activities within the city.
II. POLICIES
A. Federal regulations require each state to establish a State Emergency Response
Commission (SERC), to identify local jurisdiction emergency planning districts
and form Local Emergency Planning Committees (LEPC). The local LEPC is
required to develop hazardous materials response plans. The City of Mill Creek
shall be part of the Snohomish County Local Emergency Planning Committee for
the purpose of hazardous materials planning.
Packet Page 232 of 564
Edmonds CEMP Emergency Support Functions - 91 August 2015
III. SITUATION
Hazardous material incidents may occur anywhere and at anytime within the city. The
city is impacted by major transportation routes which are used to transport hazardous
materials. These include Interstate Highways 5 and 405. Other primary routes include
State Routes 527 and 96, as well as Burlington Northern Railway lines.
Several locations within the city are at low risk of terrorist activities which may include
the intentional release of chemical, radiological, biological or explosive devices which
would impact the city. These locations include the Snohomish County Sheriff’s Office,
US Fish and Wildlife, various power sub-stations and City government buildings and
facilities. Terrorist activities may include the intentional release of chemical, radiological
or biological materials; or the detonation of explosive devices.
The threat presented by hazardous materials incidents may be to both public health and
safety and to the environment. Hazardous materials incidents require response and
clean-up procedures to vary with the type and quantity of material released. Hazardous
material incidents may require multi-agency and multi-disciplinary responses to
adequately handle the situation.
IV. CONCEPT OF OPERATIONS
A. Snohomish County Fire District 1 is the designated Incident Command agency
for hazardous materials incidents within the city. The Fire District will establish
unified command with the Haz-Mat Team, Fire District, emergency medical
services, public works, Police and other local and state agencies as appropriate
for the specific incident.
B. The WA State Patrol will function as the designated Incident Commander for any
hazardous materials incidents taking place on State highways.
C. The Incident Command System (ICS) will be used when responding to all
hazardous material incidents.
D. Initial requests for qualified hazardous material team assistance shall be made to
SNOCOM.
E. The Incident Commander and/or SNOCOM shall be responsible for notifying
SnoCo DEM when hazardous material releases occur within the city. This
notification may be done through the dispatch center, haz-mat pager or by
telephone. SnoCo DEM will notify the Washington State Emergency Operations
Center and the Department of Ecology, as needed. These agencies are
responsible for providing support during hazardous materials emergencies.
Additional notifications may be made when appropriate.
F. The Washington State Department of Health, and the Snohomish and
Seattle/King County Health Districts shall be notified in the event of a release of
radioactive materials. Radiation detection and monitoring equipment is
maintained by the Snohomish County Hazardous Materials Team.
Packet Page 233 of 564
Edmonds CEMP Emergency Support Functions - 92 August 2015
G. The individual, business or agency responsible for the spill is responsible for
assuring effective abatement of the release or threatened release of any
hazardous substance. The Washington State Department of Ecology is
responsible for monitoring clean-up activities to assure compliance standards are
met.
H. The Fire District, in cooperation with the Police Department, is responsible for
overseeing the protection of public health and safety during hazardous material
incidents this shall include evacuation and perimeter control. Long-term site
isolation and security shall be the responsibility of the Washington State
Department of Ecology or their designee.
I. The Washington State Patrol and Snohomish County Sheriff may provide
specialty response teams for clandestine drug lab and explosive device
responses.
J. The Edmonds Public Works Department shall be the primary agency for
coordinating with water and sewer utilities for the protection of water and sewer
systems within the city which may be affected by a hazardous material release.
V. PROCEDURES
A. Responding agencies are responsible for the development of response
procedures for their agency, and for training employees involved in emergency
response operations for releases of hazardous substances in accordance with
current state and federal guidelines.
B. The Snohomish County Local Emergency Planning Committee is responsible for
the development, maintenance and distribution of the Snohomish County
Hazardous Materials Response Plan.
C. Response procedures and plans are separately published documents which
should be developed in coordination with other response agencies for the
jurisdiction.
VI. RESPONSIBILITIES
A. Snohomish County Fire District 1 and Snohomish County Haz-Mat Team
1. Provide 24-hour response to hazardous material emergencies.
2. Serve as Incident Command agency or serve as part of a unified
command as appropriate during hazardous materials emergencies.
3. Assist with law enforcement, emergency notifications and warning and
evacuations as necessary.
4. Coordinate and maintain liaison with other agencies involved in the
Packet Page 234 of 564
Edmonds CEMP Emergency Support Functions - 93 August 2015
incident.
5. Provide communications and technical support, including radiological
monitoring to the incident
6. Coordinate fire resources when emergency mobilization is authorized for
a hazardous materials incident.
7. Take initial steps to size-up the situation, isolate the scene and protect life
and property.
8. Request assistance and make initial notifications to SnoCo DEM, local
agencies and provide warning to the public as appropriate.
9. Provide on-scene City liaison and public information officer during the
emergency.
B. City of Edmonds Public Works Department
1. Assist water and sewer providers in protecting city water and sewer
supplies and systems as appropriate, and provide notification to other
utility providers which may be affected by the emergency.
2. Establish coordination with other utilities providers during response
activities.
C. City of Edmonds Police Department
1. Provide for perimeter control, re-routing of traffic and initial security.
2. Assist with emergency notification of the public and evacuation as
appropriate.
3. Provide public information officer if requested.
D. SNOCOM Communications Center
1. Provide emergency dispatch services in support of haz-mat operations.
E. Snohomish County DEM
1. Activate Emergency Operations Center as necessary to coordinate
support activities for the incident such as emergency notifications, public
shelters, resource support, public information and liaison with county and
state emergency operation centers.
2. Coordinate activities of outside agencies and departments in support of
the incident as requested.
3. Make notifications to appropriate county, state and federal agencies.
Packet Page 235 of 564
Edmonds CEMP Emergency Support Functions - 94 August 2015
4. Support activities on-scene when requested by the Incident Commander.
F. Washington State Patrol and Snohomish County Sheriff’s Department
1. Provide response teams for clandestine drug lab and explosive device
responses.
G. Snohomish County Health District
1. Provide notifications to the general public regarding precautionary
measures and health effects related to released materials, as necessary.
H. Washington State Department of Health
1. Provide response, monitoring and clean-up to radiological incidents.
2. Provide notifications to the general public regarding precautionary
measures and health effects related to released materials as necessary.
I. Washington State Department of Ecology
1. Provide 24-hour response to serious hazardous material incidents.
2. Provide expertise in containment and clean-up of hazardous materials
and ensure that source control, containment, clean-up and disposal are
accomplished.
3. Assume responsibility of incident management and clean-up if the
responsible party is unavailable, unresponsive or unidentified.
4. Provide coordination with other environmental and state agencies
involved in clean-up and/or recovery.
5. Initiate enforcement actions as appropriate.
J. Washington State Emergency Operations Center
1. Maintain 24-hour communication and notification capability.
2. Coordinate state agency response activities through the state EOC,
including procurement of state resources as needed for response
activities.
3. Provide a public information officer to support a joint information center if
needed.
K. Washington State Military Department/National Guard CST
1. Provide technical support, response, decontamination and monitoring at
hazardous materials incidents of significant size and/or duration.
Packet Page 236 of 564
Edmonds CEMP Emergency Support Functions - 95 August 2015
EMERGENCY SUPPORT FUNCTION 11
AGRICULTURE AND NATURAL RESOURCES
PRIMARY AGENCY: City of Edmonds Parks and Recreation Department
SUPPORT AGENCIES: City of Edmonds Development Services Department
City of Edmonds Police Department
Snohomish County DEM
Snohomish Health District
Snohomish County Red Cross
Local Volunteer and Human Service Agencies
Washington State Emergency Operations Center
Washington State Department of Agriculture
Washington State Department of Social and Health Services
Federal Agencies
I. INTRODUCTION
A. Purpose
The purpose of this Emergency Support Function is to coordinate efforts
to provide safe handling of food, water and donated goods for mass
feeding and distribution; and for providing transportation to distribution
sites during a catastrophic disaster.
B. Scope
This Emergency Support Function is applicable to catastrophic events
which exceed the capabilities of the local resources available through city,
county, private and volunteer agencies and organizations. This
Emergency Support Function is designed to closely support Emergency
Support Function 6 - Mass Care, Emergency Assistance, Housing and
Human Services.
II. POLICIES
A. The City will coordinate with county, state and federal officials and follow
the policies of these agencies in the execution of this Emergency Support
Function.
B. The City will work with all community, humanitarian and social service
organizations to coordinate this activity.
Packet Page 237 of 564
Edmonds CEMP Emergency Support Functions - 96 August 2015
C. The Snohomish Health District will provide guidance to City Departments
and other agencies to ensure the safety of food and water distributed to
the public.
D. The priority for providing food will be to areas of acute need then to areas
of moderate need.
E. The City will incorporate preservation and conservation measures for
critical areas into response activities.
III. SITUATION
An event of catastrophic proportion will deprive large numbers of people access
to and/or the means to prepare food. In addition to disruption of the local food
supply and distribution network, an event may destroy food supplies in the
general area. Commercial cold storage and freezer facilities may be inoperable.
Water supplies may be insufficient due to damage to the local distribution system
and/or contamination. This will require potable water or beverage supplies to be
distributed in mass quantities.
The City has limited experience in coordinating the distribution of food, water and
donated goods in a catastrophic event; and if not handled properly, food, water
and donated goods can become vehicles for illness and disease transmission,
which must be avoided. Guidance for these activities will be provided by local
and State Health authorities when appropriate.
IV. CONCEPT OF OPERATIONS
A. The Parks and Recreation Department, assisted by the Development
Services Department, will be responsible for coordinating the functions of
this Emergency Support Function with county, state and federal agencies
on behalf of the City as required by the nature and extent of the disaster.
B. All requests for food and water of this magnitude will be processed
through the County Emergency Operations Center. The City will
determine needs based on the information available and make request to
the state through SnoCo DEM.
C. Coordination of distribution locations will be done on a county-wide level.
The City will provide information to SnoCo DEM regarding suitable
locations for storage, distribution and mass feeding within the city.
Packet Page 238 of 564
Edmonds CEMP Emergency Support Functions - 97 August 2015
D. Locations suitable for providing storage, distribution and mass feeding
capability from a single location will be preferred sites.
E. The operational concepts and resources established for Emergency
Support Function 6 - Mass Care, Emergency Assistance, Housing and
Human Services will be utilized in support of this function.
F. Mass distribution of food and water will be provided for as short a period of
time as possible. It is essential to the economic recovery of the
community that regular methods of distribution through local businesses
be re-established as quickly as possible.
V. PROCEDURES
A. Procedures established to carry out the responsibilities of Emergency
Support Function 6 - Mass Care, Housing and Human Services will be
utilized to guide the activities of City staff and support agencies.
B. Procedures established by state and federal agencies which are charged
with food and water distribution under the state and federal response
plans will be followed when these agencies are working within the city.
City officials will support state and federal efforts as necessary.
C. Rehabilitation, recovery and/or restoration of critical areas such as stream
beds and wetlands within the City will be accomplished in a manner
consistent with WA State Department of Ecology recommendations and
requirements.
VI. RESPONSIBILITIES
A. City of Edmonds Parks and Recreation Department
1. Coordinate with SnoCo DEM and county, state and federal
agencies regarding the need for food and water distribution within
the city.
2. Make requests for food and water resources through the County
Emergency Operations Center when local resources are/or will be
inadequate to meet area needs.
3. Provide support to county, state and federal agencies with City staff
and resources available to support food and water distribution.
Packet Page 239 of 564
Edmonds CEMP Emergency Support Functions - 98 August 2015
4. Identify suitable locations within the city for food and water
distribution and mass feeding operations.
B. City of Edmonds Development Services Department
1. Provide support to the Parks and Recreation Department with staff
and resources as requested to support food and water distribution
activities.
C. Snohomish County DEM
1. Serve as the primary contact point to coordinate area wide activities
with county, state and federal officials.
D. City of Edmonds Police Department
1. Provide law enforcement activities in support of food and water
distribution.
E. Local Volunteer and Human Service Agencies
1. Coordinate distribution activities and provide volunteer resources for
distribution site management.
F. WA Department of Agriculture and Department of Social and Health
Services
1. Provide nutrition assistance through the Food and Nutrition Service.
This assistance may include: determination of need; obtaining
appropriate food supplies; arrangement of delivery; and
authorization of food stamps.
G. Other County, State, and Federal Agencies
1. Provide food and water supplies; and coordination and distribution of
food and water supplies utilizing all available resources and
procedures established in the Agencies’ response plans.
Packet Page 240 of 564
Edmonds CEMP Emergency Support Functions - 99 August 2015
EMERGENCY SUPPORT FUNCTION 12
ENERGY
PRIMARY AGENCIES: Snohomish County PUD
Puget Sound Energy
City of Edmonds Emergency Operations Board
SUPPORT AGENCIES: Washington State Emergency Operations Center
Washington State Department of Commerce
Washington Utilities and Transportation Commission
Snohomish County DEM
I. INTRODUCTION
A. Purpose
To provide for coordination between the City of Edmonds, county, state
and federal agencies, and local utility providers for the effective use of
electric power, natural gas and petroleum supplies.
B. Scope
The level to which energy supplies are restricted due to damages suffered
during an emergency or disaster will be determined by the nature and
scope of the event.
II. POLICIES
A. The State of Washington and the Federal Government have the authority
to restrict use of energy resources during times of emergency or disaster.
The City of Edmonds shall comply with all orders issued regarding the
curtailment of energy resources.
B. The City of Edmonds shall provide a liaison to coordinate energy related
issues with county, state and federal officials and utility providers as
necessary. This may be done through SnoCo DEM.
III. SITUATION
Electric utilities which provide service to the City of Edmonds are an organized
collection of public and private generating and distribution facilities. They are
Packet Page 241 of 564
Edmonds CEMP Emergency Support Functions - 100 August 2015
interconnected to the Northwest Power Pool. Relying on the power pool concept,
the electric power industry has developed the capability to provide power under
extreme conditions.
Natural gas distribution is provided by Puget Sound Energy and is supplied
primarily by Northwest Pipeline. Distribution of natural gas is subject to control of
the federal government in response to supply and demand factors and
emergency situations.
Petroleum fuel supplies are provided through a wide variety of sources and
companies. Like natural gas and electricity it is subject to control by the federal
government during times of emergency.
There is no centralized system at the local level to provide for the coordination of
emergency services provided by public utility providers.
IV. CONCEPT OF OPERATIONS
A. In the event of state or federally imposed energy restrictions, or in times of
emergency when supplies of resources are strictly limited due to damage
or shortage of energy supplies, the City will assign a liaison to
communicate local needs with utility providers and county, state and
federal authorities. This will normally be the Disaster Coordinator or the
SnoCo DEM Director.
B. Public and private utility providers are expected to manage and operate
the utility within their own jurisdiction, providing energy resources based
on requirements and capabilities.
C. Public utility resources will be used to meet immediate and essential
emergency needs, to include restoration of utilities to critical and essential
facilities within the city. Outside resources may be requested through
other utility providers, mutual aid agreements or through the Washington
State Emergency Operations Center.
D. To the maximum extent practical, and within the limitations imposed by
state or federal government, public utilities will continue to provide
services through their normal means. In the event curtailment orders are
issued by the state or federal government, all utilities will comply with such
orders.
E. In the event that energy restrictions affect the delivery of supplies to the
general public, the City may be required to enforce such restrictions
locally. The need to provide enforcement will be evaluated and handled
Packet Page 242 of 564
Edmonds CEMP Emergency Support Functions - 101 August 2015
on a case by case basis.
V. PROCEDURES
A. Each utility provider has plans established for the restoration of utility
services and for the emergency allocation of resources during times of
restriction or shortage. These plans comply with state and federal plans
for the curtailment of energy and petroleum products. These plans which
are developed and maintained by the state and federal government, and
utility providers are separately published documents.
B. The City will follow guidelines and procedures as provided by state and
federal officials at the time of emergency.
VI. RESPONSIBILITIES
A. City of Edmonds Emergency Operations Board or SnoCo DEM Director
1. Serve as liaison to utility providers and higher levels of government
during emergencies affecting energy utilities and provide
information regarding priority needs within the City.
2. Provide information to local agencies and officials, and the general
public.
B. Snohomish County PUD and Puget Sound Energy
1. Operate utilities according to established procedures during times
of energy emergency.
2. Provide for the restoration of utility services when disrupted.
3. Provide information on status of utilities to county and state officials
for dissemination to local jurisdictions.
C. Washington State Emergency Operations Center
1. Coordinate State assets to support local jurisdictions.
2. Provide information and guidance to local jurisdictions during
energy emergencies.
3. Develop and maintain plans for the priority allocation of energy
resources.
Packet Page 243 of 564
Edmonds CEMP Emergency Support Functions - 102 August 2015
4. Establish a means of gathering information from local jurisdictions
regarding local energy needs and priorities.
D. Washington State Department of Commerce
1. Prepare and update energy supply contingency plans.
2. Administer energy allocation and curtailment programs in
accordance with the Governor’s emergency powers energy
legislation.
3. Provide information regarding the location and quantity of
petroleum supplies, status of electricity supply and status of natural
gas supply.
E. Washington Utilities and Transportation Commission
1. Provide informational assistance and expedite processing of
requests from utilities under the Commission’s jurisdiction for
authority to provide specific services or take specific action related
to the emergency or disaster.
Packet Page 244 of 564
Edmonds CEMP Emergency Support Functions - 103 August 2015
EMERGENCY SUPPORT FUNCTION 13
PUBLIC SAFETY AND SECURITY
PRIMARY AGENCY: City of Edmonds Police Department
SUPPORT AGENCIES: Snohomish County Sheriff’s Office
Mutual Aid Police Agencies
Washington State Patrol
Washington State Emergency Operations Center
Snohomish County DEM
I. INTRODUCTION
A. Purpose
To provide for the effective coordination of local law enforcement
operations and resources during major emergencies and disasters.
B. Scope
This Emergency Support Function augments existing mutual aid
agreements, emergency response plans and procedures existing at the
local, county and state levels. It provides guidance for managing and
coordinating law enforcement functions and addresses all public safety
activities within the city.
II. POLICIES
A. The procedures established in local plans and consent and/or mutual aid
agreements shall be utilized when responding to an emergency or
disaster.
B. Additional resources necessary for law enforcement activities shall
normally be obtained through agencies with which letters of mutual aid
consent are in place.
III. SITUATION
Law enforcement emergencies may occur at anytime and under many
circumstances. Major emergencies affecting law enforcement agencies include
civil disturbances, crowd control at large public gatherings, evacuation activities,
Packet Page 245 of 564
Edmonds CEMP Emergency Support Functions - 104 August 2015
major transportation route disruptions, and threats and/or acts of terrorism.
General law enforcement problems may be compounded by disaster-related
community disruption. Law enforcement agencies may also be required to
provide support activities to other City Departments during emergencies.
In January of 2011, the Department of Homeland Security introduced the new
National Terrorism Advisory System (NTAS), which takes the place of the color-
coded alerts formerly found in the Homeland Security Advisory System (HSAS).
The new system has been developed to better coordinate information sharing
among all levels of Law Enforcement and other stakeholders; and provide more
specific guidance for the public, as well. With NTAS, the Department of
Homeland Security will coordinate the development and issuance of formal,
detailed alerts regarding specific or credible terrorist threats. The alerts will
clearly identify threats as either “imminent” or “elevated;” and provide a concise
summary of the potential threat, actions being taken at the Federal level, and
recommended steps for local government, business and private individuals.
The Edmonds Police Department response to terrorism is dependent upon the
situation presented. Within the response will be an analytical element, as
information collection and disbursement would be a key component of any
response. The goal of the response is two-fold: 1) to enhance the safety of the
public at large, and 2) to neutralize any threat to the best of the Department’s
ability.
The Edmonds Police Department participates in the Regional Intelligence Group
(RIG). The RIG has access to a variety of databases that are specific to WA
State Homeland Security Region 1, which includes Snohomish, Skagit,
Whatcom, Island and San Juan Counties. In the event of an act of terrorism
within the City of Edmonds, the Department would be in contact with the RIG 1
analyst, in an effort to gain intelligence and useful information. The RIG may
also disseminate related information to those that may find the information useful.
The Edmonds Police Department has the ability to reach out directly to the WA
State Fusion Center, which has broader access to information. This
communication can be conducted one-on-one through the Fusion center, via
direct email, or through the Northwest Warn (NWWARN) system. The Fusion
Center provides interdisciplinary expertise and situational awareness, as well as
information analysis and sharing, to support public and private sector security
and critical infrastructure protection.
Additionally, the Edmonds Police Department also has access to the Joint
Terrorism Task Force (JTTF) working group. Any credible terrorist threat would
be immediately reported to the JTTF, and leads followed up on appropriately
utilizing federal resources if authorized.
Packet Page 246 of 564
Edmonds CEMP Emergency Support Functions - 105 August 2015
IV. CONCEPT OF OPERATIONS
A. The Edmonds Police Department is the Incident Command Agency for law
enforcement activities within the city. Supporting agencies shall report to,
and operate under the Incident Commander. The Police Department may
establish a unified command with supporting agencies during large-scale
incidents.
B. Letters of mutual aid consent exist with various law enforcement agencies
throughout the state. Supplemental law enforcement assistance should
be requested through these agencies.
C. The Police Chief or designee will report to the Emergency Operations
Center to coordinate law enforcement field operations and resources
when activated.
D. On-scene management of emergencies shall follow the Incident
Command System, as mandated by the National Incident Management
System (NIMS).
E. The Police Chief or designee shall provide direction and control over
Department resources and coordination with the Emergency Operations
Center. Department personnel shall operate according to specific
directives, Department policies and procedures, and by exercising
reasonable personal judgment when unusual or unanticipated situations
arise and command guidance is not available.
F. Command posts may be established for the coordination of field
operations. The On-scene Commander shall provide regular status
reports and coordinate requests through the Emergency Operations
Center when activated. Co-location of command posts will be the
preferred method of field operations when multiple departments/agencies
have command posts established.
G. Communications and emergency notifications shall be through established
channels.
H Notification of off-duty personnel shall be done according to Department
procedures, by telephone, Department radio, pager or by Emergency
Public Information Procedures.
I. When the emergency warrants the involvement of state and/or federal
military or law enforcement agencies, the Police Chief shall be responsible
for the coordination of activities between these agencies and the City, and
for providing appropriate information to the Emergency Operations Center
Packet Page 247 of 564
Edmonds CEMP Emergency Support Functions - 106 August 2015
when activated.
V. PROCEDURES
A. Responding agencies are responsible for the development of response
procedures for their agency, and for training employees involved in
emergency response.
B. Response plans, agency procedures and mutual aid agreements are
separately published documents which should be developed in
coordination with other response agencies for the jurisdiction.
C. Additional information can be found in the Snohomish County Law
Enforcement Mobilization Plan, a separately published document.
VI. RESPONSIBILITIES
A. City of Edmonds Police Department
1. Provide law enforcement activities within the city.
2. Provide emergency traffic control, coordination of evacuation
operations, perimeter control and assistance with citywide damage
assessment.
3. Provide security at the Emergency Operations Center and other
critical locations when necessary.
4. Provide communications equipment and emergency notification
and warning activities within the city.
5. Provide for the coordination of explosive device identification,
handling and disposal.
6. Provide support to the Snohomish County Medical Examiner in the
identification of the deceased.
7. Serve as liaison between City personnel and military and state and
federal law enforcement agencies responding to emergencies.
8. Provide direction and control for air and land search and rescue
activities.
Packet Page 248 of 564
Edmonds CEMP Emergency Support Functions - 107 August 2015
B. Mutual Aid Police Agencies
1. Provide law enforcement operational support with staff, equipment
and supplies in accordance with existing consent and/or mutual aid
agreements.
C. Snohomish County DEM
1. Provide resource assistance and/or support to command officers as
requested.
D. State
Washington State Patrol
1. Provide law enforcement on state and interstate highways within
the city.
2. Provide law enforcement operational support with staff equipment
and supplies in accordance with existing agreements and/or as
requested through the State Emergency Operations Center when
activated.
Washington State Emergency Operations Center
1. Coordinate requests for state and federal resources as appropriate.
2. Provide National Guard support to law enforcement as requested
and as approved by the Governor.
E. Federal
See Emergency Support Function (ESF) 20 - Defense Support to Civil
Authorities
Packet Page 249 of 564
Edmonds CEMP Emergency Support Functions - 108 August 2015
EMERGENCY SUPPORT FUNCTION 14
LONG-TERM COMMUNITY RECOVERY
PRIMARY AGENCIES: City of Edmonds Community Services Department
City of Edmonds Public Works Department
City of Edmonds Development Services Department
City of Edmonds Finance Department
SUPPORT AGENCIES: All City of Edmonds Departments
Snohomish County Fire District 1
Sound Disposal
Republic Services
Waste Management NW
Snohomish County DEM
Snohomish Chapter American Red Cross
Washington State Emergency Operations Center
Washington State Department of Commerce
Washington State Department of Employment Security
Washington State Department of Social and Health Services
I. INTRODUCTION
A. Purpose
To provide guidance for the overall recovery and restoration activities
taking place in the city following a major emergency or disaster. The
recovery phase includes both short-term and long-term activities. Short-
term activities begin during the response phase of the disaster and can
last up to six (6) months; long-term activities may continue for ten (10)
years or more. Mitigation activities are on-going and will continue to be
addressed throughout the response and recovery phases of a disaster.
B. Scope
Recovery and restoration activities taking place following any emergency
or disaster will be determined by the specific event. The goal of long-term
recovery is to restore the city to pre-disaster (or improved) condition.
Some of the long-term recovery activities are extensions of short-term
activities; other long-term tasks begin after short-term tasks are
completed. City, county, state and federal agencies may be involved in
activities depending upon the event and scope of the situation.
Packet Page 250 of 564
Edmonds CEMP Emergency Support Functions - 109 August 2015
II. POLICIES
A. A preliminary damage assessment shall be carried out any time there is a
potential for a Presidential Declaration of a disaster; or if an assessment is
requested by state or county officials. This information shall be provided
to SnoCo DEM in order to support the Governor’s disaster declaration to
the President.
B. The City shall provide support to local, state and federal officials in the
completion of Damage Survey Reports in order to expedite the availability
of Public and Individual Assistance Programs that provide support in the
overall recovery of the community. Additional information on damage
assessment activities may be found in Support Annex B: Damage
Assessment.
C. Recovery activities of state, federal and organized volunteer agencies will
be coordinated through a Joint Field Office. The location and level of
operation will be determined by the extent of the disaster and upon the
needs of local jurisdictions.
D. SnoCo DEM will provide a liaison to coordinate activities with the Disaster
Field Office when requested by Washington State Division of Emergency
Management or the Federal Emergency Management Agency.
E. Recovery activities shall be in accordance with the City of Edmonds
Disaster Recovery Plan, a separately published document.
III. SITUATION
Recovery and restoration activities include, but are not limited to: repair of
damaged facilities, utilities and infrastructure; site decontamination; and broad-
based assistance to citizens and businesses. Depending upon the nature of the
event, one or more City Departments will have a role in restoration and recovery
activities.
IV. CONCEPT OF OPERATIONS
A. The Community Services and Public Works Departments shall be the lead
agencies for damage assessment activities within the city. The damage
assessment process will include staff from all City Departments capable of
contributing to this effort and shall be carried out in a cooperative manner.
B. The American Red Cross utilizes a damage survey process in order to
Packet Page 251 of 564
Edmonds CEMP Emergency Support Functions - 110 August 2015
determine the effect of the disaster on individual citizens and to evaluate
immediate human needs. This assessment can contribute to the overall
picture of damage status and should be coordinated when possible.
C. In major events requiring the involvement of multiple City Departments,
support agencies or community support groups the Mayor will appoint a
Recovery Task Force to coordinate recovery activities within the city.
D. In most disaster recovery situations a team composed of state and federal
disaster assistance employees will be assigned to the City to assist with
damage survey and provide restoration guidance.
E. Following an evaluation of damage, appropriate City Staff and other
involved agencies will determine priorities for repair of essential facilities,
utilities and infrastructure.
F. The Community Services Department is the lead agency in the
coordination of recovery efforts and the maintenance of the City’s Disaster
Recovery Plan. In situations where disaster recovery is primarily
composed of repair to facilities, utilities and infrastructure, the Public
Works Department will play a key role in recovery efforts. In situations
where there is contamination from hazardous materials releases requiring
long-term mitigation and clean-up activities Snohomish County Fire
District 1 will play a key role.
G. The Finance Department will assist Public Works and Engineering in
preparing work contracts; and in the collection and documentation of all
costs associated with disaster response and recovery activities.
H. In situations where the county or state has received a Presidential
Disaster Declaration, state and federal funds will be made available to
assist local jurisdiction with disaster costs. The Finance Department, with
assistance from other City Departments, will prepare all financial
documentation required by the state and federal government to ensure
recovery of allowable disaster costs.
I. In disaster recovery situations involving major damage to portions of the
city, it may be necessary to evaluate reconstruction and zoning in certain
areas. This may include sensitive land use areas, areas targeted for re-
development or re-zoning and areas which need other improvements.
The Development Services Department will be responsible for reviewing
such areas and making recommendations regarding re-building, re-zoning
and other desirable community improvements. The Development
Services Department will also research potential funding sources for such
improvements.
Packet Page 252 of 564
Edmonds CEMP Emergency Support Functions - 111 August 2015
J. The City Clerk shall provide training and information to City Departments
regarding the protection of vital City records prior to emergency situations.
In post emergency or disaster situations where vital records have been
damaged or destroyed, the City Clerk shall have the lead role for
recovering and restoring vital records. City Departments shall provide
assistance to the City Clerk when requested.
V. PROCEDURES
A. Specific information on Recovery policies and procedures can be found in
the City of Edmonds Disaster Recovery Plan.
B. Specific information on Damage Assessment can be found in Support
Annex B: Damage Assessment.
C. The City of Edmonds will follow established state and federal procedures
required for the recovery of disaster costs.
D. The City of Edmonds may develop special policies and ordinances for
zoning, development and construction following a disaster.
VI. RESPONSIBILITIES
A. City of Edmonds Public Works Department
1. Evaluate facilities, utilities and infrastructure damaged during a
disaster and establish priorities for repair.
2. Work with other local, state and federal agencies involved in repair
and recovery activities within the city to ensure coordinated and
efficient operations.
3. When appropriate, serve as the City's liaison with disaster
assistance teams from the state and federal government.
4. Document all costs and activities associated with disaster response
and recovery activities and provide information to the Administrative
Services Department.
5. Serve as a member of the Recovery Task Force as appropriate.
Packet Page 253 of 564
Edmonds CEMP Emergency Support Functions - 112 August 2015
B. Snohomish County Fire District 1
1. Work with local, state and federal agencies to mitigate hazardous
material contaminated areas to ensure community safety.
2. Evaluate Fire District facilities damaged during a disaster and
establish priorities for repair.
3. When appropriate, serve as the City's liaison with disaster
assistance teams from the state and federal government.
4. Document all costs and activities associated with disaster response
and recovery activities and provide information to Administrative
Services.
5. Provide personnel to serve as a member of the Recovery Task
Force, as appropriate.
C. City of Edmonds Community Services / Economic Development
Department
1. Serve as the lead agency in recovery planning and post disaster
activities.
2. Coordinate Recovery Task Force Activities when necessary and
serve as chairperson when directed by the Mayor.
3. Assist local businesses in determining essential recovery needs.
4. Support local businesses throughout the recovery process.
5. Serve as a member of the Recovery Task Force as Appropriate.
D. City of Edmonds Finance Department
1. Collect information regarding disaster related costs, prepare
documentation and submit to appropriate state and federal
agencies.
2. Serve as a member of the Recovery Task Force as appropriate.
3. Provide training and information to City Departments regarding the
protection of vital city records.
4. Coordinate recovery and restoration activities associated with vital
Packet Page 254 of 564
Edmonds CEMP Emergency Support Functions - 113 August 2015
City records.
E. City of Edmonds Development Services Department
1. Evaluate land use, zoning and target improvement areas following
a disaster. Make appropriate recommendations.
2. Serve as a member of the Recovery Task Force as appropriate.
F. All City of Edmonds Departments
1. Evaluate City facilities as appropriate and establish priorities for
repair.
2. Document all costs and activities associated with disaster response
and recovery activities and provide information to Administrative
Services.
3. Serve as a member of the Recovery Task Force as appropriate.
G. Sound Disposal, Republic Services, and Waste Management NW
1. Provide for the continuation of regularly scheduled household
waste pick-up services.
2. Coordinate with the Edmonds Public Works Department for the
collection and management of disaster-related debris.
H. Snohomish County DEM
1. Serve as liaison between state/federal disaster recovery teams and
the City, as appropriate.
2. Provide a location for state/federal disaster recovery teams to work
as necessary.
3. Assist the City with the development and maintenance of the City’s
Disaster Recovery Plan.
H. WA State Emergency Operations Center
1. Coordinate activities of Disaster Reservists in support of
Preliminary Damage Assessment mission.
Packet Page 255 of 564
Edmonds CEMP Emergency Support Functions - 114 August 2015
I. County, State and Federal Agencies
1. Provide direction and support to the City during disaster recovery
operations.
Packet Page 256 of 564
Edmonds CEMP Emergency Support Functions - 115 August 2015
EMERGENCY SUPPORT FUNCTION 15
EXTERNAL AFFAIRS AND EMERGENCY PUBLIC INFORMATION
PRIMARY AGENCY: City of Edmonds Disaster Coordinator
Snohomish County DEM
SUPPORT AGENCIES: All City Departments
Snohomish County Fire District 1
SNOCOM Communications Center
Washington State Emergency Operations Center
Federal Emergency Management Agency
I. INTRODUCTION
A. Purpose
1. To ensure that sufficient assets are mobilized during emergencies
or disasters to provide accurate, coordinated and timely information
to impacted communities and populace, first responders,
governments, media and the private sector.
2. To provide resource support and mechanisms to implement a local
Joint Information Center (JIC) when necessary, supplementing first
responder public information officers (PIOs) operations with JIC
resources.
B. Scope
This Emergency Support Function details the establishment of support
positions to coordinate communications to various audiences. It applies to
all City Departments that may require public affairs or public information
support; or whose public information support or assets may be employed
during an emergency or disaster.
II. POLICIES
A. It is the policy of the City of Edmonds to provide consistent, accurate,
complete and timely information using all available communications
methods.
B. It is the policy of the City to coordinate the development and dissemination
of all disaster-related public information through the designated Public
Packet Page 257 of 564
Edmonds CEMP Emergency Support Functions - 116 August 2015
Information Officer.
III. SITUATION
Emergency or disaster situations are typically complex and extend beyond one
operational period, possibly exhausting the public information capability of the
City.
IV. CONCEPT OF OPERATIONS
A. The Mayor or Disaster Coordinator appoints a Public Information Officer
(PIO) to act as the official for coordinating the dissemination of emergency
public information as approved and authorized by the City Disaster
Coordinator.
B. Emergency public information shall be coordinated by the PIO with prior
approval from the Disaster Coordinator.
C. The Disaster Coordinator may appoint an Assistant PIO when media
briefings are required from multiple locations or as the situation requires.
D. Media briefings will normally take place at City Hall. In the event that this
location is not functional or communications are inadequate, alternate
locations will be identified by the EOC and announced by the PIO.
E. Any or all of the following methods may be utilized to relay emergency
information to the public:
Print, radio, cable and television media
City website: http://www.edmondswa.gov
Printed education/information materials
City radio systems
Amateur Radio Services
Public address systems
AlertSense system
Emergency Alert System (EAS)
F. In some circumstances, it may become necessary to release emergency
public information from field command posts. In this event, the individual
in charge at the location shall notify the EOC in a timely manner and
provide detailed information regarding information released.
G. The City can post emergency public information on the City’s website.
Packet Page 258 of 564
Edmonds CEMP Emergency Support Functions - 117 August 2015
The PIO will coordinate all posted information.
H. In an emergency, people will turn first to traditional sources of information.
The PIO will strive to ensure the same message is given to all “traditional”
sources.
V. PROCEDURES
A. The PIO will determine the methods for dissemination of local emergency
information and instructions, with authorization from the Disaster
Coordinator.
B. Information will also be disseminated to the Mayor, City Council,
emergency personnel in the field and other City employees so they will
know what information and guidance is being released to the public.
C. A Joint Information Center (JIC) may be established by SnoCo DEM, in
coordination with other agencies, to coordinate emergency public
information where multiple jurisdictions are impacted and/or involved in
the response. This facility would be in direct contact with the City EOC,
may include PIOs from other jurisdictions, and may be in conjunction with
State and Federal information efforts. The location of the JIC will be
determined at the time of the emergency.
D. The designated PIO will maintain up-to-date distribution lists.
E. Translation of emergency public information for non-English speaking
persons will be coordinated through the EOC, with assistance requested
from WA State Emergency Operations Center.
F. Special instructions and provisions may be made for hospitals, nursing
homes, schools and other groups.
VI. RESPONSIBILITIES
A. City of Edmonds Mayor
1. Represent the City at press conferences, public hearings and other
public events, as appropriate.
2. Appoint a Public Information Officer (PIO) to coordinate the
dissemination of emergency public information.
Packet Page 259 of 564
Edmonds CEMP Emergency Support Functions - 118 August 2015
B. City of Edmonds Disaster Coordinator
1. Appoint a Public Information Officer (PIO) if necessary.
2. Establish policies and procedures pertaining to the release of
emergency information and instructions.
3. Approve all press releases and briefings.
4. Support the PIO in coordinating all press releases and briefings.
C. All City Departments
1. Provide pertinent and timely information (e.g. road closures,
emergency instructions, available assistance, restricted areas, etc.)
to the EOC regarding field activities and emergency public
information.
2. Coordinate requests for assistance through the EOC.
3. Notify the designated PIO of rumors and misinformation so that
corrections can be prepared and issued immediately.
D. Public Information Officer(s)
1. Represent the City at press conferences, public hearings and other
public events as directed by the Disaster Coordinator.
2. Receive approval from the Disaster Coordinator for all press
releases and briefings.
3. Coordinate with SnoCo DEM when information is to be released on
the EAS, AlertSense, or other shared information system(s).
4. Gather and coordinate emergency public information for timely
release to the public.
5. Provide copies of all press releases to SnoCo DEM.
6. Notify appropriate agencies to assist in the dissemination of
emergency public information.
7. Give regular information briefings to City officials, news media and
the public, as authorized by the Disaster Coordinator.
Packet Page 260 of 564
Edmonds CEMP Emergency Support Functions - 119 August 2015
8. Provide information to City Departments that may dispense
information to ensure consistency of messaging.
9. Provide pre-printed emergency public information brochures and/or
flyers for distribution to the public.
10. Recommend appropriate location(s) for public official and media
briefings.
11. Monitor media coverage and public reaction and perceptions to
identify rumors and misinformation as soon as possible. Prepare
correction(s), if applicable.
E. Snohomish County DEM
Throughout the emergency or disaster, SnoCo DEM will coordinate with
city, county and state PIOs to develop and disseminate emergency public
information.
F. WA State Emergency Operations Center
1. Throughout the emergency, public information staff from the State
EOC will work with the Governor’s press secretary to develop and
disseminate information regarding the emergency and State
response efforts. State EOC staff will also be available to assist
local officials in disseminating emergency instructions to affected
communities.
2. Coordinates with local and Federal agencies on the release of
emergency information and instructions.
G. Federal
The Federal Emergency Management Agency provides for the
assignment and establishment of Public Information operations at the
Joint State/Federal Disaster Field Office after a Presidential Disaster
Declaration.
Packet Page 261 of 564
Edmonds CEMP Emergency Support Functions - 120 August 2015
EMERGENCY SUPPORT FUNCTION 20
DEFENSE SUPPORT TO CIVIL AUTHORITIES
PRIMARY AGENCIES: Washington State Military Department, National Guard
Snohomish County DEM
City of Edmonds Police Department
SUPPORT AGENCIES: Washington State Emergency Operations Center
Federal Emergency Management Agency
US Northern Command (USNORTHCOM)
I. INTRODUCTION
A. Purpose
To establish guidelines for requesting military assistance and for
coordinating military support with City response activities.
B. Scope
The scope of military involvement will be determined by the nature of the
incident and the amount of support needed for the event.
II. POLICIES
A. The City of Edmonds Police Department shall serve as liaison between
military forces located within the city and the Emergency Operations
Center.
B. All military forces remain under, and will follow the military chain of
command.
III. SITUATION
It is anticipated that military support will be requested or authorized only under
the most extreme circumstances when city, county and state resources are
unable to cope with the nature or extent of the emergency or disaster.
Packet Page 262 of 564
Edmonds CEMP Emergency Support Functions - 121 August 2015
IV. CONCEPT OF OPERATIONS
A. The Governor of the State of Washington has the authority to order the
organized militia of Washington or any part thereof into active service in
order for the state to execute the laws and perform such services as the
Governor shall deem proper. This power resides with the Governor or
acting Governor alone and may not be delegated.
B. The Washington Emergency Management Division, in consultation with
the Adjutant General, may recommend activation of the National Guard
when there is an anticipated justifiable need for the services of the military,
or upon a validated request from a local jurisdiction when the need cannot
be met by local or state resources.
C. Requests for military assistance will be coordinated through SnoCo DEM.
Requests must include the following: proclamation of local emergency;
date, time and location of incident; damage done; casualties; extent of the
event; and the severity and magnitude.
D. The role of the military in a disaster operation in limited to the preparation
for an impending disaster and emergency response. This role may
include the following: transportation; security forces; urban search and
rescue; hazardous materials; communications; air support; wild-land
firefighting; limited feeding; medical; and supplemental power.
E. The base commander of a military installation has the authority to respond
to immediate life threatening emergencies. Requests under these
circumstances may be made directly to the local installation.
F. Coordination of military activities will normally occur between a military
liaison assigned to the County Emergency Operations Center and the
State Emergency Operations Center.
G. Federal military forces may be activated under the authority of the
President of the United States.
V. PROCEDURES
A. Individual military organizations will follow the military chain of command
and established procedures for their organization.
B. Requests for military assistance shall be made by the Mayor or Disaster
Coordinator to SnoCo DEM.
Packet Page 263 of 564
Edmonds CEMP Emergency Support Functions - 122 August 2015
VI. RESPONSIBILITIES
A. City of Edmonds Police Department
1. Serve as liaison between military personnel and the City
Emergency Operation Center.
B. Snohomish County DEM
1. Request military support as necessary.
2. Serve as liaison between military personnel located at the County
Emergency Operations Center and City of Edmonds.
3. Assign military personnel as required through the military liaison at
the County Emergency Operations Center.
C. WA State Emergency Operations Center
1. Serve as the coordination point between military forces and the
County Emergency Operations Center.
D. Military Organizations
1. Provide assistance as directed by the Adjutant General and
approved by the Governor.
E. Federal Emergency Management Agency
1. Coordinate requests for federal military support through the US
Northern Command.
Packet Page 264 of 564
Edmonds CEMP Support Annexes - 123 August 2015
SUPPORT ANNEX A
EVACUATION AND MOVEMENT
PRIMARY AGENCIES: City of Edmonds Police Department
Snohomish County Fire District 1
SUPPORT AGENCIES: City of Edmonds Public Works Department
City of Edmonds Development Services Department
City of Edmonds Community Services Department
City of Edmonds Finance Department
City of Edmonds Parks and Recreation Department
Snohomish County DEM
WA Department of Transportation
WA State Patrol
WA State Emergency Operations Center
I. INTRODUCTION
A. Purpose
The purpose of this emergency support function is to provide guidance for
carrying out evacuation operations within the City of Edmonds.
B. Scope
Evacuation operations will be determined by the nature and magnitude of
the specific event. Evacuations may, in some events, cross jurisdictional
boundaries.
C. Assumptions
1. The City of Edmonds has few major highways or arterials which
could adequately handle traffic volumes if it were necessary to
evacuate all or part of the City.
2. Daily experience demonstrates that routes into and out of Edmonds
are routinely overloaded with traffic during peak travel times. It can
be safely assumed that any evacuation would overwhelm main
available routes in all directions.
3. Any evacuation planning must be considered within the larger
context of regional planning. The City of Edmonds is bordered on
Packet Page 265 of 564
Edmonds CEMP Support Annexes - 124 August 2015
three sides by heavily populated neighboring jurisdictions. Should
the need arise to evacuate those jurisdictions as well as the City,
traffic volumes will increase exponentially.
4. The City is bordered on the west by Puget Sound, and a WA State
Ferries terminal is located within the City.
5. The majority of threats facing the City of Edmonds occur with little
or no warning, providing no opportunity to evacuate citizens.
6. While mass evacuation planning is necessary for a scenario in
which the City of Edmonds would be rendered uninhabitable due to
catastrophic destruction caused by natural phenomena or terrorist
attack; it is far more likely that only specific areas of the City would
need to be evacuated in response to a localized threat such as a
limited haz-mat incident.
7. Sheltering-in-place could be the best response to most threats
faced by the City of Edmonds.
8. Citizens evacuating from other locations may pass through the City
of Edmonds while en-route elsewhere.
9. Any evacuation operation will require the meeting of human needs
during and after the movement of citizens.
II. POLICIES
A. Evacuation orders shall be issued by the highest ranking official available
at the time of the emergency. This will normally be the Mayor, Police
Chief, Fire Chief, or Public Works Director.
B. The Disaster Coordinator and SnoCo DEM shall be notified anytime there
is an evacuation affecting the City.
C. All City-owned vehicles (not otherwise involved in emergency response)
will be made available for use.
III. SITUATION
Nearly any emergency or disaster could create a need for an evacuation.
Evacuation operations are utilized to remove people from areas that pose a
Packet Page 266 of 564
Edmonds CEMP Support Annexes - 125 August 2015
potential or immediate danger which is extreme in nature. These situations could
arise as the result of a natural or technological event and range from the
evacuation of a few individuals from a small area to large populations from a
widespread area. The evacuation of people from areas of risk in the City of
Edmonds may involve the emergency responses of more than one governmental
jurisdiction. The movement of people may be across jurisdictional boundaries.
There are three (3) types of evacuation order: voluntary evacuation,
recommended evacuation order, and mandatory evacuation order.
A. Voluntary Evacuation Order
A voluntary evacuation order is issued when it is believed that a hazard
has a moderate probability of posing a significant threat to people living or
working in an area of risk. Citizens are encouraged to leave the area;
however the decision if and when to evacuate will be made by the
individual.
B. Recommended Evacuation Order
A recommended evacuation order is issued when it is believed that the
possibility of hazard occurrence is high, but the potential impact is low to
moderate. As with the voluntary evacuation order, the decision to
evacuate is the responsibility of the citizen.
C. Mandatory Evacuation Order
A mandatory evacuation order is issued when it is believed that both the
probability and impact of a hazard are high, and the lives of citizens and
responders assisting them are at risk. The decision to evacuate still rests
with the citizen; however, those who choose to remain within the danger
area will be informed that emergency assistance may not be available to
them.
IV. CONCEPT OF OPERATIONS
A. Evacuation Operations include the following six (6) phases:
1. Incident Analysis
Decisions to evacuate will be made on a case-by-case basis. The
decision to evacuate will depend entirely upon the nature, scope
and severity of the emergency. Other factors to be considered
Packet Page 267 of 564
Edmonds CEMP Support Annexes - 126 August 2015
include the number of people affected; necessary protective
actions; available transportation routes and resources; and the time
available in which to effect the evacuation.
2. Warning
The evacuation information will be promulgated to the public from
the Incident Command Post or Emergency Operations Center
(EOC). Information will be disseminated following procedures
outlined in Emergency Support Function (ESF) 2 –
Communications; and Emergency Support Function (ESF) 15 –
External Affairs and Emergency Public Information.
3. Preparation to Move
Before the evacuation order is disseminated to the public, it is
essential that all details be checked and the necessary response
personnel are organized and prepared to implement the
evacuation. An effective evacuation is dependent upon the close
coordination of evacuation information and instructions.
4. Movement of Population
An orderly evacuation of even a small area of the City will be an
immense undertaking which largely depends upon the willing
cooperation of the public. For this reason, it is critical that the
public information provided be timely, accurate, and reassuring. In
an evacuation of limited scope, with information promulgated over
the electronic media, it may be physically impossible to discourage
others from leaving, regardless of their actual risk. Even with
accurate and consistent messaging, it is possible for a panic to
develop and create city-wide gridlock. If this situation should arise,
the City will attempt to execute a traffic plan with the resources
available, and continue to reinforce accurate messaging.
Evacuations will be accomplished through the use of appropriate
modes of transportation to include, but not be limited to: private
vehicle, public transportation, and pedestrian (foot) traffic.
5. Reception / Support of Evacuees
In the event of an evacuation of a small number of people, for a
limited amount of time, it may be possible to set-up a
reception/support facility in an area or structure with limited
services. Provisions for large numbers of people or for longer
Packet Page 268 of 564
Edmonds CEMP Support Annexes - 127 August 2015
periods of time will quickly overwhelm City resources.
Considerations include: sanitary services, food preparation,
sleeping facilities, logistical support and security. The reception
and support of large numbers of people will require a regional,
state-wide and/or probable Federal coordination effort.
6. Return
The return and re-entry of people to their homes and businesses
can be as difficult to manage as the initial evacuation. To assist in
the management of the returning population, an orderly, phased
return will be implemented to the best of the City’s ability.
B. Evacuation Operational Concepts
1. All evacuation operations will utilize the Incident Command System
in accordance with NIMS and the National Response Framework.
2. In the event of an incident requiring the evacuation of all or part of
the City of Edmonds, the evacuation order will be issued by the
highest ranking City official available at the time of the event. This
will normally be the Mayor, Police Chief, Fire Chief, or Public Works
Director. The SnoCo DEM Director may issue evacuation orders in
the absence of a ranking City official. On-scene Incident
Commanders may issue evacuation orders when dangerous or life-
threatening situations exist.
3. Except in situations where there exists an immediate life-
threatening situation, evacuation orders shall be coordinated
through the Emergency Operations Center.
4. The individual ordering the evacuation shall request notification of
the Disaster Coordinator and SnoCo DEM. Additionally, a request
will be made for the activation of the County Emergency Operations
Center any time there is a need to evacuate individuals to public
shelters or across jurisdictional boundaries.
5. In the event of an evacuation impacting the major arterials, SR 99,
SR 104, and/or SR 524 every effort will be made to include WA
State DOT and State Patrol in the planning process.
6. Any evacuation operation utilizing the WA State Ferries will be
coordinated with WA DOT – Ferries Division. An evacuation of
Kitsap County may also impact the City of Edmonds should the
Packet Page 269 of 564
Edmonds CEMP Support Annexes - 128 August 2015
Kingston-Edmonds ferry run be used to transport evacuees.
7. Evacuation information shall be given in as clear and direct a
manner as possible in order to provoke immediate response by the
affected population. Direction and control of evacuation operations
and notification to the public shall be done by uniformed personnel
when possible. See sample Evacuation Order on page 144 of this
document.
8. The primary mode of evacuation transportation will be private
vehicle. Other transportation modes and assets will be utilized as
appropriate and available. If public transit assets are utilized,
pedestrian traffic will be directed to transfer points to access transit
vehicles.
9. Provisions for individuals with special needs and the use of mass
transit for the relocation of affected individuals will be handled on a
case-by-case basis according to the needs of the situation.
10. The threat of a detonation of a nuclear, or other explosive device
may result in the spontaneous evacuation of the general public.
Direction and control during an evacuation of this type will be
limited to recommending evacuation routes, traffic control and
coordination through SnoCo DEM with jurisdictions outside the area
regarding reception and shelter needs.
11. Evacuation information shall be disseminated through procedures
established in Emergency Support Function 2 – Communications;
and Emergency Support Function 15 – External Affairs and
Emergency Public Information.
12. Re-entry to evacuated areas will be allowed after the appropriate
agencies have determined that the threat no longer exists or when
appropriate controls have been put into place to protect those re-
entering the area.
C. Direction and Control
1. The Police Department or Fire District shall provide direction and
control over evacuation operations. The lead agency shall be
dependent upon the situation and will likely be coordinated between
the two departments. A Unified Command structure will be
instituted as appropriate.
Packet Page 270 of 564
Edmonds CEMP Support Annexes - 129 August 2015
2. The City of Edmonds will provide direction and control for the
movement of people within the City. Coordination with other
jurisdictions and agencies involved in the evacuation operation or
reception of evacuees shall be through the County Emergency
Operations Center.
3. Requests for resources through existing mutual aid agreements
and/or contracts through private contractors will be coordinated
through the City EOC. Resources beyond those will be requested
through the County EOC.
V. PROCEDURES
The following procedures, coupled with existing emergency mobilization
procedures located in the Edmonds Police Department’s Policy Manual, a
separately published document, shall be used to guide operations.
A. Incident Analysis
1. Command and Control
a) Identify incident and necessity for evacuation.
b) Notify City of Edmonds Disaster Coordinator and SnoCo
DEM Director.
c) Determine degree of mobilization necessary and appropriate
command structure.
d) Determine assignment of personnel.
2. Planning
a) Collect situation information from field and Incident
Commander.
b) Initiate coordination with adjacent jurisdictions.
c) Identify emergency response routes.
d) Identify special needs populations and develop strategies to
meet their needs.
e) Identify destination areas and needed shelters.
f) Begin long-range staffing determinations.
3. Operations
a) Conduct situation size-up and determine need for
evacuation.
Packet Page 271 of 564
Edmonds CEMP Support Annexes - 130 August 2015
b) Determine initial evacuation boundaries.
c) Determine number of dwellings / citizens to be evacuated.
d) Determine time available for evacuation.
e) Determine resources necessary to accomplish evacuation.
f) Provide Incident Commander with current situation report.
4. Logistics
a) Locate resources needed to conduct an evacuation or
support movement of citizens through jurisdiction.
b) Assess resource availability, to include staffing, material
assets and supplies.
5. Finance
Maintain accurate tracking, recording and documentation of all
associated costs and expenses incurred throughout all phases of
evacuation operations.
B. Warning
1. Command and Control
a) Assign a Public Information Officer to ensure that all
messaging is correct, timely, and consistent.
b) Determine appropriate notification methods. Refer to ESF 2
– Communications.
c) Review and re-evaluate on-going activities.
2. Planning
a) Identify areas and/or populations to be notified.
b) Assess communications infrastructure. Refer to ESF 2 –
Communications.
c) Determine timing of notifications.
d) Develop messaging appropriate to notification methods in
use.
3. Operations
a) Disseminate evacuation information.
b) Maintain record of addresses notified and/or special
conditions or needs.
c) Maintain record of evacuation refusals.
Packet Page 272 of 564
Edmonds CEMP Support Annexes - 131 August 2015
4. Logistics
a) Support communications efforts as appropriate.
5. Finance
Maintain accurate tracking, recording and documentation of all
associated costs and expenses incurred throughout all phases of
evacuation operations.
C. Preparation to Move
1. Command and Control
a) Approve prepared Incident Evacuation Plan.
b) Direct personnel to carry out evacuation activities.
c) Review and evaluate on-going activities.
2. Planning
a) Make final determination of evacuation area.
b) Assess transportation infrastructure. Refer to ESF 1 –
Transportation.
c) Identify destination areas and/or shelters. Refer to ESF 6 –
Mass Care, Emergency Assistance, Housing and Human
Services.
d) Identify suitable non-public shelter locations (i.e. hotels, etc.)
e) Establish evacuation routes and develop Incident Action
Plan (IAP).
f) Identify transfer points if needed.
g) Identify en-route support areas.
h) Prepare notification documentation system.
i) Begin return planning.
3. Operations
a) Request assistance to support operational activities.
b) Mark evacuation route(s).
c) Establish needed transfer points.
d) Identify and activate route control points.
e) Identify critical intersections and potential problem areas
along route(s).
f) Establish dedicated routes for emergency response
personnel and vehicles.
Packet Page 273 of 564
Edmonds CEMP Support Annexes - 132 August 2015
g) Initial activation of destination areas/shelters.
4. Logistics
a) Initiate resource tracking procedures.
b) Identify transportation resources available.
c) Procure needed resources for route marking/management.
d) Deploy traffic management, mass care and sheltering staff
and assets.
e) Coordinate with SnoCo DEM for additional resources as
needed.
5. Finance
Maintain accurate tracking, recording and documentation of all
associated costs and expenses incurred throughout all phases of
evacuation operations.
D. Movement and En-route Support
1. Command and Control
a) Direct personnel to carry out evacuation activities.
b) Review and re-evaluate on-going activities.
2. Planning
a) Continue incident data collection.
b) Prepare estimate of evacuation population size.
3. Operations
a) Monitor and manage traffic flow along evacuation route(s).
b) Fully staff transfer points.
c) Staff critical intersections.
d) Continue evacuation information dissemination.
e) Identify citizens requiring assistance.
f) Closely document evacuation process to avoid duplication of
effort and/or missed areas.
g) Maintain law enforcement presence in evacuated area(s)
and along routes.
h) Decontamination activities, if warranted by the event. Refer
to ESF 10 – Hazardous Materials.
Packet Page 274 of 564
Edmonds CEMP Support Annexes - 133 August 2015
4. Logistics
a) Coordinate deployment of transportation assets to assist
citizens without private transportation, and/or those in need
of para-transit support.
b) Provide supplies to en-route support areas.
c) Respond to resource requests as necessary.
d) Maintain resource tracking.
e) Coordinate with SnoCo DEM for additional resources as
needed.
5. Finance
Maintain accurate tracking, recording and documentation of all
associated costs and expenses incurred throughout all phases of
evacuation operations.
E. Reception and Support
1. Command and Control
a) Ensure Mass Care activities are initiated. Refer to ESF 6 –
Mass Care, Emergency Assistance, Housing and Human
Services.
b) Coordinate with SnoCo DEM to provide out-of-area shelters
and reception areas, if needed.
2. Planning
a) Identify number and type(s) of shelters needed.
b) Prepare estimate of resources needed in support of shelter
operations.
c) Refer to ESF 6 – Mass Care, Emergency Assistance,
Housing and Human Services.
3. Operations
a) Activation of shelters and/or support centers. Refer to ESF 6
– Mass Care, Emergency Assistance, Housing and Human
Services.
b) Provide current and accurate information updates to
evacuees.
c) Initiate identification, registration and tracking of evacuees
Packet Page 275 of 564
Edmonds CEMP Support Annexes - 134 August 2015
requiring shelter.
4. Logistics
a) Ensure adequate supply levels at shelters and reception
areas.
b) Respond to resource requests as necessary.
5. Finance
Maintain accurate tracking, recording and documentation of all
associated costs and expenses incurred throughout all phases of
evacuation operations.
F. Return
1. Command and Control
a) Determine safety of restricted areas.
b) Identify appropriate controls to manage re-entry.
2. Planning
a) Determine end of evacuation and timing to begin Return
phase.
b) Determine shelter closure schedule.
c) Identify transportation resources needed for Return phase.
d) Determine necessary staffing levels for Return operations.
3. Operations
a) Mark return route(s).
b) Inform evacuees of timing and method of return.
c) Provide transportation as needed and possible.
d) Monitor and manage traffic flow along return route(s).
e) Fully staff transfer points.
f) Staff critical intersections.
g) Deactivation of shelter operations.
4. Logistics
a) Identify and procure transportation resources needed for
return of evacuees.
b) Coordinate return of deactivated resources.
Packet Page 276 of 564
Edmonds CEMP Support Annexes - 135 August 2015
5. Finance
Maintain accurate tracking, recording and documentation of all
associated costs and expenses incurred throughout all phases of
evacuation operations.
VI. RESPONSIBILITIES
A. City of Edmonds Police Department and Snohomish County Fire District 1
1. Conduct rapid situation size-up to determine the need to evacuate.
2. Determine initial evacuation boundaries.
3. Obtain evacuation order from highest ranking official available at
the time of the event.
4. Coordinate the dissemination of evacuation orders and emergency
public information.
5. Request activation of the County Emergency Operations Center to
facilitate coordination of activities with outside agencies and
jurisdictions when appropriate.
6. Provide direction and control of evacuation operations.
7. Determine appropriate routes.
8. Provide perimeter control and security of evacuation zone.
9. Establish accountability procedure for all personnel.
10. Provide EOC with current and updated information as conditions
change, or as requested.
11. Determine appropriate and safe re-entry timing.
B. City of Edmonds Public Works Department
1. Assist with situation size-up as necessary and appropriate.
2. Assess transportation routes, identify alternate routes; and provide
temporary traffic control measures/devices and operations control
Packet Page 277 of 564
Edmonds CEMP Support Annexes - 136 August 2015
of traffic signals.
3. Remove debris and other obstacles from evacuation routes as
needed.
4. Coordinate use of City transportation resources when used to
transport evacuees during evacuation operations.
5. Provide other support as requested and appropriate.
C. City of Edmonds Community Services and Development Services
Departments
1. Provide support and assistance in evacuation efforts as
appropriate.
D. City of Edmonds Parks and Recreation Department
1. In the event of an evacuation of limited scope and/or duration,
coordinate mass care activities as described in Emergency Support
Function 6 – Mass Care, Emergency Assistance, Housing and
Human Services.
2. Provide support and assistance in evacuation efforts as
appropriate.
E. City of Edmonds Finance Department
1. Maintain accurate tracking, recording and documentation of all
expenses incurred throughout all phases of evacuation operations.
F. Snohomish County DEM
1. Activate County EOC to appropriate level.
2. Disseminate public information regarding evacuation through
appropriate sources.
3. Notify mass transit services to delay, postpone and/or re-direct
incoming traffic from the evacuation area.
4. Notify affected jurisdictions and coordinate evacuation activities as
appropriate.
Packet Page 278 of 564
Edmonds CEMP Support Annexes - 137 August 2015
5. Arrange for temporary sheltering and reception areas for
evacuations that relocate populations across jurisdictional
boundaries.
6. Coordinate outside transportation resources planned for use in an
evacuation.
7. Mobilize volunteer assets as appropriate.
Packet Page 279 of 564
Edmonds CEMP Support Annexes - 138 August 2015
COMMAND AND CONTROL
Evacuation Action Checklist
Incident Analysis
Identify incident and determine need for evacuation Time: __________
Notify Edmonds Disaster Coordinator and SnoCo DEM Director Time: __________
Determine necessary degree of mobilization __________
Determine command structure __________
Begin Assignment of personnel Time: __________
Warning
Assign Public Information Officer (PIO) Time: __________
Determine appropriate notification methods __________
(Refer to ESF 2 – Communications)
Approve and release notifications Time: __________
Review and evaluate on-going activities __________
Provide briefing to City Policy group Time: __________
Preparation to Move
Approve evacuation Incident Action Plan (IAP) Time: __________
Direct personnel to carry out evacuation activities Time: __________
Review and evaluate on-going activities __________
Movement and En-route Support
Review, amend and revise evacuation orders as necessary Time: __________
Notify relevant agencies/jurisdictions of changes Time: __________
Ensure Public Information notices are consistent and on-going __________
(Refer to ESF 15 – External Affairs and Emergency Public Information)
Review and evaluate on-going activities __________
Reception and Support
Ensure Mass Care activities are initiated Time: __________
(Refer to ESF 6 – Mass Care, Emergency Assistance, Housing and Human
Services)
Return
Determine safety of restricted areas Time: __________
Confirm approval to return Time: __________
Identify appropriate controls to manage re-entry Time: __________
Packet Page 280 of 564
Edmonds CEMP Support Annexes - 139 August 2015
PLANNING
Evacuation Action Checklist
Incident Analysis
Collect situation information from field personnel and Incident
Commander __________
Determine resources necessary to accomplish evacuation __________
Initiate coordination with adjacent jurisdictions Time: __________
Identify emergency response routes Time: __________
Identify special needs populations and develop strategies
to meet identified needs __________
Identify destination areas and needed shelters Time: __________
Begin long-range staffing determinations __________
Warning
Identify areas and/or populations to be notified __________
Assess communications infrastructure __________
(Refer to ESF 2 – Communications)
Determine timing of notifications __________
Develop messaging appropriate to notification methods in use Time: __________
Preparation to Move
Make final determination of evacuation area Time: __________
Assess transportation infrastructure __________
(Refer to ESF 1 – Transportation)
Establish evacuation route(s) and develop Incident Action Plan (IAP)Time: __________
Identify transfer points __________
Identify en-route support areas __________
Identify available transportation resources __________
Activate shelter planning __________
(Refer to ESF 6 – Mass Care, Emergency Assistance, Housing and Human
Services)
Prepare notification documentation system __________
Begin return planning __________
Movement and En-route Support
Continue incident data collection __________
Monitor and document evacuation progress __________
Prepare estimate of evacuation population size __________
(Continued on next page.)
Packet Page 281 of 564
Edmonds CEMP Support Annexes - 140 August 2015
Reception and Support
Prepare estimate of resources needed in support of shelter operations __________
(Refer to ESF 6 – Mass Care, Emergency Assistance, Housing and Human
Services)
Return
Determine end of evacuation and timing to begin Return phase Time: __________
Determine shelter closure schedule __________
Identify transportation resources needed for Return phase __________
Determine necessary staffing levels for Return operations __________
Packet Page 282 of 564
Edmonds CEMP Support Annexes - 141 August 2015
OPERATIONS
Evacuation Action Checklist
Incident Analysis
Conduct situation size-up and determine need for evacuation Time: __________
Determine initial evacuation boundaries Time: __________
Determine number of dwellings / citizens to be evacuated __________
Determine time available for evacuation operations __________
Provide Incident Commander with current situation report Time: __________
Warning
Disseminate evacuation information Time: __________
Maintain record of addresses notified __________
Document special conditions or needs to be addressed __________
Preparation to Move
Request assistance to support operational activities Time: __________
Establish communications between Operations Branches Time: __________
Mark evacuation route(s) Time: __________
Identify traffic management tactics to be used Time: __________
Establish needed transfer points Time: __________
Identify and activate route control points Time: __________
Identify critical intersections / possible problem areas __________
Establish dedicated emergency response routes __________
Activate destination areas/shelters Time: __________
Movement and En-route Support
Monitor and manage traffic flow along evacuation route(s) __________
Fully staff transfer points __________
Staff critical intersections __________
Continue evacuation information dissemination __________
Identify citizens requiring assistance __________
Maintain law enforcement presence in evacuated area(s) __________
and along routes
Quarantine and decontamination activities, if warranted by event __________
(Refer to ESF 10 – Hazardous Materials)
Request additional support resources as necessary Time: __________
Reception and Support
Activate shelters and/or support centers Time: __________
Provide current and accurate information to evacuees __________
Provide information on location of specialty shelters __________
Packet Page 283 of 564
Edmonds CEMP Support Annexes - 142 August 2015
Initiate identification, registration and tracking of evacuees __________
requiring shelter services
Determine level of site security necessary at activated shelters __________
Return
Mark return route(s) Time: __________
Inform evacuees of timing and method of return Time: __________
Provide transportation as needed and possible __________
Monitor and manage traffic flow along return route(s) __________
Fully staff transfer points __________
Staff critical intersections __________
Deactivate shelter operations Time: __________
Packet Page 284 of 564
Edmonds CEMP Support Annexes - 143 August 2015
LOGISTICS
Evacuation Action Checklist
Incident Analysis
Identify resources needed to conduct an evacuation or support __________
movement of citizens through jurisdiction
Assess resource availability, to include staffing, material assets __________
and supplies
Warning
Support communications efforts as appropriate __________
Preparation to Move
Initiate resource tracking procedures __________
Procure needed resources __________
Deploy traffic management, mass care and sheltering staff Time: __________
and assets
Movement and En-route Support
Coordinate deployment of transportation assets to assist citizens __________
without private transportation, and/or those needing para-transit
support
Identify accommodations for transport of luggage __________
Provide supplies to en-route support areas Time: __________
Respond to resource requests as necessary __________
Maintain resource tracking __________
Monitor availability of supplies for en-route support area(s) __________
Reception and Support
Ensure adequate supply levels at shelters and reception area(s) __________
Respond to resource requests as necessary __________
Return
Identify and procure transportation resources needed for return __________
of evacuees
Coordinate return of deactivated resources __________
Packet Page 285 of 564
Edmonds CEMP Support Annexes - 144 August 2015
Sample Evacuation Order
Attention!
An emergency situation exists at ___(location)___________________.
The __(jurisdiction)_________ fire/police department has issued the
following emergency evacuation order.
All persons within the area of ________________________________
are directed to evacuate immediately. Tie a towel or cloth to your front
door knob to indicate the premises are vacated. Police will secure the
evacuated area.
Bring the following supplies with you __________________________.
Use the following evacuation routes ___________________________.
Shelters are set up at _______________________.
School children will be evacuated by bus. Do not attempt to pick them
up at school.
If you require special assistance, call _______________.
Stay tuned to your television or radio station for further instructions and
information. DO NOT CALL 911.
Packet Page 286 of 564
Edmonds CEMP Support Annexes - 145 August 2015
ITEMS TO TAKE TO A SHELTER
Depending upon the situation, evacuees may be required to remain at shelters for
several hours to several days, or longer.
Take only essential items, and avoid bringing valuables (shelters are not
responsible for lost or stolen items).
Be sure to lock your home when you leave.
The following are supplies you may wish to take with you when you evacuate to a
shelter:
Essential items if you must leave immediately:
Emergency contact information (i.e. family members, insurance, etc.)
Change of clothing
Medications and medical supplies
Bottled water
Car and house keys
Items to take with advanced notice:
Essential items - plus
Extra clothing
Sleeping bag and/or bedding for each family member
Snacks and/or food for special dietary needs
Toiletry and hygiene supplies
First aid kit
Flashlight(s) w/ extra batteries
Books, games, cards, etc.
DO NOT bring the following items, as they will not be allowed in the shelter:
Alcohol or non-prescription drugs
Guns and/or other weapons
Pets
Packet Page 287 of 564
Edmonds CEMP Support Annexes - 146 August 2015
EVACUATING WITH YOUR PET
You are responsible for your pet in an emergency. Having a disaster kit for your
pet is essential. Depending upon the situation, pet shelters may be opened;
however, NO pets will be allowed in human shelters.
When evacuating with your pet, you will need the following to manage their care:
• Carrier or cage, including bedding
• Leash AND muzzle
• Immunization records and any required medications
• Food, water and water/food bowls
• Current photo and narrative description of pet (photo should show owner w/pet)
• Contact information for current veterinarian
• Toys (Must be washable)
Packet Page 288 of 564
Edmonds CEMP Support Annexes - 147 August 2015
SUPPORT ANNEX B
DAMAGE ASSESSMENT
PRIMARY AGENCIES: City of Edmonds Public Works Department
City of Edmonds Development Services Department
City of Edmonds Police Department
SUPPORT AGENCIES: Snohomish County Fire District 1
Snohomish County DEM
American Red Cross
WA State Emergency Operations Center
I. INTRODUCTION
A. Purpose
To provide guidelines for city-wide damage assessment activities in order
to establish response and resource allocation priorities; and determine
building and City infrastructure safety.
B. Scope
This Emergency Support Function is designed to provide guidance in the
coordination and execution of damage assessment activities within the
city. Damage assessment will be divided into three levels:
• Windshield Survey - a drive by assessment of overall damage to
determine resource allocation priorities during the response phase
of the emergency
• Preliminary Damage Assessment - an initial estimate of monetary
damage
• Safety Evaluation of Damaged Buildings - an assessment of
building safety carried out by trained staff utilizing Applied
Technology Council (ATC-20) Guidelines.
II. POLICIES
A. A preliminary damage assessment shall be carried out any time there is a
potential for a Presidential Declaration of a disaster or it is requested by
state or county officials. This information shall be provided to Snohomish
County DEM in order to support the Governor's disaster declaration to the
President.
Packet Page 289 of 564
Edmonds CEMP Support Annexes - 148 August 2015
B. The City shall provide support to local, state and federal officials in the
completion of Damage Survey Reports in order to expedite the availability
of Public and Individual Assistance Programs which provide support in the
overall recovery of the community.
III. SITUATION
Nearly any disaster can cause significant damage requiring a thorough
assessment of its impact on the City. It is essential that procedures are in place
that will expedite the damage assessment process in order to assist in the priority
allocation of resources and gain access to state and federal disaster recovery
funding.
IV. CONCEPT OF OPERATIONS
A. Specific information on Damage Assessment procedures can be found in
the City of Edmonds Damage Assessment Manual, a separately published
document.
B. The Public Works Department and Building Division shall be the lead
agencies for damage assessment activities within the city. The damage
assessment process will include staff from all City departments capable of
contributing to this effort and shall be carried out in a cooperative manner.
C. Damage assessment activities will normally be coordinated through the
Emergency Operations Center. The Planning Division shall be responsible
for compiling windshield survey damage assessment information as it is
reported to the Emergency Operations Center to aid response operations.
D. The Development Services Department will provide damage assessment
for City buildings and infrastructure. The Department will coordinate with
Facilities Maintenance to make minor repairs. Public Works Department
will be responsible for identifying needed repairs and/or coordinating the
relocation of City employees, if necessary. The Emergency Operations
Board, utilizing recommendations from staff, will prioritize repair activities
of City facilities. Priority will be given to critical and essential services.
E. The Public Works Department will coordinate damage assessment
information with utility services providers to facilitate priority repair
activities.
F. The Development Services and Public Works Departments will coordinate
Packet Page 290 of 564
Edmonds CEMP Support Annexes - 149 August 2015
activities with local, state and federal agencies to ensure the timely
completion of Damage Survey Reports and other documentation
necessary to obtain state and federal cost recovery assistance.
G. The Fire District, Police, and Public Works Departments shall carry out
windshield survey damage assessment according to established
procedures or as directed at the time of the emergency. Information shall
be reported to the Emergency Operations Center or other designated
location.
H. Evaluation of damaged buildings shall be coordinated by the Building
Official and be carried out by staff trained in the Applied Technology
Council (ATC-20) Procedures for Post-earthquake Safety Evaluation of
Buildings or other appropriate training based on the scope of the disaster.
This evaluation will normally take place after completion of the windshield
survey and in conjunction with preliminary damage assessment activities.
I. The American Red Cross utilizes a damage survey process in order to
determine the effect of the disaster on individual citizens and to evaluate
immediate human needs. This assessment can contribute to the overall
picture of damage status and should be coordinated when possible.
J. Structural engineers may be required for detailed evaluation of some City
buildings. When necessary this shall be coordinated by the Engineering
Division.
V. RESPONSIBILITIES
A. City of Edmonds Development Services Department
1. Coordinate city-wide damage assessment activities with all involved
departments and support agencies.
2. Develop damage assessment procedures in coordination with the
Fire District, Public Works and Police Departments and provide
training to appropriate City staff.
3. Provide training to appropriate staff in the Applied Technology
Council (ATC-20) Post-earthquake Safety Evaluation of Buildings.
4. Record damage assessment information and report to appropriate
local, state and federal agencies.
Packet Page 291 of 564
Edmonds CEMP Support Annexes - 150 August 2015
5. Prepare necessary documentation for cost recovery through state
and federal programs.
B. City of Edmonds Police Department
1. Provide staff and equipment as available, to carry out windshield
survey and provide information to the Emergency Operations
Center or other designated location.
2. Assist the Development Services Department in the development of
damage assessment procedures.
C. Snohomish County Fire District 1
1. Provide staff and equipment as available, to carry out windshield
survey and provide information to the Emergency Operations
Center or other designated location.
2. Assist the Development Services Department in the development of
damage assessment procedures.
D. City of Edmonds Public Works Department
1. Assist the Development Services Department in the development of
damage assessment procedures.
2. Provide staff to coordinate damage assessment information
reported to the Emergency Operations Center.
3. Provide staff and equipment to the Development Services
Department to support windshield survey activities.
4. Provide damage assessment for City utilities and infrastructure.
5. Make emergency temporary repairs to City facilities as necessary.
E. Snohomish County DEM
1. Gather damage assessment information from the City and report
information to appropriate county, state and federal agencies.
F. American Red Cross
1. Carry out damage survey activities in accordance with Red Cross
Packet Page 292 of 564
Edmonds CEMP Support Annexes - 151 August 2015
Procedures. Report information to the County Emergency
Operations Center.
G. All City Departments
1. Provide support as directed to the damage assessment process.
H. WA State Emergency Operations Center
1. Coordinate activities of Disaster Reservists in support of
Preliminary Damage Assessment mission.
Packet Page 293 of 564
Edmonds CEMP Support Annexes - 152 August 2015
SUPPORT ANNEX C
ANIMAL DISASTER PROTECTION PLAN
For ESCA Member Cities
PRIMARY AGENCIES: Progressive Animal Welfare Society (PAWS)
Washington State Animal Rescue Team (WASART)
SUPPORT AGENCIES: Emergency Services Coordinating Agency (ESCA)
ESCA Member Cities:
Brier Mill Creek
Edmonds Mountlake Terrace
Kenmore Mukilteo
Lake Forest Park Woodinville
Lynnwood Town of Woodway
Community Transit
Everett Transit
Sound Transit
Metro Transit
Washington Animal Response Management (WARM)
Red Cross of Snohomish County
Red Cross of King/Kitsap Counties
Local veterinary clinics, kennels, and animal boarding
facilities
Sarvey Wildlife Center
Packet Page 294 of 564
Edmonds CEMP Support Annexes - 153 August 2015
I. INTRODUCTION
A. SITUATION
Pets and livestock can become victims of disaster. Pets can be injured or
become separated from their owners, and livestock can be displaced or
threatened by emergency conditions. Recent experiences demonstrate
that disaster animal welfare plans are an essential component in overall
community emergency response and recovery planning.
B. PURPOSE
This document articulates how animal welfare will be coordinated, and is
the basis for development of supporting plans and procedures consistent
with state and national standards for dealing with animals in a disaster.
This procedure establishes a working structure for animal rescue,
evacuation, shelter, veterinary services, and mortality management during
disasters that occur within the boundaries of one or more of ESCA’s
member Cities. The plan is intended to assist volunteer organizations in
addressing needs of pets, livestock, poultry, horses and captive wildlife
during disasters.
C. AUTHORITIES AND REFERENCES
Comprehensive Emergency Management Plans
• Brier Comprehensive Emergency Management Plan
• Edmonds Comprehensive Emergency Management Plan
• Kenmore Comprehensive Emergency Management Plan
• Lake Forest Park Comprehensive Emergency Management Plan
• Lynnwood Comprehensive Emergency Management Plan
• Mill Creek Comprehensive Emergency Management Plan
• Mountlake Terrace Comprehensive Emergency Management Plan
• Mukilteo Comprehensive Emergency Management Plan
• Woodinville Comprehensive Emergency Management Plan
• Town of Woodway Comprehensive Emergency Management Plan
Washington State Comprehensive Emergency Management Plan,
Emergency Support Function (ESF) 11, Appendix A, Tab B – Washington
Animal Response Management Plan, March 2006.
RCW 38.52, Emergency Management
Packet Page 295 of 564
Edmonds CEMP Support Annexes - 154 August 2015
Federal Emergency Management Agency, Disaster Assistance Policy
DAP9523.19, Eligible Costs Related to Pet Evacuations and Sheltering,
dated October 24, 2007.a
National Pets Evacuation and Transportation Standards Act (H.R. 3858-
PETS)
Americans With Disabilities Act (ADA)
Inter-local Cooperation Agreement for the Emergency Services
Coordinating Agency (ESCA)
D. RELEVENT DEFINITIONS
Congregate household pet shelter – Any private or public facility that
provides refuge of rescued household pets and the household pets of
shelter clients in response to a declared major disaster or emergency
under federal regulations.b
Household pet – Any cat, dog, or other domesticated animal normally
maintained in or near the domicile of the owner or caregiver of the animal.
For the purpose of this plan, household pets do not include reptiles
(except turtles), amphibians, fish, insects/arachnids, farm animals, and
animals kept for racing purposes.
Service animal – In accordance with the Americans with Disabilities Act
(rev. July 2010): A dog or miniature horse trained to perform specific
tasks for a person with a sensory, emotional, mental or physical disability.
PAWS – Progressive Animal Welfare Society
• On a daily basis, PAWS operates an animal rescue, rehabilitation, and
adoption center for dogs and cats. During disaster, PAWS will take the
lead as the primary animal welfare coordinating group and will provide
animal shelter services.
• PAWS has a wildlife rescue and rehabilitation department that may be
utilized, to some degree, if captive wildlife are discovered during
animal rescue and shelter operations. Limited capability is available
to assist with captive exotic animals.
Sarvey Wildlife Center – Sarvey rescues and rehabilitates orphaned,
injured, and sick wild animals from the Puget Sound area. In the event
exotic or captive wildlife are discovered during animal rescue and shelter
a Always refer to the most current version before assuming eligibility for possible reimbursement. FEMA policies change frequently.
b Household pets are defined separately from horses or farm animals because of eligibility for the reimbursement of eligible costs in the event of a
federally declared emergency.
Packet Page 296 of 564
Edmonds CEMP Support Annexes - 155 August 2015
operations, Sarvey will be utilized as a backup resource and subject
matter expert.
WARM – Washington Animal Response Management – Established to
coordinate the response of State agencies in assisting local and volunteer
organizations to provide all animals affected by natural or technological
disasters. Activities include: emergency medical care; evacuation; rescue;
temporary confinement, shelter, food and water; and identification for
return to the owner.
WASART – Washington State Animal Rescue Team – WASART is a
volunteer organization that partners with government agencies and other
public and private organizations to rescue, transport and shelter animals in
a disaster or emergency. WASART will be the lead animal rescue agency.
II. CONCEPT OF OPERATIONS
A. These special procedures for dealing with animals are activated by ESCA
upon occurrence of an emergency or disaster as defined in Chapter 38.52,
Revised Code of Washington and at the request of one or more of ESCA’s
member Cities.
B. Animal rescue and shelter activities are coordinated through the ESCA
Emergency Operations Center (EOC) and will be addressed on a regional
basis.
C. The primary animal disaster shelter organization is PAWS. PAWS will be
activated by ESCA. Where possible, PAWS members will be registered in
advance as Emergency Workers under RCW .
D. When animal rescue activities are required, ESCA will activate WASART.
Where possible, WASART members will be registered in advance as
Emergency Workers under WAC 118-04.
• WASART will work in partnership with PAWS. WASART will be the
lead agency for: (a) animal search, rescue and recovery; and (b)
large animal sheltering (e.g., horses, camelids, etc.).
• WASART will support animal shelter operations as a secondary duty
according to needs and staffing availability.
E. Animal welfare response will provide for joint owner-pet rescue/evacuation
whenever possible without endangering human life.
F. Maximum attempt should be made to identify and establish animal
evacuation shelters in close proximity to human sheltering facilities.
Adjacent sheltering is the desired method.
Packet Page 297 of 564
Edmonds CEMP Support Annexes - 156 August 2015
G. Household pets in cages or carriers, or are under close control will be
allowed to use public transitc for movement to shelter facilities.
H. Those facilities that normally house multiple animals (animal hospitals,
boarding kennels, etc.) are encouraged to create evacuation plans for
such animals consistent with this procedure.
I. Coordination of animal disaster operations will be conducted according to
the standards and practices of the National Incident Management System
(NIMS) and the Incident Command System (ICS).
J. According to updated FEMA policy, domesticated animals (not kept for
commercial purposes) can travel in commercial carriers and be housed in
temporary facilities. Wherever possible, household pets will be housed
adjacent to established public shelters.
K. Local governments that conduct animal shelter operations or receive
evacuees from areas declared a major disaster or an emergencyd may
seek reimbursement for eligible pet rescue, sheltering and evacuation-
support costs. This only applies to household pets and service animals.
Contractors and private nonprofit (PNP) organizations can be reimbursed
through the ESCA Member Cities provided that the contractor or PNP is
performing operations on behalf of the ESCA Member Cities and ESCA
according to this plan, and all eligible expenses are documented.
(Reference FEMA Disaster Assistance Policy DAP9523.19 - October 24,
2007).
L. It is foreseeable that some emergency operations may take priority over
the rescue of animals under this plan. Although every effort will be made
to include animals in all emergency response strategy, circumstances may
prevent the full implementation of that strategy.
M. Ineligibility of horses and farm animals for FEMA reimbursement in a
major disaster will not impact the purpose of this plan to carry out the
rescue and evacuation of such animals to the extent possible with the
resources available.
III. RESPONSIBILITIES
A. ESCA
ESCA activates and coordinates animal disaster welfare operations
through the Emergency Operations Center upon request of the member
City(s). ESCA’s responsibilities include:
c According to current transit policies.
d Robert T. Stafford Disaster Relief and Assistance Act, as amended.
Packet Page 298 of 564
Edmonds CEMP Support Annexes - 157 August 2015
1. Overall coordination of disaster mitigation, preparedness, response,
and recovery in accordance with the law and the Comprehensive
Emergency Management Plan.
2. Provide overall coordination of emergency/disaster animal welfare
response activities.
3. Activate the provisions of this plan.
4. Provide assistance where possible through the resource management
capabilities of the Emergency Operations Center.
B. PAWS
PAWS is the recognized alliance of volunteers responsible for executing
this animal emergency plan. Responsibilities include:
1. Develop and maintain lists of resources, including trained volunteers
and animal professionals able to provide assistance in a disaster.
2. Maintain a trained volunteer base in accordance with PAWS’ internal
policies and procedures.
3. Coordinate just-in-time, on-site training for animal professionals and
trained animal shelter/rescue volunteers as needed during an event.
4. Provide safety and awareness briefings as needed to first responders
and disaster volunteers.
5. Conduct domestic animal shelter activities using PAWS personnel and
coordinating the efforts of additional groups as available and
appropriate.
6. Conduct limited exotic animal rescue and shelter activities as
resources allow. (See Appendix 8 for additional details.) Assist in
identifying and contacting appropriate exotic animal partners to aid in
rescue and shelter efforts.
7. Develop and release public information prior to the emergency or
disaster on disaster planning and safety for animals.
8. Notify and mobilize all PAWS volunteers and partnering animal groups
in time of emergency.
9. Assist ESCA and the Red Cross with identification of suitable facilities
for animal shelters and other animal rescue and shelter resources.
10. Be prepared to make reports to the Emergency Operations Center
(EOC) on animal emergency response activities.
11. Participate, through the appropriate EOC representative, in
development of animal rescue and shelter provisions in the Incident
Action Plans (IAPs) prepared for each operational period.
12. Assist with the annual review and revision of plans and procedures for
dealing with animals in an emergency or disaster.
13. Prepare after action reports for ESCA.
Packet Page 299 of 564
Edmonds CEMP Support Annexes - 158 August 2015
C. WASART
WASART is the lead agency for animal rescue operations. They will
coordinate activities with PAWS and other regional partners as
appropriate. Responsibilities include:
1. Develop and maintain lists of resources, including trained volunteers
and animal professionals able to provide assistance in a disaster.
2. Maintain a trained volunteer base in accordance with WASART’s
internal policies and procedures.
3. Coordinate just-in-time, on-site training for animal professionals and
trained animal shelter/rescue volunteers as needed during an event.
4. Provide safety and awareness briefings as needed to first responders
and disaster volunteers.
5. Conduct large-animal shelter activities using WASART personnel and
coordinating the efforts of additional groups as available and
appropriate.
6. Conduct limited exotic animal rescue and shelter activities as
resources allow. Assist in identifying and contacting appropriate exotic
animal partners to aid in rescue and shelter efforts.
7. Develop and release public information prior to the emergency or
disaster on disaster planning and safety for animals.
8. Notify and mobilize all WASART volunteers and partnering animal
groups in time of emergency.
9. Assist ESCA with identification of suitable facilities for large-animal
shelters and other animal rescue and shelter resources.
10. Be prepared to make reports to the Emergency Operations Center
(EOC) on animal emergency response activities.
11. Participate, through the appropriate EOC representative, in
development of animal rescue and shelter provisions in the Incident
Action Plans (IAPs) prepared for each operational period.
12. Assist with the annual review and revision of plans and procedures for
dealing with animals in an emergency or disaster.
13. Prepare after action reports for ESCA.
D. Each City’s Department of Animal Control will carry out its statutory
responsibilities in coordination with PAWS and WASART to the extent
possible.
E. Washington Animal Response Management (WARM) assistance may be
requested in the event local resources are overwhelmed.
IV. PROCEDURES
A. PAWS and WASART are independent agencies. As such, each is
responsible for maintaining a database of local resources to be used for
Packet Page 300 of 564
Edmonds CEMP Support Annexes - 159 August 2015
animal disaster response. Resources will include, but not be limited to,
trained and professionally qualified volunteers, contact information,
available supplies, equipment, facilities and transportation.
B. Animal disaster response volunteers from each agency will participate in
animal handling skills and animal behavior training and disaster exercises
as a part of disaster readiness. It is highly recommended that all
volunteers also are “NIMS compliant” with Incident Command System
courses, ICS-100 and ICS-700.
C. PAWS will coordinate with the Red Cross chapters (King/Kitsap and
Snohomish Counties) to develop co-location (adjacent facilities) of
human/household pet shelters to the extent possible.
D. ESCA will activate the provisions of this plan by contacting PAWS and
WASART leadership. Activate means notification of the PAWS and
WASART personnel, implementation of domestic animal evacuation and
shelter operations, and conducting other animal rescue activities as
Emergency Workers as defined in WAC 118-04.
E. A designated representative from PAWS and/or WASART will coordinate
with the EOC Public Information Officer (or Joint Information Center) to
ensure dissemination of information on the location and availability of
animal shelters and animal care resources. The joint public information
process will be used for reunification of animals with their owners.
F. The Seattle/King Health Department or Snohomish Health District and
Washington State Department of Agriculture will assist with identification,
prevention and control of animal diseases that may impact public and
animal health.
G. PAWS and WASART, in cooperation with Animal Control, will coordinate
with the EOC for removal and disposal of animal carcasses consistent
with internal policies and requirements of the Seattle/King Health
Department or Snohomish Health District and Washington State
Department of Agriculture.
V. TRAINING AND EXERCISING
A. ESCA is responsible for including scenarios utilizing the Animal Plan in
training and exercise opportunities as appropriate.
B. PAWS and WASART are responsible for:
1. Providing all basic skills trainings to their volunteers, including --
• Animal handling and care
• Documentation and accountability procedures
Packet Page 301 of 564
Edmonds CEMP Support Annexes - 160 August 2015
• Animal shelter set-up, management, demobilization and
associated activities
• Search and rescue (as appropriate)
2. Participating in Animal Plan training and exercise opportunities as
appropriate.
VI. PLAN MAINTENANCE
A. ESCA will have responsibility for maintaining the basic Animal Plan.
B. PAWS and WASART will have responsibility for formulating and updating
plans, procedures, and guidelines for their respective organizations.
Copies of disaster-related documents will be provided to ESCA for
inclusion in this document as Appendices.
C. Review and update cycle:
1. The basic Animal Plan will be reviewed every five years.
2. PAWS and WASART Appendices will be reviewed every five years by
the respective agencies.
3. Interim reviews and updates may occur at any time during the cycle as
necessary. The five-year cycle will then start from the date of the most
current review and update.
Packet Page 302 of 564
Edmonds CEMP Support Annexes - 161 August 2015
Appendix 1
Contact Information for Participating Agencies
Progressive Animal Welfare Society (PAWS)
15305 4th Avenue W
Lynnwood, WA 98037
Main phone: 425/787-2500
Emergency Contact: Kay Joubert
Emergency phone: 425/412-4029
KJoubert@paws.org
WA State Animal Rescue Team (WASART)
Emergency Contact: Gretchen McCallum
Phone: 360/886-7276
animalresponseteam@gmail.com
Sarvey Wildlife Center
Emergency Contact: Leslie Henry
Phone: 360/435-4817
Leslie@sarveywildlife.org
Packet Page 303 of 564
Edmonds CEMP Support Annexes - 162 August 2015
Appendix 2 – Potential Pet Sheltering Sites
Develop in coordination with Red Cross and other partners
Bitter Lake Community Center
13035 Linden Avenue N
Seattle, WA
206/684-7524
Storage space within Bitter Lake Shelter House
Completely enclosed
~800 sq. ft.
Concrete structure and floor
Single-room
Bathrooms located in Community Center
Water - yes
Heat - no
Electricity - yes
Large roll-up door that opens onto wading pool
Magnuson Hangar 30
7400 Sand Point Way NE
Seattle, WA
206/684-4946
20,000 sq. ft. space with 32 ft ceiling
Concrete and steel construction
Not earthquake retro-fitted
Water – yes, hose spigot in adjoining room
Heat -no
Electricity -yes
Not considered for human sheltering
Large truck door
Packet Page 304 of 564
Edmonds CEMP Support Annexes - 163 August 2015
Appendix 3 – Pet Sheltering Supplies
The City of Everett has a regional go-kit with necessary supplies for a setting up of a
temporary small animal housing area. The go-kit contains enough supplies to care for
20 animals and can be requested through the Everett Office of Emergency
Management. Included in this kit are:
• 20 large wire crates
• Bleach – 96 oz.
• Bucket – 5 gallon with lid
• Cat litter trays
• Duct tape
• Food bowls – 40 stainless steel, 1 quart
• Leather gloves
• Muzzles – 1 package various sizes
• Nylon leashes – 20
• Hospital name band material
• Spray bottles - 3
• Watering can - 1
• Zip ties – 7.5”
Upon opening of the shelter, the following supplies will need to be acquired:
• Pet Shelter Forms
• Cat Food
• Dog Food
• Cat Litter (preferably wood pellets or pelletized horse bedding)
• Plastic (6 mil) for walls and floor
• Plastic sheet protectors
• Rubber runners
• Microchip scanners
• Camera with printer
• Printouts of all forms
Packet Page 305 of 564
Edmonds CEMP Support Annexes - 164 August 2015
• Hoses
• Towels/Blankets
• Paper towels
• First Aid Kits
• Hand Sanitizer
Packet Page 306 of 564
Edmonds CEMP Support Annexes - 165 August 2015
Appendix 4 – Pre-Disaster Outreach and Public Education
The following pages are suggestions for pre-disaster efforts at outreach and public
education.
Packet Page 307 of 564
Edmonds CEMP Support Annexes - 166 August 2015
Pets and Disasters Fact Sheet
What can I do to protect my pets BEFORE a disaster?
A disaster can hit your area with or without notice, that’s why it is very important for a
family to be prepared in case such an event should occur. The best preparation is a
family household disaster plan, and this plan should always include your pets. There are
several things a family should do before a disaster approaches to better prepare.
Contact your veterinarian, local animal shelter, humane society, or emergency
management office for information on caring for pets in an emergency. Find out if there
are any shelters set-up to take pets in an emergency, but keep in mind that shelters are
usually full even without a disaster so any space would be very limited. Check with your
veterinarian to see if he can board your pet or if there is someone he could recommend
in the area or town you have designated as your family evacuation site. If you decide
to take your pet with you, have a carrier that allows your pet to stand up and turn around
inside. Put familiar items such as the pet’s normal bedding and favorite toys inside.
Train your pets to become comfortable with the carrier beforehand by using it as its
“room”, and feeding it in the carrier and placing a favorite toy or blanket inside. Keep a
list of hotels that will accept pets, and be sure to ask if there are any size restrictions.
When assembling emergency supplies for the household, include items for pets such as
extra food, kitty litter, bowls, and extra medication. Pets should have their vaccines
current, and records kept in a plastic, sealable bag. If your pet gets separated from you,
proper identification may be its only way home, so make sure it has a properly fitted
collar or harness that includes current license, identification and rabies tags. Microchips
are also a good way for your pet to be identified, but not every shelter and clinic has
access to a microchip scanner, and not all scanners read all chips.
What can I do to protect my pets DURING a disaster?
During a disaster bring your pets inside immediately. Animals have instincts about
severe weather changes and may isolate themselves or try to escape, especially if they
are afraid. Never leave a pet outside or tied up during a storm. You may need to
separate dogs and cats, because even if your pets normally get along, the anxiety of an
emergency situation can cause pets to act unreasonably. If you decide to evacuate
during a disaster, plan to take your pets with you. Do not leave your pet at home during
a disaster because you never know what will happen when you are gone, or when you
will be able to get back. Remember to take your pet’s medical records and medicines
with your emergency supplies. If you have a bird, make sure the bird is caged and you
have a thin cloth or sheet to cover the cage. The stress of moving and the anxiety of
the disaster may stress the bird, and being in a covered cage may help alleviate some
of this. Not all evacuation facilities will accept animals, so it would be better for you to
evacuate early with your pet to a previously identified safe location than to wait until it is
Packet Page 308 of 564
Edmonds CEMP Support Annexes - 167 August 2015
too late and you have to be evacuated by emergency personnel that may not allow you
to bring your animal.
What can I do to protect my pets AFTER a disaster?
Just because a disaster has passed, do not assume that the worst is over. Do not let
your pets loose in the house or yard until you have had the chance to examine
everything very carefully. It is possible, especially with flooding, that there may be
damage to your home which could hurt you or your pet. Carefully walk the yard to verify
the fence is intact and there is nothing new and dangerous in the yard, particularly
snakes or other dangerous animals which may have come into your yard during
flooding.
If your pet was placed in a shelter or boarding facility, contact them as soon as possible
to verify your pet is fine and let them know when you will be able to come get it. If your
pet is lost during a disaster, check with your area shelters every day since strays only
have to be held for 3 days before being considered unclaimed and put to sleep.
Don’t be surprised if your pet is more anxious or fearful after a disaster. Familiar scents
and landmarks may look different and your pet may become confused and lost.
Normally quiet and friendly pets may become defensive and aggressive. It’s very
important to observe your pets closely after a disaster, and give them extra attention, if
necessary. They won’t understand everything that just happened, and will look to you
to provide some stability and comfort.
Where can I get more information on protecting my pet during a disaster?
Your veterinarian is always your best source of information. You can also visit the
following websites for more information.
www.countypets.com
www.bt.cdc.gov/planning
www.fema.gov
Source of information:
Federal Emergency Management Agency (FEMA)
Packet Page 309 of 564
Edmonds CEMP Support Annexes - 168 August 2015
Checklist for Disaster Preparedness for Pets
You should already have these for the people in your household:
Written family disaster plan
Disaster preparedness kit
Add the following items for your pet(s):
Crate and bedding
Food, water, manual can opener and dishes
Plastic garbage bags, paper towels, newspaper (when shredded, can be used as
cat litter), disinfectant
Collar, leash, harnesses
Muzzles, gauze rolls
Identification tags
Current medical and vaccination records
Extra bottles of daily medications or copies of prescriptions with current
expiration date
Current photos
Pet comfort items: towels, blankets, toys
A list of hotels, motels and boarding kennels that accept pets
Detailed instructions for animal care and rescue workers
First aid kit
Flashlights, batteries
Copies of health certificates
Out-of-STATE telephone contact
Packet Page 310 of 564
Edmonds CEMP Support Annexes - 169 August 2015
What to Expect if you register your pet into a Pet Shelter
In a disaster, Pet Shelters will be co-located with Human Shelters whenever possible.
In this situation, owners are expected to take care of their pets. Below is a checklist of
what to bring and what to expect:
What to bring to the Pet Shelter:
• Your pet on a leash or in a carrier
• Food for your animal
• Any medications your animal is taking
• Vaccination records
• A picture of yourself with your pet
• Your ID
What happens next?
• The Pet Shelter will have housing for your pet (usually a crate).
• You are expected to feed and water your pet every day.
• You are expected to clean up after your pet every day.
• If applicable, you are expected to exercise your pet every day.
• You are expected to check on your pet twice per day.
• Your pet must be on a leash or in its crate at all times.
• You will be given an ID band to ensure that you and your pet belong together.
This ensures the safety of your pet.
What if I can’t care for my pet or need help?
• If you need help caring for your pet in the Pet Shelter, volunteers are available.
• If you are completely unable to care for your pet and cannot keep ownership of
your pet, you should surrender your pet to the local Animal Shelter or other
rescue organization.
• If you do not care for your pet within the Pet Shelter for 48 hours or more, your
pet will be considered abandoned and removed to the local Animal Shelter.
Packet Page 311 of 564
Edmonds CEMP Support Annexes - 170 August 2015
Household Pet Exposure to Potential Toxins/Chemicals Fact Sheet
What are toxins and chemicals?
Chemicals are substances produced to be used as a tool to get something done.
Toxins are a type of chemical produced by a living organism such as bacteria. Animals
can have bad reactions to chemicals or toxins because they are too strong for the
animal’s body.
How can my pet be exposed?
Pets are at higher risk of being exposed to toxins or chemicals because they tend to get
into things and places their owners cannot, particularly when the animals are outside. In
addition, animals are more likely to eat or drink things found out in the environment.
Some examples include: swimming in contaminated water, licking antifreeze left on a
driveway, or running through a recently fertilized field. A pet does not have to live near
a chemical plant to be exposed to toxins or chemicals. Anywhere there are chemicals is
a perfect place for your pet to be exposed.
What signs may be present if my pet is exposed to a toxin or chemical?
The typical signs associated with a reaction to a chemical or toxin can be as different as
the chemicals themselves, but some common signs include: vomiting, diarrhea,
coughing up food or blood, irritated skin, drooling, behavioral changes, seizures,
shaking and weakness. In other cases, the owner might not see any change in the
animal’s behavior, but can smell the chemical or see it on its coat. If your pet is
showing these signs or you suspect it may have come in contact with a chemical or
toxin, contact your veterinarian immediately or call Washington Poison Center at (800)
222-1222.
What can I do if my pet is exposed to a toxin or chemical?
The first thing you should do if you think your pet is exposed to a toxin or chemical is to
keep it from getting exposed more by cleaning it up or removing the animal from the
area. If it is on the animal’s skin, don’t let it run around and spread the chemical to
other things. Next, try to find out what your animal was exposed to, which will help
determine the appropriate treatments. If your pet is showing signs of being sick, it
should be seen by a veterinarian as soon as possible.
If the animal has something on its skin or coat and is not acting sick, decontamination or
removal can be done at home with water and mild, plain dish soap. Other cleaning
products are too strong and can make the pet sick or damage the skin.
Packet Page 312 of 564
Edmonds CEMP Support Annexes - 171 August 2015
When washing your animal, be sure to protect yourself by wearing gloves and a long
sleeve shirt and pants. Wash your pet several times and rinse very well. Dry the
animal with a rag or towel and then dispose of these items to prevent further spread. If
you feel you were exposed to the chemical or toxin during the bath, remove your clothes
quickly and wash your entire body with soap and water. If there is a major chemical
event in your area, there will likely not be decontamination areas for pets, and owners
will be asked to wash their pets at home.
How can I prevent my pet from being exposed to a chemical or toxin?
The safest way to control and protect your pet from being exposed to toxins or
chemicals is by controlling their activities. In King and Snohomish Counties, animals
must be confined or on a leash at all times (except for off-leash parks). By keeping your
pets away from areas that may contain toxins or chemicals, you are reducing their risk
of being exposed. Household chemicals should also be stored away and out of the
reach of pets. If you have a small chemical spill around your house, do not allow
anyone near it and clean it up as quickly as possible. If the chemical spill is too large or
is making you sick, call 911.
Where can I get more information if my pet is exposed to a toxin?
Your best source for pet information is always your veterinarian. If you
have additional questions, please contact him/her.
Packet Page 313 of 564
Edmonds CEMP Support Annexes - 172 August 2015
Recommendations for Pet Owners in Hotels
• Clean-up pet urine and waste immediately.
• Do not keep pet urine or waste in your hotel room.
• Clean your pet’s living area daily.
• Notify Housekeeping when a major clean-up is needed.
• After cleaning-up after your pet, wash your hands.
• Keep your pet on a leash or in a carrier inside and outside of the
hotel.
• Make sure your pet has food and fresh water.
• If your pet has been in floodwaters, bath him or her with a non-
irritating oil-stripping shampoo labeled for pets. If you are unsure
what to use, contact a veterinarian.
• If your hotel allows you to keep your pet in the room while you are not
present, keep your pet in a locked carrier.
• If you suspect that your pet is ill, consult a veterinarian.
• Have you lost a pet? If you or someone you know needs to be
reunited with their pet, contact Seattle Animal Shelter or your local
animal control organization.
Packet Page 314 of 564
Edmonds CEMP Support Annexes - 173 August 2015
Bite Prevention
Pets that were evacuated are likely under stress because they are away from their
home and familiar surroundings. Sometimes stressed animals act differently than they
normally would. Even though you love your pet, it is important to be cautious during
these times.
To Prevent Animal Bites:
• Be careful when new people approach your pet.
• Do not approach unknown animals.
• Loud noises and fast movements can be scary, so approach all animals calmly and
quietly.
• Keep your pet on a leash or in a carrier, especially in unfamiliar surroundings.
• Keep your animal’s rabies vaccine information in an accessible location in case
someone does get bit.
If you are bitten:
• Immediately wash the wound with soap and water.
• Consult a physician.
• Report the bite to Seattle Animal Shelter or your local animal control agency.
Packet Page 315 of 564
Edmonds CEMP Support Annexes - 174 August 2015
Pet Owner’s Prescription for Health
Pets that were evacuated may have been exposed to contaminated water or other
harmful substances. Being away from home and in unfamiliar surroundings may make
them more susceptible to infections. The following are some recommendations to help
keep them healthy and to prevent you from getting sick as well.
1. Bathe your pet if it has been exposed to flood waters.
2. Wash your hands after cleaning-up after your pet.
3. Watch your pet closely for any of the following signs:
a. Vomiting/diarrhea
b. Skin/ear infections
c. Conjunctivitis
4. If you suspect that your pet is ill, consult a veterinarian.
Packet Page 316 of 564
Edmonds CEMP Appendices - 175 August 2015
APPENDIX 1
ESF RESPONSIBILITY MATRIX
Packet Page 317 of 564
Edmonds CEMP Appendices - 176 August 2015
APPENDIX 2
AUTHORITIES AND REFERENCES
This Appendix is a compilation of references used in the completion of this version of
the City of Edmonds’s Comprehensive Emergency Management Plan. References
include City, State and Federal codes and regulations as well as plans and widely used
standards.
CODES AND REGULATIONS:
City of Edmonds
Ordinance 2224
Municipal Code 6.60
Washington State
RCW 35.33.081, Emergency Expenditures – Non-debatable Emergencies
RCW 35.33.101, Emergency Warrants
RCW 35A.38, Emergency Services
RCW 38.52, Emergency Management
RCW 38.52.070, Local Organization and Joint Local Organizations Authorized
RCW 39.34, Interlocal Cooperation Act
RCW 42.12, Vacancies
RCW 42.14, Continuity of Government
RCW 43.43, Washington State Patrol – State Fire Service Mobilization Plan
RCW 47.68.380, Search and Rescue
RCW 49.60, Laws Against Discrimination
WAC 118-04, Emergency Worker Program
WAC 118-30, Local Emergency Management/Services Organizations, Plans and
Programs
WAC 296-62, General Occupational Health Standards
Federal
Public Law 93-288, The Robert T. Stafford Disaster Relief and Emergency Assistance
Act, as amended
Public Law 99-499, Superfund Amendments and Reauthorization Act (SARA) of 1986,
Title III, Emergency Planning and Community Right to Know
Homeland Security Presidential Directive 1 - 8
Homeland Security Act of 2002
Americans With Disabilities Act
National Pets Evacuation and Transportation Standards Act of 2006 (H.R. 3858-PETS)
Packet Page 318 of 564
Edmonds CEMP Appendices - 177 August 2015
PLANS
City of Edmonds Emergency Operations Center Procedures
City of Edmonds Damage Assessment Manual
City of Edmonds Disaster Recovery Plan
Edmonds City Departments Standard Operating Procedures
Snohomish County Regional Mitigation Plan
Snohomish County Law Enforcement Mobilization Plan
Snohomish County Hazard Identification and Vulnerability Assessment
Snohomish County Comprehensive Emergency Management Plan
Snohomish Health District Strategic National Stockpile Activation Plan
Snohomish Health District Pandemic Flu Response Plan
Washington State Comprehensive Emergency Response Plan
National Response Framework
Packet Page 319 of 564
CITY OF EDMONDS
DISASTER RECOVERY PLAN
ANNEX C – DEBRIS MANAGEMENT
TABLE OF CONTENTS
Section I. Introduction
Authority Page - 1
Alignment with Other Plans Page - 2
Limitations Page - 2
Section II. Situation and Assumptions
Characteristics of Possible Events Page - 3
Debris Estimation Page - 4
Low-Volume Event Page - 5
Medium-Volume Event Page - 6
High-Volume Event Page - 6
Section III. Organization and Responsibilities
City Departments Page - 7
Staffing Organizational Chart Page - 9
External Agencies Page - 9
Contractors and Vendors Page - 11
Additional Resources Page - 12
Current Resources Page - 12
Emergency Communications Plan Page - 16
Health & Safety Plan and Procedures Page - 16
Packet Page 320 of 564
Section IV. Concept of Operations
NIMS Integration Page - 17
Debris Management Response Levels Page - 17
Debris Management Operational Phases Page - 18
Section V. Debris Collection and Hauling Operations
Damage Assessment and Debris Estimates Page - 21
Debris Clearance and Removal Guidelines Page - 21
Debris Removal Priorities Page - 22
Debris Operations Page - 22
Neighborhood Collection Sites Page - 26
Debris Reuse, Reduction and Disposal Methods Page - 28
Section VI. Contracted Resources
Existing Solid Waste Contracts Page - 31
Contract Debris Management Resource Needs Page - 31
Emergency Contracting / Procurement Procedures Page - 31
Section VII. Private Property Demolition and Debris Removal
Debris Removal and Demolition Permitting & Procedures Page - 33
Special Considerations Page - 36
Eligibility of Private Property Demolition and Debris Removal Costs Page - 36
Section VIII. Public Information
Public Information Officer Page - 39
Communication and Public Education Strategy Prior to an Incident Page - 39
Public Information Strategy During an Incident Page - 40
Packet Page 321 of 564
Section IX. Training and Exercise Page - 43
Section X. Plan Maintenance Page - 44
Appendices:
A: Maps of City and Priority Routes / Facilities
B: Staffing Assignment Maps
C: Text of MOU with Snohomish County Public Works Solid Waste Division
D: City of Edmonds Health and Safety Plan
E: Additional Resources
F: Neighborhood Collection Sites
G: List of Pre-Qualified Contractors
H: Debris Management Operations Forms
Packet Page 322 of 564
This page intentionally left blank.
Packet Page 323 of 564
I. INTRODUCTION
A. INTRODUCTION
The City of Edmonds recognizes that natural and human-caused disasters have the potential
to create debris that can disrupt the quality of life for its citizens, and complicate disaster
response and recovery operations following such disasters. This Annex has been developed
to provide the framework for City government and other entities to clear and remove debris
generated during a public emergency or disaster occurring within the limits of the City of
Edmonds. This Annex focuses on the activities likely to be required during an emergency or
disaster, without regard to the type or cause of the event; and unifies the efforts of public and
private organizations for a comprehensive and effective approach to:
• Provide organizational structure, guidance, and standardized guidelines for the
clearance, removal, and disposal of debris caused by a major debris-generating event;
• Establish the most efficient and cost effective methods to resolve disaster debris
removal and disposal issues;
• Implement and coordinate private sector debris removal and disposal contracts to
maximize clean-up efficiencies;
• Expedite debris removal and disposal efforts that provide visible signs of recovery
designed to mitigate threats to the health, safety, and welfare of Edmonds residents;
and
• Coordinate partner relationships through communications and pre-planning with local,
State, and Federal agencies that have debris management responsibilities.
B. AUTHORITY
The City of Edmonds Disaster Debris Management Annex is developed under the authority of
the following local, state, and federal statutes and regulations.
1. Revised Code of Washington 38.52.070; 35.33.081; 35.33.101; and 70.95
2. Washington Administrative Codes 118-30; 173-350-040; 173-350-310; 173-350-320;
and 296-62-41011
3. U.S. Codes 5121-5202 Disaster Relief Act of 1974, as amended, 2251-2303 Federal
Civil Defense Act of 1950, as amended, 2301-2303 Improved Civil Defense 1980
4. Homeland Security Presidential Directive 5
5. Edmonds City Ordinance 2224
6. Edmonds Municipal Code Chapter 1.02.035
7. Edmonds Municipal Code Chapter 6.60
Packet Page 324 of 564
C. ALIGNMENT WITH OTHER PLANS
1. City Plans
The City of Edmonds Disaster Debris Management Annex is a supplement to the City’s
Disaster Recovery Plan; and is designed to work in concert with the City’s
Comprehensive Emergency Management Plan, and The North King and South
Snohomish Counties Regional Mitigation Plan for Natural Hazards.
2. Snohomish County Debris Plan
This Annex aligns with and implements the Snohomish County Public Works Solid
Waste Division Disaster Debris Management Plan, a separately published document.
3. Washington State Comprehensive Emergency Management Plan
This Annex aligns with the Washington State Comprehensive Emergency Management
Plan (CEMP), Emergency Support Function (ESF) #3: Public Works, and ESF #14:
Long-Term Community Recovery, by providing operational guidance to organize
disaster debris operations at the local level.
4. National Response Framework
The National Response Framework (NRF) provides the concept of operations for
Federal response to events. This Annex aligns with ESF #3: Public Works, and ESF
#14: Long-Term Community Recovery, by providing for the coordination of disaster
debris operations through all levels of government using the National Incident
Command System (NIMS) organizational structure.
D. LIMITATIONS
The information and procedures included in this Annex have been prepared utilizing the best
information and planning assumptions available at the time of preparation. There is no
guarantee implied by this Annex that in major emergencies and disaster situations a perfect
response to all incidents will be practical or possible. As Edmonds resources may be
overwhelmed and essential systems may be dysfunctional, the City can only endeavor to make
every reasonable effort to respond and recover based on the situation, information, and
resources available at the time the situation occurs.
Packet Page 325 of 564
II. SITUATION AND ASSUMPTIONS
A. SITUATION AND ASSUMPTIONS
This Annex takes an all-hazards approach to identifying and responding to hazards that may
pose a threat to the City of Edmonds. Natural hazards such as wind, rain and snow storms,
earthquake, flood, landslide, tidal surge, create a variety of debris that includes, but is not
limited to: trees and other vegetative organic matter, construction materials, appliances,
personal property, mud and sediment. Technological, or man-made, disasters such as
common and private carrier accident, civil disturbance, terrorist activity, conventional and
nuclear war, explosion, structural collapse, hazardous material incident, and major fire, may
result in a large number of casualties and heavy damage to buildings and basic infrastructure.
Law enforcement constraints due to terrorist or criminal activity may hinder normal debris
operations, and contaminated debris may require special handling. These factors will
necessitate close coordination with local and Federal law enforcement, health and
environmental officials. See Table 1-1: Characteristics of Possible Events, below.
Table 1-1: Characteristics of Possible Events
Incident Debris Characteristics Regional
Probability
Debris
Impact
Wind Storm Primarily vegetative waste; may also include
construction/demolition materials from damaged or
destroyed structures, some municipal solid waste
from damaged structures. Extended power outages
may result in large amounts of putrescible waste
from private homes and grocery stores.
High Moderate
Flooding Construction/demolition waste, municipal solid
waste, and problem waste, including sediment,
vegetative waste, animal carcasses, and hazardous
materials deposited on public and private property.
Much of the debris from flooding events may be
considered problem waste because of
contamination from wastewater, petroleum, or other
substances.
High Moderate
Earthquake Primarily construction/demolition waste and
municipal solid waste intermixed with problem
waste.
Moderate High
Urban, Wild-
land, and Wild-
land/Urban
Interface Fires
Burned vegetative waste, burned construction
demolition waste, and problem waste, including ash
and charred wood waste and ash-covered items. /
Moderate Low
Ice Storms Primarily vegetative waste from broken tree limbs
and branches. May also include
construction/demolition waste and putrescible waste
from extended power outages.
Moderate Moderate
Volcano Primarily ash, mud, and ash-covered items. May
also include construction/demolition waste.
Low High
Tsunami or
Seiche
Sediment and construction/demolition waste
possibly contaminated with problem waste,
including wastewater, petroleum, or other
Low Moderate
Packet Page 326 of 564
Incident Debris Characteristics Regional
Probability
Debris
Impact
hazardous materials.
Landslides Sediments and construction/demolition waste
possibly contaminated with problem waste.
High High
Plant Disease Variable amounts of vegetative debris that might
require special handling as problem waste with
specific disposal characteristics.
Low Moderate
Animal Disease Variable amounts of putrescible waste that might
require special handling as problem waste with
specific disposal instructions.
Low Moderate
Nuclear,
Chemical, or
Biological
Accident
Various amounts of contaminated soil, water,
construction/demolition waste, and/or municipal
solid waste that would require special handling as
problem waste with specific disposal instructions.
Moderate Moderate
Nuclear,
Chemical, or
Biological
Attack
Various amounts of contaminated soil, water,
construction/demolition waste, and/or municipal
solid waste that would require special handling as
problem waste with specific disposal instructions.
High High
The quantity and type of debris generated, its location, and the size of the area over which it is
dispersed will have a direct impact on the type of removal and disposal methods utilized, the
associated costs, and the speed with which the problem can be addressed. Further, the
quantity and type of debris generated from any particular disaster will be a function of the
location and kind of event experienced, as well as its magnitude, duration and intensity.
For planning purposes, this Annex assumes that the magnitude of the event exceeds the
capacities of the City of Edmonds. This Annex addresses the clearing, removal, and disposal
of debris generated by the above hazards based on the following assumptions:
• A major natural or man-made disaster that requires the removal of debris from public or
private lands and waters could occur at any time;
• The amount of debris resulting from a major natural disaster will exceed the removal
and disposal capabilities of the City of Edmonds;
• The City of Edmonds will coordinate with the Snohomish County Public Works Solid
Waste Division and the City’s certificated waste haulers for additional resources to
assist in the debris removal, reduction, and disposal processes;
• The City of Edmonds may contract for additional resources to assist in the debris
removal, reduction, and disposal capabilities.
B. DEBRIS ESTIMATION
This Annex addresses the potential impacts resulting from three different debris scenarios: a
low-volume event, such as damaging winds or winter storm; a medium-volume event, such as
urban flooding or severe storm; and a high-volume-event, such as an earthquake or man-
Packet Page 327 of 564
made incident.
The United States Army Corps of Engineers (USACE) has developed the following guidelines
for use in debris estimating:
• Treat debris piles as a cube, not a cone, when estimating
• 15 trees, 8 inches in diameter = 40 cubic yards (cy) on average
• One acre of debris, 3.33 yards high = 16,117 cy
The Federal Emergency Management Agency (FEMA) also provides debris estimation
guidance in its publication, Debris Management Guide (FEMA Publication 325). The volume of
debris from a residential structure can be estimated using the following formula:
L’ x W’ x S x 0.20 x VCM = cubic yards (cy) of debris
L = building length in feet
W = building width in feet
S = height of building expressed in stories
VCM = Vegetative Cover Multiplier. This is a measure of the amount of debris
within a sub-division or neighborhood. The descriptions and multipliers are:
Light (1.1 multiplier) – includes new home developments where more ground is
visible than trees; these areas have sparse canopy cover.
Medium (1.3 multiplier) – generally has a uniform pattern of open space and tree
canopy cover; this is the most common description for vegetative cover.
Heavy (1.5 multiplier) – generally found in mature neighborhoods and woodlots
where the ground or houses cannot be seen due to the tree canopy cover.
Personal property within an average single-family residence is estimated based on these
averages:
• Homes without a basement, 25 – 30 cy
• Homes with a basement, 45 – 50 cy
For example, the debris generated by the destruction of a one-story, single-family, 2000 sq ft
home in Edmonds would be calculated this way:
40’ x 50’ x 1 x 0.20 x 1.3 = 520cy of debris for the structure
+ 25cy of personal property
545cy of total debris for this property
1. Low-Volume Event
Characteristics of low-volume events include, but are not limited to:
Packet Page 328 of 564
• Result from high winds, winter storms, or limited urban flooding
• Have a minimal impact on critical resources and infrastructure
• May not receive a Presidential Disaster Declaration
• Debris composition is primarily vegetative with some construction/demolition
• Debris may include white goods and putrescible materials, depending upon the
size of the event and secondary impacts, such as extended power outage
Historically, high winds and winter storms occur one to five times a year in Edmonds.
2. Medium-Volume Event
Characteristics of medium-volume events include, but are not limited to:
• Result from high winds, winter storms, snow/ice, or urban flooding with landslides
• Have a measurable impact on critical resources and infrastructure
• May not immediately receive a Presidential Disaster Declaration
• Debris composition is primarily vegetative with some construction/demolition
• Debris may include white goods and putrescible materials, depending upon the
size of the event and secondary impacts, such as extended power outage
• Debris may also include soil, gravel, rock and asphalt
Historically, urban-flooding with landslides occur one or more times per year in
Edmonds. These events can generate a medium to high amount of debris.
3. High-Volume Event
Characteristics of high-volume events include, but are not limited to:
• Result from severe storms, earthquake or man-made event
• Have significant impacts to critical resources and infrastructure, including utilities,
transportation and communications
• Immediately receives a Presidential Disaster Declaration
• Debris composition may include vegetative, construction/demolition, white goods
and putrescible materials, household hazardous waste, vessels and vehicles
• Debris may also include soil, gravel, rock and asphalt
A high-volume event is considered an infrequent event, occurring once every 100 or
more years. While a large magnitude earthquake has a medium probability of
impacting the City, it carries the greatest probability of generating large amounts of
debris, potentially causing partial damage or a total loss to numerous single and
multi-family homes in Edmonds.
Packet Page 329 of 564
III. ORGANIZATION and RESPONSIBILITIES
A. CITY OF EDMONDS DEPARTMENTS
Debris Management operations will be managed as part of the City of Edmonds overall
recovery processes. The specific Debris Management responsibilities of primary and
support agencies are as follows:
1. Public Works Department
The Public Works Department’s responsibilities include, but are not limited to:
• Designation of a Debris Manager to oversee debris clearance and removal
operations for the City
• Provide a liaison to the City Emergency Operations Center (EOC) to
coordinate debris management related requests
• Coordinate all assignments of City staff involved in debris management
operations
• Provide personnel and equipment to assist in clearing priority
transportation routes and access to critical facilities
• Provide personnel and equipment to remove and dispose of debris
• Assess availability and suitability of Neighborhood Collection Sites
• Open and ready for operations appropriate NCS
• Track and document data required for completion of Public Assistance
program Project Worksheets
• Establish and maintain necessary contracts with solid waste haulers and
other contractors, for provision of personnel, equipment and assistance
with debris removal operations
• Provide timely Situation Reports and updates to the Snohomish County
Debris Management Center and SnoCo DEM EOC
• Assist in the development of Public Information messaging
2. Development Services Department
The Development Services Department’s responsibilities include, but are not
limited to:
• Provide GIS mapping in support of on-going debris management activities
• Provide expertise and recommendation for reconstruction and demolition
Packet Page 330 of 564
3. Administrative Services / Finance
The Administrative Services / Finance Department’s responsibilities include, but
are not limited to:
• Compile debris related costs and maintain financial records of the event
• Coordinate emergency purchasing and contracting
• Receive contractor invoices and review for compliance against the
contract
• Assist Public Works Department with completion of Project Worksheets
• Coordinate with Snohomish County Public Works for City debris activities
which use the County Debris Plan to manage debris generated within the
City of Edmonds
4. Police Department
The Police Department’s responsibilities include, but are not limited to:
• Assist in monitoring illegal dumping activities
• Assist in monitoring Neighborhood Collection sites to ensure compliance
with local traffic regulations, if necessary
• Coordinate traffic control at all loading sites and at entrances to and from
Neighborhood Collection sites
• Document debris management activities and costs
5. Parks and Recreation
The Park and Recreation Department’s responsibilities include, but are not
limited to:
• Assist Public Works Department with debris removal and recycling efforts
• Provide light and heavy equipment, generators, personnel, and supplies
• Provide barricades for routing of traffic around and through Neighborhood
Collection sites
• Document debris management activities and costs
6. City of Edmonds Attorney’s Office
The City Attorney’s responsibilities include, but are not limited to:
• Review contracts
• Identify City liability issues
• Manage all legal matters associated with debris operations
• Assist, as needed, with private property actions necessary to ensure
public health and safety
Packet Page 331 of 564
B. DEBRIS MANAGEMENT ORGANIZATION
Immediately following a disaster event, the City of Edmonds will establish a Disaster
Debris Management Team. The Debris Management Team will help facilitate the
successful coordination of debris operations. The Public Works Director, or designee,
will identify the appropriate staff members for the Team.
Director of Public Works & Utilities ___
↓ ↓
↓ ↓ → → Recycling Coordinator
↓ ↓
Water & Sewer Division Manager Street & Storm Division Manager
↓ ↓ ↓ ↓
↓ ↓ ↓ ↓
Water Division Lead Worker Sewer Division Lead Worker Street Division Lead Worker Storm Division Lead Worker
C. EXTERNAL AGENCIES
1. Snohomish County Fire District #1
The City of Edmonds contracts with Snohomish County Fire District #1 for the
provision of fire and EMS services. The Fire District’s Debris Management
responsibilities include, but are not limited to:
• Respond to fire and other emergencies at Neighborhood Collection sites
• Respond to hazardous materials incidents
• Assist in the distribution of emergency public information
• Document debris management activities and costs
2. Snohomish County Department of Emergency Management
• Coordinate additional resource needs through the SnoCo EOC
• Assist with the development and dissemination of public information
• Provide guidance as requested throughout the Public Assistance process
3. Snohomish County Public Works Solid Waste Division
It is anticipated that requests for county debris management assistance will be
coordinated through the county EOC, with SnoCo DEM providing the lead
coordination with the DMC. (per Snohomish County Disaster Debris
Management Plan, Section 2.2.3)
4. Snohomish County Health District
• Inspect and approve location of additional Neighborhood Collection sites
not identified and approved with this Plan
Packet Page 332 of 564
• Assist in monitoring collection site operations and close-out activities
• Enforce existing regulations regarding vector control and proper disposal
of garbage
5. Puget Sound Clean Air Agency (PSCAA)
The PSCAA is responsible for regulating air quality in Puget Sound. During
debris-causing disasters, the PSCAA bans outdoor burning of debris and
provides guidance on the removal and disposal of asbestos contaminated debris.
They also provide information the City will need to contract with an industrial
hygiene consultant to provide air quality monitoring for debris operations that
create large quantities of dust and other particulates.
6. Washington State Emergency Operations Center (WA EMD)
• Facilitate Governor’s Disaster Declarations
• Receive and respond to resource requests
• Administer Public and Individual Assistance programs, and act as Liaison
to FEMA on behalf of Cities and Counties
7. Washington State Department of Ecology (WA DOE)
The Department of Ecology is responsible for the protection of Washington’s
environment, providing statewide regulation of municipal solid waste and
hazardous waste. During a disaster, WA DOE may provide support and
guidance to local health districts and solid waster agencies regarding debris
operations. WA DOE may also issue permits for debris activities.
8. Washington State General Administration (WA GA)
As the primary State agency tasked under Emergency Support Function (ESF)
#3: Public Works of the WA State Comprehensive Emergency Operations Plan,
WA GA coordinates logistical and engineering support for State facilities. During
a debris-causing event, WA GA may provide resources to local requests
coordinated through the WA State Emergency Operations Center.
9. Washington State National Guard
The Washington National Guard may provide equipment, personnel, and
technical assistance to protect the State of Washington. During debris-causing
events, National Guard resources provide security for equipment staging areas,
debris sorting and reduction sites, limited electrical power, sheltering, traffic
control, and aerial reconnaissance. National Guard resources must be
requested through the WA State Emergency Operations Center, and are
available only after local resources have been exhausted.
Packet Page 333 of 564
10. US Army Corps of Engineers (USACE)
The USACE is the lead Federal agency for ESF #3: Public Works and
Engineering, of the National Response Framework. During a Presidentially
declared disaster, the USACE may provide technical assistance to local
responders for debris removal operations. The USACE also has contract
resources available to support local debris management operations.
11. Environmental Protection Agency (EPA)
EPA may provide technical assistance and guidance on collection, reduction and
disposal of contaminated debris and other hazardous materials during debris
operations. EPA also has contract resources available to assist with collection,
management, and disposal of hazardous materials.
12. United States Coast Guard (USCG)
As designated in the Ports and Waterways Safety Act, the USCG is responsible
for keeping waterways safe and open. While there is no specific language
stating that USCG is responsible for debris removal from navigable waterways,
the USCG has been tasked in the past to assist in waterway and marine
transportation system recovery.
13. Federal Emergency Management Agency (FEMA)
FEMA is the Federal agency tasked with coordination of the emergency
management functions of the Federal government. In catastrophic disasters,
FEMA may provide direct Federal assistance to support the performance of local,
tribal and state debris management activities and operations. Following a
Presidential declaration, FEMA may use its mission authority to task other
Federal agencies, such as USACE and EPA, with debris clearance. FEMA also
administers the Public Assistance program.
D. CONTRACTORS and VENDORS
The City of Edmonds may elect to use contractors and service vendors to augment
local resources in support of City debris management operations.
1. Solid Waste Collection Companies
Solid waste collection companies are private entities that provide daily municipal
solid waste service. During disaster events, solid waste service providers remain
responsible for the collection and transportation of municipal solid waste. Sound
Packet Page 334 of 564
Disposal and Republic Services of Lynnwood (formerly Allied Waste Services)
provide daily municipal solid waste service to the City of Edmonds. These
haulers will provide assistance to the City in the removal and transportation of
disaster debris in addition to their regular solid waste collections. Details on the
additional services to be provided by these companies can be found in Section VI
– Contracted Resources of this document.
2. Debris Management Contractors
Debris management contractors provide additional resources to assist with
debris clearance, removal, separation, and disposal during debris-generating
events. These contractors can be put under contract prior to an incident to
ensure efficient response during and after an event. Federal agencies, such as
the US Army Corps of Engineers (USACE) and US Environmental Protection
Agency (EPA), may also have contract resources available to assist with debris
management operations.
3. Debris Monitoring Contractors
Debris monitoring contractors provide oversight and documentation of debris
management operations. This can include supervising other contractors,
documenting debris clearance and disposal operations for potential
reimbursement, and operations of neighborhood collection sites.
Appendix G: Pre-Qualified Contractors, provides a list of contractors that can be
used to support debris management operations.
E. ADDITIONAL RESOURCES
Additional resources may be available from neighboring jurisdictions and county
departments. Resource requests beyond existing mutual aid and inter-local
agreements shall be coordinated through SnoCo DEM. These requests for assistance
include, but are not limited to, the state and Federal assets listed in sub-section C:
External Agencies above. Requests for state and/or Federal assets must be
coordinated through SnoCo DEM.
F. CURRENT RESOURCES
1. Staff
Debris operations staff members are responsible for directing debris operations
during and after an event. The number and type of staff needed to complete
debris operations will be dependant upon the scope and magnitude of the
disaster. Debris operations staff will likely be comprised of City of Edmonds full-
Packet Page 335 of 564
time personnel, personnel from neighboring jurisdictions, and/or contractors.
Some support roles may be filled by volunteer Registered Emergency Workers.
During an incident, staff may be needed to assume one or more roles as
described below. The Public Works Director will be responsible for appointing
appropriate staff to fulfill these roles.
• Debris Removal Manager – The Debris Removal Manager coordinates all
debris removal activities related to an incident. Activities include
communication among other members of the Debris Management Team,
communication of project status activity and reporting, and dissemination
and implementation of policy directives to debris removal personnel.
• Debris Collection Supervisor – The Debris Collection Supervisor oversees
collection activities prior to debris arrival at the disposal site, and
coordinates debris routing, staffing and field reporting activities.
• Debris Site Supervisor – The Debris Site Supervisor manages one or
more Neighborhood Collection Sites and is responsible for overseeing
waste separation and environmental protection concerns, as well as
completing required reporting documentation.
• Finance, Administration and Logistical Staff – These positions track time
for personnel, equipment, and incident costs. These positions also assist
with contracting and purchasing resources, completing documentation
required for reimbursement of expenses, and coordinates the de-
mobilization of resources.
Additional specialized staff may be needed to act as technical specialists during
all phases of a debris-generating event. These include the following:
• Debris Management Subject Matter Expert (SME) – A Debris
Management SME provides information and guidance to command staff
working in the operations and planning sections.
• Quality Assurance Personnel – Quality Assurance Personnel ensure the
debris operations are cost effective. Possible duties include, but are not
limited to, monitoring the type and amount of debris during collection,
sorting, reduction, and disposal.
• Structural Engineer – A Structural Engineer oversees, inspects, and
assesses impacted structures and makes appropriate recommendations
on building condemnation and demolition.
• Legal Staff – The City of Edmonds Attorney’s Office will conduct reviews
and manages all legal matters in the debris management planning
process. In addition to advising the debris management planning staff, the
City Attorney’s Office may also perform the following tasks:
o Development of Memorandums of Understanding with adjacent
jurisdictions
o Contract review
o Right-of-entry permitting
Packet Page 336 of 564
o Community liability
o Indemnification
o Condemnation of buildings
o Land acquisition for Neighborhood Collection Sites
o Site closure / restoration and insurance
• Public Information Officer (PIO) – The Mayor will assign appropriate staff
to function as the City’s PIO for debris operations. The PIO shall
coordinate with Debris Operations staff and PIOs of other involved
agencies to provide timely and accurate information to the public
regarding debris removal activities and schedules.
2. Equipment
During an incident, equipment such as trucks, rubber tire loaders, graders,
chippers, chain saws, small cranes, bulldozers and backhoes may be needed to
complete debris clearance and removal operations. The City of Edmonds will
endeavor to work cooperatively with Sound Disposal and Republic Services of
Lynnwood (formerly Allied Waste Services) and other vendors to provide for the
needed equipment. Equipment needs are dependant upon the scope and
magnitude of the incident and will be identified at the time of the incident.
Appendix E: Additional Resources includes a list of City of Edmonds equipment
available for debris operations.
3. Technology
Geographic Information System (GIS) mapping and modeling can be used to
estimate debris volumes and distributions; plan debris clearance operations; and
identify debris clearance priorities. The City of Edmonds has the capability to
provide GIS mapping and modeling. Snohomish County GIS staff are also
available to assist with GIS.
4. Contract Resources
During an incident it may be necessary to contract with other resource providers
to augment the City of Edmonds debris management staff and equipment.
These resources can be used to assist with specific tasks such as debris
clearance or collection site management. Contractors cannot be awarded pre-
disaster / stand-by contracts with mobilization or unit costs that are significantly
higher than what they could be if the contract were awarded post-disaster.
Section VI, Contracted Resources, provides instructions for contracting additional
resources prior to and during an incident. Appendix G: Pre-Qualified
Contractors, provides a list of standby and pre-qualified contract resources
available for debris operations.
5. Mutual Aid and Inter-local Agreements
Packet Page 337 of 564
The City of Edmonds has a variety of agreements in place to assist with the
provision of staff, equipment, and other resources during an incident.
Agreements applicable to a debris incident include:
• WA Public Works Emergency Response Mutual Aid Agreement – This is a
voluntary agreement which provides Public Works equipment and staff to
signatories upon request following a local and/or state proclamation of
emergency.
• Emergency Management Assistance Compact – Upon declaration of a
state of emergency made by the governor, resources may be requested
through the WA State Emergency Operations Center. This is a voluntary,
mutual aid agreement between states which may provide all types of
resources. Requests for EMAC resources shall be coordinated through
SnoCo DEM.
• WA State Fire Mobilization Plan – This plan provides firefighting personnel
and equipment necessary to manage fires, disasters or other large-scale
incidents. Resource requests are made through SnoCo DEM to the WA
State Emergency Operations Center. This agreement in no way replaces
local mutual aid.
6. Disposal Facilities
During a debris-generating event, it may be necessary to utilize a variety of
resources to dispose of different types of debris. A limited number of regional
disposal facilities exist. The amount and type of debris each facility accepts may
change based on the size and severity of the incident; and will be determined by
the Snohomish County Debris Management Team. The County has developed a
system of identified sites; and will be responsible for titrating the event generated
debris into the rail/barge system.
Each Neighborhood Collection Site will collect Household Hazardous Waste.
The County Solid Waste Division will be responsible for consolidating event
generated HHW at the Cathcart facility to ensure it is accounted for as
specifically event related material.
7. Recycling and Composting Facilities
During a debris-generating event, it may be necessary to utilize a variety of
resources to recycle, compost, or otherwise reduce different types of debris.
These resources provide an alternative to divert waste from landfills and may
provide additional economic and environmental benefits. The amount and type
of debris each facility accepts may change based on the size and severity of the
incident. These facilities include:
• Cedar Grove Composting – 3620 36th Place NE, Everett. This facility
Packet Page 338 of 564
accepts green waste suitable for composting.
• Fruhling Sand and Topsoil – 1010 228th Street SW, Bothell. This facility
accepts green waste suitable for composting.
• Pacific Topsoil – 7500 NE 175th Street, Kenmore. This facility accepts
green waste suitable for composting.
• CleanScapes – 7201 E Marginal Way S, Seattle. This facility accepts
construction and demolition (CDL) debris.
Use of these facilities as debris management sites or final disposition of disaster
debris will be coordinated by the Snohomish County Solid Waste Debris
Management Coordinator (DMC).
G. EMERGENCY COMMUNICATIONS PLAN
Communications within the City of Edmonds and with other external agencies during
a debris-causing event shall be managed according to Emergency Support Function
2 – Telecommunications, Information Systems and Warning of the City of Edmonds
Comprehensive Emergency Management Plan.
H. HEALTH and SAFETY
Debris operations involve the use of heavy equipment to move and process various
types of debris. Many of these actions can pose safety hazards to emergency
response and recovery personnel as well as the public. In addition to those safety
hazards, exposure to certain types of debris, such as building materials that contain
asbestos and mixed debris that contains hazardous materials, can pose potential
health risks to emergency workers.
All debris operations shall be done in compliance with the health and safety
requirements found in the City of Edmonds Citywide Accident Prevention Program.
A copy of this Program will be included as Appendix D of this Annex. Currently the
draft of the Program is pending final approval. The procedures in the Accident
Prevention Program enable the City of Edmonds and their contractors to avoid
accidents during debris recovery operations and to protect workers from exposure to
hazardous materials. The health and safety strategy establishes minimum safety
standards for the agency and contractor personnel to follow. In addition, the strategy
provides emergency workers with information on how to identify hazardous
conditions and specific guidelines on the appropriate and proper use of personal
protective equipment (PPE).
To facilitate compliance, the health and safety strategy specifies how the safety
information will be disseminated to all Edmonds emergency/temporary employees
and contractors, and how compliance with minimum safety standards will be
monitored. The strategy also includes specific corrective actions to be taken if
Packet Page 339 of 564
workers do not comply with the minimum safety standards.
Packet Page 340 of 564
IV. CONCEPT OF OPERATIONS
A. NIMS INTEGRATION
The National Incident Management System (NIMS) is mandated by Homeland
Security Presidential Directive – 5, and provides a consistent, nationwide approach
for Federal, State, local and tribal governments, the private sector and non-
governmental organizations to effectively and efficiently prepare for, respond to and
recover from domestic incidents, regardless of cause, size or complexity.
To provide for interoperability and compatibility among Federal, State, local and
tribal capabilities, the NIMS includes a core set of principles and terminology.
It is the policy of the City of Edmonds that all disaster related Debris Management
activities will be conducted in accordance with NIMS.
B. DEBRIS MANAGEMENT RESPONSE LEVELS
Response to debris-generating events is categorized into three (3) levels. The
required level of response will be established by the Incident Commander or Debris
Manager, and is triggered by the geographic scope and impact of an actual or
anticipated incident.
1. Level One: Routine Operations
A Level One incident corresponds to day-to-day emergencies, requiring minimal
coordination and assistance. These include incidents such as small landslides,
minor flooding or a single building collapse. The situation can be efficiently and
effectively supported with existing resources and there is no need to proclaim a
local emergency.
2. Level Two: Medium Impact Disaster
A Level Two incident requires more than routine coordination and assistance;
and generally involves more than one jurisdiction. These include incidents such
as moderate earthquakes, minor or moderate flooding in multiple locations, and
winter storms with snow, ice, or high winds. The situation may require mutual aid
or contract resources; and may be necessary to proclaim a local emergency.
3. Level Three: High Impact Disaster
Level Three incidents are incidents that require a high degree of coordination and
generally involve State and Federal assistance. These include incidents such as
large earthquakes, severe or wide-spread flooding, or severe winter storms. In
most cases, a local emergency will be proclaimed.
Packet Page 341 of 564
C. DEBRIS MANAGEMENT OPERATIONAL PHASES
Response to debris management events are characterized by the three (3) phases
described below. These phases may overlap based on the specifics of the incident.
1. Increased Readiness
The City of Edmonds will move to the increased readiness phase when a natural
or human-caused incident capable of creating disaster debris threatens the
region. During this time, staff will complete the following tasks:
• Review and update plans, standard operating procedures, generic
contracts, and checklists relating to debris removal, storage, reduction,
and disposal operations.
• Alert City departments that have debris removal responsibilities to ensure
that personnel, facilities, and equipment are ready and available for
emergency use.
• If necessary, relocate personnel and resources to safety and stage in
areas where they can be effectively mobilized.
• Review potential local and regional debris collection sites that may be
used in the response and recovery phases in the context of the current
threat or event.
• Begin communication with Snohomish County Solid Waste Debris
Management Coordinator (DMC) regarding their expected activation level,
and anticipated City needs.
• Begin public information messaging regarding debris removal and
collection.
• Review resource listing of private contractors who may assist in debris
removal operations. Make necessary arrangements to ensure their
availability in the event of the disaster.
2. Response
Debris management response operations are designed to address immediate or
short-term effects of a debris causing incident. Prior to deployment, staff will be
briefed on the debris removal plan and all safety issues concerning it, to include
issuing any personal protective equipment that may be needed. During the
response phase, staff will initiate the following tasks:
• Activate debris management plan and coordinate with damage
assessment team.
• Begin documenting costs.
• Begin debris clearance from transportation routes, based on identified
debris removal priorities.
• Coordinate and track resources.
Packet Page 342 of 564
• Establish priorities regarding allocation and use of available resources.
• Identify need for and activate neighborhood collection sites if necessary.
• Coordinate with Sound Disposal and Republic Services of Lynnwood
(formerly Allied Waste Services) for curbside collection and/or removal of
debris from neighborhood sites.
• Confirm location(s) of regional debris management sites with Snohomish
County Solid Waste DMC.
• Address any legal, environmental, and/or health issues relating to the
debris removal process.
• Continue to provide public information messaging through City PIO and
SnoCo DEM.
3. Recovery
Debris management operations are designed to return the community to
normalcy following a debris-generating event. During the recovery phase, staff
will initiate the following tasks:
• Continue to collect, store, reduce, and dispose of debris in a cost-
effective and environmentally responsible manner.
• Continue to document all associated costs.
• Upon completion of the debris removal mission, close-out debris sorting
and reduction sites by developing and implementing the necessary site
restoration actions.
• Coordinate project worksheet completion with Snohomish County Solid
Waste DMC.
• Perform necessary audits of operation and submit claim for Federal
assistance.
Packet Page 343 of 564
V. DEBRIS COLLECTION and HAULING OPERATIONS
A. DAMAGE ASSESSMENT and DEBRIS ESTIMATES
Damage assessment is the systematic process of gathering preliminary estimates of
disaster debris quantities and composition; damage costs; and general descriptions
of the locale, type, and severity of damage sustained by both the public and private
sectors. Initial damage assessments are usually completed within 36 hours of an
incident by local, state, Federal, and volunteer organizations and provide an
indication of the loss and recovery needs. The initial damage assessment is the
basis for determining the level of state and Federal assistance needed, as well as
the types of assistance necessary for recovery. The assessment may take longer
depending upon the City of Edmonds’ or the Region’s ability to respond to life,
safety, and property concerns.
The damage assessment should accomplish all of the following:
• Estimate the quantity and types of debris
• Estimate damage costs
• Determine impact on critical facilities
• Identify impact on residential and commercial areas
• Identify additional resources needed for response and recovery
1. Damage Assessment Operations
The City of Edmonds will follow damage assessment procedures as described in
Support Annex A: Damage Assessment of the City’s Comprehensive
Emergency Management Plan.
2. FEMA Preliminary Damage Assessment
A Preliminary Damage Assessment shall be carried out any time there is a
potential for a Presidential Declaration of a disaster; or if it is requested by
Snohomish County or state officials.
B. DEBRIS CLEARANCE and REMOVAL GUIDELINES
The City of Edmonds has developed the following guidance for prioritizing debris
removal:
• Life Safety
• Situation Stabilization
• Property Protection
• Economic Stability and Environmental Protection
Packet Page 344 of 564
These guidelines will dictate planning, response, and recovery during disaster
debris-generating events.
C. DEBRIS REMOVAL PRIORITIES
The City of Edmonds has developed the following priorities for debris clearance.
Specific incident factors, such as crime scene preservation and accident
investigation, may require a delay in the clearing of debris until approval is obtained
from law enforcement officials.
• Clear Lifelines and Emergency Access Routes – Lifelines are those routes
that provide access for emergency responders, alternate and evacuation
routes, and damage assessment routes. Lifelines also include potential
staging areas, shelter access and other community resources which support
emergency response. The City of Edmonds will coordinate with WA DOT and
neighboring cities to identify priorities for clearing transportation access
routes.
• Clear Access to Critical Facilities and Infrastructure – These vital assets,
systems, and networks include hospitals, fire and police stations, dispatch
centers, and emergency operation centers, as well as cellular and land-line
telephone services, utilities, water and sanitation facilities.
• Clear Major Freeways or Arterial Routes – Freeways and arterial routes are
portions of the public transportation system that are needed to aid in
response and recovery operations. They may or may not have been cleared
as an emergency access route.
• Clear Areas Necessary for Movement of Goods and Services / Economic
Restoration – These are routes necessary for the effective transportation of
goods and services throughout the region, but are not included in one of the
preceding categories. Included here are access to warehouses, airports,
seaports, and major business districts.
• Clear Minor Arterial Routes – These routes typically receive moderate traffic
flows.
• Clear Local Routes – Residential neighborhoods.
Appendix A: City and Priority Routes and Facilities provides a listing and map
of debris clearance priorities, including lifeline routes and critical
infrastructure.
D. DEBRIS OPERATIONS
Debris clearance and removal operations will focus predominately on public roads
and other critical infrastructure.
Packet Page 345 of 564
1. Debris Clearance
Initial debris clearance will focus on removing debris from public property based
on the priorities listed above. Additional debris clearance from private or
commercial property may be necessary if the debris presents a health or safety
risk to the citizens of Edmonds.
Issues to be considered during debris clearance and collection include the
following:
• Debris Composition – Commingling of debris creates problems with
reduction and recycling techniques, which may adversely affect future
reimbursement. Whenever possible, immediate action should be taken to
prevent or reduce commingling of debris during debris collection
operations.
• Location of Debris – Debris clearance on private property is not a
reimbursable expense, however, should debris on private property present
a health or safety risk, the City may elect to clear the debris. This will be
decided on a case-by-case basis at the time of the incident.
Appendix E: Additional Resources lists additional resources that can be used to
clear and haul disaster debris following an incident.
2. Collection Methods
Based on the specifics of the debris-generating event, the City of Edmonds will
utilize curbside collection, neighborhood collection sites, or a combination of both
methods.
• Curbside Collection – Edmonds residents may be asked to place their
debris at the edge of the right-of-way for pickup. If curbside collection is
used, residents will be instructed to separate their debris into multiple
categories including municipal solid waste; vegetative (green) waste;
construction and demolition debris; and putrescible materials. The haulers
prefer to have debris separated if possible.
• Neighborhood Collection Sites – Residents may be asked to bring disaster
debris to collection sites to temporarily store, segregate, and process
debris before it is hauled to a County Debris Management Site or Transfer
Station. The City of Edmonds will use drop boxes as debris receptacles at
neighborhood collection site(s).
3. Household Hazardous Waste and White Goods
Household Hazardous Waste (HHW) removal is eligible for FEMA
reimbursement if the debris is a result of the disaster. In most cases, HHW will
Packet Page 346 of 564
be hauled by residents and collected at the Everett MRW facility (3434
McDougall Avenue, Everett).
The City of Edmonds will coordinate with the Snohomish County DMC and
contracted haulers to determine the handling of HHW.
Household hazardous wastes include:
• Gas cans
• Aerosol spray cans
• Fire extinguishers
• Fluorescent lamps
• Paint and lacquers
• Lawn chemicals
• Household electronics
• Cleaning agents
• Batteries
White goods debris removal is eligible for FEMA reimbursement if the debris is a
result of the disaster and removed from publicly maintained property and
roadways whose maintenance is the responsibility of the City. White goods
debris that contains ozone depleting refrigerants, mercury, or compressor oils
need to have such materials removed by a certified technician before recycling.
The SCC, RCW, and federal laws should be followed regarding the final disposal
of removed refrigerants, mercury, or compressor oils. The City of Edmonds will
coordinate with the Snohomish County DMC to determine the need for white
goods collection.
White goods include:
• Refrigerators
• Freezers
• Air conditioners
• Ovens / ranges
• Washing machines
• Clothes dryers
• Heat pumps
• Commercial chillers
4. Other Problem Wastes
In addition to white goods and household hazardous waste, other problem
wastes, such as pathogenic waste, biological or nuclear waste, asbestos, etc.
can be generated by a debris causing event. These wastes require additional,
specialized handling. These problem wastes can include:
Packet Page 347 of 564
• Electronics (E-waste) – E-waste may contain a variety of potentially toxic
chemicals, including heavy metals and polychlorinated biphenyls (PCBs).
The EPA has classified cathode ray tube monitors as hazardous waste,
and other electronic components may also qualify as hazardous. The City
of Edmonds will coordinate the collection of e-wastes with Snohomish
County Solid Waste.
• Treated Wood – treated wood includes different types of building
materials, including telephone poles, railroad ties, fence posts and wood
used to construct marine docks. Care must be taken to ensure that
treated wood is not chipped, shredded, mulched, composted, incinerated
or otherwise improperly disposed of.
• Gypsum Drywall – When gypsum deteriorates in landfills it can create
hydrogen sulfide gas, which poses an explosion and inhalation hazard.
Large amounts of drywall are often generated during storms and floods. If
possible, gypsum drywall should be recycled rather than disposed of in a
landfill.
• Asbestos – regulations for asbestos handling are well established by
several different local, state and Federal agencies. After a major debris-
causing incident, asbestos inspections may not be possible prior to
demolition, resulting in an increased risk to public health. The City of
Edmonds will work with the Snohomish County DMC and haulers to
ensure that waste possibly containing asbestos is properly handled and
disposed of.
• Human Waste – In the event of a disaster which disables water, sewer, or
septic systems, citizens may have human waste stored in containers that
require disposal. This waste is considered a bio-hazard and cannot enter
the debris stream. The City of Edmonds will cooperate with the
Snohomish Health District, Snohomish Solid Waste and ESCA to
determine the proper method for collection and disposal of this waste.
• Titled Vehicles – vehicles including cars, trailers, mobile homes, boats and
RVs may be included in the event generated debris. Snohomish County
Solid Waste utilizes a “Junk Vehicle” affidavit process. Forms are
available on line. The City, with assistance from the SnoCo ECUP team
will manage the process prior to recycling and disposal.
5. Debris Operations Monitoring
Debris monitoring operations document the debris clearance and removal
operations, including the location and amount of debris collected. Monitoring is
needed to ensure that any debris removal contractors are performing the scope
of work required by their contract, and to determine eligibility for FEMA Public
Assistance program reimbursement.
Debris monitoring will be performed by City of Edmonds staff, staff from
neighboring jurisdictions, and/or by a debris monitoring contractor hired by the
Packet Page 348 of 564
City.
Key elements to observe and record when monitoring and documenting debris
operations include:
• Type of debris collected
• Amount of debris collected
• Original collection location
• Amount of debris processed and final disposition for each type of debris
(reuse, recycle, special processing, etc.)
6. Documentation and Reporting Requirements
During operation of neighborhood collection sites, any incidents that will have a
bearing on site close-out need to be documented. These include, but are not
limited to: fuel or hydraulic fluid spills; discovery of hazardous waste; etc.
E. NEIGHBORHOOD COLLECTION SITES
The City of Edmonds may elect to open Neighborhood Collection Site(s). The
decision to open neighborhood sites will be made at the time of the incident, based
upon the estimated amount and types of debris generated by the event. Appendix
B: Collection Sites and Staffing Assignment Maps identifies the possible locations of
Neighborhood Collection Sites within the City of Edmonds.
1. Site Management
Neighborhood Collection Site preparation and operation may be managed by the
City of Edmonds or a contractor. To meet overall debris management strategy
goals and to ensure that the site operates safely and efficiently, a site manager,
debris monitoring personnel, and safety personnel should be assigned for each
site. The City of Edmonds will work cooperatively with neighboring jurisdictions
to help meet collection site staffing needs. Collection site staff responsibilities
include, but are not limited to:
• Site Manager – The site manager is responsible for supervising day-to-
day operations, maintaining daily logs, preparing site progress reports,
and enforcing safety and permitting requirements during site operations.
The site manager is also responsible for scheduling the environmental
monitoring and updating the site layout. The site manager has oversight
of the activities of debris operations contractors and haulers to ensure
that they comply with the terms of their contracts.
• Monitoring Staff and Assignments – Monitors should be placed at ingress
and egress points to verify residency of individuals bringing debris,
quantify debris loads, check loads for hazardous materials, and confirm
Packet Page 349 of 564
final destination of debris with hauler(s). The specific duties of the
monitors will depend on how debris is collected.
• Safety Personnel – safety personnel are responsible for traffic control and
ensuring that site operations comply with local, state and Federal
occupational safety regulations.
2. Site Establishment and Operations Planning
When possible, neighborhood collection sites will be identified and established
prior to an incident to allow for appropriate planning and permitting to be
completed. Appendix F: Neighborhood Collection Site Operating Plans contains
operating plans for potential collection sites identified by the City of Edmonds.
3. Neighborhood Collection Site Locations
The City of Edmonds has identified two Neighborhood Collection Site(s) for use
during disaster debris operations that meet the criteria discussed below.
Appendix F: Neighborhood Collection Site Operating Plans provides a list of
sites currently identified.
Considerations for the location of Neighborhood Collection Sites include:
• Proximity to the impacted area – as close as possible
• Hard, preferably non-porous, surface such as a paved parking lot
• Accessible by main transportation routes with good ingress and egress to
accommodate heavy truck traffic
• Outside environmentally sensitive areas, such as wetlands
• Large enough to accommodate multiple debris drop boxes, white goods
and HHW collection
• Can be secured when not actively staffed
4. Site Preparation and Permitting
For privately owned sites, the City of Edmonds will develop lease/use
agreements or Memorandums of Understanding with the property owners.
The City of Edmonds has procured temporary permits from the Health District,
and will endeavor to develop and operate City Neighborhood Collection Sites
using the WA State Department of Ecology’s Intermediate Solid Waste Handling
Facility Standards under WAC 173-350-310 as guidance. Storm water permitting
regulations will apply, so the City will procure a blanket NPDES permit for debris
operations as necessary.
5. Traffic Patterns
Traffic circulation should be well defined around and through the Neighborhood
Packet Page 350 of 564
Collection Site(s). Although traffic signage and barricades can aid in directing
traffic, the planning staff may also consider the use of flag personnel to help
direct traffic.
6. Environmental Monitoring Program
Environmental data will be collected prior to the start of site operations, and at
the close of operations to support site close-out and quality assurance. A
comparison of the data will be used to determine any necessary remediation.
If the site is also used as an equipment staging area, fueling and repair activities
will be monitored to prevent and mitigate any spills of petroleum products.
7. Site Closure
After site operations have concluded, the property must be restored to its pre-
activity environmental state. Restoration of a site involves removing all traces of
the operations and remediation of any contamination that may have occurred.
Debris, bins, protective berms and any other items should be removed from the
site upon completion of all debris removal operations.
8. Site Evaluation and Restoration
Final restoration of the landscape must be acceptable to the landowner, within
reasonable expectations. Landscape restoration will be included in the
operations plans as early as possible, and preferably included in any MOUs or
lease agreements.
The final environmental site evaluation is the last step of the environmental
monitoring program. Testing will be conducted to confirm that the site has been
returned to its pre-activity state. Test samples will be taken at the same locations
as those of the initial assessment and monitoring program.
Based on the results of testing, additional remediation may be required before
the owner takes final acceptance of the site. The MOU or lease agreement shall
have provisions to release the City from future damages when the site is returned
to its original condition, or when final acceptance is received from the owner.
F. DEBRIS REUSE, REDUCTION, and DISPOSAL METHODS
The 1989 Waste Not Washington Act (ESHB 1671) revisions to RCW 70.95
established waste reduction and recycling as the priority methods of managing
waste in the State of Washington. The City of Edmonds will make reduction and
recycling the highest priorities for managing disaster debris. The Debris Removal
Manager will coordinate with debris hauling contractors to ensure maximum
Packet Page 351 of 564
segregation for recyclable materials. Numerous methods are available that reduce
the overall volume of disaster debris and limit the amount of debris remaining for
landfill disposal.
1. Reuse and Recycling
Reuse and recycling strategies involve diverting material from the disposal
stream and reusing it. The recycling and reuse of disaster debris is most often
limited to metals, soils, and construction and demolition debris. Appendix E:
Additional Resources has a list of contractors that can provide these services
during an incident. Debris types most suitable for reuse and recycling include:
• Metals – Most non-ferrous and ferrous metal debris is suitable for
recycling. Metal maulers and shredders can be used to shred trailer
frames, trailer parts, appliances and other metal items. Ferrous and non-
ferrous metals are separated using an electromagnet and then sold to
metal recycling companies.
• Soil – Soil can be combined with other organic materials that will
decompose over time. This procedure produces significant amounts of
material which can be sold, recycled back into the agricultural community,
or stored on-site to be used as cover for debris management sites when
they are returned to their original states. The City of Edmonds will consult
with the Snohomish Health District to establish what monitoring and
testing is necessary to ensure that soil is not contaminated with chemicals.
If soil is not suitable for agricultural or residential use, it may be disposed
of in a permitted landfill.
• Construction and Demolition Materials – Concrete, asphalt, and masonry
products can be crushed and used as base material for certain road
construction products, or as trench backfill. Debris targeted for base
materials needs to meet size specifications as determined by the end
user. Clean wood products used in construction can also be chipped or
ground for use as mulch or hog fuel.
• Organic Materials – Organic materials such as leaves, grass, wood, and
food scraps are suitable for composting, which is the controlled
decomposition of organic materials by microorganisms. The result of this
process is a soil-like material called compost. Yard trimmings and food
scraps make up about 25% of the waste generated by the average
household. Composting can greatly reduce the amount of waste that ends
up in landfills or incinerators. The City of Edmonds will work to ensure
that appropriate materials are composted to the greatest degree possible.
2. Volume Reduction Methods
Volume reduction methods reduce the volume of disaster debris to decrease
impact on disposal facilities or create opportunities to reuse debris. Appendix E:
Additional Resources has a list of contractors that can provide these services
Packet Page 352 of 564
during an incident. Volume reduction methods include:
• Chipping and Grinding – chipping and grinding reduces the volume of
some types of debris by as much as 75%. This method is commonly
used to reduce the volume of disaster debris, including vegetative debris,
construction / demolition debris, plastics, rubber, and metals. Clean wood
can also be reduced and used for mulch. Plastics and metals can be
chipped to reduce overall volume prior to transport for disposal.
• Hog Fuel Incinerators - Hog fuel is made up of a specific grade of ground-
up wood and bark. Wood and paper processing companies in the region
utilize hog fuel as fuel for boilers. These companies may purchase storm
debris that has been processed into hog fuel, depending upon current
market conditions.
3. Debris Sorting and Diversion
When establishing and operating neighborhood collection sites, the Site Manager
is responsible for ensuring appropriate staff are available to monitor debris and
ensure that the debris is sorted into the appropriate categories for recycling,
reuse, special waste processing, and disposal. The Site Manager may request
guidance from a Subject Matter expert if needed.
Packet Page 353 of 564
VI. CONTRACTED RESOURCES
A. EXISTING SOLID WASTE CONTRACTS
As stated in Part D: Contractors and Vendors of Section III – Organization and
Responsibilities, the City of Edmonds has existing franchise agreements for
municipal waste collection with Sound Disposal and Republic Services of Lynnwood
(formerly Allied Waste Services). It is expected that in a large scale debris-
generating event, the City of Edmonds resources will be overwhelmed and the City
will need to contract for additional debris services. Prior to contracting for additional
resources, the City of Edmonds has consulted with Sound Disposal and Republic
Services to determine what gaps exist.
See Appendix G Pre-Qualified Contracts (Hauler Agreements)
B. CONTRACT DEBRIS MANAGEMENT RESOURCE NEEDS
The City of Edmonds has identified that additional resources may be needed in
these areas to support disaster debris operations:
• Semi Tractors
• Truck Mounted Grapple Hooks
• Backhoes
Contracts have been or are being developed to address these identified needs.
C. EMERGENCY CONTRACTING and PROCUREMENT PROCEDURE
The City of Edmonds will endeavor to contract for debris management resources
prior to a debris causing incident or to pre-qualify contractors who may perform
debris management operations. If emergency contracts have to be established
during an event, the following general emergency contract rules apply:
• The contractor must be licensed and bonded
• The contractor must have adequate insurance
• The contract must comply with state and Federal procurement standards
including provisions of 44 CFR part 13
• The contractor cannot be on the WA State Department of Labor and
Industries Debarred Contractors list
In addition, the following City of Edmonds emergency contracting and procurement
procedures must be followed:
• Edmonds City Code Chapter 3.10 – Emergency Reserve Finance Fund
• Edmonds City Code Chapter 6.60 – Disaster Preparation and Coordination
• RCW 35A.33.080 – Emergency Expenditures – Non-debatable Emergencies
Packet Page 354 of 564
• RCW 35A.33.090 – Emergency Expenditures – Other Emergencies – Hearing
1. Types of Contracts
When developing contracts for emergency work, the City will ensure that each
scope of work will reference such terms as: “eligible work,” “work eligible under
FEMA Public Assistance regulations, policies, and guidance,” “work performed
on public property and/or public rights-of-way,” or other similar elements if the
performed work is to be potentially reimbursed by FEMA. The type of contract
used to supply debris management services will vary depending on the type of
work to be performed and how soon after the incident the work is planned. The
three recommended contract types for debris operations are:
• Time and Materials – These contracts will be limited to the first 96 hours of
operation and only after local and State equipment has been committed.
The price for equipment applies only when the equipment is operating, the
City can terminate the contract at its convenience, and the City does not
guarantee a minimum number of hours. These contracts MUST be
converted to either Lump Sum or Unit Price contracts after the first 96 hours.
The City will actively avoid this type of contracting, if at all possible.
• Lump Sum – The price of the work is fixed unless there is a change in the
scope of work to be performed. Lump sum contracts will be calculated on
either the “area” method or the “pass” method. The lump sum contract shall
be used only when the scope of work is clearly defined and the areas of
work can be specifically quantified.
• Unit Price – This is the most accurate account of actual quantities removed.
This contract requires field inspectors to eliminate contractor fraud. All
contractor trucks must be measured. Requires load tickets identifying truck
number, contract number, contractor’s name, date, time departed site and
estimated volume. A unit price is based on weight or volume of debris
hauled.
All contracts shall be reviewed and approved by the City Attorney.
2. Competitive Bid Process
In some situations, such as emergency road clearing, or removal of debris at a
specific site, FEMA allows for awarding a non-competitive contract for site-
specific work. This is only allowable in cases where it is not feasible to delay the
contract award by the amount of time necessary to obtain competitive bidding;
and only in the first 96 hours for the purpose of life safety, rescue operations, or
dire threat to public health. The City of Edmonds may elect to develop an
expedited process to competitively bid work.
Packet Page 355 of 564
Packet Page 356 of 564
VII. PRIVATE PROPERTY DEMOLITION and DEBRIS REMOVAL
Private property removal refers to the demolition and removal of disaster debris on
private commercial or residential property. Private property demolition and debris
removal is generally not eligible for reimbursement under the FEMA Public Assistance
program. However, under specific circumstances private property demolition and
removal may be reimbursed. The following section provides information on the process
to demolish and remove disaster debris on private property with or without owner
consent; and outlines the procedures that the City of Edmonds will need to follow in
order to potentially receive expense reimbursement through the Public Assistance
program.
A. DEBRIS REMOVAL and DEMOLITION PERMITTING and PROCEDURES
Following a debris causing incident, the City of Edmonds may need to enter private
property to demolish private structures made unsafe by the event in order to
eliminate immediate threats to the life, health and safety of the citizens of Edmonds.
The demolition of privately owned structures deemed unsafe and subsequent
removal of demolition debris may be required if the following conditions are met:
• The City of Edmonds Building Official, or other designated authority,
determines that the structure is unsafe and poses an immediate threat to the
public. A structure will be considered unsafe if it is so damaged or structurally
unstable that partial or complete collapse is imminent.
• The City of Edmonds demonstrates that it has the authority and legal
responsibility to enter private property to perform the demolition. The legal
basis for this responsibility must be established by law, ordinance or
municipal code at the time of the disaster and must be relevant to the post-
disaster condition representing an immediate threat to life, public health, and
safety, not merely defining the City’s uniform level of services.
• A legally authorized official has ordered the demolition of unsafe structures
and removal of demolition debris.
The condemnation and demolition of structures must comply with existing City
condemnation and demolition procedures, unless expedited procedures are enacted
due to the severity of the event.
1. Demolition Documentation
The following documents should be collected and/or completed prior to
demolition in order to comply with City of Edmonds regulations and to conform to
FEMA reimbursement guidelines.
• Verification of Ownership – ensures that the proper site and owner are
identified and that the owner is aware of the nature of the scheduled
building assessment.
Packet Page 357 of 564
• Right-of-Entry Form – signed by the property owner, this form allows the
building official or other authorized agent to enter the property to
complete the assessment. A sample Right-of-Entry form is included in
Appendix H: Debris Management Operations Forms of this document.
• Building Assessment – documents the damage to the structure and
description of the threat to public health and safety. This assessment
may contain the Building Official, or authorized agent’s, determination as
to whether the structure should be condemned, repaired or demolished.
• Photographic Documentation – illustrates the condition of the structure
prior to the beginning of demolition work. Also can be used to confirm the
address of the property and the scope of work required.
• Verification of Insurance - allows the City to pursue financial
compensation if the property owner’s insurance policy covers demolition
and debris removal.
• Archeological Review – outlines the archeological low-impact stipulations
for demolition and debris removal activities; also highlights the
implications for failing to comply with the guidelines.
• Environmental Review – ensures that adverse impacts to protected
environmental resources are minimized or avoided.
• WA State Historical Preservation Office Review – confirms that the WA
State Historic preservation Officer has been notified and correspondence
has been received to absolve the area of any historic significance.
• Letter or Notice of Condemnation – document signed by the Building
Official that outlines the specific threat to the public’s health and safety.
• Notice of Demolition – document issued to inform the property owner
when the demolition will begin.
• Notice of Intent to Demolish – Notice conspicuously posted on or near the
structure to be demolished.
• Demolition permit(s) issued in accordance with Edmonds Community
Development Code Title 19.
2. Inspections
Prior to demolition, a representative of the City of Edmonds Building Division will
conduct an inspection of the site. The inspector will photograph and document
each site inspection. The inspections should include:
• Water and Sewer / Septic Tank Inspection – verifies that the utilities have
been terminated and isolated from the proposed sphere of influence
during demolition operations. The inspector should also verify that all
other utilities have been terminated.
• Occupancy Inspection – conducted immediately before demolition to
ensure that no one is physically in the structure.
• Open Void Inspection – performed if there is a basement that is to be
filled. This inspection will be conducted once the above-grade structure is
Packet Page 358 of 564
gone and the inspector can visually see the entire below-grade
excavation.
• Post-Demolition Inspection – completed once the structure is demolished,
the debris is removed, and the site is graded.
3. Debris Removal and Demolition of Private Property without Owner Consent
If a privately owned structure meets the requirements for demolition but the
consent by the owner is not obtained, an abbreviated and expedited procedure
shall take place. The procedure to be followed by the City of Edmonds includes:
• A determination by the Building Official, or other authorized agent, that
the structure is unsafe, unfit for human habitation, or presents a danger to
the public in its existing state.
• The City of Edmonds will make a reasonable attempt to identify and
contact the legal owner of the structure. The attempt to contact shall
consist of those measures reasonable and possible based upon the state
of available records and communication channels at the time of the event.
• A notice and order describing the area and/or parcel of land where debris
removal or demolition will take place shall be published in the Seattle
Times, Edmonds Beacon, and Enterprise publications at least seven (7)
calendar days prior to the beginning of debris removal operations. During
the seven (7) day period, property owners shall have the right and
opportunity to go upon their property and remove such items as they
deem appropriate.
• A notice and order shall be clearly posted in the area where debris
removal will take place.
• The posting of a notice and order on the structure containing a physical
address and telephone number where the owner can contact the City
Staff person assigned, designating the date of posting of the
condemnation notice, and stating the time period available prior to
demolition for contacting the City.
• A waiting period of seven (7) days from the posting of the notice for a
property owner to contact the City of Edmonds and present compelling
evidence to the Development Services Director stating why the
abatement or debris removal should not proceed.
If an owner does contact the City as provided in the notice and the Development
Services Department does not conclude that the evidence presented by the
owner alleviates the danger to the public, an owner may appeal to the Hearing
Examiner. However, no appeal shall be allowed to jeopardize the health and
safety of the citizens of Edmonds by causing a postponement of demolition
beyond the next Edmonds Council meeting following the filing of such an appeal,
unless postponement is ordered by the City.
Packet Page 359 of 564
B. SPECIAL CONSIDERATIONS
1. Abandoned Vehicles and Vessels
Following a significant event, abandoned vehicles and vessels may be deposited
on City roadways and property, causing a threat to public health and safety. The
City of Edmonds will coordinate the impoundment, salvage or sale of such
vehicles with the Snohomish County Solid Waste Management Division. See
Section D – Debris Operations, #4 Problem Wastes: Titled Vehicles (page 24 of
this document).
2. Mobile Home Parks
Mobile home parks, and other high structure density situations, create an
extensive amount of mixed debris in a relatively small area. The most complex
aspect of debris operations in a mobile home park is documenting ownership and
legal responsibility for clean-up within the park. A mobile home park site may be
owned, operated and maintained by multiple parties. The individual homes may
be owned by a landlord or agency, or by the occupants. The City of Edmonds
has one (1) mobile home park within its boundaries.
3. Navigation Hazard Removal
Damage to the City of Edmonds tideland property, the Port of Edmonds, and
navigable waterways can include abandoned sunken boats and other debris that
may impede navigation. Marine debris removal will be coordinated with the US
Coast Guard. Debris removal may also include assistance from the WA State
Department of Transportation – Ferries, marine salvage contractors, commercial
divers, and certified surveyors to ensure that navigation hazards are removed
safely and efficiently.
Navigation hazards present two (2) primary challenges: locating the debris, and
finding the legal owners. Marinas can be visually inspected by helicopter or boat.
Sonar or dive teams may be needed for submerged vessels. A location or
flotation marker may be helpful in order to keep vessel positions documented.
The legal owner’s information may be obtained by using a vessel’s registration
number and marina records.
C. ELIGIBILITY of PRIVATE PROPERTY DEMOLITION and DEBRIS REMOVAL
COSTS
In some cases, the costs of performing demolition of private structures may be
eligible for Individual Assistance funding. FEMA will consider alternative measures
to eliminate threats to life, public health and safety posed by disaster-damaged,
Packet Page 360 of 564
unsafe structures, including fencing off unsafe structures and restricting access,
when evaluating requests for Public or Individual Assistance funding for demolition
work. The Public Assistance staff must also concur that the demolition of unsafe
structures and removal of demolition debris are in the public interest.
Eligible costs for FEMA Public Assistance reimbursement associated with the
demolition of private structures may include, but not be limited to:
• Capping wells
• Pumping and capping septic tanks
• Filling in basements and swimming pools
• Testing and removing hazardous materials from unsafe structures, including
asbestos and household hazardous wastes
• Securing utilities
• Securing permits, licenses, and title searches
• Demolition of disaster-damaged outbuildings, such as garages, sheds, and
workshops determined to be unsafe
Ineligible casts associated with the demolition of private structures include:
• Removal of slabs or foundations, except in very unusual circumstances, such
as when disaster-related erosion under slabs on a hillside causes an
immediate public health and safety threat
• Removal of pads and driveways
Structures condemned as safety hazards prior to the disaster event are not eligible
for demolition and subsequent demolition debris removal.
1. Commercial Property
The removal of debris from commercial property and the demolition of
commercial structures are generally not eligible for Public Assistance funding. It
is assumed and expected that these commercial enterprises retain insurance that
can and will cover the cost of debris removal and/or demolition. However, in
some cases, the removal of debris from private commercial property and/or the
demolition of private commercial structures by a local government may be
eligible for FEMA reimbursement only when such removal is in the public
interest.
2. Duplication of Benefits
FEMA is prohibited from approving funds for work that is covered by any other
source of funding. Therefore, the City of Edmonds will take reasonable steps to
prevent such an occurrence and will verify that insurance coverage or any other
source of funding does not exist for private property debris removal work and the
demolition of private structures. The Right-of-Entry from included in Appendix H
Packet Page 361 of 564
of this document has a clause stating that a private property owner will re-pay the
City of Edmonds the amount of insurance proceeds received for any debris
removal or demolition work performed.
If the property owner indicates that they have insurance that will cover all or part
of the cost for debris removal and structure demolition, the insurance proceeds
must be used as the first source of funding. Public Assistance funding may be
available for the remainder of the cost of the eligible work after insurance
proceeds are recouped from the property owner.
Packet Page 362 of 564
VIII. PUBLIC INFORMATION
The provision of adequate and timely public information during debris management
operations is essential to the overall success of debris management activities and
maintaining good community relations within the City. The City of Edmonds will
manage the public information related to debris operations in accordance with the
Public Information concept of Operations found in the City of Edmonds Disaster
Recovery Plan and ESF 15 – External Affairs and Emergency Public Information of the
City of Edmonds Comprehensive Emergency Management Plan, separately published
documents.
A. PUBLIC INFORMATION OFFICER
The City of Edmonds Mayor will assign appropriate staff to function as the City’s PIO
for debris operations. The PIO shall assist with the distribution of information
regarding the debris operations.
B. COMMUNICATION and PUBLIC EDUCATION STRATEGY PRIOR to an
INCIDENT
The City of Edmonds will work cooperatively with the Snohomish County Public
Works Communication Group and County Joint Information Center to provide a
coordinated public information effort during debris causing incidents. The City of
Edmonds will endeavor to provide information to City employees, stakeholders, and
the public prior to, during, and after a debris causing event. The public information
effort will include the following elements:
1. Special Waste Considerations
Special waste items are those that require special handling, treatment, and
disposal due to their hazardous potential, large volumes, or other problematic
characteristics. The City will coordinate with Snohomish County Public Works
Communication Group and SnoCo DEM to develop and provide to the public
information on:
• How to identify Special Waste
• Why they should separate Special Waste
• Precautions to be taken if placing Special Waste in the Right-of-Way
2. Debris Collection Methods
The City will endeavor to provide information on debris management operations
and how the citizens can best assist themselves following a debris causing
event. This messaging will include:
Packet Page 363 of 564
• Separation of Municipal Solid Waste
• Recycling and Recyclable Materials
• Composting
• Overview of a Neighborhood Collection Site
Public information pre-event will be posted to or linked from the City of Edmond’s
website. In addition, Update on Edmonds, the City’s newsletter, can be used to
disseminate information on hazard mitigation, and other debris related topics. When
possible, public information will include messaging in languages other than English.
Community facilities and events will also have information available throughout the
year to help reduce risks.
C. PUBLIC INFORMATION STRATEGY DURING an INCIDENT
The City of Edmonds public information staff will provide information to media outlets
and the public during an incident. These activities may be provided solely by the
City or through the cooperation of multiple jurisdictions as indicated above.
1. Coordination with the Joint Information Center (JIC)
Communications will normally be coordinated through the City’s PIO and City
Emergency Operations Center (EOC). In a large-scale or regional event, a
County-level Joint Information Center (JIC) may be activated. If a JIC is
activated, a City of Edmonds PIO and debris liaison will work with the JIC to
coordinate messaging on behalf of the entire area. Messaging will include
current information on:
• Clean-up instructions
• Status of City operations
• Location(s) of Neighborhood Collection Sites
• How to source-separate waste
• Handling procedures
• Illegal dumping provisions
2. Pre-scripted Information
The City of Edmonds will develop pre-scripted information will include, but not be
limited to:
• Debris pick-up schedules
• Disposal methods and on-going actions to comply with Federal, state, and
local environmental regulations
• Disposal procedures for self-help and independent contractors
• Restrictions and penalties for illegal dumping
Packet Page 364 of 564
• Curbside debris segregation instructions
• Process for answering the public’s questions concerning debris removal
Pre-scripted information will be coordinated with SnoCo DEM, Snohomish Health
District, and the Snohomish County Public Works Communications Group.
3. Distribution Strategy
The City of Edmonds will utilize various types of media to disseminate debris
management public information as noted in ESF 15 – External Affairs and
Emergency Public Information of the Edmonds CEMP, a separately published
document. These can include, but are not limited to:
• Television and radio media
• Internet media – City website and the Regional Public Information Network
(RPIN)
• Public forums – Community meetings, public area kiosks
• Direct mail products – Door hangers, fact sheets, flyers within City
Mailings
The public information staff will take advantage of every information vehicle
available if power, utilities, and other infrastructure have been damaged. In
event of limited media capability, the City of Edmonds will provide public
information materials to City staff and responders to have available for
distribution during the course of their duties.
4. Alternate Languages and Formats
The City of Edmonds will rely on outside resources to assist in the provision of
message materials in languages other than English. Based on the community
demographics of the City of Edmonds, messaging may need to be developed in
the following languages:
• Spanish
• Russian
• Korean
• Tagalog
• Vietnamese
The special needs population within Edmonds may also need information
materials in alternate formats. Language and alternate format resources include
the following:
• American Red Cross Seattle/Kitsap County
• ARC of Snohomish County
Packet Page 365 of 564
• Catholic Community Services
• Compass Health
• Community Services for the Blind
• Chinese Information and Service Center
• Edmonds Community College
• Refugee Federation Service Center
• Ukrainian Community Center of Washington
• Volunteers of America
• WA State Department of Emergency Management
• Google Translate
These and other resources are available through the 211 telephone service or
on-line at: www.win211.org
Packet Page 366 of 564
IX. TRAINING and EXERCISES
A. TRAINING
General emergency management training requirements are developed as part of the
National Incident Management System (NIMS). Online courses and additional NIMS
and FEMA information are available at http://training.fema.gov . The City of
Edmonds is NIMS compliant and will remain in compliance by ensuring that all
applicable staff have completed the required courses.
Specific training is available for staff that will support debris management operations.
These courses include:
• IS-630: Introduction to the Public Assistance Program
• IS-631: Public Assistance Operations
• IS-632: Introduction to Debris Operations in FEMA’s Public Assistance
Program
• E-202: Debris Management
As scheduling and funding allow, the City of Edmonds will endeavor to have all
appropriate staff trained in the above classes, in order to support their understanding
and implementation of this Debris Management Annex.
B. EXERCISES
Procedures for disaster debris removal can be tested through table-top and
operational exercises. The debris operations described in this Annex can be
exercised specifically using a debris management scenario, or as part of another
exercise. At minimum, operational exercises involving the debris management plan
will be conducted every four (4) years.
Due to the close coordination required throughout the region for debris management
operations, exercises will be developed and executed individually and collaboratively
with other stakeholders. Regional stakeholders that will be considered include:
• Neighboring jurisdictions
• Snohomish County DEM
• Snohomish and King County agencies
• Snohomish Health District
• Commercial haulers
Packet Page 367 of 564
X. PLAN MAINTENANCE
This Debris Management Annex was assembled by the City of Edmonds with
assistance and input from the Emergency Services Coordinating Agency (ESCA),
multiple City Departments, Snohomish County Public Works – Solid Waste Division,
Snohomish Health District, the Port of Edmonds, Republic Services of Lynnwood
(formally Allied Waste Services) and Sound Disposal. On-going maintenance of the
Annex is the responsibility of the City of Edmonds Public Works Director.
This Annex will be reviewed annually prior to the onset of the winter storm season to
address any staffing or organizational changes. Modifications to the Annex will be
made according to information gathered from exercise after action reports and
improvement plans, as well as actual events.
Packet Page 368 of 564
Appendices A through H
See separate Attachments:
Appendix A: Maps of City Proiority Routes and Facilities
Appendix B: Staffing Assignment Maps
Appendix C: Text of City’s MOU with Snohomish County Solid Waste
Appendix D: City of Edmonds Health and Safety Plan
Appendix E: Additional Resources
Appendix F: Neighborhood Collection Sites
Appendix G: Pre-Qualified Contracts
Appendix H: Debris Management Operations Forms
Packet Page 369 of 564
Packet Page 370 of 564
Packet Page 371 of 564
Packet Page 372 of 564
Appendix C
Text of the City of Edmonds’ MOU with
Snohomish County Solid Waste Management
Division
Packet Page 373 of 564
Appendix C – Text of the City of Edmonds’ Memo of
Understanding with Snohomish County Solid Waste Management
Division
Following approval and adoption of this Plan by the Edmonds City Council, it will
be submitted to the Washington State EMD for their review and acceptance. If the
document is found to be sufficient, Washington State Public Assistance Program
staff will forward it to FEMA for review and acceptance.
Once FEMA acceptance is received, the City of Edmonds will petition to have the
document annexed to the Snohomish County Public Works Solid Waste Division
Disaster Debris Management Plan.
A Memorandum of Understanding (MOU) will be negotiated at that time.
Packet Page 374 of 564
Appendix D
City of Edmonds Health and Safety Plan
Packet Page 375 of 564
Appendix D – City of Edmonds Health and Safety Plan
A draft plan, the Citywide Accident Prevention Program, is pending final approval.
Packet Page 376 of 564
Appendix E
Additional City Resources
Packet Page 377 of 564
Appendix E – Additional City Resources
The Public Works Department maintains a fleet of vehicles and equipment that
would be available to respond and assist during and following a disaster event.
As of 2015 the following is a general list of the fleet resources owned by the City of
Edmonds:
• 46 pickup trucks, dump trucks and flatbed trucks
• 3 large step vans
• 2 street sweepers
• 2 vactor trucks
• 2 backhoes
• 1 loader
• 1 chipper
• Trailers with generators, compressors and pumps
In addition the Parks Maintenance Division operates the following vehicles and
equipment:
• 12 pickup trucks and flatbed trucks
• 2 tractors
• 1 loader
• 1 backhoe
Both Public Works and Parks Maintenance own various power tools, hand tools,
ladders, spill response equipment, etc. The Street and Storm Division keeps a
stock of permanent and temporary signage, barricades, and other safety
equipment.
Packet Page 378 of 564
Packet Page 379 of 564
Packet Page 380 of 564
Packet Page 381 of 564
Packet Page 382 of 564
Packet Page 383 of 564
Packet Page 384 of 564
Packet Page 385 of 564
Packet Page 386 of 564
Packet Page 387 of 564
Packet Page 388 of 564
Packet Page 389 of 564
Appendix G
Pre-Qualified Agreements with the City of
Edmonds’ Certified Solid Waste Haulers
Packet Page 390 of 564
Appendix G – Pre-Qualified Agreements with the City of
Edmonds’ Certified Solid Waste Haulers
The following letters qualify as letters of agreement from the City of Edmonds
certified waste hauling companies:
• Letter from the Operations Manager at Republic Services of Lynnwood
(formally Allied Waste Services).
• Letters from the President of Sound Disposal, Inc. – one from the company
proper and two that Sound Disposal has elicited from both Republic
Services and Rubatino Refuse Removal, Inc., in regards to additional
resources.
Packet Page 391 of 564
Appendix H
Debris Management Operations Forms
Packet Page 392 of 564
Appendix H – Debris Management Operations Forms
Included herein:
Notice of Intent to Operate forms
One for Civic Center Playfield
One for Sierra Park
Daily Site Activity Log templates
One for Civic Center Playfield
One for Sierra Park
Right-of-Entry forms
A sample form is to be included in order to complete this section. The form is to
be provided by ESCA
Packet Page 393 of 564
Notice of Intent to Operate
Debris Management Site and Neighborhood Collection Site
Site Information
Site Type: X Neighborhood Collection Site
Debris Management Site
Site Name: Civic Center Playfield Parcel Number 00434210000000
Site Address: 300 Sixth Avenue N., Edmonds WA 98020 Site Coordinates: N 47.812
Estimated Property Size: 8.1 acres W 122.374
Site Owner: City of Edmonds
Ownership Type: X Jurisdiction Property County Property Private Property
Agency Operating Site
Agency Name: City of Edmonds Agency Contact: Phil Williams
Agency Address: 121 Fifth Avenue N., Edmonds WA Contact Title: Public Works Director
Contact Phone: 425-771-0235 Contact Email: phil.williams@ci.edmonds.wa.us
General Description of Activity to be Performed at Site
The Neighborhood Collection Site (NCS) consists of: A gravel unloading area with large-capacity
drop-box containers. Customers will be directed to back up to a location at the edge of the
unloading area and deposit their solid waste into the containers. Full containers will be picked
up by a hauler and transported to a permitted disposal site. The solid waste is dumped at the
disposal site and the empty containers are returned to the NCS facility as needed.
Packet Page 394 of 564
Submit this form along with the completed Debris Management Site Inventory form and Debris
Management or Neighborhood Collection Site Operating Plan to your local health agency.
Packet Page 395 of 564
Notice of Intent to Operate
Debris Management Site and Neighborhood Collection Site
Site Information
Site Type: X Neighborhood Collection Site
Debris Management Site
Site Name: Sierra Park Parcel Number 00481600600200
Site Address: 80th Avenue & 191st St. SW, Edmonds 98026 Site Coordinates: N 47.826
Estimated Property Size: 5.5 acres W 122.343
Site Owner: City of Edmonds
Ownership Type: X Jurisdiction Property County Property Private Property
Agency Operating Site
Agency Name: City of Edmonds Agency Contact: Phil Williams
Agency Address: 121 Fifth Avenue N, Edmonds 98020 Contact Title: Public Works Director
Contact Phone: 425-771-0235 Contact Email: phil.williams@ci.edmonds.wa.us
General Description of Activity to be Performed at Site
The Neighborhood Collection Site (NCS) consists of: A grass field and gravel unloading area
with large-capacity drop-box containers. Customers will be directed to back up to a location at
the edge of the unloading area and deposit their solid waste into the containers. Full
containers will be picked up by a hauler and transported to a permitted disposal site. The solid
waste is dumped at the disposal site and the empty containers are returned to the NCS facility
as needed.
Submit this form along with the completed Debris Management Site Inventory form
and Debris Management or Neighborhood Collection Site Operating Plan to your local
health agency.
Packet Page 396 of 564
Pa
g
e
6
o
f
8
La
s
t
U
p
d
a
t
e
d
1
0
-
1
4
-
2
0
0
9
Da
i
l
y
S
i
t
e
A
c
t
i
v
i
t
y
L
o
g
Si
t
e
N
a
m
e
:
S
i
e
r
r
a
P
a
r
k
Si
t
e
T
y
p
e
:
Ne
i
g
h
b
o
r
h
o
o
d
C
o
l
l
e
c
t
i
o
n
s
i
t
e
/
De
b
r
i
s
M
g
m
t
.
S
i
t
e
Si
t
e
L
o
c
a
t
i
o
n
:
8
0
th
A
v
e
.
W
&
1
9
1
st
S
t
.
S
W
D
a
t
e
:
Ti
m
e
Ve
h
i
c
l
e
Ty
p
e
:
Pu
b
l
i
c
or
Pr
i
v
a
t
e
Ve
h
i
c
l
e
#
(p
u
b
l
i
c
/
C
o
n
t
r
a
c
t
)
or
Li
c
e
n
s
e
#
(p
r
i
v
a
t
e
)
De
b
r
i
s
we
i
g
h
t
or
vo
l
u
m
e
Em
p
t
y
Ve
h
i
c
l
e
We
i
g
h
t
(i
f
v
o
l
u
m
e
re
c
o
r
d
e
d
by
w
e
i
g
h
t
)
Lo
c
a
t
i
o
n
de
b
r
i
s
or
i
g
i
n
a
t
e
d
fr
o
m
El
i
g
i
b
l
e
(Y
/
N
)
C
o
m
m
e
n
t
s
Packet Page 397 of 564
ap
p
e
n
d
i
x
X
–
s
a
m
p
l
e
f
o
r
m
s
f
o
r
d
e
b
r
i
s
t
r
a
c
k
i
n
g
DI
S
A
S
T
E
R
D
E
B
R
I
S
M
A
N
A
G
E
M
E
N
T
P
L
A
N
X -7
PU
B
L
I
C
A
T
I
O
N
D
A
T
E
Da
i
l
y
S
i
t
e
A
c
t
i
v
i
t
y
L
o
g
Si
t
e
N
a
m
e
:
C
i
v
i
c
C
e
n
t
e
r
P
l
a
y
f
i
e
l
d
Si
t
e
T
y
p
e
:
Ne
i
g
h
b
o
r
h
o
o
d
C
o
l
l
e
c
t
i
o
n
s
i
t
e
/
De
b
r
i
s
M
g
m
t
.
S
i
t
e
Si
t
e
L
o
c
a
t
i
o
n
:
3
0
0
S
i
x
t
h
A
v
e
n
u
e
N
.
Da
t
e
:
Ti
m
e
Ve
h
i
c
l
e
Ty
p
e
:
Pu
b
l
i
c
or
Pr
i
v
a
t
e
Ve
h
i
c
l
e
#
(p
u
b
l
i
c
/
C
o
n
t
r
a
c
t
)
or
Li
c
e
n
s
e
#
(p
r
i
v
a
t
e
)
De
b
r
i
s
we
i
g
h
t
or
vo
l
u
m
e
Em
p
t
y
Ve
h
i
c
l
e
We
i
g
h
t
(i
f
v
o
l
u
m
e
re
c
o
r
d
e
d
by
w
e
i
g
h
t
)
Lo
c
a
t
i
o
n
de
b
r
i
s
or
i
g
i
n
a
t
e
d
fr
o
m
El
i
g
i
b
l
e
(Y
/
N
)
C
o
m
m
e
n
t
s
Packet Page 398 of 564
ap
p
e
n
d
i
x
X
–
s
a
m
p
l
e
f
o
r
m
s
f
o
r
d
e
b
r
i
s
t
r
a
c
k
i
n
g
DI
S
A
S
T
E
R
D
E
B
R
I
S
M
A
N
A
G
E
M
E
N
T
P
L
A
N
X -8
PU
B
L
I
C
A
T
I
O
N
D
A
T
E
Packet Page 399 of 564
Neighborhood Collection Site Operating Plan
1.1 Summary
The Neighborhood Collection Site (NCS) is located at the Civic Center Playfield in
downtown Edmonds, approximately as shown on the Site Location Map, Figure 1. The
facility provides service to the local residential population. This Plan of Operation
provides a description of the procedures that Edmonds will use to operate the site.
1.1.1 Operation Summary
The NCS consists of: A gravel unloading area with large-capacity drop-box containers.
Customers will be directed to back up to a location at the edge of the unloading area and
deposit their solid waste into the containers. Full containers will be picked up by a hauler
and transported to a permitted disposal site. The solid waste is dumped at the disposal
site and the empty containers are returned to the NCS facility as needed.
1.1.2 Regulatory Compliance
The NCS should meet the applicable regulatory requirements of WAC Chapter 173-350-
310 “Intermediate Solid Waste Handling Facilities.” The following sections briefly outline
the WAC requirements and how they have been addressed.
1.1.2.1 WAC 173-350-310 Intermediate Solid Waste Handling Facilities
This document will serve as the operating plan identified in WAC 173-350-310. As defined
in the WAC “The plan shall describe the facility's operation and shall convey to site
operating personnel the concept of operation intended by the designer. The plan of
operation shall be available for inspection at the request of the jurisdictional health
department. If necessary, the plan shall be modified with the approval, or at the direction
of the jurisdictional health department. Each plan of operation shall include the
following:”
a. A description of the types of solid wastes to be handled at the facility; see
section 2.4
b. A description of how solid wastes are to be handled on-site; see section 2.6
c. A description of the procedures used to ensure that dangerous waste and other
unacceptable waste are not accepted at the facility; see section 2.11
d. Safety and emergency plans; see section 2.8 and 2.10
e. A description of how equipment, structures and other systems are to be
inspected and maintained, including the frequency of inspection and inspection
logs; see section 3.1
f. For putrescibles wastes, an odor management plan describing the actions to be
taken to control nuisance odors; not applicable as waste will be removed from the
NCS daily.
g. The forms used to record volumes or weights; see section 3.2
h. Other such details to demonstrate that the facility will be operated in
accordance with this subsection and as required by the jurisdictional health
department.
Packet Page 400 of 564
1.1.2.2 WAC 173-350-310 (5) (a) (ii) Operating Standards for Drop Box Facilities
Operations at this facility will meet the requirements of WAC 173-350-310 (5) (a) (ii)
Operating Standards for Drop Box facilities:
a. Constructed with a lid or screen on top that prevents the loss of materials
during transport and prevents access by rats and other vermin;
b. Located in an easily identifiable place accessible by all-weather roads.
c. Designed and serviced as often as necessary to ensure adequate dumping
capacity at all times. Storage of solid waste outside of the drop-box is prohibited.
d. Facility sign – a sign will be posted at the site entrance identifying the facility,
hours of operation, and type of waste accepted.
e. Remove all remaining waste at facility closure and remove the drop-boxes from
the facility. At closure all waste will be removed to a permitted disposal site and
the facility will be closed.
2 OPERATIONS
2.1 Hours
The NCS will be open from 8 am to 5 pm, Monday through Saturday. The site hours may
be and could be revised to meet operational needs.
2.2 Staffing
The NCS will be staffed by one or more staff responsible for observing and measuring
refuse loads, keeping the site free of litter and debris, contacting the hauler when drop-
box containers are full and contacting the appropriate authorities in case of emergency.
2.3 Vehicle Traffic
All vehicles using the drop-box facility will enter the site through a gate located along the
alleyway along the north side of the property. This gate may also serve as an exiting
point. Another entrance and/or exit that is located on the west side of the property may
also be utilized during part or all of the operation..
2.4 Allowable Materials
This site will only handle the following types of debris:
X Construction and Demolition debris
X Vegetative debris
X Municipal Solid Waste
X White goods
2.5 Site Operations
Debris will be transported to the NCS by citizens and unloaded by citizens and site staff
into the drop-boxes located at the unloading area. The containers will have screened lids
Packet Page 401 of 564
and will be emptied at a permitted disposal site when full. The maximum amount of
debris allowable on site will be dictated by the number of containers on-site. No debris
will be left at the site over night. See attached NCS Activity Plan Map.
2.5.1 Debris Movement
Vehicles will back up to a designated spot in the unloading area and unload debris into
the drop-box containers. Scavenging will not be permitted at the site. Customers are
instructed to keep small children and animals in their vehicles when at the facility.
2.5.2 Cleaning
Site staff will be responsible for picking up debris and litter at the site, sweeping the
concrete area and sweeping and raking spilled debris. Debris and spilled refuse will be
placed in the drop-box containers.
2.6 Site Controls
The following strategies will be used to mitigate nuisance conditions at the site.
2.6.1 Site Access
Fences will be used to prevent unauthorized access to the site.
2.6.2 Vector Control
Waste will be removed from the NCS on a daily basis. NCS site grounds will be kept
clean by operating personnel. No formal vector or pest controls beyond removing the
waste on a daily basis and maintaining the NCS site in a clean & sanitary condition are
anticipated.
2.6.3 Bird Hazards
No bird hazards are anticipated for this NCS site. Waste will be removed from the NCS
on a daily basis. NCS site grounds will be kept clean by operating personnel. No bird
controls beyond removing the waste on a daily basis and maintaining the NCS site in a
clean & sanitary condition are anticipated.
2.6.4 Nuisance Odors
Waste will be removed from the NCS on a daily basis. NCS site grounds will be kept
clean by operating personnel. No nuisance odors are anticipated as all waste will be
removed by the end of each day and the site will be maintained in a clean & sanitary
condition.
2.6.5 Storm water runoff
Storm water impacts from this temporary NCS site are not anticipated as the drop boxes
& waste unloading activities will be located on an impervious surface area and wastes
will be immediately loaded into the drop boxes. Impervious surface area at this site may
consist of asphalt or plastic/PVC sheeting. Spilled waste at this temporary NCS site will
be swept up or otherwise picked up on an ongoing basis during site operations and all
wastes will be removed by the end of each day.
2.7 Safety Plan
The City of Edmonds has on file with the Department of Labor and Industries a
recognized accident prevention program. The Snohomish County Operational Disaster
Debris Management Plan includes a detailed safety plan for disaster debris operations. The
Packet Page 402 of 564
City of Edmonds’ accident prevention program is in compliance with all OSHA and
WISHA regulations. A City of Edmonds Safety Manual and Operations Plan will be kept
at the site.
2.8 Training
The Snohomish County Operational Disaster Debris Management Plan includes a detailed
training plan for employees who participate in disaster debris operations.
2.9 Emergency Plans and Procedures
The general types of emergency conditions that may occur include fire and explosions. A
list of emergency phone numbers and contacts will be kept at the facility and updated
annually.
The general response to an emergency is:
• Assess the conditions and the impact on public health and operation of the facility.
• Determine the immediate response required with regard to public health and
safety considerations.
• Notify the appropriate personnel, utilities and regulatory agencies as soon as
possible.
• Take corrective action to restore the facility to normal operation.
Emergency telephone numbers include:
• Fire District 911
• Law Enforcement Agency 911
• Snohomish health District 425-339-5250
• Department of Ecology 360-407-6300
The nearest hospital is Swedish Stevens Hospital, which is located at 21600 76th Avenue W
in Edmonds, Washington.
2.9.1 Fire
Immediate fire protection for the site will be provided by portable fire extinguishers. Staff
will be familiar with the location of the fire extinguishers and trained in their use. All fire
extinguishers will be inspected annually. Any smoldering debris found at the facility will
be extinguished by portable fire extinguisher. The waste will then be turned over and
allowed to cool. All debris must be completely extinguished before loading into the drop
box containers to prevent a fire in the containers. In case of a major fire, the public will be
evacuated, all personnel will leave the area and the local fire department will be notified.
The site will be closed to all be emergency vehicles. The nearest fire station is located
approximately 200 yards from the drop box facility.
2.9.2 Explosions
The most likely source of explosion is reactive or explosive waste inadvertently disposed
of by the public. This could include small amounts of hazardous wastes, containers of
gasoline or other explosive liquid, fireworks or ammunition. To minimize the potential for
these occurrences, waste coming into the site will be observed by site staff. If suspicious
containers or materials are noted, the local fire department will be contacted regarding
proper removal and disposal.
If an explosion occurs at the drop box facility, eliminating any possible ignition sources,
such as vehicles and open flames, and evacuating the area will prevent the potential for
Packet Page 403 of 564
further explosions and injury. Anyone injured by an explosion will be given first aid and
the fire department or paramedics will be contacted immediately. The gates to the facility
will be closed to all but emergency vehicles.
2.10 Hazardous Waste
No hazardous waste, whether HHW or regulated business waste should be handled
through the NCS site. Residents or businesses that bring hazardous waste to the NCS will
be directed to take the material to one of the fixed moderate risk waste (MRW) collection
facilities or other suitable debris management sites. If hazardous waste is found in the
drop box containers, access to the area will be restricted. Any flames or other potential
sources of ignition will be removed from the area. The Snohomish Health District and
appropriate regulatory agencies will be notified. A hazardous waste materials response
team will be called to investigate the waste and determine how to remove it.
Debris from private vehicles may contain some small amounts of household hazardous
waste. Visual inspection of the materials cannot be expected to remove all quantities.
However, large and substantial amounts of hazardous waste will be strictly prohibited
from the neighborhood collection facility unless the facility is configured to handle and
process this type of waste.
2.11 Spill Control Plan
The NCS will not accept liquids or barrels that may contain liquids. Liquid spills must be
prevented from getting into storm drains. If a liquid spill is noticed at the site the
following actions will be taken:
• Restrict access to the area by the public.
• Berm off the area with absorbent material, such as newspaper and cardboard that
is available at the site, and prevent the liquid from reaching the storm water drains
or runoff ditches.
• Call a hazardous materials response team to investigate the liquid and determine
how to remove it
• If the liquid spilled is determined to be oil or hazardous material, notify the
Snohomish Health District at 425-339-5250.
• If the liquid spilled is determined to be non-hazardous, dispose of wet absorbent
material in the drop-boxes.
• If necessary, clean the floor to remove any contaminants.
2.12 Closure
2.12.1 General
The NCS will have a limited operational life based on the needs of the debris causing
incident. The final disposition of the site facilities and closure of the site will depend on
the pre-disaster use and the future use of the site. In general sites will be returned to their
pre-use condition. The following section presents a general closure plan for the facility.
2.12.2 Closure Procedure
• Any structures or machinery used to operate the facility will be removed.
• All waste will be removed from the site.
Packet Page 404 of 564
• New utilities installed as part of site development would be disconnected and the
structures supporting them removed. This would include telephone and
electricity.
• The drop-box area would be graded to a smooth surface or pre-existing contours.
For unpaved portions of the site that were disturbed, a suitable material mix
would be applied. Any grass areas disturbed by the operations would be returned
to pre-existing conditions and could include a re-seeding over the area.
• Paved surfaces will be swept clean and returned to pre-existing conditions. Storm
water catch basins shall be inspected and cleaned of accumulated debris if
necessary.
3 FACILITY INSPECTIONS, RECORD KEEEPING AND
REPORTING
3.1 Inspections
The City of Edmonds will conduct site inspections daily during the life of this NCS to
maintain the facility in good operating order and identify items needing maintenance. An
inspection sheet will be filled out for each inspection and will be kept on site in a logbook.
3.2 Record keeping
Daily records will be kept of the amount and type of solid waste delivered to and
removed from the site tracking the following factors:
• Waste delivered by the public will be documented by volume.
• The number and type of vehicles coming to the site
• Address where each load of debris originated from
A Daily Site Activity Form should be included as an attachment to this document1.
3.3 Reporting
A report will be prepared and submitted to the Snohomish Health District in accordance
with WAC 173-350-310 following the closure of the site. If the site is operated longer than
one year annual reports will be provided. The report will describe facility activities for the
previous year and will contain the following minimum information:
• Facility name and address
• Calendar year reported
• Annual quantity and type of debris received
1 A sample daily site activity log is included as attachment G to this document.
Packet Page 405 of 564
Debris Management Site Inventory
Investigation of Site Suitability
Site Name: Civic Center Playfield Parcel Number 00434210000000
Site Address: 300 Sixth Avenue N Site Coordinates: N 47.812
Estimated Property
Size:
8.1 acres W 122.374
Site Owner:
Ownership Type: X Jurisdiction Property County
Property
Private Property
Other (describe)
Owner Address: 121 5th Ave. N
Owner Phone: 425-775-2525
Owner Email:
Site and Neighboring Properties Characterization
Characteristic Comments
Current Use Sports field; outdoor event site
Proposed Future Land Use Unknown
Current Land use/Zoning Public Use
Restoration Time Requirements Unknown
Proximity to School, Church, or Community Center Adjacent to property
Property Topography Flat
Environmental Considerations Potential for ground/surface water contamination
Open Water or Wetlands None
Proximity to Ground Water Wells (wellhead protection area) Unknown
Within 100-year floodplain No
Soil/Slope Integrity Good
Surface Water Drainage Fair
Suitable for use in wet weather Yes
Prevailing Wind Direction Westerly
Brownfield Site No
Superfund Site No
Archeological or Historic Properties or Artifacts None
Underground Utilities (water, wastewater, natural gas, electricity) Yes
Noise Control Buffer No
Adjacent to Airport/Airfield No
Access to Electrical Service Yes
Access to Water Service Yes
Access to Sewer Service Yes
Existing Lighting Yes
Traffic Ingress/Egress Capacity Will require traffic control plan & attendants
Transportation accessibility (topography, traffic congestion) Suitable
Capable of Accepting Heavy Trucks (site and neighboring
roads)
Yes
Proximity to Major Roadway Within .5 mile to Main St. or 2i2th St. SW
Fencing and Other Security Features Yes
Site Preparation Level of Effort High X Medium Low
Packet Page 406 of 564
Suitability to Wet Weather X High Medium Low
Ability to Serve Spatial Area X High Medium Low
Recommended Uses for This Site:
X C&D X Vegetative X White Goods
X Hazardous Waste Other (describe)
Reduction Methods Acceptable for This Site:
Open Burning Incineration
Grinding X Other (describe) Collection for consolidation & transfer only
Site Map: Please indicate intended use areas, traffic management patterns, utilities, and any other
elements that will involve or impact operation of the site.
See attached NCS Activity Plan Map – Civic Center Playfield
List Jurisdictions that could utilize this site: City of Edmonds; Town of Woodway
Closest Recycling Facility Available to This Site: Recycling Area at County’s SWRTS facility in Mountlake
Terrace
Closest Yard Waste/Composting Facility Available to This Site: Fruhling Sand & Topsoil, 1010 228th St.
SW, Bothell
Closest CDL Facility Available to This Site: Unknown
Closest Transfer Station Available to This Site: Southwest Recycling & Transfer Station, 21311 61st Place
W, Mountlake Terrace
Closest Landfill Available to This Site: Unknown
Date of Site Survey: 10/2010
List pictures or other observations taken during site visit:
Potential Site Rating X Primary Secondary Tertiary
Packet Page 407 of 564
Packet Page 408 of 564
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
EDMONDS, WASHINGTON, TO ADOPT THE 2015 CITY OF
EDMONDS COMPREHENSIVE EMERGENCY MANAGEMENT
PLAN AND DISASTER DEBRIS MANAGEMENT PLAN.
_____________________________________________________________________________________
WHEREAS, the City of Edmonds has prepared a Comprehensive Emergency
Management Plan in accordance with RCW 38.52 and WAC 118-30; and
WHEREAS, the City of Edmonds has also had prepared a Disaster Debris
Management Plan; and
WHEREAS, the City has submitted these plans to the Washington State Military
Department, Emergency Management Division for review and acceptance;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EDMONDS,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
The Comprehensive Emergency Management and Disaster Debris Management Plans are
hereby adopted pursuant to the requirements of RCW 38.52 and WAC 118-30, to be
effective immediately upon adoption, and to continue in full force and effect until
amended. Copies of such plans are attached hereto as Exhibits A and B, and incorporated
by this reference as fully as if herein set forth.
RESOLVED this _____ day of _______________, 2015.
APPROVED:
________________________________
MAYOR, DAVID O. EARLING
ATTEST/AUTHENTICATED:
_____________________________________
CITY CLERK, SCOTT PASSEY
FILED WITH THE CITY CLERK:
PASSED BY THE CITY COUNCIL:
RESOLUTION NO.
Packet Page 409 of 564
AM-8166 7. A.
City Council Meeting
Meeting Date:12/15/2015
Time:10 Minutes
Submitted For:Jerry Shuster Submitted By:Megan Luttrell
Department:Engineering
Type: Forward to Consent
Information
Subject Title
Presentation of an Agreement with the State of Washington Department of Ecology for a Municipal
Stormwater Capacity Grant
Recommendation
Forward this item to the consent agenda for approval at the January 5, 2016 City Council meeting.
Previous Council Action
None.
Narrative
In 2015, the Washington State Legislature appropriated funds to the Department of Ecology (Ecology)
for implementation of the Western Washington Phase II Municipal Stormwater Permit. The Ecology
grant funding targets stormwater management and control by building capacity, improving local
stormwater programs, research, data management, and monitoring. Each jurisdiction subject to Ecology’s
Municipal Stormwater Permit receives $50,000 to use in the 2015-2017 biennium.
The City has received these grants in prior years and has used the funds to implement the public
education, public outreach, and other provisions of Ecology’s Municipal Stormwater Permits. This new
round of funding will be used to complete the update of the stormwater management code and associated
documents and to evaluate opportunities for integrating low impact development techniques into all
applicable portion of the Edmonds Community Development Code (ECDC), as required by Ecology’s
Municipal Stormwater Permit. Grant funds will also continue to be used for public education and outreach
on various stormwater management issues including natural yard care and rain gardens.
Fiscal Impact:
This grant will add $50,000 to the 422 Stormwater Utility Fund. There is no funding match required by
the City.
Attachments
Draft Ecology Grant Agreement
Form Review
Inbox Reviewed By Date
Engineering (Originator)Robert English 12/09/2015 05:10 PM
Packet Page 410 of 564
Public Works Phil Williams 12/11/2015 08:51 AM
City Clerk Scott Passey 12/11/2015 08:53 AM
Mayor Dave Earling 12/11/2015 10:03 AM
Finalize for Agenda Scott Passey 12/11/2015 10:03 AM
Form Started By: Megan Luttrell Started On: 12/01/2015 03:26 PM
Final Approval Date: 12/11/2015
Packet Page 411 of 564
Page 1 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
Agreement WQSWCAP-1517-Edmond-00056
WATER QUALITY STORMWATER CAPACITY AGREEMENT
BETWEEN THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY
AND
City of Edmonds
This is a binding Agreement entered into by and between the State of Washington, Department of Ecology,
hereinafter referred to as “ECOLOGY” and City of Edmonds, hereinafter referred to as the "RECIPIENT" to carry
out with the provided funds activities described herein.
2015-2017 Biennial Stormwater Capacity Grants
GENERAL INFORMATION
Project Title:
Total Cost:$50,000.00
Total Eligible Cost:$50,000.00
Ecology Share:$50,000.00
Recipient Share:$0.00
The Effective Date of this Agreement is:07/01/2015
The Expiration Date of this Agreement is no later than 03/31/2017
Project Type:Capacity Grant
Project Short Description:
This project will assist Phase I and II Permittes in implementation or management of municipal stormwater
programs.
Project Long Description:
N/A
Overall Goal:
This project will improve water quality in the State of Washington by reducing stormwater pollutants discharged to
state water bodies.
WQSWCAP-1517-Edmond-00056 Packet Page 412 of 564
Page 2 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
RECIPIENT INFORMATION
Organization Name: City of Edmonds
Federal Tax ID: 91-6001244
DUNS Number: 040172827
Mailing Address: 121 5th Ave N
Edmonds, WA, 98115
Physical Address: 121 5th Ave N
Edmonds, Washington, 98020
Contacts
Project Manager Jerry Shuster
121 5th Ave N.
Edmonds, Washington, 98020
Email: jerry.shuster@edmondswa.gov
Phone: (425) 771-0220
Billing Contact
Authorized
Signatory
Megan Luttrell
Admin Assistant
121 5th Ave N
Edmonds, Washington, 98020
Email: megan.luttrell@edmondswa.gov
Phone: (425) 771-0220
David O Earling
Mayor
121 5th Avenue North
Edmonds, Washington, 98020
Email: dave.earling@edmondswa.gov
Phone: (425) 771-0247
Organization Email: jerry.shuster@edmondswa.gov
WQSWCAP-1517-Edmond-00056 Packet Page 413 of 564
Page 3 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
ECOLOGY INFORMATION
Mailing Address: Department of Ecology
Water Quality
PO BOX 47600
Olympia, WA 98504-7600
Physical Address: Water Quality
300 Desmond Drive
Lacey, WA 98503
Contacts
Project
Manager
Financial
Manager
Kyle Graunke
P.O. Box 47600
Olympia, Washington, 98504-7600
Email: kygr461@ecy.wa.gov
Phone: (360) 407-6638
Kyle Graunke
P.O. Box 47600
Olympia, Washington, 98504-7600
Email: kygr461@ecy.wa.gov
Phone: (360) 407-6638
WQSWCAP-1517-Edmond-00056 Packet Page 414 of 564
Page 4 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
RECIPIENT agrees to furnish the necessary personnel, equipment, materials, services, and otherwise do all things
necessary for or incidental to the performance of work as set forth in the Scope of Work.
RECIPIENT agrees to read, understand, and accept all information contained within this entire Agreement.
Furthermore, RECIPIENT acknowledges that they have reviewed the terms and conditions of this Agreement, Scope
of Work, attachments, all incorporated or referenced documents, as well as all applicable laws, statutes, rules,
regulations, and guidelines mentioned in this Agreement.
This Agreement contains the entire understanding between the parties, and there are no other understandings or
representations other than as set forth, or incorporated by reference, herein.
This Agreement shall be subject to the written approval of Ecology’s authorized representative and shall not be
binding until so approved.
The signatories to this Agreement represent that they have the authority to execute this Agreement.
IN WITNESS WHEREOF, the parties hereby sign this Agreement
Washington State
Department of Ecology
Water Quality
Program Manager Date Date
City of Edmonds
Heather Bartlett Mayor
David O Earling
WQSWCAP-1517-Edmond-00056 Packet Page 415 of 564
Page 5 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
SCOPE OF WORK
Task Number: 1 Task Cost: $5,000.00
Task Title: Project Administration/Management
Task Description:
A. The RECIPIENT shall carry out all work necessary to meet ECOLOGY grant or loan administration requirements.
Responsibilities include, but are not limited to: maintenance of project records; submittal of requests for
reimbursement and corresponding backup documentation; progress reports; and a recipient closeout report (including
photos).
B. The RECIPIENT shall maintain documentation demonstrating compliance with applicable procurement,
contracting, and interlocal agreement requirements; application for, receipt of, and compliance with all required
permits, licenses, easements, or property rights necessary for the project; and submittal of required performance items.
C. The RECIPIENT shall manage the project. Efforts include, but are not limited to: conducting, coordinating, and
scheduling project activities and assuring quality control. Every effort will be made to maintain effective
communication with the RECIPIENT's designees; ECOLOGY; all affected local, state, or federal jurisdictions; and any
interested individuals or groups. The RECIPIENT shall carry out this project in accordance with any completion dates
outlined in this agreement.
Task Goal Statement:
Properly managed and fully documented project that meets ECOLOGY’s grant or loan administrative requirements.
Task Expected Outcome:
* Timely and complete submittal of requests for reimbursement, quarterly progress reports, and RECIPIENT closeout
report.
* Properly maintained project documentation
Deliverables
Project Administration/Management
Number Description Due Date
1.1 Quarterly Progress Reports
1.2 Recipient Closeout Report
1.3 Project Outcome Summary Report
WQSWCAP-1517-Edmond-00056 Packet Page 416 of 564
Page 6 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
SCOPE OF WORK
Task Number: 2 Task Cost: $45,000.00
Task Title: Project Administration/Management
Task Description:
Conduct work related to implementation of municipal stormwater National Pollutant Discharge Elimination System
(NPDES) permit requirements. If the RECIPIENT is out of compliance with the municipal stormwater National
Pollutant Discharge Elimination System (NPDES) permit, the RECIPIENT will ensure funds are used to attain
compliance where applicable.
RECIPIENT may conduct work related to implementation of additional activities required by the municipal stormwater
NPDES permits. The following is a list of elements RECIPIENT’s project may include.
1) Public education and outreach activities, including stewardship activities.
2) Public involvement and participation activities.
3) Illicit discharge detection and elimination (IDDE) program activities, including:
a) Mapping or geographic information systems of municipal separate storm sewer systems (MS4s).
b) Staff training.
c) Activities to identify and remove illicit stormwater discharges.
d) Field screening procedures.
e) Complaint hotline database or tracking system improvements.
4) Activities to support programs to control runoff from new development, redevelopment, and construction sites,
including:
a) Development of an ordinance and associated technical manual or update of applicable codes.
b) Inspections before, during, and upon completion of construction, or for post-construction long-term maintenance.
c) Training for plan review and/or inspection staff.
d) Participation in applicable watershed planning effort.
5) Pollution prevention, good housekeeping, and operation and maintenance program activities, such as:
a) Inspecting and/or maintaining the MS4 infrastructure.
b) Developing and/or implementing policies, procedures, or stormwater pollution prevention plans at municipal
properties or facilities.
6) Annual reporting activities.
7) Establishing and refining stormwater utilities, including stable rate structures.
8) Water quality monitoring to implement permit requirements for a Water Cleanup Plan (TMDL). Note that any
monitoring funded by this program requires submittal of a Quality Assurance Project Plan (QAPP) that the
DEPARMENT approves prior to awarding funding for monitoring.
Monitoring, including:
a) Development of applicable QAPPs.
b) Monitoring activities, in accordance with a DEPARTMENT- approved QAPP, to meet Phase I/II permit
requirements.
9) Structural stormwater controls program activities (Phase I permit requirement)
10) Source control for existing development (Phase I permit requirement), including:
a) Inventory and inspection program.
b) Technical assistance and enforcement.
c) Staff training.
11) Equipment purchases that result directly in improved compliance with permit requirements. Allowed costs for
equipment purchases must be specific to implementing a permit requirement (such as a vactor truck) rather than
WQSWCAP-1517-Edmond-00056 Packet Page 417 of 564
Page 7 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
general use (such as a general use pick-up truck). Qualified equipment purchases include but are not limited to:
a) Illicit discharge testing equipment and materials.
b) Vactor truck or sweeper truck or MS4 maintenance activities.
c) Electronic devices dedicated to mapping of MS4 facilities and attributes.
d) Software dedicated to tracking permit implementation activities.
As a deliverable, documentation of all tasks completed is required. Documentation includes but is not limited to:
maps, field reports, dates and number of inspections conducted, dates of trainings held and participant lists, number of
illicit discharges investigated and removed, summaries of planning, stormwater utility or procedural updates, annual
reports, copies of approved QAPPs, summaries of structural or source control activities, summaries of how equipment
purchases have increased or improved permit compliance.
Task Goal Statement:
This task will improve water quality in the State of Washington by reducing the pollutants delivered by stormwater to
lakes, streams, and the Puget Sound by implementing measures required by Phase I and II NPDES permits.
Task Expected Outcome:
RECIPIENTS will implement measures required by Phase I and II NPDES permits.
Deliverables
Project Administration/Management
Number Description Due Date
2.1 Documentation of tasks completed
WQSWCAP-1517-Edmond-00056 Packet Page 418 of 564
Page 8 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
BUDGET
Funding Distribution EG160352
Funding Title:Capacity Grant FY16
Funding Type:Grant
Funding Effective Date: 07/01/2015
Funding Source:
Title: ELSA: Environmental Legacy Stewardship Account
Type: State
CFDA:
Assistance Agreement:
Description:
MTCA
Recipient Match %: 0
InKind Interlocal Allowed: No
InKind Other Allowed: No
Is this Funding Distribution used to match a federal grant? No
Funding Expiration Date: 03/31/2017
Capacity Grant FY16 Task Total
Project Administration/Management 2,500.00$
Permit Implementation 22,500.00$
25,000.00$Total:
WQSWCAP-1517-Edmond-00056 Packet Page 419 of 564
Page 9 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
BUDGET
Funding Distribution EG160353
Funding Title:Capacity Grant FY17
Funding Type:Grant
Funding Effective Date: 07/01/2015
Funding Source:
Title: ELSA: Environmental Legacy Stewardship Account
Type: State
CFDA:
Assistance Agreement:
Description:
MTCA
Recipient Match %: 0
InKind Interlocal Allowed: No
InKind Other Allowed: No
Is this Funding Distribution used to match a federal grant? No
Funding Expiration Date: 03/31/2017
Capacity Grant FY17 Task Total
Project Administration/Management 2,500.00$
Permit Implementation 22,500.00$
25,000.00$Total:
WQSWCAP-1517-Edmond-00056 Packet Page 420 of 564
Page 10 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
Funding Distribution Summary
Recipient / Ecology Share
Recipient Share Ecology Share TotalRecipient Match %Funding Distribution Name
$$$%25,000.00 25,000.000.000.00Capacity Grant FY16
$$$%25,000.00 25,000.000.000.00Capacity Grant FY17
Total $$0.00 50,000.00 $50,000.00
AGREEMENT SPECIFIC TERMS AND CONDITIONS
N/A
SPECIAL TERMS AND CONDITIONS
SECTION 1: DEFINITIONS
Unless otherwise provided, the following terms will have the respective meanings for all purposes of this agreement:
“Administration Charge” means a charge established in accordance with Chapter 90.50A RCW and Chapter 173-98
WAC, to be used to pay Ecology’s cost to administer the State Revolving Fund by placing a percentage of the interest
earned in an Administrative Charge Account.
“Administrative Requirements” means the effective edition of ECOLOGY's ADMINISTRATIVE REQUIREMENTS
FOR RECIPIENTS OF ECOLOGY GRANTS AND LOANS at the signing of this agreement.
“Annual Debt Service” for any calendar year means for any applicable bonds or loans including the loan, all interest
plus all principal due on such bonds or loans in such year.
“Average Annual Debt Service” means, at the time of calculation, the sum of the Annual Debt Service for the
remaining years of the loan to the last scheduled maturity of the loan divided by the number of those years.
“Centennial Clean Water Program” means the state program funded from various state sources.
“Contract Documents” means the contract between the RECIPIENT and the construction contractor for construction of
the project.
“Cost Effective Analysis” means a comparison of the relative cost-efficiencies of two or more potential ways of solving
a water quality problem as described in Chapter 173-98-730 WAC.
“Defease” or “Defeasance” means the setting aside in escrow or other special fund or account of sufficient investments
and money dedicated to pay all principal of and interest on all or a portion of an obligation as it comes due.
“Effective Date” means the earliest date on which eligible costs may be incurred.
“Effective Interest Rate” means the total interest rate established by Ecology that includes the Administrative Charge.
WQSWCAP-1517-Edmond-00056 Packet Page 421 of 564
Page 11 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
“Estimated Loan Amount” means the initial amount of funds loaned to the RECIPIENT.
“Estimated Loan Repayment Schedule” means the schedule of loan repayments over the term of the loan based on the
Estimated Loan Amount.
“Equivalency” means projects designated by ECOLOGY to meet additional federal requirements.
“Final Accrued Interest” means the interest accrued beginning with the first disbursement of funds to the RECIPIENT
through such time as the loan is officially closed out and a final loan repayment schedule is issued.
“Final Loan Amount” means all principal of and interest on the loan from the Project Start Date through the Project
Completion Date.
“Final Loan Repayment Schedule” means the schedule of loan repayments over the term of the loan based on the Final
Loan Amount.
“Forgivable Principal” means the portion of a loan that is not required to be paid back by the borrower.
“General Obligation Debt” means an obligation of the RECIPIENT secured by annual ad valorem taxes levied by the
RECIPIENT and by the full faith, credit, and resources of the RECIPIENT.
“General Obligation Payable from Special Assessments Debt” means an obligation of the RECIPIENT secured by a
valid general obligation of the Recipient payable from special assessments to be imposed within the constitutional and
statutory tax limitations provided by law without a vote of the electors of the RECIPIENT on all of the taxable property
within the boundaries of the RECIPIENT.
“Gross Revenue” means all of the earnings and revenues received by the RECIPIENT from the maintenance and
operation of the Utility and all earnings from the investment of money on deposit in the Loan Fund, except (i) Utility
Local Improvement Districts (ULID) Assessments, (ii) government grants, (iii) RECIPIENT taxes, (iv) principal
proceeds of bonds and other obligations, or (v) earnings or proceeds (A) from any investments in a trust, Defeasance, or
escrow fund created to Defease or refund Utility obligations or (B) in an obligation redemption fund or account other
than the Loan Fund until commingled with other earnings and revenues of the Utility or (C) held in a special account
for the purpose of paying a rebate to the United States Government under the Internal Revenue Code.
“Guidelines” means the ECOLOGY's Funding Guidelines that that correlate to the State Fiscal Year in which the
project is funded.
“Initiation of Operation Date” means the actual date the Water Pollution Control Facility financed with proceeds of the
loan begins to operate for its intended purpose.
“Loan” means the Washington State Water Pollution Control Revolving Fund Loan or Centennial Clean Water Fund
(Centennial) Loan made pursuant to this loan agreement.
“Loan Amount” means either an Estimated Loan Amount or a Final Loan Amount, as applicable.
“Loan Fund” means the special fund of that name created by ordinance or resolution of the RECIPIENT for the
repayment of the principal of and interest on the loan.
WQSWCAP-1517-Edmond-00056 Packet Page 422 of 564
Page 12 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
“Loan Security” means the mechanism by which the RECIPIENT pledges to repay the loan.
“Loan Term” means the repayment period of the loan.
“Maintenance and Operation Expense” means all reasonable expenses incurred by the RECIPIENT in causing the
Utility to be operated and maintained in good repair, working order, and condition including payments to other parties,
but will not include any depreciation or RECIPIENT levied taxes or payments to the RECIPIENT in lieu of taxes.
“Net Revenue” means the Gross Revenue less the Maintenance and Operation Expense.
“Original Engineer’s Estimate” means the engineer’s estimate of construction costs included with bid documents.
“Principal and Interest Account” means, for a loan that constitutes Revenue-Secured Debt, the account of that name
created in the loan fund to be first used to repay the principal of and interest on the loan.
“Project” means the project described in this agreement.
“Project Completion Date” means the date specified in the agreement on which the Scope of Work will be fully
completed.
“Project Schedule” means that schedule for the project specified in the agreement.
“Reserve Account” means, for a loan that constitutes Revenue-Secured Debt, the account of that name created in the
loan fund to secure the payment of the principal of and interest on the loan.
“Revenue-Secured Debt” means an obligation of the RECIPIENT secured by a pledge of the revenue of a utility and
one not a general obligation of the RECIPIENT.
“Risk-Based Determination” means an approach to sub-recipient monitoring and oversight based on risk factors
associated to a RECIPIENT or project.
“Scope of Work” means the tasks and activities constituting the project.
“Section 319” means the section of the Clean Water Act that provides funding to address nonpoint sources of water
pollution.
“Senior Lien Obligations” means all revenue bonds and other obligations of the RECIPIENT outstanding on the date of
execution of this loan agreement (or subsequently issued on a parity therewith, including refunding obligations) or
issued after the date of execution of this loan agreement having a claim or lien on the Gross Revenue of the Utility prior
and superior to the claim or lien of the loan, subject only to Maintenance and Operation Expense.
“State Water Pollution Control Revolving Fund (Revolving Fund)” means the water pollution control revolving fund
established by Chapter 90.50A.020 RCW.
“Termination Date” means the effective date of ECOLOGY’s termination of the agreement.
“Termination Payment Date” means the date on which the RECIPIENT is required to repay to ECOLOGY any
outstanding balance of the loan and all accrued interest.
WQSWCAP-1517-Edmond-00056 Packet Page 423 of 564
Page 13 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
“Total Eligible Project Cost” means the sum of all costs associated with a water quality project that have been
determined to be eligible for ECOLOGY grant or loan funding.
“Total Project Cost” means the sum of all costs associated with a water quality project, including costs that are not
eligible for ECOLOGY grant or loan funding.
“ULID” means any utility local improvement district of the RECIPIENT created for the acquisition or construction of
additions to and extensions and betterments of the Utility.
“ULID Assessments” means all assessments levied and collected in any ULID. Such assessments are pledged to be
paid into the Loan Fund (less any prepaid assessments permitted by law to be paid into a construction fund or account).
ULID Assessments will include principal installments and any interest or penalties which may be due.
“Utility” means the sewer system, stormwater system, or the combined water and sewer system of the RECIPIENT, the
Net Revenue of which is pledged to pay and secure the loan.
SECTION 2: THE FOLLOWING CONDITIONS APPLY TO ALL RECIPIENTS OF WATER QUALITY FINANCIAL
ASSISTANCE FUNDING.
The Water Quality Financial Assistance Funding Guidelines are included in this agreement by reference.
A. Architectural and Engineering Services: The RECIPIENT certifies by signing this agreement that the requirements
of Chapter 39.80 RCW, “Contracts for Architectural and Engineering Services,” have been, or shall be, met in
procuring qualified architectural/engineering services. The RECIPIENT shall identify and separate eligible and
ineligible costs in the final negotiated agreement and submit a copy of the agreement to ECOLOGY.
B. Best Management Practices (BMP) Implementation: If the RECIPIENT installs BMPs that are not approved by
ECOLOGY prior to installation, the RECIPIENT assumes the risk that part or all of the reimbursement for that activity
may be delayed or ineligible. For more details regarding BMP Implementation, please reference the Water Quality
Financial Assistance Funding Guidelines available on ECOLOGY’s Water Quality Program funding website.
C. Cultural and Historic Resources Protection Compliance with Environmental Laws and Regulations. The
RECIPIENT shall:
1) The RECIPIENT shall comply with all applicable federal, state and local environmental laws, statutes, regulations,
executive orders, and permits.
2) The RECIPIENT shall comply with Ecology’s Archaeological Resource and Historic Property review process. The
RECIPIENT agrees that in no case shall construction activities, ground disturbance, or excavation of any kind, begin
until provisions of this process are complied with. The RECIPIENT is responsible for developing a complete
Inadvertent Discovery Plan (IDP). The IDP must be immediately available by request by any party. An IDP must be
immediately available and be implemented to address any discovery. The RECIPIENT will implement the procedures
in the IDP, and immediately notify ECOLOGY, the Department of Archeology and Historic Preservation (DAHP), and
tribal representatives if human remains, cultural, or archeological resources are discovered in the course of construction.
For more details regarding requirements under this provision, please reference the Water Quality Financial Assistance
Funding Guidelines available on ECOLOGY’s Water Quality Program funding website.
D. Electronic Fund Transfers: The RECIPIENT must register as a statewide vendor in order to receive payment
reimbursement. Washington State’s Department of Enterprise Services (DES) issues all payments. DES maintains a
WQSWCAP-1517-Edmond-00056 Packet Page 424 of 564
Page 14 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
central vendor file for Washington State agency use to process vendor payments. The RECIPIENT can complete the
registration process online at http://des.wa.gov/services/ContractingPurchasing/Business/VendorPay/Pages/default.aspx.
This registration process also allows The RECIPIENT to sign up for direct deposit payments, also known as electronic
fund transfers (EFT). If The RECIPIENT have questions about the vendor registration process or setting up direct
deposit payments contact DES at the Payee Help Desk at (360) 664-7779 or payeehelpdesk@des.wa.gov.
E. Equipment Purchase: Equipment not included in the scope of work or a construction plan and specification approval
must be pre-approved by ECOLOGY’s project manager before purchase.
F. Funding Recognition: The RECIPIENT must inform the public about ECOLOGY or any EPA (see Section 3 for
Section 319 funded projects or 7 for SRF funded projects) funding participation in this project through the use of
project signs, acknowledgement in published materials, reports, the news media, websites, or other public
announcements. Projects addressing site-specific locations must utilize appropriately sized and weather-resistant signs.
Sign logos are available from ECOLOGY’s Financial Manager upon request.
G. Growth Management Planning: The RECIPIENT certifies by signing this agreement that it is in compliance with the
requirements of Chapter 36.70A RCW, “Growth Management Planning by Selected Counties and Cities.” If the status
of compliance changes, either through RECIPIENT or legislative action, the RECIPIENT shall notify ECOLOGY in
writing of this change within 30 days.
H. Interlocal: The RECIPIENT certifies by signing this agreement that all negotiated interlocal agreements necessary
for the project are, or shall be, consistent with the terms of this agreement and Chapter 39.34 RCW, “Interlocal
Cooperation Act.” The RECIPIENT shall submit a copy of each interlocal agreement necessary for the project to
ECOLOGY.
I. Lobbying and Litigation: Costs incurred for the purposes of lobbying or litigation are not eligible for funding under
this agreement.
J. Post Project Assessment Survey: The RECIPIENT agrees to participate in a brief survey regarding the key project
results or water quality project outcomes and the status of long-term environmental results or goals from the project
approximately three years after project completion. A representative from ECOLOGY’s Water Quality Program may
contact the RECIPIENT to request this data. ECOLOGY may also conduct site interviews and inspections, and may
otherwise evaluate the project, as part of this assessment.
K. Project Status Evaluation: ECOLOGY may evaluate the status of this project 18 months from the effective date of
this agreement. ECOLOGY’s Project Manager and Financial Manager will meet with the RECIPIENT to review
spending trends, completion of outcome measures, and overall project administration and performance. If the
RECIPIENT fails to make satisfactory progress toward achieving project outcomes, ECOLOGY may change the scope
of work, reduce grant funds, or increase oversight measures.
L. Technical Assistance: Technical assistance for agriculture activities provided under the terms of this agreement will
be consistent with the current U.S. Natural Resource Conservation Service (“NRCS”) Field Office Technical Guide for
Washington State. However, ECOLOGY may accept as eligible technical assistance, proposed practices, or project
designs that do not meet these standards if approved in writing by the NRCS and ECOLOGY.
SECTION 3: THE FOLLOWING CONDITIONS APPLY TO ALL RECIPIENTS OF SFY15-17 CAPACITY
GRANTS
ECOLOGY shall reimburse eligible project expenses following the schedule below.
WQSWCAP-1517-Edmond-00056 Packet Page 425 of 564
Page 15 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
Prior to July 1, 2016: Total reimbursements to the RECIPIENT for eligible project expenses are limited to a maximum
$25,000.
After July 1, 2016: If funding is available, ECOLOGY will provide written notification via email to the RECIPIENT
project manager stating that ECOLOGY may reimburse additional eligible expenses up to the total project eligible cost
of $50,000. Eligible project expenses may be incurred at any time between July 1, 2015 and March 31, 2017. If
additional funds are not available, total reimbursements for eligible project expenses will be limited to a maximum of
$25,000.
If the RECIPENT fails to submit two or more consecutive quarterly reports via the EAGL grant management system,
ECOLOGY may consider this failure to provide progress reports as non-performance and initiate actions to amend or
terminate this agreement.
GENERAL FEDERAL CONDITIONS
If a portion or all of the funds for this agreement are provided through federal funding sources or this
agreement is used to match a federal grant award, the following terms and conditions apply to you.
CERTIFICATION REGARDING SUSPENSION, DEBARMENT, INELIGIBILITY OR VOLUNTARY EXCLUSION:
1. The RECIPIENT/CONTRACTOR, by signing this agreement, certifies that it is not suspended, debarred,
proposed for debarment, declared ineligible or otherwise excluded from contracting with the federal
government, or from receiving contracts paid for with federal funds. If the RECIPIENT/CONTRACTOR is
unable to certify to the statements contained in the certification, they must provide an explanation as to why they
cannot.
2. The RECIPIENT/CONTRACTOR shall provide immediate written notice to ECOLOGY if at any time the
RECIPIENT/CONTRACTOR learns that its certification was erroneous when submitted or had become
erroneous by reason of changed circumstances.
3. The terms covered transaction, debarred, suspended, ineligible, lower tier covered transaction, participant,
person, primary covered transaction, principal, proposal, and voluntarily excluded, as used in this clause, have
the meaning set out in the Definitions and Coverage sections of rules implementing Executive Order 12549.
You may contact the department for assistance in obtaining a copy of those regulations..
4. The RECIPIENT/CONTRACTOR agrees it shall not knowingly enter into any lower tier covered transaction
with a person who is proposed for debarment under the applicable Code of Federal Regulations, debarred,
suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction.
5. The RECIPIENT/CONTRACTOR further agrees by signing this agreement, that it will include this clause titled
“CERTIFICATION REGARDING SUSPENSION, DEBARMENT, INELIGIBILITY OR VOLUNTARY
EXCLUSION” without modification in all lower tier covered transactions and in all solicitations for lower tier
covered transactions.
6. Pursuant to 2CFR180.330, the RECIPIENT/CONTRACTOR is responsible for ensuring that any lower tier
covered transaction complies with certification of suspension and debarment requirements.
7. RECIPIENT/CONTRACTOR acknowledges that failing to disclose the information required in the Code of
Federal Regulations may result in the delay or negation of this funding agreement, or pursuance of legal
remedies, including suspension and debarment.
8. RECIPIENT/CONTRACTOR agrees to keep proof in its agreement file, that it, and all lower tier recipients or
contractors, are not suspended or debarred, and will make this proof available to ECOLOGY before requests for
reimbursements will be approved for payment. RECIPIENT/CONTRACTOR must run a search in
<http://www.sam.gov> and print a copy of completed searches to document proof of compliance.
WQSWCAP-1517-Edmond-00056 Packet Page 426 of 564
Page 16 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
Federal Funding Accountability And Transparency Act (FFATA) Reporting Requirements:
RECIPIENT must complete the FFATA Data Collection Form (ECY 070-395) and return it with the signed
agreement to ECOLOGY.
Any RECIPIENT that meets each of the criteria below must also report compensation for its five top executives,
using FFATA Data Collection Form.
· Receives more than $25,000 in federal funds under this award; and
· Receives more than 80 percent of its annual gross revenues from federal funds; and
· Receives more than $25,000,000 in annual federal funds
ECOLOGY will not pay any invoice until it has received a completed and signed FFATA Data Collection Form.
ECOLOGY is required to report the FFATA information for federally funded agreements, including the required
DUNS number, at www.fsrs.gov <http://www.fsrs.gov> within 30 days of agreement signature. The FFATA
information will be available to the public at www.usaspending.gov <http://www.usaspending.gov>.
For more details on FFATA requirements, see www.fsrs.gov <http://www.fsrs.gov>.
GENERAL TERMS AND CONDITIONS
1. ADMINISTRATIVE REQUIREMENTS
a) RECIPIENT shall follow the "Administrative Requirements for Recipients of Ecology Grants and Loans – EAGL
Edition". https://fortress.wa.gov/ecy/publications/SummaryPages/1401002.html
b) RECIPIENT shall complete all activities funded by this Agreement and be fully responsible for the proper
management of all funds and resources made available under this Agreement.
c) RECIPIENT agrees to take complete responsibility for all actions taken under this Agreement, including ensuring
all subgrantees and contractors comply with the terms and conditions of this Agreement. ECOLOGY reserves the right
to request proof of compliance by subgrantees and contractors.
d) RECIPIENT’s activities under this Agreement shall be subject to the review and approval by ECOLOGY for the
extent and character of all work and services.
2. AMENDMENTS AND MODIFICATIONS
This Agreement may be altered, amended, or waived only by a written amendment executed by both parties. No
subsequent modification(s) or amendment(s) of this Agreement will be of any force or effect unless in writing and
signed by authorized representatives of both parties. ECOLOGY and the RECIPIENT may change their respective staff
contacts and administrative information without the concurrence of either party.
3. ARCHAEOLOGICAL AND CULTURAL RESOURCES
RECIPIENT shall take reasonable action to avoid, minimize, or mitigate adverse effects to archeological or cultural
resources. Activities associated with archaeological and cultural resources are an eligible reimbursable cost subject to
approval by ECOLOGY.
RECIPIENT shall:
a) Immediately cease work and notify ECOLOGY if any archeological or cultural resources are found while
conducting work under this Agreement.
WQSWCAP-1517-Edmond-00056 Packet Page 427 of 564
Page 17 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
b) Immediately notify the Department of Archaeology and Historic Preservation at (360) 586-3064, in the event
historical or cultural artifacts are discovered at a work site.
c) Comply with Governor Executive Order 05-05, Archaeology and Cultural Resources, for any capital construction
projects prior to the start of any work.
d) Comply with RCW 27.53, Archaeological Sites and Resources, for any work performed under this Agreement, as
applicable. National Historic Preservation Act (NHPA) may require the RECIPIENT to obtain a permit pursuant to
Chapter 27.53 RCW prior to conducting on-site activity with the potential to impact cultural or historic properties.
4. ASSIGNMENT
No right or claim of the RECIPIENT arising under this Agreement shall be transferred or assigned by the RECIPIENT.
5. COMMUNICATION
RECIPIENT shall make every effort to maintain effective communications with the RECIPIENT's designees,
ECOLOGY, all affected local, state, or federal jurisdictions, and any interested individuals or groups.
6. COMPENSATION
a) Any work performed prior to effective date of this Agreement will be at the sole expense and risk of the
RECIPIENT. ECOLOGY must sign the Agreement before any payment requests can be submitted.
b) Payments will be made on a reimbursable basis for approved and completed work as specified in this Agreement.
c) RECIPIENT is responsible to determine if costs are eligible. Any questions regarding eligibility should be clarified
with ECOLOGY prior to incurring costs. Costs that are conditionally eligible may require approval by ECOLOGY
prior to purchase.
d) RECIPIENT shall not invoice more than once per month unless agreed on by ECOLOGY.
e) ECOLOGY will not process payment requests without the proper reimbursement forms, Progress Report and
supporting documentation. ECOLOGY will provide instructions for submitting payment requests.
f) ECOLOGY will pay the RECIPIENT thirty (30) days after receipt of a properly completed request for payment.
g) RECIPIENT will receive payment through Washington State Department of Enterprise Services’ Statewide Payee
Desk. RECIPIENT must register as a payee by submitting a Statewide Payee Registration form and an IRS W-9 form at
the website, http://www.des.wa.gov/services/ContractingPurchasing/Business/VendorPay/Pages/default.aspx. For any
questions about the vendor registration process contact the Statewide Payee Help Desk at (360) 407-8180 or email
payeehelpdesk@des.wa.gov.
h) ECOLOGY may, at its sole discretion, withhold payments claimed by the RECIPIENT if the RECIPIENT fails to
satisfactorily comply with any term or condition of this Agreement.
i) Monies withheld by ECOLOGY may be paid to the RECIPIENT when the work described herein, or a portion
thereof, has been completed if, at ECOLOGY's sole discretion, such payment is reasonable and approved according to
this Agreement, as appropriate, or upon completion of an audit as specified herein.
j) RECIPIENT should submit final requests for compensation within thirty (30) days after the expiration date of this
Agreement. Failure to comply may result in delayed reimbursement.
7. COMPLIANCE WITH ALL LAWS
RECIPIENT agrees to comply fully with all applicable Federal, State and local laws, orders, regulations, and permits
related to this Agreement, including but not limited to:
a) RECIPIENT agrees to comply with all applicable laws, regulations, and policies of the United States and the State
of Washington which affect wages and job safety.
b) RECIPIENT agrees to be bound by all federal and state laws, regulations, and policies against discrimination.
c) RECIPIENT certifies full compliance with all applicable state industrial insurance requirements.
d) RECIPIENT agrees to secure and provide assurance to ECOLOGY that all the necessary approvals and permits
required by authorities having jurisdiction over the project are obtained. RECIPIENT must include time in their project
timeline for the permit and approval processes.
WQSWCAP-1517-Edmond-00056 Packet Page 428 of 564
Page 18 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
ECOLOGY shall have the right to immediately terminate for cause this Agreement as provided herein if the
RECIPIENT fails to comply with above requirements.
If any provision of this Agreement violates any statute or rule of law of the state of Washington, it is considered
modified to conform to that statute or rule of law.
8. CONFLICT OF INTEREST
RECIPIENT and ECOLOGY agree that any officer, member, agent, or employee, who exercises any function or
responsibility in the review, approval, or carrying out of this Agreement, shall not have any personal or financial
interest, direct or indirect, nor affect the interest of any corporation, partnership, or association in which he/she is a part,
in this Agreement or the proceeds thereof.
9. CONTRACTING FOR GOODS AND SERVICES
RECIPIENT may contract to buy goods or services related to its performance under this Agreement. RECIPIENT shall
award all contracts for construction, purchase of goods, equipment, services, and professional architectural and
engineering services through a competitive process, if required by State law. RECIPIENT is required to follow
procurement procedures that ensure legal, fair, and open competition.
RECIPIENT must have a standard procurement process or follow current state procurement procedures. RECIPIENT
may be required to provide written certification that they have followed their standard procurement procedures and
applicable state law in awarding contracts under this Agreement.
ECOLOGY reserves the right to inspect and request copies of all procurement documentation, and review procurement
practices related to this Agreement. Any costs incurred as a result of procurement practices not in compliance with
state procurement law or the RECIPIENT's normal procedures may be disallowed at ECOLOGY’s sole discretion.
10. DISPUTES
When there is a dispute with regard to the extent and character of the work, or any other matter related to this
Agreement the determination of ECOLOGY will govern, although the RECIPIENT shall have the right to appeal
decisions as provided for below:
a) RECIPIENT notifies the funding program of an appeal request.
b) Appeal request must be in writing and state the disputed issue(s).
c) RECIPIENT has the opportunity to be heard and offer evidence in support of its appeal.
d) ECOLOGY reviews the RECIPIENT’s appeal.
e) ECOLOGY sends a written answer within ten (10) business days, unless more time is needed, after concluding the
review.
The decision of ECOLOGY from an appeal will be final and conclusive, unless within thirty (30) days from the date of
such decision, the RECIPIENT furnishes to the Director of ECOLOGY a written appeal. The decision of the Director or
duly authorized representative will be final and conclusive.
The parties agree that this dispute process will precede any action in a judicial or quasi-judicial tribunal.
Appeals of the Director's decision will be brought in the Superior Court of Thurston County. Review of the Director’s
decision will not be taken to Environmental and Land Use Hearings Office.
Pending final decision of a dispute, the RECIPIENT agrees to proceed diligently with the performance of this
Agreement and in accordance with the decision rendered.
WQSWCAP-1517-Edmond-00056 Packet Page 429 of 564
Page 19 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
Nothing in this contract will be construed to limit the parties’ choice of another mutually acceptable method, in addition
to the dispute resolution procedure outlined above.
11. ENVIRONMENTAL STANDARDS
a) RECIPIENTS who collect environmental-monitoring data must provide these data to ECOLOGY using the
Environmental Information Management System (EIM). To satisfy this requirement these data must be successfully
loaded into EIM, see instructions on the EIM website at: http://www.ecy.wa.gov/eim.
b) RECIPIENTS are required to follow ECOLOGY’s data standards when Geographic Information System (GIS) data
are collected and processed. More information and requirements are available at:
http://www.ecy.wa.gov/services/gis/data/standards/standards.htm. RECIPIENTS shall provide copies to ECOLOGY of
all final GIS data layers, imagery, related tables, raw data collection files, map products, and all metadata and project
documentation.
c) RECIPIENTS must prepare a Quality Assurance Project Plan (QAPP) when a project involves the collection of
environmental measurement data. QAPP is to ensure the consistent application of quality assurance principles to the
planning and execution of all activities involved in generating data. RECIPIENTS must follow ECOLOGY’s
Guidelines for Preparing Quality Assurance Project Plans for Environmental Studies, July 2004 (Ecology Publication
No. 04-03-030). ECOLOGY shall review and approve the QAPP prior to start of work. The size, cost, and complexity
of the QAPP should be in proportion to the magnitude of the sampling effort.
12. GOVERNING LAW
This Agreement will be governed by the laws of the State of Washington, and the venue of any action brought
hereunder will be in the Superior Court of Thurston County.
13. INDEMNIFICATION
ECOLOGY will in no way be held responsible for payment of salaries, consultant's fees, and other costs related to the
project described herein, except as provided in the Scope of Work.
To the extent that the Constitution and laws of the State of Washington permit, each party will indemnify and hold the
other harmless from and against any liability for any or all injuries to persons or property arising from the negligent act
or omission of that party or that party's agents or employees arising out of this Agreement.
14. INDEPENDENT STATUS
The employees, volunteers, or agents of each party who are engaged in the performance of this Agreement will continue
to be employees, volunteers, or agents of that party and will not for any purpose be employees, volunteers, or agents of
the other party.
15. KICKBACKS
RECIPIENT is prohibited from inducing by any means any person employed or otherwise involved in this Agreement to
give up any part of the compensation to which he/she is otherwise entitled to or receive any fee, commission, or gift in
return for award of a subcontract hereunder.
16. MINORITY AND WOMEN’S BUSINESS ENTERPRISES (MWBE)
RECIPIENT is encouraged to solicit and recruit, to the extent possible, certified minority-owned (MBE) and
women-owned (WBE) businesses in purchases and contracts initiated under this Agreement.
Contract awards or rejections cannot be made based on MWBE participation; however, the RECIPIENT is encouraged
to take the following actions, when possible, in any procurement under this Agreement:
a) Include qualified minority and women's businesses on solicitation lists whenever they are potential sources of goods
WQSWCAP-1517-Edmond-00056 Packet Page 430 of 564
Page 20 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
or services.
b) Divide the total requirements, when economically feasible, into smaller tasks or quantities, to permit maximum
participation by qualified minority and women's businesses.
c) Establish delivery schedules, where work requirements permit, which will encourage participation of qualified
minority and women's businesses.
d) Use the services and assistance of the Washington State Office of Minority and Women's Business Enterprises
(OMWBE) (866-208-1064) and the Office of Minority Business Enterprises of the U.S. Department of Commerce, as
appropriate.
17. ORDER OF PRECEDENCE
In the event of inconsistency in this Agreement, unless otherwise provided herein, the inconsistency shall be resolved by
giving precedence in the following order: (a) applicable federal and state statutes and regulations; (b) The Agreement;
(c) Scope of Work; (d) Special Terms and Conditions; (e) Any provisions or terms incorporated herein by reference,
including the "Administrative Requirements for Recipients of Ecology Grants and Loans"; and (f) the General Terms
and Conditions.
18. PRESENTATION AND PROMOTIONAL MATERIALS
RECIPIENT shall obtain ECOLOGY’s approval for all communication materials or documents related to the
fulfillment of this Agreement. Steps for approval:
a) Provide a draft copy to ECOLOGY for review and approval ten (10) business days prior to production and
distribution of any documents or materials compiled or produced.
b) ECOLOGY reviews draft copy and reserves the right to require changes until satisfied.
c) Provide ECOLOGY two (2) final copies and an electronic copy of any tangible products developed.
Copies include any printed materials, and all tangible products developed such as brochures, manuals, pamphlets,
videos, audio tapes, CDs, curriculum, posters, media announcements, or gadgets, such as a refrigerator magnet with a
message as well as media announcements, and any other online communication products such as Web pages, blogs, and
Twitter campaigns. If it is not practical to provide a copy, then the RECIPIENT must provide a complete description
including photographs, drawings, or printouts of the product that best represents the item.
RECIPIENT shall include time in their project timeline for ECOLOGY’s review and approval process.
RECIPIENT shall acknowledge in the materials or documents that funding was provided by ECOLOGY.
19. PROGRESS REPORTING
a) RECIPIENT must satisfactorily demonstrate the timely use of funds by submitting payment requests and progress
reports to ECOLOGY. ECOLOGY reserves the right to amend or terminate this Agreement if the RECIPIENT does not
document timely use of funds.
b) RECIPIENT must submit a progress report with each payment request. Payment requests will not be processed
without a progress report. ECOLOGY will define the elements and frequency of progress reports.
c) RECIPIENT shall use ECOLOGY’s provided progress report format.
d) Quarterly progress reports will cover the periods from January 1 through March 31, April 1 through June 30, July 1
through September 30, and October 1 through December 31. Reports shall be submitted within thirty (30) days after
the end of the quarter being reported.
e) RECIPIENT shall submit the Closeout Report within thirty (30) days of the expiration date of the project, unless an
extension has been approved by ECOLOGY. RECIPIENT shall use the ECOLOGY provided closeout report format.
20. PROPERTY RIGHTS
a) Copyrights and Patents. When the RECIPIENT creates any copyrightable materials or invents any patentable
WQSWCAP-1517-Edmond-00056 Packet Page 431 of 564
Page 21 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
property, the RECIPIENT may copyright or patent the same but ECOLOGY retains a royalty free, nonexclusive, and
irrevocable license to reproduce, publish, recover, or otherwise use the material(s) or property, and to authorize others
to use the same for federal, state, or local government purposes.
b) Publications. When the RECIPIENT or persons employed by the RECIPIENT use or publish ECOLOGY
information; present papers, lectures, or seminars involving information supplied by ECOLOGY; or use logos, reports,
maps, or other data in printed reports, signs, brochures, pamphlets, etc., appropriate credit shall be given to ECOLOGY.
c) Presentation and Promotional Materials. ECOLOGY shall have the right to use or reproduce any printed or graphic
materials produced in fulfillment of this Agreement, in any manner ECOLOGY deems appropriate. ECOLOGY shall
acknowledge the RECIPIENT as the sole copyright owner in every use or reproduction of the materials.
d) Tangible Property Rights. ECOLOGY's current edition of "Administrative Requirements for Recipients of Ecology
Grants and Loans," shall control the use and disposition of all real and personal property purchased wholly or in part
with funds furnished by ECOLOGY in the absence of state and federal statutes, regulations, or policies to the contrary,
or upon specific instructions with respect thereto in this Agreement.
e) Personal Property Furnished by ECOLOGY. When ECOLOGY provides personal property directly to the
RECIPIENT for use in performance of the project, it shall be returned to ECOLOGY prior to final payment by
ECOLOGY. If said property is lost, stolen, or damaged while in the RECIPIENT's possession, then ECOLOGY shall
be reimbursed in cash or by setoff by the RECIPIENT for the fair market value of such property.
f) Acquisition Projects. The following provisions shall apply if the project covered by this Agreement includes funds
for the acquisition of land or facilities:
a. RECIPIENT shall establish that the cost is fair value and reasonable prior to disbursement of funds provided for in
this Agreement.
b. RECIPIENT shall provide satisfactory evidence of title or ability to acquire title for each parcel prior to
disbursement of funds provided by this Agreement. Such evidence may include title insurance policies, Torrens
certificates, or abstracts, and attorney's opinions establishing that the land is free from any impediment, lien, or claim
which would impair the uses intended by this Agreement.
g) Conversions. Regardless of the agreement expiration date, the RECIPIENT shall not at any time convert any
equipment, property, or facility acquired or developed under this Agreement to uses other than those for which
assistance was originally approved without prior written approval of ECOLOGY. Such approval may be conditioned
upon payment to ECOLOGY of that portion of the proceeds of the sale, lease, or other conversion or encumbrance
which monies granted pursuant to this Agreement bear to the total acquisition, purchase, or construction costs of such
property.
21. RECORDS, AUDITS, AND INSPECTIONS
RECIPIENT shall maintain complete program and financial records relating to this Agreement, including any
engineering documentation and field inspection reports of all construction work accomplished.
All records shall:
a) Be kept in a manner which provides an audit trail for all expenditures.
b) Be kept in a common file to facilitate audits and inspections.
c) Clearly indicate total receipts and expenditures related to this Agreement.
d) Be open for audit or inspection by ECOLOGY, or by any duly authorized audit representative of the State of
Washington, for a period of at least three (3) years after the final grant payment or loan repayment, or any dispute
resolution hereunder.
RECIPIENT shall provide clarification and make necessary adjustments if any audits or inspections identify
discrepancies in the records.
ECOLOGY reserves the right to audit, or have a designated third party audit, applicable records to ensure that the state
has been properly invoiced. Any remedies and penalties allowed by law to recover monies determined owed will be
enforced. Repetitive instances of incorrect invoicing or inadequate records may be considered cause for termination.
WQSWCAP-1517-Edmond-00056 Packet Page 432 of 564
Page 22 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
All work performed under this Agreement and any property and equipment purchased shall be made available to
ECOLOGY and to any authorized state, federal or local representative for inspection at any time during the course of
this Agreement and for at least three (3) years following grant or loan termination or dispute resolution hereunder.
RECIPIENT shall provide right of access to ECOLOGY, or any other authorized representative, at all reasonable times,
in order to monitor and evaluate performance, compliance, and any other conditions under this Agreement.
22. RECOVERY OF FUNDS
The right of the RECIPIENT to retain monies received as reimbursement payments is contingent upon satisfactory
performance of this Agreement and completion of the work described in the Scope of Work.
All payments to the RECIPIENT are subject to approval and audit by ECOLOGY, and any unauthorized expenditure(s)
or unallowable cost charged to this agreement shall be refunded to ECOLOGY by the RECIPIENT.
RECIPIENT shall refund to ECOLOGY the full amount of any erroneous payment or overpayment under this
Agreement.
RECIPIENT shall refund by check payable to ECOLOGY the amount of any such reduction of payments or repayments
within thirty (30) days of a written notice. Interest will accrue at the rate of twelve percent (12%) per year from the
time ECOLOGY demands repayment of funds.
Any property acquired under this Agreement, at the option of ECOLOGY, may become ECOLOGY's property and the
RECIPIENT's liability to repay monies will be reduced by an amount reflecting the fair value of such property.
23. SEVERABILITY
If any provision of this Agreement or any provision of any document incorporated by reference shall be held invalid,
such invalidity shall not affect the other provisions of this Agreement which can be given effect without the invalid
provision, and to this end the provisions of this Agreement are declared to be severable.
24. STATE ENVIRONMENTAL POLICY ACT (SEPA)
RECIPIENT must demonstrate to ECOLOGY’s satisfaction that compliance with the requirements of the State
Environmental Policy Act (Chapter 43.21C RCW and Chapter 197-11 WAC) have been or will be met. Any
reimbursements are subject to this provision.
25. SUSPENSION
When in the best interest of ECOLOGY, ECOLOGY may at any time, and without cause, suspend this Agreement or
any portion thereof for a temporary period by written notice from ECOLOGY to the RECIPIENT. RECIPIENT shall
resume performance on the next business day following the suspension period unless another day is specified by
ECOLOGY.
26. SUSTAINABLE PRACTICES
In order to sustain Washington’s natural resources and ecosystems, the RECIPIENT is fully encouraged to implement
sustainable practices and to purchase environmentally preferable products under this Agreement.
a) Sustainable practices may include such activities as: use of clean energy, use of double-sided printing, hosting low
impact meetings, and setting up recycling and composting programs.
b) Purchasing may include such items as: sustainably produced products and services, EPEAT registered computers
and imaging equipment, independently certified green cleaning products, remanufactured toner cartridges, products
with reduced packaging, office products that are refillable, rechargeable, and recyclable, and 100% post-consumer
WQSWCAP-1517-Edmond-00056 Packet Page 433 of 564
Page 23 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
recycled paper.
For more suggestions visit ECOLOGY’s web page: Green Purchasing, http://www.ecy.wa.gov/programs/swfa/epp.
27. TERMINATION
a) For Cause
ECOLOGY may terminate for cause this Agreement with a seven (7) calendar days prior written notification to the
RECIPIENT, at the sole discretion of ECOLOGY, for failing to perform an Agreement requirement or for a material
breach of any term or condition. If this Agreement is so terminated, the parties shall be liable only for performance
rendered or costs incurred in accordance with the terms of this Agreement prior to the effective date of termination.
Failure to Commence Work. ECOLOGY reserves the right to terminate this Agreement if RECIPIENT fails to
commence work on the project funded within four (4) months after the effective date of this Agreement, or by any date
mutually agreed upon in writing for commencement of work, or the time period defined within the Scope of Work.
Non-Performance. The obligation of ECOLOGY to the RECIPIENT is contingent upon satisfactory performance by the
RECIPIENT of all of its obligations under this Agreement. In the event the RECIPIENT unjustifiably fails, in the
opinion of ECOLOGY, to perform any obligation required of it by this Agreement, ECOLOGY may refuse to pay any
further funds, terminate in whole or in part this Agreement, and exercise any other rights under this Agreement.
Despite the above, the RECIPIENT shall not be relieved of any liability to ECOLOGY for damages sustained by
ECOLOGY and the State of Washington because of any breach of this Agreement by the RECIPIENT. ECOLOGY
may withhold payments for the purpose of setoff until such time as the exact amount of damages due ECOLOGY from
the RECIPIENT is determined.
b) For Convenience
ECOLOGY may terminate for convenience this Agreement, in whole or in part, for any reason when it is the best
interest of ECOLOGY, with a thirty (30) calendar days prior written notification to the RECIPIENT. If this Agreement
is so terminated, the parties shall be liable only for performance rendered or costs incurred in accordance with the terms
of this Agreement prior to the effective date of termination.
Non-Allocation of Funds. ECOLOGY’s ability to make payments is contingent on availability of funding. In the event
funding from state, federal or other sources is withdrawn, reduced, or limited in any way after the effective date and
prior to the completion or expiration date of this agreement, ECOLOGY, at its sole discretion, may elect to terminate
the agreement, in whole or part, or renegotiate the agreement, subject to new funding limitations or conditions.
ECOLOGY may also elect to suspend performance of the agreement until ECOLOGY determines the funding
insufficiency is resolved. ECOLOGY may exercise any of these options with no notification or restrictions.
If payments have been discontinued by ECOLOGY due to unavailable funds, the RECIPIENT shall not be obligated to
repay monies which had been paid to the RECIPIENT prior to such termination.
RECIPIENT’s obligation to continue or complete the work described in this Agreement shall be contingent upon
availability of funds by the RECIPIENT's governing body.
c) By Mutual Agreement
ECOLOGY and the RECIPIENT may terminate this Agreement, in whole or in part, at any time, by mutual written
agreement.
d) In Event of Termination
WQSWCAP-1517-Edmond-00056 Packet Page 434 of 564
Page 24 of 24Agreement No:WQSWCAP-1517-Edmond-00056
Project Title:2015-2017 Biennial Stormwater Capacity Grants
Recipient Name: City of Edmonds
All finished or unfinished documents, data studies, surveys, drawings, maps, models, photographs, reports or other
materials prepared by the RECIPIENT under this Agreement, at the option of ECOLOGY, will become property of
ECOLOGY and the RECIPIENT shall be entitled to receive just and equitable compensation for any satisfactory work
completed on such documents and other materials.
Nothing contained herein shall preclude ECOLOGY from demanding repayment of all funds paid to the RECIPIENT in
accordance with Recovery of Funds, identified herein.
28. THIRD PARTY BENEFICIARY
RECIPIENT shall ensure that in all subcontracts entered into by the RECIPIENT pursuant to this Agreement, the state
of Washington is named as an express third party beneficiary of such subcontracts with full rights as such.
29. WAIVER
Waiver of a default or breach of any provision of this Agreement is not a waiver of any subsequent default or breach,
and will not be construed as a modification of the terms of this Agreement unless stated as such in writing by the
authorized representative of ECOLOGY.
WQSWCAP-1517-Edmond-00056 Packet Page 435 of 564
AM-8191 7. B.
City Council Meeting
Meeting Date:12/15/2015
Time:60 Minutes
Submitted By:Kernen Lien
Department:Planning
Type: Potential Action
Information
Subject Title
Review and Potential Action on the Critical Area Regulations Update
Recommendation
Direct staff to prepare an ordinance adopting the proposed amendments to the critical area regulations
(ECDC 23.40 - ECDC 23.90) as contained in Exhibit 1 and associated frequently flooded areas
amendments to the Building Code (ECDC 19.00.025) and the definition of height contained in
ECDC 21.40.030 relating to properties in the coastal flood hazard zones as contained in Exhibit 2.
Previous Council Action
The Council has provided funding for Critical Area Regulation update and heard a progress report at the
June 23, 2015 Council meeting. The City Council reviewed the draft updated critical area regulation as
recommended by the Planning Board at the September 8, 2015 Council meeting (Exhibit 4) and
continued review at the September 22, 2015 Council meeting (Exhibit 5). The City Council held a public
hearing at the October 6, 2015 City Council meeting (Exhibit 6) and continued to review the critical area
regulations at the November 2, 2015 Council meeting (Exhibit 7).
Narrative
City Council will continue review of the critical area regulations update as required by the Growth
Management Act.
Staff has prepared a Question and Answer memorandum (included in Exhibit 3) in order to clarify some of
the questions that have been raised by City Council during review of the critical areas update. Staff and
consultants ESA will be present to answer any further questions from the City Council regarding the
critical areas update.
Exhibit 1 contains the draft Critical Area Regulations in ECDC 23.40 - 23.90.
Exhibit 2 contains the Planning Board's recommended frequently flooded area amendments
Exhibit 3 contains a Q & A memorandum clarifying Council questions raised during the critical area
regulations review
Exhibits 4 - 7 contains the City Council minutes excerpts related to the critical area review.
Please see the Critical Areas agenda item from the September 8, 2015 Council meeting for the 2004 Best
Available Science Report, the 2015 Best Available Science Addendum, the Best Available Science and
Gap Analysis Matrix, and Planning Board minutes.
Packet Page 436 of 564
Attachments
Exhibit 1 - Draft Critical Area Regulations ECDC 23.40 - 23.90
Exhibit 2 - Planning Board Recommended Frequently Flooded Area Amendments
Exhibit 3 - Critical Areas Update Q & A Memorandum
Exhibit 4 - September 8, 2015 Council Minutes Excerpt
Exhibit 5 - September 22, 2015 Council Minutes Excerpt
Exhibit 6 - October 6, 2015 Council Minutes Excerpt
Exhibit 7 - November 2, 2015 Council Minutes Excerpt
Form Review
Inbox Reviewed By Date
Development Services Shane Hope 12/10/2015 03:28 PM
City Clerk Scott Passey 12/10/2015 03:33 PM
Mayor Dave Earling 12/10/2015 04:45 PM
Finalize for Agenda Scott Passey 12/10/2015 06:41 PM
Form Started By: Kernen Lien Started On: 12/10/2015 12:05 PM
Final Approval Date: 12/10/2015
Packet Page 437 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 1 of 90
EDMONDS CITY CODE AND COMMUNITY DEVELOPMENT CODE
Chapter 23.40
ENVIRONMENTALLY CRITICAL AREAS GENERAL PROVISIONS
Sections:
Part I. Purpose and General Provisions
23.40.000 Purpose.
23.40.010 Authority.
23.40.020 Relationship to other regulations.
23.40.030 Severability.
23.40.040 Jurisdiction – Critical areas.
23.40.050 Protection of critical areas.
Part II. Critical Areas Review Process
23.40.060 General requirements.
23.40.070 Critical areas preapplication consultation.
23.40.080 Notice of initial determination.
23.40.090 Critical areas report – Requirements.
23.40.100 Critical areas report – Modifications to requirements.
23.40.110 Mitigation requirements.
23.40.120 Mitigation sequencing.
23.40.130 Mitigation plan requirements.
23.40.140 Innovative mitigation.
23.40.150 Critical areas decision.
23.40.160 Review criteria.
23.40.170 Favorable critical areas decision.
Packet Page 438 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 2 of 90
23.40.180 Unfavorable critical areas decision.
23.40.190 Completion of the critical areas review.
23.40.200 Appeals.
23.40.210 Variances.
23.40.215 Critical Area Restoration Projects
Part III. Allowed Activities, Exemptions and Noncompliance Penalties
23.40.220 Allowed activities.
23.40.230 Exemptions.
23.40.240 Unauthorized critical areas alterations and enforcement.
Part IV. General Critical Areas Protective Measures
23.40.250 Critical areas markers and signs.
23.40.270 Critical areas tracts.
23.40.280 Building setbacks.
23.40.290 Bonds to ensure mitigation, maintenance, and monitoring.
23.40.300 Critical areas inspections.
Part V. Incorporation of Best Available Science
23.40.310 Best available science.
Part VI. Definitions
23.40.320 Definitions pertaining to critical areas.
Part I. Purpose and General Provisions
23.40.000 Purpose.
A. The purpose of this title is to designate and classify ecologically sensitive and hazardous areas and to
protect these areas and their functions and values, while also allowing for reasonable use of private
property.
Packet Page 439 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 3 of 90
B. This title is to implement the goals, policies, guidelines, and requirements of the comprehensive plan
and the Washington State Growth Management Act.
C. The city of Edmonds finds that critical areas provide a variety of valuable and beneficial biological
and physical functions that benefit Edmonds and its residents, and/or may pose a threat to human safety
or to public and private property. The beneficial functions and values provided by critical areas include,
but are not limited to, water quality protection and enhancement, fish and wildlife habitat, food chain
support, flood storage, conveyance and attenuation of flood waters, ground water recharge and
discharge, erosion control, wave attenuation, protection from hazards, historical, archaeological, and
aesthetic value protection, and recreation. These beneficial functions are not listed in order of priority.
D. Goals. By limiting development and alteration of critical areas, this title seeks to:
1. Protect members of the public and public resources and facilities from injury, loss of life, or property
damage due to landslides and steep slope failures, erosion, seismic events, or flooding;
2. Maintain healthy, functioning ecosystems through the protection of unique, fragile, and valuable
elements of the environment, including ground and surface waters, wetlands, and fish and wildlife and
their habitats, and to conserve the biodiversity of plant and animal species;
3. Direct activities not dependent on critical areas resources to less ecologically sensitive sites and
mitigate unavoidable impacts to critical areas by regulating alterations in and adjacent to critical areas;
and
4. Prevent cumulative adverse environmental impacts to water quality, wetlands, and fish and wildlife
habitat, and the overall net loss of wetlands, frequently flooded areas, and fish and wildlife habitat
conservation areas.
E. The regulations of this title are intended to protect critical areas in accordance with the Growth
Management Act and through the application of the best available science, as determined according to
WAC 365-195-900 through 365-195-925 and RCW 36.70A.172, and in consultation with state and
federal agencies and other qualified professionals.
F. This title is to be administered with flexibility and attention to site-specific characteristics. It is not the
intent of this title to make a parcel of property unusable by denying its owner reasonable economic use
of the property nor to prevent the provision of public facilities and services necessary to support existing
development.
G. The city of Edmonds’ enactment or enforcement of this title shall not be construed to benefit any
individual person or group of persons other than the general public. [Ord. 3527 § 2, 2004].
23.40.010 Authority.
A. As provided herein, the Edmonds development services director or his/her designee (hereafter
referred to as “the director”) is given the authority to interpret and apply, and the responsibility to
enforce, this title to accomplish the stated purpose.
Packet Page 440 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 4 of 90
B. The director may withhold, condition, or deny development permits or activity approvals to ensure
that the proposed action is consistent with this title. [Ord. 3527 § 2, 2004].
23.40.020 Relationship to other regulations.
A. These critical areas regulations shall apply as an overlay and in addition to zoning, site development,
stormwater management, building and other regulations adopted by the city of Edmonds.
B. Any individual critical area adjoined or overlain by another type of critical area shall have the buffer
and meet the requirements that provide the most protection to the critical areas involved. When any
provision of this title or any existing land use regulation conflicts with this title, that which provides
more protection to the critical area shall apply.
C. These critical areas regulations shall be coordinated with review conducted under the State
Environmental Policy Act (SEPA), as necessary and locally adopted.
D. Compliance with the provisions of this title does not constitute compliance with other federal, state,
and local regulations and permit requirements that may be required (for example, shoreline substantial
development permits, Hydraulic Permit Act (HPA) permits, Section 106 of the National Historic
Preservation Act, U.S. Army Corps of Engineers Section 404 permits, and National Pollution Discharge
Elimination System permits). The applicant is responsible for complying with these requirements, apart
from the process established in this title. [Ord. 3527 § 2, 2004].
23.40.030 Severability.
If any clause, sentence, paragraph, section, or part of this title or the application thereof to any person or
circumstances shall be judged by any court of competent jurisdiction to be invalid, such order or
judgment shall be confined in its operation to the controversy in which it was rendered. The decision
shall not affect or invalidate the remainder of any part thereof and to this end the provisions of each
clause, sentence, paragraph, section, or part of this law are hereby declared to be severable. [Ord. 3527
§ 2, 2004].
23.40.040 Jurisdiction – Critical areas.
A. The director shall regulate all uses, activities, and developments within, adjacent to, or likely to affect
one or more critical areas, consistent with the best available science and the provisions herein.
B. Critical areas regulated by this title include:
1. Wetlands as designated in Chapter 23.50 ECDC, Wetlands;
2. Critical aquifer recharge areas as designated in Chapter 23.60 ECDC, Critical Aquifer Recharge
Areas;
3. Frequently flooded areas as designated in Chapter 23.70 ECDC, Frequently Flooded Areas;
Packet Page 441 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 5 of 90
4. Geologically hazardous areas as designated in Chapter 23.80 ECDC, Geologically Hazardous Areas;
and
5. Fish and wildlife habitat conservation areas as designated in Chapter 23.90 ECDC, Fish and Wildlife
Habitat Conservation Areas.
C. All areas within the city of Edmonds meeting the definition of one or more critical areas, regardless
of any formal identification, are hereby designated critical areas and are subject to the provisions of this
title.
D. Areas Adjacent to Critical Areas Subject to Regulation. Areas adjacent to critical areas shall be
considered to be within the jurisdiction of these requirements and regulations to support the intent of this
title and ensure protection of the functions and values of critical areas. “Adjacent” shall mean any
activity located:
1. On a site immediately adjoining a critical area; and
2. Areas located within 200 feet of a subject parcel containing a jurisdictional critical area. [Ord. 3527
§ 2, 2004].
23.40.050 Protection of critical areas.
Any action taken pursuant to this title shall result in equivalent or greater functions and values of the
critical areas associated with the proposed action, as determined by the best available science. All
actions and developments shall be designed and constructed in accordance with ECDC 23.40.120,
Mitigation sequencing, to avoid, minimize, and restore all adverse impacts. Applicants must first
demonstrate an inability to avoid or reduce impacts before the use of actions to mitigate potential
impacts will be allowed. No activity or use shall be allowed that results in a net loss of the functions or
values of critical areas. [Ord. 3527 § 2, 2004].
Part II. Critical Areas Review Process
23.40.060 General requirements.
A. As part of this review, the director shall:
1. Verify the information submitted by the applicant;
2. Evaluate the project area and vicinity for critical areas;
3. Determine whether the pro posed project is likely to impact the functions or values of critical areas;
and
Packet Page 442 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 6 of 90
4. Determine if the proposed project adequately assesses all impacts, avoids impacts, and/or mitigates
impacts to the critical area associated with the project.
B. If the proposed project is within, adjacent to, or is likely to impact a critical area, the director shall:
1. Require a critical areas report from the applicant that has been prepared by a qualified professional;
2. Review and evaluate the critical areas report;
3. Determine whether the development proposal conforms to the purposes and performance standards of
this title, including the criteria in ECDC 23.40.160, Review criteria;
4. Assess the potential impacts to the critical area and determine if they can be avoided or minimized;
and
5. Determine if any mitigation proposed by the applicant is sufficient to protect the functions and values
of the critical area and public health, safety, and welfare concerns consistent with the goals, purposes,
objectives, and requirements of this title. [Ord. 3527 § 2, 2004].
23.40.070 Critical areas preapplication consultation.
Any person preparing to submit an application for development or use of land that may be regulated by
the provisions of this title may request a preapplication meeting with the director prior to submitting an
application for development or other approval. At this meeting, the director shall discuss the
requirements of this title; provide critical areas maps, scientific information, and other source materials;
outline the review process; and work with the activity proponent to identify any potential concerns that
might arise during the review process, in addition to discussing other permit procedures and
requirements. All applicants, regardless of participation in a preapplication meeting, are held fully
responsible for knowledge and disclosure of critical areas on, adjacent to, or associated with a subject
parcel and full compliance with the specific provisions and goals, purposes, objectives, and requirements
of this title. [Ord. 3527 § 2, 2004].
23.40.080 Notice of initial determination.
A. If the director determines that no critical areas report is necessary, the director shall state this in the
notice of application issued for the proposal.
B. If the director determines that there are critical areas on the site that the proposed project is unlikely
to impact and the project meets the requirements for and has been granted a waiver from the requirement
to complete a critical areas report, this shall be stated in the notice of application for the proposal. A
waiver may be granted if the director determines that all of the following requirements will be met:
1. There will be no alteration of the critical area or buffer;
2. The development proposal will not affect the critical area in a manner contrary to the purpose, intent,
and requirements of this Title.
Packet Page 443 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 7 of 90
C. If the director determines that critical areas may be affected by the proposal and a critical areas report
is required, public notice of the application shall include a description of the critical area that might be
affected and state that a critical areas report(s) is required.
D. Critical areas determinations shall be considered valid for five years from the date in which the
determination was made; after such date the city shall require a new determination, or at minimum
documentation of a new assessment verifying the accuracy of the previous determination [Ord. 3527
§ 2, 2004].
23.40.090 Critical areas report – Requirements.
A. Preparation by Qualified Professional. The applicant shall submit a critical areas report prepared by a
qualified professional as defined herein. For wetlands, frequently flooded areas and fish and wildlife
habitat conservation areas, an applicant may choose one of the qualified technical consultants on the
city’s approved list to prepare critical areas reports per the requirements of this title or may apply to
utilize an alternative consultant. Critical areas studies and reports developed by an alternative consultant
shall may be subject to independent review pursuant to subsection B of this section. Applicants utilizing
the services of a qualified technical consultant from the city’s approved list shall enter into a three- party
contract between the applicant, the consultant and the city. All costs associated with the critical areas
study shall be borne by the applicant.
B. Independent Review of Critical Areas Reports. Critical areas studies and reports on geologically
hazardous areas and those developed by an applicant representative or consultant not as part of a three-
party contract may, at the discretion of the director, be subject to independent review. This independent
review shall be performed by a qualified technical consultant selected by the city with all costs borne by
the applicant. The purpose of such independent review is to provide the city with objective technical
assistance in evaluating the accuracy of submitted reports and/or the effects on critical areas which may
be caused by a development proposal and to facilitate the decision-making process. The director may
also have technical assistance provided by appropriate resource agency staff if such assistance is
available in a timely manner.
C. Best Available Science. The critical areas report shall use scientifically valid methods and studies in
the analysis of critical areas data and field reconnaissance and reference the source of science used. The
critical areas report shall evaluate the proposal and all probable impacts to critical areas in accordance
with the provisions of this title.
D. Minimum Report Contents. At a minimum, the report shall contain the following:
1. The name and contact information of the applicant, a description of the proposal, and identification of
the permit requested;
2. A copy of the site plan for the development proposal including:
a. A map to scale depicting critical areas, buffers, the development proposal, and any areas to be cleared;
and
Packet Page 444 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 8 of 90
b. A description of the proposed storm water management plan for the development and consideration of
impacts to drainage alterations;
3. The dates, names, and qualifications of the persons preparing the report and documentation of any
fieldwork performed on the site;
4. Identification and characterization of all critical areas, wetlands, water bodies, shorelines, and buffers
adjacent to the proposed project area;
5. A description of reasonable efforts made to apply mitigation sequencing pursuant to ECDC
23.40.120, Mitigation sequencing, to avoid, minimize, and mitigate impacts to critical areas; and
6. Report requirements specific to each critical area type as indicated in the corresponding chapters of
this title.
7. A statement specifying the accuracy of the report and all assumptions made and relied upon;
8. A description of the methodologies used to conduct the critical areas study, including references; and
9. Plans for adequate mitigation, as needed to offset any critical areas impacts, in accordance with the
Mitigation Plan Requirements in Section 23.40.130.
E. Unless otherwise provided, a critical areas report may incorporate, be supplemented by or composed,
in whole or in part, of any reports or studies required by other laws and regulations or previously
prepared for and applicable to the development proposal site, as approved by the director. At the
discretion of the director, reports previously compiled or submitted as part of a proposal for
development may be used as a critical areas report to the extent that the requirements of this section and
the report requirements for each specific critical area type are met.
F. Critical areas reports shall be considered valid for five years; after such date the city shall determine
whether a revision or additional assessment is necessary.[Ord. 3527 § 2, 2004].
23.40.100 Critical areas report – Modifications to requirements.
A. Limitations to Study Area. The director may limit the required geographic area of the critical areas
report as appropriate if:
1. The applicant, with assistance from the city of Edmonds, cannot obtain permission to access
properties adjacent to the project area; or
2. The proposed activity will affect only a limited part of the subject site.
B. Modifications to Required Contents. The applicant may consult with the director prior to or during
preparation of the critical areas report to obtain approval of modifications to the required contents of the
report where, in the judgment of a qualified professional, more or less information is required to
adequately address the potential critical area impacts and required mitigation.
Packet Page 445 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 9 of 90
C. Additional Information Requirements. The director may require additional information to be included
in the critical areas report when determined to be necessary to the review of the proposed activity in
accordance with this title. Additional information that may be required includes, but is not limited to:
1. Historical data, including original and subsequent mapping, aerial photographs, data compilations and
summaries, and available reports and records relating to the site or past operations at the site;
2. Grading and drainage plans; and
3. Information specific to the type, location, and nature of the critical area. [Ord. 3527 § 2, 2004].
23.40.110 Mitigation requirements.
A. The applicant shall avoid all impacts that degrade the functions and values of critical areas. Unless
otherwise provided in this title, if alteration to the critical area is unavoidable, all adverse impacts to or
from critical areas and buffers resulting from a development proposal or alteration shall be mitigated
using the best available science in accordance with an approved critical areas report and SEPA
documents, so as to result in no net loss of critical area functions and values.
B. Mitigation shall be in-kind and on-site, when possible, and sufficient to maintain or compensate for
the functions and values of the impacted critical area and to prevent risk from a hazard posed by a
critical area.
C. Mitigation shall not be implemented until after the director has provided approval of a critical areas
report that includes a mitigation plan. Mitigation shall be implemented in accordance with the provisions
of the approved critical areas report. [Ord. 3527 § 2, 2004].
23.40.120 Mitigation sequencing.
A. Applicants shall demonstrate that all reasonable efforts have been examined with the intent to avoid
and minimize impacts to critical areas.
B. When an alteration to a critical area is proposed, such alteration shall be avoided, minimized, or
compensated for in the following sequential order of preference:
1. Avoiding the impact altogether by not taking a certain action or parts of an action;
2. Minimizing impacts by limiting the degree or magnitude of the action and its implementation by
using appropriate technology or by taking affirmative steps, such as project redesign, relocation, or
timing, to avoid or reduce impacts;
3. Rectifying the impact to wetlands, frequently flooded areas, and fish and wildlife habitat conservation
areas by repairing, rehabilitating, or restoring the affected environment to the historical conditions or the
conditions existing at the time of the initiation of the project;
Packet Page 446 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 10 of 90
4. Minimizing or eliminating the hazard by restoring or stabilizing the hazard area through engineering
or other methods;
5. Reducing or eliminating the impact or hazard over time by preservation and maintenance operations
during the life of the action;
6. Compensating for the impact to wetlands, frequently flooded areas, and fish and wildlife habitat
conservation areas by replacing, enhancing, or providing substitute resources or environments; and/or
7. Monitoring the hazard or other required mitigation and taking remedial action when necessary.
C. Mitigation for individual actions may include a combination of the above measures. [Ord. 3527 § 2,
2004].
23.40.130 Mitigation plan requirements.
When mitigation is required, the applicant shall submit for approval by the director a mitigation plan as
part of the critical areas report. The mitigation plan shall include:
A. Environmental Goals and Objectives. The mitigation plan shall include a written report identifying
environmental goals and objectives of the compensation proposed and including:
1. A description of the anticipated impacts to the critical areas and the mitigating actions proposed and
the purposes of the compensation measures, including the site selection criteria; identification of
compensation goals; identification of resource functions; and dates for beginning and completion of site
compensation construction activities. The goals and objectives shall be related to the functions and
values of the impacted critical area;
2. A review of the best available science supporting the proposed mitigation;
3. An analysis of the likelihood of success of the compensation project; and
4. Specific mitigation plan and report requirements for each critical area type as indicated in this title.
B. Performance Standards. The mitigation plan shall include measurable specific criteria for evaluating
whether or not the goals and objectives of the mitigation project have been successfully attained and
whether or not the requirements of this title have been met.
C. Detailed Construction Plans. The mitigation plan shall include written specifications and descriptions
of the mitigation proposed, such as:
1. The proposed construction sequence, timing, and duration;
2. Areas of proposed impacts on critical areas or buffers;
3. Grading and excavation details;
Packet Page 447 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 11 of 90
34. Erosion and sediment control features;
45. A planting plan specifying plant species, quantities, locations, size, spacing, and density; and
56. Measures to protect and maintain plants until established.
These written specifications shall be accompanied by detailed site diagrams, scaled cross-sectional
drawings, topographic maps showing slope percentage and final grade elevations, and any other
drawings appropriate to show construction techniques or anticipated final outcome.
D. Monitoring Program. The mitigation plan shall include a program for monitoring construction and for
assessing a completed project. A protocol shall be included outlining the schedule for site monitoring
(for example, monitoring shall occur in years one, three, and five after site construction), and how the
monitoring data will be evaluated to determine if the performance standards are being met. A monitoring
report shall be submitted as needed to document milestones, successes, problems, and contingency
actions of the compensation project. The compensation project shall be monitored for a period necessary
to establish that performance standards have been met, but not for a period less than three five (5) years
without approval from the director.
E. Contingency Plan. The mitigation plan shall include identification of potential courses of action and
any corrective measures to be taken if monitoring or evaluation indicates project performance standards
are not being met.
F. Financial Guarantees. The mitigation plan shall include financial guarantees, as necessary, to ensure
that the mitigation plan is fully implemented. Financial guarantees ensuring fulfillment of the
compensation project, monitoring program, and any contingency measures shall be posted in accordance
with ECDC 23.40.290, Bonds to ensure mitigation, maintenance, and monitoring. [Ord. 3527 § 2, 2004].
23.40.140 Innovative mitigation.
A. The city of Edmonds may encourage, facilitate, and approve innovative mitigation projects that are
based on the best available science. Advance mitigation, in lieu fee programs, or mitigation banking are
examples of alternative mitigation projects approaches allowed under the provisions of this section
wherein one or more applicants, or an organization with demonstrated capability, may undertake a
mitigation project together if it is demonstrated that all of the following circumstances exist:
1. There are no reasonable opportunities on- site or within the same sub-drainage basin, or opportunities
on-site or within the sub-drainage basin do not have a high likelihood of success based on a
determination of the capacity of the site to compensate for the impacts. Considerations should include:
anticipated replacement ratios for wetland mitigation, buffer conditions and proposed widths, available
water to maintain anticipated hydrogeomorphic classes of wetlands when restored, proposed flood
storage capacity, and potential to mitigate fish and wildlife impacts (such as connectivity);
1. Creation or enhancement of a larger system of critical areas and open space is preferable to the
preservation of many individual habitat areas;
Packet Page 448 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 12 of 90
2. The group demonstrates the organizational and fiscal capability to act cooperatively;
3. The group demonstrates that long-term management of the habitat area will be provided; and
4. 2. The off-site mitigation has a greater likelihood of providing equal or improved critical areas
functions than the altered critical area, and there is a clear potential for success of the proposed
mitigation at the identified mitigation site.
3. Off-site locations shall be in the same basin and within the City unless:
a. Established watershed goals for water quality, flood storage or conveyance, habitat, or other wetland
functions have been established by the City and strongly justify location of mitigation at another site; or
b. Credits from an approved (State-certified) wetland mitigation bank are used as compensation, and the
use of credits is consistent with the terms of the approved bank instrument;
c. Fees are paid to an approved in-lieu fee program to compensate for the impacts.
B. Development proposals impacting critical areas and/or associated buffers may contribute payment
towards an identified City of Edmonds mitigation project with approval from the director, provided that
the mitigation approach meets all state and federal permit requirements, where required. Such mitigation
actions shall be consistent with ECDC 23.40.140.A.1. and ECDC 23.40.140.A.2., and with all other
applicable provisions of ECDC Chapters 23.50 and 23.90.
BC. Conducting mitigation as part of a cooperative process provides for retention or an increase in the
beneficial functions and values of critical areas within the Edmonds jurisdiction. [Ord. 3527 § 2, 2004].
23.40.150 Critical areas decision.
The city of Edmonds development services director shall make a decision as to whether the proposed
activity and mitigation, if any, is consistent with the provisions of this title. The decision shall be based
on the criteria of ECDC 23.40.160, Review criteria, and shall affect and be incorporated within the
larger project decision. [Ord. 3527 § 2, 2004].
23.40.160 Review criteria.
A. Any alteration to a critical area, unless otherwise provided for in this title, shall be reviewed and
approved, approved with conditions, or denied based on the proposal’s ability to comply with all of the
following criteria:
1. The proposal minimizes the impact on critical areas in accordance with ECDC 23.40.120, Mitigation
sequencing;
2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the
development proposal site;
Packet Page 449 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 13 of 90
3. The proposal is consistent with the general purposes of this title and the public interest;
4. Any alterations permitted to the critical area are mitigated in accordance with ECDC 23.40.110,
Mitigation requirements;
5. The proposal protects the critical area functions and values consistent with the best available science
and results in no net loss of critical area functions and values; and
6. The proposal is consistent with other applicable regulations and standards.
B. The director may condition the proposed activity as necessary to mitigate impacts to critical areas and
to conform to the standards required by this title. Except as provided for by this title, any project that
cannot adequately mitigate its impacts to critical areas in the sequencing order of preferences in ECDC
23.40.120 shall be denied. [Ord. 3527 § 2, 2004].
23.40.170 Favorable critical areas decision.
If the director determines that the proposed activity meets or is exempt from the criteria in ECDC
23.40.160, Review criteria, and complies with the applicable provisions of this title, the development
services director shall prepare a written notice of decision for the applicant and identify any required
conditions of approval as part of the larger project decision. The notice of decision and conditions of
approval shall be included in the project file and be considered in the next phase of the city’s review of
the proposed activity in accordance with any other applicable codes or regulations.
Any conditions of approval included in a notice of decision shall be attached to the underlying permit or
approval. Any subsequent changes to the conditions of approval shall void the previous decision
pending re-review of the proposal and conditions of approval previously set by the director.
A favorable decision should not be construed as endorsement or approval of any underlying permit or
approval. [Ord. 3527 § 2, 2004].
23.40.180 Unfavorable critical areas decision.
If the director determines that a proposed activity is not exempt or does not adequately mitigate its
impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160, Review criteria,
and the provisions of this title, the director shall prepare a written decision for the applicant that includes
findings of noncompliance.
No proposed activity or permit shall be approved or issued if it is determined that the proposed activity
does not adequately mitigate its impacts on the critical areas and/or does not comply with the provisions
of this title.
Following notice of decision that the proposed activity does not meet the review criteria and/or does not
comply with the applicable provisions of this title, the applicant may request consideration of a revised
critical area report. If the revision is found to be substantial and relevant to the critical area review, the
Packet Page 450 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 14 of 90
director may reopen the critical area review and make a new decision based on the revised report. [Ord.
3527 § 2, 2004].
23.40.190 Completion of the critical areas review.
The director’s decision regarding critical areas pursuant to this title shall be final concurrent with the
final project decision to approve, condition, or deny the development proposal or other activity involved.
[Ord. 3527 § 2, 2004].
23.40.200 Appeals.
Any decision to approve, condition, or deny a development proposal or other activity based on the
requirements of this title may be appealed according to, and as part of, the appeal procedure, if any, for
the permit or approval involved. [Ord. 3736 § 71, 2009; Ord. 3527 § 2, 2004].
23.40.210 Variances.
A. Variances from the standards of this title may be authorized through the process of hearing examiner
review in accordance with the procedures set forth in Chapter 20.85 ECDC only if an applicant
demonstrates that one or more of the following two conditions exist:
1. The application of this title would prohibit a development proposal by a public agency or public
utility. A public agency and utility exception may be granted as a variance if:
a. There is no other practical alternative to the proposed development with less impact on the critical
areas;
b. The application of this title would unreasonably restrict the ability to provide utility services to the
public;
c. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the
development proposal site;
d. The proposal attempts to protect and mitigate impacts to the critical area functions and values
consistent with the best available science; and
e. The proposal is consistent with other applicable regulations and standards.
2. The application of this title would deny all reasonable economic use (see the definition of “reasonable
economic use(s)” in ECDC 23.40.320) of the subject property. A reasonable use exception may be
authorized as a variance only if an applicant demonstrates that:
a. The application of this title would deny all reasonable economic use of a property or subject parcel;
b. No other reasonable economic use of the property consistent with the underlying zoning and the city
comprehensive plan has less impact on the critical area;
Packet Page 451 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 15 of 90
c. The proposed impact to the critical area is the minimum necessary to allow for reasonable economic
use of the property;
d. The inability of the applicant to derive reasonable economic use of the property is not the result of
actions by the applicant after the effective date of the ordinance codified in this title or its predecessor;
e. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the
development proposal site;
f. The proposal minimizes net loss of critical area functions and values consistent with the best available
science; and
g. The proposal is consistent with other applicable regulations and standards.
B. Specific Variance Criteria. A variance may be granted if the applicant demonstrates that the requested
action conforms to all of the following specific criteria:
1. Special conditions and circumstances exist that are peculiar to the land, the lot, or something inherent
in the land, and that are not applicable to other lands in the same district;
2. The special conditions and circumstances do not result from the actions of the applicant;
3. A literal interpretation of the provisions of this title would deprive the applicant of all reasonable
economic uses and privileges permitted to other properties in the vicinity and zone of the subject
property under the terms of this title, and the variance requested is the minimum necessary to provide
the applicant with such rights;
4. Granting the variance requested will not confer on the applicant any special privilege that is denied by
this title to other lands, structures, or buildings under similar circumstances;
5. The granting of the variance is consistent with the general purpose and intent of this title, and will not
further degrade the functions or values of the associated critical areas or otherwise be materially
detrimental to the public welfare or injurious to the property or improvements in the vicinity of the
subject property; and
6. The decision to grant the variance is based upon the best available science and gives special
consideration to conservation or protection measures necessary to preserve or enhance anadromous fish
habitat.
C. Hearing Examiner Review. The city hearing examiner shall, as a Type III-A decision (see Chapter
20.01 ECDC), review variance applications and conduct a public hearing. The hearing examiner shall
approve, approve with conditions, or deny variance applications based on a proposal’s ability to comply
with general and specific variance criteria provided in subsections (A) and (B) of this section.
Packet Page 452 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 16 of 90
D. Conditions May Be Required. The director retains the right to prescribe such conditions and
safeguards as are necessary to secure adequate protection of critical areas from adverse impacts, and to
ensure conformity with this title for variances granted through hearing examiner review.
E. Time Limit. The director shall prescribe a time limit within which the action for which the variance is
required shall be begun, completed, or both. Failure to begin or complete such action within the
established time limit shall void the variance, unless the applicant files an application for an extension of
time before the expiration. An application for an extension of time shall be reviewed by the director as a
Type II decision (see Chapter 20.01 ECDC).
F. Burden of Proof. The burden of proof shall be on the applicant to bring forth evidence in support of a
variance application and upon which any decision has to be made on the application. [Ord. 3783 § 15,
2010; Ord. 3775 § 15, 2010; Ord. 3736 §§ 72, 73, 2009; Ord. 3527 § 2, 2004].
23.40.215 Critical Area Restoration Projects
A. When a critical area restoration project is proposed that is not required as mitigation for a
development proposal, the City of Edmonds may grant relief from standard critical area buffer
requirements if the restoration project involves:
1. The daylighting of a stream, or
2. Creation or expansion of a wetland that would cause a landward expansion of the wetland and/or
wetland buffer
B. At the time a restoration project is proposed, a buffer shall be established that will apply to the
restoration project boundary. Restoration project buffers shall be established according to the following
requirements:
1. For the purposes of this section, an expanded buffer is that portion of the stream or wetland buffer
that extended landward as a result of the restoration project.
2. A buffer may be applied to the restored portion of the stream or wetland that is not less than 75% of
the expanded buffer associated with the class of stream or category of wetland; or,
3. The project proponent may request a reduced buffer of between 50% and 75% of the expanded buffer
associated with the class of stream or category of wetland. The following criteria will be used by the
City in reviewing the request for a reduced buffer:
a. The Director determines that applying a 75% expanded buffer would significantly limit the use of the
property for existing or permitted uses, thus making the restoration project infeasible;
b. The proposed expanded buffer relief is the minimum necessary to achieve the restoration project;
c. There will be a net environmental benefit from the restoration project with the reduced expanded
buffer;
Packet Page 453 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 17 of 90
d. Granting the proposed relief is consistent with the objectives of the critical area restoration project
and consistent with purposes of the City’s critical area regulations.
Part III. Allowed Activities, Exemptions and Noncompliance Penalties
23.40.220 Allowed activities.
A. Critical Area Report. Activities allowed under this title shall have been reviewed and permitted or
approved by the city of Edmonds or other agency with jurisdiction, but do not require submittal of a
critical area report, unless such submittal was required previously for the underlying permit. The director
may apply conditions to the underlying permit or approval to ensure that the allowed activity is
consistent with the provisions of this title to protect critical areas.
B. Required Use of Best Management Practices. All allowed activities shall be conducted using the best
management practices that result in the least amount of impact to the critical areas. Best management
practices shall be used for tree and vegetation protection, construction management, erosion and
sedimentation control, water quality protection, and regulation of chemical applications. The city may
observe or require independent inspection of the use of best management practices to ensure that the
activity does not result in degradation to the critical area. Any incidental damage to, or alteration of, a
critical area shall be restored, rehabilitated, or replaced at the responsible party’s expense.
C. Allowed Activities. The following activities are allowed:
1. Permit Requests Subsequent to Previous Critical Areas Review. Development permits and approvals
that involve both discretionary land use approvals (such as subdivisions, rezones, or conditional use
permits) and construction approvals (such as building permits) if all of the following conditions have
been met:
a. The provisions of this title have been previously addressed as part of another approval;
b. There have been no material changes in the potential impact to the critical area or buffer since the
prior review;
c. The permit or approval has not expired or, if no expiration date, no more than five years have elapsed
since the issuance of that permit or approval;
d. There is no new information available that is applicable to any critical area review of the site or
particular critical area; and
de. Compliance with any standards or conditions placed upon the prior permit or approval has been
achieved or secured.;
2. Modification to Structures Existing Outside of Critical Areas and/or Buffers. Structural modification
of, addition to, or replacement of a legally constructed structure existing outside of a critical area or its
buffer that does not further alter or increase the impact to the critical area or buffer and there is no
increased risk to life or property as a result of the proposed modification or replacement;
Packet Page 454 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 18 of 90
3. Permitted AlterationModifications to Existing Structures Existing Withinwithin Critical Areas and/or
Buffers. Permitted alterationModification to a legally constructed structure existing within a critical area
or buffer shall be allowed when the alterationatmodification: does not
a. Does not increase the footprint of the structuredevelopment; and
b. or Does not increase the impact to the critical area or buffer; and
c. Does not increasethere is no increased risk to life or property as a result of the proposed modification
or replacement. (
Aadditions to legally constructed structures existing within a critical area or buffer that do increase the
existing footprint of development shall be subject to and permitted in accordance with the development
standards of the associated critical area type (see ECDC 23.50.040 and 23.90.040)). This provision shall
be interpreted to supplement the provisions of the Edmonds Community Development Code relating to
nonconforming structures in order to permit the full reconstruction of a legal nonconforming building
within its footprint;
4. Development Proposals within Physically Separated and Functionally Isolated Stream or Wetland
Buffers. Areas that are physically separated and functionally isolated from a stream or wetland due to
existing, legally established roadways, paved trails twelve (12) feet or more in width, or other legally
established structures or paved areas twelve (12) feet or more in width that occur between the area in
question and the stream or wetland may be considered physically separated and functionally isolated
from the stream or wetland. Once determined by the director to be a physically separated and
functionally isolated stream or wetland buffer, development proposals shall be allowed in these areas.
The director may require a site assessment and functional analysis documentation by a qualified
professional to determine whether the buffer is functionally isolated. In determining whether an area is
physically separated and functionally isolated from the adjacent stream or wetland, the director shall
consider the hydrologic, geologic, and/or biological habitat connection potential and the extent and
permanence of the interruption.
45. Activities Withinwithin the Improved Right-of-Way. Replacement, modification, installation, or
construction of utility facilities, lines, pipes, mains, equipment, or appurtenances, when such facilities
are located within the improved portion of the public right-of-way or a city-authorized private roadway,
except those activities that alter a wetland or watercourse, such as culverts or bridges, or result in the
transport of sediment or increased stormwater.
56. Minor Utility Projects. Utility projects that have minor or short-duration impacts to critical areas, as
determined by the director in accordance with the criteria below, and which do not significantly impact
the function or values of a critical area(s); provided, that such projects are constructed with best
management practices and additional restoration measures are provided. Minor activities shall not result
in the transport of sediment or increased storm water. Such allowed minor utility projects shall meet the
following criteria:
a. There is no practical alternative to the proposed activity with less impact on critical areas;
Packet Page 455 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 19 of 90
b. The activity involves the placement of utility pole(s), street sign(s), anchor(s), or vault(s) or other
small component(s) of a utility facility; and
c. The activity involves disturbance of an area less than 75 square feet;
6. Public and Private Pedestrian Trails. New public and private pedestrian trails subject to the following:
a. The trail surface shall be limited to pervious surfaces and meet all other requirements, including water
quality standards set forth in the current editions of the International Residential Code and International
Building Code, as adopted in ECDC Title 19;
b. Critical area and/or buffer widths shall be increased, where possible, equal to the width of the trail
corridor, including disturbed areas; and
c. Trails proposed to be located in landslide or erosion hazard areas shall be constructed in a manner that
does not increase the risk of landslide or erosion and in accordance with an approved geotechnical
report; and
d. Trails located only in the outer twenty-five percent (25%) of critical areas buffers, and located to
avoid removal of significant trees. Where existing legally established development has reduced the
width of the critical areas buffer, trails may be placed in the outer twenty-five percent (25%) of the
remaining critical area buffer. The trail shall be no more than five (5) feet in width and for pedestrian
use only. Raised boardwalks utilizing nontreated pilings may be acceptable.
Allowances for trails within the inner seventy-five percent (75%) of critical areas buffers are provided
within applicable sections of ECDC Chapters 23.50 – 23.90.
7. Select Vegetation Removal Activities. The following vegetation removal activities:
a. The removal of the following vegetation with hand labor and light hand-held equipment when the area
of work is under one thousand five hundred (1,500) square feet in area as calculated cumulatively over
three (3) years:
i. Invasive and noxious weeds;
ii. English ivy (Hedera helix);
iii. Himalayan blackberry (Rubus discolor, R. procerus);
iv. Evergreen blackberry (Rubus laciniatus);
v. Scot’s broom (Cytisus scoparius); and
vi. Hedge and field bindweed (Convolvulus sepium and C. arvensis);
Packet Page 456 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 20 of 90
Removal of these invasive and noxious plant species shall be restricted to hand removal unless permits
or approval from the appropriate regulatory agencies have been obtained for approved biological or
chemical treatments or other removal techniques. All removed plant material shall be taken away from
the site and appropriately disposed of. Plants that appear on the Washington State Noxious Weed
Control Board list of noxious weeds must be handled and disposed of according to a noxious weed
control plan appropriate to that species.
b. The removal of trees from critical areas and buffers that are hazardous, posing a threat to public
safety, or posing an imminent risk of damage to private property; provided, that:
i. The applicant submits a report from an ISA- or ASCA-certified arborist or registered landscape
architect that documents the hazard and provides a replanting schedule for the replacement trees;
ii. Tree cutting shall be limited to pruning and crown thinning, unless otherwise justified by a qualified
professional. Where pruning or crown thinning is not sufficient to address the hazard, trees should be
removed or converted to wildlife snags;
iii. All vegetation cut (tree stems, branches, etc.) shall be left within the critical area or buffer unless
removal is warranted due to the potential for disease or pest transmittal to other healthy vegetation or
unless removal is warranted to improve slope stability;
iv. The land owner shall replace any trees that are removed with new trees at a ratio of two replacement
trees for each tree removed (two to one2:1) within one year in accordance with an approved restoration
plan. Replacement trees may be planted at a different, nearby location if it can be determined that
planting in the same location would create a new hazard or potentially damage the critical area.
Replacement trees shall be species that are native and indigenous to the site and a minimum of one inch
in diameter at breast height (dbh) for deciduous trees and a minimum of six feet in height for evergreen
trees as measured from the top of the root ball;
v. If a tree to be removed provides critical habitat, such as an eagle perch, a qualified wildlife biologist
shall be consulted to determine timing and methods of removal that will minimize impacts; and
vi. Hazard trees determined to pose an imminent threat or danger to public health or safety, to public or
private property, or of serious environmental degradation may be removed or pruned by the land owner
prior to receiving written approval from the city; provided, that within 14 days following such action,
the land owner shall submit a restoration plan that demonstrates compliance with the provisions of this
title;
c. Measures to control a fire or halt the spread of disease or damaging insects consistent with the State
Forest Practices Act, Chapter 76.09 RCW; provided, that the removed vegetation shall be replaced in
kind or with similar native species within one year in accordance with an approved restoration plan;
d. Chemical Applications. The application of herbicides, pesticides, organic or mineral-derived
fertilizers, or other hazardous substances, if necessary, as approved by the City, provided that their use
shall be restricted in accordance with state Department of Fish and Wildlife Management
Packet Page 457 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 21 of 90
Recommendations and the regulations of the state Department of Agriculture, the U.S. Environmental
Protection Agency, and Department of Ecology; and
de. Unless otherwise provided, or as a necessary part of an approved alteration, removal of any
vegetation or woody debris from a fish and wildlife habitat conservation area or wetland shall be
prohibited;
8. Minor Site Investigative Work. Work necessary for land use submittals, such as surveys, soil logs,
percolation tests, and other related activities, where such activities do not require construction of new
roads or significant amounts of excavation. In every case, impacts to the critical area shall be minimized
and disturbed areas shall be immediately restored; and
9. Navigational Aids and Boundary Markers. Construction or modification of navigational aids and
boundary markers. [Ord. 3527 § 2, 2004].
23.40.230 Exemptions.
A. Exemption Request and Review Process. The proponent of the activity may submit a written request
for exemption to the director that describes the activity and states the exemption listed in this section
that applies.
The director shall review the exemption request to verify that it complies with this title and approve or
deny the exemption. If the exemption is approved, it shall be placed on file with the city of Edmonds. If
the exemption is denied, the proponent may continue in the review process and shall be subject to the
requirements of this title.
B. Exempt Activities and Impacts to Critical Areas. All exempted activities shall use reasonable
methods to avoid potential impacts to critical areas. To be exempt from this title does not give
permission to degrade a critical area or ignore risk from natural hazards. Any incidental damage to, or
alteration of, a critical area that is not a necessary outcome of the exempted activity shall be restored,
rehabilitated, or replaced at the responsible party’s expense.
C. Exempt Activities. The following developments, activities, and associated uses shall be exempt from
the provisions of this title; provided, that they are otherwise consistent with the provisions of other local,
state, and federal laws and requirements:
1. Emergencies. Those activities necessary to prevent an immediate threat to public health, safety, or
welfare, or that pose an immediate risk of damage to private property and that require remedial or
preventative action in a time frame too short to allow for compliance with the requirements of this title.
Emergency actions that create an impact to a critical area or its buffer shall use reasonable methods to
address the emergency; in addition, they must have the least possible impact to the critical area or its
buffer. The person or agency undertaking such action shall notify the director within one working day
following commencement of the emergency activity. Within 30 days, the director shall determine if the
action taken was within the scope of the emergency actions allowed in this subsection. If the director
determines that the action taken, or any part of the action taken, was beyond the scope of an allowed
Packet Page 458 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 22 of 90
emergency action, then enforcement provisions of ECDC 23.40.240, Unauthorized critical area
alterations and enforcement, shall apply.
After the emergency, the person or agency undertaking the action shall fully fund and conduct necessary
restoration and/or mitigation for any impacts to the critical area and buffers resulting from the
emergency action in accordance with an approved critical areas report and mitigation plan. The person
or agency undertaking the action shall apply for review, and the alteration, critical area report, and
mitigation plan shall be reviewed by the director in accordance with the review procedures contained
herein. Restoration and/or mitigation activities must be initiated within one year of the date of the
emergency and completed in a timely manner;
2. Operation, Maintenance, or Repair. Operation, maintenance, or repair of existing structures,
infrastructure improvements, utilities, public or private roads, dikes, levees, or drainage systems that do
not require construction permits, if the activity does not further alter or increase the impact to, or
encroach further within, the critical area or buffer and there is no increased risk to life or property as a
result of the proposed operation, maintenance, or repair. Operation and maintenance also includes
normal maintenance of vegetation performed in accordance with best management practices, provided
that such management actions are part of regular and ongoing maintenance, do not expand further into
the critical area, are not the result of an expansion of the structure or utility, and do not directly impact
an endangered or threatened species; and
3. Passive Outdoor Activities. Recreation, education, and scientific research activities that do not
degrade the critical area, including fishing, hiking, and bird watching. Trails must be constructed
pursuant to ECDC 23.40.220(C)(6), Public and Private Pedestrian Trails. [Ord. 3527 § 2, 2004].
23.40.240 Unauthorized critical area alterations and enforcement.
A. When a critical area or its buffer has been altered in violation of this title or the provisions of Chapter
7.200 ECC, all ongoing development work shall stop and the critical area shall be restored. The director
shall have the authority to issue a stop work order to cease all ongoing development work, and order
restoration, rehabilitation, or replacement measures at the owner’s or other responsible party’s expense
to compensate for violation of the provisions of this title. The director may also require an applicant or
property owner to take immediate action to ensure site stabilization and/or erosion control as needed.
B. Requirement for Restoration Plan. All development work shall remain stopped until a restoration plan
is prepared and approved by the director. Such a plan shall be prepared by a qualified professional using
the best available science and shall describe how the actions proposed meet the minimum requirements
described in subsection C of this section. The director shall, at the violator’s expense, seek expert advice
in determining the adequacy of the plan. Inadequate plans shall be returned to the applicant or violator
for revision and resubmittal.
C. Minimum Performance Standards for Restoration.
1. For alterations to frequently flooded areas, wetlands, and fish and wildlife habitat conservation areas,
the following minimum performance standards shall be met for the restoration of a critical area;
Packet Page 459 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 23 of 90
provided, that if the violator can demonstrate that greater functional and habitat values can be obtained,
these standards may be modified:
a. The historic structural and functional values shall be restored, including water quality and habitat
functions;
b. The historic soil types and configuration shall be replicated;
c. The critical area and buffers shall be replanted with native vegetation that replicates the vegetation
historically found on the site in species types, sizes, and densities. The historic functions and values
should be replicated at the location of the alteration; and
d. Information demonstrating compliance with the requirements in ECDC 23.40.130, Mitigation plan
requirements, shall be submitted to the city planning division.
2. For alterations to flood and geological hazards, the following minimum performance standards shall
be met for the restoration of a critical area; provided, that if the violator can demonstrate that greater
safety can be obtained, these standards may be modified:
a. The hazard shall be reduced to a level equal to, or less than, the predevelopment hazard;
b. Any risk of personal injury resulting from the alteration shall be eliminated or minimized; and
c. The hazard area and buffers shall be replanted with native vegetation sufficient to minimize the
hazard.
D. Site Investigations. The director is authorized to make site inspections and take such actions as are
necessary to enforce this title. The director shall present proper credentials and make a reasonable effort
to contact any property owner before entering onto private property.
E. Penalties. Any person, party, firm, corporation, or other legal entity convicted of violating any of the
provisions of this title shall be guilty of a misdemeanor and subject to penalties not to exceed a square
footage cost of three dollars ($3.00) per square foot of impacted critical area and critical area buffer
and/or a per tree penalty consistent with ECDC 18.45.070B. and C. set forth in ECDC 18.45.070 and
18.45.075. Each day or portion of a day during which a violation of this title is committed or continued
shall constitute a separate offense. Any development carried out contrary to the provisions of this title
shall constitute a public nuisance and may be enjoined as provided by the statutes of the state of
Washington. The city of Edmonds may levy civil penalties against any person, party, firm, corporation,
or other legal entity for violation of any of the provisions of this title. The civil penalty shall be assessed
as proscribed in ECDC 18.45.070 and 18.45.075.[Ord. 3828 § 2, 2010; Ord. 3527 § 2, 2004].
Part IV. General Critical Areas Protective Measures
23.40.250 Critical areas markers and signs.
Packet Page 460 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 24 of 90
A. The boundary at the outer edge of a critical area, critical area buffer or critical area tract may, at the
discretion of the director, be required to be delineated with wood fencing.
B. The boundary at the outer edge of the critical area or buffer may be identified with temporary signs
prior to any site alteration. Such temporary signs may be replaced with permanent signs prior to
occupancy or use of the site.
C. These provisions may be modified by the director as necessary to ensure protection of sensitive
features or wildlife needs. [Ord. 3527 § 2, 2004].
23.40.270 Critical areas tracts and easements.
A. At the discretion of the director, critical areas tracts and/or easements may be required in
development proposals for subdivisions, short subdivisions, and planned unit
developments.developments that include critical areas. These critical areas tracts and/or easements shall
delineate and protect those contiguous critical areas and buffers greater than 5,000 square feet including:
1. Landslide hazard areas and buffers;
2. Wetlands and buffers;
3. Fish and wildlife habitat conservation areas; and
4. Other lands to be protected from alterations as conditioned by project approval.
B. Notice on Title. The owner of any property with field-verified presence of critical areas and/or critical
areas buffers, except critical aquifer recharge areas, for which a permit application is submitted shall, as
a condition of permit issuance, record a notice of the existence of such critical area and/or critical area
buffer against the property with the Snohomish County Auditor’s office. The notice shall be approved
by the director and the city attorney for compliance with this provision. The titleholder will have the
right to challenge this notice and to have it released if the critical area designation no longer applies;
however, the titleholder shall be responsible for completing a critical areas report, subject to approval by
the director, before the notice on title can be released.Critical areas tracts shall be recorded on all
documents of title of record for all affected lots.
C. Critical areas tracts or easements shall be designated on the face of the plat or recorded drawing in a
format approved by the director. The designation shall include the following restrictions:
1. An assurance that native vegetation will be preserved for the purpose of preventing harm to property
and the environment, including, but not limited to, controlling surface water runoff and erosion,
maintaining slope stability, buffering, and protecting plants, fish, and animal habitat; and
2. The right of the director to enforce the terms of the restriction.
D. The director may require that critical areas tracts be dedicated to the city, to be held in an undivided
interest by each owner of a building lot within the development with the ownership interest passing with
Packet Page 461 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 25 of 90
the ownership of the lot, or held by an incorporated homeowner’s association or other legal entity (such
as a land trust), which ensures the ownership, maintenance, and protection of the tract and contains a
process to assess costs associated therewith.
E. The use of herbicides within critical areas tracts or easements is prohibited except use of aquatic
approved herbicides where recommended by the Noxious Weed Control Board and where otherwise
consistent with the provisions of ECDC Title 23. [Ord. 3527 § 2, 2004].
23.40.280 Building setbacks.
Unless otherwise providedExcept for geologically hazardous areas where setbacks are determined by a
geotechnical report, buildings and other structures shall be set back a distance of 15 feet from the edges
of all critical area buffers or from the edges of all critical areas, if no buffers are required. The In
addition to other allowances provided by this Title, the following may be allowed in the building setback
area:
A. Landscaping;
B. Uncovered decks;
C. Building overhangs, if such overhangs do not extend more than 30 inches into the setback area; and
D. Impervious ground surfaces, such as driveways and patios; provided, that such improvements may be
subject to water quality regulations as adopted in the current editions of the International Residential
Code and International Building Code, as adopted in ECDC Title 19. [Ord. 3527 § 2, 2004].
23.40.290 Bonds to ensure mitigation, maintenance, and monitoring.
A. When mitigation required pursuant to a development proposal is not completed prior to final permit
approval, such as final plat approval or final building inspection, the applicant shall be required to post a
performance bond or other security in a form and amount deemed acceptable by the director. If the
development proposal is subject to mitigation, the applicant shall post a mitigation bond or other
security in a form and amount deemed acceptable by the city to ensure mitigation is fully functional.
B. The bond shall be in the amount of 120 percent of the estimated cost of the uncompleted actions or
the estimated cost of restoring the functions and values of the critical area that are at risk, whichever is
greater. The amount of the performance bond shall include a reasonable allocation for inflation based on
the length of anticipated delay and the provisions of subsection D of this section.
C. The bond shall be in the form of a surety bond, performance bond, and/or maintenance bond from an
acceptable financial institution, with terms and conditions acceptable to the city of Edmonds’ attorney.
D. Bonds or other security authorized by this section shall remain in effect until the director determines,
in writing, that the standards bonded for have been met. Bonds or other security shall be held by the city
for a minimum of three five (5) ye ars to ensure that the required mitigation has been fully implemented
and demonstrated to function, and may be held for longer periods when necessary to achieve these goals.
Packet Page 462 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 26 of 90
E. Depletion, failure, or collection of bond funds shall not discharge the obligation of an applicant or
violator to complete required mitigation, maintenance, monitoring, or restoration.
F. Public development proposals shall be relieved from having to comply with the bonding requirements
of this section if public funds have previously been committed for mitigation, maintenance, monitoring,
or restoration.
G. Any failure to satisfy critical area requirements established by law or condition including, but not
limited to, the failure to provide a monitoring report within thirty (30) days after it is due or comply with
other provisions of an approved mitigation plan shall constitute a default, and the city may demand
payment of any financial guarantees or require other action authorized under this title or any other law.
H. Any funds recovered pursuant to this section shall be used to complete the required mitigation. [Ord.
3527 § 2, 2004].
23.40.300 Critical area inspections.
Reasonable access to the site shall be provided to the city, state, and/or federal agency review staff for
the purpose of inspections during any proposal review, restoration, emergency action, or monitoring
period. Failure to provide access shall constitute grounds for issuance of a stop work order. [Ord. 3527
§ 2, 2004].
Part V. Incorporation of Best Available Science
23.40.310 Best available science.
A. Protect Functions and Values of Critical Areas with Special Consideration to Anadromous Fish.
Critical areas reports and decisions to alter critical areas shall rely on the best available science to
protect the functions and values of critical areas and must give special consideration to conservation or
protection measures necessary to preserve or enhance anadromous fish, such as salmon and bull trout,
and their habitat, where applicable.
B. Best Available Science to Be Consistent with Criteria. The best available science is that scientific
information applicable to the critical area prepared by local, state, or federal natural resource agencies, a
qualified scientific professional, or a team of qualified scientific professionals that is consistent with
criteria established in WAC 365-195-900 through 365-195-925 and RCW 36.70A.172.
C. Characteristics of a Valid Scientific Process. In the context of critical areas protection, a valid
scientific process is one that produces reliable information useful in understanding the consequences of a
local government’s regulatory decisions, and in developing critical areas policies and development
regulations that will be effective in protecting the functions and values of critical areas. To determine
whether information received during the permit review process is reliable scientific information, the
director shall determine whether the source of the information displays the characteristics of a valid
scientific process. Such characteristics are as follows:
Packet Page 463 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 27 of 90
1. Peer Review. The information has been critically reviewed by other persons who are qualified
scientific experts in that scientific discipline. The proponents of the information have addressed the
criticism of the peer reviewers. Publication in a refereed scientific journal usually indicates that the
information has been appropriately peer-reviewed;
2. Methods. The methods used to obtain the information are clearly stated and reproducible. The
methods are standardized in the pertinent scientific discipline or, if not, the methods have been
appropriately peer-reviewed to ensure their reliability and validity;
3. Logical Conclusions and Reasonable Inferences. The conclusions presented are based on reasonable
assumptions supported by other studies and consistent with the general theory underlying the
assumptions. The conclusions are logically and reasonably derived from the assumptions and supported
by the data presented. Any gaps in information and inconsistencies with other pertinent scientific
information are adequately explained;
4. Quantitative Analysis. The data have been analyzed using appropriate statistical or quantitative
methods;
5. Context. The information is placed in proper context. The assumptions, analytical techniques, data,
and conclusions are appropriately framed with respect to the prevailing body of pertinent scientific
knowledge; and
6. References. The assumptions, analytical techniques, and conclusions are well referenced with
citations to relevant, credible literature and other pertinent existing information.
D. Nonscientific Information. Nonscientific information, such as anecdotal observations, non-expert
opinion, and hearsay, may supplement scientific information, but it is not an adequate substitute for
valid and available scientific information.
E. Absence of Valid Scientific Information. Where there is an absence of valid scientific information or
incomplete scientific information relating to a critical area leading to uncertainty about the risk to
critical area function of permitting an alteration of or impact to the critical area, the director shall:
1. Take a “precautionary or a no-risk approach” that strictly limits development and land use activities
until the uncertainty is sufficiently resolved; and
2. Require application of an effective adaptive management program that relies on scientific methods to
evaluate how well regulatory and nonregulatory actions protect the critical area. An adaptive
management program is a formal and deliberate scientific approach to taking action and obtaining
information in the face of uncertainty. An adaptive management program shall:
a. Address funding for the research component of the adaptive management program;
b. Change course based on the results and interpretation of new information that resolves uncertainties;
and
Packet Page 464 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 28 of 90
c. Commit to the appropriate time frame and scale necessary to reliably evaluate regulatory and
nonregulatory actions affecting protection of critical areas and anadromous fisheries. [Ord. 3527 § 2,
2004].
Part VI. Definitions
23.40.320 Definitions pertaining to critical areas.
For the purposes of this chapter and the chapters on the five specific critical area types (Chapters 23.50,
23.60, 23.70, 23.80 and 23.90 ECDC) the following definitions shall apply:
“Adjacent” means those areas activities located on- site immediately adjoining a critical area; or a
distance equal to or less than two hundred and twenty five (225)200 feet of a development proposal or
subject parcel and those areas located within 800 feet of a documented bald eagle nest.
“Alteration” means any human-induced action which changes the existing condition of a critical area or
its buffer. Alterations include, but are not limited to: grading; filling; dredging; draining; channelizing;
cutting, pruning, limbing or topping, clearing, relocating or removing vegetation; applying herbicides or
pesticides or any hazardous or toxic substance; discharging pollutants; paving, construction, application
of gravel; modifying for surface water management purposes; or any other human activity that changes
the existing landforms, vegetation, hydrology, wildlife or wildlife habitat value of critical areas.
“Best management practices” means a system of practices and management measures that:
1. Control soil loss and reduce water quality degradation caused by nutrients, animal waste, and toxics;
2. Control the movement of sediment and erosion caused by land alteration activities;
3. Minimize adverse impacts to surface and ground water quality, flow, and circulation patterns; and
4. Minimize adverse impacts to the chemical, physical, and biological characteristics of critical areas.
“Buffer” means the designated area immediately next to and a part of a steep slope or landslide hazard
area and which protects slope stability, attenuation of surface water flows and landslide hazards
reasonably necessary to minimize risks to persons or property; or a designated area immediately next to
and part of a stream or wetland that is an integral part of the stream or wetland ecosystem.
“Chapter” means those sections of this title sharing the same third and fourth digits.
“City” means the city of Edmonds.
“Class” or “wetland class” means descriptive categories of wetland vegetation communities within the
wetlands taxonomic classification system of the U.S. Fish and Wildlife Service (Cowardin, et al., 1979).
“Clearing” means the act of cutting and/or removing vegetation. This definition shall include grubbing
vegetation and the use or application of herbicide.
Packet Page 465 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 29 of 90
“Compensation project” means an action(s) specifically designed to replace project-induced critical area
or buffer losses. Compensation project design elements may include, but are not limited to: land
acquisition procedures and detailed plans including functional value assessments, detailed landscaping
designs, construction drawings, and monitoring and contingency plans.
“Compensatory mitigation” means replacing project-induced losses or impacts to a critical area, and
includes, but is not limited to, the following:
1. “Restoration” means actions performed to reestablish wetland functional characteristics and processes
that have been lost by alterations, activities, or catastrophic events within an area that no longer meets
the definition of a wetland.
21. “Creation” means actions performed to intentionally establish a wetland or steam at a site where it
did not formerly exist.
2. “Re-establishment” means actions performed to restore processes and functions to an area that was
formerly a critical area, where the former critical area was lost by past alterations and activities.
3. “Rehabilitation” means improving or repairing processes and functions to an area that is an existing
critical area that is highly degraded because one or more environmental processes supporting the critical
area have been disrupted.
34. “Enhancement” means actions performed to improve the condition of existing degraded wetlands
critical area so that the functions they provide are of a higher quality; enhancement activities usually
attempt to change plant communities within existing wetlands from non-native communities to native
scrub-shrub or forested communities.
45. “Preservation” means actions taken to ensure the permanent protection of existing high-quality
wetlands.
“Creation” means a compensation project performed to intentionally establish a wetland or stream at a
site where one did not formerly exist.
“Critical areas” for the city of Edmonds means wetlands, critical aquifer recharge areas, frequently
flooded areas, geologically hazardous areas, and fish and wildlife habitat conservation areas as defined
in Chapters 23.50, 23.60, 23.70, 23.80 and 23.90 ECDC, respectively.
“Development proposal” means any activity relating to the use and/or development of land requiring a
permit or approval from the city, including, but not limited to: commercial or residential building
permit; binding site plan; conditional use permit; franchise; right-of-way permit; grading and clearing
permit; mixed use approval; planned residential development; shoreline conditional use permit;
shoreline substantial development permit; shoreline variance; short subdivision; special use permit;
subdivision; flood hazard permit; unclassified use permit; utility and other use permit; variance; rezone;
or any required permit or approval not expressly exempted by this title.
“Director” means the city of Edmonds development services director or his/her designee.
Packet Page 466 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 30 of 90
“Division” means the planning division of the city of Edmonds development services department.
“Enhancement” means an action taken to improve the condition and function of a critical area. In the
case of wetland or stream, the term includes a compensation project performed to improve the
conditions of an existing degraded wetland or stream to increase its functional value.
“Erosion” means the process in which soil particles are mobilized and transported by natural agents such
as wind, rain, frost action, or stream flow.
“Erosion Hazard Areas.” See ECDC 23.80.020(A).
“Fish and Wildlife Habitat Conservation Areas.” See Chapter 23.90 ECDC.
“Floodplain” means the total area subject to inundation by a “100-year flood.” “100-year flood” means a
flood having a one percent chance of being equaled or exceeded in any given year.
“Footprint of Existing Development” or “Footprint of Development” means the area of a site that
contains legally established: buildings; roads, driveways, parking lots, storage areas, walkways or other
areas paved with concrete, asphalt or compacted gravel; outdoor swimming pools; and patios.
“Frequently Flooded Areas.” See Chapter 23.70 ECDC.
“Functions” means the roles served by critical areas including, but not limited to: water quality
protection and enhancement; fish and wildlife habitat; food chain support; flood storage, conveyance
and attenuation; ground water recharge and discharge; erosion control; wave attenuation; aesthetic value
protection; and recreation. These roles are not listed in order of priority.
“Geologically Hazardous Areas.” See Chapter 23.80 ECDC.
“Geologist” means a person licensed as a geologist, engineering geologist, or hydrologist in the state of
Washington who has earned a degree in geology from an accredited college or university and has at least
five years of experience as a practicing geologist or four years of experience and at least two years of
postgraduate study, research or teaching. The practical experience shall include at least three years of
work in applied geology and landslide evaluation in close association with qualified, practicing
geologists and geotechnical/civil engineers. For geologically hazardous areas, an applicant may choose a
geologist or engineering geologist licensed in the State of Washington to assess the potential hazard.
“Geotechnical engineer” means a practicing geotechnical/civil engineer licensed as a professional civil
engineer in the state of Washington who has at least four five years of professional employment as a
geotechnical engineer in responsible charge including experience with landslide evaluation.
“Grading” means any one or a combination of excavating, filling, or disturbance of that portion of the
soil profile which contains decaying organic matter.
“Habitats of local importance” means areas that include a seasonal range or habitat element with which a
given species has a primary association, and which, if altered may reduce the likelihood that the species
Packet Page 467 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 31 of 90
will maintain and reproduce over the long-term. These might include areas of high relative density or
species richness, breeding habitat, winter range, and movement corridors. These might also include
habitats that are of limited availability or high vulnerability to alterations such as cliffs, talus, and
wetlands. In urban areas like the city of Edmonds, habitats of local importance include biodiversity areas
and corridors, which are characterized by a framework of ecological components which provides the
physical conditions necessary for ecosystems and species populations to survive in a human-dominated
landscape. include a seasonal range or habitat element with which a given species has a primary
association, and which, if altered, may reduce the likelihood that the species will maintain and reproduce
over the long term. These might include areas of high relative density or species richness, breeding
habitat, winter range, and movement corridors. These might also include habitats that are of limited
availability or high vulnerability to alteration, such as cliffs, shorelines, coastal beaches, mudflats,
eelgrass beds, and wetlands. (See ECDC 23.90.010(A)(4).)
“In lieu fee program” means a program which sells compensatory mitigation credits to permittees whose
obligation to provide compensatory mitigation is then transferred to the in lieu program sponsor, a
governmental or non-profit natural resource management entity.
“Landslide Hazard Areas.” (See ECDC 23.80.020(B).)
“Mitigation” means the use of any or all of the following actions, which are listed in descending order of
preference:
1. Avoiding the impact altogether by not taking a certain action or parts of an action;
2. Minimizing impacts by limiting the degree or magnitude of the action and its implementation by
using appropriate technology or by taking affirmative steps such as project redesign, relocation, or
timing to avoid or reduce impacts;
3. Rectifying the impact to wetlands, critical aquifer recharge areas, frequently flooded areas, and habitat
conservation areas by repairing, rehabilitating, or restoring the affected environment to the historical
conditions or the conditions existing at the time of the initiation of the project;
4. Minimizing or eliminating the hazard by restoring or stabilizing the hazard area through engineered or
other methods;
5. Reducing or eliminating the impact or hazard over time by preservation and maintenance operations
during the life of the action;
6. Compensating for the impact to wetlands, critical aquifer recharge areas, frequently flooded areas, and
habitat conservation areas by replacing, enhancing, or providing substitute resources or environments;
and
7. Monitoring the hazard or other required mitigation and taking remedial action when necessary.
Packet Page 468 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 32 of 90
“Native vegetation” means vegetation comprised of plant species which are indigenous to the Puget
Sound region and which reasonably could have been expected to naturally occur on the site. “Native
vegetation” does not include noxious weeds as defined by the state of Washington or federal agencies.
“Normal maintenance of vegetation” means removal of shrubs/non-woody vegetation and trees (less
than 3-inch diameter at breast height) that occurs at least every other year. Maintenance also may
include tree topping that has been previously approved by the City in the past 5 years.
“Noxious weeds” means any plant which, when established,that is highly destructive, competitive or
difficult to control by cultural or chemical practices, limited to those plants on the state noxious weed
list contained in Chapter , as further listed in Chapter 16-750 WAC.
“Planning staff” means those employed in the planning division of the city of Edmonds development
services department.
“Qualified critical areas consultant” or “qualified professional” means a person who has the
qualifications specified below to conduct critical areas studies pursuant to this title, and to make
recommendations for critical areas mitigation. For geologically hazardous areasFor areas of potential
geologic instability, the qualified critical areas consultant shall be a geologist or geotechnical engineer.
engineering geologist licensed in the State of Washington to assess the potential hazard. If development
is to take place within a geologically hazardous area, the qualified critical areas consultant developing
mitigation plans and design shall be a Professional Engineer licensed in the State of Washington and
familiar with landslide and slope stability mitigation. For wetlands and streams, the qualified critical
areas consultant shall be a specialist in botany, fisheries, wetland biology, and/or hydrology with a
minimum of two five years’ field experience with wetlands and/or streams in the Pacific Northwest.
Requirements defining a qualified critical areas consultant or qualified professional are contained within
the chapter on each critical area type.
“Reasonable economic use(s)” means the minimum use to which a property owner is entitled under
applicable state and federal constitutional provisions in order to avoid a taking and/or violation of
substantive due process.
“Redeveloped land(s)” means those lands on which existing structures are demolished in their entirety to
allow for new development. The director shall maintain discretion to determine if the demolition of a
majority of existing structures or portions thereof constitute the re-development of a property or subject
parcel.
“Restoration” means the actions necessary to return a stream, wetland or other critical area to a state in
which its stability, functions and values approach its unaltered state as closely as possible. For wetlands,
restoration as compensatory mitigation may include re-establishment or rehabilitation.
“Seismic Hazard Areas.” (See ECDC 23.80.020(C).)
“Species of local importance” means those species that are of local concern due to their population
status, their sensitivity to habitat manipulation, or that are game (hunted) species. (See ECDC
23.90.010(A)(4).)
Packet Page 469 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 33 of 90
“Storm Water Management Manual” means the Storm Water Management Manual for the Puget Sound
Basin by the Washington State Department of Ecology (as included in stormwater manual specified in
Chapter 18.30 ECDC).
“Streams” means any area where surface waters produce a defined channel or bed which demonstrates
clear evidence, such as the sorting of sediments, of the passage of water. The channel or bed need not
contain water year-round. This definition is not meant to include irrigation ditches, canals, storm or
surface water runoff devices (drainage ditches) or other entirely artificial watercourses unless they are
used by salmonids or used to convey streams naturally occurring prior to construction of such
watercourse. Streams are further classified into Categories S, F, Np and Ns and fishbearing or
nonfishbearing 1, 2 and 3. (See ECDC 23.90.010(A)(1).)
“Title” means all chapters of the city of Edmonds Development Code beginning with the digits 23.
“Undeveloped land(s)” means land(s) on which manmade structures or land modifications (clearing,
grading, etc.) do not exist. The director retains discretion to identify undeveloped land(s) in those
instances where historical modifications and structures may have existed on a property or subject parcel
in the past.
“Wetland functions” means those natural processes performed by wetlands, such as facilitating food
chain production; providing habitat for nesting, rearing and resting sites for aquatic, terrestrial or avian
species; maintaining the availability and quality of water; acting as recharge and/or discharge areas for
ground water aquifers; and moderating surface water and storm water flows.
“Wetland mitigation bank” means a site where wetlands are restored, created, enhanced, or in
exceptional circumstances, preserved expressly for the purpose of providing compensatory mitigation in
advance of authorized impacts to similar resources.
“Wetlands” means those areas that are inundated or saturated by ground or surface water at a frequency
and duration sufficient to support, and that under normal circumstances do support, a prevalence of
vegetation typically adapted for life in saturated soil conditions. Wetlands do not include those artificial
wetlands intentionally created from nonwetland sites, including, but not limited to, irrigation and
drainage ditches, grass-lined swales, canals, detention facilities, wastewater treatment facilities, farm
ponds, and landscape amenities, or those wetlands created after July 1, 1990, that were unintentionally
created as a result of the construction of a road, street or highway. However, wetlands may include those
artificial wetlands intentionally created from nonwetland areas created to mitigate conversion of
wetlands if permitted by the city (WAC 365-190-030(22)). Wetlands are further classified into
Categories 1, 2, 3 and 4. (See ECDC 23.50.010(B).) [Ord. 3952 § 1, 2013; Ord. 3931 § 2, 2013; Ord.
3527 § 2, 2004].
Packet Page 470 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 34 of 90
Chapter 23.50
WETLANDS
Sections:
Part I. Designation, Rating and Mapping
23.50.000 Wetlands compliance requirements flowchart.
23.50.010 Designation, rating and mapping – Wetlands.
Part II. Allowed Activities – Wetlands
23.50.020 Allowed activities – Wetlands.
Part III. Additional Report Requirements – Wetlands
23.50.030 Special study and report requirements – Wetlands.
Part IV. Development Standards – Wetlands
23.50.040 Development standards – Wetlands.
23.50.050 Mitigation requirements – Wetlands.
23.50.060 Performance standards – Subdivisions.
Part V. City of Edmonds Wetland Field Data Form
23.50.070 Wetland field data form.
Part I. Designation, Rating and Mapping
23.50.000 Wetlands compliance requirements flowchart.
See Figure 23.50.000 at the end of this chapter. [Ord. 3527 § 2, 2004].
23.50.010 Designation, rating and mapping – Wetlands.
A. Designating Wetlands. Wetlands are those areas, designated in accordance with the approved federal
wetland delineation manual and applicable regional supplements as set forth in WAC 173-22-035
Washington State Wetland Identification and Delineation Manual (1997), that are inundated or saturated
by surface or ground water at a frequency and duration sufficient to support, and that under normal
circumstances do support, a prevalence of vegetation adapted for life in saturated soil conditions. All
areas within the city of Edmonds meeting the wetland designation criteria in the Identification and
Packet Page 471 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 35 of 90
Delineation Manual, regardless of any formal identification, are hereby designated critical areas and are
subject to the provisions of this title.
B. Wetland Ratings. Wetlands shall be rated according to the Washington State Department of Ecology
wetland rating system found in the 2014 Washington State Wetland Rating System for Western
Washington documents (Western Washington, Ecology Publications Nos. 14-06-02993-74 and 04-06-
025). Thiese documents contains the definitions and methods for determining the criteria and parameters
defining the following wetland rating categories: Consistent with the wetland rating system criteria and
parameters within this document, wetlands that are rated for ecological functions with highest point
totals (23 points or higher) perform ecological functions associated with water flow, water quality and
habitat at highest levels, whereas wetlands that are rated with lowest point totals (15 points or lower)
perform ecological functions at lowest levels. Wetlands that are rated with points between 16 and 22
points perform ecological functions at moderate to high levels.
1. The City of Edmonds Wetland Rating Categories:
a. Category 1 I Wetlands. Category 1 I wetlands are those that represent a unique or rare wetland type;
are more sensitive to disturbance than most wetlands; are relatively undisturbed and contain ecological
attributes that are impossible to replace within a human lifetime; or provide a high level of function. The
following types of wetlands are Category I:meet one or more of the following criteria:
i. Relatively undisturbed estuarine wetlands larger than one(1) acre;
ii. Wetlands of high conservation value that are identified by scientists of the Washington Natural
Heritage Program/DNR;Wetlands that are identified by scientists of the Washington Natural Heritage
Program/DNR as high-quality wetlands;
iii. Bogs larger than one-half acre;
iv. Wetlands with mature and old growth forests Mature and old-growth forested wetlands larger than
one (1) acre;
v. Wetlands in coastal lagoons;
vi. Wetlands that perform functions at high levels Wetlands that perform many functions well as
indicated by a score of 70 twenty-three (23) points or more based on functions on the city of Edmonds
wetland field data form.
b. Category 2 II Wetlands. Category II wetlands are those that are difficult, though not impossible, to
replace, and provide high levels of some functions. The following types of wetlands are Category 2II
wetlands are:
i. Estuarine wetlands smaller than one acre, or disturbed estuarine wetlands larger than one acre;
ii. A wetland identified by the state Department of Natural Resources as containing “sensitive” plant
species;
Packet Page 472 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 36 of 90
iii. A bog between one-quarter and one-half acre in size; or
iv. Wetlands with a moderately high level of functions as indicated by a score of 51 to 6920 to 22 points
based on functions on the city of Edmonds wetland field data form.
c. Category 3 III Wetlands. Category 3 III wetlands are wetlands with a moderate level of functions as
indicated by a score of 30 16 to 50 19 points on the city of Edmonds wetland field data formbased on
functions.
d. Category 4 IV Wetlands. Category 4 IV wetlands are those with the lowest levels of functions as
indicated by scores below 30 16 points based on functionson the city of Edmonds wetland field data
form.
All wetlands should be rated consistent with the 2014 Washington State Wetland Rating System for
Western Washington using the 2014 Western Washington Rating Form. The city of Edmonds wetland
field data form is provided in ECDC 23.50.070.
C. Date of Wetland Rating. Wetland rating categories shall be applied as the wetland exists on the date
of adoption of the rating system by the local government, as the wetland naturally changes thereafter, or
as the wetland changes in accordance with permitted activities. Wetland rating categories shall not
change due to illegal modifications.
D. Mapping. The approximate location and extent of wetlands are shown on the city of Edmonds critical
areas inventory. In addition, the National Wetlands Inventory and Soil Maps produced by the U.S.
Department of Agriculture, National Resources Conservation Service may be useful in helping to
identify potential wetland areas. The inventory and cited resources are to be used as a guide for the city
of Edmonds, project applicants, and/or property owners, and may be continuously updated as new
critical areas are identified. They are a reference and do not provide a final critical area designation.
E. Delineation. The exact location of a wetland’s boundary shall be determined through the performance
of a field investigation by a qualified professional wetland scientist applying the approved federal
wetland delineation manual and applicable regional supplementsWashington State Wetlands
Identification and Delineation Manual as required by RCW 36.70A.175 (Ecology Publication No. 96-94,
1997). Wetland delineations are valid for five years; after such date the city shall determine whether a
revision or additional assessment is necessary.
F. Lake Ballinger. Lake Ballinger is designated on the U.S. National Wetlands Inventory as a lacustrine
(lake) environment and should not be delineated as a wetland in its entirety. Lake fringe wetlands
existing along the periphery of Lake Ballinger shall be identified according to specific criteria provided
in 23.50.010. the Washington State Wetlands Identification and Delineation Manual (Ecology
Publication No. 96-94, 1997) and updated guidance provided in Washington State Wetlands Rating
System for Western Washington – Revised (Ecology Publication No. 04-06-025, 2004). Consistent with
guidance for delineating lake fringe wetlands provided in these resources, the existence of jurisdictional
wetlands along Lake Ballinger shorelines shall be largely based upon the presence of persistent
emergent vegetation in shoreline areas less than 6.6 feet in depth. Provisions for protection of Lake
Packet Page 473 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 37 of 90
Ballinger shorelines not meeting criteria for jurisdictional wetlands are provided in the city of Edmonds
shoreline master program. [Ord. 3527 § 2, 2004].
Part II. Allowed Activities – Wetlands
23.50.020 Allowed activities – Wetlands.
The activities listed below are allowed in wetlands in addition to those activities listed in, and consistent
with, the provisions established in ECDC 23.40.220, and do not require submission of a critical areas
report, except where such activities result in a loss to the functions and values of a wetland or wetland
buffer. These activities include:
A. Conservation or preservation of soil, water, vegetation, fish, shellfish, and other wildlife that does not
entail changing the structure or functions of the existing wetland.
B. The harvesting of wild crops in a manner that is not injurious to natural reproduction of such crops
and provided the harvesting does not require tilling of soil, planting of crops, chemical applications, or
alteration of the wetland by changing existing topography, water conditions, or water sources.
C. Drilling for utilities under a wetland; provided, that the drilling does not interrupt the ground water
connection to the wetland or percolation of surface water down through the soil column. Specific studies
by a hydrologist are necessary to determine whether the ground water connection to the wetland or
percolation of surface water down through the soil column could be disturbed.
D. Enhancement of a wetland through the removal of nonnative invasive species. Weeding shall be
restricted to hand removal and weed material shall be removed from the site. Bare areas that remain after
weed removal shall be revegetated with native shrubs and trees at natural densities. Some hand seeding
may also be done over the bare areas with native herbs. Noxious weeds listed on the Washington State
Noxious Weed Control Board list must be handled and disposed of according to a noxious weed control
plan appropriate to that species.
E. Permitted alteration to a legally constructed structure existing within a wetland or wetland buffer that
does not increase the footprint of development or impervious surfacing or increase the impact to a
wetland or wetland buffer. [Ord. 3527 § 2, 2004].
Part III. Additional Report Requirements – Wetlands
23.50.030 Special study and report requirements – Wetlands.
A. Additional Requirements for Wetlands. In addition to the general critical areas report requirements of
ECDC 23.40.090, critical areas reports for wetlands must meet the requirements of this section. Critical
areas reports for two or more types of critical areas must meet the report requirements for each relevant
type of critical area.
Packet Page 474 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 38 of 90
B. Critical areas report requirements for wetlands may be met in “stages” or through multiple reports.
The typical sequence of potentially required reports that may in part or in combination fulfill the
requirements of this section include:
1. Wetland reconnaissance report documenting the existence and general location of wetlands in the
vicinity of a project area;
2. Wetland delineation report documenting the extent and boundary of a jurisdictional wetland per RCW
36.70A.175; and
3. Wetland mitigation report documenting potential wetland impacts and mitigation measures designed
to retain or increase the functions and values of a wetland in accordance with ECDC 23.50.050 and the
general provisions of this title.
C. A wetland critical areas report may include one or more of the above three report types, depending on
the information required by the director and the extent of potential wetland impacts. The Edmonds
development services director maintains the authority and discretion to determine which report(s) alone
or combined are sufficient to meet the requirements outlined below and to waive report requirements
based upon site conditions and the potential for project impacts.
D. Preparation by a Qualified Professional. A critical area report for wetlands shall be prepared by a
qualified professional who is a certified professional wetland scientist or a noncertified professional
wetland scientist with a minimum of five years of experience in the field of wetland science and with
experience preparing wetland reports. Pursuant to ECDC 23.40.090(A), applicants may choose one of
the qualified technical consultants on the city’s approved list in preparing critical areas reports for
wetlands, or may utilize an alternative consultant. Critical areas studies and reports developed by an
alternative consultant shall be subject to independent review pursuant to ECDC 23.40.090(B).
E. Area Addressed in Critical Area Report. The following areas shall be addressed in a critical area
report for wetlands:
1. The project area of the proposed activity;
2. All wetlands and recommended buffers within 200 feet of the project area; and
3. All shoreline areas, water features, floodplains, and other critical areas, and related buffers within 200
feet of the project area. The location and extent of wetlands and other critical areas existing outside of
the project area or subject parcel boundary may be shown in approximation as practical and necessary to
provide an assessment of potential project effects.
F. Wetland Analysis. In addition to the minimum required contents of ECDC 23.40.090, Critical areas
reports – Requirements, a critical areas report for wetlands shall contain an analysis of the wetlands,
including the following site- and proposal-related information at a minimum:
1. A written assessment and accompanying maps of the wetlands and buffers within 200 feet of the
project area, including the following information at a minimum:
Packet Page 475 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 39 of 90
a. Wetland delineation and required buffers;
b. Existing wetland acreage;
c. Wetland category;
d. Vegetative, faunal, and hydrologic characteristics;
e. Soil and substrate conditions;
f. Topographic elevations, at two-foot contours; and
g. A discussion of the water sources supplying the wetland and documentation of hydrologic regime
(locations of inlet and outlet features, water depths throughout the wetland, and evidence of recharge or
discharge, evidence of water depths throughout the year: drift lines, algal layers, moss lines, and
sediment deposits).
The location, extent and analyses of wetlands not contiguous with the subject parcel existing outside of
the immediate project area may be described in approximation as practical and necessary to provide an
assessment of potential project effects and hydrologic/ecological connectivity to on-site wetlands and
other critical areas.
2. A discussion of measures, including avoidance, minimization, and mitigation, proposed to preserve
existing wetlands and restore any wetlands that were degraded prior to the current proposed land use
activity.
3. A habitat and native vegetation conservation strategy that addresses methods to protect and enhance
on-site habitat and wetland functions.
4. Functional evaluation for the wetland and adjacent buffer using a local or state agency staff-
recognized method and including the reference of the method and all data sheets.
5. Proposed mitigation, if needed, including a written assessment and accompanying maps of the
mitigation area, including the following information at a minimum:
a. Existing and proposed wetland acreage;
b. Vegetative and faunal conditions;
c. Surface and subsurface hydrologic conditions including an analysis of existing and future hydrologic
regime and proposed hydrologic regime for enhanced, created, or restored mitigation areas;
d. Relationship to the watershed and existing waterbodies;
e. Soil and substrate conditions, topographic elevations;
Packet Page 476 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 40 of 90
f. Existing and proposed adjacent site conditions;
g. Required wetland buffers; and
h. Property ownership.
6. A scale map of the development proposal site and adjacent area. A discussion of ongoing
management practices that will protect wetlands after the project site has been developed, including
proposed monitoring and maintenance programs.
7. A bond estimate for the installation (including site preparation, plant materials and installation,
fertilizers, mulch, and stakes) and the proposed monitoring and maintenance work for the required
number of years. [Ord. 3527 § 2, 2004].
Part IV. Development Standards – Wetlands
23.50.040 Development standards – Wetlands.
A. Activities may only be permitted in a wetland buffer if the applicant can show that the proposed
activity will not degrade the functions and functional performance of the wetland and other critical
areas.
B. Activities and uses shall be prohibited in wetlands and wetland buffers, except as provided for in this
title.
C. Category 1 I Wetlands. Activities and uses shall be prohibited from Category 1 I wetlands, except as
provided for in the public agency and utility exception, reasonable use exception, and variance sections
of this title.
D. Category 2 II Wetlands. With respect to activities proposed in Category 2 II wetlands, the following
standards shall apply:
1. Water-dependent activities may be allowed where there are no practicable alternatives that would
have a less adverse impact on the wetland, its buffers and other critical areas.
2. Where non-water-dependent activities are proposed, it shall be presumed that alternative locations are
available, and activities and uses shall be prohibited, unless the applicant demonstrates that:
a. The basic project purpose cannot be accomplished as proposed and successfully avoid, or result in less
adverse impact on, a wetland on another site or sites in the general region; and
b. All alternative designs of the project as proposed, such as a reduction in the size, scope, configuration,
or density of the project, would not avoid or result in less of an adverse impact on a wetland or its
buffer.
Packet Page 477 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 41 of 90
E. Category 3 III and 4 IV Wetlands. Activities and uses that result in unavoidable and necessary
impacts may be permitted in Category 3 III and 4 IV wetlands and associated buffers in accordance with
an approved critical areas report and mitigation plan.
F. Wetland Buffers.
1. Standard Buffer Widths. The standard buffer widths in ECDC 23.50.040.F.1.d below have been
establish in accordance with best available science. The buffers are based on the category of wetland and
the habitat score as determined by a qualified wetland professional using the Washington State Wetland
Rating System for Western Washington.
a. The use of the standard buffer widths requires the implementation of the measures in ECDC
23.50.040.F.2, where applicable, to minimize the impacts of the adjacent land uses.
b. If an applicant chooses not to apply the mitigation measures in ECDC 23.50.040.F.2, than a thirty-
three (33%) increase in the width of all buffer is required.
c. The standard buffer widths presume the existence of a relatively intact native vegetation community
in the buffer zone adequate to protect the wetland functions and values at the time of the proposed
activity. If the buffer is composed of nonnative vegetation, lawn, or bare ground, vegetation is
inadequate, then, at the discretion of the director, the buffer width may be increased or an applicant may
be required to either develop and implement a wetland buffer enhancement plan to maintain the standard
width or widen the standard width to ensure that adequate functions of the buffer are provided. (see
subsection (F)(3) of this section). Required standard wetland buffers, based on wetland category, are as
follows:
a. Category 1: 200 feet;
b. Category 2: 100 feet;
c. Category 3: 50 feet;
d. Category 4: 35 feet.
d. Standard Wetland Buffer Widths Table.
Wetland Category
Minimum
Buffer
Width
(Wetland
scores 3-4
habitat
points)
Buffer
Width
(Wetland
scores 5
habitat
points)
Buffer
Width
(Wetland
scores 6-7
habitat
points)
Buffer Width
(Wetland scores
8-9 habitat
points)
Packet Page 478 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 42 of 90
Category I:
Based on total score 75 ft 105 ft 165 ft 225 ft
Category I:
Bogs and
Wetlands of High
Conservation Value
190 ft 190 ft 190 ft 225 ft
Category I:
Forested 75 ft 105 ft 165 ft 225 ft
Category I:
Estuarine 150 ft 150 ft 150 ft 150 ft
Category II:
Based on score 75 ft 105 ft 165 ft 225 ft
Category III (all) 60 ft 105 ft 165 ft 165 ft
Category IV (all) 40 ft 40 ft 40 ft 40 ft
2. Required Measures to Minimize Impacts to Wetlands. The standard wetland buffer widths in ECDC
23.50.040.F.1.e assumes implementation of the following measures, where applicable to a specific
proposal.
Disturbance Required Measures to Minimize Impacts
Lights Direct lights away from wetland
Noise Locate activity that generates noise away from wetland
If warranted, enhance existing buffer with native vegetation
plantings adjacent to noise source
immediately adjacent to the out wetland buffer
Toxic runoff Route all new, untreated runoff away from wetland while
Packet Page 479 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 43 of 90
Disturbance Required Measures to Minimize Impacts
ensuring wetland is not dewatered
Establish covenants limiting use of pesticides within 150 feet of
wetlands
Apply integrated pest management
Stormwater runoff Retrofit stormwater detention and treatment for roads and
existing adjacent development
Prevent channelized flow from lawns that directly enters the
buffer
Use Low Impact Development techniques (per PSAT publication
on LID techniques)
Change in water
regime
Infiltrate or treat, detain, and disperse into buffer new runoff
from impervious surfaces and new lawns
Pets and human
disturbance
Use privacy fencing OR plant dense vegetation to delineate
buffer edge and to discourage disturbance using vegetation
appropriate for the ecoregion
Place wetland and its buffer in a separate tract or protect with a
conservation easement
Dust Use best management practices to control dust
Disruption of
corridors or
Maintain connections to offsite areas that are undisturbed
Restore corridors or connections to offsite habitats by replanting
Packet Page 480 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 44 of 90
Disturbance Required Measures to Minimize Impacts
connections
2. Increased Wetland Buffer Widths. The director shall require increased buffer widths in accordance
with the recommendations of an experienced, qualified professional wetland scientist and the best
available science on a case-by-case basis when a larger buffer is necessary to protect wetland functions
and values based on site-specific characteristics. This determination shall be based on one or more of the
following criteria:
a. A larger buffer is needed to protect other critical areas;
b. The buffer or adjacent uplands has a slope greater than 15 percent or is susceptible to erosion and
standard erosion control measures will not prevent adverse impacts to the wetland; or
c. The buffer area has minimal vegetative cover. In lieu of increasing the buffer width where existing
buffer vegetation is inadequate to protect the wetland functions and values, development and
implementation of a wetland buffer enhancement plan in accordance with subsection (F)(3) of this
section may substitute.
d. The wetland and/or buffer is occupied by a federally listed threatened or endangered species, a bald
eagle nest, a great blue heron rookery, or a species of local importance; and it is determined by the
director that an increased buffer width is necessary to protect the species.
53. Measurement of Wetland Buffers. All buffers shall be measured from the wetland boundary as
surveyed in the field. The buffer for a wetland created, restored, or enhanced as compensation for
approved wetland alterations shall be the same as the buffer required for the category of the created,
restored, or enhanced wetland.
64. Buffer Consistency. All mitigation sites shall have buffers consistent with the buffer requirements of
this chapter.
75. Buffer Maintenance. Except as otherwise specified or allowed in accordance with this title, wetland
buffers shall be retained in an undisturbed or enhanced condition. Removal of invasive nonnative weeds
is required for the duration of the mitigation bond.
G. Wetland Buffer Modifications and Uses
1. Where wetland or buffer alterations are permitted by the City of Edmonds, the applicant shall mitigate
impacts to achieve no not loss of wetland acreage and functions consistent with ECDC 23.50.050 and
other applicable provisions of this Title.
Packet Page 481 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 45 of 90
2. At the discretion of the Director, standard wetland buffers may be averaged or reduced when
consistent with all criteria in ECDC 23.50.040.G. Wetland buffer averaging with enhancement shall be
preferred over wetland buffer averaging with enhancement. Wetland buffer reduction shall only be
approved by the director when buffer averaging cannot be accomplished on-site.
43. Wetland Buffer Width Averaging with Buffer Enhancement. The director may allow modification of
a standard or reduced wetland buffer width in accordance with an approved critical areas report and the
best available science on a case-by-case basis by averaging buffer widths. Any allowance for averaging
buffer widths shall only be granted concomitant to the development and implementation of a wetland
buffer enhancement plan for areas of buffer degradation. Only those portions of a wetland buffer
existing within the project area or subject parcel shall be considered the total standard or reduced buffer
for buffer averaging. Averaging of buffer widths may only be allowed where a qualified professional
wetland scientist demonstrates that:
a. The buffer averaging and enhancement plan provides evidence that wetland functions and values will
be:
i. Increased or retained through plan implementation for those wetlands where existing buffer vegetation
is generally intact; or
ii. Increased through plan implantation for those wetlands where existing buffer vegetation is inadequate
to protect the functions and values of the wetland;
a. It will not reduce the function and value of wetlands or associated buffers;
b. The wetland contains variations in sensitivity due to existing physical characteristics or the character
of the buffer varies in slope, soils, or vegetation, and the wetland would benefit from a wider buffer in
places and would not be adversely impacted by a narrower buffer in other places;
c. The total area contained in the buffer area, or the total buffer area existing on a subject parcel for
wetlands extending off-site, after averaging is no less than that which would be contained within a
standard or reduced buffer; and
d. The buffer width at any single location is not reduced to less than 50 seventy-five percent (75%) of
the standard or reduced buffer width.
34. Buffer Width Reductions Throughthrough Buffer Enhancement. At the discretion of the Edmonds
development services director, and only when buffer averaging cannot be accomplished on site, wetland
buffer width reductions (or approval of standard buffer widths for wetlands where existing buffer
conditions require increased buffer widths) may be granted concomitant to the development and
implementation of a wetland buffer enhancement plan for Category 3 III and 4 IV wetlands only.
Approval of a wetland buffer enhancement plan shall, at the discretion of the director, allow for wetland
buffer width reductions to no less than seventy-five 50 percent (75%) of the standard width; provided,
that:
a. The plan provides evidence that wetland functions and values will be:
Packet Page 482 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 46 of 90
i. Iincreased or retained through plan implementation to at least the level provided by a standard buffer
or through additional mitigationfor those wetlands where existing buffer vegetation is generally intact;
or
ii. Increased through plan implantation for those wetlands where existing buffer vegetation is inadequate
to protect the functions and values of the wetland;
b. The plan documents existing native plant densities and provides for increases in buffer native plant
densities to no less than three feet on center for shrubs and eight feet on center for trees;
c. The plan requires monitoring and maintenance to ensure success in accordance with ECDC
23.40.130(D); and
d. The plan specifically documents methodology and provides performance standards for assessing
increases in wetland buffer functioning as related to including but not limited to:
i. Water quality protectionPercent vegetative cover;
ii. Provision of wildlife habitatPercent invasive species cover;
iii. Maintenance of wetland hydrologySpecies richness; and
iv. Restricting wetland intrusion and disturbanceAmount of large woody debris.
5. Measurement of Wetland Buffers. All buffers shall be measured from the wetland boundary as
surveyed in the field. The buffer for a wetland created, restored, or enhanced as compensation for
approved wetland alterations shall be the same as the buffer required for the category of the created,
restored, or enhanced wetland.
6. Buffer Consistency. All mitigation sites shall have buffers consistent with the buffer requirements of
this chapter.
7. Buffer Maintenance. Except as otherwise specified or allowed in accordance with this title, wetland
buffers shall be retained in an undisturbed or enhanced condition. Removal of invasive nonnative weeds
is required for the duration of the mitigation bond.
8. Buffer Uses. The following uses may be permitted within a wetland buffer in accordance with the
review procedures of this title; provided, they are not prohibited by any other applicable law and they
are conducted in a manner so as to minimize impacts to the buffer and adjacent wetland:
a. All activities allowed by ECDC 23.50.020 (Allowed activities – wetlands).
b. Conservation and Restoration Activities. Conservation or restoration activities aimed at protecting the
soil, water, vegetation, or wildlife.
Packet Page 483 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 47 of 90
bc. Passive Recreation. Passive recreation facilities designed and in accordance with an approved critical
area report, including:
i. Walkways and trails; provided, that those pathways are generally constructed with a surface that does
not interfere with substrate permeability. , are generally located only in the outer twenty-five percent
(25%) of wetland buffers, and are located to avoid removal of significant trees. Where existing legally
established development has reduced the width of the wetland buffer, trails may be placed in the outer
twenty-five percent (25%) of the remaining wetland buffer. The trail shall be no more than five (5) feet
in width and for pedestrian use only. Raised boardwalks utilizing nontreated pilings may be acceptable.
The director may allow trails within the inner twenty-five percent (25%) of wetland buffers when
required to provide access to wildlife viewing structures, fishing access areas, or connections to other
trail facilities;
ii. Wildlife viewing structures; and
iii. Fishing access areas down to the water’s edge that shall be no larger than six feet.
c. Storm Water Management Facilities. Storm water management facilities, limited to outfalls, pipes and
conveyance systems, storm water dispersion outfalls and bioswales, may be allowed within the outer 25
percent of a standard or modified buffer for Category 3 or 4 wetlands only; provided, that:
i. No other location is feasible; and
ii. The location and function of such facilities will not degrade the functions or values of the wetland.
iii. Storm water management facilities are not allowed in buffers of Category 1 or 2 wetlands.
iv. Projects shall also comply with all applicable requirements in Chapter 18.30 ECDC, Stormwater
Management, including Minimum Requirement #8, Wetland Protection.
GH. Signs and Fencing of Wetlands.
1. Temporary Markers. The outer perimeter of the wetland or buffer and the limits of those areas to be
disturbed pursuant to an approved permit or authorization shall be marked in the field in such a way as
to ensure that no unauthorized intrusion will occur and is subject to inspection by the director prior to
the commencement of permitted activities. The director may require the use of fencing to protect
wetlands from disturbance and intrusion. Temporary marking shall be maintained throughout
construction and shall not be removed until permanent signs, if required, are in place.
2. Permanent Signs. As a condition of any permit or authorization issued pursuant to this chapter, the
director may require the applicant to install permanent signs along the boundary of a wetland or buffer.
a. Permanent signs shall be made of an enamel-coated metal face and attached to a metal post or another
nontreated material of equal durability. Signs must be posted at an interval of one per lot or every 50
feet, whichever is less, and must be maintained by the property owner in perpetuity. The sign shall be
worded as follows or with alternative language approved by the director:
Packet Page 484 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 48 of 90
Protected Wetland Area
Do Not Disturb
Contact the City of Edmonds
Regarding Uses and Restrictions
b. The provisions of subsection (G)(2)(a) of this section may be modified as necessary to assure
protection of sensitive features or wildlife.
3. Permanent Fencing. Permanent fencing shall be required at the outer edge of the critical area buffer
under the following circumstances, provided that the director may waive this require:
a. As part of any development proposal for single-family plats, single-family short plats, multifamily,
mixed use, and commercial development where the director determines that such fencing is necessary to
protect the functions of the critical area, provided that breaks in permanent fencing may be allowed for
access to permitted buffer uses (ECDC 23.50.040.G.8);
b. As part of development proposals for parks where the adjacent proposed use is active recreation and
the director determines that such fencing is necessary to protect the functions of the critical area;
c. When buffer averaging is employed as part of a development proposal;
d. When buffer reductions are employed as part of a development proposal; or
e. At the director’s discretion to protect the values and functions of a critical area.
HI. Additions to Structures Existing Within Wetlands and/or Wetland Buffers.
1. Additions to legally constructed structures existing within wetlands or wetland buffers that increase
the footprint of development or impervious surfacing shall be permitted consistent with the development
standards of this section, provided that a wetland and/or buffer enhancement plan is provided to mitigate
for impacts consistent with this Title, and provided that all. impacts from temporary disturbances within
the critical area buffer shall be addressed through use of best management plans and buffer enhancement
plantings during and following construction of the allowed alteration. Provisions for standard wetland
buffers, buffer reductions through enhancement, and wetland buffer averaging with enhancement, and
buffer reductions with enhancement require applicants to locate such additions in accordance with the
following sequencing:
1a. Outside of the standard wetland buffer;
3b. Outside of a wetland buffer reduced through buffer averaged (with enhancement)ing per subsection
(FG)(43) of this section;
Packet Page 485 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 49 of 90
2c. Outside of a wetland buffer reduced (withthrough enhancement) per subsection (FG)(34) of this
section;
3. Outside of a wetland buffer reduced through buffer averaging per subsection (F)(4) of this section; or
4d. Outside of the inner twenty five25 percent (25%) of the standard wetland buffer width through the
use of both buffer reduction and buffer averagingwith no more than three hundred (300) square feet of
structure addition footprint within the inner fifty percent (50%) of the standard wetland buffer width,
provided that enhancement is provided at a minimum three-to-one (3:1) ratio (enhancement-to-impact);
e. Outside of the inner twenty five percent (25%) of the standard wetland buffer width with no more
than five hundred (500) square feet of new footprint within the inner fifty percent (50%) of the standard
wetland buffer width, provided that enhancement is provided at a minimum five-to-one (5:1) ratio
(enhancement-to-impact), and that stormwater low impact development (LID) techniques and other
measures are included as part of the wetland / buffer enhancement plan.
2. Where meeting wetland buffer enhancement requirements required by H.1. of this section would
result in enhancement that is separated from the critical area due to uncommon property ownership,
alternative enhancement approaches may be approved by the director. Alternative approaches could
include a vegetated rain garden that receives storm runoff, replacement of existing impervious surfaces
with pervious materials, or other approaches that provide ecological benefits to the adjacent critical area.
3. Additions to legally constructed structures existing within wetlands or wetland buffers that cannot be
accommodated in accordance with the above sequencing in H.1. of this section (i.e., additions proposed
within a wetland or the inner 25 percent of a standard buffer width) may be permitted at the director’s
discretion as a variance subject to review by the city hearing examiner and the provisions of ECDC
23.40.210.
J. Development Proposals within the Footprint of Existing Development. New development shall be
allowed within the footprint of existing development occurring within a wetland buffer, provided that
the following conditions are met:
1. The footprint of existing development was legally established, and is consistent with the definition
provided in ECDC 23.40.320;
2. The proposed development within the footprint of existing development is sited as far away from the
wetland edge as is feasible;
3. As part of the development proposal, opportunities to reduce the footprint of existing development are
implemented where such reduction would increase the buffer width adjacent to the wetland and not
represent an undue burden given the scale of the proposed development.
4. The proposed development includes enhancement to the adjacent wetland and associated buffer in
order to improve functions degraded by previous development;
Packet Page 486 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 50 of 90
5. Enhancement is provided as wetland or buffer enhancement for an equivalent area of the footprint of
the newly proposed development within in the footprint of existing development occurring in wetland
buffer, or through an alternative approach approved by the director that restores degraded functions of
the wetland and remaining buffer; and
6. Impacts from temporary disturbances within the wetland buffer shall be addressed through use of best
management plans and buffer enhancement plantings during and following construction of the allowed
alteration.
IK. Small, hydrologically isolated wetlandsExemptions. The director may allow small, hydrologically
isolated Category 3 III or IV4 wetlands under 500one thousand (1,000) square feet in area to be exempt
from the avoidance sequencing provisions of ECDC 23.40.120 and the wetland development standards
provisions of ECDC 23.50.040.F. At the discretion of the director such wetlands may be altered,
provided that provisions of this title. A wetland exemption shall only be granted if a submitted critical
areas report and mitigation plan, in the form of a critical areas reconnaissance or delineation, provides
evidence that all of the following conditions are met:
1. The wetland is underless than 500 one thousand (1,000) square feet in area;
2. The wetland is a low-quality Category 3or 4 wetland;
32. The wetland does not provide significant habitat value for wildlife; and
3. The wetland is not adjacent to a riparian area;
4. The wetland has a score of three (3) – four (4) points for habitat in the adopted Western Washington
rating system; and
5. A mitigation plan to replace lost wetland functions and values is developed, approved and
implemented consistent with ECDC 23.50.050.
4. Filling of the wetland can maintain equivalent or greater habitat functions and values over existing
site conditions. [Ord. 3527 § 2, 2004].
23.50.050 Mitigation requirements – Wetlands.
Compensatory mitigation for alterations to wetlands shall achieve equivalent or greater biologic
functions. Wetland mitigation plans shall be consistent with the state Department of Ecology
Gguidelines for in Wetland Mitigation in Washington State—Part 2: Developing Mitigation Plans
(Ecology, 2006) and Selecting Wetland Mitigation Sites Using a Watershed Approach (Ecology,
2009)Developing Freshwater Wetlands Mitigation Plans and Proposals, 1994, as revised.
A. Mitigation shall be required in the following order of preference:
1. Avoiding the impact altogether by not taking a certain action or parts of an action.
Packet Page 487 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 51 of 90
2. Minimizing impacts by limiting the degree or magnitude of the action and its implementation, by
using appropriate technology, or by taking affirmative steps to avoid or reduce impacts.
3. Rectifying the impact by repairing, rehabilitating, or restoring the affected environment.
4. Reducing or eliminating the impact over time by preservation and maintenance operations.
5. Compensating for the impact by replacing, enhancing, or providing substitute resources or
environments.
BA. Mitigation for Lost or Affected Functions. Compensatory mitigation actions shall address functions
affected by the alteration to achieve functional equivalency or improvement and shall provide similar
wetland functions as those lost, except when:
1. The lost wetland provides minimal functions as determined by a site-specific function assessment, and
the proposed compensatory mitigation action(s) will provide equal or greater functions or will provide
functions shown to be limiting within a watershed through a formal Washington State watershed
assessment plan or protocol; or
2. Out-of-kind replacement will best meet formally identified watershed goals, such as replacement of
historically diminished wetland types.
CB. Preference of Mitigation Actions. Mitigation actions that require compensation by replacing,
enhancing, or substitution shall occur in the following order of preference:
1. Implementing compensatory restoration through purchase of credits at an approved mitigation bank or
through payment into an approved in lieu fee program.
12. Restoring (re-establishing) wetlands on upland sites that were formerly wetlands.
23. Creating wetlands on disturbed upland sites such as those with vegetative cover consisting primarily
of nonnative, introduced species. This should only be attempted when there is a consistent source of
hydrology and it can be shown that the surface and subsurface hydrologic regime is conducive for the
wetland community that is being designed.
4. Enhancing significantly degraded wetlands in combination with restoration or creation. Such
enhancement should be part of a mitigation package that includes replacing the impacted area meeting
appropriate ratio requirements.
DC. Type and Location of Mitigation. Unless it is demonstrated that a higher level of ecological
functioning would result from an alternate approach, compensatory mitigation for ecological functions
shall be in-kind and conducted on the site or in the vicinity of the alteration except when all of the
following apply:
1. On-site opportunities do not have a high likelihood of success, after a determination of the natural
capacity of the site to mitigate for the impacts. Consideration should include: anticipated wetland
Packet Page 488 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 52 of 90
mitigation replacement ratios, buffer conditions and proposed widths, hydrogeomorphic classes of on-
site wetlands when restored, proposed flood storage capacity, and potential to mitigate riparian fish and
wildlife impacts (such as connectivity);
2. Off-site mitigation has a greater likelihood of providing equal or improved wetland functions than the
impacted wetland; and
3. Off-site mitigation incorporates guidance from Calculating Credits and Debits for Compensatory
Mitigation in Wetlands of Western Washington (Ecology Publication #10-06-011, Hruby. 2012); and
34. Off-site locations for compensatory mitigation are consistent with city of Edmonds goals for
jurisdictionwatershed-wide ecological restoration. Off-site locations are selected with a preference for
sites within the same basin as the impact, followed by other sites within the city. Specific areas targeted
for restoration efforts include:
a. Lake-fringe wetlands and habitat areas associated with Lake Ballinger;
b. Edmonds marsh;
c. Yost Park wetlands;
d. Good Hope wetlands; and
e. Wetlands and habitat areas peripheral to anadromous fish-bearing streams.; and
f. Sites available through an approved mitigation bank or in- lieu fee program.
This list is not comprehensive and may change as the city of Edmonds identifies areas suitable for
restoration and capital improvement projects consistent with goals for jurisdiction-wide habitat retention
and enhancement provided in the city’s comprehensive plan.
ED. Mitigation Timing. Mitigation projects shall be completed with an approved monitoring plan prior
to activities that will disturb wetlands. In all other cases, mitigation shall be completed immediately
following disturbance and prior to use or occupancy of the activity or development. Construction of
mitigation projects shall be timed to reduce impacts to existing fisheries, wildlife, and flora.
FE. Mitigation Ratios.
1. Acreage Replacement Ratios. The following ratios in the table below shall apply to creation or
restorationcreation or re-establishment, rehabilitation, or enhancement that is in-kind, is on-site, is the
same category, is timed prior to or concurrent with alteration, and has a high probability of success.
These ratios do not apply to remedial actions resulting from unauthorized alterations; greater ratios shall
apply in those cases. The first number specifies the acreage of replacement wetlands and the second
specifies the acreage of wetlands altered. Ratios for rehabilitation and enhancement may be reduced
when combined with 1:1 replacement through creation or re-establishment pursuant to Table 1a,
Wetland Mitigation in Washington State – Part 1: Agency Policies and Guidance –Version 1, (Ecology
Packet Page 489 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 53 of 90
Publication #06-06-11a, or as revised). Creation, re-establishment, rehabilitation, and enhancement
definitions are provided in ECDC 23.40.320 (see definition for “compensatory mitigation”, and shall be
additionally consistent with intent pursuant to Ecology Publication #06-06-11a.:
a. Category 1: six-to-one;
b. Category 2: three-to-one;
c. Category 3: two-to-one;
d. Category 4: one and one-half-to-one.
Category and
Type of Wetland
Creation or
Re-
establishment
Rehabilitation
only
Enhancement
only
Category IV 1.5:1 3:1 6:1
Category III 2:1 4:1 8:1
Category II 3:1 6:1 12:1
Category I:
Based on functions 4:1 8:1 16:1
Category I:
Mature and old
growth forest
6:1 12:1 24:1
Category I:
High conservation
value / Bog
Not considered
possible
Not considered
possible
Not considered
possible
Mitigation requirements may also be determined using the credit/debit tool described in Calculating
Credits and Debits for Compensatory Mitigation in Wetlands of Western Washington: Final Report
(Ecology Publication #10-06-011, Olympia, WA, March 2012, or as revised) if approved by the director.
2. Off-site Mitigation. These ratios provided in ECDC 23.50.050.F.1. do not apply to off-site mitigation,
including the use of credits from a state-certified wetland mitigation bank or payment to a certified in-
lieu fee program. When off-site mitigation is proposed, or when credits from a certified mitigation bank
Packet Page 490 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 54 of 90
or in lieu fee program isare used, replacement ratios mayshould incorporate guidance from Calculating
Credits and Debits for Compensatory Mitigation in Wetlands of Western Washington (Ecology
Publication #10-06-011, Hruby. 2012), and for mitigation banks or in lieu fee program should be
consistent with the certification requirements of the bank’s certification. Use of mitigation banks shall
meet all requirements of ECDC 23.50.050.H.The first number specifies the acreage of replacement
wetlands and the second specifies the acreage of wetlands altered:
23. Increased Replacement Ratio. The director may require increased compensatory mitigation ratios
under the following circumstances:
a. Uncertainty exists as to the probable success of the proposed restoration or creation;
b. A significant period of time will elapse between impact and replication of wetland functions;
c. Proposed mitigation will result in a lower-category wetland or reduced functions relative to the
wetland being impacted; or
d. The impact was an unauthorized impact.
G. Wetlands Enhancement as Mitigation.
1. Impacts to wetland functions may be mitigated by enhancement of existing significantly degraded
wetlands, but may, at the discretion of the director, be used in conjunction with restoration and/or
creation. Applicants proposing to enhance wetlands must produce a critical areas report that identifies
how enhancement will increase the functions of the degraded wetland and how this increase will
adequately mitigate for the loss of wetland area and function at the impact site. An enhancement
proposal must also show whether existing wetland functions will be reduced by the enhancement
actions.
2. At a minimum, enhancement acreage shall be double the acreage required for creation or restoration
under subsection F of this section. The ratios shall be greater than double the required acreage where the
enhancement proposal would result in minimal gain in the performance of wetland functions and/or
result in the reduction of other wetland functions currently being provided in the wetland.
3. Mitigation ratios for enhancement in combination with other forms of mitigation shall range from six-
to-one to three-to-one and be limited to Class 3 and 4 wetlands.
H. Wetland Mitigation Banks and In- Lieu Fee Programs.
1. Wetland Mitigation Banks. Credits from a wetland mitigation bank may be approved for use as
compensation for unavoidable impacts to wetlands when:
a. The bank is certified under Chapter 173-700 WACstate rules;
b. The director determines that the wetland mitigation bank provides appropriate compensation for the
authorized impacts; and
Packet Page 491 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 55 of 90
c. The proposed use of credits is consistent with the terms and conditions of the bank’s certification
instrument.
d. 2. Replacement ratios for projects using bank credits shall beare consistent with replacement ratios
specified in the bank’s certification.
e. Credits from a certified wetland mitigation bank are used to compensate for impacts located within
the service area specified in the certified bank instrument. In some cases, the service area of the bank
may include portions of more than one adjacent drainage basin for specific wetland functions.
32. In - Lieu Fee Programs. In lieu of wetland mitigation bank creditAs an alternative to on-site or other
off-site mitigation approaches, the director may provideapprove purchase of credit for compensatory
mitigation from an in lieu fee program. Any such program used to compensate for direct wetland
impacts shall be developed and approved through a public process and be consistent with federal rules,
state policy on in lieu fee mitigation and state water quality regulations, Determining credit purchase
necessary to compensate for wetland impacts shall incorporate guidance from Calculating Credits and
Debits for Compensatory Mitigation in Wetlands of Western Washington (Ecology Publication #10-06-
011, Hruby. 2012). Development proposals impacting critical areas and/or associated buffers may
contribute payment towards an identified City of Edmonds mitigation project with approval from the
director, provided that the mitigation approach meets all state and federal permit requirements, where
required. through applicant provision of funds to identified capital improvement projects for wetland
restoration. The director retains discretion to establish a monetary value for applicant provision of funds
which shall be, at a minimum, equal to the cost of designing, developing, implementing and monitoring
in-kind compensatory mitigation on-site or in the project vicinity. Applicant provision of funds for
compensatory mitigation shall only be approved if:
a. The director determines that it would provide environmentally appropriate compensation for the
proposed wetland impacts;Such funding can be demonstrated to directly support wetland restoration
efforts;
b. The mitigation will occur on a site identified using the site selection and prioritization process in the
approved in -lieu fee program instrument or at a City-identified restoration site consistent with
ECDC23.40.140Funding can be demonstrated to provide compensatory wetland mitigation consistent
with the provisions and ratios of this title;
c. A restoration area and plan have been identified and shall be implemented within three years of
project development;
d. Restoration efforts are focused in those areas identified in subsection (D)(3) of this section and areas
identified as suitable for restoration by the director; and
e. Credits from an approved in- lieu fee program may be used to compensate for impacts located within
the service area specified in the approved in- lieu fee instrument.
A suitable capital improvement project and plan for implementation is in place prior to receipt of an
applicant proposal. [Ord. 3527 § 2, 2004].
Packet Page 492 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 56 of 90
23.50.060 Performance standards – Subdivisions.
The subdivision and short subdivision of land in wetlands and associated buffers is subject to the
following:
A. Land that is located wholly within a wetland or its buffer may not be subdivided.
B. Land that is located partially within a wetland or its buffer may be subdivided; provided, that an
accessible and buildable contiguous portion of each new lot is located outside of the wetland and its
buffer.
C. Access roads and utilities serving the proposed subdivision may be permitted within the wetland and
associated buffers only at the discretion of the director. [Ord. 3527 § 2, 2004].
Part V. City of Edmonds Wetland Field Data Form
23.50.070 Wetland field data form.
The city of Edmonds wetland field data used for completion of wetland ratings shall be consistent with
the Washington State Wetland Rating System for Western Washington: 2014 Update (Ecology
Publication #14-06-029; Hruby 2014).form is available in the city of Edmonds development services
department and on the city of Edmonds website. [Ord. 3527 § 2, 2004].
Figure 23.50.000
Packet Page 493 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 57 of 90
Packet Page 494 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 58 of 90
Chapter 23.60
CRITICAL AQUIFER RECHARGE AREAS
Sections:
Part I. Designation, Rating and Mapping
23.60.010 Critical aquifer recharge areas designation.
Part I. Designation, Rating and Mapping
23.60.010 Critical aquifer recharge areas designation.
Critical aquifer recharge areas (CARAs) are those areas with a critical recharging effect on aquifers used
for potable water as defined by WAC 365-190-030(2). CARAs have prevailing geologic conditions
associated with infiltration rates that create a high potential for contamination of ground water resources
or contribute significantly to the replenishment of ground water. CARAs are protected as critical areas
under the Washington State Growth Management Act. However, no areas meeting criteria for CARAs
exist in the vicinity of the city of Edmonds. Thus, additional specific provisions for protection of this
critical area type are not provided within this title. [Ord. 3527 § 2, 2004].
Packet Page 495 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 59 of 90
Chapter 23.70
FREQUENTLY FLOODED AREAS
Sections:
Part I. Designation, Rating and Mapping
23.70.010 Designation, rating and mapping – Frequently flooded areas.
Part II. Additional Report Requirements – Frequently Flooded Areas
23.70.020 Special study and report requirements – Frequently flooded areas.
23.70.030 Warning and disclaimer of liability.
Part III. Development Standards – Frequently Flooded Areas
23.70.040 Development standards – Frequently flooded areas.
Part I. Designation, Rating and Mapping
23.70.010 Designation, rating and mapping – Frequently flooded areas.
A. Frequently Flooded Areas. Frequently flooded areas shall include:
1. Those areas identified on FEMA flood insurance maps as areas of special flood hazard, which include
those lands in the floodplain subject to a one percent or greater chance of flooding in any given year. For
the purposes of this title, areas of special flood hazard for the city of Edmonds are hereby declared
generally to be those areas shown as Zone A (including Zones A, AE, A1–A30, AH, AO, AR and A99)
and Zone V (including Zones V and VE) on the following FEMA maps or panels: 53061C00;
53061C1292 E, Panel 1292; 53061C1285 E, Panel 1285; 53061C1315 E, Panel 1315; and 53061C1305
E, Panel 1305. The following maps and panels were revised and effective on January 30, 1998November
8, 1999, and such maps and panels are adopted by this reference as a part of this chapter as if fully set
forth herein.The city will use the most currently adopted FEMA maps in determining whether a property
is located within a frequently flooded area. Base flood elevations and flood hazard factors for those
areas shown as Zone A on the map have not been determined and the local flood management
administrator shall utilize such other data as may be reasonably available from federal, state or other
sources in administering this chapter as provided in the current editions of the International Residential
Code and International Building Code, as adopted in ECDC Title 19.
2. Those areas identified as frequently flooded areas on the city of Edmonds critical areas inventory.
Identified frequently flooded areas are consistent with and based upon designation of areas of special
flood hazard on FEMA flood insurance maps as indicated above.
Packet Page 496 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 60 of 90
B. City Discretion and Designation. Flood insurance maps and the city’s critical areas inventory are to
be used as a guide for the city of Edmonds development services department, project applicants and/or
property owners, and the public and should be considered a minimum designation of frequently flooded
areas. As flood insurance maps may be continuously updated as areas are reexamined or new areas are
identified, newer and more restrictive information for flood hazard area identification shall be the basis
for regulation. The city of Edmonds shall retain the right to designate and identify areas known to be
prone to flooding outside of the 100-year floodplain and subject them to the provisions and protections
of this title and the current editions of the International Residential Code and International Building
Code, as adopted in ECDC Title 19. [Ord. 3527 § 2, 2004].
Part II. Additional Report Requirements – Frequently Flooded Areas
23.70.020 Special study and report requirements – Frequently flooded areas.
In addition to the general critical areas report requirements of ECDC 23.40.090, critical areas reports for
frequently flooded areas must meet the requirements of this section and the current editions of the
International Residential Code and International Building Code, as adopted in ECDC Title 19. Critical
areas reports for two or more types of critical areas must meet the report requirements for each relevant
type of critical area.
A. Preparation by a Qualified Professional. A frequently flooded areas report shall be prepared by a
qualified professional who is a hydrologist or engineer, licensed in the state of Washington, with
experience in preparing flood hazard assessments. Pursuant to ECDC 23.40.090(A), applicants may
choose one of the qualified technical consultants on the city’s approved list in preparing critical areas
reports for frequently flooded areas, or may utilize an alternative consultant. Critical areas studies and
reports developed by an alternative consultant shall be subject to independent review pursuant to ECDC
23.40.090(B).
B. Areas to Be Addressed. The following areas shall be addressed in a critical areas report for frequently
flooded areas:
1. The site area of the proposed activity;
2. All areas of a special flood hazard area, as indicated on the flood insurance map(s), within 200 feet of
the project area; and
3. All other flood areas indicated on the flood insurance map(s) within 200 feet of the project area.
C. Flood Hazard Assessment. A critical area report for a proposed activity within a frequently flooded
area shall contain a flood hazard assessment including the following site- and proposal-related
information at a minimum:
1. Site and Construction Plans. A copy of the site and construction plans for the development proposal
showing:
Packet Page 497 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 61 of 90
a. Floodplain (100-year flood elevation), 10- and 50-year flood elevations, floodway, other critical areas,
buffers, and shoreline areas;
b. Proposed development, including the location of existing and proposed structures, fill, storage of
materials, and drainage facilities, with dimensions indicating distances to the floodplain;
c. Clearing limits; and
d. Elevation of the lowest floor (including basement) of all structures, and the level to which any
nonresidential structure has been floodproofed.
2. Watercourse Alteration. Alteration of natural watercourses shall be avoided, if feasible. If
unavoidable, a critical areas report shall include:
a. Extent of Watercourse Alteration. A description of and plan showing the extent to which a
watercourse will be altered or relocated as a result of a proposal;
b. Maintenance Program Required for Watercourse Alterations. A maintenance program that provides
maintenance practices for the altered or relocated portion of the watercourse to ensure that the flood-
carrying capacity is not diminished.
D. Information Regarding Other Critical Areas. Potential impacts to wetlands, fish and wildlife habitat,
and other critical areas shall be addressed in accordance with the applicable sections of this title. [Ord.
3527 § 2, 2004].
23.70.030 Warning and disclaimer of liability.
The degree of flood protection required by this chapter and the current editions of the International
Residential Code and International Building Code, as adopted in ECDC Title 19, is considered
reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger
floods can and will occur on rare occasions. Flood heights may be increased by manmade or natural
causes. This chapter does not imply that land outside frequently flooded areas or uses permitted within
such areas will be free from flooding or flood damages. This chapter shall not create liability on the part
of the city of Edmonds, any officer or employee thereof, or the Federal Insurance Administration for any
flood damages that result from reliance on this chapter or any administrative decision lawfully made
hereunder. [Ord. 3527 § 2, 2004].
Part III. Development Standards – Frequently Flooded Areas
23.70.040 Development standards – Frequently flooded areas.
Development standards and provisions for protection of frequently flooded areas are provided as
applicable to areas of special flood hazard in the current editions of the International Residential Code
and International Building Code, as adopted in ECDC Title 19. Conformance with the provisions for
flood hazard reduction of the current editions of the International Residential Code and International
Building Code, as adopted in ECDC Title 19, shall constitute conformance with ECDC 23.40.050,
Packet Page 498 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 62 of 90
Protection of critical areas, per the mandates of the Washington Growth Management Act and the
purposes and objectives of this title. [Ord. 3527 § 2, 2004].
Chapter 23.80
GEOLOGICALLY HAZARDOUS AREAS
Sections:
Part I. Designation, Rating and Mapping
23.80.000 Geologically hazardous areas compliance requirements flowchart.
23.80.010 Designation, rating and mapping – Geologically hazardous areas.
23.80.020 Designation of specific hazard areas.
23.80.030 Mapping of geologically hazardous areas.
Part II. Allowed Activities – Geologically Hazardous Areas
23.80.040 Allowed activities – Geologically hazardous areas.
Part III. Additional Report Requirements – Geologically Hazardous Areas
23.80.050 Special study and report requirements – Geologically hazardous areas.
Part IV. Development Standards – Geologically Hazardous Areas
23.80.060 Development standards – General requirements.
23.80.070 Development standards – Specific hazards.
Part I. Designation, Rating and Mapping
23.80.000 Geologically hazardous areas compliance requirements flowchart.
See Figure 23.80.000 at the end of this chapter. [Ord. 3527 § 2, 2004].
23.80.010 Designation, rating and mapping – Geologically hazardous areas.
Geologically hazardous areas include areas susceptible to erosion, land sliding, earthquake, or other
geological events. They pose a threat to the health and safety of citizens when incompatible
Packet Page 499 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 63 of 90
development is sited in areas of significant hazard. Such incompatible development may not only place
itself at risk, but also may increase the hazard to surrounding development and use. Areas susceptible to
one or more of the following types of hazards shall be designated as a geologically hazardous area:
A. Erosion hazard;
B. Landslide hazard; and
C. Seismic hazard. [Ord. 3527 § 2, 2004].
23.80.020 Designation of specific hazard areas.
A. Erosion Hazard Areas. Erosion hazard areas are at least those areas identified by the U.S. Department
of Agriculture’s Natural Resources Conservation Service as having a “moderate to severe,” “severe,” or
“very severe” rill and inter-rill erosion hazard. Erosion hazard areas are also those areas impacted by
shoreland and/or stream bank erosion. Within the city of Edmonds erosion hazard areas include:
1. Those areas of the city of Edmonds containing soils that may experience severe to very severe erosion
hazard. This group of soils includes, but is not limited to, the following when they occur on slopes of 15
percent or greater:
a. Alderwood soils (15 to 25 percent slopes);
b. Alderwood/Everett series (25 to 70 percent slopes);
c. Everett series (15 to 25 percent slopes);
2. Coastal and stream erosion areas which are subject to the impacts from lateral erosion related to
moving water such as stream channel migration and shoreline retreat.
32. Any area with slopes of 15 percent or greater and impermeable soils interbedded with granular soils
and springs or ground water seepage; and
43. Areas with significant visible evidence of ground water seepage, and which also include existing
landslide deposits regardless of slope.
B. Landslide Hazard Areas. Landslide hazard areas are areas potentially subject to landslides based on a
combination of geologic, topographic, and hydrologic factors. They include areas susceptible because of
any combination of bedrock, soil, slope (gradient), slope aspect, structure, hydrology, or other factors.
Within the city of Edmonds potential landslide hazard areas specifically include:
1. Areas of ancient or historic failures in Edmonds which include all areas within the earth subsidence
and landslide hazard area as identified in the 1979 report of Robert Lowe Associates and amended by
the 1985 report of GeoEngineers, Inc. and further discussed in the 2007 report by Landau Associates;
Packet Page 500 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 64 of 90
2. Coastal areas mapped as class u (unstable), uos (unstable old slides), and urs (unstable recent slides)
in the Department of Ecology Washington coastal atlas;
3. Areas designated as quaternary slumps, earthflows, mudflows, or landslides on maps published by the
United States Geological Survey or Washington State Department of Natural Resources;
Figure 1
24. Any slope of forty percent (40%) or steeper that exceeds a vertical height of ten (10) feet over a
twenty-five (25) foot horizontal run. Except for rockeries that have been engineered and approved by the
engineer as having been built according to the engineered design, all other modified slopes (including
slopes where there are breaks in slopes) meeting overall average steepness and height criteria should be
considered potential landslide hazard areas);
Packet Page 501 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 65 of 90
5. Any slope with all three of the following characteristics:
a. Slopes steeper than fifteen percent (15%);
b. Hillsides intersecting geologic contacts with a relatively permeable sediment overlying a relatively
impermeable sediment; and
c. Springs or groundwater seepage; Any area with a slope of 40 percent or steeper and with a vertical
relief of 10 or more feet except areas composed of consolidated rock. A slope is delineated by
establishing its toe and top (as defined in Figure 1 in subsection (B)(1) of this section) and is measured
by averaging the inclination over at least 10 feet of vertical relief or 25 feet of horizontal distance.
Benches, steps and variations in gradient shall be incorporated into a larger slope if they do not meet
criteria defining toe and/or top depicted in Figure 1 in subsection (B)(1) of this section (see also Figure 2
at the end of this subsection). If the toe or top of a slope is located off of a subject property, then the
location of the toe or top shall be delineated 200 horizontal feet from the property boundary or at its
natural location, whichever is closer to the subject parcel (see Figure 2 at the end of this subsection);
Figure 2
36. Any area potentially unstable as a result of rapid stream incision or stream bank erosion; and
47. Any area located on an alluvial fan, presently subject to, or potentially subject to, inundation by
debris flow or deposition of stream-transported sediments; and
8. Any slopes that have been modified by past development activity that still meet the slope criter .
C. Seismic Hazard Areas. Seismic hazard areas are areas subject to severe risk of damage as a result of
earthquake-induced ground shaking, slope failure, settlement, soil liquefaction, lateral spreading, or
surface faulting. These areas are designated as having a “high” and “moderate to high” risk of
liquefaction as mapped on the Liquefaction Susceptibility Map of Snohomish County by the
Washington State Department of Natural Resources or areas located within or near landslide hazard
areas.Settlement and soil liquefaction conditions occur in areas underlain by cohesionless, loose, or soft-
saturated soils of low density, typically in association with a shallow ground water table. [Ord. 3527 § 2,
2004].
23.80.030 Mapping of geologically hazardous areas.
A. The approximate location and extent of geologically hazardous areas are shown on the city of
Edmonds critical areas inventory. In addition, resources providing information on the location and
extent of geologically hazardous areas in Edmonds include:
1. Washington Department of Ecology coastal zone atlas (for marine bluffs);
2. U.S. Geological Survey geologic maps, landslide hazard maps, and seismic hazard maps;
3. Washington State Department of Natural Resources seismic hazard maps for Western Washington;
Packet Page 502 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 66 of 90
4. Washington State Department of Natural Resources slope stability maps;
5. National Oceanic and Atmospheric Administration tsunami hazard maps; and
6. Federal Emergency Management Administration flood insurance maps.
B. The critical areas inventory and the resources cited above are to be used as a guide for the city of
Edmonds development services department, project applicants and/or property owners and may be
continuously updated as new critical areas are identified. They are a reference and do not provide a final
critical area designation. [Ord. 3527 § 2, 2004].
Part II. Allowed Activities – Geologically Hazardous Areas
23.80.040 Allowed activities – Geologically hazardous areas.
The following activities are allowed in geologically hazardous areas as consistent with ECDC
23.40.220, Allowed activities, Chapter 19.10 ECDC, Building Permits – Earth Subsidence and
Landslide Hazard Areas, and Chapter 18.30 ECDC, Storm Water Management, and do not require
submission of a critical area report:
A. Erosion and Landslide Hazard Areas. Except for installation of fences and as otherwise provided for
in this title, only those activities approved and permitted consistent with an approved critical areas report
in accordance with this title shall be allowed in erosion or landslide hazard areas.
B. Seismic Hazard Areas. The following activities are allowed within seismic hazard areas:
1. Construction of new buildings with less than 2,500 square feet of floor area or roof area, whichever is
greater, and which are not residential structures or used as places of employment or public assembly;
2. Additions to existing single-story residences that are 250 square feet or less; and
3. Installation of fences. [Ord. 3527 § 2, 2004].
Part III. Additional Report Requirements – Geologically Hazardous Areas
23.80.050 Special study and report requirements – Geologically hazardous areas.
Critical area report requirements for geologically hazardous areas are generally met through submission
to the director of one or more geotechnical engineering reports. In addition to the general critical areas
report requirements of ECDC 23.40.090, critical areas reports for geologically hazardous areas must
meet the requirements of this section and Chapters 18.30 and 19.10 ECDC as applicable. Critical areas
reports for two or more types of critical areas must meet the report requirements for each relevant type
of critical area. Geotechnical report(s) submitted for the purpose of critical areas review are required as
necessary in addition to reports, data and other information mandated per ECDC Titles 18 and 19.
Geotechnical report(s) shall be required: whenever a potential erosion hazard area or potential landslide
Packet Page 503 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 67 of 90
hazard area, as mapped by Edmonds critical areas inventory or shown on other information consistent
with ECDC 23.80.030, is located within 50 feet of the proposed development site; whenever a
development site is located within a seismic hazard area; or when otherwise determined warranted by
the director (e.g. a distance equal to the height of the slope).
A. Preparation by a Qualified Professional. A critical areas report for assessing a potential geologically
hazardous area shall be prepared by an engineer or geologist licensed in the state of Washington, with
experience analyzing geologic, hydrologic, and ground water flow systems, and who has experience
preparing reports for the relevant type of hazard. If mitigation measures are necessary, the report
detailing the mitigation measures and design of the mitigation shall be prepared by an engineer licensed
in the State of Washington, with experience stabilizing slopes with similar geotechnical properties.
Critical areas studies and reports on geologically hazardous areas shall be subject to independent review
pursuant to ECDC 23.40.090(B).
B. Area Addressed in Critical Areas Report. The following areas shall be addressed in a critical areas
report for geologically hazardous areas:
1. The project area of the proposed activity; and
2. All geologically hazardous areas within 200 feet of the project area or that have the potential to be
affected by the proposal.
C. Geological Hazards Assessment. A geology hazard assessment critical areas report for a geologically
hazardous area shall include a field investigation and contain an assessment of whether or not each type
of geologic hazard identified in ECDC 20.80.020 is present or not present and if development of the site
will increase the risk of landslides or erosion on or off the site. Geotechnical reports shall be prepared,
stamped and signed by a qualified professional. These reports must:
1. Be appropriate for the scale and scope of the project;
2. Include a discussion of all geologically hazardous areas on the site and any geologically hazardous
areas off site potentially impacted by the proposed project. If the affected area extends beyond the
subject property, the geology hazard assessment may utilize existing data sources pertaining to that area;
3. Clearly state that the proposed project will not decrease slope stability or pose an unreasonable threat
to persons or property either on or off site and provide a rationale as to those conclusions based on
geologic conditions and interpretations specific to the project;
4. Provide adequate information to determine compliance with the requirements of ECDC Chapter
23.80;
5. Generally follow the guidelines set forth in the Washington State Department of Licensing Guidelines
for Preparing Engineering Geology Reports in Washington (2006). In some cases, such as when it is
determined that no landslide or erosion risk is present, a full report may not be necessary to determine
compliance with the ECDC Chapter 23.80, and in those cases a letter or abbreviated report may be
provided.
Packet Page 504 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 68 of 90
6. If a landslide or erosion hazard is identified, provide minimum setback recommendations for avoiding
the landslide or erosion hazard, other recommendations for site development so that the frequency or
magnitude of landsliding or erosion on or off the site is not altered, and recommendations consistent
with ECDC 23.80.060 and 23.80.070.
geological hazards including the following site- and proposal-related information at a minimum:
1. Site and Construction Plans. The report shall include a copy of the site plans for the proposal
showing:
a. The type and extent of geologic hazard areas, any other critical areas, and buffers on, adjacent to,
within 200 feet of, or that are likely to impact the proposal;
b. Proposed development, including the location of existing and proposed structures, fill, storage of
materials, and drainage facilities, with dimensions indicating distances to the floodplain, if available;
c. The topography, in two-foot contours, of the project area and all hazard areas addressed in the report;
and
d. Clearing limits;
2. Assessment of Geological Characteristics. The report shall include an assessment of the geologic
characteristics of the soils, sediments, and/or rock of the project area and potentially affected adjacent
properties, and a review of the site history regarding landslides, erosion, and prior grading. Soils
analysis shall be accomplished in accordance with accepted classification systems in use in the region.
The assessment shall include, but not be limited to:
a. A description of the surface and subsurface geology, hydrology, soils, and vegetation found in the
project area and in all hazard areas addressed in the report;
b. A detailed overview of the field investigations, published data, and references; data and conclusions
from past assessments of the site; and site-specific measurements, tests, investigations, or studies that
support the identification of geologically hazardous areas; and
c. A description of the vulnerability of the site to seismic and other geologic events;
3. Analysis of Proposal. The report shall contain a hazards analysis including a detailed description of
the project, its relationship to the geologic hazard(s), and its potential impact upon the hazard area, the
subject property, and affected adjacent properties; and
4. Minimum Buffer and Building Setback. The report shall make a recommendation for the minimum
no-disturbance buffer and minimum building setback from any geologic hazard based upon the
geotechnical analysis.
D. Incorporation of Previous Study. Where a valid critical areas report has been prepared within the last
five years for a specific site, and where the proposed land use activity and surrounding site conditions
Packet Page 505 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 69 of 90
are unchanged, said report may be incorporated into the required critical areas report. The applicant shall
submit a hazards assessment detailing any changed environmental conditions associated with the site.
E. Mitigation of Long-Term Impacts. When hazard mitigation is required, the mitigation plan shall
specifically address how the activity maintains or reduces the preexisting level of risk to the site and all
other adjacent properties potentially impacted on a long-term basis (equal to or exceeding the projected
lifespan of the activity or occupation). Proposed mitigation techniques shall be considered to provide
long-term hazard reduction only if they do not require regular maintenance or other actions to maintain
their function. Mitigation may also be required to avoid any increase in risk above the preexisting
conditions following abandonment of the activity.
F. Additional Technical Information Requirements for Projects within Erosion and Landslide Hazard
Areas. In addition to the basic critical areas report requirements for geologically hazardous areas
provided in subsections A through E of this section, technical information for any development within
erosion and earth subsidence and landslide hazard areas shall meet the requirements of Chapter 19.10
ECDC and include the following information at a minimum:
1. Site Plan. The critical areas report shall include a copy of the site plan for the proposal showing:
a. The height of slope, slope gradient, and cross-section of the project area;
b. The location of springs, seeps, or other surface expressions of ground water on or within 200 feet of
the project area or that have the potential to be affected by the proposal; and
c. The location and description of surface water runoff features;
2. Hazards Analysis. The hazards analysis component of the critical areas report shall specificall y
include:
a. A description of the extent and type of vegetative cover;
b. A description of subsurface conditions based on data from site-specific explorations;
c. Descriptions of surface and ground water conditions, public and private sewage disposal systems, fills
and excavations, and all structural improvements;
d. An estimate of slope stability and the effect construction and placement of structures will have on the
slope over the estimated life of the structure;
e. An estimate of the bluff retreat rate or an estimate of the percent risk of landslide area expansion that
recognizes and reflects potential catastrophic events such as seismic activity or a 100-year storm event;
f. Consideration of the run-out hazard of landslide debris and/or the impacts of landslide run-out on
down-slope properties;
g. A study of slope stability including an analysis of proposed cuts, fills, and other site grading;
Packet Page 506 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 70 of 90
h. Recommendations for building siting limitations; and
i. An analysis of proposed surface and subsurface drainage, and the vulnerability of the site to erosion;
3. Geotechnical Engineering Report. The technical information for a project within a landslide hazard
area shall include a geotechnical engineering report prepared by a licensed engineer that presents
engineering recommendations for the following:
a. Parameters for design of site improvements including appropriate foundations and retaining
structures. These should include allowable load and resistance capacities for bearing and lateral loads,
installation considerations, and estimates of settlement performance;
b. Recommendations for drainage and subdrainage improvements;
c. Earthwork recommendations including clearing and site preparation criteria, fill placement and
compaction criteria, temporary and permanent slope inclinations and protection, and temporary
excavation support, if necessary; and
d. Mitigation of adverse site conditions including slope stabilization measures and seismically unstable
soils, if appropriate;
4. Erosion and Sediment Control Plan. For any development proposal on a site containing an erosion
hazard area, an erosion and sediment control plan shall be required. The erosion and sediment control
plan shall be prepared in compliance with requirements set forth in Chapter 18.30 ECDC.
G. Limited Report Requirements for Stable Erosion Hazard Areas. At the director’s discretion, detailed
critical areas report requirements may be waived for erosion hazard areas with suitable slope stability.
Report requirements for stable erosion hazard areas may be met through construction documents that
shall include at a minimum an erosion and sediment control plan prepared in compliance with
requirements set forth in Chapter 18.30 ECDC.
H. Seismic Hazard Areas. In addition to the basic critical areas report requirements for geologically
hazardous areas provided in subsections A through E of this section, a critical areas report for a seismic
hazard area shall also meet the following requirements:
1. The site map shall show all known and mapped active faults within 200 feet of the project area or that
have the potential to be affected by the proposal.
21. The hazards analysis shall include a complete discussion of the potential impacts of seismic activity
on the site (for example, forces generated and fault displacement).
32. A geotechnical engineering report shall evaluate the physical properties of the subsurface soils,
especially the thickness of unconsolidated deposits and their liquefaction potential. If it is determined
that the site is subject to liquefaction, mitigation measures appropriate to the scale of the development
shall be recommended and implemented. [Ord. 3527 § 2, 2004].
Packet Page 507 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 71 of 90
Part IV. Development Standards – Geologically Hazardous Areas
23.80.060 Development standards – General requirements.
A. Alterations of geologically hazardous areas or associated buffers may only occur for activities that:
1. Will not increase the threat of the geological hazard to adjacent properties beyond predevelopment
conditions;
2. Will not adversely impact other critical areas;
3. Are designed so that the hazard to the project is eliminated or mitigated to a level equal to or less than
predevelopment conditions; and
4. Are certified as safe as designed and under anticipated conditions by a qualified engineer or geologist,
licensed in the state of Washington.
B. Critical Facilities Prohibited. Critical facilities shall not be sited within geologically hazardous areas
unless there is no other practical alternative. [Ord. 3527 § 2, 2004].
23.80.070 Development standards – Specific hazards.
A. Erosion and Landslide Hazard Areas. Activities on sites containing erosion or landslide hazards shall
meet the requirements of ECDC 23.80.060, Development Standards – General Requirements, and the
specific following requirements:
1. Minimum Building Setback. The minimum setback shall be the distance required to ensure the
proposed structure will not be at risk from landslides for the life of the structure, considered to be one
hundred and twenty (120) years and will not cause an increased risk of landslides taking place on or off
the site. Buffer Requirement. A setback buffer shall be established from all edges of landslide hazard
areas. The size of the setbackbuffer shall be determined by the director consistent with recommendations
provided in the geotechnical report to eliminate or minimize the risk of property damage, death, or
injury resulting from landslides caused in whole or part by the development, based upon review of and
concurrence with a critical areas report prepared by a qualified professional.
2. Buffer Requirements. A buffer may be established with specific requirements and limitations,
including but not limited to, drainage, grading, irrigation, and vegetation. Buffer requirements shall be
determined by the director consistent with recommendations provided in the geotechnical report to
eliminate or minimize the risk of property damage, death, or injury resulting from landslides caused in
whole or part by activities within the buffer area, based upon review of and concurrence with a critical
areas report prepared by a qualified professional.
a. Minimum Buffer. The minimum buffer shall be equal to the height of the slope existing within the
project area or 50 feet, whichever is greater;
Packet Page 508 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 72 of 90
b. Buffer Reduction. The buffer may be reduced to a minimum of 10 feet when a qualified professional
demonstrates to the satisfaction of the director that the reduction will adequately protect the proposed
development, adjacent developments and uses and the subject critical area;
c. Increased Buffer. The buffer may be increased where the director determines that a larger buffer is
necessary to prevent risk of damage to proposed and existing development;
23. Alterations. Alterations of an erosion or landslide hazard area, minimum building setback and/or
buffer may only occur for activities for which a hazards analysis is submitted and certifies that:
a. The alteration development will not increase surface water discharge or sedimentation to adjacent
properties beyond predevelopment conditions;
b. The alterationdevelopment will not decrease slope stability on adjacent properties; and
c. Such alterations will not adversely impact other critical areas;
3. Design Standards within erosion and landslide hazard areas. Development within an erosion or
landslide hazard area and/or buffer shall be designed to meet the following basic requirements unless it
can be demonstrated that an alternative design that deviates from one or more of these standards
provides greater long-term slope stability while meeting all other provisions of this title. The
requirement for long-term slope stability shall exclude designs that require regular and periodic
maintenance to maintain their level of function. The basic development design standards are:
a. The proposed development shall not decrease the factor of safety for landslide occurrences below the
limits of 1.5 for static conditions and 1.2 for dynamic conditions. If stability at the proposed
development site is below these limits, the proposed development shall provide practicable approaches
to reduce risk to human safety and improve the factor of safety for landsliding. In no case shall the
existing factor of safety be reduced for the subject property or adjacent properties;
b. Structures and improvements shall be clustered to avoid geologically hazardous areas and other
critical areas;
c. Structures and improvements shall minimize alterations to the natural contour of the slope, and
foundations shall be tiered where possible to conform to existing topography;
d. Structures and improvements shall be located to preserve the most critical portion of the site and its
natural landforms and vegetation;
e. The proposed development shall not result in greater risk or a need for increased buffers on
neighboring properties;
f. The use of retaining walls that allow the maintenance of existing natural slope area is preferred over
graded artificial slopes; and
g. Development shall be designed to minimize impervious lot coverage;
Packet Page 509 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 73 of 90
4. Vegetation Retention. Unless otherwise provided or as part of an approved alteration, removal of
vegetation from an erosion or landslide hazard area or related buffer shall be prohibited;
5. Seasonal Restriction. Clearing shall be allowed only from May 1st to October 1st of each year;
provided, that the director may extend or shorten the dry season on a case-by-case basis depending on
actual weather conditions, except that timber harvest, not including brush clearing or stump removal,
may be allowed pursuant to an approved forest practice permit issued by the city of Edmonds or the
Washington State Department of Natural Resources;
6. Point Discharges. Point discharges from surface water facilities and roof drains onto or upstream from
an erosion or landslide hazard area shall be prohibited except as follows:
a. Conveyed via continuous storm pipe downslope to a point where there are no erosion hazard areas
downstream from the discharge;
b. Discharged at flow durations matching predeveloped conditions, with adequate energy dissipation,
into existing channels that previously conveyed storm water runoff in the predeveloped state; or
c. Dispersed discharge upslope of the steep slope onto a low-gradient, undisturbed buffer demonstrated
to be adequate to infiltrate all surface and storm water runoff, and where it can be demonstrated that
such discharge will not increase the saturation of the slope; and
7. Prohibited Development. On-site sewage disposal systems, including drain fields, shall be prohibited
within erosion and landslide hazard areas and related buffers.
B. Earth Subsidence and Landslide Hazard Area. In addition to the requirements of this chapter,
development proposals for lands located within the earth subsidence and landslide hazard area as
indicated on the critical areas inventory shall be subject to the provisions of Chapter 19.10 ECDC.
C. Seismic Hazard Areas. Activities proposed to be located in seismic hazard areas shall meet the
standards of ECDC 23.80.060, Development Standards – General Requirements. [Ord. 3527 § 2, 2004].
Packet Page 510 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 74 of 90
Figure 23.80.000
Packet Page 511 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 75 of 90
Chapter 23.90
FISH AND WILDLIFE HABITAT CONSERVATION AREAS
Sections:
Part I. Designation, Rating and Mapping
23.90.000 Fish and wildlife habitat conservation areas compliance requirements flowchart.
23.90.010 Designation, rating and mapping – Fish and wildlife habitat conservation areas.
Part II. Additional Report Requirements – Fish and Wildlife Habitat Conservation Areas
23.90.020 Special study and report requirements – Fish and wildlife habitat conservation areas.
Part III. Development Standards – Fish and Wildlife Habitat Conservation Areas
23.90.030 Development standards – General requirements.
23.90.040 Development standards – Specific habitats.
Part I. Designation, Rating and Mapping
23.90.000 Fish and wildlife habitat conservation areas compliance requirements
flowchart.
See Figure 23.90.000 at the end of this chapter. [Ord. 3527 § 2, 2004].
23.90.010 Designation, rating and mapping – Fish and wildlife habitat conservation
areas.
A. Fish and wildlife habitat conservation areas in the city of Edmonds include:
1. Streams. Within the city of Edmonds streams shall include those areas where surface waters produce a
defined channel or bed which demonstrates clear evidence, such as the sorting of sediments, of the
passage of water. The channel or bed need not contain water year-round. Streams shall be classified in
accordance with the Washington Department of Natural Resources water typing system (WAC 222-16-
030) hereby adopted in its entirety by reference and summarized as follows:
a. Type S: streams inventoried as “shorelines of the state” under Chapter 90.58 RCW and the rules
promulgated pursuant to Chapter 90.58 RCW;
b. Type F: streams which contain fish habitat;
Packet Page 512 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 76 of 90
c. Type Np: perennial nonfish habitat streams; and
d. Type Ns: seasonal nonfish habitat streams.
All streams included on the inventory that are known to exist within the city of Edmonds do not meet
criteria for “shorelines of the state” but contain fish habitat and, thus, meet designation criteria for Type
F waters pursuant to WAC 222-16-030. However, not all Edmonds streams support anadromous fish
populations or have the potential for anadromous fish occurrence because of obstructions, blockages or
access restrictions resulting from existing conditions. Therefore, in order to provide special
consideration of and increased protection for anadromous fish in the application of development
standards, Edmonds streams shall be further classified as follows:
Anadromous fishbearing streams: streams existing in whole or in part within the city of Edmonds in
which anadromous fish are known to occur. As of 2004, Edmonds fishbearing streams are known to
include Willow Creek, Shellabarger Creek, Shell Creek, Hindley Creek, Perrinville Creek, and Lunds
Creek; and
Nonanadromous fishbearing streams: streams existing in whole or in part within the city of Edmonds
which do not support fish populations and do not have the potential for fish occurrence because of
barriers to fish passage or lack of suitable habitat.
Streams with anadromous fish occurrence were identified in the Edmonds Stream Inventory and
Assessment, a 2002 report of Pentec Environmental which is incorporated by this reference as if herein
set forth. The city of Edmonds advocates and encourages the removal of barriers to anadromous fish
passage consistent with the purposes and objectives of this title. The director may provide updated
information on the occurrence of anadromous fish in Edmonds streams consistent with changes in
existing environmental conditions.
2. Areas with Which which State or Federally Designated Endangered, Threatened, and Sensitive
Species Have a Primary Association, or offer important fish and wildlife habitat within the urban
environment.
a. Federally designated endangered and threatened species are those fish and wildlife species identified
by the U.S. Fish and Wildlife Service and the NOAA Fisheries that are in danger of extinction or
threatened to become endangered. The U.S. Fish and Wildlife Service and the National Marine Fisheries
Service should be consulted for current listing status.
b. State-designated endangered, threatened, and sensitive species are those fish and wildlife species
native to the state of Washington identified by the Washington Department of Fish and Wildlife, that are
in danger of extinction, threatened to become endangered, vulnerable, or declining and are likely to
become endangered or threatened in a significant portion of their range within the state without
cooperative management or removal of threats. State-designated endangered, threatened, and sensitive
species are periodically recorded in WAC 232-12-014 (state endangered species) and WAC 232-12-011
(state threatened and sensitive species). The state Department of Fish and Wildlife maintains the most
current listing and should be consulted for current listing status.
Packet Page 513 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 77 of 90
3. State Priority Habitats and Areas Associated with State Priority Species. Priority habitats and species
are considered to be priorities for conservation and management. Priority species require protective
measures for their perpetuation due to their population status, sensitivity to habitat alteration, and/or
recreational, commercial, or tribal importance. Priority habitats are those habitat types or elements with
unique or significant value to a diverse assemblage of species. A priority habitat may consist of a unique
vegetation type or dominant plant species, a described successional stage, or a specific structural
element. Priority habitats and species are identified by the state Department of Fish and Wildlife.
4. Habitats and Species of Local Importance. Habitats and species of local importance are those
identified by the city of Edmonds, including but not limited to those habitats and species that, due to
their population status or sensitivity to habitat manipulation, warrant protection. Habitats may include a
seasonal range or habitat element with which a species has a primary association, and which, if altered,
may reduce the likelihood that the species will maintain and reproduce over the long term.
45. Commercial and Recreational Shellfish Areas. These areas include all public and private tidelands or
bedlands suitable for shellfish harvest, including shellfish protection districts established pursuant to
Chapter 90.72 RCW.
56. Kelp and eelgrass beds and herring and smelt spawning areas.
67. Naturally Occurring Ponds Under 20 Acres. Naturally occurring ponds are those ponds under 20
acres and their submerged aquatic beds that provide fish or wildlife habitat, including those artificial
ponds intentionally created from dry areas in order to mitigate impacts to ponds. Naturally occurring
ponds do not include ponds deliberately designed and created from dry sites, such as canals, detention
facilities, wastewater treatment facilities, farm ponds, temporary construction ponds, and landscape
amenities, unless such artificial ponds were intentionally created for mitigation.
78. Waters of the State. Waters of the state include lakes, rivers, ponds, streams, inland waters,
underground waters, salt waters, and all other surface waters and watercourses within the jurisdiction of
the state of Washington, as classified in WAC 222-16-031 (or WAC 222-16-030, depending on
classification used).
9. Lakes, ponds, streams, and rivers planted with game fish by a governmental or tribal entity.
10. Urban open space and land useful or essential for preserving connections between habitat.
11. Areas of Rare Plant Species and High-Quality Ecosystems. Areas of rare plant species and high-
quality ecosystems are identified by the Washington State Department of Natural Resources through the
Natural Heritage Program.
B. All areas within the city of Edmonds meeting one or more of these criteria, regardless of any formal
identification, are hereby designated critical areas and are subject to the provisions of this title and shall
be managed consistent with the best available science, such as the Washington Department of Fish and
Wildlife’s Management Recommendations for Priority Habitat and Species.
Packet Page 514 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 78 of 90
C. Mapping. The approximate location and extent of fish and wildlife habitat conservation areas are
shown on the city of Edmonds critical areas inventory. Resources providing information on the location
and extent of fish and wildlife habitat conservation areas incorporated into the inventory include:
1. Washington Department of Fish and Wildlife priority habitat and species maps;
2. Washington State Department of Natural Resources official water type reference maps, as amended;
3. Washington State Department of Natural Resources Puget Sound intertidal habitat inventory maps;
4. Washington State Department of Natural Resources shorezone inventory;
5. Washington State Department of Natural Resources Natural Heritage Program mapping data;
6. Washington State Department of Health annual inventory of shellfish harvest areas;
7. Anadromous and resident salmonid distribution maps contained in the habitat limiting factors reports
published by the Washington Conservation Commission; and
8. Washington State Department of Natural Resources state natural area preserves and natural resource
conservation area maps.
The critical areas inventory and the resources cited above are to be used as a guide for the city of
Edmonds development services department, project applicants, and/or property owners and should be
continuously updated as new critical areas are identified. They are a reference and do not provide a final
critical areas designation. [Ord. 3527 § 2, 2004].
Part II. Additional Report Requirements – Fish and Wildlife Habitat Conservation Areas
23.90.020 Special study and report requirements – Fish and wildlife habitat
conservation areas.
In addition to the general critical areas report requirements of ECDC 23.40.090, critical area reports for
fish and wildlife habitat conservation areas must meet the requirements of this section. Critical areas
reports for two or more types of critical areas must meet the report requirements for each relevant type
of critical area.
A. Preparation by a Qualified Professional. A critical areas report for a fish and wildlife habitat
conservation area shall be prepared by a qualified professional who is a biologist with experience
preparing reports for the relevant type of habitat. Pursuant to ECDC 23.40.090(A), applicants may
choose one of the qualified technical consultants on the city’s approved list in preparing critical areas
reports for fish and wildlife habitat conservation areas, or may utilize an alternative consultant. Critical
areas studies and reports developed by an alternative consultant shall be subject to independent review
pursuant to ECDC 23.40.090(B).
Packet Page 515 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 79 of 90
B. Areas Addressed in Critical Areas Report. The following areas shall be addressed in a critical areas
report for fish and wildlife habitat conservation areas:
1. The project area of the proposed activity;
2. All fish and wildlife habitat conservation areas and recommended buffers within 200 feet of the
project area; and
3. All shoreline areas, floodplains, other critical areas, and related buffers within 200 feet of the project
area; and.
4. A discussion of the efforts to avoid and minimize potential effects to these resources and the
implementation of mitigation/enhancement measures as required.
C. Habitat Assessment. A habitat assessment is an investigation of the project area to evaluate the
potential presence or absence of designated critical fish or wildlife species or habitat. A critical areas
report for a fish and wildlife habitat conservation area shall contain an assessment of habitats, including
the following site- and proposal-related information at a minimum:
1. Detailed description of vegetation on and adjacent to the project area and its associated buffer;
2. Identification of any species of local importance, priority species, or endangered, threatened,
sensitive, or candidate species that have a primary association with habitat on or adjacent to the project
area, and assessment of potential project impacts to the use of the site by the species;
3. A discussion of any federal, state, or local special management recommendations, including
Washington Department of Fish and Wildlife habitat management recommendations, that have been
developed for species or habitats located on or adjacent to the project area.
D. Additional Technical Information Requirements for Streams. Consistent with specific development
standards for Edmonds streams (ECDC 23.90.040(D)), critical areas report requirements for streams
may be met, at the discretion of the director, through submission of one or more specific report types. If
stream buffer enhancement is proposed to reduce a standard stream buffer width or as part of project
mitigation required by the director, a stream buffer enhancement plan may be submitted to fulfill the
requirements of this section. If no project impacts are anticipated and standard stream buffer widths are
retained, a stream survey report, general critical areas report or other reports alone or in combination
may be submitted as consistent with the specific requirements of this section. In addition to the basic
critical areas report requirements for fish and wildlife habitat conservation areas provided in subsections
(A) through (C) of this section, technical information on streams shall include the following information
at a minimum:
1. A written assessment and accompanying maps of the stream and associated hydrologic features within
200 feet of the project area, including the following information at a minimum:
a. Stream survey showing the ordinary high water mark(s);
Packet Page 516 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 80 of 90
b. Standard stream buffer boundary;
c. Boundary for proposed reduced stream buffers;
d. Vegetative, faunal, and hydrologic characteristics;
e. Soil and substrate conditions; and
f. Topographic elevations, at two-foot contours;
2. A detailed description and functional assessment of the stream buffer under existing conditions
pertaining to the protection of stream functions, fish habitat and, in particular, potential anadromous
fisheries;
3. A habitat and native vegetation conservation strategy that addresses methods to protect and enhance
on-site habitat and stream functions;
4. Proposed buffer enhancement, if needed, including a written assessment and accompanying maps and
planting plans for buffer areas to be enhanced, including the following information at a minimum:
a. A description of existing buffer conditions;
b. A description of proposed buffer conditions and how proposed conditions will increase buffer
functioning in terms of stream and fish habitat protection;
c. Performance standards for measuring enhancement success through a monitoring period of at least
three years; and
d. Provisions for monitoring and submission of monitoring reports documenting buffer conditions as
compared to performance standards for enhancement success;
5. A discussion of ongoing management practices that will protect stream functions and habitat value
through maintenance of vegetation density within the stream buffer. [Ord. 3527 § 2, 2004].
Part III. Development Standards – Fish and Wildlife Habitat Conservation Areas
23.90.030 Development standards – General requirements.
A. Alterations. A fish and wildlife habitat conservation area may be altered only if the proposed
alteration of the habitat or the mitigation proposed does not degrade the quantitative and qualitative
functions and values of the habitat. There are no specific development standards for upland habitats of
local importance unless these areas include another critical area (streams, heron rookeries, steep slopes,
etc.). City staff will review the critical areas report (ECDC 23.90.020) and work with the applicant to
minimize effects or improve conditions to upland habitat.
Packet Page 517 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 81 of 90
B. Approvals of Activities. The director shall condition approvals of activities allowed within or
adjacent to a habitat conservation area or its buffers as necessary to minimize or mitigate any potential
adverse impacts. Conditions shall be based on the best available science and may include, but are not
limited to, the following:
1. Establishment of buffer zones;
2. Preservation of critically important vegetation and/or habitat features such as snags and downed
wood;
3. Limitation of access to the habitat area, including fencing to deter unauthorized access;
4. Seasonal restriction of construction activities;
5. Establishment of a duration and timetable for periodic review of mitigation activities; and
6. Requirement of a performance bond, when necessary, to ensure completion and success of proposed
mitigation.
C. Mitigation and Equivalent or Greater Biological Functions. Mitigation of alterations to fish and
wildlife habitat conservation areas shall achieve equivalent or greater biologic and hydrologic functions
and shall include mitigation for adverse impacts upstream or downstream of the development proposal
site. Mitigation shall address each function affected by the alteration to achieve functional equivalency
or improvement on a per function basis. Mitigation shall be located on-site except when demonstrated
that a higher level of ecological functioning would result from an off-site location. Mitigation shall be
detailed in a fish and wildlife habitat conservation area mitigation plan, which may include the following
as necessary:
1. A native vegetation planting plan;
2. Plans for retention, enhancement or restoration of specific habitat features;
3. Plans for control of nonnative invasive plant or wildlife species; and
4. Stipulations for use of innovative, sustainable building practices.
D. Approvals and the Best Available Science. Any approval of alterations or impacts to a fish and
wildlife habitat conservation area shall be supported by the best available science.
E. Buffers.
1. Establishment of Buffers. The director shall require the establishment of temporary or permanent
buffer areas for permitted activities adjacent to fish and wildlife habitat conservation areas which may
result in fish or wildlife disturbance (e.g., construction, grading, etc.) when needed to protect fish and
wildlife habitat conservation areas. Establishment of buffers shall follow recommendations set forth by a
qualified biologist in the project critical areas report. Required buffer widths shall reflect the sensitivity
Packet Page 518 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 82 of 90
of the habitat and the type and intensity of human activity proposed to be conducted nearby and shall be
consistent with the management recommendations issued by the Washington Department of Fish and
Wildlife.
2. Seasonal and Daily Timing Restrictions. When a species is more susceptible to adverse impacts
during specific periods of the year or day, seasonal restrictions on permitted activities within or adjacent
to fish and wildlife habitat conservation areas may be required at the discretion of the director pursuant
to recommendations set forth in a critical areas report.
F. Signs and Fencing of Fish and Wildlife Habitat Conservation Areas.
1. Temporary Markers. The outer perimeter of the fish and wildlife habitat conservation area or buffer
and the limits of those areas to be disturbed pursuant to an approved permit or authorization shall be
marked in the field as required by the director in such a way as to ensure that no unauthorized intrusion
will occur. This temporary marking shall be maintained throughout construction and shall not be
removed until permanent signs, if required, are in place.
2. Permanent Signs. As a condition of any permit or authorization issued pursuant to this chapter, the
director may require the applicant to install permanent signs along the boundary of a fish and wildlife
habitat conservation area or buffer.
a. Permanent signs shall be made of a metal face and attached to a metal post or another material of
equal durability. Signs must be posted at an interval of one per lot or every 50 feet, whichever is less,
and must be maintained by the property owner in perpetuity. The sign shall be worded as follows or with
alternative language approved by the director:
Fish and Wildlife Habitat
Conservation Area
Do Not Disturb
Contact the City of Edmonds
Regarding Uses and Restriction
b. The provisions of subsection (F)(2)(a) of this section may be modified by the director as necessary to
assure protection of sensitive features or wildlife.
3. Fencing.
a. The director shall determine if fencing is necessary to protect the functions and values of the critical
area. If found to be necessary, the director shall condition any permit or authorization issued pursuant to
this chapter to require the applicant to install a permanent fence at the edge of the fish and wildlife
habitat conservation area or buffer, when fencing will prevent future impacts to the fish and wildlife
habitat conservation area.
Packet Page 519 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 83 of 90
b. The applicant shall be required to install a permanent fence around the fish and wildlife habitat
conservation area or buffer when domestic grazing animals are present or may be introduced on-site.
c. Fencing installed as part of a proposed activity or as required in this subsection shall be designed so as
to not interfere with species migration, including fish runs, and shall be constructed in a manner that
minimizes habitat impacts. [Ord. 3527 § 2, 2004].
23.90.040 Development standards – Specific habitats.
A. Endangered, Threatened, and Sensitive Species.
1. No development shall be allowed within a fish and wildlife habitat conservation area or buffer with
which state or federally endangered, threatened, or sensitive species have a primary association, except
that which is provided for by a management plan established by the Washington Department of Fish and
Wildlife or applicable state or federal agency.
2. Whenever activities are proposed adjacent to a fish and wildlife habitat conservation area with which
state or federally endangered, threatened, or sensitive species have a primary association, such area shall
be protected through the application of protection measures in accordance with a critical areas report
prepared by a qualified professional and approved by the director. Approval for alteration of land
adjacent to the fish and wildlife habitat conservation area or its buffer shall not occur prior to
consultation with the Washington Department of Fish and Wildlife for animal species, the Washington
State Department of Natural Resources for plant species, and other appropriate federal or state agencies.
3. Bald eagle habitat is subject to the Federal Bald and Golden Eagle Protection Act. Washington State
bald eagle protection rules (WAC 232-12-292) shall not be required as long as bald eagles are not listed
as a State Endangered or Threatened species. Bald eagle habitat shall be protected pursuant to the
Washington State bald eagle protection rules (WAC 232-12-292). Whenever activities are proposed
within 800 feet of a verified nest territory or communal roost, a habitat management plan shall be
developed by a qualified professional. The director shall verify the location of eagle management areas
for each proposed activity. Approval of the activity shall not occur prior to approval of the habitat
management plan by the Washington Department of Fish and Wildlife.
B. Anadromous Fish.
1. All activities, uses, and alterations proposed to be located in water bodies used by anadromous fish or
in areas that affect such water bodies shall give special consideration to the preservation and
enhancement of anadromous fish habitat, including, but not limited to, adhering to the following
standards:
a. Activities shall be timed to occur only during the allowable work window as designated by the
Washington Department of Fish and Wildlife for the applicable species;
b. An alternative alignment or location for the activity is not feasible;
Packet Page 520 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 84 of 90
c. The activity is designed so that it will not degrade the functions or values of the fish habitat or other
critical areas;
d. Shoreline erosion control measures shall be designed to use bioengineering methods or soft armoring
techniques, according to an approved critical areas report; and
e. Any impacts to the functions or values of the fish and wildlife habitat conservation area are mitigated
in accordance with an approved critical areas report.
2. Structures that prevent the migration of salmonids shall not be allowed in the portion of water bodies
currently or historically used by anadromous fish. Fish bypass facilities shall be provided that allow the
upstream migration of adult fish and shall prevent fry and juveniles migrating downstream from being
trapped or harmed.
3. Fills, when authorized, shall not adversely impact anadromous fish or their habitat or shall mitigate
any unavoidable impacts and shall only be allowed for a water-dependent use.
C. Retention of Vegetation on Subdividable, Undeveloped Parcels. As a provision of this title, the
director shall require retention of a minimum of 30 percent of native vegetation on undeveloped (or
redeveloped), subdividable lands zoned as RS-12 or RS-20 per Chapter 16.10 ECDC. This standard for
development shall apply to all undeveloped (or redeveloped), subdividable lands zoned RS-12 or RS-20
regardless of the potential for designation as a fish and wildlife habitat conservation area or other critical
areathat contain a landslide hazard area as defined by ECDC 23.80.020.B; a stream or stream buffer; or
a wetland or wetland buffer, except for as provided in ECDC 23.90.040.C.4. This provision for native
vegetation retention will provide increased protection of fish and wildlife habitat throughout the
Edmonds jurisdiction, and shall be applied consistent with the following criteria:
1. Achieving the minimum 30 percent retention requirement for native vegetation shall be determined by
assessing the existing site area that supports native vegetation. For purposes of this provision, areas that
support native vegetation shall include areas dominated by plant species which are indigenous to the
Puget Sound region, which reasonably could have been expected to naturally occur on the site, and
within which native trees over 10 inches in diameter at breast height (DBH) make up more than 70
percent of the canopy cover.
2. The goal of 30 percent native vegetation can be met through maintaining existing native vegetation,
establishing native vegetation, or a combination of both.
3. A vegetation management plan, subject to the approval of the director, is required for approval of the
proposed development.
4. For undeveloped (or redeveloped), subdividable lands zoned as RS-12 or RS-20 that currently do not
support any native vegetation areas meeting minimum requirements in ECDC 23.90.040.C.1, the
director may waive the requirements of this provision.
D. Streams. No alteration to a stream or stream buffer shall be permitted unless consistent with the
provisions of this title and the specific standards for development outlined below.
Packet Page 521 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 85 of 90
1. Standard Stream Buffer Widths. Buffers for streams shall be measured on each side of the stream,
from the ordinary high water mark. The following shall be the standard buffer widths for streams based
upon the Washington State Department of Natural Resources water typing system and further
classification based upon fish presence (fishbearing vs. nonfishbearing) for the Type F streams existing
in the city of Edmonds:
a. Type S: 150 feet;
b. Type F anadromous fishbearing stream adjacent to reaches with anadromous fish access: 100 feet;
c. Type F anadromous fishbearing stream adjacent to reaches without anadromous fish access: 75 feet;
d. Type F nonanadromous fishbearing stream: 75 feet;
e. Type Np: 50 feet;
f. Type Ns: 25 40 feet.
General areas and stream reaches with access for anadromous fish are indicated on the city of Edmonds
critical areas inventory. The potential for anadromous fish access shall be confirmed in the field by a
qualified biologist as part of critical areas review and determination of standard stream buffer widths.
2. Reduced Stream Buffer Widths. Standard stream buffer widths may be reduced by no more than 50
twenty five percent (25%) of the standard stream buffer width concomitant to development and
implementation of a stream buffer enhancement plan approved by the director. Reduced stream buffer
widths shall only be approved by the director if a stream buffer enhancement plan conclusively
demonstrates that enhancement of the reduced buffer area will not degrade the quantitative and
qualitative functions and values of the buffer area in terms of fish and stream protection and the
provision of wildlife habitat. Stream buffer enhancement plans must meet the specific requirements of
ECDC 23.40.110, 23.40.120 and 23.40.130 and:
a. Provide evidence that the reduced buffer, through enhancement, will provide equivalent to or greater
than a standard buffer without enhancementThe buffer enhancement plan proposed as part of buffer
reduction provides evidence that functions and values in terms of stream and wildlife protections will
beequivalent to or greater than a standard buffer without enhancement:
i. Increased or retained through plan implementation for those streams where existing buffer vegetation
is generally intact; or
ii. Increased through plan implantation for those streams where existing buffer vegetation is inadequate
to protect the functions and values of the stream;
b. The plan documents existing native plant densities and provides for increases in buffer native plant
densities to no less than three feet on center for shrubs and eight feet on center for trees;
Packet Page 522 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 86 of 90
c. The plan requires monitoring and maintenance to ensure success for a minimum of three five (5) years
in accordance with ECDC 23.40.130(D) and (E); and
d. The plan specifically documents methodology and provides performance standards for assessing
increases in stream buffer functioning as related to:
i. Water quality protection;
ii. Provision of wildlife habitat;
iii. Protection of anadromous fisheries;
iv. Enhancement of fish habitat; and
v. Restricting intrusion and disturbance.
3. Stream Buffer Width Averaging with Enhancement. The director may allow modification of a
standard or reduced stream buffer width in accordance with an approved critical areas report and the best
available science on a case-by-case basis by averaging buffer widths. Any allowance for averaging
buffer widths shall only be granted concomitant to the development and implementation of a buffer
enhancement plan for areas of buffer degradation. Only those portions of a stream buffer existing within
the project area or subject parcel shall be considered in the total buffer area for buffer averaging.
Averaging of buffer widths may only be allowed where a qualified professional demonstrates that:
a. The buffer enhancement plan proposed as part of buffer averaging provides evidence that functions
and values in terms of stream and wildlife protections will be:
i. Increased or retained through plan implementation for those streams where existing buffer vegetation
is generally intact; or
ii. Increased through plan implantation for those streams where existing buffer vegetation is inadequate
to protect the functions and values of the stream;
b. The total area contained in the buffer area, or the total buffer area existing on a subject parcel for a
stream extending off-site, after averaging is no less than that which would be contained within the
standard buffer;
bc. The buffer width at any single location is not reduced to less than 5075 percent of the reduced or
standard width; and
c. The functions and values of the stream and associated buffer will not be diminished through the use of
buffer averaging.
4. Additions to Structures Existing within Stream Buffers.
Packet Page 523 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 87 of 90
a. Additions to legally constructed structures existing within stream buffers that increase the footprint of
development or impervious surfacing shall be permitted consistent with the development standards of
this chapter (ECDC 23.90.030 and this section). , provided that a buffer enhancement plan is provided to
mitigate for impacts consistent with this Title, and provided that all impacts from temporary
disturbances within the critical area buffer shall be addressed through use of best management plans and
buffer enhancement plantings during and following construction of the allowed alteration. Provisions for
standard stream buffers, buffer reductions through enhancement, and stream buffer averaging with
enhancement, and buffer reductions through enhancement require applicants to locate such additions in
accordance with the following sequencing:
ai. Outside of the standard stream buffer;
bii. Outside of a stream buffer reduced through enhancementaveraged (with enhancement) per
subsection (D)(23) of this section;
ciii. Outside of a stream buffer reduced (with enhancement) through buffer averaging per subsection
(D)(32) of this section; or
div. Outside of the inner twenty five percent (25%) percent of the standard stream buffer width through
the use of both buffer reduction and buffer averagingwith no more than three hundred (300) square feet
of structure addition footprint within the inner fifty percent (50%) of the standard stream buffer width,
provided that enhancement is provided at a minimum three-to-one (3:1) ratio (enhancement-to-impact).
v. Outside of the inner 25 percent of the standard stream buffer width with no more than five hundred
(500) square feet of new footprint within the inner fifty percent (50%) of the standard stream buffer
width, provided that enhancement is provided at a minimum five-to-one (5:1) ratio (enhancement-to-
impact), and that stormwater low impact development (LID) techniques or other measures that enhance
existing buffer condition are included as part of the stream buffer enhancement plan.
b. Where meeting stream buffer enhancement requirements required by H.1. of this section would result
in enhancement that is separated from the critical area due to uncommon property ownership, alternative
enhancement approaches may be approved by the director. Alternative approaches could include a
vegetated rain garden that receives storm runoff, replacement of existing impervious surfaces with
pervious materials, or other approaches that provide ecological benefits to the adjacent critical area.
c. Additions to legally constructed structures existing within stream buffers that cannot be
accommodated in accordance with the above sequencing (i.e., additions proposed within the inner 25
percent of a standard buffer width) may be permitted at the director’s discretion as a variance subject to
review by the city hearing examiner and the provisions of ECDC 23.40.210.
5. Development Proposals within the Footprint of Existing Development. New development shall be
allowed within the footprint of existing development occurring within a stream buffer, provided that the
following conditions are met:
a. The footprint of existing development was legally established, and is consistent with the definition
provided in ECDC 23.40.320;
Packet Page 524 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 88 of 90
b. The proposed development within the footprint of existing development is sited as far away from the
stream edge as is feasible;
c. As part of the development proposal, opportunities to reduce the footprint of existing development are
implemented where such reduction would increase the buffer width adjacent to the stream and not
represent an undue burden given the scale of the proposed development.
d. The proposed development includes enhancement to the adjacent remaining stream buffer in order to
improve functions degraded by previous development;
e. Enhancement is provided as buffer enhancement for an equivalent area of the footprint of the newly
proposed development within in the footprint of existing development occurring in stream buffer, or
through an alternative approach approved by the director that restores degraded functions of the wetland
and remaining buffer; and
f. Impacts from temporary disturbances within the stream buffer shall be addressed through use of best
management plans and buffer enhancement plantings during and following construction of the allowed
alteration.
56. Stream Crossings. Stream crossings may be allowed only if all reasonable construction techniques
and best management practices are used to avoid disturbance to the stream bed or bank. Upon
completion of construction, the area affected shall be restored to an appropriate grade, replanted with
native species and/or otherwise protected according to a stream mitigation and buffer enhancement plan
approved by the director, and maintained and monitored per the requirements of ECDC 23.40.110,
23.40.120 and 23.40.130 and providing for buffer enhancement in accordance with the requirements of
subsection (D)(2) of this section. In addition, the applicant must demonstrate that best management
practices will be used during construction to provide the following:
a. Fisheries protection, including no interference with fish migration or spawning;
b. All crossings shall be constructed during summer low flow periods and shall be timed to avoid stream
disturbance during periods when stream use is critical to salmonids;
c. Crossings shall not occur over salmonid spawning areas unless no other possible crossing site exists;
d. Crossings and culverted portions of the stream shall be minimized to the extent feasible and serve
multiple purposes and multiple lots whenever possible;
e. Roads may cross streams only on previously approved rights-of-way, provided no practical alternative
exists and adequate provision is made to protect and/or enhance the stream through appropriate
mitigation. Roads shall be designed and located to conform to topography, and maintained to prevent
erosion and restriction of the natural movement of ground water as it affects the stream;
f. Roads and utilities shall be designed in conjunction to minimize the area of disturbance to the stream;
and
Packet Page 525 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 89 of 90
g. Roads shall be constructed so as to minimize adverse impacts on the hydrologic quality of the stream
or associated habitat to a degree acceptable to the city;
h. An alternative alignment or location with less impact is not feasible; and
i. The crossing will be designed as near as perpendicular with the water body as possible..
67. Trails. After reviewing the proposed development and technical reports, the director may determine
that a pedestrian-only trail may be allowed in a stream buffer; provided, nonimpervious surface
materials are used, all appropriate provision is made to protect water quality, and all applicable permit
requirements have been met. No motorized vehicles shall be allowed within a stream or its buffer except
as required for necessary maintenance or security. Vegetative edges, structural barriers, signs or other
measures must be provided wherever necessary to protect streams by limiting vehicular access to
designated public use or interpretive areas.
78. Storm Water Management Facilities. Storm water management facilities, limited to outfalls, pipes
and conveyance systems, storm water dispersion outfalls and bioswales, may be allowed within stream
buffers; provided, that:
a. No other location is feasible;
b. Pipes and conveyance facilities will be in the outer twenty five percent (25%) of the buffer;
c. Stormwater dispersion outfalls, bioswales, and bioretention facilities may be allowed anywhere within
stream buffers;
d. Such facilities are designed consistent with requirements of ECDC Chapter 18.30; and
be. The location and function of such facilities will not degrade the functions or values of the stream or
stream buffer.
89. City Discretion in Protection, Enhancement and Preservation of Streams. The city of Edmonds is
unique within the state of Washington as a built-out community with streams that have been
incorporated within, and often located immediately adjacent to, residential development. This title
allows the director full discretion to condition proposals for development on parcels containing, adjacent
to, or potentially impacting streams to enhance conditions consistent with ECDC 23.40.050 and the
purposes and objectives of this title. Conditions on development shall be required to enhance streams
and stream buffers as fish and wildlife habitat conservation areas to provide increased protection of
anadromous fisheries and potential fish habitat in accordance with best available science and the
recommendations of an approved critical areas report and may include:
a. Removal of stream bank armoring;
b. In -stream habitat modification;
c. Native planting;
Packet Page 526 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 90 of 90
d. Relocation of stream channel portions to create contiguous riparian corridors or wildlife habitat;
e. Planting of stream bank native vegetation to increase stream shading;
f. Removal and control of nonnative, invasive weed species;
g. Requiring additional building setbacks or modified buffers; and
h. Limiting or reducing the types or densities of particular uses.
The right of discretion in provisioning development in regard to streams is maintained in order to
provide for the creation of enhanced conditions over those currently existing around streams in the city
of Edmonds. In all instances where an applicant cannot demonstrate that standard stream buffer widths
as provided in subsection (D)(1) of this section can be accommodated by project development, the
applicant shall be required to submit a stream buffer enhancement plan or a stream mitigation and buffer
enhancement plan as part of a critical areas report indicating that post-project site conditions will
provide equivalent or greater protection of stream functions and fish habitat over a standard stream
buffer and existing site conditions. [Ord. 3527 § 2, 2004].
Figure 23.90.000
Packet Page 527 of 564
City of Edmonds – City Code and Community Development Code
Environmentally Critical Areas – Proposed Code Updates, October 19, 2015
Page 91 of 90
Packet Page 528 of 564
Proposed Frequently Flooded Areas Code Amendment
Building Code Amendment
Amendment to Building Code requiring structures to be constructed two feet above base flood
elevation:
19.00.025 International Building Code section amendments
Q. IBC section 1612.4.1, Lowest Flood Elevation, is added and reads:
For buildings in all structure categories located in the Coastal High Hazard Areas and Coastal A Flood Zones, the
elevation of the lowest floor shall be a minimum of two feet above the base flood elevation, as determined from the
applicable FEMA flood hazard map.
Development Code Amendment to Address Height Issues – Definition of Height
21.40.030 Height.
A. Height means the average vertical distance from the average level of the undisturbed soil of the site covered by a
structure to the highest point of the structure. (See subsection (D) of this section for exceptions to this rule.)
B. “Average level” shall be determined by averaging elevations of the downward projections of the four corners of the
smallest rectangle which will enclose all of the building, excluding a maximum of 30 inches of eaves. If a corner falls
off the site, its elevation shall be the average elevation of the two points projected downward where the two sides of
the rectangle cross the property line. (See subsection (D) of this section for exceptions to this rule.)
C. Accessory buildings that are attached to the main building by a breezeway, hallway, or other similar connection so
that the accessory building is separated by 10 feet or less from the main building shall be considered to be part of the
main building for purposes of determining the average level. For the purposes of this section, in order for an accessory
building to be considered to be attached to and a part of the main building, the connecting structure must have a roof
and be constructed of similar materials to both the main building and the accessory building so that it appears to be a
unified and consistently designed building.
D. Height Exceptions.
1. (Reserved) For all properties located within the Coastal High Hazard Areas and Coastal A Flood Zones, height
is measured from the elevation that is two feet above base flood elevation as identified from the applicable FEMA
flood hazard map. ;
2. Church steeples;
3. Elevator penthouses, not to exceed 72 square feet in horizontal section, or three feet in height, for that portion
above the height limit;
4. Chimneys, not to exceed nine square feet in horizontal section or more than three feet in height, for that portion
above the height limit. In RM districts, chimneys shall be clustered. No multiple-flue chimney shall exceed 39
square feet in horizontal section. The first chimney shall not exceed nine square feet in horizontal section, and
other chimneys shall not exceed six square feet in horizontal section;
5. Vent pipes not to exceed 18 inches in height above the height limit;
6. Standpipes not to exceed 30 inches in height above the height limit;
Packet Page 529 of 564
7. Solar energy installations not to exceed 36 inches in height above the height limit. Such an installation may be
approved as a Type II staff decision if it is designed and located in such a way as to provide reasonable solar
access while limiting visual impacts on surrounding properties; and
8. Replacement of existing rooftop HVAC equipment which exceeds the existing height limit, so long as the
replacement equipment does not exceed the height of the existing equipment by more than 12 inches. The
replacement equipment must have earned the Energy Star label. [Ord. 3866 § 1, 2011; Ord. 3728 § 2, 2009; Ord.
3654 § 1, 2007; Ord. 3569 § 2, 2005].
Packet Page 530 of 564
City of Edmonds City Council
Meeting Date: December 15, 2015
Agenda Subject: Critical Area Ordinance Update
Staff Lead /
Author:
Kernen Lien, Senior Planner
Initiated By: City Council Planning Board City Staff
Citizen Request Other: GMA Required Update
Buffer Purpose and Function
1. How do buffers help protect streams and wetlands?
Two principal functions provided by buffers are habitat and improving water quality.
Habitat includes areas where wildlife (and fish) feed, rest, travel, and rear their
young. In urban settings, buffer habitat values typically diminish as patches of
habitat are smaller and disconnected due to existing development while the
importance of water quality grows with the presence urban stormwater.
2. Does a wider buffer always protect a critical area more than a narrow buffer?
Department of Ecology materials detail a range of buffer widths suggested by BAS
needed for protection of habitat and water quality functions. Typically, wider buffer
widths are recommended for habitat and narrower buffers can provide water quality
functions. In addition to buffer width, the buffer condition plays an important role in
maintaining buffer functions. In general, for buffers of the same quality (vegetation
type and density) larger buffers provide increased function (habitat, water quality,
etc.) than smaller buffers.
Wildlife species that would most benefit from expansive buffer widths (typically
mammals with large home ranges and species intolerant of increased human
disturbance) likely no longer occur within the City or could not be sustained
regardless of buffer width. Urban areas such as Edmonds cannot be expected to
provide habitat for species requiring large contiguous areas of forest habitat. For
example, instituting large buffers that would extend into residential yards that have
been previously developed would offer no additional protection for the City’s critical
areas.
Edmonds City Council
Agenda Memo
Packet Page 531 of 564
Page 2 of 6
BAS indicates that those functions and values most important to the a built-out urban
area like Edmonds (e.g. water quality, flood storage, provision of habitat for species
common to developed areas) can be adequately protected with buffer widths
commensurate with those proposed in the updated CAO.
3. Beside buffer widths, what are other ways to maintain or improve the functions and
values of critical areas?
As noted above, instituting large buffers that extend into residential yards that have
been previously developed offers no additional protection for the City’s critical areas.
In developing the CAO, staff and ESA sought ways to provide flexibility for City
staff to work with landowners in the development scientifically-based enhancement
plans. For example, in order to ensure improvement in buffer function over time,
provisions in the updated CAO require buffer enhancement for development or
redevelopment within buffers that have been previously developed. This could
include planting a previously landscaped buffer area with native vegetation.
Improving the density and diversity of vegetation in buffers serves as physical and
visual screens for wetlands and streams; provides improved habitat; supports
improved water quality by intercepting rainfall, promoting direct infiltration to the
ground, limiting and slowing overland flow, and contributes to pollutant reduction
through biotic uptake and transformation as well as adsorption to soil particles.
Physically Separated/Functionally Isolated Buffers
1. What is a physically separated and functionally isolated buffer?
A physically separated and functionally isolated buffer is that portion of a site that is
within the standard buffer distance from a stream or wetland but is separated from the
stream or wetland by legally established roadways, paved trails or other legally
established structures or paved areas twelve (12) feet or more in width. Because the
buffer is bisected by a developed corridor and is no long adjacent to the
stream/wetland its effectiveness is significantly reduced.
2. What is the purpose of this provision?
The purpose of this provision is to allow for future development or redevelopment in
physically separated and functionally isolated areas where such activity would have
no impact on the nearby stream or wetland.
3. What/who determines if a buffer is physically separated and functionally isolated?
The Development Services Director (or designee) makes the determination if a buffer
is physically separated and functionally isolated based on the criteria established in
ECDC 23.40.220.C.4. The Director may require documentation of the buffer
condition and consistency with criteria by a qualified professional.
4. Is this provision consistent with best available science?
BAS does not directly speak to criteria for determining when existing modification
makes an adjacent area physically separated and functionally isolated. That said,
existing interruptions in surrounding buffers is one of the primary criteria used to
Packet Page 532 of 564
Page 3 of 6
evaluate the habitat functional value of wetlands under the Washington State Wetland
Rating System for Western Washington (Hruby, 2014). Where existing development
results in physical separation and functional isolation between a stream or wetland
and adjacent area, it is clear that the functional value of maintaining the adjacent area
as buffer is negligible or eliminated.
5. Is there currently a physically separated and functional isolated provision in the City’s
critical area regulations?
There is not currently a physically separated and functionally isolated provision in the
City’s critical area regulations; however, the City Council did include a physically
separated functionally isolated provision in the Shoreline Master Program currently
being reviewed by the Department of Ecology.
6. Do other jurisdictions have physically separated functional isolated buffer provisions
in their critical area regulations?
Yes, other jurisdictions have provisions for physically separated and functionally
isolated buffers. The proposed City of Edmonds provision provides more clarity than
other jurisdictions in providing more definition to what constitutes a physical and
functional isolation (12 feet or more of paved area or structure and functional
isolation of hydrologic, geologic, and biological habitat connections).
7. Will critical areas values be impacted or enhanced by this provision?
By definition, if an area is physically separated and functional isolated from the
critical area, the critical area will not be impacted by development in that area.
Buffer Width Reduction
1. What is buffer width reduction?
This provision allows for a 25% reduction of a standard buffer for streams and
Category III and IV wetlands with enhancement.
2. What is the purpose of this provision?
The intent of this provision is to provide flexibility for new development or
redevelopment on highly constrained parcels while improving conditions along the
City’s streams and wetlands by requiring enhancement within the remaining buffer.
3. Is this provision consistent with best available science?
BAS summary provided in recent Ecology guidance does not explicitly support
reduction of standard buffers. Buffer averaging without loss of overall buffer area is
preferred at the state level. However, Ecology materials detail a range of buffer
widths suggested by BAS needed for protection of habitat and water quality functions
and the importance of buffer condition along with buffer width in maintaining
functions. Review of the variable buffer widths suggested by BAS, and the influence
of buffer conditions and surrounding development, suggests that alternative strategies
beyond just fixed-width buffers may be useful to maintain wetland functions and
values.
Packet Page 533 of 564
Page 4 of 6
4. Is there currently a buffer width reduction provision in the City’s critical area
regulations?
Yes. The proposed buffer width reduction provisions differ from the existing
provision in two ways. First, the existing buffer width reduction allows the buffer to
be reduced to 50% of the standard buffer. Second, the existing provision allows for
both a buffer width reduction and a buffer average. The proposed provisions only
allows buffer reduction when buffer averaging cannot be accomplished on site
(consistent with Ecology guidance).
5. Do other jurisdictions allow for buffer width reductions in their critical area
regulations?
Many jurisdictions’ critical area regulations contain provisions for the reduction of
stream and wetland buffers.
6. Will critical areas values be impacted or enhanced by this provision?
The intent of this provision is to enhance existing conditions. In many cases the areas
adjacent to the City’s streams and wetlands lack the structure needed for functioning
buffers. For example, lawn or sparse landscaping extends up to the edge of streams.
Allowing a reduced buffer with required enhancement should improve the existing
condition of the City’s streams and wetlands.
Development within the Previously Developed Footprint
1. What is the previously developed footprint provision?
This provision would allow development within a previously developed footprint
with enhancement at a ratio of 1:1 (e.g. a 600 square foot garage in a previously
development footprint requires 600 square feet of enhancement to the critical area or
critical area buffer). The footprint of development is defined as “the area of a site
that contains legally established: buildings; roads, driveways, parking lots, storage
areas, walkways or other areas paved with concrete, asphalt or compacted gravel;
outdoor swimming pools; and patios.”
2. What is the purpose of this provision?
The intent of this provision is to provide flexibility for new development or
redevelopment on a site that contains legally established development.
3. Is this provision consistent with best available science?
Although BAS provided in recent Ecology guidance (Bunten et al., 2012 and other
materials) does not explicitly support allowances for existing urban development,
BAS does document the importance of buffer condition, and suggests that alternative
strategies (beyond just rigid buffer width requirements) may be useful.
Packet Page 534 of 564
Page 5 of 6
4. Is there currently a previously developed footprint provision in the City’s critical area
regulations?
Yes. The existing regulations allow alterations to a legally constructed structures
existing within a critical area or buffer that does not increase the footprint of
development.
5. Do other jurisdictions have provisions for development with the previously developed
footprint?
Yes, several other jurisdictions provide similar provisions. Several jurisdictions
(Grandview, Toppenish, Ellensburg, Poulsbo, and Tacoma) have provisions that
indicate the buffer ends where the pavement begins; however these examples are less
protective than the proposed provision because they don’t require enhancement to
compensate for the new development or redevelopment with this previously
developed area.
6. Will critical area values be impacted or enhanced by this provision?
Allowing some development within the footprint of existing development in
exchange for enhancement of the critical area and/or critical area buffer will result in
a net benefit to the City’s critical areas condition.
Critical Area Restoration Projects
1. What are critical area restoration projects that are applicable to this provision?
The daylighting of a stream or creation or landward expansion of a wetland that is not
required as mitigation for a development proposal.
2. What is the purpose of this provision?
This provision is intended to avoid placing undue restrictions on opportunities for
stream daylighting and/or wetland creation that could result if standard buffers are
required, and thus providing a disincentive for implementing restoration projects. The
proposed provision would grant relief from the standard buffer requirements for the
identified restoration projects.
3. Is this provision consistent with best available science?
BAS provided in recent Ecology guidance does not explicitly support reduction of
standard stream or wetland buffers, even for restoration projects. Ecology guidance
does support provisions to facilitate elective restoration of streams and wetlands,
including relaxing and/or streamlining some critical areas requirements; however
protections must still be provided as part of restoration projects that adequately
maintain functions associated with the establish/re-established critical area. Further,
WDFW is currently focused on removal of fish passage barriers (primarily culverts)
as a high priority for salmon recovery. Prioritizing the restoration of streams over the
ability to provide standard buffers within urban areas appears to be consistent with
the science as long as the restoration project serves to improve salmonid habitat
overall.
Packet Page 535 of 564
Page 6 of 6
4. Is there currently a restoration projects provision in the City’s critical area
regulations?
No.
5. Do other jurisdictions have provisions for granting relief from critical area restoration
projects?
The proposed restoration projects section is modeled after the Washington State
Shoreline Management Act provision (RCW 90.58.580) that grants relief for
shoreline restoration projects from shoreline master program development standards
and use regulations. Additionally, the City of Seattle also includes provisions that
grant relief for stream daylighting projects.
6. Will critical area values be impacted or enhanced by this provision?
One of the requirements of this provision is that there will be a net environmental
benefit from the restoration project with the reduced buffer width. Specific criteria are
provided within the provision to maximize the net environmental benefit, including
requiring that the buffer reduction is the minimum necessary to achieve the
restoration project.
Packet Page 536 of 564
Edmonds City Council Approved Minutes
September 8, 2015
Page 11
negotiated an agreement with the property owner in lieu of him filing a lawsuit in an attempt to settle any
claim with the City. The City worked with a consultant to design a remedy; most of it will exist on private
property but will connect to the City’s stormwater system in the street. The property owner will hire a
contractor to build it, the City will inspect it and as long as all the improvements are built in accordance
with expectations, the City will pay the property owner for the City’s portion of the project and he will
release the City from future liability and maintenance on the improvements that will be on his property.
Staff worked with the City Attorney’s office on the agreement; it is a good resolution, keeps costs down
to the City and the homeowner.
Councilmember Petso asked if this would ordinarily be discussed in executive session instead of in open
session. Mr. Taraday answered there is no ordinary as this is a fairly unusual agreement. Mr. Williams
said this is the first agreement of this type. Councilmember Petso said the design is for a 25-year storm
event; her understanding is a 25-year storm event occurs far more frequently than every 25 years and a
bigger storm event such as a 100-year storm even could occur. She asked whether the property owner was
okay with designing for a 25-year storm event. Mr. Williams answered yes, and that is the proper level of
design, the same that most of the City’s storm system is designed to. Designing to 100-year storm events
the pipes become enormous, the basins are huge and it is not cost effective. The latest data was used in
calculating the design for a 25-year storm event and a fair amount of conservatism is built in. In addition,
some of the upstream drainage has been rerouted in another direction which should lessen the load on this
channel by a noticeable amount. He was confident what was designed would be successful.
It was the consensus of the Council to schedule approval on next week’s Consent Agenda.
E. INTRODUCTION OF PLANNING BOARD RECOMMENDATION ON CRITICAL AREA
REGULATIONS
Senior Planner Kernen Lien explained review of the critical area regulations began in late 2014. In June
he provided a precursor of some items being discussed by the Planning Board. Over the past year, the
Planning Board has reviewed the critical area regulations over five meetings and at their July 22
forwarded a recommendation to the City Council. Tonight is an introduction; because the critical area
regulations can be technical, another work session in scheduled in two weeks followed by a public
hearing.
Aaron Booy, ESA, advised Jim Keany, ESA was also present tonight to answer questions. They have
been supported by a geologist with the Stratton Group. He reviewed the background and purpose
• GMA (1990) requires identification, designation, and protection of critical areas
• Purpose of the CAO (CAO) is to protect:
o Natural environment
o Public health and safety
o Once lost, function and value of critical areas very difficult to restore.
• Existing CAO –established from comprehensive update in 2004 and 2005
He described what critical areas are:
• Frequently flooded areas
• Geologically hazardous areas
o Landslide, erosion, seismic hazards)
• Fish and wildlife habitat conservation areas (FWHCAs)
o Streams
o Habitat for listed and sensitive fish and wildlife species
o Lakes < 20 acres
• Wetlands
Packet Page 537 of 564
Edmonds City Council Approved Minutes
September 8, 2015
Page 12
He reviewed how the CAO protects critical areas:
• Prohibiting, limiting and/or allowing certain activities
• Requiring buffers or setbacks around critical areas
o Landslide and erosion hazards
o Wetlands
o FWHCAs (streams)
• Requiring avoidance and minimization of impacts
• Requiring mitigation sequencing for impacts
o Avoidance
o Minimization/reduction
o Rectification
o Compensation (for unavoidable impacts)
o Monitoring
He described the CAO update process:
• GMA requires cities to update CAOs on the same 8-year Comprehensive Plan update timeline
• Consideration of Best Available Science (BAS)
• Revise code
o Public participation and review
July 22: Planning Board recommended update
Today: City Council review process initiated
• Adopt revised Code
He described what BAS is:
• Research and guidance
o Conducted by qualified individuals
o Documented methodologies
o Verifiable results and conclusions
• Published bibliographies; state guidance; primary research publications
• 1995 Amendment to the GMA requires consideration of “best available science” for protecting
critical areas
Mr. Booy reviewed the BAS Review and Update:
• BAS addendum (March 2015)
o Companion to 2004 BAS Report (EDAW)
o Focused on new science and guidance in last decade
• Wetlands
o Delineation and rating
o Buffer approach
o Alternative mitigation strategies; mitigation guidance
• Floodplains
o Climate change
o Coastal flood zones
• Geological hazardous areas
o North Edmonds Earth Subsidence and Landslide Area Summary Report (Landau 2007)
o Newly available LiDAR data
• FWHCAs
o Buffer approach
o Habitat connectivity
Packet Page 538 of 564
Edmonds City Council Approved Minutes
September 8, 2015
Page 13
Mr. Lien referred to Exhibit 2, 2015 BAS addendum and Exhibit 5, BAS and Gap Analysis Matrix. He
reviewed revisions to the CAO:
• Geologically hazardous areas
o Revising how landslide hazard areas are defined
o Updating geological report requirements
o Setbacks and buffers determined by geotechnical report
• Wetlands – ECDC 23.50
o Updating delineation manuals
o Revising Wetland Categories Consistent with latest criteria
o Buffer widths being revised consistent with Ecology’s guidance for small jurisdictions
(Ecology Publication #10-06-002)
o Mitigation Ratios per Ecology guidance (Ecology Publication #10-06-011)
o Stream and wetland buffer reduction
CAO allows buffer reduction via buffer reduction or buffer averaging
Current code allows buffer reduction to be combined with buffer averaging
New code does not allow them to be combined, only one allowed with buffering
averaging preferred
• Small Isolated Wetlands (changed from exempt wetlands)
o ECDC 23.50.040.J
o Based on language in the Guidance for Small Jurisdictions
o Category III and IV wetlands less than 1,000 square feet
o Exempt from buffer provisions
o Not subject to avoidance
o May be altered if lost functions are replaced
o Added habitat score
He identified changes proposed to ECDC 23.90.040.C
• Requires retention or establishment of a minimum of 30 percent native vegetation on
undeveloped or redeveloped property within the RS-12 and RS-20 zones due to the prevalence of
critical areas in those zones
• Similar to a King County provision that was struck down by the courts (Citizens Alliance for
Property Rights v. Sims)
• Provide more definition to specific habitat features to be retained
o Indigenous species
o Native trees of 10 inches dbh make up more than 70% canopy coverage
• Provisions may be waived for properties that do not support native vegetation
Mr. Lien explained Edmonds was developed in a large part before any critical area regulations or
environmental regulations were adopted. He provided an aerial image of a stream between two houses
and a photograph of the actual stream, noting this situation exists throughout the City. This particular
stream came to staff’s attention when a house two parcels away from the stream was prevented from
constructing an addition because it was within the stream buffer.
He recalled 1-2 years ago the Council considered an interim ordinance regarding physically separated and
functionally isolated buffers and development within the developed footprint. The ordinance stalled at the
Planning Board and was put on hold anticipating the critical areas update. He reviewed a new section
within Allowed Activities, ECDC 23.40.20.C.4 that would allow development outright on:
• Site separated from a critical area by legally established roads, trails and structures 12 feet or
more in width may be physically separated and functionally isolated
• The director may require a site assessment by a qualified professional to make the determination
Packet Page 539 of 564
Edmonds City Council Approved Minutes
September 8, 2015
Page 14
He described changes with regard to development within the previously developed footprint:
• Allow development within the legally established footprint of development
• “Footprint of Existing Development” definition 23.40.320
o “The area of a site that contains legally established buildings, concrete, asphalt, gravel, paved
roads, parking lots, storage areas or other paved areas, driveways, walkways, outdoor
swimming pools and patios.”
• Site new development as far away from critical area as possible
• Enhancement required at a ratio of 1:1
Using the photograph and aerial image he described a hypothetical addition of a 600 square foot garage
on the graved area adjacent to the stream, noting it would meet the definition of a previously developed
area. The addition would require a 600 square foot enhancement of the stream buffer. The intent of the
footprint of existing development was to have critical areas enhanced. In this instance if the 75 foot buffer
was strictly applied and no development was allowed, the stream buffer would not be enhanced. The
addition would not cause any more harm and allowing some development in the previously developed
footprint would improve streams and wetlands throughout the City in the long run.
He reviewed changes to the code regarding additions:
• Additions to existing structures within a buffer that increase the footprint of development
• Outside the inner 25% of buffer
o No more than 300 square feet addition within the inner 50%
Mitigate at a ratio of 3:1
o No more than 500 square feet additional within the inner 50%
Mitigate at a ratio of 5:1
He described changes regarding frequently flooded areas:
• Currently regulated by building code Title 19 ECDC
• Include new flood zones (Zones V and VE)
• Amend ECDC 19.00.025 requiring structures within the coastal flood hazard zones to be
constructed two feet above base flood elevation
o New FEMA flood zone map expands the flood zone along within the waterfront area
o Natural Resource Council 2012 study predicts an average sea level rise of 2 feet by 2100.
He commented on height implications of the requirement for structures to be constructed two feet above
the base flood elevation:
• Requiring structures to be constructed above the base flood elevation will impact overall
allowable height as allowed by zoning
• Maximum allowable height is measured from an average level of undisturbed soil
• Modified definition of height in ECDC 21.40.030 so structures within the coastal flood zones
measure height from two feet above base flood elevation
New section added to critical area regulations:
• ECDC 23.40.215 - Critical areas restoration projects
o Provide relief from standard critical area buffer for restoration projects that is not required as
mitigation for a development proposal
o Restoration project involve:
The daylighting of a stream, or
Creation or expansion of a wetland that would cause a landward expansion of the wetland
and/or wetland buffer
Packet Page 540 of 564
Edmonds City Council Approved Minutes
September 8, 2015
Page 15
He described restoration project relief:
• May apply a buffer that is not less than 75% of the standard buffer to the restoration project
boundary
• Request a buffer between 50% and 7% of standard buffer if:
o 75% buffer would significantly limit use of the property
o Minimum necessary to achieve restoration project
o There will be a net environmental benefit
o Granting relief is consistent with the purposes of the critical area regulations
Mr. Lien reviewed next steps:
• Comments from state and tribal agencies (Commerce, Ecology, WDFW)
• September 22 City Council work session
• October 6 City Council public hearing
• Consideration for adoption
Councilmember Buckshnis commended Mr. Lien on his presentation. She asked him to describe the
relationship between the Shoreline Management Program (SMP) and the Critical Areas Ordinance
(CAO). Mr. Lien explained the CAO is an outgrowth of the Growth Management Act (GMA) and the
SMP is an outgrowth of the Shoreline Management Act (SMA); the two do not mesh. Within shoreline
jurisdiction, 200 feet from the ordinary high water mark, the SMA rules; outside that area, the CAO rules.
He recalled during the SMP update, certain areas of the existing critical area regulations were excepted
out and provisions included in the SMP. One of the main provisions was regarding wetlands and Ecology
requested the Guidance for Small Jurisdictions be included. Ecology is in the process of reviewing the
City’s SMP and are about to send comments to the City. This CAO update addresses a lot of Ecology’s
concerns with the CAO. As changes are considered for the SMP, he suggested incorporating the updated
CAO.
Councilmember Buckshnis asked if BAS addresses temperature change. She referred to a newspaper
article by King County Councilmember Larry Phillips regarding how the increase in stream temperature
affects fish, habitat, etc. Mr. Lien answered one of the functions of stream buffers is to provide shade. Mr.
Booy agree with Mr. Lien, ensuring buffers are adequate to provide a forested canopy that provides
adequate shade to the stream is the primary consideration. That was considered when the City’s buffers
were evaluated against buffer guidance within BAS. The fact that Edmonds is a built out urban area,
ensuring residents are able to use their property and not creating a lot of nonconforming structures must
be balanced with BAS and guidance for providing riparian habitat along streams. They concluded the
stream buffers in the City’s existing regulations are adequate for providing an adequate, relative large
buffer, 75 – 100 feet for streams with salmon.
Councilmember Buckshnis referred to the mitigation approach and things the director can require and
asked if that director is Shane Hope. Mr. Lien answered yes, it refers to the Development Services
Director. Councilmember Buckshnis observed the review is administrative and asked if ever reaches the
legislative level. Mr. Lien answered not usually, an appeal of a critical area variance application could
come to Council on a closed record review.
Councilmember Petso pointed out the BAS document does not seem to support the physically separated
and functionally isolated exception and in fact on page 6 it admits it does not support it. She asked staff
and the consultant to show where the science supported that type of exception. Her interpretation of the
science was that bigger buffers were better and when there were imperfect buffers, the buffer should be
even larger. Mr. Lien read from page 6, in highly developed communities such as Edmonds, standard
buffer widths may be difficult to achieve. As noted in the 2014 BAS report, many streams and wetland
buffers extend into residential yards that have been previously developed and provide limited function in
Packet Page 541 of 564
Edmonds City Council Approved Minutes
September 8, 2015
Page 16
terms of wetland protection. Furthermore, some buffers are substantially developed and contain
impervious surface in commercial and residential areas. While not explicitly stated in BAS and buffer
guidance documents, a scientific judgment of these areas would conclude that they do not provide the
same function and value as a vegetated or undeveloped buffer due to physical separation.
Mr. Lien pointed out one of issues with BAS is where it was conducted. In large part buffer studies are
conducted in areas where buffers actually exist such as rural areas. There is no specific peer reviewed
study that looked at a physically separated and functionally isolated buffer but a buffer is something that’s
adjacent to a critical area and provides value. When it is physically separated and functionally isolated, by
definition, it is not providing those values. He concluded the BAS report does address physically
separated and functionally isolate buffers. Critical area regulations need to be balanced with the reality on
the ground.
Councilmember Petso referred to the in-lieu-of fee for mitigation, finding the BAS report more or less
says that doesn’t work and provides a lot of examples where it has failed. She asked why that would be
started in Edmonds. Mr. Lien disagreed the BAS report said that; what fails with regarding to mitigation
is requiring mitigation on sites that are not appropriate for mitigation. The fee in lieu of would allow off
site mitigation. Washington State Department of Ecology established wetland banking for offsite
mitigation, basically a fee in lieu of program, State sponsored banks, where an enhanced wetland is
created and credits established and development at another location can buy credits for that bank.
Councilmember Petso asked if any the methods allowed mitigation to occur outside the City. Mr. Lien
said no, offsite mitigation should occur within same drainage basin. In the example of wetland banks, it
could occur outside the City but the likelihood of that happening was slim because wetland banks are
usually set up within a certain basin. Edmonds was not likely to be in the service area of one of the larger
banks.
Councilmember Petso referred to Table XXI regarding proposed new buffer widths where the buffer is
based on the category and width is added based on habitat values. She asked why some pages were not
included in the ordinance. Mr. Lien clarified she was referring to the Guidance for Small Jurisdictions
which was not included in the Council packet. Table XXI lists a number of wetland types; Category 1
wetlands include bogs, natural heritage wetland, forested wetland, none of which exist in Edmonds. The
only Category 1 wetland identified in the 2004 BAS is the Edmonds Marsh which is an estuarine wetland.
Councilmember Petso said it appeared it may apply to the marsh. Mr. Lien agreed that was the only
Category 1 that applied to Edmonds and it could be added. Councilmember Petso observed the buffer is
150 feet which is significant different if that section is not included.
Councilmember Petso referred to incentives for critical area restoration and asked whether other cities
have done that successfully. Mr. Lien answered not that he was aware of. He based that on the SMA
provisions and not wanting to discourage a restoration project. He clarified that is not for mitigation
projects required for development but rather something that is being because someone wants to do a
restoration project. Councilmember Petso expressed concern it may not be written as tightly as it should;
for example it appeared if she agreed to expand a wetland near her property by one inch, she
automatically got a 75% reduced buffer which did not seem to match the intent. Mr. Lien offered to
research.
Councilmember Nelson referred to page 5 of the Gap Analysis Matrix, 23.40.220 Allowed Activities and
removal of invasive species, where it is proposed to add, “the application of herbicides, pesticides…or
other hazardous substances, if necessary…” He asked the rationale for adding that. Mr. Booy answered
per WDFW, Ecology, and King County guidelines for controlling invasive species, some are noxious and
persistent enough that chemical treatment is the recommended and preferred strategy such as Japanese
Packet Page 542 of 564
Edmonds City Council Approved Minutes
September 8, 2015
Page 17
Knotweed, Canary Grass, and Himalayan Blackberry. There are very tight guidelines regarding how
herbicides are applied to complete maintenance activities such as ensuring the herbicides are safe within
an aquatic environment. Councilmember Nelson asked whether the invasive species is more harmful than
the herbicide. Mr. Booy answered there is a balance; looking at the long term health of the system, if the
invasive species can be replaced with a native, forested community a lot more habitat value is provided.
Focused on habitat functions of the system, there is a reasonable expectation that there would be long
term good as long as the invasive species removal activities are consistent with available guidance.
Councilmember Nelson referred to page 24 of the Gap Analysis Matrix where the bald eagle is removed
because it has been delisted from the Endangered Species Act. He noted one of the things that nearly
wiped out bald eagles was pesticides. There is no reference to state and federal regulations that require
conferring with WDFW if development is done within 660 feet of a nest. Mr. Lien explained in the
existing code the bald eagle section 23.90.040 was specifically related to endangered, threatened and
sensitive species; the bald eagle no longer falls into that category. The regulations no longer apply since
the bald eagle was delisted.
Councilmember Nelson referred to the WDFW website which stated although the bald eagle is no longer
listed as state threatened specifies, it is still remains classified by WDFW as a state sensitive species and
because they are still vulnerable and may continue to decline, cities and counties may continue to protect
eagles under local critical area rules pursuant to the GMA. Mr. Lien agreed the City had that option.
There used to be 3-4 nests in Edmonds; in the past when development was proposed within that area,
developers were referred to the State for regulation. Since the bald eagle was delisted, this section of the
code has not been applied. Mr. Booy offered to research, noting in projects outside of Edmonds they have
looked at eagle nests through the WDFW requirements for certain kinds of activities such as pile driving.
Mayor Earling suggested Councilmembers refer any substantive questions to Mr. Lien prior to the next
work session.
Councilmember Mesaros suggested Council be provided the Washington State Noxious Weed Control
Board’s list of noxious weeds. He asked if there were other lists of noxious weeds. Mr. Lien explained the
noxious weed list the City uses is the Snohomish County Noxious Weed Board’s list because the State
Noxious Weed Board delegates to the County.
With regard to the bald eagle, Councilmember Mesaros suggested the code refer to the State regulations.
Mr. Lien encouraged Councilmembers to contact him with any specific issues they want addressed at the
September 22 meeting. He will provide additional information regarding bald eagles and restoration
projects. Council President Fraley-Monillas encouraged Councilmembers to refer questions to Mr. Lien as
only 60 minutes is scheduled for this item on September 22.
F. PRESENTATION OF AN AGREEMENT WITH QUIET ZONE TECHNOLOGIES FOR
THE WAYSIDE HORN PROJECT
Public Works Director Phil Williams explained the City solicited Requests for Qualifications/Proposals
and received three responses. A selection committee reviewed the responses and recommends Quiet Zone
Technologies as the preferred vendor. This is a professional services agreement as well as a design/build.
QZT will do the design of a trackside warming system at Dayton and Main Streets, a highly directional
sound generator that mimic railroad horns but in a small footprint that does not spread to the community
and reduces the footprint of the noise. It will be a welcome addition to Edmonds for anyone who lives or
recreates near the railroad tracks. The agreement for approximately $208,000 includes a management
reserve which can only be used by the vendor if specific tasks are authorized by the City. QZT’s portion
of the contract is approximately $189,000 split between the design and construction phases. The 2015
Packet Page 543 of 564
Edmonds City Council Approved Minutes
September 22, 2015
Page 16
Councilmember Bloom observed the cost of the Sunset Avenue Walkway had increased from $1.9
million to $2.35. Mr. Williams answered until the scope of the project is known, the cost is unknown. A
number was developed quite a long time ago associated with a full size Sunset Avenue Walkway that
included a raised, decorative pathway all along the west side of the street. The project will likely look
different than original scope, be less expensive and robust with fewer improvements and concentrated on
the two ends. He did not see the cost estimate being particularly relevant but it could be reduced if the
Council wished. Councilmember Bloom asked if the goal was to have that decision made before the
Council votes on the CIP/CFP. Mr. Williams answered the cost estimate would not be changed unless the
Council requested. The exact scope of the project will not be completed by the time the CIP/CFP is
adopted.
Mayor Earling declared a brief recess.
E. CONTINUED REVIEW OF CRITICAL AREA REGULATIONS UPDATE
Senior Planner Kernen Lien explained this is the second in-depth review with the Council of the Critical
Area Ordinance (CAO) update. As he did not receive any questions from Councilmembers as a result of
the first review, he will highlight a few items in the update. He described critical area restoration projects:
New Section ECDC 23.40.215
Provide relief from standard critical area buffer for restoration projects that is not required as
mitigation for a development proposal
Restoration Project involves:
o The day-lighting of a stream, or
o Creation or expansion of a wetland that would cause a landward expansion of the wetland
and/or wetland buffer
In response to a Council comment at the previous meeting, whether the restoration provisions were tight
enough and whether a 1-inch expansion of a wetland would allow a substantially reduced buffer, the
restoration project relief was amended slightly:
Expanded buffer: that portion of the stream or wetland buffer that extended landward as a result
of the restoration project (not associated with a development proposal)
May apply a buffer that is not less than 75% of the expanded buffer
Request a buffer between 50% and 75% of expanded buffer if:
o 75% buffer would significantly limit use of the property
o Minimum necessary to achieve restoration project
o There will be a net environmental benefit
o Granting relief is consistent with the purposes of the critical area regulations
Mr. Lien provided a drawing of an example of an existing wetland with a 50 buffer, expanded buffer and
a 75% relief buffer. He reviewed changes made in response to a comment at the September 8 presentation
that the estuarine wetland buffer was missing from the wetland buffer categories:
Added Category I – Estuarine Wetland Buffers to ECDC 23.50.040.F
Modified Category III wetland buffers to be consistent with the Guidance for Small Jurisdictions
He reviewed changes made in response to a comment at the September 8 presentation regarding Bald
Eagle habitat:
Existing provisions under Endangered, Threaten, and Sensitive Species
o References WAC 232-12-292
o Only applies when threatened or endangered in Washington State
Added new section ECDC 23.90.040.E referencing Federal Bald and Golden Eagle Protection
Act
Packet Page 544 of 564
Edmonds City Council Approved Minutes
September 22, 2015
Page 17
Mr. Lien highlighted changes related to critical area report and determinations:
Critical area reports and determinations valid for 5 years
Critical area determination after 5-years
o New determination, or
o New assessment verifying previous determination
Critical area report after 5-years
o Determine if revision or additional assessment necessary
He highlighted changes to allowed activities and exemptions:
ECDC 23.40.220.C.7 – Select Vegetation Removal
ECDC 23.40.230.C.2 – Operation and Maintenance includes normal maintenance of vegetation
performed in accordance with best management practices
o Would allow removal of alder seedlings
“Normal maintenance of vegetation” means removal of shrubs/non-woody vegetation and trees
(less than 3-inch diameter at breast height) that occurs at least every other year. Maintenance also
may include tree topping that has been previously approved by the City in the past 5 years.
He highlighted new provisions related to penalties for critical area violations – ECDC 23.40.240.E:
Currently references tree cutting penalties in ECDC 18.45
Maintain reference to tree cutting penalties, and
$3 per square foot penalty of impacted critical area and critical area buffer
He reviewed next steps:
Comments from state and tribal agencies (Commerce, Ecology, WDFW)
October 6: City Council Public Hearing
Consideration for Adoption
Councilmember Petso asked if the City has to follow Best Available Science (BAS) in developing the
CAO or does BAS only have to have been considered. Mr. Lien answered generally BAS has to be
followed; jurisdictions can deviate from BAS if there is a documented reason to do so. For example, the
City deviated with regard to the restoration project, allowing a buffer reduction to 50%; that is not really
supported by BAS but it provides a net benefit to critical areas. Other things that may be a slight deviation
from BAS include physically separated and functionally isolated; that has not been studied and there is no
peer review report but because Edmonds was developed prior to adoption of critical area and
environmental regulations, the intent is to provide a net benefit to critical areas. Mr. Taraday said in
looking at this in the context of the Shoreline Management Act (SMA) and Shoreline Management
Program (SMP), BAS is a factor but not the only factor jurisdictions are allowed to consider. He offered
to provide a more detailed explanation in the future.
Councilmember Petso referred to development within the previously developed footprint, noting that also
may not be entirely consistent with BAS. She suggested gravel be deleted from the definition of
previously developed footprint. She questioned why gravel and a structure would be treated the same; she
acknowledged a 5-story structure represented previously developed but gravel will revegetate. Mr. Lien
answered the interim ordinance regarding previously developed footprint defined developed footprint as
all impervious surface areas which included gravel. He displayed an aerial of stream between two house
and photograph of the stream adjacent to a gravel parking area. By the definition, that is a previously
developed area. If a garage was added to that area, it would not be adding new impervious surface and by
allowing some development in exchange of the buffer achieves a net benefit to critical areas instead of no
change to the buffer if no development is allowed. Gravel is listed because it is an impervious area and
the addition of a building would not increase the impervious surface area.
Packet Page 545 of 564
Edmonds City Council Approved Minutes
September 22, 2015
Page 18
Councilmember Petso commented she has never had impervious gravel; the gravel she has experienced is
pervious to water, vegetation, etc. Mr. Lien said gravel is defined as an impervious surface in the State
stormwater regulations. Councilmember Petso asked whether the Council could change the definition of
previously developed area to be only structures. Mr. Lien answered the definition of previously developed
area could be changed; the existing definition includes gravel, blacktop, structures, and several other
things.
Councilmember Petso recalled discussion at the September 8th meeting about buffer reduction and buffer
averaging; it was her understanding averaging was a better way to protect critical area buffers. Mr. Lien
responded both buffer averaging and buffer reduction are allowed but buffer averaging is preferred. A
change was made in the draft code related to the amount of buffer averaging and buffer reduction that
could occur. In the existing code the buffer can be reduced or averaged up to 50% and a buffer width
reduction and buffer averaging could be combined on the same project. The draft code does not allow the
buffer to be reduced or averaged not more than 75% and averaging and reduction cannot be combined.
Councilmember Petso agreed that was a change for better but asked why buffer reduction would be
allowed at all when buffer averaging was a better tool. Mr. Lien responded it is another tool in the
toolbox. Jim Keeney, ESA, explained depending on land used on adjacent properties, buffer averaging
may not be an option; therefore, a secondary choice would be buffer reduction. Buffer reduction provides
some flexibility without overly restricting potential land uses on a property being redeveloped.
Councilmember Bloom commented the imperviousness of gravel depends on how deep it is. She agreed
with Councilmember Petso’s suggestion to eliminate gravel as an impervious surface. She commented the
stormwater regulations may consider a different depth. Mr. Lien provided the definition of footprint of
development, the area of a site that contains legally established buildings, concrete, asphalt, or gravel
paved roads, parking lots, storage areas or other paved areas, driveways, walkways, outdoor swimming
pools and patios. He offered to confer with Stormwater Engineer Jerry Shuster to determine how that
definition could be tweaked. He pointed out a gravel paved road as well as a graveled parking area that
was driven on a great deal and was packed down were impervious. A walkway with two inches of pea
gravel may not be impervious.
Councilmember Bloom referred to the reasonable use definition that states “while also allowing for
reasonable use of private property.” She asked whether that meant private property and did not include
public property such as the Port, Woodway Fields, School District, City owned property, etc. Mr. Lien
provided the definition of reasonable economic uses, “the minimum use to which a property owner is
entitled under applicable state and federal constitutional provisions in order to avoid taking and/or
violations of substantive due process.” The definition was amended a few years ago to omit reference to a
single family residence. Mr. Taraday said that raises the question whether a governmental entity could sue
the City for a taking. He suspected governments that hold property in a propriety capacity likely have
property rights and if violated could lead to a constitutional violation. For example if General Motors is a
person for constitutional purposes, a municipal corporation could also be a person and therefore entitled
to constitutional rights. If that was an important issue to the Council, further research could be done. Mr.
Lien referenced the critical area section, advising A.1 addresses critical area variances for public agencies
and A.2 addresses variances for private properties.
Councilmember Bloom reiterated the definition refers to private property. Mr. Lien again referenced the
definition of reasonable economic use on page 32 of definitions. Councilmember Bloom said she read a
statement somewhere, possibly in the introductory statement that included “while also allowing for
reasonable use of private property.” Mr. Taraday said in the vast majority of instances the City would be
dealing with private property.
Packet Page 546 of 564
Edmonds City Council Approved Minutes
September 22, 2015
Page 19
Council President Fraley-Monillas referred to the proposed $3 per square foot penalty for activities like
filling a wetland. She asked if there was also a requirement to rehab what was done. Mr. Lien answered
the violation would have to be rectified in addition to paying a penalty. Council President Fraley-Monillas
calculated filling a 2,000 square foot wetland would only result in a $6,000 penalty. Mr. Lien said fill was
used as an example but mowing down vegetation in a wetland would be another example. Council
President Fraley-Monillas asked how $3/foot was determined. Mr. Lien said that is the cost of a simple
planting plan for wetland mitigation. Council President Fraley-Monillas did not view that as enough for
destroying a critical area. Mr. Lien said he compared it to the current tree cutting violation where a
violator can be fined up to $9,000 for removing one tree in a critical area. Council President Fraley-
Monillas asked if anyone had been ever been fined $9,000 for the removal of one tree. Mr. Lien answered
yes, the last tree cutting violation was appealed to the Hearing Examiner and the $23,000 fine was upheld.
Another appeal of a $45,000 fine for the removal of multiple trees is coming up. He explained he was
comparing the fine to the current tree cutting violations since that was what this section referenced. There
could be a critical area violation without removal of a tree but since the section refers to the tree cutting
fines, this fine would be comparable. Council President Fraley-Monillas suggested separating a tree
cutting fine from a wetland violation.
Councilmember Buckshnis commented the CAO reads very well. She referred to standard buffers,
wetland categories and scoring of habitat and asked how the habitat score was determined. Mr. Lien
explained the scores come from a wetland delineation which is a change in the science in the last ten
years. When a wetland scientist delineates a wetland, a number of scores are calculated to categorize the
wetland. One of those scores, largely on which buffer widths are based, is related to habitat; higher habitat
scores require wider buffers. Councilmember Buckshnis referred to Category 1 Estuary such as the
Edmonds Marsh which requires 150 feet. She asked if that was 150 feet from the ordinary high water
mark (OHWM) like the SMP. Mr. Lien answered it is from the edge of the wetland which is same as the
OHWM in the SMP.
Councilmember Buckshnis referred to the differentiation between setbacks and buffers in 23.80.070 and
the addition of a buffer requirement. She recalled in the SMP some citizens took issue with including the
buffer in the setback. Mr. Lien answered it a little different in the critical area regulations. He referenced
building setbacks in 23.40.280. In the existing code the buffer is the area adjacent to the wetland, stream,
or slope and there is an additional 15-foot building setback. The change in the draft COA is related to
geologically hazardous area; the buffer or setback for geologically hazardous area is determined by a
geotechnical report.
Councilmember Buckshnis referred to the section regarding mitigation ratios and the table of wetland
categories and ratios for rehabilitation only and enhancement only (packet page 53 of 90). Mr. Lien
explained this came from Department of Ecology’s Guidance for Small Jurisdictions. Mr. Keeney
explained the general concept is it is harder to create a new wetland than to rehabilitate an existing
wetland. The intent is to encourage the use of natural systems rather than to make new ones. Ecology
reviewed the scientific literature to develop these ratios; the primary driver of that science was Dr. Tom
Ruby, Department of Ecology, who has experience in wetland modeling. Mr. Kenney summarized the
table is basically Ecology’s assimilation of all the science and making it applicable to land planning
processes. Councilmember Buckshnis relayed her understanding of his explanation was Ecology would
rather have a wetland enhanced than recreated. Mr. Keeney explained a lot more must be done to get the
same credit for creation or reestablishment.
Councilmember Nelson expressed appreciation for the updated information regarding Bald Eagles. He
referred to definitions and the experience/qualifications for geologist, geotechnical engineer and qualified
critical area consultant, observing a geologist is no longer required to have a license and the experience
Packet Page 547 of 564
Edmonds City Council Approved Minutes
September 22, 2015
Page 20
requirement was removed. Mr. Lien said that information was relocated in the code. He offered to email it
to Councilmember Nelson.
Councilmember Johnson recommended when a penalty is assessed, restoration or rehabilitation also be
required. Mr. Lien referred to 23.40.240 Unauthorized critical areas alterations and enforcement;
paragraph B addresses requirement for a restoration plan.
COUNCIL PRESIDENT FRALEY-MONILLAS MOVED, SECONDED BY COUNCILMEMBER
BUCKSHNIS SECONDED, TO EXTEND TO 10:10 P.M. MOTION CARRIED UNANIMOUSLY.
Councilmember Bloom recalled the presentation identified tree topping as maintenance and if approval
had been given in the past, approval would be given to top trees. She asked if there were any criteria for
restricting or prohibiting tree topping. Mr. Lien explained tree topping is considered tree cutting; topping
is generally frowned upon by arborists. A tree cutting permit is required to top a tree. A lot of trees in the
City have been topped in the past. Once a tree is topped and grows out, the branches are not as strong and
do not grow as well and it needs to be maintained which is why that provision is included. He clarified it
did not refer to new topping but maintaining trees that had already been topped in a safe manner.
Councilmember Bloom asked if there was clarity in the code that tree topping was not allowed unless it
was approved in the past. Mr. Lien read the definition of alteration, “Alteration” means any human-
induced action which changes the existing condition of a critical area or its buffer. Alterations include, but
are not limited to: grading; filling; dredging; draining; channelizing; cutting, pruning, limbing or topping,
clearing, relocating or removing vegetation; applying herbicides or pesticides or any hazardous or toxic
substance; discharging pollutants; paving, construction, application of gravel; modifying for surface water
management purposes; or any other human activity that changes the existing landforms, vegetation,
hydrology, wildlife or wildlife habitat value of critical areas.” Councilmember Bloom relayed her
understanding that the way the City finds out that any of that has occurred is via code enforcement. Mr.
Lien answered generally yes.
Councilmember Bloom referred to small hydrologically isolated wetland (packet page 50 of 90) where the
size was changed from 500 to 1,000. She asked whether the size of the smallest critical area had been
increased to 1,000 from 500 square feet. Mr. Lien said most of the language is from the Guidance for
Small Jurisdictions but was tweaked slightly so that a small hydrologically isolated wetland was no longer
an exempt wetland but a specific category of wetland. Hydrologically isolated means it is not connected
to a stream or other wetland complex. This section only applied to Category III and IV wetlands that have
a low habitat score. He summarized these wetlands are not exempt but are exempt from a few of the
provisions such as they do not necessarily have to have buffers, mitigation sequencing must occur before
a wetland can be impacted but a mitigation plan must be developed to replace lost wetland functions and
values. For example if a small wetland was filled, an onsite rain garden could be established to replace it.
He clarified 500 square feet was in the existing code and 1,000 is from Ecology’s Guidance for Small
Jurisdictions.
Councilmember Bloom asked for an explanation of the in lieu fee program. Mr. Lien responded that was
related to mitigation, a small site that impacted a wetland but there was no opportunity to mitigate on site.
The in lieu fee program allows a property owner to put money toward wetland mitigation in another
location. Councilmember Bloom asked if that wetland would be within the City. Mr. Lien answered
typically it is desirable to have mitigation occur within the same drainage basin. The one instance where it
may occur outside the City is via a certified wetland bank which has defined service areas. He did not
envision Edmonds being within the service area of a certified wetland mitigation bank due to short
drainages that go directly to Puget Sound.
Packet Page 548 of 564
Edmonds City Council Approved Minutes
September 22, 2015
Page 21
Councilmember Bloom referred to discretion of the director as well as the term shall which appear a lot in
the CAO. She was puzzled by the numerous opportunities for the discretion of the director when there
were so many statements of shall. She asked how that was resolved. Mr. Lien said often someone in City
must make a call; the director is the highest ranking person. There are definitions in the code where shall
means imperative. Not everything in the critical area is imperative; when there is a judgment call, the
director makes that decision.
Councilmember Bloom referred to the definition of director which means the City of Edmonds
Development Services Director or his/her designee. She suggested tweaking the language to ensure it was
the director’s responsibility rather than someone the director designates. Mr. Lien explained ultimate
authority falls to the director. How it works, there are four planners in the City, they do not go to the
director to interpret every sentence in the code. Questions about the code or how the code is applied are
brought to the director. Councilmember Bloom suggested the definition of director be the Development
Services Director and delete designee. Development Services Shane Hope said the term “or designee” is
used because it means the director makes the decision unless he/she designates someone else in his/her
absence. The term director means the highest person responsible. Councilmember Bloom commented
these decisions do not have to be made immediately so she felt any important decisions up to the
discretion of director should be reviewed by director. She requested eliminating “his/her designee.”
Mayor Earling suggested Councilmembers forward any additional questions to Mr. Lien.
Mr. Lien advised he will provide highlights and respond to any additional Council questions at the
October 6 public hearing
8. MAYOR'S COMMENTS
Mayor Earling reported on the AWC legislative meeting he attended yesterday. The focus of the
legislative session will be education, education, education. Elections are upcoming in 2016 for some of
the Senate and all of the House so the legislative session will only be 60 days.
9. COUNCIL COMMENTS
Councilmember Nelson announced the Diversity Commission is seeking applicants; the deadline for
applications is September 30.
Council President Fraley-Monillas reminded the public to get a flu shot. The vaccine is a better strain this
year and it is important to get vaccinated early.
10. CONVENE IN EXECUTIVE SESSION REGARDING PENDING OR POTENTIAL LITIGATION
PER RCW 42.30.110(1)(i)
This item was not needed.
11. RECONVENE IN OPEN SESSION. POTENTIAL ACTION AS A RESULT OF MEETING IN
EXECUTIVE SESSION
Packet Page 549 of 564
Edmonds City Council Approved Minutes
October 6, 2015
Page 4
Shannon Roeder, Edmonds, spoke regarding Seaview Woods. She was pleased the Council was
reviewing the critical area regulations. She has lived in Edmonds for 29 years at this same location and
has seen a lot of improvement and things left as they are to help citizens enjoy the Edmonds way of life.
She loves the birds, trees and wetlands. She and her son have hiked Seaview Woods and nearby areas for
many years; her son’s Eagle Scout project was a trail improvement in the wood s. Mayor Pro Tem Fraley-
Monillas interrupted and suggested she make her comments during the public hearing.
Councilmember Bloom asked Mr. Taraday to address Mr. Hertrich’s comments regarding the ILA. Mr.
Taraday responded he has not been interacting directly with the superintendent but has been working with
their lawyer. He acknowledged it was conceivable the District was playing games with the City. He sent
the District a draft and is awaiting a draft back from the District. He has not reached any conclusion about
what that means.
Councilmember Bloom asked whether there was a deadline, noting there the funds related to the fields
may need to be reallocated and an alternate location found for the community garden. Her impression
from Mr. Hertrich’s comments is that the District is not involved in negotiations. Mr. Taraday said that is
news to him; the District’s attorney has not informed him they are not sending the City a draft or that the
deal is done, he is still expecting to see a draft.
Councilmember Bloom said from her perspective as a Councilmember, she would like to know where the
ILA stands and to know soon so the Council can make decisions about the funds that have been allocated.
Mayor Pro Tem Fraley-Monillas suggested have further discussion under Council Comments.
7. PUBLIC HEARING
A. PUBLIC HEARING ON PROPOSED AMENDMENTS TO THE CITY OF EDMONDS
CRITICAL AREA REGULATIONS CONTAINED IN CHAPTERS 23.40 - 23.90 OF THE
EDMONDS COMMUNITY DEVELOPMENT CODE (ECDC) AND ASSOCIATED CODE
AMENDMENTS RELATED TO FREQUENTLY FLOODED AREAS IN CHAPTER 19.00
ECDC AND CHAPTER 21 ECDC
Senior Planner Kernen Lien reviewed the background and purpose:
GMA (1990) requires identification, designation, and protection of critical areas
Purpose of the CAO (CAO) is to protect:
o Natural environment
o Public health and safety
o Once lost, function and value of critical areas very difficult to restore.
Existing CAO –established from comprehensive update in 2004 and 2005
He described what critical areas are:
Frequently flooded areas
Geologically hazardous areas
o Landslide, erosion, seismic hazards)
Fish and wildlife habitat conservation areas (FWHCAs)
o Streams
o Habitat for listed and sensitive fish and wildlife species
o Lakes 20 acres
Wetlands
Aquifer recharge areas (none in Edmonds)
Packet Page 550 of 564
Edmonds City Council Approved Minutes
October 6, 2015
Page 5
He reviewed the CAO update process
GMA requires cities to update CAOs on the same 8-year Comprehensive Plan update timeline
Consideration of Best Available Science (BAS)
Revise Code
o Five Planning Board meetings including July 8 public hearing and July 22 recommendation
o City Council review
Adoption of revised code
He described consideration of BAS in the critical area update:
RCW 36.70A.172 “…cities shall include the best available science in developing policies and
development regulations to protect functions of values of critical areas.”
Other factors may be considered
WAC 365-195-915 criteria for including and departing from BAS
Mr. Lien reviewed significant updates:
Geologically Hazardous Areas
o Update requirements for geotechnical reports
o Update how buffers are determined
o Slight changes in how geologically hazardous area are defined
Wetlands
o Bring wetland regulations consistent with Ecology’s Guidelines for Small Jurisdictions
Native vegetation in RS-12 and RS-20 zones
o Provide more definition to the type of habitat to maintain
o Current regulations have similarities to a King County ordnance that was struck down
Physically separated/functionally isolated buffers
o Added definition
Development within existing footprint
o Added provisions
Restoration project relief
o New provision modeled after a SMA provision
Frequently flooded areas
o Regulated in building code, require structures in the coastal flood hazard area to be
constructed 2 feet above base flood elevation. Change definition of height so that zoning
height would be measured from the elevation that is 2 feet above the base flood elevation in
the coastal flood hazard area.
In response to a question raised at the last meeting regarding whether gravel is considered a developed
footprint, Mr. Lien explained Stormwater Engineering Program Manager Jerry Shuster indicated
stormwater regulations consider compacted gravel impervious surface. He provided a slightly amended
definition of Footprint of Development: “Footprint of Existing Development” or “footprint of
development” means the area of the site that contains legally established: building; roads, driveways,
parking lots, storage areas, walkways or other areas paved with concrete, asphalt or compacted gravel;
outdoor swimming pools; and patios.”
Mr. Lien recalled a suggestion was made at the last Council meeting to reconsider the penalties section
ECDC 23.40.240.E:
Currently reference tree cutting penalties in ECDC 18.45
Maintain reference to tree cutting penalties, and
As a violation could occur that did not include cutting a tree, “up to” $3 per square foot penalty of
impacted critical area and critical area buffer was added
Packet Page 551 of 564
Edmonds City Council Approved Minutes
October 6, 2015
Page 6
Mr. Lien explained most of Ecology’s draft comments have been incorporated into the critical area
regulations. Recommendations he did not include are related to:
Buffer reduction – ECDC 23.50.040.G.4
o Currently allow buffer reduction and buffer averaging up t o50% of standard buffer and can
do both
o Change proposed to no longer allow both, only allow one or the other
o Buffer averaging is preferable to buffer reduction
o Buffer averaging is within the Ecology’s Guidelines for Small Jurisdictions
o Both buffer averaging and buffer reduction, the buffer cannot be reduced to more than 75%
of the standard buffer
Mr. Lien explained the reason he did not make the change in response to Ecology’s comments is
information in BAS states buffer reduction is consistent with BAS. He read from page 6 of the current
BAS report: “Granger et al. (2005) notes that for some situations where the buffer is composed of non-
native vegetation, and therefore providing limited functions and values, simply applying a fixed width
buffer may fail to provide the necessary characteristics to protect a wetland’s functions. In these cases, it
can be better to restore the buffer through enhancement activities.” He explained Granger et al. is a
Wetlands in Washington State Guidance for Protecting and Managing Wetlands, Department of
Ecology’s main guidance on BAS for wetlands. In a developed community like Edmonds where there are
yards and landscaping up to these areas, simply requiring a flat buffer does not really improve the critical
area. One of the goals in developing the regulations was to obtain improvement of some critical areas. He
summarized this was consistent with BAS per Ecology’s guidance.
Another change that was not made is related to:
Critical area restoration projects
o Do not want to discourage projects that provide a net benefit.
o New Section ECDC 23.40.215
o Provide relief from standard critical area buffer for restoration projects that is not required as
mitigation for a development proposal
o Restoration project involves:
The daylight of a stream, or
Creation or expansion of a wetland that would cause a landward expansion of the wetland
and/or wetland buffer
o Restoration project relief
Expanded buffer: that portion of the stream or wetland buffer that extended landward as a
result of the restoration project
May apply a buffer that is not less than75% of the expanded buffer
Request a buffer between 50% and 7% of expanded buffer if:
- 75% buffer would significantly limit use of the property
- Minimum necessary to achieve restoration project
- There will be a net environmental benefit
- Granting relief is consistent with the purposes of the critical area regulations
Mr. Lien displayed a slide illustrating a wetland restoration project, identifying the existing wetland and
the standard 50-foot buffer. A restoration project that expands the wetland landward would result in an
equivalent expansion of the standard buffer. The relief provision allows the expanded buffer to
automatically get the 75% relief for the expanded buffer and could potentially ask for a 50% relief of the
expanded buffer. The intent is not to discourage restoration projects.
Packet Page 552 of 564
Edmonds City Council Approved Minutes
October 6, 2015
Page 7
Mr. Lien recommended Council direct staff to develop an ordinance adopting the proposed amendments
to the critical area regulations as contained in Exhibits 1 and 2.
Councilmember Buckshnis inquired about the timeframe for approval, noting she was not ready to take
action tonight. Mr. Lien said July was the statutory deadline for all the updates but it needs to be approved
this year for sure.
Councilmember Buckshnis relayed the Council has been receiving emails with no content other than
stating the person wants to be a party of record. She asked why a person would want to be party of record
but not make any comment regarding the critical area regulations. City Attorney Jeff Taraday answered
this is a legislative process, not quasi-judicial process where there are parties of record. He was uncertain
the City’s code defines party of record in the context of a legislative process. He was unclear about the
motive behind those emails and requested Councilmember Buckshnis forward one to him.
Councilmember Buckshnis asked the date of the stormwater manual referenced in the critical area
regulations. Mr. Lien answered the 2005 manual.
Councilmember Bloom referred to Mr. Lien’s statement that he did not include all Ecology’s
recommendations and that that decision was supported by BAS. She referred to Ecology’s statement
regarding buffer width reduction through enhancement, “Reducing wet land buffers to 75% of their
standard buffer width and expecting enhancement to maintain the effectiveness of the buffer is not
supported by BAS.” She asked why Mr. Lien recommended something that Ecology is clearly stating is
not supported by BAS. Mr. Lien said what he read was from Wetlands in Washington State Volume 2,
Guidance for Protecting and Managing Wetlands, which is the guidance from Ecology. He noted BAS is
largely conducted in rural areas where buffers already exist. Not a lot, if any, BAS reports address buffers
in an urban environment where buffers are largely degraded. The previous BAS also addressed this, “In
assessing the potential effectiveness of Edmonds updated wetland buffer widths and comparing them to
mandates of BAS, it is important to remember that much of the literature on wetland buffer width as cited
above was developed from studies in rural areas, forested regions, and generally more pristine natural
environments. As mentioned above, areas within the jurisdiction of Edmonds cannot be expected to
provide habitat for species requiring large contiguous areas of forest habitat.” He summarized
consideration has to be given to the science, where it was done and the environment where it is
implemented. What is included in the critical area regulations is consistent with Ecology’s guidance and
BAS document in the City’s BAS report.
Councilmember Bloom said she did not understand the majority of what Mr. Lien said because he knows
more about it than she does. She reiterated her concern with Ecology’s statement regarding buffer width
reduction through enhancement. Ecology also states in their comments, “Although we support voluntary
restoration of habitat, the buffers should be wide enough to protect the wetland’s necessary functions. She
said Mr. Lien was making an interpretation based on BAS but Ecology is saying the City’s regulations are
not meeting it. Mr. Lien disagreed he was making an interpretation, he was reading from Ecology’s
guidance. Councilmember Bloom referred to the language Mr. Lien read that includes “for some
situations.” Mr. Lien said “some situations” refer to urban environments like Edmonds where there are
landscaped lawns right to the edge of streams and wetlands in many cases. He said just requiring a buffer
of a certain distance without enhancement will not improve the critical area. In some situations like
Edmonds, it makes more sense to enhance the buffer area to improve the buffer and critical area rather
than requiring a standard buffer. He said Ecology’s comments are draft comments; he has talked to
Ecology and did not know if the City will receive any official comments. He will point out to Ecology the
section that he referred to with regard to buffer reduction.
Packet Page 553 of 564
Edmonds City Council Approved Minutes
October 6, 2015
Page 8
Councilmember Petso cited from the Granger et al. document, paragraph 8.3.8.5 that appears to say while
it is true a fixed buffer width is not always good enough, if a properly vegetated buffer cannot be
provided, a larger buffer, not a smaller buffer, is necessary. She offered to send that language to Mr. Lien
and Council. She offered to speak with Mr. Lien directly or discuss this further at a future meeting. Mr.
Lien answered there are provisions in the CAO regarding expansion of buffers in that situation. He
referred to page 41, Section F.1.c, “The standard buffer widths presume the existence of a relatively intact
native vegetation community in the buffer zone adequate to protect the wetland functions and values at
the time of the proposed activity. If the buffer is composed of nonnative vegetation, lawn, or bare ground,
then, at the discretion of the director, the buffer width may be increased or an applicant may be required
to either develop and implement a wetland buffer enhancement plan to maintain the standard width or
widen the standard width to ensure that adequate functions of the buffer are provided.” He noted there are
situations where it makes sense to allow flexibility in the urban environment. Councilmember Petso asked
where that is stated in the Granger et al. document.
Mayor Pro Tem Fraley-Monillas asked when the 2005 stormwater regulations will be updated. Public
Works Director Phil Williams answered the City is in the process of updating the existing regulations as
part of the overall code update. There will be a separate section regarding stormwater and all cross
references corrected in the existing code. Ecology’s deadline for updating the stormwater regulations code
is the end of 2017; staff’s goal is to complete it by the end of 2016.
Mayor Pro Tem Fraley-Monillas assumed the new stormwater regulations will impact the CAO. Mr.
Williams answered the stormwater regulations are generally related to development and could apply in a
critical area. The effort is to update the development code so that new buildings and qualifying remodels
will be brought up to new stormwater management code. Mr. Lien explained Mr. Shuster looked through
the critical area regulations update with an eye toward the stormwater update and a few amendments were
made so that it is consistent with the stormwater update particularly what is allowed in buffers. Mayor Pro
Tem Fraley-Monillas questioned how the critical area regulations could be updated to meet the
stormwater regulations if staff did not know what they will look like. Mr. Williams clarified staff does
know what the new stormwater regulations look like, the difficulty is integrating them into the code.
Simply adopting the most recent stormwater guidance would create enforcement issues within the
existing code; it needs to be done as one effort.
Mayor Pro Tem Fraley-Monillas asked whether staff was using the 2005 stormwater regulations to update
the code. Mr. Williams answered when a development proposal is submitted, it is reviewed against the
2005 regulations which are still relatively aggressive. There is a 2012 version and a recent tweak that
takes it to 2014. He said those were not major advancements but need to be captured in the City’s code.
Councilmember Nelson said he would also like more time to review the critical area regulations. He
referred to a statement in the agenda memo that more study is needed to fully develop standards for
retention and connection of Biodiversity Areas and Corridors. He asked what that would entail. Mr. Lien
answered there was reference in the Comprehensive Plan to developing an Urban Forest Management
Plan. That plan could include information related to Biodiversity Areas and Corridors such as where the
corridors exist, the forest canopy, goals, etc. The provisions in the critical area related to that are in the
RS-12 and RS-20 zones; those zones were established in large part due to the presence of critical areas,
primarily northern Edmonds. This update provides better definition to the type of habitat that is desired;
an Urban Forest Management Plan could include more definition regarding corridors, habitat, etc.
Councilmember Nelson asked the timeline for the Urban Forest Management Plan. Mr. Lien answered
there is a proposal for funding in the 2016 budget.
Councilmember Bloom asked what form the 2005 stormwater regulations were in. Mr. Williams
answered they are Ecology’s and the City tries to duplicate them but they are not currently in City code.
Packet Page 554 of 564
Edmonds City Council Approved Minutes
October 6, 2015
Page 9
Councilmember Bloom asked why it was necessary to include the 2012/2014 stormwater regulations in
the code. Mr. Williams answered there are specific stormwater regulations that are City regulations; the
intent is to make them consistent with the 2005 Ecology document. The City uses its own regulations to
evaluate development proposals. Working with the consultant, the stormwater-specific provisions of the
code are being rewritten to update it to the 2012 and 2014 regulations.
If the City was using the 2005 regulations that are not integrated into the code, Councilmember Bloom
asked why not just adopt the 2014 stormwater regulations and integrate them into the code over time. She
found that preferable in order to ensure critical areas are preserved and the code fully updated. Mr.
Williams answered the 2005 and 2014 regulations are not as different as one might think. The primary
difference is everything that happens upfront such as taking into account preservation of native
vegetation, minimize the amount of impervious surface, etc. Those issues need to be incorporated into the
development code as they may impact stormwater issues. He agreed the stormwater regulations need to be
updated but appropriate references to the development code are needed which is part of the current
update. He commented it may sound simplistic but it is not easy to do and takes a great deal of effort and
expense. Development Services Director Shane Hope said there may be more discussion regarding that
effort when staff provides an update on the development code update later this month. She summarized
stormwater regulations apply in critical areas.
Mayor Pro Tem Fraley-Monillas opened the public participation portion of the public hearing.
Gary Nelson, Edmonds, said he was encouraged by the type of questions the Council is asking regarding
changes in the CAO. He said many who submitted recommendations, including the Department of
Ecology, have lost track of the goals of the GMA. He encouraged Councilmembers to look at RCW
36.70A and 020. Four of his favorite aspects are:
1. Encourage development. As Edmonds is total within the Urban Growth Area, most of that will be
accomplished via infill which is becoming more and more difficult due to severe regulations on
property owners
2. Encourage affordability of housing
3. Protect private property rights of landowners from arbitrary and discriminatory actions
4. Applicants for state and local government permits will be processed in a timely and fair manner.
Mr. Nelson relayed the following with regard to the critical area regulations:
Concern with expanded reporting for anything done in critical area from three years to five years.
Most developments are sold within three years.
Support expanded buffer
Support exceptions regarding controlling water courses from intrusion by culverts or bridges
Concerned about $3/square foot penalties
Concern with property owner recording critical areas on their property
Concern with requiring extension of bond holding from 3-5 years
Roger Hertrich, Edmonds, commented this is a big code section and he agreed the Council should allow
more time for review. He expressed concern regarding what can and cannot be cut in a critical area. He
recalled a comment during Audience Comment at a previous meeting regarding including alders as a tree
that can be removed and that state regulations allow removal up to 4-inch diameter. Mr. Hertrich
displayed 3-inch and 4-inch sections of a tree and suggested if removal of a 3-inch tree was allowed, 4-
inch was not much bigger and suggested removal of up to 6-inch diameter should be allowed. He did not
find any scientific evidence regarding the size of trees that can be removed. He pointed out a lot of
properties in Edmonds are within critical areas but many have flat yards and only step edges. However,
the City will not let a property owner remove a tree without providing a great deal of scientific evidence
which he felt was arbitrary. He suggested the City needs to treat citizens fairly and not allow staff to make
a determination that a tree in a critical area cannot be removed if it is a safety concern.
Packet Page 555 of 564
Edmonds City Council Approved Minutes
October 6, 2015
Page 10
Shannon Roeder, Edmonds, said she and her son have hiked through Seaview Woods and the
surrounding area for many years and her son did a trail project in Seaview Woods for his Eagle Scout
project. She wanted to preserve the Edmonds way of life and to preserve trees. She was pleased the City
plans to develop an Urban Forest Management Plan which helps retain native plant species, animals and
birds in area. She urged the Council to consider the impact that critical area regulations regarding slopes
and wetlands have on the community as a whole. She was concerned Seaview Woods would be overrun
with development and wanted the footprint remain and not be developed much beyond what currently
exist due to limited infrastructure such as sidewalks in the area. She urged the Council to move forward to
preserve Edmonds.
Dave Tietzel, Edmonds, reported he learned from Keely O’Connell, Earth Corp, that fish live in Shell
Creek, Perrinville Creek and Willow Creek. He naively assumed streams were toxic wastelands, ecology
deserts due to pesticides and fertilizers. Ms. O’Connell informed him salmon return partway up Shell
Creek. The volunteers at the Shell Creek Hatchery informed him there is a healthy population of Bull
trout in Willow Creek. The City has the opportunity to protect those fish and resources and to enhance the
quality of water via the CAO to encourage a greater population of fish. He urged the Council to carefully
consider the critical area regulations and take steps to preserve the City’s waterways.
Susan Paine, Edmonds, relayed she drove past the Oso mudslide today and was stunned by the
devastation due to logging that occurred in those areas. She was pleased the Council wanted more time to
study critical area regulations. She recommended using the most up-to-date state regulations as critical
areas deserve the best science available. The City’s waterways are all very sensitive to development.
Councilmember Bloom read an email from Maggie Pinson, Edmonds, expressing concern the City
already has a poor track record of protecting valuable habitat areas, open space areas, natural meadows
and other areas included in the definition of critical areas. Edmonds is not going far enough to protect
beautiful, natural spaces and they are rapidly disappearing and future generations will not have the same
opportunities to enjoy nature and wetland. The City is not protecting fields, meadows, marshes, wildlife
corridors, and more from development. She questioned why the open space fields at the former Woodway
High School campus, surrounded by Fish and Wildlife habitat conservation areas and formerly surfaced
with grass and therefore providing an obvious recharging effect on the Deer Creek Aquifer, have not
received better protection from City code, City planners and City officials. Environmental conservation,
air, water and soil quality and human health are critically important conversations for all.
Councilmember Buckshnis said she had forwarded emails from Val Stewart and Susan Paine to the City
Clerk.
Mayor Pro Tem Fraley-Monillas closed the public participation portion of the public hearing.
Councilmember Petso said she received a number of emails today and asked if she should forward them
to staff to have them included in the record. If Councilmembers were contacted by citizens with concerns
about the CAO, Mr. Taraday recommended any correspondence be forwarded to Mr. Lien. The purpose
of the process is to hear concerns from the public so that the Council can direct staff to be responsive to
those concerns or staff can be responsive to the concerns if they deem appropriate.
It was the consensus of the Council that they wanted more time for review. Mr. Lien requested the
Council email him with any specific concerns for him to address at a future meeting. He offered make
another presentation at the October 27 work session.
8. AUGUST 2015 MONTHLY FINANCIAL REPORT
Packet Page 556 of 564
Edmonds City Council Approved Minutes
November 2, 2015
Page 8
A. CONTINUED REVIEW OF CRITICAL AREA REGULATIONS UPDATE
Senior Planner Kernen Lien commented this is the fourth meeting with the City Council to discuss the
Critical Areas Ordinance update. Tonight’s presentation will relate to Exhibit 3 and address development
flexibility for 1) reduced buffer, 2) physical separated and functionally isolated provisions, and 3)
restoration projects.
Aaron Booy, ESA, recalled Council concern with development flexibilities that were not entirely
consistent with Ecology guidance. The City received a comment review letter from Department of
Ecology that expressed some of the same concerns. Exhibit 3 provides rationale and Best Available
Science (BAS) associated with each of the development flexibilities.
He summarized BAS in the Critical Areas Ordinance (CAO) update:
BAS should be included
Use of “nonscientific information” is allowed, based on:
o Local conditions
o Economic consideration
o Social considerations
Rational and measures to minimize risk for development flexibilities should be documented
He explained the flexibility included in the proposed critical area regulations are not really departures
from BAS. Ecology highlighted and he agreed the development flexibilities are not fully consistent with
the exact language of Ecology guidance but there is good rationale for why they will be important for
ongoing protection of critical area within Edmonds. He displayed an aerial of existing Edmonds
conditions, identifying Shell Creek and Hindley Creek and a built out residential development pattern
where the streams run through residential neighborhoods. There is some minimal amount of riparian
vegetation along the streams but homes, yards and other associated structures are built up to the edge of
the streams or within 10-15 feet. There are also many examples where streams are culverted for roads and
road crossings as well as other areas of historical development.
He described physically separated and functionally isolated buffers:
Allowed activity under new Section, ECDC 23.40.220.C.4
Applicable to sites separated from a critical area by existing, legally established roads, trails and
structures 12 feet or more in width
May be determined to be both physically separated and functionally isolated, and not subject to
stream and wetland buffer provisions
The director may require a site assessment by a qualified professional to make the determination
He provided a photographic example of Shellabarger Creek running between two houses with little
functioning riparian corridor, rockeries on both sides of the stream, lawn on one side and gravel on the
other. He displayed an aerial view of the same area, highlighting two sample scenarios where the
physically separated and functionally isolated provision could be applied:
1. Addition fronting central house – not allowed (driveway less than 12 feet wide)
2. Addition on north house – potentially allowed (central house physically separates this area,
functional isolation would need to be documented)
Councilmember Johnson asked if this was an actual or theoretical example. Mr. Lien answered the
property owner in Example #2 came to the City to inquire about an addition but did not move forward
with it.
Mr. Booy continued his review of physically separated and functionally isolated buffers:
Relevant BAS
Packet Page 557 of 564
Edmonds City Council Approved Minutes
November 2, 2015
Page 9
o Buffer effectiveness influenced by many factors, with existing alterations degrading the
functional importance
o Where full physical separation / functional isolation occurs, the value of maintaining the
adjacent area is negligible or eliminated
Rationale for allowance – allowing for future development/ redevelopment within areas where
such activity would have no impact on the nearby stream or wetland
Potential risks – misinterpretation and over-application
Measures to minimize – clear criteria, and provisions to require an evaluation of functional
isolation (including new language)
Give the identified risk of over-application, Councilmember Petso asked whether documentation of
applicability should also be required rather than leaving it to the Development Services Director’s
discretion. Mr. Booy answered that could be an option. There will be situations where a stream runs along
a roadway in a ditch during past historical development and the standard buffer associated with the stream
would potentially extend across the roadway to properties on the other side. In that situation, where there
is a full width City roadway and a clear functional separation from the areas on the opposite side, it would
be fairly cut and dry that no function is provided by the separated buffer area and a determination could
be made quickly. Councilmember Petso asked why 12 feet versus another number was selected. Mr. Booy
answered 12 feet was selected in discussion with the Planning Board; 12 feet is the minimum standard
width for a driveway.
Councilmember Buckshnis also questioned the rationale for 12 feet and asked whether the new
regulations allow pervious or impervious or does it matter. Mr. Lien agreed the width of 12 feet was
selected as it is the required minimum driveway width in Edmonds. The first proposal reviewed by the
Planning Board was 8 feet and following discussion, they agreed on 12 feet. The 12 feet is for established
roadways, paved trails 12 feet in width or more, or legally established structures or other paved areas.
Councilmember Johnson observed in this example the creek has a fairly discernable physical area; in a
wetland where much of the hydrologic action occurs underground, she questioned how this BAS
information could be relevant. Mr. Booy answered for wetlands it would still only apply to physical
separation and functional isolation in the buffer area. In a wetland area where hydrology supports wetland
conditions, any modifications would not apply in that area. The criterion in the proposed amendments to
the critical area regulations requires verification that there is physical separation and function isolation. In
a sloped wetland or buffer where information led planning staff to believe there was a functional
connection through the physical separation, they could make the determination that the criteria did not
apply. It requires some review and interpretation by planning staff but the criteria and putting the onus on
the developer/applicant provides the City the ability to say no when there is a functional connection.
Councilmember Johnson said gravel or impervious surface seems to change the character of the
hydrology. If historically there was a paved area regardless of the hydrology, she asked whether there
would be an opportunity to waive the requirement. Mr. Booy agreed for a paved area with sheet flow
running off it directly into a wetland or stream, there would be an important connection between the
paved area and the adjacent resource. These provisions are not looking at a paved area but the area
beyond it where there is no imperious surface and because of the requirement that it be functionally
isolated, presumably there would be no surface water connection between the isolated area and the
adjacent resource. With regard to the concern with sheet flow from an impervious surface directly into a
wetland or stream, there are other provisions for those situations such as allowances for buffer reduction
and development within the previously developed footprint. The focus of this provision is on areas that
are on the far side of the impervious surface or structure that provides the physical separation and
functional isolation.
Packet Page 558 of 564
Edmonds City Council Approved Minutes
November 2, 2015
Page 10
Councilmember Johnson asked if the physically separated and functionally isolated language came from
DOE. Mr. Booy responded this language is not included in DOE’s guidance for small cities . Mr. Lien
explained there is a similar provision in the Shoreline Management Plan. Staff developed this as a result
of encountering it while implementing the critical area regulations over the past 10 years. He referred to
the photograph of a stream that is highly channelized; there is a house adjacent to the stream, but because
it is technically within the buffer, an addition would not be allowed. This is a means of providing some
flexibility given that the City is highly developed and in example #2, the addition would not have any
impact on the stream. If the addition is physically separated and functionally isolated, by definition, it will
not have any impact on the critical area. A number of jurisdictions have similar language including
Tacoma and eight others. Mr. Booy advised through his work with other communities this is often a
practice that is not addressed in the code; the standard buffer requirement is not applied for roadways,
legally established structures, etc. Including it in the code removes that ambiguity; other cities have done
the same, providing criteria so it can be applied fairly and consistently.
Councilmember Nelson agreed he had seen physically separated and functionally isolated provisions in
other cities’ codes. He asked whether other cities included a specific measurement such as 12 feet. Mr.
Booy relayed Redmond has a minimum width but he did not recall the amount; Tacoma does not have a
minimum width, their code only addresses physical separation and functional isolation and ensuring
review is done to verify the functional isolation exists. Councilmember Nelson asked why Tacoma did
not have a minimum width but the proposal was to have a minimum width in Edmonds. Mr. Lien
explained one of the reasons for a minimum width is to establish a base standard; at least a 12 foot width
is required. There were questions with the interim ordinance regarding the width and minimum
separation; including a width establishes a minimum requirement. A minimum width also addresses
questions that arise such whether a paved path provides physical separation and functional isolation.
Mr. Booy continued his presentation, describing buffer reduction through buffer enhancement:
Development standards – ECDC 20.50.040.G.4 (wetlands) and 23.90.040.D.2 (streams)
Existing allowance
Proposed updates would further limit the existing allowance
o Only when averaging is not feasible
o Maximum buffer reduction = 25%
New criteria to ensure that functions are increased or retained through plan implementation
He provided a photographic example taken from the street where Hindley Creek runs through a forested
area in a backyard adjacent to lawn, a driveway, a home and ornamental vegetation. He provided an aerial
view of the same property and reviewed:
Residential addition proposed
Opportunity for buffer averaging
Restoration feasible, and provided so that stream functions and values are increased or retained
He provided further information regarding buffer reduction through buffer enhancement:
Relevant BAS
o No explicit support for buffer reduction standards
o BAS does suggest a range of buffer widths – no set width that ensures protection
o BAS documents the important of buffer condition, and suggests that alternative strategies
(beyond just buffer width requirements) may be useful.
Rational for allowance – maintaining some flexibility for new development/redevelopment on
highly constrained parcels, while improving conditions
Potential risks – misinterpretation and over-application
Measures to minimize – updated criteria that provide preference for averaging, limit the
allowance to 25% maximum, and that ensure any reduction results in increased/retained functions
Packet Page 559 of 564
Edmonds City Council Approved Minutes
November 2, 2015
Page 11
Councilmember Buckshnis asked about the buffer reduction, recalling it previously was 50% and was
changed to 25%. Mr. Booy explained the existing code allows a 50% reduction; the proposal is a
maximum 25% reduction, requiring 75% of the standard buffer width to be maintained.
Mr. Booy reviewed critical areas restoration projects - new section ECDC 23.40.215
Buffer flexibilities for stream-daylighting and wetland creation/expansion projects
o 25% reduction allowed
o 25% to 50% reduction for constrained properties where reduction is the minimum
necessary, and there is a net environmental benefit consistent with CAO intent
Relevant BAS
o No explicit support for buffer reduction standards, even for restoration projects
o Ecology guidance does support streamlining to facilitate restoration
o Removal of fish passage barriers is a high priority for WDFW, suggesting prioritizing these
efforts over ensuring standard buffers is warranted
Rational for allowance – modeled after a State SMA provision, intended to avoid placing undue
(or prohibitive) restriction on important restoration projects
Potential Risks – future stream segments and wetlands with relatively narrow buffers
Measures to minimize – criteria that buffer is at least 50%, and that widest possible is provided
Councilmember Nelson questioned a project that would restore a creek or wetland but also reduce the
buffer to enhance the environment. Mr. Booy suggested envisioning a stream in a pipe underground that a
passerby would not even be aware of, there is no riparian buffer and there is often pavement on top. For
example, Willow Creek as it leaves Edmonds Marsh, passes under the railroad tracks, along a roadway,
through the park southwest of the marina; for majority of the distance of the culverted stream there is no
riparian vegetation. If the City daylighted that stream, removing it from the culvert and restoring the
channel, instead of requiring the full 100-foot standard buffer which would have significant impacts to the
roadway, the park, and the adjacent marina, this provision would allow the buffer to be reduced to a
minimum of 50% of the standard buffer. It is not applicable to an existing stream channel that is already
daylighted or an existing wetland.
Councilmember Nelson asked if Mr. Booy was saying a 50-foot buffer was just as good as a 100-foot
buffer in that situation. Mr. Booy answered he was not saying a 50-foot buffer was as good as a 100-
buffer; a 100-foot buffer would be better but to achieve feasible restoration within an urban situation,
applying a standard buffer would be very limiting. He clarified a daylighted stream with a 50-foot buffer
would be better than leaving the stream in the culvert.
Councilmember Buckshnis agreed with everything in Mr. Booy’s memo (Exhibit 3) except for this
provision. She pointed out WRIA8 has done a great deal of work to promote salmon recovery. The
economic feasibility sometimes cannot be projected because people cannot visualize how wonderful
having salmon returning to an estuary would be. She preferred a trigger or amount, not just allowing it to
be the director decision, such as requiring Council approval. For example requiring Council approval if
the buffer is proposed to be reduced from 100 feet to 50 feet, similar to spending limits that are
established for the Mayor. She suggested a mechanism whereby Council was apprised. She recalled
providing an example to Mr. Lien that in the end the Council had no say.
Mr. Lien said the opportunity for Council input is via this policy. Staff’s position is a daylighted creek
with a 50-foot buffer is better than a culverted creek; in the end, there is a net benefit from the project.
The intent of this provision is not to discourage a project that will provide a net benefit. This would be
applicable to restoration projects, not projects where mitigation is required. This was modeled after a
SMA provision where the SMA and SMP would not apply in the expanded area when a shoreline project
expands the shoreline jurisdiction. Appeals will come to the Council. Councilmember Buckshnis said the
Packet Page 560 of 564
Edmonds City Council Approved Minutes
November 2, 2015
Page 12
example she provided was tree cutting in 2005 where the developer paid a fine and the trees were cut
again a few years ago The Council had a strong opinion about the situation but the fee was minimal and
Council discussed it at length in executive session. Mr. Lien said that is a separate issue. The opportunity
for Council input is now and ultimately implementation of development regulation is up to the
Development Services Director.
City Attorney Jeff Taraday said the development permit types in Title 20 are where Council sets policy
direction over who makes decisions on permits and the appeals for each permit type. If the Council
wanted to establish a special process for certain types of critical area approvals, Title 20 could be changed
so that instead of Director approval, it goes to the Hearing Examiner. Just because a permit is currently a
Type II staff decision, does not mean it cannot be changed; it can be revisited by the Council.
Councilmember Petso asked whether Ecology’s comments were in the Council packet. Mr. Lien advised
they are in Exhibit 8; he read a paragraph from the October 29, 2015 letter: “The City has provided
additional information through a memorandum prepared by ESA dated October 22, 2015. This
memorandum provided a thorough explanation of the rationale for these wetland buffer reductions. In
light of this explanation, Ecology offers our support of the critical area ordinance updates being
considered for adoption by the City Council.” Councilmember Petso asked about Ecology’s earlier
comments. Mr. Lien advised they are also contained Exhibit 8; he referred to an Ecology letter dated
October 26, 2015 that mentioned concerns about the restoration project provision and buffer width
reductions.
Councilmember Petso relayed she was contacted today regarding the previously developed footprint
exception. She pointed out there could be a property where development in the buffer is irregularly
shaped and the desire would be to cover essentially the same square footage but not the irregular shape of
the existing development. She asked how that situation would be addressed under the code as currently
drafted. Mr. Lien answered if a house within a critical area buffer burns down, it can be rebuilt in the
exact same footprint. Another provision is development in the previously developed footprint, an
irregularly shaped house with a lawn between the house and critical area would not meet the definition of
developed footprint; anything new would be required to meet different provisions of the CAO. If the
existing house were demolished and rebuilt, whatever is rebuilt must comply with the critical area
regulations. There is nothing in the draft CAO that addresses that specific situation. He was familiar with
the situation Councilmember Petso referenced.
Councilmember Petso inquired about changing the regulations to limit it to like-for-like development. For
example compacted gravel, considered existing development, is replaced with a 5-story structure; she felt
that would have a different impact on the nearby critical area. She suggested the regulations be tweaked to
allow a structure to be replaced with a similar size structure or a parking area replaced with a parking
area. Mr. Lien observed the provision Councilmember Petso was referring to was development within the
previously developed footprint; the definition is a legally established paved area, structures or other
pervious surface areas. He recalled development that this provision applied to when the interim ordinance
was in place, the American Brewery silo. In that case there was a paved area behind American Brewery
where the owner wanted to add a silo that was technically in the Edmonds Marsh buffer. The silo did not
add new impervious surface or have any new impact to the critical area. The proposed provision would
allow improvement over existing conditions; allowing the silo to be constructed on the blacktop area in
exchange for buffer enhancement of the Edmonds Marsh. American Brewery’s proposal was for 1,100
square feet and they provided 1,100 square feet of buffer enhancement.
Councilmember Petso asked whether protecting the functions and values of critical area also included
habitat, temperatures, etc. or was it only impervious surface. Mr. Lien answered habitat is taken into
consideration; the physically separated and functionally isolated provision includes criteria related to
hydrological, geological, or biological habitat connection. The science studies address a range of buffers;
Packet Page 561 of 564
Edmonds City Council Approved Minutes
November 2, 2015
Page 13
each study focuses on the buffer width for a certain function such as removing phosphorous, a specific
creature, etc. so the studies provide a range of buffers. The intent of the proposed regulations is to allow
some flexibility in developed areas while getting some enhancement of critical areas. That is the reason
for flexible standards for development within developed footprint, buffer averaging, buffer width
reduction, etc.
Councilmember Petso suggested eliminating physically separated and functionally isolated and the buffer
reduction as they are noncompliant with BAS, and tweaking previously developed footprint to better
reflect the expected impact on the range of functions and values that a critical area can provide. She felt
there was a big difference between a compacted gravel area and a tall structure in terms of the impact on
adjacent wildlife.
Councilmember Johnson recalled staff indicated a 50% buffer for a restoration project was better than a
creek in a pipe. Ecology’s comments state reducing buffers to between 50% to 75% of the standard buffer
for streams and wetlands is not consist with BAS or their guidance for wetland mitigation in Washington
State. She referred to Marina Beach and the daylighting Willow Creek which is estimated to cost $5
million and questioned reducing the buffer for economic reasons or adjacent projects if the goal is to
improve salmon habitat in the estuary marsh. She said that seems counterintuitive if the goal is to daylight
Willow Creek and improve salmon habitat, why start with a reduced buffer. Mr. Lien answered there are
tradeoffs. A daylighted stream is better than a culverted stream; Willow Creek is currently culverted for
1,500 feet; daylighting Willow Creek opens the channel which provides an avenue for salmon to reach the
marsh. That is a benefit of daylighting the stream. A 50-foot buffer still provides some functions and
values. With regard to tradeoffs, a standard 100-foot buffer would essentially wipe out Marina Beach.
Daylighting Willow Creek and providing a 50-foot buffer will provide salmon access to the marsh, and
provide an area for citizens to enjoy Puget Sound and the daylighted stream. Ultimately a daylighted
Willow Creek is better than a culverted Willow Creek.
Councilmember Johnson pointed out the Council has not adopted the Marina Beach Master Plan; perhaps
there is a problem with the assumption that the dog park needs to be balanced with activities on both sides
of the creek. If the purpose of daylighting Willow Creek is to improve salmon habitat, that should be the
goal and not balancing other needs. She summarized it was a question of priorities. Mr. Lien said he was
only using Marina Beach as an example; there are other areas with the same tradeoffs. Councilmember
Johnson questioned those tradeoffs; this is the Council’s opportunity to make a policy decision and she
did not want to give away salmon habitat or creek enhancements especially if Ecology did not support it.
She summarized the proposed provisions were headed in the wrong direction.
Councilmember Bloom agreed with Councilmember Johnson and had similar concerns. She referred to
the Development Services Director making decisions regarding critical area waivers, buffer averaging,
etc. The definition of director states the City of Edmonds Development Services Director or his/her
designee. She objected to allowing those decisions to be made by the director’s designee as she felt it was
a very serious role, a role of accountability. She asked under what circumstance would a critical area
waived need to be done so quickly that the Development Services Director could not be the one that
reviewed and made the final decision. Mr. Lien said that relates to how development review is conducted
in the City. There are four planners; when a critical area application is submitted, it is assigned to a
planner. The planner does a desk review looking at the critical area maps, soils, topography, etc. as well
as a site visit to ensure the maps accurately reflect conditions and makes the determination. If the
language “director or his/her designee” were changed, the director would need to do all the development
review with regard to critical areas in the City.
Councilmember Bloom said that was not her suggestion; she understood the director cannot do all the
onsite visits, review, etc. She was suggesting the Development Services Director have final authority and
accountability for that decision. The planner presents the recommendation to the director but the director
Packet Page 562 of 564
Edmonds City Council Approved Minutes
November 2, 2015
Page 14
signs off on it since it is such an important decision. She noticed in the comments that many citizens are
concerned with enforcement of critical areas; allowing planners to make those decisions is not doing a
service for those citizens. Development Services Director Shane Hope appreciated the interest in having a
good process and ensuring any waivers are carefully thought through. She suggested staff return with a
proposal that allows a director-only decision on waivers but recognizing it would be based on knowledge
from the direct review, site visit, etc. by the planner. She questioned if there is value added for the
director to sign off when he/she relies on the planner who does the work.
Councilmember Bloom responded she believed there is. The City did not have a Development Services
Director for a number of years and planners signed off on things that were not necessarily done properly.
She referred to the situation cited by Mr. Blomenkamp, a critical area waiver done by a planner in 1993
related to the Woodway Fields that the Development Services Director never signed off on it even though
the code states he/she is supposed to. She summarized errors can arise later related to the way it has been
done in the past and there is value added in having the director be accountable and responsible. Ms. Hope
said one of the reason for “director or his/her designee” is it is intended to provide some accountability;
the director has the oversight, they may not do the actual review themselves because they count on the
work done by staff. She acknowledged were things that were problematic in the past. With the language
“director or his/her designee,” as long as there is a director, there is an accountability system.
Councilmember Bloom reiterated she would like to change it to be the responsibility of the director. If
there were an extended leave of absence, one specific designee could be identified such as Mr. Lien’s
position who knows the code well. She was not comfortable with final decisions being signed off on by a
planer and wanted anywhere in the critical area regulations that states “director or his/her designee”
changed to “Development Services Director” with any designation done on a case-by-case basis if the
director was not available to designate the authority. Ms. Hope questioned what value is added if she
signs off on something she does not have knowledge of. She relies on the planner, similar to the building
official who relies on the plans examiner. She understood certain things could require the director’s
involvement but to require the director sign off on everything, there was no way she can know everything.
Councilmember Bloom asked if Ms. Hope was suggesting the Development Services Director only sign
off on waivers and she could not sign off on everything. Ms. Hope offered to return to Council with
options.
Councilmember Bloom assumed the CAO also applied to the City such as when trees were removed on a
steep slope to replace a sewer line. Mr. Lien agreed. Councilmember Bloom cited an example provided
by a Tree Board Member and asked about the City’s responsibility to plant trees in an area where a sewer
or water line was installed. Mr. Lien answered when the utility engineers plan water and sewer main
replacements, they identify any critical areas and ask him what will be required. If a City utility project is
located in a critical area, staff must provide a critical area report that is submitted review along with the
SEPA. Councilmember Bloom asked whether trees the City removed on a steep slope would need to be
replaced. Mr. Lien answered it depends on the project; staff does not usually like to plant trees on top of
sewer lines. Councilmember Bloom noted there are some trees that can be planted on top of or adjacent to
sewer lines. She said this is an issue because a lot of trees are being lost and the City taking responsibility
for replacement would help improve the canopy.
Public Works Director Phil Williams did not recall any trees were removed in the example
Councilmember Bloom cited. A waterline was replaced on a steep slope; vegetation, jute matting and
seeds and native grasses were planted. There was a desire by the neighbors for additional plantings for
visual enhancement versus holding slope. Staff offered to buy the plants if the neighborhood wanted to
have a planting party. Councilmember Bloom said trees were cut and left as crags along the walkway. She
inquired about the City’s responsibility if trees are removed for the installation of a sewer or water line.
Mr. Williams answered the City must comply with the CAO; if that requires replanting, it would be
preferable not to plant along the utility alignment. Mr. Lien recalled another project where trees were
Packet Page 563 of 564
Edmonds City Council Approved Minutes
November 2, 2015
Page 15
removed, the pump station 2 project on Shell Creek a few years ago. In that instance, a critical area report,
a stream study, and a wetland report was done and every tree that was cut down was replaced at a ratio of
2:1 as required by the code. He summarized the City also has to comply with critical area regulations.
Councilmember Buckshnis offered to email her question to staff.
Council President Fraley-Monillas referred to the City of Sammamish’s (population 50,000) wetland
development standards that Ms. Stewart provided her which she provided to all Councilmember, City
Clerk and Mayor. She suggested Councilmembers review those regulations prior to the Council’s next
discussion.
Councilmember Mesaros asked where removal/replacement of trees was located in the ordinance. He
recalled Mr. Hertrich’s comments a few weeks ago regarding a 3-inch tree and 4-inch tree. Mr. Lien
referred to 23.40.220.C.7, Allowed Activities, where specific species are mentioned that can be removed
in a critical area including noxious species, blackberries, English ivy, etc. An additional limitation is
added in the draft critical area regulations that allows up to 1,500 square feet of invasive and noxious
weeks, English ivy, Himalayan blackberry, Evergreen blackberry, Scot’s broom, Hedge and field
bindweed to be removed in a critical area within a 3 year period. With regard to a suggestion to allow
removal of alders, Mr. Lien referred language added in section, 23.40.220.C.2 that addresses operation,
maintenance and repair exemptions, “Operation and maintenance also includes normal maintenance of
vegetation performed in accordance with best management practices…” A definition was also added of
operation and maintenance and best management practices with regard to vegetation, “Normal
maintenance of vegetation” means removal of shrubs/non-woody vegetation and trees (less than 3-inch
diameter at breast height) that occurs at least every other year. Maintenance also may include tree topping
that has been previously approved by the City in the past 5 years.” As drafted, alders in a critical area less
than 3-inches in diameter could be removed as normal maintenance of vegetation. If alders were added to
the list in C.7, it would be limited to 1500 square feet of alder removal within a 3-year period.
Council President Fraley-Monillas suggested the definition of normal maintenance of vegetation should
be “chest height” instead of “breast height.” Mr. Lien said that was standard terminology.
Mayor Earling advised staff will return this to Council for another study session. He declared a brief
recess.
B. SEPTEMBER 2015 QUARTERLY FINANCIAL REPORT
Finance Director Scott James provided multiple choice questions, the answers to be revealed at the end of
his presentation. He displayed and reviewed 3rd Quarter 2015 Revenue Summary – General Fund Types
without bond proceeds and General Fund Revenue Budget to Actual. He displayed a comparison of
General Fund Revenue Budget to Actual, highlighting taxes:
General Fund Resource Category YTD Actual
9/30/2014 9/30/2015 % Change
Taxes
Property Taxes $7,413,082 $7,779,098 4.9%
Sales Tax 4,267,681 4,937,480 15.7%
Utility Tax 5,094,356 5,075,412 -0.4%
Other Taxes 667,384 699,942 4.9%
Total Taxes $17,442,503 $18,491,932 6.0%
Licenses & Permits
Business Licenses & Misc Permits $ 169,438 $ 163,897 -3.3%
Franchise Fees 817,758 851,573 4.1%
Development Related Permits 647,556 537,866 -16.9%
Packet Page 564 of 564