Loading...
2018-04-10 City Council - Full Agenda-2093Agenda Edmonds City Council COUNCIL CHAMBERS 250 5TH AVE NORTH, EDMONDS, WA 98020 APRIL 10, 2018, 7:00 PM Edmonds City Council Agenda April 10, 2018 Page 1 1. CALL TO ORDER/FLAG SALUTE 2. ROLL CALL 3. APPROVAL OF THE AGENDA 4. APPROVAL OF THE CONSENT AGENDA 1. Approval of Council Meeting Minutes of April 3, 2018 2. Approval of claim, payroll and benefit checks, direct deposit and wire payments. 3. Acknowledge receipt of Claims for Damages from Phil Lovell ($441.51) and Karen Gottlieb (amount undetermined). 4. Confirm Appointment of Carolyn Henry to the Cemetery Board 5. ADJOURN TO COUNCIL COMMITTEE MEETINGS THE CITY COUNCIL COMMITTEE MEETINGS ARE WORK SESSIONS FOR THE CITY COUNCIL AND STAFF ONLY. THE MEETINGS ARE OPEN TO THE PUBLIC BUT ARE NOT PUBLIC HEARINGS. THE COMMITTEES MEET CONCURRENTLY IN SEPARATE ROOMS AS INDICATED BELOW. 6. PARKS AND PUBLIC WORKS COMMITTEE (COUNCIL CHAMBER) 1. Report on Bids for the Seaview Park Infiltration Facility (10 min) 2. Report on Bids for the 2018 Sanitary Sewer Replacement Project (10 min) 3. Presentation of the 2018 Transportation Safety Plan (10 min) 4. Report on Final Construction Costs for the Frances Anderson Center Bandshell Replacement Project (10 min) 5. Presentation of a Supplemental Agreement with Murraysmith for the 2019 Sewerline Replacement (10 min) 6. Civic Stadium project demolition closeout (5 min) 7. Final Acceptance of the 228th St. SW Corridor Improvements Project (10 min) 8. Engineering Analysis and Preliminary Design for the WWTP Phase 6 Energy Energy Conservation Project - Carbon Recovery (10 min) 9. Special Event Contracts (10 min) 10. RCO Grants Resolution (15 min) 11. Civic Field PSA for design services (20 min) 7. FINANCE COMMITTEE (JURY MEETING ROOM) 1. Report on Public Works committee agenda items (15 min) 2. Capital Asset Policy and Resolution for Adoption (10 min) 3. First Quarter 2018 Budget Amendment (15 min) 4. Ordinance to Repeal CC Chapter 3.04 to be replaced later with Resolution (10 min) Edmonds City Council Agenda April 10, 2018 Page 2 5. February 2018 Monthly Financial Report (15 min) 8. PUBLIC SAFETY, PERSONNEL AND PLANNING COMMITTEE (POLICE TRAINING ROOM) 1. Proposed Mid-Cycle Building and Fire Code Amendment (30 min) 2. Amendments to ECC 8.48 to Address Parking Regulation Issues (10 min) 3. Agreement With Snohomish County for Flex Funds for Social Worker Program (10 min) 4. Ordinance Amending 5.34 (Domestic Violence) (10 min) City Council Agenda Item Meeting Date: 04/10/2018 Approval of Council Meeting Minutes of April 3, 2018 Staff Lead: Scott Passey Department: City Clerk's Office Preparer: Scott Passey Background/History N/A Staff Recommendation Review and approve the draft meeting minutes on the Consent Agenda. Narrative N/A Attachments: 04-03-2018 Draft Council Meeting Minutes 4.1 Packet Pg. 3 Edmonds City Council Draft Minutes April 3, 2018 Page 1 EDMONDS CITY COUNCIL DRAFT MINUTES April 3, 2018 ELECTED OFFICIALS PRESENT Michael Nelson, Mayor Pro Tem Kristiana Johnson, Councilmember Adrienne Fraley-Monillas, Councilmember* *(participated by phone) Thomas Mesaros, Councilmember Diane Buckshnis, Councilmember Dave Teitzel, Councilmember Neil Tibbott, Councilmember ELECTED OFFICIALS ABSENT Dave Earling, Mayor ALSO PRESENT Noal Leonetti, Student Representative STAFF PRESENT Phil Williams, Public Works Director Patrick Doherty, Econ. Dev & Comm. Serv. Dir. Shane Hope, Development Services Director Rob Chave, Planning Manager Rob English, City Engineer Ed Sibrel, Capital Project Manager Rosa Fruehling-Watson, City Attorney’s Office Scott Passey, City Clerk Jerrie Bevington, Camera Operator Jeannie Dines, Recorder 1. CALL TO ORDER/FLAG SALUTE The Edmonds City Council meeting was called to order at 7:00 p.m. by Mayor Pro Tem Nelson in the Council Chambers, 250 5th Avenue North, Edmonds. The meeting was opened with the flag salute. 2. ROLL CALL City Clerk Scott Passey called the roll. All elected officials were present with the exception of Mayor Earling. 3. APPROVAL OF AGENDA COUNCIL PRESIDENT PRO TEM BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER TEITZEL, TO APPROVE THE AGENDA IN CONTENT AND ORDER. MOTION CARRIED UNANIMOUSLY. 4. APPROVAL OF CONSENT AGENDA ITEMS COUNCIL PRESIDENT PRO TEM BUCKSHNIS, MOVED, SECONDED BY COUNCILMEMBER TIBBOTT, TO APPROVE THE CONSENT AGENDA. MOTION CARRIED UNANIMOUSLY. The agenda items approved are as follows: 1. APPROVAL OF COUNCIL MEETING MINUTES OF MARCH 27, 2018 2. APPROVAL OF CLAIM CHECKS 4.1.a Packet Pg. 4 Attachment: 04-03-2018 Draft Council Meeting Minutes (Approval of Council Meeting Minutes) Edmonds City Council Draft Minutes April 3, 2018 Page 2 5. PRESENTATIONS 1. CEMETERY BOARD ANNUAL REPORT Jerry Janacek, Chair, Cemetery Board, explained the Cemetery Board is an advisory committee comprised of local volunteers who organize two public events each year, the Memorial Day observation and the Walk Back in Time open house, celebrated on the third Thursday of July. In addition to the 7 board members, there are at least 100 volunteers on Memorial Day and 5-6 volunteers for the Walk Back in Time. A special volunteer at the Memorial Day annual ceremony was Olivia Olson, the VFW essay winner in 2017 and will be again in 2018. Another special volunteer is Dale Hoggins who has been involved in planning the 2017 and 2018 Memorial Day ceremonies and since 2014 has been involved in discussions regarding the future location of the memorial monument that was recently moved to the Edmonds Memorial Cemetery. Chair Janacek highlighted the Board’s 2017 accomplishments:  Mapping project o Sustainable partnership with Western Washington University o Developed new marker system that allows family members to locate a grave site  City completed sidewalk and fencing on the north side of cemetery o Allows citizens to safely walk along the north side of cemetery o Improvement made via removal of stumps, fixing tilting grave markers and cleaning up parts of the cemetery  Relocated memorial monument to cemetery o Board Member Betty Lou Gaeng has written extensively about the monument in a book, “Etched in Stone.” o A special dedication of the monument will occur at this year’s Memorial Day ceremony Everyone is invited to attend the Memorial Day ceremony; Mayor Earling will provide comments during the ceremony. This year’s ceremony will honor veterans of the wars in Afghanistan and Iraq. More than 750 veterans are buried in the Edmonds Cemetery. The Board welcomes donations; during the past year, a local citizen, Carolyn Henry, donated a bench in memory of her husband and a son who are buried at the cemetery. Chair Janacek expressed appreciation for the work of City staff including Cindi Cruz, Rich Lindsay and Cliff Edwards, the Cemetery Sexton. One of example of his dedication, Mr. Sexton volunteers to be present into the late hours on Halloween, keeping roving bands of “what do we do now” teenagers from causing damage in the cemetery. The Board will be looking at expanding the columbarium and will be talking with city staff and citizens about the City’s vision 2020 project. Eventually the existing columbarium, the first of three phases, will be filled and the Board would like to have it expanded. Councilmember Mesaros complimented the Cemetery Board for their leadership and the other volunteers who work on Memorial Day. As a veteran, Memorial Day is an inspiring event that the citizens enjoy. Chair Janacek commented 500-600 people often attend the event. 2. UPDATE OF EDMONDS STREET WATERFRONT CONNECTOR PROJECT Public Works Director Phil Williams introduced Capital Projects Manager Ed Sibrel. Mr. Sibrel explained this is one of three briefings during the course of this project. The project is currently in design development. He reviewed:  Purpose and Need o Map of waterfront and surrounding area 4.1.a Packet Pg. 5 Attachment: 04-03-2018 Draft Council Meeting Minutes (Approval of Council Meeting Minutes) Edmonds City Council Draft Minutes April 3, 2018 Page 3  Unreliable access to the entire waterfront area by emergency responders  Ferry loading and unloading  Access to the waterfront area by people driving, walking or biking  Ferry, rail and bus connections o Map identifying high tide line, highly protected area, project site, railroad, parking, ferry dock, railroad crossing, pedestrian walkway, emergency vehicle route to waterfront o Provide reliable and efficient access to the waterfront for emergency responders  Between 2010 and 2015, there were 277 emergency 911 calls, 171 required basic life support and 72 required advance life support, 14 fires, 8 water rescues, and 40-50 marine rescue boat responses.  Typical three minute response time increases to over 30 minutes when a blockage occurs o Create a continuous pedestrian walkway along the waterfront o Help pedestrians, bicycle riders and emergency responders avoid street-level conflicts with BNSF rail lines o Be designed using community input and inspiration o Access issues are a critical element for the Edmonds Street Waterfront Connector Rich Schaefer, Tetra Tech, reviewed:  Map of 51 Initial Concepts  Edmonds Waterfront-at-Grade Cross Analysis o Held 4 public meetings (in-person and online) attended by over 750 community members o Held 21 Advisory Task Force meetings o Gave 4 City Council briefings o Received 124 written comment cards, emails or surveys with over 450 specific points of feedback o Featured in 42 local media articles o 51 initial concepts narrowed to 11 alternatives explored in-depth to reach recommended solution  Alternatives Evaluation Summary Matrix o How the 11 alternatives addressed:  Emergency access by foot  Emergency vehicle access  Emergency vehicle access and ferry load/offload o Edmonds Street Overpass selected as recommended alternative, now called the Edmonds Street Waterfront Connector  Aerial image of project site o Edmonds Street intersection with Sunset Avenue o Challenge is to come off that intersection with bridge over the railroad providing enough clearance to meet the railroad’s requirements, turn south parallel to the beach trying to not encroach on the beach any more than necessary and landing near the restroom in Brackett’s Landing North Park o Goal: Avoid building a bridge any higher than necessary  Project schedule o Continuing broad engagement o Evaluate six concepts, reduce to two and make a recommendation by end of summer  Bridge experiential elements o Entrance o Spanning Structure o Landing area  Concept 01 – Sculptural Column Bridge o Integration of natural form – Connections to the Sound 4.1.a Packet Pg. 6 Attachment: 04-03-2018 Draft Council Meeting Minutes (Approval of Council Meeting Minutes) Edmonds City Council Draft Minutes April 3, 2018 Page 4 o Girder structure below deck o Distinct overlooks  Concept 02 – Driftwood Bridge o Re-creation of the Edmonds bluff – Spirit of Place o Form is driven by key views of the water and mountains o Low to moderate expense girder structure  Concept 03 – Kelp Ribbon Bridge o Form inspired by kelp beds & sea grass o Girder (large beam structure) with sinuous alignment o More frequent columns, thinner structural depth  Concept 04 – Intersecting Wave Bridge o Form derived from waves o Steel through girder – structure above walkway  Concept 05 – Boats in the Harbor Bridge o Plays off marina forms & traditional fishing structures o Truss – long span steel structure – moderate economy  Concept 06 – Cast Net Bridge o Singular element o Form inspired by fishing net hoops o Steel arch – long main span – moderate expense  How we will evaluate alternatives o Landing experience o Visual o Reliable emergency access o Pedestrian user experience o Bicycle user experience o Cost o Neighborhood compatibility Mr. Sibrel commented a project of this size includes heavy-duty funding responsibilities. At approximately $30 million, this will be the largest public works project Edmonds has ever undertaken and will require securing outside funding. Typically projects of this type receive up to 80% of funding from outside funding sources. He reviewed the funding outlook: Overall Project Cost Estimate $29,885,000 Current Commitments Washington State $ 7,200,000 City, BNSF, Sound Transit, Port of Edmonds, Community Transit $480,000 Funding Gap $22,205,000 Outstanding Funding Applications INFRA Grant $16,926,000 FMSIB Grant $3,000,000 Councilmember Johnson recalled before the first phase began, there was a great deal of discussion about the need. She understood the need was pedestrian access and fire/first aid. Now the needs include ferry boat offloading and the possibility that an incident would require direct access. She requested the evaluation differentiate between the basic need and the full-blown need. A pedestrian bridge would not cost $30 million but that much may need to be spent to address all the needs that have been described. For example, what would be needed just to get bicycle, pedestrians and first aid trucks over the overpass and possibly 4.1.a Packet Pg. 7 Attachment: 04-03-2018 Draft Council Meeting Minutes (Approval of Council Meeting Minutes) Edmonds City Council Draft Minutes April 3, 2018 Page 5 consider rotating a fire truck to a temporary location. She wanted to be able to look at a total project and alternative costs. Although staff indicates funding may be available, as a policy and decision-making board, the Council needs to understand the cost relative to the components and needs of the project. Mr. Williams responded staff and the consultants will do their best to develop information to answer that question. With regard to aid cars, one of the services this project seeks to provide is to get aid cars on the other side of the tracks in an emergency. The difference in loading, structural members, permitting, design costs, etc. to accommodate an aid car versus a fire truck is a very small, subtle difference in terms of cost. A pedestrian bridge would certainly be less expensive, but the primary purpose is to get an aid car across the tracks. A structure that would accommodate an aid car would also allow pedestrians and bicycles to cross. Council President Pro Tem Buckshnis agreed this began as emergency access for pedestrians; there was never discussion of aid cars or ferry loading/offloading. She agreed with Councilmember Johnson about differentiating between the two. She noted the Port of Everett is constructing a pedestrian bridge to Grand Avenue Park and wanted to know the cost of that project. Councilmember Buckshnis commented the public comments included in the packet indicate a lot of people are not in support of the project; she did not support it due to the funding and felt something cheaper could be done on the other side. As the project will help WSDOT and BNSF, she suggested they should provide more funding. Mr. Williams answered there is an expectation that BNSF will participate in funding; exactly how much, how they will value the project and what improvements they will realize, are unknown. There is a typical practice that up to 5% of project costs could be paid for by BNSF, but they generally only participate if the project grade separates a crossing which this project does not propose to do; Dayton and Main will remain at-grade crossings. BNSF has shown considerable interest in the project and have provided some funding for phases 1 and 2, knowing there would not be grade separation of any crossings. The stage is set to ask BNSF to consider assisting with funding. He anticipated the $6 million provided by the State was due in part to the benefit the project will provide to ferries. He acknowledged the project would not provide grade-separated crossing but when a problem occurs, a ferry could be offloaded and possibly the next ferry loaded. If the emergency will last longer than one boat, he anticipated ferry service would be halted. Council President Pro Tem Buckshnis commented loading/offloading of ferries was never conceived which she opined would further congest that area. She inquired about the environmental impact of the overpass on the dive park and the beach. Mr. Williams referred to the map that identified property that be used landward of the Ordinary High Water Mark (OHWM) and the highly protected area waterward of the OHWM and explained construction could occur waterward of the OHWM but the cost of permitting, mitigation, etc. begin to increase. The hope is to be able to build this without encroaching into that area which should have no impact on the dive park. The overpass may provide dive park users an easier way to reach the park. Council President Pro Tem Buckshnis asked if the project will affect the parking lot. Mr. Williams answered Brackett’s North has limited parking; the parking will not be increased. As vehicles would not be using the overpass, he did not expect the project to exacerbate the parking issue. Mr. Sibrel commented if the design process finds the project will impact the park in any way, the City is required to mitigate those impacts. Councilmember Teitzel noted the presentation referred to aid car access for emergencies on the waterfront, however, it is possible a fire truck could be dispatched. He asked if the connector would be robust enough to accommodate a fire truck. Mr. Sibrel answered yes. Councilmember Teitzel anticipated a scenario where there were pedestrians on the overpass to include possibly people in wheelchairs when a fire truck was dispatched over the connector. He asked if there would be enough room for a person in a wheelchair to get 4.1.a Packet Pg. 8 Attachment: 04-03-2018 Draft Council Meeting Minutes (Approval of Council Meeting Minutes) Edmonds City Council Draft Minutes April 3, 2018 Page 6 safely out of the way. Mr. Sibrel said the intent is to design the bridge to accommodate that; the roadbed will be 16 feet wide, the largest fire truck is 10 feet wide. There are also plans to incorporate pedestrian landings on the way down as well as some type of advance warning so that if a fire or aid truck is dispatched, pedestrians would be provided some advance warning. Councilmember Teitzel said in reviewing the citizen input regarding the designs, most express a preference for a low-profile bridge. However, some of the designs displayed include masts 20-30 feet tall which he found contrary to the public input. Mr. Schaefer explained the concepts were developed prior to public meetings. The intent was to develop a wide range of ideas that included different structural concepts, features and impressions. The concepts elicited exactly what they wanted to hear – preferences and dislikes. He agreed most people do not want an iconic structure but something subtler. Councilmember Fraley-Monillas asked when public hearings at the Council would occur. She understood there have been public meetings and Planning Board interactions but she recalled being told it would come to the Council for a public hearing. Mr. Williams referred to the schedule and the blue diamond in August 2018 when a preferred alternative would be selected. The schedule also includes City Council updates in June and July. The intent would be to bring the project to Council and seek an endorsement of a recommendation or modified recommendation from the Council in early August. Councilmember Fraley-Monillas asked if it would be up to the City Council to direct staff to have a public hearing at the Council level. Mr. Williams said this schedule does not incorporate a public hearing per se; when the Council is considering a recommendation on an alternative, there would be opportunity for public comment or a public hearing. Councilmember Fraley-Monillas requested a public hearing be scheduled. Councilmember Fraley-Monillas anticipated the citizens will reach a good decision regarding the design. She was very concerned about the streets in that area and the neighbors and has spoken to a number of them who have concerns. Their concerns are alleviated if the overpass will only be used in emergent situations. She recalled the crossings had been closed twice in five years for suicides on the tracks. The citizens living in that area understand they may have cars through their neighborhood if something that tragic occurred. However, there is concern that the overpass would be used in instances such as a long train delaying the ferry. She asked if the overpass would be opened to ferry unloading for emergent purposes only. Mr. Williams answered it would only be used for emergent purposes; a long or slow train not be a reason to open the structure to onload or offloading. Use by the ferry would be for an accident such as Councilmember Fraley-Monillas described, a train/vehicle accident, something that would stall a train and block the two crossings for an extended period of time. He anticipated if a ferry was already on its way from the Kingston dock, it would dock and the vehicles would be offloaded utilizing personnel to direct traffic as there is no signal system. Depending on the length of the blockage, there would be 240 cars waiting to load which could also be done but would be less likely. After that, WSF has no interest in continuing service in that manner and would discontinue the Edmonds-Kingston run until the issue was resolved. The ability to offload and possibly load one ferry still provides value to WSF. Mr. Williams explained the other use by public services is 24/7 access for emergency vehicles. Regardless of the presence of a train, emergency vehicles would come directly west from the downtown fire station to access the waterfront for calls originating on the waterfront. Councilmember Fraley-Monillas said she did not think neighbors would object to that. If the priority during a blockage is first response, she anticipated response could be delayed while a ferry was being offloaded/loaded. Mr. Williams agreed if an aid car used the structure, traveled south through Brackett’s North parking lot to a response further south such as Senior Center or Marina Beach Park, it would intersect offloading ferry traffic. WSF has personnel who stop ferry traffic to allow pedestrians to cross and 4.1.a Packet Pg. 9 Attachment: 04-03-2018 Draft Council Meeting Minutes (Approval of Council Meeting Minutes) Edmonds City Council Draft Minutes April 3, 2018 Page 7 anticipated they would do the same for an aid car or the second person in an aid car could get out and stop traffic. Councilmember Fraley-Monillas commented it was difficult to visualize it all that happening at same time although fortunately there are not a lot of emergency calls on the waterfront due to the limited population. Mr. Williams commented there were 277 emergency responses over a five-year period and 40- 50 Marine One responses which equates to approximately twice a week response to the waterfront on average. Councilmember Tibbott expressed appreciation for the work that has been done, noting he learned a lot from the public comments and the responses provided tonight. He noted the public expressed a desire for a subtle design that preserve views, goes below the bluff as soon as possible, has a pedestrian/bicycle amenity for views over Puget Sound and a waterfront walkway attraction. He asked if consideration had been given to developing a written policy prior to full construction related to criteria for using the ramp. Mr. Williams said that has not been done yet. He asked if Councilmember Tibbott’s question was getting a permit to use the structure for an event. Councilmember Tibbott clarified his question was related to how frequently it would be used for offloading/loading ferries. His understanding was that would be a fairly rare occurrence and on those rare occurrences, it would be one round trip to alleviate a situation, possibly once a year. He asked if it would be sensible to have a written policy so the City, WSF, BNSF, etc. know the expectations. Mr. Williams agreed it may be beneficial to describe the circumstances under which it would be used and ask all the relevant parties to agree. Mr. Schaefer said the process has included the Police Department, Fire Department, WSF, etc. and the creation of a list of operation rules which could be fleshed out and vetted with all the stakeholders. Councilmember Tibbott envisioned using the bridge and not having to navigate Main Street could save an emergency vehicles 1-2 minutes to reach the waterfront. He relayed his understanding the Brackett’s Landing North restroom would be replaced. Mr. Williams answered that is likely but will be determined once a concept is selected and detailed design begins. The space for the landing is approximately where the restrooms are. The restrooms are old and need to be replaced anyway. A few creative ideas have been developed with regard to how to rearrange the park to create the same amount of park space and not take up prime space with restrooms. Councilmember Tibbott summarized there would be no fewer parking spaces but no more parking and if the restroom were eliminated, it would be replaced. Mr. Williams agreed. Councilmember Tibbott observed the INFRA and FMSIB grants are federal grants that the City’s federal lobbyist is assisting with. Mr. Sibrel agreed. Councilmember Tibbott observed those grants are dedicated to transportation and crossing projects like this and cannot be used for housing or to improve a park. Mr. Sibrel agreed. Councilmember Tibbott commented even though the project is expensive, it is significant less than other cities have spent recently on 2-lane elevated bridges over the railroad tracks. This is an elegant solution to a potentially difficult situation. If the City is able secure federal grants to meet that need, it is a viable solution. He preferred the subtle designs that used natural materials and make the structure more interesting and part of a waterfront walkway connectivity that would be very interesting to the City. Councilmember Johnson referred to Mr. Williams’ comment that the intent was for the overpass to be a 24/7 emergency access, commenting that was the first time she has heard that and did not think the Council had agreed to that. She acknowledged this was a very exciting project, a chance of a lifetime to manage a multi-dimensional project and Tetra Tech and Parametric have done other large complex projects, but the planning assumptions seem to be missing. The expectation that this is 24/7 lights and sirens access to the waterfront may not be compatible with the community values. It may be appropriate for advanced life support or during a blockage, but it was never the City Council’s intent that this be full-time emergency access. The initial intent was pedestrian and emergency access but that has morphed. She suggested the 4.1.a Packet Pg. 10 Attachment: 04-03-2018 Draft Council Meeting Minutes (Approval of Council Meeting Minutes) Edmonds City Council Draft Minutes April 3, 2018 Page 8 expectations, planning assumptions, expected contributions, etc. of the stakeholders and administrative members of the City be written down and verified to ensure a smooth process. Councilmember Mesaros commented it would be helpful have someone from South Snohomish County Fire & Rescue make a presentation to the Council regarding how they currently access the waterfront, how that would change with the new emergency access and whether it was important to have 24/7 access. He assumed they currently travel down Edmonds, turn left on Sunset Avenue and turn right on Dayton or Main depending on the location of the emergency. The connector would actually limit emergency vehicles in the public area; instead of going down Sunset, etc. and disturbing more people, emergency vehicles would use the flyover. Mr. Williams agreed the Fire Department could be invited to make a presentation or to provide a memo. Councilmember Mesaros preferred a presentation in the event Councilmembers had questions. He noted there was adequate time to have that discussion as a preferred alternative will not be selected until August. Council President Pro Tem Buckshnis agreed with Councilmember Johnson, the Council was never told the overpass would be used 24/7 by emergency vehicles. She commented the people on Sunset and 2nd Avenue have already put up with what has gone on recently and she wanted more details and plans so the Council is aware rather than surprised. 6. AUDIENCE COMMENTS Luke Distelhorst, Edmonds, President, Friends of the Edmonds Library, asked for a show of hands of those in the audience who were present in support of the Edmonds Library; numerous people raised their hands. He was recently disappointed to see certain Edmonds officials seeking to erode public support for the Sno-Isle levy proposition. Spreading confusion in the minds of Edmonds voters jeopardizes crucial services not only in our community, but also the other 22 branch locations throughout Snohomish and Island counties. The Edmonds branch and the services it provides are not only inseparable from the larger whole the Sno-Isle Libraries System, they cannot be replicated or valued independently. For instance, 20% of the items checked out at the Edmonds Library come from other branches. At the core of the Sno-Isle library services is the mission of serving all citizens; to provide a community doorway to reading, resources, and lifelong learning, and a center for people, ideas, and culture. At the Edmonds Library you will see students collaborating, babies and toddlers at story times with their parents, people of all ages at STEM, arts, culture, and business programs, and of course everyday citizens utilizing a wide range of free resources that the library provides. You would also see the evolving role that libraries play in our community. Addressing socio-economic disparity and serving a range of demographic groups with composure, libraries and their staff are on the front line of engaging the widest range of citizens. The Sno-Isle system is a source of empowerment to diverse groups in our community. No matter your background or the state of your bank account, every person has equal access to all the resources and learning opportunities of public libraries. Failing to support our public libraries will disproportionately affect some of our most vulnerable citizens. Mr. Distelhorst continued, the Edmonds Library and its staff are top notch. The library has more programs, new equipment and resources, and an excellent location to tie into the city’s thriving arts and entertainment scene, which contributes $50 million dollars per year in economic impact to our community. The Sno-Isle levy proposition has received YES endorsements from Congressman Rick Larsen, the mayors of Mukilteo, Arlington, Stanwood, Coupeville and Darrington; five Snohomish County Council Members, including the Edmonds representative; the Island County Commission chair, various state and city council representatives and the YMCA and United Way of Snohomish County. In this context, he found the public silence of Edmonds city councilmembers troubling and requested councilmembers publicly express their support for our excellent library system, the vital services it provides in our communities, and the Sno-Isle levy proposition. 4.1.a Packet Pg. 11 Attachment: 04-03-2018 Draft Council Meeting Minutes (Approval of Council Meeting Minutes) Edmonds City Council Draft Minutes April 3, 2018 Page 9 Tom Mayer, Edmonds, explained the purpose of his comments was to respond to statements made by Councilmember Teitzel and Finance Director James in a recent edition of My Edmonds News. According to several sources, his home’s value was approximately double of an average home value in Edmonds; he assumed that meant he paid about twice as much in property taxes as the average homeowner. In the words of Councilmember Teitzel, he was a victim of his own success. If he pays twice as much, should he expect twice as much city services, or pay half as much for Parks & Recreation program fees; no, that was not what he expected. Citizens live in a country that believes in promoting the general welfare as stated in the preamble of the constitution; the public library is a wonderful example of promoting the general welfare. He was supportive of his tax dollars being used to help children in Darrington learn to love books and reading at their library’s preschool story hours, to enable students of all ages in Oak Harbor to gain access to library research and materials, or to make computers available to senior citizens in Edmonds unable to afford their own. Those who are paying more to help our less fortunate neighbors should feel privileged; it is the price of living in an enlightened and compassionate society. Carmen Rumbaut, Edmonds, expressed support for the Sno-Isle Library levy as a library is one of greatest gifts a community can give to its self. She also supported relooking at the use of single use plastic straws, explaining plastic straws are difficult to recycle because they are so tiny. Recycling centers use conveyor belts and air to sort materials, plastic straws are lost in that process which is why they are not recyclable. All the plastic ever made is still around, it does not biodegrade, it only gets broken into only smaller bits and people end up breathing and eating plastic. A 2014 French study found oysters have a lower reproductive rate when exposed to plastic in the water and a 2014 University of Glasgow study found crabs take in microplastics through respiration that end up being retained in their bodies for up to 3 weeks. Burning plastic creates toxic dioxides. Seattle’s ban on plastic straws included a voluntary strawless month in September 2017 in which 200 retailers participated. According to Strawlessoceans.org, that month permanent removed 2.3 million single use plastic straws. Even starting with that in Edmonds would be a great help. Dianna Maish, Edmonds, expressed her support for the levy. Councilmember Teitzel, Chair of the Council Finance Committee, raised three questions regarding the Sno-Isle Edmonds Library, 1) taxes collected for the library exceed Sno-Isle’s investment in the library, 2) the library location at 651 Main Street may not be the highest and best use of the site and a Highway 99 location has been mentioned, and 3) the library may be obsolete over time. She offered a different perspective on these concerns. With regard to taxes collected, everyone pays taxes for services they not use such as schools, medic and fire response, road repairs on street they do not drive; however, those services add to the overall value of the quality of the community. The library levy is proportionate to individual property taxes and the property values in Edmonds are generally higher than more rural areas. The total levy amounts for property owners are slight given the value. A property accessed at $500,000 pays $190/year for Sno-Isle; with passage of the levy, that will increase to $235 or an increase in 2019 of only $45/year. This will allow the Edmonds Library to continue the level of service patrons now enjoy, maintain hours of operation, retain excellent staff, sustain the cost of new materials, technical upgrades, and routine maintenance on the facility. Second, the highest and best use of the property is more than the financial profitability, tax proceeds and zoning. She questioned how the value of the experience of individual attention to patrons’ needs, face-to-face support and a public space for bringing people together could be determined. Edmonds prides itself on its walkability, links to a variety of amenities. She summarized there is no possibility of the library becoming obsolete; it is much more than circulating materials. Emily Paynich, Edmonds, expressed support for the Sno-Isle library levy, commenting her family are lifelong library fans and use the library several times a month. She requested a show of support from the City Council to continue the gem of the community center that is the library. As a member of the Edmonds Neighborhood Action Coalition (ENAC), she expressed support for Edmonds continuing to be a leader in environmental causes. Edmonds was the first city to ban single use plastic bags and suggested the City 4.1.a Packet Pg. 12 Attachment: 04-03-2018 Draft Council Meeting Minutes (Approval of Council Meeting Minutes) Edmonds City Council Draft Minutes April 3, 2018 Page 10 continue to show its leadership by banning plastic straws and possibly plastic utensils. She submitted a flyer that could be provided to neighborhood restaurants who may be amenable to make this position change for the environment and encourages them to learn the facts about plastic straws, the impact they have on the delicate ecosystem and alternatives. Audrey Paynich, Edmonds, a student at Edmonds Heights K-12, who was doing a project on marine pollution, explained it is a very big issue. The ecosystem is very important with its trees, oceans and waterways, but they are being polluted by straws and utensils. Plastics degrade into microplastics which are eaten by animals and people who eat animals also then eat microplastic. If Edmonds would become straw free, it would be very helpful to everyone. Laurel Ehrlich, Edmonds, a member of ENAC, a volunteer for the climate change and environment group, and representing the campaign, The Last Straw in Edmonds. There is too much plastic in the waters; straws are always in the top ten of items found in beach cleanups. Straws are an easy item to do without and there are plastic straw alternatives including straws made from bamboo or metal. Before moving to Edmonds, she volunteered hundreds of hours for the National Marine Mammals Stranding Network in the Florida Keys where she saw firsthand what happens to marine wildlife when plastic ends up in the water. They rescued manatees entangled in plastic fishing line, rescued stranded dolphins and whales and as a photographer on the necropsy team, she witnessed large amount of plastic in whales’ stomachs. She recalled a photo of a turtle having a plastic straw removed from its nostril; over 50% of all sea turtles have been found to have ingested some type of plastic. Critically endangered resident orcas need clean, trash-free waters to survive. Deceased orcas have been found with stomachs full of plastic causing them to starve to death. Eight million tons of plastic are dumped in our oceans every year. By 2050 there will be more plastic in the oceans than fish. Banning plastic straws may seem like a small gesture, but it is a start. After educating everyone about plastic straws and reducing their use, Edmonds can tackle another plastic problem and develop a solution to single use plastic water bottles. She suggested visitors could be provided a reusable water bottle with Edmonds’ logo and local business sponsors and the City locate water bottle filling stations in the downtown area. She urged the City to follow the lead set by the Strawless in Seattle campaign sponsored by LonelyWhale.org and help Edmonds be a true environmental leader. Chris Walton, Edmonds, expressed support for the Edmonds Library and the Sno-Isle levy and concurred with the previous speakers’ comments. As a senior citizen living on fixed income, he totally supported the possibility he may have to pay even more taxes due to the incredible importance of the library to the community. Next, he referred to the recent cost estimate for the senior center that was about $6 million higher than expected. He was in total support of the redevelopment of the senior center but that increase seems extraordinarily large, making him question the bidding process and whether adequate consideration was given in the bids for normal cost increases. That and seeing what has happened in Seattle with the streetcar project, he feared the Edmonds connector project, currently estimated at $30 million, would increase to $40-50 million. 7. PUBLIC HEARING 1. PUBLIC HEARING ON PLANNING BOARD RECOMMENDATION TO AMEND ECDC 23.40.220(C)(8): ALLOWED ACTIVITIES Planning Manager Rob Chave explained the allowed activities section of the code includes a provision for doing invasive species removal to protect and/or restore critical areas. The code currently includes a threshold, if the removal of invasive species exceeds 1500 square feet in a 3-year period, a consultant study is required. Due to a concern raised by the Council that this requirement could be a detriment/barrier to community groups or non-profits doing restoration work, it was forwarded to the Planning Board for consideration and recommendation. The Planning Board’s recommendation was to add the following provision to the vegetation removal section: 4.1.a Packet Pg. 13 Attachment: 04-03-2018 Draft Council Meeting Minutes (Approval of Council Meeting Minutes) Edmonds City Council Draft Minutes April 3, 2018 Page 11 “For activities intended to protect or restore habitat in wetlands or fish and wildlife habitat conservation areas, vegetation removal under this section may exceed the 1,500 square foot limitation if: i. The activity is proposed and managed by a non-profit or other organization, approved by the City, that has demonstrated expertise and experience in the restoration or invasive removal activity; and, ii. The project sponsor provides a specific proposal identifying the scope and location of the project, provides for project supervision, and includes a monitoring and inspection schedule acceptable to the City and approved by the appropriate City department.” Mr. Chave explained this allows an organization that has done this type of work in the past, can demonstrate they know what they’re doing and that they have a plan for what they are doing, to do a restoration/enhancement activity without hiring a consultant. This amendment gives the City the opportunity to encourage appropriate restoration projects and provides assurance it will be done right. After the public hearing, staff recommends the Council direct the City Attorney to an draft ordinance for approval on the Consent Agenda. Mayor Pro Tem Nelson opened the public participation portion of the public hearing. Joe Scordino, Edmonds, said he has been working with students at Edmonds-Woodway High School who have done restoration projects in Edmonds. He approached the City Council last September to point out the problem with the ordinance and their ability to do a restoration on private property. The 1500 square foot in 3 years threshold was restrictive and raised concern about their ability to continue restoration efforts and build on the community effort that began on the Holy Rosary project. He would like to see that continue in Edmonds, it raises environmental consciousness as well as awareness of how activities on their property affects steams. His earlier request to the Council was for an exemption to the restriction because 1500 square feet every 3 years was constraining. He described having to replot the location of invasive vegetation removal, first due to a hornet’s nest, again when volunteers wanted to remove invasive vegetation close to the hornet’s nest and again when a volunteer was stung. The concern that prompted the existing language seems to be erosion, steep slopes, etc. A better way may be to amend the ordinance so that allowed activity is only for the purpose of habitat restoration along streams and wetlands which negate concerns about steep slopes and to make the removal threshold per year. Hearing no further comment, Mayor Pro Tem Nelson closed the public hearing. Council President Pro Tem Buckshnis asked where the 1500 square foot threshold came from. Mr. Chave said the consultants who prepared the critical area update were doing a number of ordinances and the provision in Seattle made sense to them so they suggested it for Edmonds. COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER TIBBOTT, TO DIRECT THE CITY ATTORNEY TO DRAFT AN ORDINANCE. Councilmember Johnson thanked the public, staff and Planning Board for proposing a code change that will facilitate restoration projects and will ensure they are done by an agency that will oversee the work. She recalled two sites that would benefit from this change, Holy Rosary and removal of purple loosestrife in the marsh. Councilmember Teitzel supported this change to remove barriers to restoration. He referred to 23.40.220(C)(8)(a), “The removal of the following vegetation with hand labor and hand-held equipment when the area of work is under 1,500 square feet in area…” and questioned the term hand-held equipment. For example, a rototiller is operated using ones’ hands but he assumed that was not the intent of “hand-held 4.1.a Packet Pg. 14 Attachment: 04-03-2018 Draft Council Meeting Minutes (Approval of Council Meeting Minutes) Edmonds City Council Draft Minutes April 3, 2018 Page 12 equipment”. Mr. Chave said the intent was wheeled equipment, etc. Councilmember Teitzel suggested changing hand-held to hand tools. Councilmember Teitzel envisioned restoration work in a 200-foot section of Shell Creek and part of it includes a slope of over 30 degrees down to the stream. He asked whether City staff would visit the restoration site before work began and flag the area where restoration could occur outside the steep slope. Mr. Chave answered staff would check if a steep slope land hazard area was present to ensure the right area for restoration has been identified. Councilmember Tibbott appreciated the work done by staff and the Planning Board. If this work is supervised as prescribed in the packet, he asked why restoration of 3,000 square feet or even 5,000 square feet per year would not be allowed as long as it is supervised by an organization that is an expert in that activity. Mr. Chave said this provision provides the ability to go above 1500 square feet but does not describe an upper limit. Councilmember Tibbott expressed support for that. He asked if there were any other exceptions in addition to steep slopes. Mr. Chave said rather than identifying exceptions, the amendment states the only vegetation removal allowed is to protect or restore habitat in wetlands or fish and wildlife habitat conservation areas which means it could not be done on steep slopes, earth subsidence zones, liquefaction areas, earthquake hazard areas, etc. COUNCIL PRESIDENT PRO TEM BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER TEITZEL, TO AMEND 23.40.220(8)(a) TO READ, “THE REMOVAL OF THE FOLLOWING VEGETATION WITH HAND LABOR AND HAND TOOLS FOR THE PURPOSE OF HABITAT RESTORATION WHEN THE AREA OF THE WORK IS UNDER 1500 SQUARE FEET IN AREA PER YEAR. AMENDMENT CARRIED UNANIMOUSLY. MAIN MOTION AS AMENDED CARRIED UNANIMOUSLY. Mayor Pro Tem Nelson declared a brief recess. 8. STUDY ITEMS 1. PRESENTATION OF FIVE CORNERS UPDATE FEASIBILITY AND PLANNING BOARD RECOMMENDATION Development Services Director Shane Hope explained this project goes back more than 10 years when the City undertook an effort for Westgate and Five Corners. Several years ago, a decision was made to proceed with Westgate first because the Five Corners roundabout had not been completed. Councilmember Johnson and others have encouraged staff to look at Five Corners again. When this issue was raised at a previous Council meeting, she questioned the feasibility of taking this project up again. The City engaged a consultant, Heartland, on a limited basis to look at key sites to identify whether it was feasible to proceed and if it did not seem feasible, how else it could be it feasible. The Council packet includes the Planning Board minutes and their recommendation to move forward as well as a summary of the vision behind the original concept for Five Corners and the Economic Development Commission’s memo recommending the Council move forward. She sought the Council’s input on the priority of this effort, commenting it could not be done immediately due to other existing priorities. She summarized a lot of work would be required to develop a final code and the public process especially due to the length of time since this has been discussed. Chris Fiori, Principal and Project Director, Heartland, explained Heartland is a real estate advisor, investor and brokerage firm; this analysis focused on financial economics and does not address the broader planning policy considerations related to a rezone. He reviewed:  Project Overview: 4.1.a Packet Pg. 15 Attachment: 04-03-2018 Draft Council Meeting Minutes (Approval of Council Meeting Minutes) Edmonds City Council Draft Minutes April 3, 2018 Page 13 o Context:  The City of Edmonds is considering a form-based code for the Five Corners area  Five Corners area has potential to add increased density and additional housing with newer building stock.  Goal: explore the feasibility of redevelopment of four sites within current market conditions under draft code.  Property Overview (four of five corners investigated) o NW Quadrant – 8401 Main Street  BARC facility  1.66 Acres o NE Quadrant – 8325 212th St SW  Edmonds Veterinary  0.9 acres o SE Quadrant – 8330 212th St SW  Calvary Chapel  0.99 acres o SW Quadrant - 8400-8416 Bowdoin Way  Five Corners Retail Plaza  0.82 acres  Methodology o Feasibly of Redevelopment form developer’s perspective  Developer analyzes project specific returns to make “go/no-go” decision  Residual Land Value (“RLV”):  Amount the developer can afford to pay for the “land”  Assuming the developer maximizes allowed buildable square feet, the total value of developed project is set  Any additional project costs push down the residual land value, while additional entitlements can increase it o Redevelopment occurs went the residential land value is higher than the value of the site’s current use  Draft Form-Based Code Assumptions o 75% site area developable o Maximum height of four stories (three stories residential over one story retail) o Parking Minimums – 1 Stall/Residential Unit + 1 Stall/500 square foot retail o 15% units affordable at 80% AMI o Average unit size = 600 SF (20% of units < 900 SF, no units over 1,600 SF)  Flexible Form-Based Code Assumptions 1. Maximum height of five stories (four stories residential over one story retail) 2. Parking Minimums – 0.5 Stalls/Residential Unit + 1 Stall/500 square foot retail 3. Combined maximum height of five stories and parking minimums of 0.5 stall/residential units  Findings o Existing buildings on the four tested sites in the Five Corners area are currently 100% occupied with relatively high market rents.  Current zoning prohibits multi-family or buildings with heights over 25 feet o The new draft Form-Based Code for Five Corners increases development capacity enough to make redevelopment financially feasible. o Additional enhancements to the code would increase redevelopment value.  For medium-sized and large sites, decreasing required parking minimums provides the highest lift to land value  For small sites, allowing an extra floor of building height provides the most additional value. 4.1.a Packet Pg. 16 Attachment: 04-03-2018 Draft Council Meeting Minutes (Approval of Council Meeting Minutes) Edmonds City Council Draft Minutes April 3, 2018 Page 14  A combination of decreased parking minimums and an extra floor of building height would provide the highest additional value for all sites.  Bar graph of All Properties Scenarios: Comparative Performance Summary for BARC, Edmonds Veterinary, Cavalry Chapel and Four Corners Plaza comparing value in use, draft form-based code, flexible height, flexible parking, flexible height plus parking As an example, he reviewed their analysis of the BARC site:  1.66 acres  Land Value Under Current Use ~$65 Per Square Foot  Land Value Under Draft Form-Based Code ~$95 Per Square Foot  Flexible Height o Land Value Under Flexible Form-Based Code ~$120 Per Square Foot  Flexible parking o Land Value Under Flexible Form-Based Code ~$172 Per Square Foot  Flexible Height & Parking o Land Value Under Flexible Form-Based Code ~$219 Per Square Foot  Comparative Performance of five scenarios He noted there have not been any direct conversations with any of the property owners. Council President Pro Tem Buckshnis commented whenever she hears about flexible parking, she, like Planning Board Member Cloutier, thinks of Seattle who is now looking at requiring zero parking. In Seattle, people live and work in close proximity; Edmonds does not have mass transit, so she is cautious about flexible parking. Without a mechanism get people to commuter rail, light rail or Swift, not providing parking could be problematic. She likes form-based code and hopes BARC remains for a long time due to the need in the animal community. Ms. Hope said flexible parking was only a concept that was considered. Councilmember Mesaros was glad flexible parking had been considered as an option when reviewing concepts. He recalled visiting Chicago in the past for business and buildings often had no parking. Larger cities, including Seattle, encourage walking and public transportation so they discourage parking. Edmonds does not have infrastructure. The BARC site has some rental income from a coffee stand, but the majority of the site is owner occupied. He commented the existing owner may be able to expand the development under the current code and expand the revenue it generates. Councilmember Teitzel was excited about Five Corners’ future and the opportunities. He is also a proponent of form-based code as a way to reinvigorate the area. On a tour of the BARC facility today, Dr. Chelsey said their business is booming; they draw clients from as far as Bellingham, Tacoma and Kitsap County. He envisioned for the foreseeable future that building would not be redeveloped. With regard to transitions, he recalled discussions during the Highway 99 Subarea plan about building as tall as five stories next to single family. He asked how transition would be handled in the Five Corners neighborhood where there are single family homes close to the roundabout. Ms. Hope recalled transition was provided in the draft concept; buildings rapidly step down from the higher heights. Councilmember Johnson was familiar with Five Corners as it has been her neighborhood. She suggested there was an opportunity to look at parking needs as an areawide issue as there may be excess parking at the BARC site and the churches, possibly stalls could be rented out. She anticipated it would be challenging to redevelop the SW quadrant and accommodate the parking needs for residential; parking across the street in a flexible arrangement could be possibility. Councilmember Fraley-Monillas said her issue with parking in this area is that it abuts residential and the goal should be to keep cars out of the neighborhood. She agreed it would be the most difficult to provide 4.1.a Packet Pg. 17 Attachment: 04-03-2018 Draft Council Meeting Minutes (Approval of Council Meeting Minutes) Edmonds City Council Draft Minutes April 3, 2018 Page 15 an adequate level of parking in the SW quadrant. She asked why the fifth arm of Five Corners was not included and if it was because the lot was so small. Ms. Hope answered the intent to was limit the analysis and these four were good examples to determine the feasibility. If redevelopment is feasible for the other four quadrants, it would be feasible for the dry cleaner site. With regard to the priority of this effort, Councilmember Mesaros sensed that although this is not the City’s number 1 priority, it should be moved forward on a good basis. He suggested staff keep moving forward, keep the Council informed and use the Planning Board as appropriate to keep this project alive and moving forward. He commented it would be interesting to hear the property owners’ thoughts. As was learned with Westgate, some properties will redevelop faster and others will take 15-20 years even though the code was changed. Councilmember Johnson asked how this could be moved forward expeditiously. Ms. Hope said even moving expeditiously, it could not begin for several months due to other projects underway. Depending on circumstances it could take a few months or a year to complete. Councilmember Johnson asked if writing form-based code would involve the Green Futures Lab. Ms. Hope explained similar to Westgate, their basic work would be used to develop the code. They provided good concepts, but they are not accustomed to writing code. Councilmember Johnson observed that would be the most time-consuming piece. Ms. Hope agreed writing the code and the public process are time consuming. Councilmember Johnson summarized even moving expeditiously would take a year or more. Ms. Hope agreed. Councilmember Teitzel echoed Councilmember Mesaros’ comment, to move ahead as there are opportunities but it should not be the City’s top priority. That area has languished for some time and it is in need of improvement, aesthetically and functionally. Mayor Pro Tem Nelson summarized the Council’s input was to proceed at a moderate pace. 9. MAYOR'S COMMENTS Mayor Pro Tem Nelson announced his appointment of Kimberly Koenig to the Economic Development Commission. With regard to citizens’ comment on the library and wanting to hear from Council, he relayed his support for the Edmonds Library which is a wonderful resource. He recalled when he was in middle school, he was challenged playing the trumpet, so much that he practiced in his mom’s car. When he was no longer allowed in the band, he was assigned to become library aid and spent a lot of time in the library. He summarized the library is a vital place for the community gather, learn and share and he fully supports it. 10. COUNCIL COMMENTS Councilmember Johnson said she loves the Edmonds Library and is a proud member of the Friends of the Edmonds Library. Due to the ground swell in the community and world, next week in committee, the Council will discuss plastic straws. Alternatives to plastic straws would move the zero-waste policy further ahead and she was happy to hear the citizens’ comments tonight regarding that issue. Councilmember Teitzel said he also is a strong supporter of the Edmonds Library. Living in Edmonds since 1987, his two daughters were often in the library. He is a proud holder of a Sno-Isle library card and checks out materials fairly often. His sole concern as the chair of the Finance Committee was the library’s funding model. Edmonds property values have increased rapidly over the past 10-15 years and the level of subsidy Edmonds citizens contribute to the Sno-Isle is disproportionate. Edmonds is the only city creating a subsidy to Sno-Isle. His concern has nothing to do about the quality of service. Relative to moving the library, he said there is no effort to move the library. The City Council has an obligation to look 10-15 years in the future and how demographics and population distribution are changing. The Highway 99 Subarea Plan 4.1.a Packet Pg. 18 Attachment: 04-03-2018 Draft Council Meeting Minutes (Approval of Council Meeting Minutes) Edmonds City Council Draft Minutes April 3, 2018 Page 16 anticipates substantial population growth which prompted the question of whether the library’s current location was sufficient to serve a changing distribution of population in the future. He summarized it is a blue-sky question, there are no plans to move the library. Councilmember Teitzel reported on the Cedar Creek Memory Care open house; it is a fabulous facility for those with Alzheimer’s and memory challenges and he encouraged the public to schedule a tour. The 54,000 square foot facility opens in April, has 80 beds, 50% have been leased to patients. Councilmember Teitzel relayed his plans to meet with the Mayor’s Climate Protection Committee on Thursday to discuss single use plastic straws with the goal of bringing a resolution to the City Council soon. He reported the Homelessness Task Force received four responses to the RFP; the task force will meet on Friday to discuss the responses and consider next steps. Councilmember Tibbott relayed his support of the library, an amenity the City and his family use a great deal. He questions whether the levy is the appropriate next step for funding the Sno-Isle library system but he is supportive of the Edmonds Library and wants to see it continue. He trusts Edmonds citizens will study and do their due diligence on the levy and its impacts on their family. He recalled not long ago the library was run by the City and was not part of the Sno-Isle system; those days may need to be recalled going forward. Councilmember Tibbott relayed having a conversation with a restaurant owner in the City who asked his opinion on a plastic straw and utensil ban; the owner’s concern was how fast they could make a transition and the cost. This restaurant owner felt there was a lot of support for reducing that kind of waste. Councilmember Tibbott recognized his wife, Margaret, a high school teacher at Mountlake Terrace High School, who was selected staff member of month. Councilmember Fraley-Monillas said this will be the last meeting she participates in by phone; she will return next week. With regard to straws, she pointed out in addition to businesses, a ban would also affect the school district and the hospital. She suggested it would be nice to get businesses to volunteer to use compostable straws. With regard to the library, Councilmember Fraley-Monillas said citizens were responding to the comments of one Councilmember and explained one Councilmember can technically say or question anything they wish but it takes four votes to do anything. Just because a Councilmember says something does not necessarily mean that is what the City will do. Council President Pro Tem Buckshnis said she loves libraries so much she has a library in her house. She loves books and grew up going to a library. This is an emotional issue to a lot of people and she agreed with the comment that if her tax dollars helped Reading with Rover in Darrington, she was supportive. Councilmember Buckshnis reported Councilmember Teitzel, who has been spearheading the plastic straw issue, will bring a resolution to the Mayors Climate Protection Committee on Thursday at 8:45 a.m. in the Fortner Room; meetings are open to the public. She noted Seattle did not enforce their ban for 3 years; she anticipated if the Council passed a resolution, a long period of time would be provided before enforcement. She agreed with Councilmember Fraley-Monillas that a ban would impact more than just businesses. On Thursday night at 6:00 p.m. the Davies Resource Group will make a presentation to the Tree Board on the Urban Forestry Management Plan. Councilmember Mesaros endorsed the Sno-Isle Library levy and said it was important for the community to support the quality the library has provided in the past and will continue to provide. With regard to a library on Highway 99, his first thought when he saw that was there would be a second library in Edmonds. 4.1.a Packet Pg. 19 Attachment: 04-03-2018 Draft Council Meeting Minutes (Approval of Council Meeting Minutes) Edmonds City Council Draft Minutes April 3, 2018 Page 17 The City does not control the library but could endorse having a second library on Hwy 99 as Edmonds is the third largest city in Snohomish County. An entirely new community will be developed on Highway 99 in the future and they will want those services. With regard to plastic straws, he was glad to see that issue was moving forward, finding it long overdue and an issue that would make a big impact. Student Representative Noal Leonetti voiced his appreciation for the library; as a high school student, he has spent many nights studying there, loved going there as a kid and was grateful for everything the library provides. He voiced his strong support for banning straws and other plastics in Edmonds, commenting the impact that plastics have on the marine system is frightening. This issue will continue in the future and it will be his generation’s responsibility to solve the problem. He recalled hearing comments from the community about banning Styrofoam in Edmonds which was also something he supported although he was unsure there had been any action taken. Taming Bigfoot just finished its third month and the public is invited to the final ceremony on April 23. 11. CONVENE IN EXECUTIVE SESSION REGARDING PENDING OR POTENTIAL LITIGATION PER RCW 42.30.110(1)(i) This item was not needed. 12. RECONVENE IN OPEN SESSION. POTENTIAL ACTION AS A RESULT OF MEETING IN EXECUTIVE SESSION This item was not needed. 13. ADJOURN With no further business, the Council meeting was adjourned at 9:34 p.m. 4.1.a Packet Pg. 20 Attachment: 04-03-2018 Draft Council Meeting Minutes (Approval of Council Meeting Minutes) City Council Agenda Item Meeting Date: 04/10/2018 Approval of claim, payroll and benefit checks, direct deposit and wire payments. Staff Lead: Scott James Department: Administrative Services Preparer: Nori Jacobson Background/History Approval of claim checks #230532 through #230654 dated April 5, 2018 for $276,300.39. Approval of wire payment on April 5, 2018 for $417.67. Approval of payroll direct deposit and checks #63219 through #63224 for $550,226.45, benefit checks #63225 through #63230 and wire payments of $529,407.96 for the pay period March 16, 2018 through March 31, 2018. Approval of clothing allowance check #63231 dated April 4, 2018 for Law Enforcement Commissioned Employees in the amount of $207.79 per union contract. Staff Recommendation Approval of claim, payroll and benefit checks, direct deposit and wire payments. Narrative In accordance with the State statutes, City payments must be approved by the City Council. Ordinance #2896 delegates this approval to the Council President who reviews and recommends either approval or non-approval of expenditures. Attachments: claim cks 04-05-18 wire 04-05-18 FrequentlyUsedProjNumbers 04-05-18 payroll summary 04-05-18 payroll benefit 04-05-18 clothing allowance 04-04-18 4.2 Packet Pg. 21 04/05/2018Voucher ListCity of Edmonds1 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230532 4/5/2018073947 A WORKSAFE SERVICE INC 256331DOT TESTINGstorm dot testing422.000.72.531.90.41.00 55.00Total :55.00230533 4/5/2018070322 A&A LANGUAGE SERVICES INC 15-58508LITHUANIAN INTERPRETER COURT 03/14/2018LITHUANIAN INTERPRETER COURT 03/14/2018001.000.23.512.50.41.01 161.09Total :161.09230534 4/5/2018065052 AARD PEST CONTROL 400896MEADOWDALE CC PEST CONTROL CUST 1-23276MEADOWDALE CC PEST CONTROL CUST 1-23276001.000.64.576.80.41.00 88.24Total :88.24230535 4/5/2018 061029 ABSOLUTE GRAPHIX 318111P&R LEAGUE SHIRTSP&R LEAGUE SHIRTS001.000.64.571.25.31.00 150.1510.4% Sales Tax001.000.64.571.25.31.00 15.62Total :165.77230536 4/5/2018075197 AGREEMENT DYNAMICS INC 5149COACHING SERVICESPARKS COACHING/INTERVIEWS001.000.64.571.21.41.00 750.00WWTP COACHING/INTERVIEWS423.000.76.535.80.41.00 4,000.00Total :4,750.00230537 4/5/2018074488 ALPHA COURIER INC 18223WWTP: 3/1/18 COURIER P/U TO EURO3/1/18 COURIER PICK UP423.000.76.535.80.42.00 29.70Total :29.70230538 4/5/2018069751 ARAMARK UNIFORM SERVICES 1990642045WWTP: 3/28/18 UNIFORMS,TOWELS+MATSMats/Towels1Page:4.2.aPacket Pg. 22Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds2 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230538 4/5/2018(Continued)069751 ARAMARK UNIFORM SERVICES423.000.76.535.80.41.00 106.38Uniforms423.000.76.535.80.24.00 3.5010.3% Sales Tax423.000.76.535.80.41.00 10.9610.3% Sales Tax423.000.76.535.80.24.00 0.36PARKS MAINT UNIFORM SERVICE1990642046PARKS MAINT UNIFORM SERVICE001.000.64.576.80.24.00 56.86FACILITIES DIVISION UNIFORMS1990642047FACILITIES DIVISION UNIFORMS001.000.66.518.30.24.00 32.5710.3% Sales Tax001.000.66.518.30.24.00 3.35PUBLIC WORKS OMC LOBBY MATS1990645915PUBLIC WORKS OMC LOBBY MATS001.000.65.518.20.41.00 1.61PUBLIC WORKS OMC LOBBY MATS111.000.68.542.90.41.00 6.11PUBLIC WORKS OMC LOBBY MATS421.000.74.534.80.41.00 6.11PUBLIC WORKS OMC LOBBY MATS422.000.72.531.90.41.00 6.11PUBLIC WORKS OMC LOBBY MATS423.000.75.535.80.41.00 6.11PUBLIC WORKS OMC LOBBY MATS511.000.77.548.68.41.00 6.0810.3% Sales Tax001.000.65.518.20.41.00 0.3310.3% Sales Tax111.000.68.542.90.41.00 0.6610.3% Sales Tax421.000.74.534.80.41.00 0.662Page:4.2.aPacket Pg. 23Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds3 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230538 4/5/2018(Continued)069751 ARAMARK UNIFORM SERVICES10.3% Sales Tax422.000.72.531.90.41.00 0.6610.3% Sales Tax423.000.75.535.80.41.00 0.6610.3% Sales Tax511.000.77.548.68.41.00 0.34FLEET DIVISION UNIFORMS & MATS1990645916FLEET DIVISION UNIFORMS511.000.77.548.68.24.00 5.68FLEET DIVISION MATS511.000.77.548.68.41.00 18.4010.3% Sales Tax511.000.77.548.68.24.00 0.5910.3% Sales Tax511.000.77.548.68.41.00 1.89Total :275.98230539 4/5/2018071124 ASSOCIATED PETROLEUM 1226939-INWWTP: 3/27/18 DIESEL FUEL3/27/18 ULSD #2 DYED - BULK fuel423.000.76.535.80.32.00 331.3210.3% Sales Tax423.000.76.535.80.32.00 34.13Total :365.45230540 4/5/2018069076 BACKGROUND INVESTIGATIONS INC COE0318-2BACKGROUND CHECKS - MARCHBACKGROUND CHECKS - MARCH001.000.22.518.10.41.00 97.00Total :97.00230541 4/5/2018061659 BAILEY'S TRADITIONAL TAEKWON 6282 6290 TAEKWON-DO6282 6290 TAEKWON-DO INSTRUCTION6282 TAEKWON-DO INSTRUCTION001.000.64.571.22.41.00 52.006290 TAEKWON-DO INSTRUCTION001.000.64.571.27.41.00 1,104.563Page:4.2.aPacket Pg. 24Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds4 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount(Continued)Total :1,156.56230541 4/5/2018 061659 061659 BAILEY'S TRADITIONAL TAEKWON230542 4/5/2018 002100 BARNARD, EARL 32REIMBURSEMENTREIMBURSEMENT617.000.51.517.20.23.00 232.49Total :232.49230543 4/5/2018063408 BARTELS & STOUT INC SRC1829WWTP: LEICA DMLS PREV. MAINTENANCELEICA DMLS PREV. MAINTENANCE423.000.76.535.80.41.00 170.0010.3% Sales Tax423.000.76.535.80.41.00 17.52Total :187.52230544 4/5/2018002170 BARTON, RONALD 29REIMBURSEMENTREIMBURSEMENT009.000.39.517.20.23.00 1,931.75Total :1,931.75230545 4/5/2018073834 BATTERIES PLUS 263-104359-01WWTP: WRONG TAX CHGD-CREDIT INV 263-2845WRONG TAX CHGD-CREDIT INV 263-284571423.000.76.535.80.31.00 1,326.6010.4% Sales Tax423.000.76.535.80.31.00 137.97WWTP: 3/23/18 CREDIT FOR INV 263-104359-263-2845713/23/18 CREDIT FOR INV423.000.76.535.80.31.00 -1,326.6010.4% Sales Tax423.000.76.535.80.31.00 -137.97WWTP: 12V BATTERIES263-28457212V Batteries423.000.76.535.80.31.00 1,326.6010.3% Sales Tax423.000.76.535.80.31.00 136.64Total :1,463.24230546 4/5/2018072696 BJORBACK, LEIF WABOLBWABO TRAVEL EXPENSES4Page:4.2.aPacket Pg. 25Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds5 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230546 4/5/2018(Continued)072696 BJORBACK, LEIFparking 8.00, mileage 34.34001.000.62.524.20.43.00 42.34Total :42.34230547 4/5/2018074307 BLUE STAR GAS 1030202-INFLEET AUTO PROPANE 682.3 GALFleet Auto Propane 682.3 Gal511.000.77.548.68.34.12 1,014.21Total :1,014.21230548 4/5/2018076341 BRK THRU DIGITAL LLC BID-1328BID/ED! DIGITAL ADVERTISING MARCH 2018BID/Ed! Digital advertising March 2018140.000.61.558.70.41.40 1,500.00Total :1,500.00230549 4/5/2018076240 CADMAN MATERIALS INC 5501956ROADWAY - ASPHALTRoadway - Asphalt111.000.68.542.31.31.00 185.4210.0% Sales Tax111.000.68.542.31.31.00 18.54ROADWAY - ASPHALT5502281Roadway - Asphalt111.000.68.542.31.31.00 152.5710.0% Sales Tax111.000.68.542.31.31.00 15.26STORM DUMP FEES5502914Storm Dump Fees422.000.72.531.10.49.00 969.80Total :1,341.59230550 4/5/2018071816 CARLSON, JESSICA 6174 DRAWING6174 ADVENTURES IN DRAWING INSTRUCTION6174 ADVENTURES IN DRAWING INSTRUCTION001.000.64.571.22.41.00 691.90Total :691.90230551 4/5/2018 075994 CARTER, ERIC WABOECWABO TRAVEL EXPENSES5Page:4.2.aPacket Pg. 26Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds6 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230551 4/5/2018(Continued)075994 CARTER, ERICPARKING 20, MILEAGE 34.34001.000.62.524.20.43.00 54.34Total :54.34230552 4/5/2018075388 CASCADE SUBSCRIPTION SERVICE 1340535AMERICAN CEMETERY SUBSCRIPTIONAMERICAN CEMETERY SUBSCRIPTION130.000.64.536.20.49.00 99.00Total :99.00230553 4/5/2018069813 CDW GOVERNMENT INC MBJ4868WWTP: THUMB DRIVESthumb drives423.000.76.535.80.31.00 67.40Freight423.000.76.535.80.31.00 19.8810.3% Sales Tax423.000.76.535.80.31.00 8.99Total :96.27230554 4/5/2018003515 CH2M HILL INC 381138881WWTP: 2/10-3/9/18 TO 5.20172/10-3/9/18 Task Order 5.2017423.000.76.535.80.41.00 8,739.00Total :8,739.00230555 4/5/2018076520 CHRISTY & MITCH HAMILTON 2-17250#733758RT UTILITY REFUND#733758RT Utility refund due to411.000.233.000 365.15Total :365.15230556 4/5/2018069457 CITY OF EDMONDS E5KA.BLD20171768E5KA.BLD20171768 BUILDING PERMITE5KA.BLD20171768 Building Permit421.000.74.594.34.65.41 4,690.50Total :4,690.50230557 4/5/2018 074241 CLUGSTON, MICHAEL WABOMCWABO TRAVEL EXPENSESPARKING 8, MILEAGE 34.34001.000.62.558.60.43.00 42.346Page:4.2.aPacket Pg. 27Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds7 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount(Continued)Total :42.34230557 4/5/2018 074241 074241 CLUGSTON, MICHAEL230558 4/5/2018 074255 COAL CREEK ENVIRONMENTAL ASSOC 120902-22WWTP: 12/3/17-2/28/18 TO 6.201712/3/17-2/28/18 TO 6.2017423.000.76.535.80.41.00 3,825.00WWTP: 1/1-3/3/18 TASKS 1.2018-3.2018120902-231/1-3/3/18 TASKS 1.2018 - 3.2018423.000.76.535.80.41.00 6,525.00Total :10,350.00230559 4/5/2018 064369 CODE PUBLISHING CO 59538EDMONDS DEVELOPMENT AND CITY CODEEdmonds Development and City Code001.000.62.524.10.49.00 202.95Total :202.95230560 4/5/2018062975 COLLISION CLINIC INC 37557UNIT 100 - REPAIRSUnit 100 - Repairs511.000.77.548.68.48.00 782.0010.3% Sales Tax511.000.77.548.68.48.00 80.55Total :862.55230561 4/5/2018069892 COLUMBIA FORD INC 3-J1005UNIT E150PO - NEW 2018 FORD ESCAPEUnit E150PO - New 2018 Ford Escape511.100.77.594.48.64.00 25,898.008.4% Sales Tax511.100.77.594.48.64.00 2,175.43Total :28,073.43230562 4/5/2018 071417 CORE & MAIN LP I606909STORM PIPEStorm Pipe422.000.72.531.40.31.00 2,130.4810.3% Sales Tax422.000.72.531.40.31.00 219.45Total :2,349.93230563 4/5/2018074444 DATAQUEST LLC 5103INV 5103 EDMONDS PD - MARCH 2018 REPORTS7Page:4.2.aPacket Pg. 28Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds8 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230563 4/5/2018(Continued)074444 DATAQUEST LLCPRE-HIRE CREDIT CHECK RAFTIS001.000.41.521.10.41.00 20.00Total :20.00230564 4/5/2018064531 DINES, JEANNIE 18-383703/27/2018 CITY COUNCIL03/27/2018 - CITY COUNCIL MINUTES &001.000.25.514.30.41.00 272.00Total :272.00230565 4/5/2018073772 DIRECT MATTERS 55130ORDER ON INFRACTION DEFERRAL (2500)ORDER ON INFRACTION DEFERRAL (2500)001.000.23.512.50.31.00 444.7910.3% Sales Tax001.000.23.512.50.31.00 45.81Total :490.60230566 4/5/2018064640 DMCMA04032018REGISTRATION FEE SPRING REGIONALREGISTRATION FEE SPRING REGIONAL001.000.23.512.50.49.00 100.00Total :100.00230567 4/5/2018076517 DUENAS, ERIC EDUENAS32618WWTP: EDUENAS PER DIEM REIM-WOW CONF. 20ERIC DUENAS PER DIEM REIMBURSEMENT -423.000.76.535.80.43.00 111.00Total :111.00230568 4/5/2018007253 DUNN LUMBER 5416217PM: SUPPLIES ACCT E000027PM: SUPPLIES LUMBER001.000.64.576.80.31.00 61.22Total :61.22230569 4/5/2018007675 EDMONDS AUTO PARTS 1-82732CEMETERY: 12 VOLTCEMETERY: 12 VOLT130.000.64.536.50.31.00 159.9510.3% Sales Tax130.000.64.536.50.31.00 16.478Page:4.2.aPacket Pg. 29Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds9 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount(Continued)Total :176.42230569 4/5/2018 007675 007675 EDMONDS AUTO PARTS230570 4/5/2018 074302 EDMONDS HARDWARE & PAINT LLC 002712PM: BLADE, FASTENERSPM: BLADE, FASTENERS001.000.64.576.80.31.00 22.3110.3% Sales Tax001.000.64.576.80.31.00 2.30PM: VALVE, BOLT KIT002715PM: VALVE, BOLT KIT001.000.64.576.80.31.00 74.2210.3% Sales Tax001.000.64.576.80.31.00 7.64Total :106.47230571 4/5/2018074302 EDMONDS HARDWARE & PAINT LLC 1015PLAZA RM - SUPPLIESPlaza Rm - Supplies001.000.66.518.30.31.00 15.99PW - Supplies001.000.66.518.30.31.00 54.9910.3% Sales Tax001.000.66.518.30.31.00 7.31Total :78.29230572 4/5/2018076519 ESTATE OF SHIRLEY MORRIS 5-06450#731383RT UTILITY REFUND#731383RT Utility refund due to411.000.233.000 121.65Total :121.65230573 4/5/2018009350 EVERETT DAILY HERALD EDH800797LEGAL DESCRIPT: PLN20180007 - WOLFELegal Descript: PLN20180007 - WOLFE001.000.62.558.60.41.40 55.04CITY ORDINANCES 4102-4103EDH801191CITY ORDINANCES - 4102 - 4103001.000.25.514.30.41.40 49.88Total :104.92230574 4/5/2018075673 FARMER, MARIA 26796SPANISH INTERPRETER COURT 03/28/20189Page:4.2.aPacket Pg. 30Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds10 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230574 4/5/2018(Continued)075673 FARMER, MARIASPANISH INTERPRETER COURT 03/28/2018001.000.23.512.50.41.01 133.13Total :133.13230575 4/5/2018066378 FASTENAL COMPANY WAMOU44104 FLEET RETURNFleet Return511.000.77.548.68.31.10 -378.009.8% Sales Tax511.000.77.548.68.31.10 -37.04WATER SEWER - PAINT AND SUPPLIESWAMOU45390Water Sewer - Paint and Supplies421.000.74.534.80.31.00 235.27Water Sewer - Paint and Supplies423.000.75.535.80.31.00 235.2610.3% Sales Tax421.000.74.534.80.31.00 24.2410.3% Sales Tax423.000.75.535.80.31.00 24.22Total :103.95230576 4/5/2018009815 FERGUSON ENTERPRISES INC 0589064WATER METER INVENTORY - #2034 ~Water Meter Inventory - #2034 ~421.000.74.534.80.34.30 3,972.90#2027 M-METER-02-010421.000.74.534.80.34.30 1,528.0310.3% Sales Tax421.000.74.534.80.34.30 566.60Total :6,067.53230577 4/5/2018062193 FIELD INSTRUMENTS & CONTROLS 167008WWTP: TRANSMITTER & DISPLAYTransmitter & Display423.000.76.535.80.35.00 260.00Freight423.000.76.535.80.35.00 21.9810.3% Sales Tax10Page:4.2.aPacket Pg. 31Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds11 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230577 4/5/2018(Continued)062193 FIELD INSTRUMENTS & CONTROLS423.000.76.535.80.35.00 29.04Total :311.02230578 4/5/2018011900 FRONTIER 253-003-6887LIFT STATION #6 VG SPECIAL ACCESS LINESLIFT STATION #6 VG SPECIAL ACCESS LINES423.000.75.535.80.42.00 42.10WWTP: 3/25-4/24/18 AUTO DIALER 1 VOICE G253-012-91893/25-4/24/18 AUTO DIALER - 1 VOICE423.000.76.535.80.42.00 41.53WWTP: 3/25-4/24/18 AUTO DIALER:1 BUS. LI425-771-5553 AUTO DIALER - 1 BUSINESS LINE W/TOLL423.000.76.535.80.42.00 119.50CITY HALL ALARM LINES 121 5TH AVE N425-776-6829CITY HALL FIRE AND INTRUSION ALARM001.000.66.518.30.42.00 133.97Total :337.10230579 4/5/2018012199 GRAINGER 9731496775PM: RESPIRATOR BAG, BOX, KNEE PADSPM: RESPIRATOR BAG, BOX, KNEE PADS001.000.64.576.80.31.00 72.4810.3% Sales Tax001.000.64.576.80.31.00 7.46PM: COMPSRTMENT BOX9731496783PM: COMPSRTMENT BOX001.000.64.576.80.31.00 5.4910.3% Sales Tax001.000.64.576.80.31.00 0.57FAC MAINT - T SEAT SUPPLY9737150079Fac Maint - T Seat Supply001.000.66.518.30.31.00 144.3010.3% Sales Tax001.000.66.518.30.31.00 14.86Total :245.16230580 4/5/2018060985 HARRINGTON INDUSTRIAL PLASTICS 007J0220WWTP: MODULES11Page:4.2.aPacket Pg. 32Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds12 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230580 4/5/2018(Continued)060985 HARRINGTON INDUSTRIAL PLASTICS10.3% Sales Tax423.000.76.535.80.48.00 30.28Modules for chemical feed pipes system423.000.76.535.80.48.00 294.00WWTP: CPVC DIAPH007J0294CPVC DIAPH for chemical feed pipes423.000.76.535.80.48.00 2,655.0010.3% Sales Tax423.000.76.535.80.48.00 273.47WWTP: PIPE PROLINE,ELBOWS,TEES,COUPLINGS007J0295PIPE PROLINE, ELBOWS, TEES, COUPLINGS,423.000.76.535.80.48.00 8,508.8510.3% Sales Tax423.000.76.535.80.48.00 876.43Total :12,638.03230581 4/5/2018012900 HARRIS FORD INC 177213UNIT 49 - WHEEL COVERUnit 49 - Wheel Cover511.000.77.548.68.31.10 55.3810.4% Sales Tax511.000.77.548.68.31.10 5.76Total :61.14230582 4/5/2018013140 HENDERSON, BRIAN 31REIMBURSEMENTREIMBURSEMENT009.000.39.517.20.23.00 74.00Total :74.00230583 4/5/2018061013 HONEY BUCKET 0550588780PARK SHOP DURING SEWER OUTAGEPARK SHOP DURING SEWER OUTAGE001.000.64.576.80.45.00 -191.41HICKMAN PARK HONEY BUCKET0550589896HICKMAN PARK HONEY BUCKET001.000.64.576.80.45.00 607.62YOST PARK HONEY BUCKET055058989712Page:4.2.aPacket Pg. 33Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds13 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230583 4/5/2018(Continued)061013 HONEY BUCKETYOST PARK HONEY BUCKET001.000.64.576.80.45.00 309.21HAINES WHARF PARK HONEY BUCKET0550589898HAINES WHARF PARK HONEY BUCKET001.000.64.576.80.45.00 218.78PINE STREET PARK HONEY BUCKET0550589899PINE STREET PARK HONEY BUCKET001.000.64.576.80.45.00 113.85SIERRA PARK HONEY BUCKET0550589900SIERRA PARK HONEY BUCKET001.000.64.576.80.45.00 113.85WILLOW CREEK FISH HATCHERY HONEY BUCKET0550589901WILLOW CREEK FISH HATCHERY HONEY BUCKET001.000.64.576.80.45.00 113.85CIVIC FIELD 6TH & BELL HONEY BUCKET0550589902CIVIC FIELD 6TH & BELL HONEY BUCKET001.000.64.576.80.45.00 113.85MARINA BEACH PARK HONEY BUCKET0550589903MARINA BEACH PARK HONEY BUCKET001.000.64.576.80.45.00 1,394.22CIVIC PLAYFIELD 6TH & EDMONDS HONEY0550589904CIVIC PLAYFIELD 6TH & EDMONDS HONEY001.000.64.576.80.45.00 113.85CIVIC FIELD 6TH & EDMONDS HONEY BUCKET0550589905CIVIC FIELD 6TH & EDMONDS HONEY BUCKET001.000.64.576.80.45.00 113.85HUTT PARK VOLUNTEER PROJECT 9315 187TH0550589906HUTT PARK VOLUNTEER PROJECT 9315 187TH001.000.64.576.80.45.00 155.00Total :3,176.52230584 4/5/2018062899 HUFF, ARIELE 6265 WRITE ABOUT6265 WRITE ABOUT YOUR LIFE INSTRUCTION6265 WRITE ABOUT YOUR LIFE INSTRUCTION001.000.64.571.22.41.00 56.1013Page:4.2.aPacket Pg. 34Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds14 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount(Continued)Total :56.10230584 4/5/2018 062899 062899 HUFF, ARIELE230585 4/5/2018 075966 HULBERT, CARRIE BID-0015BID/ED! MANAGEMENT SERVICES MARCH 2018BID/Ed! management services March 2018140.000.61.558.70.41.00 2,866.50Total :2,866.50230586 4/5/2018076488 HULBERT, MATTHEW STIEG BID-ED2018-02BID/ED! SOCIAL MEDIA PHOTOGRAPHY MARCH 2BID/Ed! social media and marketing140.000.61.558.70.41.00 500.00Total :500.00230587 4/5/2018073548 INDOFF INCORPORATED 3085144MOBILE PEDESTAL FILE FOR SR ACCOUNTANTLorell Mobile Pedestal File001.000.31.514.23.35.00 271.9910.3% Sales Tax001.000.31.514.23.35.00 28.01DSD - OFFICE SUPPLIES - PAPER3085146DSD - Office supplies - paper001.000.62.524.10.31.00 132.33WWTP: COPY PAPER (5000 SHEETS)3085972COPY PAPER (5000 SHEETS)423.000.76.535.80.31.00 39.9910.3% Sales Tax423.000.76.535.80.31.00 4.12Total :476.44230588 4/5/2018076514 JUSTICE, TREVYR 033018STORM - CDL & TRAINING/TESTING T JUSTICEStorm - CDL & Training/Testing T Justice422.000.72.531.90.49.00 388.00Total :388.00230589 4/5/2018072650 KCDA PURCHASING COOPERATIVE 300267373KLEENEX 100 CT FACIAL TISSUEKleenex Tissues (36 bxs case)001.000.41.521.10.31.00 41.85Total :41.8514Page:4.2.aPacket Pg. 35Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds15 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230590 4/5/2018073950 KUBWATER RESOURCES 07523WWTP: POLYMERPOLYMER423.000.76.535.80.31.51 2,843.0710.3% Sales Tax423.000.76.535.80.31.51 292.84Total :3,135.91230591 4/5/2018074417 LAW OFFICE OF CHRISTIAN SMITH 155CONFLICT COUNSEL 8Z0124518 8Z0173044CONFLICT COUNSEL 8Z0124518 8Z0173044001.000.23.512.50.41.00 600.00Total :600.00230592 4/5/2018 066064 LISTEN AUDIOLOGY SERVICE INC 4919HEARING TESTING 2018Hearing Tests, 2018 - 55 employees001.000.22.518.10.41.00 1,210.00HEARING TEST FOLLOW UP4943Hearing Test Follow up, 2018 - 15001.000.22.518.10.41.00 900.00Total :2,110.00230593 4/5/2018068957 LYNN PEAVEY COMPANY 342851INV#342851 CUST #980012 - EDMONDS PD2.75 x 2.75 Glassine Envelopes001.000.41.521.80.31.00 18.50Trace Evidence Wrap001.000.41.521.80.31.00 27.50Integrity Seal - Red001.000.41.521.80.31.00 36.50Freight001.000.41.521.80.31.00 16.0010.3% Sales Tax001.000.41.521.80.31.00 10.15Total :108.65230594 4/5/2018018980 LYNNWOOD HONDA 1028436PM: BLADE, WASHER, NUT, HOLDERPM: BLADE, WASHER, NUT, HOLDER001.000.64.576.80.31.00 165.2215Page:4.2.aPacket Pg. 36Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds16 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230594 4/5/2018(Continued)018980 LYNNWOOD HONDA10.3% Sales Tax001.000.64.576.80.31.00 17.02Total :182.24230595 4/5/2018076523 MARCUSE, EDGAR Parking Space RefundMARCUSE 4TH AVE PARKING REFUNDREFUND FOR 4TH AVE PARKING001.000.362.30.000.00 338.52Total :338.52230596 4/5/2018020039 MCMASTER-CARR SUPPLY CO 594575625WWTP: PIPE FITTINGS,HOSESPIPE FITTINGS,HOSES FOR CHEMICAL FEED423.000.76.535.80.48.00 651.74Freight423.000.76.535.80.48.00 13.83WWTP: DRUM59568610DRUM423.000.76.535.80.48.00 60.20Freight423.000.76.535.80.48.00 25.71Total :751.48230597 4/5/2018075746 MCMURRAY, LAURA 6400 FELDENKRAIS 6400 FELDENKRAIS INSTRUCTION6400 FELDENKRAIS INSTRUCTION001.000.64.571.27.41.00 117.006403 FELDENKRAIS INSTRUCTION6403 FELDENKRAIS6403 FELDENKRAIS INSTRUCTION001.000.64.571.27.41.00 65.00Total :182.00230598 4/5/2018076515 MESKE, KEVIN 100518376ONLINE TEST- KEVIN MESKEonline building test-Meske001.000.62.524.20.49.00 209.00WABO TRAVEL EXPENSESWABOKMPARKING 28, MILEAGE 68.67001.000.62.524.20.43.00 96.6816Page:4.2.aPacket Pg. 37Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds17 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount(Continued)Total :305.68230598 4/5/2018 076515 076515 MESKE, KEVIN230599 4/5/2018 069053 MICRO COM SYSTEMS LTD 17064SCANNING OF BUILDING DIVISION DOCUMENTSScanning of Building Division documents001.000.62.524.10.41.00 289.50Total :289.50230600 4/5/2018072223 MILLER, DOUG 3/28 GYM MONITO3/28/18 BASKETBALL GYM MONITOR3/28/18 BASKETBALL GYM MONITOR001.000.64.571.25.41.00 30.00Total :30.00230601 4/5/2018072746 MURRAYSMITH INC 15-1715-28E5KA.SERVICES THRU 2/28/18E5KA.Services thru 2/28/18421.000.74.594.34.65.41 15,219.00Total :15,219.00230602 4/5/2018067834 NATIONAL CONSTRUCTION RENTALS 4991484PANELSPANELS001.000.64.576.80.45.00 30.97Total :30.97230603 4/5/2018064570 NATIONAL SAFETY INC 0500706-INSTORM - WORK GEARStorm - Work Gear422.000.72.531.90.24.00 333.4010.3% Sales Tax422.000.72.531.90.24.00 34.34Total :367.74230604 4/5/2018064024 NAT'L ASSOC FOR COURT MNGMNT 04032018NACM ANNUAL CONFERENCE REGISTRATIONNACM ANNUAL CONFERENCE REGISTRATION001.000.23.512.50.49.00 545.00Total :545.00230605 4/5/2018075539 NATURE INSIGHT CONSULTING 6WILLOW CREEK DAYLIGHTING PROJ MGMTTasks 1 - 4: Parks Project Mgmt and125.000.64.575.50.41.00 937.5017Page:4.2.aPacket Pg. 38Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds18 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount(Continued)Total :937.50230605 4/5/2018 075539 075539 NATURE INSIGHT CONSULTING230606 4/5/2018 070855 NAVIA BENEFIT SOLUTIONS 10124481FSA MONTHLY FEE - MARCHMARCH FSA FEES001.000.22.518.10.41.00 140.00Total :140.00230607 4/5/2018024302 NELSON PETROLEUM 0652128-INWWTP: CHEVRON ANALYSIS KITSCHEVRON ANALYSIS KITS423.000.76.535.80.31.00 328.5010.3% Sales Tax423.000.76.535.80.31.00 33.83Total :362.33230608 4/5/2018065720 OFFICE DEPOT 117806198001INV#117806198001 ACCT#90520437 - EDMONDSharpie Perm.. Markers Bullet Point001.000.41.521.10.31.00 16.42Wirebound Top Open Memo Books 3x5 1001.000.41.521.10.31.00 22.11Perforated Writing Pads 5x8001.000.41.521.10.31.00 16.98Binder Clips Med. 1 1/4" Black001.000.41.521.10.31.00 15.99Binder Clips Small 3/4" Black001.000.41.521.10.31.00 8.72Post-it Notes 1 1/2" Canary Yellow001.000.41.521.10.31.00 11.2410.3% Sales Tax001.000.41.521.10.31.00 9.43Total :100.89230609 4/5/2018072739 O'REILLY AUTO PARTS 3685-332398 UNIT 95 - SUPPLIES (RETURNED)Unit 95 - Supplies (Returned)511.000.77.548.68.31.10 28.5010.3% Sales Tax511.000.77.548.68.31.10 2.9418Page:4.2.aPacket Pg. 39Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds19 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230609 4/5/2018(Continued)072739 O'REILLY AUTO PARTSUNIT 95 RETURNS3685-332455Unit 95 Returns511.000.77.548.68.31.10 -28.5010.3% Sales Tax511.000.77.548.68.31.10 -2.96UNIT 100 - MICRO-V BELT3685-333233Unit 100 - Micro-V Belt511.000.77.548.68.31.10 20.1610.3% Sales Tax511.000.77.548.68.31.10 2.08UNIT 100 - MUD FLAPS3685-334560Unit 100 - Mud Flaps511.000.77.548.68.31.10 18.8810.3% Sales Tax511.000.77.548.68.31.10 1.94UNIT 40 - MARKER LIGHT3685-336831Unit 40 - Marker Light511.000.77.548.68.31.10 9.3310.3% Sales Tax511.000.77.548.68.31.10 0.96Total :53.33230610 4/5/2018 072539 OTAK INC-WASHINGTON 31800160E6DA.SERVICES THRU 3/2/18E6DA.Services thru 3/2/18112.000.68.595.33.65.41 311.27E6DA.Services thru 3/2/18126.000.68.595.61.65.41 14.94E6DA.Services thru 3/2/18422.000.72.594.31.65.41 29.53E6DA.SERVICES THRU 3/2/1831800161E6DA.Services thru 3/2/18112.000.68.595.33.65.41 867.50E6DA.Services thru 3/2/18126.000.68.595.61.65.41 41.64E6DA.Services thru 3/2/1819Page:4.2.aPacket Pg. 40Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds20 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230610 4/5/2018(Continued)072539 OTAK INC-WASHINGTON422.000.72.594.31.65.41 82.29Total :1,347.17230611 4/5/2018027060 PACIFIC TOPSOILS 18-T1035664PM YARD WASTE DUMP CUST # 5130PM YARD WASTE DUMP001.000.64.576.80.47.00 220.50PM YARD WASTE DUMP CUST # 513018-T1035677PM YARD WASTE DUMP001.000.64.576.80.47.00 252.00PM YARD WASTE DUMP CUST # 513018-T1035697PM YARD WASTE DUMP001.000.64.576.80.47.00 84.00Total :556.50230612 4/5/2018 075257 PCE PACIFIC INC CD99025104 WWTP: VALVE SHAFT+ACTUATORVALVE SHAFT+ACTUATOR423.000.76.535.80.48.00 3,985.00Freight423.000.76.535.80.48.00 965.8210.3% Sales Tax423.000.76.535.80.48.00 509.94Total :5,460.76230613 4/5/2018071783 PIGSKIN UNIFORMS 2018-16INV#2018-16 - EDMONDS PD - MCINTYRE/ROBISUMMER WT/JUMPSUIT - MCINTYRE001.000.41.521.22.24.00 425.00UNDERARM VENTS - MCINTYRE001.000.41.521.22.24.00 25.00HIDDEN POCKETS - MCINTYRE001.000.41.521.22.24.00 30.00POLICE FONT - MCINTYRE001.000.41.521.22.24.00 10.00NAME PATCH - MCINTYRE001.000.41.521.22.24.00 10.00SUMMER WT/JUMPSUIT - ROBINSON20Page:4.2.aPacket Pg. 41Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds21 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230613 4/5/2018(Continued)071783 PIGSKIN UNIFORMS001.000.41.521.26.24.00 425.00UNDERARM VENTS - ROBINSON001.000.41.521.26.24.00 25.00HIDDEN UPPER POCKETS - ROBINSON001.000.41.521.26.24.00 30.00POLICE - BACK - ROBINSON001.000.41.521.26.24.00 15.00NAME PATCH - ROBINSON001.000.41.521.26.24.00 10.00Sales Tax001.000.41.521.22.24.00 42.51Sales Tax001.000.41.521.26.24.00 42.92Total :1,090.43230614 4/5/2018076342 PONTEM SOFTWARE BY RIA 00005802CEMETERY SOFTWARECEMETERY SOFTWARE130.000.64.536.50.31.00 2,550.00Total :2,550.00230615 4/5/2018066554 PRAETORIAN DIGITAL 010134-2296INV 010134-2296 EDMONDS PD - POLICE ONESUBSCRIPTION - 68 EMPLOYEES001.000.41.521.40.49.00 4,148.00ONE TIME SET UP FEE001.000.41.521.40.49.00 550.00Total :4,698.00230616 4/5/2018030400 PUGET SOUND CLEAN AIR AGENCY 18-038SQ2-2018 CLEAN AIR ASSESSMENTQ2-18 Clean Air Assessment per RCW001.000.39.553.70.51.00 8,975.75Total :8,975.75230617 4/5/2018046900 PUGET SOUND ENERGY 200000704821FRANCES ANDERSON CENTER 700 MAIN ST / MEFRANCES ANDERSON CENTER 700 MAIN ST /001.000.66.518.30.47.00 1,681.7121Page:4.2.aPacket Pg. 42Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds22 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230617 4/5/2018(Continued)046900 PUGET SOUND ENERGYYOST PARK/POOL 9535 BOWDOIN WAY / METER200002411383YOST PARK/POOL 9535 BOWDOIN WAY / METER001.000.64.576.80.47.00 156.84OLD PUBLIC WORKS 200 DAYTON ST / METER 0200007876143OLD PUBLIC WORKS 200 DAYTON ST / METER421.000.74.534.80.47.00 360.50FIRE STATION #16 8429 196TH ST SW / METE200009595790FIRE STATION #16 8429 196TH ST SW /001.000.66.518.30.47.00 773.80FIRE STATION #20 23009 88TH AVE W / METE200011439656FIRE STATION #20 23009 88TH AVE W /001.000.66.518.30.47.00 253.79CIVIC CENTER 250 5TH AVE N / METER 00052200016558856CIVIC CENTER 250 5TH AVE N / METER001.000.66.518.30.47.00 329.72FIRE STATION #17 275 6TH AVE N / METER 0200016815843FIRE STATION #17 275 6TH AVE N / METER001.000.66.518.30.47.00 884.94FLEET MAINTENANCE BAY 21105 72ND AVE W /200017676343FLEET MAINTENANCE BAY 21105 72ND AVE W511.000.77.548.68.47.00 425.79MEADOWDALE CLUBHOUSE 6801 N 200019375639MEADOWDALE CLUBHOUSE 6801 N 001.000.66.518.30.47.00 206.67SNO-ISLE LIBRARY 650 MAIN ST / METER 001200019895354SNO-ISLE LIBRARY 650 MAIN ST / METER001.000.66.518.30.47.00 217.12PUBLIC WORKS OMC 7110 210TH ST SW / METE200020415911PUBLIC WORKS OMC 7110 210TH ST SW /001.000.65.518.20.47.00 26.23PUBLIC WORKS OMC 7110 210TH ST SW /111.000.68.542.90.47.00 99.68PUBLIC WORKS OMC 7110 210TH ST SW /421.000.74.534.80.47.00 99.68PUBLIC WORKS OMC 7110 210TH ST SW /22Page:4.2.aPacket Pg. 43Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds23 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230617 4/5/2018(Continued)046900 PUGET SOUND ENERGY423.000.75.535.80.47.10 99.68PUBLIC WORKS OMC 7110 210TH ST SW /511.000.77.548.68.47.00 99.68PUBLIC WORKS OMC 7110 210TH ST SW /422.000.72.531.90.47.00 99.66WWTP: 2/21-3/22/18 METER 000390395: 200200021829581 2/21-3/22/18 200 2ND AVE S / METER423.000.76.535.80.47.63 46.89CITY PARK BUILDING 600 3RD AVE S / METER200024711901CITY PARK BUILDING 600 3RD AVE S /001.000.66.518.30.47.00 210.51Total :6,072.89230618 4/5/2018070809 PUGET SOUND EXECUTIVE 18-0514COURT SECURITY 03/12/2018-03/23/2018COURT SECURITY 03/12/2018-03/23/2018001.000.23.512.50.41.00 1,773.75PROBATION MRT SECURITY 03/14/2018001.000.23.523.30.41.00 123.75Total :1,897.50230619 4/5/2018 070955 R&R STAR TOWING 131378INV#131378 - EDMONDS PDTOW 1996 TOYOTA TEMP 2018-8603001.000.41.521.22.41.00 164.0010.4% Sales Tax001.000.41.521.22.41.00 17.06Total :181.06230620 4/5/2018073885 RANDOLPH, PAMELA PRANDOLPH32918WWTP: PRANDOLPH PER DIEM MEALS REIMB-BIOPAMELA RANDOLPH MEALS PER DIEM REIMB -423.000.76.535.80.43.00 51.75Total :51.75230621 4/5/2018076518 RHONDA'S ADULT FAMILY HOME, LL Bus License Refund LI Refund Cst #00336831LI Refund Cst #00336831001.000.257.310 100.0023Page:4.2.aPacket Pg. 44Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds24 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount(Continued)Total :100.00230621 4/5/2018 076518076518 RHONDA'S ADULT FAMILY HOME, LL230622 4/5/2018 066964 SEATTLE AUTOMOTIVE DIST INC S3-3094464FLEET BRAKE INVENTORYFleet Brake Inventory511.000.77.548.68.34.40 270.4010.3% Sales Tax511.000.77.548.68.34.40 27.86Total :298.26230623 4/5/2018062830 SEBERS, ROD RSEBERS32618WWTP: RSEBERS PER DIEM/MILES REIMB-WOW CROD SEBERS PER DIEM/MILES REIMB - WOW423.000.76.535.80.43.00 166.05Total :166.05230624 4/5/2018066918 SEDOR, NORMAN 30REIMBURSEMENTREIMBURSEMENT009.000.39.517.20.29.00 10,917.00Total :10,917.00230625 4/5/2018070495 SEPULVEDA, PABLO 26795SPANISH INTERPRETER COURT 03/28/2018SPANISH INTERPRETER COURT 03/28/2018001.000.23.512.50.41.01 130.02Total :130.02230626 4/5/2018 070115 SHANNON & WILSON INC 98107E4FC.SERVICES THRU 2/10/18E4FC.Services thru 2/10/18422.000.72.594.31.65.41 400.00Total :400.00230627 4/5/2018068489 SIRENNET.COM 0226281-INUNIT 68 - PARTSUnit 68 - Parts511.000.77.548.68.31.10 792.0010.3% Sales Tax511.000.77.548.68.31.10 81.58Total :873.58230628 4/5/2018036950 SIX ROBBLEES INC 1-915570UNIT 65 - PART24Page:4.2.aPacket Pg. 45Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds25 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230628 4/5/2018(Continued)036950 SIX ROBBLEES INCUnit 65 - Part511.000.77.548.68.31.10 84.0310.3% Sales Tax511.000.77.548.68.31.10 8.66Total :92.69230629 4/5/2018036955 SKY NURSERY T-1090843FLOWER PROGRAM: SOILFLOWER PROGRAM: SOIL001.000.64.576.81.31.00 26.0010.0% Sales Tax001.000.64.576.81.31.00 2.60CEMETERY: SOILT-1090845CEMETERY: SOIL130.000.64.536.50.31.00 26.0010.0% Sales Tax130.000.64.536.50.31.00 2.60Total :57.20230630 4/5/2018071502 SLENKER, ROBERT RSlenker32918WWTP: RSLENKER PER DIEM REIMB-3/29/18 TRRSLENKER PER DIEM REIMB-3/29/18 TRIP to423.000.76.535.80.43.00 51.75Total :51.75230631 4/5/2018037375 SNO CO PUD NO 1 2001-2487-3TRAFFIC LIGHT 9933 100TH AVE W / METER 1TRAFFIC LIGHT 9933 100TH AVE W / METER111.000.68.542.64.47.00 32.36TRAFFIC LIGHT 23602 76TH AVE W / METER 12002-7495-9TRAFFIC LIGHT 23602 76TH AVE W / METER111.000.68.542.64.47.00 18.32CLUBHOUSE 6801 MEADOWDALE RD / METER 1002003-8645-6CLUBHOUSE 6801 MEADOWDALE RD / METER001.000.66.518.30.47.00 68.87FRANCES ANDERSON CENTER 700 MAIN ST / ME2004-2241-8FRANCES ANDERSON CENTER 700 MAIN ST /001.000.66.518.30.47.00 1,344.8525Page:4.2.aPacket Pg. 46Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds26 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230631 4/5/2018(Continued)037375 SNO CO PUD NO 1TRAFFIC LIGHT 9730 220TH ST SW / METER 12007-4860-6TRAFFIC LIGHT 9730 220TH ST SW / METER111.000.68.542.64.47.00 17.17TRAFFIC LIGHT 23202 EDMONDS WAY / METER2009-4334-8TRAFFIC LIGHT 23202 EDMONDS WAY / METER111.000.68.542.64.47.00 43.76TRAFFIC LIGHT 20408 76TH AVE W / METER 12011-9222-6TRAFFIC LIGHT 20408 76TH AVE W / METER111.000.68.542.64.47.00 18.39LIFT STATION #12 16121 75TH PL W / METE2012-6598-0LIFT STATION #12 16121 75TH PL W /423.000.75.535.80.47.10 167.17LIFT STATION #11 6811 1/2 157TH PL W / M2013-7496-4LIFT STATION #11 6811 1/2 157TH PL W /423.000.75.535.80.47.10 21.15CEMETERY BUILDING2015-5730-3CEMETERY BUILDING130.000.64.536.50.47.00 177.62TRAFFIC LIGHT 660 EDMONDS WAY / METER 102015-6343-4TRAFFIC LIGHT 660 EDMONDS WAY / METER111.000.68.542.64.47.00 25.94TRAFFIC LIGHT 19600 80TH AVE W / METER 12015-8215-2TRAFFIC LIGHT 19600 80TH AVE W / METER111.000.68.542.63.47.00 24.89LIFT STATION #15 7710 168TH PL SW / METE2015-9448-8LIFT STATION #15 7710 168TH PL SW /423.000.75.535.80.47.10 19.54OVERHEAD STREET LIGHTING AT CEMETERY2016-1027-6OVERHEAD STREET LIGHTING AT CEMETERY130.000.64.536.50.47.00 8.30TRAFFIC LIGHT 20801 76TH AVE W / METER 12016-1195-1TRAFFIC LIGHT 20801 76TH AVE W / METER111.000.68.542.63.47.00 37.46DECORATIVE LIGHTING 413 MAIN ST / METER2016-5690-7DECORATIVE LIGHTING 413 MAIN ST / METER26Page:4.2.aPacket Pg. 47Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds27 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230631 4/5/2018(Continued)037375 SNO CO PUD NO 1111.000.68.542.63.47.00 263.39PEDEST CAUTION LIGHT 23190 100TH AVE W /2017-0375-8PEDEST CAUTION LIGHT 23190 100TH AVE W111.000.68.542.64.47.00 26.70415 5TH AVE S2017-6210-1415 5TH AVE S001.000.64.576.80.47.00 23.16TRAFFIC LIGHT 7133 212TH ST SW / METER 12019-0786-2TRAFFIC LIGHT 7133 212TH ST SW / METER111.000.68.542.63.47.00 32.38WWTP: LAST BILL: 2/3-3/21/2018 FLOWMETER2019-2988-2FINAL BILL: 2/3-3/21/2018 FLOWMETER423.000.76.535.80.47.62 8.01WWTP: 2/22-3/23/18 FLOWMETER 1000520295:2019-2991-62/22-3/23/18 FLOW METER 23219 74TH423.000.76.535.80.47.62 17.17FIRE STATION #20 23009 88TH AVE W / METE2020-7719-4FIRE STATION #20 23009 88TH AVE W /001.000.66.518.30.47.00 450.11LIFT STATION #6 100 PINE ST / METER 10002020-8787-0LIFT STATION #6 100 PINE ST / METER423.000.75.535.80.47.10 193.07CEMETERY WELL PUMP2021-6153-5CEMETERY WELL PUMP130.000.64.536.50.47.00 79.80TRAFFIC LIGHT 22400 HWY 99 / METER 100042022-8909-6TRAFFIC LIGHT 22400 HWY 99 / METER111.000.68.542.64.47.00 55.66LOG CABIN & DECORATIVE LIGHTING 120 5TH2024-2158-2LOG CABIN & DECORATIVE LIGHTING 120 5TH001.000.66.518.30.47.00 157.98CHARGE STATION #1 552 MAIN ST / METER 102042-9221-3CHARGE STATION #1 552 MAIN ST / METER111.000.68.542.64.47.00 85.91HAZEL MILLER PLAZA2044-6743-527Page:4.2.aPacket Pg. 48Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds28 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230631 4/5/2018(Continued)037375 SNO CO PUD NO 1HAZEL MILLER PLAZA001.000.64.576.80.47.00 26.02TRAFFIC LIGHT SR104 @ 95TH AVE W /2205-4758-2TRAFFIC LIGHT SR104 @ 95TH AVE W /111.000.68.542.63.47.00 36.57Total :3,481.72230632 4/5/2018 063941 SNO CO SHERIFFS OFFICE 2018-4414INV#2018-4414 EDMONDS JAIL - FEB 2018318.33 BASE HOUSING @ $98.73001.000.39.523.60.51.00 31,428.7245 BOOKINGS @ $121.42001.000.39.523.60.51.00 5,463.90MEDICAL/SPECIALTY HOUSING PREMIUM 33 @001.000.39.523.60.51.00 1,872.42MENTAL HEALTH HOUSING PREMIUM 45.5 @001.000.39.523.60.51.00 6,233.05VIDEO COURT HOURS 12.5 @ 134.7 EACH001.000.39.523.60.51.00 1,683.75Total :46,681.84230633 4/5/2018038300 SOUND DISPOSAL CO 103583CIVIC CENTER 250 5TH AVE NCIVIC CENTER 250 5TH AVE N001.000.66.518.30.47.00 558.58WWTP: RECYCLING103584Recycling + taxes423.000.76.535.80.47.66 29.95FRANCES ANDERSON CENTER 700 MAIN ST103585FRANCES ANDERSON CENTER 700 MAIN ST001.000.66.518.30.47.00 674.47SNO-ISLE LIBRARY 650 MAIN ST103586SNO-ISLE LIBRARY 650 MAIN ST001.000.66.518.30.47.00 555.23CITY HALL 121 5TH AVE N103588CITY HALL 121 5TH AVE N001.000.66.518.30.47.00 459.8928Page:4.2.aPacket Pg. 49Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds29 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount(Continued)Total :2,278.12230633 4/5/2018 038300 038300 SOUND DISPOSAL CO230634 4/5/2018 038410 SOUND SAFETY PRODUCTS 200010/1STREET - WORK WARE T HANSONStreet - Work Ware T Hanson111.000.68.542.90.24.00 201.049.7% Sales Tax111.000.68.542.90.24.00 19.50Total :220.54230635 4/5/2018076474 STROMME, JOANNE 6293 6296 6299 YOGA6293 6296 6299 YOGA INSTRUCTION6293 YOGA INSTRUCTION001.000.64.571.27.41.00 525.256296 YOGA INSTRUCTION001.000.64.571.27.41.00 479.606299 YOGA INSTRUCTION001.000.64.571.27.41.00 731.50Total :1,736.35230636 4/5/2018040917 TACOMA SCREW PRODUCTS INC 18192977FLEET SHOP SUPPLIESFleet Shop Supplies511.000.77.548.68.31.20 2.5710.3% Sales Tax511.000.77.548.68.31.20 0.26FLEET SHOP - SUPPLIES18192978Fleet Shop - Supplies511.000.77.548.68.31.20 16.3710.3% Sales Tax511.000.77.548.68.31.20 1.69TRAFFIC - SUPPLIES18193784Traffic - Supplies111.000.68.542.64.31.00 73.2410.3% Sales Tax111.000.68.542.64.31.00 7.54TRAFFIC - SUPPLIES18193785Traffic - Supplies111.000.68.542.64.31.00 71.4729Page:4.2.aPacket Pg. 50Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds30 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230636 4/5/2018(Continued)040917 TACOMA SCREW PRODUCTS INC10.3% Sales Tax111.000.68.542.64.31.00 7.36Total :180.50230637 4/5/2018027269 THE PART WORKS INC INV24395YOST MENS RESTROOM PARTITIONSYOST MENS RESTROOM PARTITIONS125.000.64.576.80.31.00 5,156.9610.3% Sales Tax125.000.64.576.80.31.00 531.17Total :5,688.13230638 4/5/2018 076516 THOMPSON, MILTON WABOMTWABO TRAVEL EXPENSESMILEAGE001.000.62.524.20.43.00 34.34Total :34.34230639 4/5/2018038315 THYSSENKRUPP ELEVATOR US53022ELEVATOR MAINTENANCE MUSEUMELEVATOR MAINTENANCE MUSEUM 118 5TH AVE001.000.66.518.30.48.00 378.8810.3% Sales Tax001.000.66.518.30.48.00 39.02ELEVATOR MAINTENANCE CITY HALLUS53323ELEVATOR MAINTENANCE CITY HALL 121 5TH001.000.66.518.30.48.00 1,364.19001.000.66.518.30.48.00 140.51ELEVATOR MAINTENANCE SENIOR CENTERUS54073ELEVATOR MAINTENANCE SENIOR CENTER 220001.000.66.518.30.48.00 293.5710.3% Sales Tax001.000.66.518.30.48.00 30.24Total :2,246.41230640 4/5/2018068724 US HEALTHWORKS MED GROUP OF WA0773415-WA DOT TESTINGWATER DOT TESTING30Page:4.2.aPacket Pg. 51Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds31 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230640 4/5/2018(Continued)068724 US HEALTHWORKS MED GROUP OF WA421.000.74.534.80.41.00 99.00Total :99.00230641 4/5/2018044960 UTILITIES UNDERGROUND LOC CTR 8030128UTILITIES UNDERGROUND LOCATION CENTERUTILITIES UNDERGROUND LOCATION CENTER421.000.74.534.80.41.00 120.90UTILITIES UNDERGROUND LOCATION CENTER422.000.72.531.90.41.00 120.90UTILITIES UNDERGROUND LOCATION CENTER423.000.75.535.80.41.00 124.56Total :366.36230642 4/5/2018073879 UTILITY SERVICES ASSOCIATES 125676WATER - CABLE LEAK DETECTION SURVEY TOOLWater - Cable Leak Detection Survey Tool421.000.74.534.80.31.00 225.0010.3% Sales Tax421.000.74.534.80.31.00 23.18Total :248.18230643 4/5/2018067865 VERIZON WIRELESS 9804020855C/A 571242650-0001iPhone/iPad Cell Service Bld Dept001.000.62.524.20.42.00 476.17iPhone/iPad Cell Service City Clerk001.000.25.514.30.42.00 75.88iPhone/iPad Cell Service Econ001.000.61.557.20.42.00 76.19iPad Cell Service Council001.000.11.511.60.42.00 300.10iPhone/iPad Cell Service Court001.000.23.512.50.42.00 75.88iPhone/iPad Cell Service Development001.000.62.524.10.42.00 96.18iPhone/iPad Cell Service Engineering001.000.67.518.21.42.00 954.16iPhone/iPad Cell Service Facilities31Page:4.2.aPacket Pg. 52Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds32 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230643 4/5/2018(Continued)067865 VERIZON WIRELESS001.000.66.518.30.42.00 244.39iPhone/iPad Cell Service Finance001.000.31.514.23.42.00 106.18iPhone/iPad Cell Service HR001.000.22.518.10.42.00 96.18iPhone/iPad Cell Service IS512.000.31.518.88.42.00 288.24iPhone/iPad Cell Service Mayor's Office001.000.21.513.10.42.00 101.45iPhone/iPad Cell Service Parks Dept001.000.64.571.21.35.00 341.92iPhone/iPad Cell Service Parks Dept001.000.64.571.21.42.00 285.77iPhone/iPad Cell Service Police Dept001.000.41.521.22.42.00 1,494.08Air cards Police Dept001.000.41.521.22.42.00 1,040.26iPhone/iPad Cell Service Planning Dept001.000.62.558.60.42.00 80.02iPhone/iPad Cell Service PW Admin001.000.65.518.20.42.00 26.56iPhone/iPad Cell Service PW Admin421.000.74.534.80.42.00 7.59iPhone/iPad Cell Service PW Admin422.000.72.531.90.42.00 26.56iPhone/iPad Cell Service PW Admin423.000.75.535.80.42.00 7.59iPhone/iPad Cell Service PW Admin423.000.76.535.80.42.00 7.58iPhone/iPad Cell Service PW Street Dept111.000.68.542.90.42.00 228.23iPhone/iPad Cell Service PW Fleet511.000.77.548.68.42.00 56.17iPhone/iPad Cell Service PW Water/Sewer32Page:4.2.aPacket Pg. 53Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds33 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230643 4/5/2018(Continued)067865 VERIZON WIRELESS421.000.74.534.80.42.00 159.28iPhone/iPad Cell Service PW Water/Sewer423.000.75.535.80.42.00 159.28iPhone/iPad Cell Service Sewer Dept423.000.75.535.80.42.00 282.10iPhone/iPad Cell Service Water421.000.74.534.80.42.00 338.27iPad Cell Service Storm422.000.72.531.90.42.00 75.88iPad Cell Service Street/Storm111.000.68.542.90.42.00 200.05iPad Cell Service Street/Storm422.000.72.531.90.42.00 200.05iPhone/iPad Cell Service WWTP423.000.76.535.80.42.00 691.02iPhone/iPad Cell Service Parks001.000.64.576.80.42.00 152.35C/A 772540262-000019804149387Lift Station access512.000.31.518.88.42.00 44.64Total :8,796.25230644 4/5/2018064858 VISITORS GUIDE PUBLICATIONS 18-198SNO-CO GUIDE ADSNO-CO GUIDE AD123.000.64.573.20.41.40 250.00Total :250.00230645 4/5/2018 068259 WA ST CRIMINAL JUSTICE 201129926INV 201129926 EDMONDS PD - BLEA 767 ARVABLEA CLASS 767 - ARVAN001.000.41.521.40.49.00 3,900.00INV 201129968 EDMONDS PD - COLLISION BAS201129968COLLISION BASIC 0201-8 SAUNDERS001.000.41.521.40.49.00 100.00COLLISION BASIC 0201-8 SWARTZ001.000.41.521.40.49.00 100.0033Page:4.2.aPacket Pg. 54Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds34 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230645 4/5/2018(Continued)068259 WA ST CRIMINAL JUSTICEINV 201129990 HOSTAGE NEGOTIATIONS - ROB201129990HOSTAGE NEGOT. - ROBINSON 0520-2001.000.41.521.40.49.00 100.00Total :4,200.00230646 4/5/2018064183 WA STATE LEOFF EDUCATION ASSOC 040418WSLEA 2018 CONFERENCEKEN JONES REGISTRATION FEE - LEOFF009.000.39.517.20.49.00 400.00Total :400.00230647 4/5/2018 066088 WACEThies, M 2018 WACETHIES, M. ATTEND WACE 2018 SPRING CONF.Thies, M. attend WACE 2018 Spring Conf.001.000.62.524.10.49.00 40.00Total :40.00230648 4/5/2018075635 WCP SOLUTIONS 10569828PM: SUPPLIES TOILET BOWL MOP, CLEANER,PM: SUPPLIES TOILET BOWL MOP, CLEANER,001.000.64.576.80.31.00 385.0610.3% Sales Tax001.000.64.576.80.31.00 39.66Total :424.72230649 4/5/2018064800 WEHOP 638143FLOWER PROGRAM: PLANTSFLOWER PROGRAM: PLANTS125.000.64.576.80.31.00 218.0010.3% Sales Tax125.000.64.576.80.31.00 22.45FLOWER PROGRAM: PLANTS638230FLOWER PROGRAM: PLANTS125.000.64.576.80.31.00 274.3510.3% Sales Tax125.000.64.576.80.31.00 28.26Total :543.06230650 4/5/2018 073552 WELCO SALES LLC 7447CITY CLERKS - COPY PAPER34Page:4.2.aPacket Pg. 55Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds35 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount230650 4/5/2018(Continued)073552 WELCO SALES LLC4-CASES OF X9000 COPY PAPER001.000.25.514.30.31.00 141.4010.3% Sales Tax001.000.25.514.30.31.00 14.56Total :155.96230651 4/5/2018072634 WHISTLE WORKWEAR 400327PM: OUTERWEARPM: OUTERWEAR001.000.64.576.80.31.00 521.939.7% Sales Tax001.000.64.576.80.31.00 50.63Total :572.56230652 4/5/2018064213 WSSUA TREASURER 510MENS & COED SOFTBALL UMPSMENS & COED SOFTBALL UMPS001.000.64.571.25.41.00 1,785.00Total :1,785.00230653 4/5/2018070432 ZACHOR & THOMAS PS INC 1202MAR-18 RETAINER & APPEALSMonthly Retainer001.000.36.515.33.41.00 22,204.74Infraction Appeal: Edm vs Foster001.000.36.515.33.41.00 300.00Tow Appeal: Edm vs Foster 17-2-08426-31001.000.36.515.33.41.00 787.50Total :23,292.24230654 4/5/2018076522 ZEMAN, GREG Parking Space RefundZEMAN 4TH AVE PARKING REFUNDZEMAN 4TH AVE PARKING REFUND001.000.362.30.000.00 225.68Total :225.68Bank total : 276,300.39123 Vouchers for bank code :usbank276,300.39Total vouchers :Vouchers in this report12335Page:4.2.aPacket Pg. 56Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds36 7:45:17AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount36Page:4.2.aPacket Pg. 57Attachment: claim cks 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire 04/05/2018Voucher ListCity of Edmonds110:35:23AMPage:vchlistBank code :usbankVoucherDateVendorInvoicePO #Description/AccountAmount4052018 4/5/2018076380 BETTER PROPERTIES METRO Apr 2018ACCT #00365662 4TH AVE PARKING LOT RENT4th Avenue Parking Lot Rent - April 2018001.000.39.542.64.45.00 417.67Total :417.67Bank total : 417.671 Vouchers for bank code :usbank417.67Total vouchers :Vouchers in this report11Page:4.2.bPacket Pg. 58Attachment: wire 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire PROJECT NUMBERS (By Project Title) Funding Project Title Project Accounting Number Engineering Project Number STM 12th Ave & Sierra Stormwater System Improvements c484 E5FE STR 15th St. SW Walkway (Edmonds Way to 8th Ave)c424 E3DC STM 183rd Pl SW Storm Repairs c491 E6FE SWR 2013 Sanitary Sewer Pipe Rehabilitation c390 E2GB SWR 2013 Sewerline Replacement Project c398 E3GA STR 2014 Chip Seals c451 E4CB STM 2014 Drainage Improvements c433 E4FA STR 2014 Overlay Program c438 E4CA WTR 2014 Waterline Overlays c452 E4CC STM 2015 Citywide Drainage Improvements/Rehab Projects c466 E5FA STR 2015 Overlay Program c463 E5CA SWR 2015 Sewerline Overlays i007 E5CC SWR 2015 Sewerline Replacement Project c441 E4GA STR 2015 Traffic Calming c471 E5AB WTR 2015 Waterline Overlays c475 E5CB WTR 2015 Waterline Replacement Program c440 E4JB STR 2016 Curb Ramp Upgrades i016 E6DC STR 2016 Overlay Program i008 E6CA SWR 2016 Sanitary Sewer Replacement Projects c469 E5GA SWR 2016 Sewerline Overlays i010 E6CC WTR 2016 Water Comp Plan Update c460 E4JC WTR 2016 Waterline Overlays i009 E6CB WTR 2016 Waterline Replacement Projects c468 E5JA STR 2017 Curb Ramp Upgrades i022 E7DA STR 2017 Minor Sidewalk Program i023 E7DB STR 2017 Overlay Program i018 E7CA SWR 2017 Sanitary Sewer Replacement Project i013 E6GA SWR 2017 Sewerline Overlays i020 E7CC STR 2017 Traffic Calming i021 E7AA WTR 2017 Waterline Overlays i019 E7CB WTR 2017 Waterline Replacement Projects i014 E6JB STR 2018 Minor Sidewalk Project i032 E8DA STR 2018 Overlay Program i030 E8CB SWR 2018 Sewerline Overlays i035 E8CE STR 2018 Traffic Calming i027 E8AA WTR 2018 Waterline Overlays i034 E8CD WTR 2018 Waterline Replacement Project c493 E6JC SWR 2018/19 Sewerline Replacement Project c492 E6GC WTR 2019 Waterline Replacement c498 E7JA Revised 4/4/2018 4.2.c Packet Pg. 59 Attachment: FrequentlyUsedProjNumbers 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire payments.) PROJECT NUMBERS (By Project Title) Funding Project Title Project Accounting Number Engineering Project Number STR 220th Adaptive i028 E8AB STR 220th Street Overlay Project c462 E4CD STM 224th & 98th Drainage Improvements c486 E6FB WTR 224th Waterline Relocation (2013)c418 E3JB STR 228th St. SW Corridor Improvements i005 E7AC STR 236th St. SW Walkway (Edmonds Way to Madrona School)c425 E3DD STR 238th St. SW Walkway (100th Ave to 104th Ave)c423 E3DB STR 238th St. SW Walkway (Edmonds Way to Hwy 99)c485 E6DA STM 3rd Ave Rain Gardens i012 E6FC STR 76th Ave W & 220th St. SW Intersection Improvements i029 E8CA STR 76th Ave W at 212th St SW Intersection Improvements c368 E1CA STR 84th Ave W Overlay from 220th to 212th i031 E8CC STR 89th Pl W Retaining Wall i025 E7CD STR 9th Avenue Improvement Project c392 E2AB FAC A/V Upgrades - Council Chambers c476 E5LA STR ADA Curb Ramp Upgrades along 3rd Ave S c426 E3DE STR ADA Curb Ramps i033 E8DB STR ADA Transition Plan s016 E6DB STR Audible Pedestrian Signals i024 E7AB STR Bikelink Project c474 E5DA PRK City Spray Park c417 E4MA SWR Citywide CIPP Sewer Rehab Phase I c456 E4GB SWR Citywide CIPP Sewer Rehab Phase II c488 E6GB STR Citywide Pedestrian Crossing Enhancements i026 E7DC STR Citywide Protected/Permissive Traffic Signal Conversion i015 E6AB WTR Dayton St. Utility Replacement Project (3rd Ave to 9th Ave)c482 E5JB STM Dayton Street & SR104 Storm Drainage Alternatives c374 E1FM PM Dayton Street Plaza c276 E7MA STM Dayton Street Storm Improvements (6th Ave - 8th Ave)c472 E5FC STM Dayton Street Stormwater Pump Station c455 E4FE FAC Edmonds Fishing Pier Rehab c443 E4MB STM Edmonds Marsh Feasibility Study c380 E2FC General Edmonds Waterfront Access Analysis c478 E5DB FAC ESCO III Project c419 E3LB PRK FAC Band Shell Replacement c477 E6MB WTR Five Corners Reservoir Re-coating c473 E5KA STR Five Corners Roundabout (212th Street SW @ 84th Avenue W)c342 E1AA PM Fourth Avenue Cultural Corridor c282 E8MA STR Hwy 99 Enhancements (Phase III)c405 E2AD Revised 4/4/2018 4.2.c Packet Pg. 60 Attachment: FrequentlyUsedProjNumbers 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire payments.) PROJECT NUMBERS (By Project Title) Funding Project Title Project Accounting Number Engineering Project Number STR Hwy 99 Gateway Revitalization s014 E6AA STM Lake Ballinger Associated Projects c436 E4FD SWR Lake Ballinger Trunk Sewer Study s011 E5GB STM LID Retrofits Perrinville Creek Basin c434 E4FB SWR Lift Station #1 Basin & Flow Study c461 E4GC STR Minor Sidewalk Program i017 E6DD STM North Talbot Road Drainage Improvements c378 E2FA STM Northstream Culvert Repair Under Puget Drive i011 E6FA STM Northstream Pipe Abandonment on Puget Drive c410 E3FE STM NPDES (Students Saving Salmon)m013 E7FG STM OVD Slope Repair & Stabilization m105 E7FA STM Perrinville Creek Culvert Replacement c376 E1FN STM Perrinville Creek Stormwater Flow Reduction Retrofit Study c408 E3FC FAC Public Safety Controls System Upgrades c444 E4LA STM Seaview Park Infiltration Facility c479 E5FD WWTP Sewer Outfall Groundwater Monitoring c446 E4HA STR SR104 Corridor Transportation Study c427 E3AB STR SR104/City Park Mid-Block Crossing c454 E4DB UTILITIES Standard Details Updates s010 E5NA STM Storm Drain Improvements @ 9510 232nd St. SW c495 E7FB STM Storm Drainage Improvements - 88th & 194th c429 E3FG STM Stormwater Comp Plan Update s017 E6FD STR Sunset Walkway Improvements c354 E1DA STM SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System c379 E2FB STM SW Edmonds-105th/106th Ave W Storm Improvements c430 E3FH STR Trackside Warning System c470 E5AA STR Train Trench - Concept c453 E4DA STR Transportation Plan Update c391 E2AA STM Update Stormwater Management Code & Associated Projects c467 E5FB UTILITIES Utility Rate Update s013 E6JA PRK Veteran's Plaza c480 E6MA STM Video Assessment of Stormwater Lines c459 E4FF PRK Waterfront Restoration m103 E7MA STM Willow Creek Daylighting/Edmonds Marsh Restoration c435 E4FC WWTP WWTP Outfall Pipe Modifications c481 E5HA PRK Yost Park Spa c494 E6MC Revised 4/4/2018 4.2.c Packet Pg. 61 Attachment: FrequentlyUsedProjNumbers 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire payments.) PROJECT NUMBERS (By Engineering Number) Funding Engineering Project Number Project Accounting Number Project Title STR E1AA c342 Five Corners Roundabout (212th Street SW @ 84th Avenue W) STR E1CA c368 76th Ave W at 212th St SW Intersection Improvements STR E1DA c354 Sunset Walkway Improvements STM E1FM c374 Dayton Street & SR104 Storm Drainage Alternatives STM E1FN c376 Perrinville Creek Culvert Replacement STR E2AA c391 Transportation Plan Update STR E2AB c392 9th Avenue Improvement Project STR E2AD c405 Hwy 99 Enhancements (Phase III) STM E2FA c378 North Talbot Road Drainage Improvements STM E2FB c379 SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System STM E2FC c380 Edmonds Marsh Feasibility Study SWR E2GB c390 2013 Sanitary Sewer Pipe Rehabilitation STR E3AB c427 SR104 Corridor Transportation Study STR E3DB c423 238th St. SW Walkway (100th Ave to 104th Ave) STR E3DC c424 15th St. SW Walkway (Edmonds Way to 8th Ave) STR E3DD c425 236th St. SW Walkway (Edmonds Way to Madrona School) STR E3DE c426 ADA Curb Ramp Upgrades along 3rd Ave S STM E3FC c408 Perrinville Creek Stormwater Flow Reduction Retrofit Study STM E3FE c410 Northstream Pipe Abandonment on Puget Drive STM E3FG c429 Storm Drainage Improvements - 88th & 194th STM E3FH c430 SW Edmonds-105th/106th Ave W Storm Improvements SWR E3GA c398 2013 Sewerline Replacement Project WTR E3JB c418 224th Waterline Relocation (2013) FAC E3LB c419 ESCO III Project STR E4CA c438 2014 Overlay Program STR E4CB c451 2014 Chip Seals WTR E4CC c452 2014 Waterline Overlays STR E4CD c462 220th Street Overlay Project STR E4DA c453 Train Trench - Concept STR E4DB c454 SR104/City Park Mid-Block Crossing STM E4FA c433 2014 Drainage Improvements STM E4FB c434 LID Retrofits Perrinville Creek Basin STM E4FC c435 Willow Creek Daylighting/Edmonds Marsh Restoration STM E4FD c436 Lake Ballinger Associated Projects STM E4FE c455 Dayton Street Stormwater Pump Station STM E4FF c459 Video Assessment of Stormwater Lines SWR E4GA c441 2015 Sewerline Replacement Project SWR E4GB c456 Citywide CIPP Sewer Rehab Phase I SWR E4GC c461 Lift Station #1 Basin & Flow Study Revised 4/4/2018 4.2.c Packet Pg. 62 Attachment: FrequentlyUsedProjNumbers 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire payments.) PROJECT NUMBERS (By Engineering Number) Funding Engineering Project Number Project Accounting Number Project Title WWTP E4HA c446 Sewer Outfall Groundwater Monitoring WTR E4JB c440 2015 Waterline Replacement Program WTR E4JC c460 2016 Water Comp Plan Update FAC E4LA c444 Public Safety Controls System Upgrades PRK E4MA c417 City Spray Park FAC E4MB c443 Edmonds Fishing Pier Rehab STR E5AA c470 Trackside Warning System STR E5AB c471 2015 Traffic Calming STR E5CA c463 2015 Overlay Program WTR E5CB c475 2015 Waterline Overlays SWR E5CC i007 2015 Sewerline Overlays STR E5DA c474 Bikelink Project General E5DB c478 Edmonds Waterfront Access Analysis STM E5FA c466 2015 Citywide Drainage Improvements/Rehab Projects STM E5FB c467 Update Stormwater Management Code & Associated Projects STM E5FC c472 Dayton Street Storm Improvements (6th Ave - 8th Ave) STM E5FD c479 Seaview Park Infiltration Facility STM E5FE c484 12th Ave & Sierra Stormwater System Improvements SWR E5GA c469 2016 Sanitary Sewer Replacement Projects SWR E5GB s011 Lake Ballinger Trunk Sewer Study WWTP E5HA c481 WWTP Outfall Pipe Modifications WTR E5JA c468 2016 Waterline Replacement Projects WTR E5JB c482 Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) WTR E5KA c473 Five Corners Reservoir Re-coating FAC E5LA c476 A/V Upgrades - Council Chambers UTILITIES E5NA s010 Standard Details Updates STR E6AA s014 Hwy 99 Gateway Revitalization STR E6AB i015 Citywide Protected/Permissive Traffic Signal Conversion STR E6CA i008 2016 Overlay Program WTR E6CB i009 2016 Waterline Overlays SWR E6CC i010 2016 Sewerline Overlays STR E6DA c485 238th St. SW Walkway (Edmonds Way to Hwy 99) STR E6DB s016 ADA Transition Plan STR E6DC i016 2016 Curb Ramp Upgrades STR E6DD i017 Minor Sidewalk Program STM E6FA i011 Northstream Culvert Repair Under Puget Drive STM E6FB c486 224th & 98th Drainage Improvements STM E6FC i012 3rd Ave Rain Gardens STM E6FD s017 Stormwater Comp Plan Update Revised 4/4/2018 4.2.c Packet Pg. 63 Attachment: FrequentlyUsedProjNumbers 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire payments.) PROJECT NUMBERS (By Engineering Number) Funding Engineering Project Number Project Accounting Number Project Title STM E6FE c491 183rd Pl SW Storm Repairs SWR E6GA i013 2017 Sanitary Sewer Replacement Project SWR E6GB c488 Citywide CIPP Sewer Rehab Phase II SWR E6GC c492 2018/19 Sewerline Replacement Project UTILITIES E6JA s013 Utility Rate Update WTR E6JB i014 2017 Waterline Replacement Projects WTR E6JC c493 2018 Waterline Replacement Project PRK E6MA c480 Veteran's Plaza PRK E6MB c477 FAC Band Shell Replacement PRK E6MC c494 Yost Park Spa STR E7AA i021 2017 Traffic Calming STR E7AB i024 Audible Pedestrian Signals STR E7AC i005 228th St. SW Corridor Improvements STR E7CA i018 2017 Overlay Program WTR E7CB i019 2017 Waterline Overlays SWR E7CC i020 2017 Sewerline Overlays STR E7CD i025 89th Pl W Retaining Wall STR E7DA i022 2017 Curb Ramp Upgrades STR E7DB i023 2017 Minor Sidewalk Program STR E7DC i026 Citywide Pedestrian Crossing Enhancements STM E7FA m105 OVD Slope Repair & Stabilization STM E7FB c495 Storm Drain Improvements @ 9510 232nd St. SW STM E7FG m013 NPDES (Students Saving Salmon) WTR E7JA c498 2019 Waterline Replacement PM E7MA c276 Dayton Street Plaza PRK E7MA m103 Waterfront Restoration STR E8AA i027 2018 Traffic Calming STR E8AB i028 220th Adaptive STR E8CA i029 76th Ave W & 220th St. SW Intersection Improvements STR E8CB i030 2018 Overlay Program STR E8CC i031 84th Ave W Overlay from 220th to 212th WTR E8CD i034 2018 Waterline Overlays SWR E8CE i035 2018 Sewerline Overlays STR E8DA i032 2018 Minor Sidewalk Project STR E8DB i033 ADA Curb Ramps PM E8MA c282 Fourth Avenue Cultural Corridor Revised 4/4/2018 4.2.c Packet Pg. 64 Attachment: FrequentlyUsedProjNumbers 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire payments.) PROJECT NUMBERS (By New Project Accounting Number) Funding Engineering Project Number Project Accounting Number Project Title PM E7MA c276 Dayton Street Plaza PM E8MA c282 Fourth Avenue Cultural Corridor STR E1AA c342 Five Corners Roundabout (212th Street SW @ 84th Avenue W) STR E1DA c354 Sunset Walkway Improvements STR E1CA c368 76th Ave W at 212th St SW Intersection Improvements STM E1FM c374 Dayton Street & SR104 Storm Drainage Alternatives STM E1FN c376 Perrinville Creek Culvert Replacement STM E2FA c378 North Talbot Road Drainage Improvements STM E2FB c379 SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System STM E2FC c380 Edmonds Marsh Feasibility Study SWR E2GB c390 2013 Sanitary Sewer Pipe Rehabilitation STR E2AA c391 Transportation Plan Update STR E2AB c392 9th Avenue Improvement Project SWR E3GA c398 2013 Sewerline Replacement Project STR E2AD c405 Hwy 99 Enhancements (Phase III) STM E3FC c408 Perrinville Creek Stormwater Flow Reduction Retrofit Study STM E3FE c410 Northstream Pipe Abandonment on Puget Drive PRK E4MA c417 City Spray Park WTR E3JB c418 224th Waterline Relocation (2013) FAC E3LB c419 ESCO III Project STR E3DB c423 238th St. SW Walkway (100th Ave to 104th Ave) STR E3DC c424 15th St. SW Walkway (Edmonds Way to 8th Ave) STR E3DD c425 236th St. SW Walkway (Edmonds Way to Madrona School) STR E3DE c426 ADA Curb Ramp Upgrades along 3rd Ave S STR E3AB c427 SR104 Corridor Transportation Study STM E3FG c429 Storm Drainage Improvements - 88th & 194th STM E3FH c430 SW Edmonds-105th/106th Ave W Storm Improvements STM E4FA c433 2014 Drainage Improvements STM E4FB c434 LID Retrofits Perrinville Creek Basin STM E4FC c435 Willow Creek Daylighting/Edmonds Marsh Restoration STM E4FD c436 Lake Ballinger Associated Projects STR E4CA c438 2014 Overlay Program WTR E4JB c440 2015 Waterline Replacement Program SWR E4GA c441 2015 Sewerline Replacement Project FAC E4MB c443 Edmonds Fishing Pier Rehab FAC E4LA c444 Public Safety Controls System Upgrades WWTP E4HA c446 Sewer Outfall Groundwater Monitoring STR E4CB c451 2014 Chip Seals WTR E4CC c452 2014 Waterline Overlays Revised 4/4/2018 4.2.c Packet Pg. 65 Attachment: FrequentlyUsedProjNumbers 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire payments.) PROJECT NUMBERS (By New Project Accounting Number) Funding Engineering Project Number Project Accounting Number Project Title STR E4DA c453 Train Trench - Concept STR E4DB c454 SR104/City Park Mid-Block Crossing STM E4FE c455 Dayton Street Stormwater Pump Station SWR E4GB c456 Citywide CIPP Sewer Rehab Phase I STM E4FF c459 Video Assessment of Stormwater Lines WTR E4JC c460 2016 Water Comp Plan Update SWR E4GC c461 Lift Station #1 Basin & Flow Study STR E4CD c462 220th Street Overlay Project STR E5CA c463 2015 Overlay Program STM E5FA c466 2015 Citywide Drainage Improvements/Rehab Projects STM E5FB c467 Update Stormwater Management Code & Associated Projects WTR E5JA c468 2016 Waterline Replacement Projects SWR E5GA c469 2016 Sanitary Sewer Replacement Projects STR E5AA c470 Trackside Warning System STR E5AB c471 2015 Traffic Calming STM E5FC c472 Dayton Street Storm Improvements (6th Ave - 8th Ave) WTR E5KA c473 Five Corners Reservoir Re-coating STR E5DA c474 Bikelink Project WTR E5CB c475 2015 Waterline Overlays FAC E5LA c476 A/V Upgrades - Council Chambers PRK E6MB c477 FAC Band Shell Replacement General E5DB c478 Edmonds Waterfront Access Analysis STM E5FD c479 Seaview Park Infiltration Facility PRK E6MA c480 Veteran's Plaza WWTP E5HA c481 WWTP Outfall Pipe Modifications WTR E5JB c482 Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) STM E5FE c484 12th Ave & Sierra Stormwater System Improvements STR E6DA c485 238th St. SW Walkway (Edmonds Way to Hwy 99) STM E6FB c486 224th & 98th Drainage Improvements SWR E6GB c488 Citywide CIPP Sewer Rehab Phase II STM E6FE c491 183rd Pl SW Storm Repairs SWR E6GC c492 2018/19 Sewerline Replacement Project WTR E6JC c493 2018 Waterline Replacement Project PRK E6MC c494 Yost Park Spa STM E7FB c495 Storm Drain Improvements @ 9510 232nd St. SW WTR E7JA c498 2019 Waterline Replacement STR E7AC i005 228th St. SW Corridor Improvements SWR E5CC i007 2015 Sewerline Overlays STR E6CA i008 2016 Overlay Program Revised 4/4/2018 4.2.c Packet Pg. 66 Attachment: FrequentlyUsedProjNumbers 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire payments.) PROJECT NUMBERS (By New Project Accounting Number) Funding Engineering Project Number Project Accounting Number Project Title WTR E6CB i009 2016 Waterline Overlays SWR E6CC i010 2016 Sewerline Overlays STM E6FA i011 Northstream Culvert Repair Under Puget Drive STM E6FC i012 3rd Ave Rain Gardens SWR E6GA i013 2017 Sanitary Sewer Replacement Project WTR E6JB i014 2017 Waterline Replacement Projects STR E6AB i015 Citywide Protected/Permissive Traffic Signal Conversion STR E6DC i016 2016 Curb Ramp Upgrades STR E6DD i017 Minor Sidewalk Program STR E7CA i018 2017 Overlay Program WTR E7CB i019 2017 Waterline Overlays SWR E7CC i020 2017 Sewerline Overlays STR E7AA i021 2017 Traffic Calming STR E7DA i022 2017 Curb Ramp Upgrades STR E7DB i023 2017 Minor Sidewalk Program STR E7AB i024 Audible Pedestrian Signals STR E7CD i025 89th Pl W Retaining Wall STR E7DC i026 Citywide Pedestrian Crossing Enhancements STR E8AA i027 2018 Traffic Calming STR E8AB i028 220th Adaptive STR E8CA i029 76th Ave W & 220th St. SW Intersection Improvements STR E8CB i030 2018 Overlay Program STR E8CC i031 84th Ave W Overlay from 220th to 212th STR E8DA i032 2018 Minor Sidewalk Project STR E8DB i033 ADA Curb Ramps WTR E8CD i034 2018 Waterline Overlays SWR E8CE i035 2018 Sewerline Overlays STM E7FG m013 NPDES (Students Saving Salmon) PRK E7MA m103 Waterfront Restoration STM E7FA m105 OVD Slope Repair & Stabilization UTILITIES E5NA s010 Standard Details Updates SWR E5GB s011 Lake Ballinger Trunk Sewer Study UTILITIES E6JA s013 Utility Rate Update STR E6AA s014 Hwy 99 Gateway Revitalization STR E6DB s016 ADA Transition Plan STM E6FD s017 Stormwater Comp Plan Update Revised 4/4/2018 4.2.c Packet Pg. 67 Attachment: FrequentlyUsedProjNumbers 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire payments.) PROJECT NUMBERS (By Funding) Funding Project Title Project Accounting Number Engineering Project Number FAC A/V Upgrades - Council Chambers c476 E5LA FAC Edmonds Fishing Pier Rehab c443 E4MB FAC ESCO III Project c419 E3LB FAC Public Safety Controls System Upgrades c444 E4LA General Edmonds Waterfront Access Analysis c478 E5DB PM Dayton Street Plaza c276 E7MA PM Fourth Avenue Cultural Corridor c282 E8MA PRK City Spray Park c417 E4MA PRK FAC Band Shell Replacement c477 E6MB PRK Veteran's Plaza c480 E6MA PRK Waterfront Restoration m103 E7MA PRK Yost Park Spa c494 E6MC STM 12th Ave & Sierra Stormwater System Improvements c484 E5FE STM 183rd Pl SW Storm Repairs c491 E6FE STM 2014 Drainage Improvements c433 E4FA STM 2015 Citywide Drainage Improvements/Rehab Projects c466 E5FA STM 224th & 98th Drainage Improvements c486 E6FB STM 3rd Ave Rain Gardens i012 E6FC STM Dayton Street & SR104 Storm Drainage Alternatives c374 E1FM STM Dayton Street Storm Improvements (6th Ave - 8th Ave)c472 E5FC STM Dayton Street Stormwater Pump Station c455 E4FE STM Edmonds Marsh Feasibility Study c380 E2FC STM Lake Ballinger Associated Projects c436 E4FD STM LID Retrofits Perrinville Creek Basin c434 E4FB STM North Talbot Road Drainage Improvements c378 E2FA STM Northstream Culvert Repair Under Puget Drive i011 E6FA STM Northstream Pipe Abandonment on Puget Drive c410 E3FE STM NPDES (Students Saving Salmon)m013 E7FG STM OVD Slope Repair & Stabilization m105 E7FA STM Perrinville Creek Culvert Replacement c376 E1FN STM Perrinville Creek Stormwater Flow Reduction Retrofit Study c408 E3FC STM Seaview Park Infiltration Facility c479 E5FD STM Storm Drain Improvements @ 9510 232nd St. SW c495 E7FB STM Storm Drainage Improvements - 88th & 194th c429 E3FG STM Stormwater Comp Plan Update s017 E6FD STM SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System c379 E2FB STM SW Edmonds-105th/106th Ave W Storm Improvements c430 E3FH STM Update Stormwater Management Code & Associated Projects c467 E5FB Revised 4/4/2018 4.2.c Packet Pg. 68 Attachment: FrequentlyUsedProjNumbers 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire payments.) PROJECT NUMBERS (By Funding) Funding Project Title Project Accounting Number Engineering Project Number STM Video Assessment of Stormwater Lines c459 E4FF STM Willow Creek Daylighting/Edmonds Marsh Restoration c435 E4FC STR 15th St. SW Walkway (Edmonds Way to 8th Ave)c424 E3DC STR 2014 Chip Seals c451 E4CB STR 2014 Overlay Program c438 E4CA STR 2015 Overlay Program c463 E5CA STR 2015 Traffic Calming c471 E5AB STR 2016 Curb Ramp Upgrades i016 E6DC STR 2016 Overlay Program i008 E6CA STR 2017 Curb Ramp Upgrades i022 E7DA STR 2017 Minor Sidewalk Program i023 E7DB STR 2017 Overlay Program i018 E7CA STR 2017 Traffic Calming i021 E7AA STR 2018 Minor Sidewalk Project i032 E8DA STR 2018 Overlay Program i030 E8CB STR 2018 Traffic Calming i027 E8AA STR 220th Street Overlay Project c462 E4CD STR 228th St. SW Corridor Improvements i005 E7AC STR 236th St. SW Walkway (Edmonds Way to Madrona School)c425 E3DD STR 238th St. SW Walkway (100th Ave to 104th Ave)c423 E3DB STR 238th St. SW Walkway (Edmonds Way to Hwy 99)c485 E6DA STR 76th Ave W & 220th St. SW Intersection Improvements i029 E8CA STR 76th Ave W at 212th St SW Intersection Improvements c368 E1CA STR 84th Ave W Overlay from 220th to 212th i031 E8CC STR 89th Pl W Retaining Wall i025 E7CD STR 9th Avenue Improvement Project c392 E2AB STR ADA Curb Ramp Upgrades along 3rd Ave S c426 E3DE STR ADA Curb Ramps i033 E8DB STR ADA Transition Plan s016 E6DB STR Audible Pedestrian Signals i024 E7AB STR Bikelink Project c474 E5DA STR Citywide Pedestrian Crossing Enhancements i026 E7DC STR Citywide Protected/Permissive Traffic Signal Conversion i015 E6AB STR Five Corners Roundabout (212th Street SW @ 84th Avenue W)c342 E1AA STR Hwy 99 Enhancements (Phase III)c405 E2AD STR Hwy 99 Gateway Revitalization s014 E6AA STR Minor Sidewalk Program i017 E6DD STR SR104 Corridor Transportation Study c427 E3AB STR SR104/City Park Mid-Block Crossing c454 E4DB Revised 4/4/2018 4.2.c Packet Pg. 69 Attachment: FrequentlyUsedProjNumbers 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire payments.) PROJECT NUMBERS (By Funding) Funding Project Title Project Accounting Number Engineering Project Number STR Sunset Walkway Improvements c354 E1DA STR Trackside Warning System c470 E5AA STR Train Trench - Concept c453 E4DA STR Transportation Plan Update c391 E2AA STR 220th Adaptive i028 E8AB SWR 2013 Sanitary Sewer Pipe Rehabilitation c390 E2GB SWR 2013 Sewerline Replacement Project c398 E3GA SWR 2015 Sewerline Overlays i007 E5CC SWR 2015 Sewerline Replacement Project c441 E4GA SWR 2016 Sanitary Sewer Replacement Projects c469 E5GA SWR 2016 Sewerline Overlays i010 E6CC SWR 2017 Sanitary Sewer Replacement Project i013 E6GA SWR 2017 Sewerline Overlays i020 E7CC SWR 2018 Sewerline Overlays i035 E8CE SWR 2018/19 Sewerline Replacement Project c492 E6GC SWR Citywide CIPP Sewer Rehab Phase I c456 E4GB SWR Citywide CIPP Sewer Rehab Phase II c488 E6GB SWR Lake Ballinger Trunk Sewer Study s011 E5GB SWR Lift Station #1 Basin & Flow Study c461 E4GC UTILITIES Standard Details Updates s010 E5NA UTILITIES Utility Rate Update s013 E6JA WTR 2014 Waterline Overlays c452 E4CC WTR 2015 Waterline Overlays c475 E5CB WTR 2015 Waterline Replacement Program c440 E4JB WTR 2016 Water Comp Plan Update c460 E4JC WTR 2016 Waterline Overlays i009 E6CB WTR 2016 Waterline Replacement Projects c468 E5JA WTR 2017 Waterline Overlays i019 E7CB WTR 2017 Waterline Replacement Projects i014 E6JB WTR 2018 Waterline Overlays i034 E8CD WTR 2018 Waterline Replacement Project c493 E6JC WTR 2019 Waterline Replacement c498 E7JA WTR 224th Waterline Relocation (2013)c418 E3JB WTR Dayton St. Utility Replacement Project (3rd Ave to 9th Ave)c482 E5JB WTR Five Corners Reservoir Re-coating c473 E5KA WWTP Sewer Outfall Groundwater Monitoring c446 E4HA WWTP WWTP Outfall Pipe Modifications c481 E5HA Revised 4/4/2018 4.2.c Packet Pg. 70 Attachment: FrequentlyUsedProjNumbers 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and wire payments.) Payroll Earnings Summary Report City of Edmonds Pay Period: 867 (03/16/2018 to 03/31/2018) Hours AmountHour Type Hour Class Description Educational Pay CorrectionREGULAR HOURS-ed2 0.00 -156.28 NO PAY LEAVEABSENT111 9.00 0.00 SICK LEAVESICK121 446.00 15,248.82 VACATIONVACATION122 1,051.00 42,069.23 HOLIDAY HOURSHOLIDAY123 37.50 1,419.99 FLOATER HOLIDAYHOLIDAY124 52.00 1,690.90 COMPENSATORY TIMECOMP HOURS125 179.20 6,853.76 Holiday Compensation UsedCOMP HOURS130 0.30 9.72 MILITARY LEAVEMILITARY131 25.00 814.94 Kelly Day UsedREGULAR HOURS150 115.00 4,704.14 COMPTIME AUTO PAYCOMP HOURS155 93.30 4,315.45 SICK LEAVE PAYOFFSICK157 3.38 93.34 VACATION PAYOFFVACATION158 5.68 156.86 MANAGEMENT LEAVEVACATION160 37.50 2,365.71 COUNCIL BASE PAYREGULAR HOURS170 700.00 7,875.00 COUNCIL PRESIDENTS PAYREGULAR HOURS174 0.00 200.00 COUNCIL PAY FOR NO MEDICALREGULAR HOURS175 0.00 3,465.85 REGULAR HOURSREGULAR HOURS190 16,859.61 639,769.57 FIRE PENSION PAYMENTSREGULAR HOURS191 4.00 4,127.68 LIGHT DUTYREGULAR HOURS193 80.00 2,495.91 ADMINISTRATIVE LEAVEREGULAR HOURS195 51.00 1,599.88 LIGHT DUTYREGULAR HOURS196 151.00 6,204.72 OVERTIME-STRAIGHTOVERTIME HOURS210 4.50 140.45 WATER WATCH STANDBYOVERTIME HOURS215 24.00 1,189.42 STANDBY TREATMENT PLANTMISCELLANEOUS216 18.00 1,724.43 OVERTIME 1.5OVERTIME HOURS220 346.00 23,785.10 OVERTIME-DOUBLEOVERTIME HOURS225 17.00 1,157.71 WORKING OUT OF CLASSMISCELLANEOUS410 0.00 166.36 SHIFT DIFFERENTIALSHIFT DIFFERENTIAL411 0.00 1,365.17 ACCRUED COMPCOMP HOURS602 41.25 0.00 ACCRUED COMP TIMECOMP HOURS604 131.25 0.00 ACCRUED COMP TIMECOMP HOURS606 2.00 0.00 ACCREDITATION PAYMISCELLANEOUSacc 0.00 106.71 ACCRED/POLICE SUPPORTMISCELLANEOUSacs 0.00 151.43 04/05/2018 Page 1 of 3 4.2.d Packet Pg. 71 Attachment: payroll summary 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and Payroll Earnings Summary Report City of Edmonds Pay Period: 867 (03/16/2018 to 03/31/2018) Hours AmountHour Type Hour Class Description BOC II CertificationMISCELLANEOUSboc 0.00 86.48 Collision ReconstructionistMISCELLANEOUScolre 0.00 114.63 TRAINING CORPORALMISCELLANEOUScpl 0.00 156.94 CERTIFICATION III PAYMISCELLANEOUScrt 0.00 554.28 DETECTIVE PAYMISCELLANEOUSdet 0.00 108.48 Detective 4%MISCELLANEOUSdet4 0.00 1,049.38 EDUCATION PAY 2%EDUCATION PAYed1 0.00 775.08 EDUCATION PAY 4%EDUCATION PAYed2 0.00 953.94 EDUCATION PAY 6%EDUCATION PAYed3 0.00 5,236.23 FAMILY MEDICAL/NON PAIDABSENTfmla 27.25 0.00 FAMILY MEDICAL/SICKSICKfmls 4.00 157.92 K-9 PAYMISCELLANEOUSk9 0.00 108.48 LONGEVITY PAY 2%LONGEVITYlg1 0.00 731.89 LONGEVITY 5.5%LONGEVITYlg10 0.00 144.57 LONGEVITY PAY 2.5%LONGEVITYlg11 0.00 919.55 Longevity 9%LONGEVITYlg12 0.00 5,594.50 Longevity 7%LONGEVITYlg13 0.00 2,724.94 Longevity 5%LONGEVITYlg14 0.00 1,280.98 LONGEVITY 7.5%LONGEVITYlg15 0.00 372.38 Longevity 1%LONGEVITYlg4 0.00 329.97 Longevity 3%LONGEVITYlg5 0.00 325.44 Longevity .5%LONGEVITYlg6 0.00 321.73 Longevity 1.5%LONGEVITYlg7 0.00 712.12 Medical Leave SickSICKmels 177.75 5,166.23 Medical Leave VacationVACATIONmelv 112.75 3,104.66 MOTORCYCLE PAYMISCELLANEOUSmtc 0.00 216.96 Public Disclosure SpecialistMISCELLANEOUSpds 0.00 99.30 PHYSICAL FITNESS PAYMISCELLANEOUSphy 0.00 2,198.66 PROFESSIONAL STANDARDS SERGEANMISCELLANEOUSprof 0.00 169.24 SPECIAL DUTY PAY 5%MISCELLANEOUSsdp 0.00 279.29 ADMINISTRATIVE SERGEANTMISCELLANEOUSsgt 0.00 169.24 STREET CRIMESMISCELLANEOUSstr 0.00 451.58 TRAFFICMISCELLANEOUStraf 0.00 333.49 04/05/2018 Page 2 of 3 4.2.d Packet Pg. 72 Attachment: payroll summary 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and Payroll Earnings Summary Report City of Edmonds Pay Period: 867 (03/16/2018 to 03/31/2018) Hours AmountHour Type Hour Class Description Total Net Pay:$550,226.45 $810,060.53 20,806.22 04/05/2018 Page 3 of 3 4.2.d Packet Pg. 73 Attachment: payroll summary 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and Benefit Checks Summary Report City of Edmonds Pay Period: 867 - 03/16/2018 to 03/31/2018 Bank: usbank - US Bank Direct DepositCheck AmtNamePayee #DateCheck # 63225 04/05/2018 epoa EPOA-1 POLICE 69.00 0.00 63226 04/05/2018 epoa4 EPOA-4 POLICE SUPPORT 136.50 0.00 63227 04/05/2018 jhan JOHN HANCOCK 889.22 0.00 63228 04/05/2018 flex NAVIA BENEFIT SOLUTIONS 1,981.68 0.00 63229 04/05/2018 icma VANTAGE TRANSFER AGENTS 304884 4,058.20 0.00 63230 04/05/2018 afscme WSCCCE, AFSCME AFL-CIO 2,364.03 0.00 9,498.63 0.00 Bank: wire - US BANK Direct DepositCheck AmtNamePayee #DateCheck # 2694 04/05/2018 pens DEPT OF RETIREMENT SYSTEMS 284,168.26 0.00 2695 04/05/2018 aflac AFLAC 5,739.51 0.00 2698 04/05/2018 wadc WASHINGTON STATE TREASURER 27,862.26 0.00 2699 04/05/2018 us US BANK 94,424.84 0.00 2700 04/05/2018 mebt WTRISC FBO #N3177B1 100,616.52 0.00 2702 04/05/2018 pb NATIONWIDE RETIREMENT SOLUTION 6,469.44 0.00 2703 04/05/2018 oe OFFICE OF SUPPORT ENFORCEMENT 628.50 0.00 519,909.33 0.00 529,407.96 0.00Grand Totals: Page 1 of 14/5/2018 4.2.e Packet Pg. 74 Attachment: payroll benefit 04-05-18 (Approval of claim, payroll and benefit checks, direct deposit and Payroll Earnings Summary Report City of Edmonds Pay Period: 909 (04/04/2018 to 04/04/2018) Hours AmountHour Type Hour Class Description CLOTHING ALLOWANCEMISCELLANEOUS903 0.00 225.00 Total Net Pay:$207.79 $225.00 0.00 04/05/2018 Page 1 of 1 4.2.f Packet Pg. 75 Attachment: clothing allowance 04-04-18 (Approval of claim, payroll and benefit checks, direct deposit City Council Agenda Item Meeting Date: 04/10/2018 Acknowledge receipt of Claims for Damages from Phil Lovell ($441.51) and Karen Gottlieb (amount undetermined). Staff Lead: Claims Department: City Clerk's Office Preparer: Scott Passey Background/History N/A Staff Recommendation Acknowledge receipt of the Claims for Damages by minute entry. Narrative Philip B. Lovell 7425 Braemar Dr. Edmonds, WA 98026 Karen Gottlieb 1140 N. 192nd St. Apt. B113 Shoreline, WA 98133 (amount undetermined) Attachments: Lovell Claim for Damages 20180402 Gottlieb Claim for Damages 20180404 4.3 Packet Pg. 76 4.3.a Packet Pg. 77 Attachment: Lovell Claim for Damages 20180402 (Claims for Damages) 4.3.a Packet Pg. 78 Attachment: Lovell Claim for Damages 20180402 (Claims for Damages) 4.3.a Packet Pg. 79 Attachment: Lovell Claim for Damages 20180402 (Claims for Damages) 4.3.a Packet Pg. 80 Attachment: Lovell Claim for Damages 20180402 (Claims for Damages) 4.3.b Packet Pg. 81 Attachment: Gottlieb Claim for Damages 20180404 (Claims for Damages) 4.3.b Packet Pg. 82 Attachment: Gottlieb Claim for Damages 20180404 (Claims for Damages) 4.3.b Packet Pg. 83 Attachment: Gottlieb Claim for Damages 20180404 (Claims for Damages) City Council Agenda Item Meeting Date: 04/10/2018 Confirm Appointment of Carolyn Henry to the Cemetery Board Staff Lead: Mayor Earling Department: Mayor's Office Preparer: Carolyn LaFave Background/History Carolyn Henry applied for open position #6 on the Cemetery Board. Staff Recommendation Confirm appointment of Carolyn Henry to the Cemetery Board. Narrative Mayor Earling has interviewed Carolyn Henry and is recommending her appointment to Cemetery Board position #6. 4.4 Packet Pg. 84 City Council Agenda Item Meeting Date: 04/10/2018 Report on Bids for the Seaview Park Infiltration Facility Staff Lead: Rob English Department: Engineering Preparer: Megan Luttrell Background/History None. Staff Recommendation Forward this item to April 17, 2018, consent agenda for Council approval. Narrative The project will install an infiltration facility at Seaview Park underneath the existing parking lot. The proposed drainage facility will include a diversion structure connected to an existing 24” stormwater pipe, a swirl concentrator water quality treatment device, one distribution chamber with four infiltration wells and catch basins at each end for maintenance access and an overflow connection back to the existing 24” stormwater pipe. Project costs are being funded by a Department of Ecology Stormwater Grant and the 422 Stormwater Utility Fund. On March 27, 2018, the City received ten (10) bids for the Seaview Park Infiltration Facility Project. The bids ranged from a low of $248,806.00 to a high of $401,438.00. The engineer’s estimate was $273,364.00. Dungeness Construction Corporation submitted the low responsive bid. A review of the low responsive bidder’s record has been completed. Construction is expected to begin on August 1st and be completed by October 2018. Attachments: Exhibit A - Bid Tab Summary Exhibit B - Budget 6.1 Packet Pg. 85 1 $248,806.00 2 $257,017.73 3 $271,948.21 4 $300,890.74 5 $338,251.00 6 $342,259.95 7 $368,011.00 8 $369,832.00 9 $380,905.00 10 $401,438.00 Non-Collusion Affidavit Y - N Y Y Y Y Y Y Y Y SBQ-1 Y Y Y YY Y Y Y Y Y Y Y Y ERRG Y Y YY Welwest Construction, Inc.Y Y YY A-1 Landscaping and Construction, Inc.Y Y YY Road Construction Northwest, Inc.Y Y YY Trimaxx Construction, Inc.Y Y YY Kamins Construction Y Y YY Thomco Construction, Inc.Y Y YY Redtail, LLC Y Y YY D & G Backhoe Inc.Y Y YYY P-3 5% Bid Bond Y - N BB-1P-6 Cert of Equal Employment Opp. Report Y - N Dungeness Construction Corporation Y Y NCA-1 EOR-1 CITY OF EDMONDS PROJECT NAME: Seaview Park Infiltration Facility PROJECT No.: E5FD City No.: c479 Engineer's Estimate: $273,364 Federal Aid: N/A Bid Date: 03/27/2018 CONTRACTOR Proposal Signed & Bid Price Filled-In Y - NBASE BID All Addenda Acknowledged Y - N Statement of Bidder Qual. Y - N S:\Capital\CAPITAL PROJECTS\E5FD Seaview Park Infiltration Facility\Construction\600 Bids & Contracts\605 Bid Evaluation\Seaview Park Infiltration Bid Tab Sheet 1 of 1 6.1.a Packet Pg. 86 Attachment: Exhibit A - Bid Tab Summary (Report on Bids for the Seaview Park Infiltration Facility) Seaview Park Infiltration Facility Proposed Construction Budget Description Amount Contract Award $248,806.00 Construction Management, Inspection & Testing  $70,000.00 Management Reserve (15%) $37,320.00 Total = $356,126.00 Construction Funding  Funding Amount Dept of Ecology Stormwater Grant ‐ Construction $427,500.00 Dept of Ecology Stormwater Grant ‐ Construction Management $63,400.50 422 Funds Available for Seaview Park Infiltration Facility $163,633.50 Total = $654,534.00 Exhibit B 6.1.b Packet Pg. 87 Attachment: Exhibit B - Budget (Report on Bids for the Seaview Park Infiltration Facility) City Council Agenda Item Meeting Date: 04/10/2018 Report on Bids for the 2018 Sanitary Sewer Replacement Project Staff Lead: Rob English Department: Engineering Preparer: Megan Luttrell Background/History None. Staff Recommendation Staff will provide more information on the contract award at the committee meeting. Narrative The project is part of the City's program to replace/repair and upgrade existing sewerlines at various locations around the City that are reaching the end of their useful service life, are undersized and unable to meet current requirements, or has some other existing system deficiency. The project will replace approximately 1,700 linear feet of sewerline in 6 different locations. Construction bids are due by 2:00 p.m. April 10, 2018, which may provide an opportunity to award the project at the April 17 City Council Meeting. Staff will provide more information to the committee on when the City Council may award the construction contract, after the bids have been opened. Construction is expected to begin in May and be completed by the end of this year. Attachments: Site Map 6.2 Packet Pg. 88 2018 SS REPLACEMENT6.2.aPacket Pg. 89Attachment: Site Map [Revision 1] (Report on Bids for the 2018 Sanitary Sewer Replacement Project) City Council Agenda Item Meeting Date: 04/10/2018 Presentation of the 2018 Transportation Safety Plan Staff Lead: Rob English Department: Engineering Preparer: Megan Luttrell Background/History None. Staff Recommendation Forward this item for approval at a future City Council meeting. Narrative In 2016, Washington State developed a Strategic Highway Safety Plan called “Target Zero”, with the goal of reducing the number of fatal and/or serious injury collisions in the State to zero by 2035. At the state level between 2012 and 2016, the annual number of fatal collisions ranged from 450 to 550. During this same time period, five fatalities and 37 serious injuries resulted from collisions in Edmonds. In order to align with this State Plan, the City is completing a Transportation Safety Plan that identifies all current, on-going, engineering, education, and enforcement projects and programs as well as all proposed ones needed to help reach this goal. The proposed list is prioritized based on the number of fatal and/or serious collisions the project addresses, the number of multimodal elements impacted (in support of Complete Streets policy), and the grant eligibility for both high and low cost projects. For high cost projects, the list helps determine the ones for which a future grant application should be submitted since those projects would have the chance to secure a specific safety grant. For low cost projects, it assists the City in determining the projects and programs for which local funds should be used and, if appropriate, maintained in future budget cycles. The Hwy 99 Gateway Revitalization project was identified as the top priority on the Safety Project list. This project addresses collisions between left-turning vehicles accessing driveways from the two-way left turn lane and vehicles going in the opposite direction from the BAT lane (due to limited sight distance created by vehicles stopped in the two through lanes at the red light) and head-on collisions involving vehicles in the two-way left turn lane. This project needs to be divided into several phases for cost reasons. A Federal Grant application (through the Highway Safety Improvement Program / HSIP) will be submitted this April to help fund the portion from 224th St. SW to 220th St. SW (the section with highest number of collisions) and a Transportation Safety Plan is required as part of this submittal. The City will update this document every two years to identify the top priority transportation projects and/or programs to determine future grant applications and local programs to add to the budget. Attachments: 6.3 Packet Pg. 90 Draft 2018 Transportation Safety Plan 6.3 Packet Pg. 91 2018 TRANSPORTATION SAFETY PLAN April 2018 6.3.a Packet Pg. 92 Attachment: Draft 2018 Transportation Safety Plan (Presentation of the Transportation Safety Plan) 1 Table of Contents Section 1: Overview and Background • Goals / Objectives • Summary of all fatal / serious injury collisions (2012 – 2016) Section 2: Strategies / Action Plan • High Accident Locations with proposed improvements details • Priority rating of all identified improvements Appendix A: Summary of Citywide Fatal / Serious Injury Crashes 6.3.a Packet Pg. 93 Attachment: Draft 2018 Transportation Safety Plan (Presentation of the Transportation Safety Plan) 2 SECTION 1: OVERVIEW AND BACKGROUND In 2016, Washington State developed a Strategic Highway Safety Plan called “Target Zero”, with the goal of reducing the number of fatal / serious injury collisions in the State to zero by 2035. On a state level between 2012 and 2016, the annual number of fatal collisions ranged from 450 to 550 (=> average of ~ one fatal collision every day). During this same time period in Edmonds, (5) fatalities and (37) serious injuries resulted from collisions. In order to comply with this State Plan, the City is completing a Safety Plan listing all engineering, education, and enforcement actions needed to reach the goal of providing a safer transportation system for the various modes of transportation. The City’s transportation system consists in a network of (157) centerline miles of roadway, (92) miles of sidewalk, and (9) miles of bike facilities, with numerous locations with the modes interfacing. Moving the plan forward includes a series of action items that will guide the City by laying the groundwork for a reduction on fatal and other serious accidents. Motor vehicle crashes generally involve multiple contributing factors, which may be related to drivers, the roadway, or the vehicle, thus making transportation safety a multi-disciplinary concern. This means we cannot just design and construct our way to safety. Education and enforcement must also be integrated into a Safety Culture and Strategy to achieve the desired results. Figure 1. Contributing Factors to Crashes 6.3.a Packet Pg. 94 Attachment: Draft 2018 Transportation Safety Plan (Presentation of the Transportation Safety Plan) 3 Accomplishing those safety goals will require a collaborative approach that draws several key areas associated with traffic safety, as shown below (aka 4 E’s). Figure 2. The 4 E’s • Education provides drivers information about making good choices, such as not texting while driving, avoiding alcohol or medications that affect awareness of the road, and wearing a seatbelt. Education can also inform people about the rules of the road. This program should be extended to pedestrians and cyclists (all modes of transportation interacting within our transportation system). States and Cities incorporating strong educational components report declines in fatality rates. • Enforcement affects behavior changes to transportation system users through enforcement, education, and incarceration and may deter motorists from unsafe driving behavior. • Engineering includes designing, constructing, operating, and maintaining transportation facilities to reduce fatalities and reduce the severity of collisions. 6.3.a Packet Pg. 95 Attachment: Draft 2018 Transportation Safety Plan (Presentation of the Transportation Safety Plan) 4 • Evaluation ties the other three elements together by measuring the success (effect in improving safety and cost effectiveness) of implemented solutions and deploying new solutions to address evolving needs as frequently as possible. The map below shows all the locations where fatal / serious injury collisions occurred between 2012 and 2016. 6.3.a Packet Pg. 96 Attachment: Draft 2018 Transportation Safety Plan (Presentation of the Transportation Safety Plan) 5 Appendix A provides a brief overview of all the collisions that occurred during this time period and the charts below provides an overall summary. No relative trend is noticed but the overall number of such collisions from 2012 to 2016 has more than doubled (going from 5 to 11), further highlighting the importance of this plan and identifying the best strategies to reduce those numbers. Figure 3. Annual # of Fatal / Serious Injury from Crashes (2012-2016) Figure 4: Number of annual crashes for all modes of transportation (2012-2016) 0 1 2 3 4 5 6 7 8 9 10 2012 2013 2014 2015 2016 # Fatalalities # Serious Injury 2012 2013 2014 2015 2016 TOTAL % of total for type of collision # Fatal / Severe Injury Crashes 5 9 11 6 10 41 # Motorist Fatalities - - - - 1 (2 fatalities) 1 25% of fatal # Serious Injury Motorist Collisions 4 6 3 3 5 21 57% of serious # Pedestrian Fatalities - - 2 - - 2 50% of fatal # Serious Pedestrian Collisions 1 3 4 3 4 15 41% of serious # Cyclist Fatalities - - 1 - - 1 25% of fatal # Serious Cyclist Collisions - - 1 - - 1 2% of serious 6.3.a Packet Pg. 97 Attachment: Draft 2018 Transportation Safety Plan (Presentation of the Transportation Safety Plan) 6 Important stats to note about the data are: • ~ 52% of those collisions occurred along Hwy. 99 (=> 21 out of 41) o (8) involved pedestrians [(4) jay-walkers and (4) drivers failing to yield to pedestrians within crosswalk at signalized intersections]; o (4) involved left turn vehicles in the two-way left turn colliding with vehicles in the BAT lane coming from the other direction / due to limited sight distance created by the (2) vehicles in general purpose lanes queued up at red light at up-coming traffic light / leaving “courtesy” gaps o (3) involved red lights runners o (3) involved drivers failing to yield when entering from minor street or when changing lanes o (3) other types o Based on another recently completed crash diagram study, the corridor experiences approximately 8.61 crashes per millions miles traveled (WSDOT statewide average for urban principal arterials such as Hwy 99 in the Northwest Region is 2.27 crashes per million miles traveled / number ~ 4 times greater along this corridor) • ~ 42% involved pedestrians (17 out of 41) o (5) involved jay-walkers o (8) involved pedestrians getting hit while crossing within crosswalk at signalized intersection o (4) other factors o The Average State level of pedestrian accidents is 28% (14% higher in Edmonds). The percentage further stands out since the number of pedestrians using our transportation system is much lower than the number of motorists (number of collisions for both modes practically the same). o (2) of the pedestrian collisions will be addressed as part of the Citywide Pedestrian Crossing Enhancements project (8th @ Walnut and SR-524 @ 84th Ave. W). • 60% occurred during the day-time hours • 68% occurred on clear days with dry conditions • 90% of collision involve a non-impaired driver / pedestrian Attainment of this goal requires an on-going collaboration between the different City departments and the users. The City has the following on-going programs: - Education o A Pedestrian Task Force was formed in 2016 with the goal of increasing pedestrian safety throughout the City through an education program and creative solutions. Since then, educational presentations have been made to 6.3.a Packet Pg. 98 Attachment: Draft 2018 Transportation Safety Plan (Presentation of the Transportation Safety Plan) 7 different groups and the expansion of this program at the school level in now being explored (through school assemblies, classroom presentations with hands-on activities…). o The Cascade Bicycle Club and Edmonds Bicycle Group started a Bicycle Education Program in 2015 at several schools (through grant funding secured as part of Walkway projects / Safe Routes to School Program). Bike safety rodeos and classes have been held at those locations. o The Police Department frequently holds safety campaigns at key intersections (such as within the Downtown area where the interaction between all the different modes of transportation is continuous) and along corridors with high crash history (such as Hwy. 99). A Target Zero grant through the Snohomish County Sheriff Department was recently secured to hold such a campaign. This allowed their Traffic Division to distribute safety pamphlets to both drivers and pedestrians, as well as hang posters at various locations with the goal of educating all users and raising awareness. Following the week of education, their Division will enforce both pedestrians and drivers causing any infractions. - Enforcement o The Police Department continually enforces speeding vehicles or drivers not respecting the different driving laws (such as distracted driving) throughout the City with the presence of (5) officers in their Traffic Unit. In an effort to reduce speeds and improve safety, they rotate (2) radar feedback trailers to various locations every couple of weeks (based on speeding citizen complaints). - Engineering: o Based on City records, the Engineering Division hasn’t previously completed a Transportation Safety Plan. The City currently only evaluates collision data every 6 years (as part of 2015 Transportation Plan Update). The Division continues to pursue grant opportunities to fund various engineering improvements in order to create a safer transportation system (through sidewalk projects, pedestrian crossing enhancements, intersection improvements, corridor improvements…). Local funds are budgeted for low- cost projects. Over the last couple of years, the City has budgeted funding on an annual basis for the ADA Curb Ramp Upgrades, Minor Sidewalk Improvements, and Traffic Calming Program. The Curb Ramp Program enables pedestrians of all abilities to access the sidewalk, instead of having people with certain disabilities use the travel lanes since they can’t access the sidewalk. The Minor Sidewalk Improvements consist in completing small 6.3.a Packet Pg. 99 Attachment: Draft 2018 Transportation Safety Plan (Presentation of the Transportation Safety Plan) 8 sidewalk missing links at various locations throughout the City. The Traffic Calming Program consists in the installation of traffic calming devices at various locations (five radar feedback signs have been installed at various locations over the last 5 years / to be moved to other locations every 2 to 3 months to increase their efficiency in reducing speesd). Public Works has an on-going sidewalk maintenance program, whereas sidewalk panels are replaced when cracks / lips appear (in addition to pavement maintenance). • Evaluation: currently, the City isn’t frequently evaluating the overall success of all those elements in addressing annual fatal / serious injury collisions. SECTION 2: STRATEGIES / ACTION PLAN I. Project descriptions based on High Accident Locations Based on all the fatal / serious injury collisions identified in the previous section and the collision frequency at specific locations, the following projects are proposed. Small projects would be funded with local funds while grant funds would be secured for larger projects. Even if a fatal / serious injury collisions hasn’t been identified at a specific location, improvements still need to be identified when deficiencies are noticed and / or when a high number of minor have occurred there. 1. Highway 99 Improvements from 244th St. SW to 212th St. SW o Description: the project provides access management with the installation of a raised median along the entire corridor in order to restrict left turns from the two-way left turn lane. The stretch from 228th St. SW to 224th St. SW has such an existing separation. The turning radii at the signalized intersections would need to be increased in order to accommodate U-Turns. Several mid-block left turn pockets would need to be provided to allow direct access to private properties or mid-block U-turns. “NO PEDESTRIAN CROSSING” signs would be added at minor intersections to discourage / enforce jay-walkers along this corridor. Capacity improvements (additional lanes at Hwy. 99 @ 220th St. SW and Hwy. 99 @ 212th St. SW), sidewalk widening, utility upgrades, and gateway elements would be incorporated into the project. o Crashes addressed 6.3.a Packet Pg. 100 Attachment: Draft 2018 Transportation Safety Plan (Presentation of the Transportation Safety Plan) 9  (3) accidents involved vehicle making left turn from the two-way left turn lane colliding with vehicle going in opposite direction from BAT lane  (1) accident resulted from two drivers involved in a head-on collision, while driving in two-way left turn lane  (1) accident due to failure to yield  (3) jay-walkers were involved in the accident  The stretch from 224th St. SW to 220th St. SW has the most accidents involving left turn vehicles in the two way left turn lane and vehicles going straight in the BAT lane (coming from opposite direction). Depending on the grant funds available and total project cost, the project might need to be divided in different phases. 2. New Traffic Signal at Hwy. 99 @ 234th St. SW o Description: the project proposes the installation of a traffic signal, providing one additional safer pedestrian crossing. This improvement would also provide an easier access onto the corridor, coming from the cross street. This improvements may potentially be added to the Highway 99 Improvements project. o Crashes addressed  (1) jay-walking accident occurred on both sides of this intersection (228th St .SW and 238th St. SW) 3. Traffic Signal re-timing / additional signage o Description  The project includes signal timing modifications (such as addition of short delay between the time the WALK pedestrian indication is ON and the green ball for vehicles). This delay will get pedestrians in the crosswalk before the vehicle has moved and increase their visibility. Cabinet upgrades may be needed to allow such signal timing revisions.  The project also includes the addition of signs on mast arms to remind drivers to YIELD TO PEDESTRIANS prior to completing a turn. o Crashes addressed  (8) turning vehicles colliding with a pedestrian within a crosswalk at a signalized intersection 4. Expansion of Education Program o Description: the expansion of the existing education program from Pedestrian Task Force to other groups (through more extensive advertisement) and at the school level (through school assemblies, classroom presentations with hands- 6.3.a Packet Pg. 101 Attachment: Draft 2018 Transportation Safety Plan (Presentation of the Transportation Safety Plan) 10 on activities…). Safety presentations should be displayed to social media (City website, Facebook site…) and summary education forms should be distributed to various media sources (local newspapers, newsletters). Educational pamphlets are frequently handed out to pedestrians (as part of Safety Education Program). The Bicycle Program would also be expanded. The City recently secured grant funding to improve pedestrian crossings at several locations (as part of Citywide Pedestrian Crossing Enhancement project) and a portion of the funding will be allocated to the education program at the school level. The Police Department will keep attempting to secure grants or allocate local funding in future budgets to hold education campaigns (for drivers and non-motorized transportation users). o Crashes being addressed  Some of the accidents may have been addressed through additional education (such as pedestrian being hit while crossing within crosswalk or pedestrian wearing dark clothing at night while walking). Even though accidents were mostly due to driver-error, pedestrians could be taught to be more vigilant / aware of their surroundings when using the facilities. When crossing at a signalized intersection when the WALK signal is ON, double check that vehicles making the turn are yielding and make eye contact with the driver. 5. Additional Enforcement o Description: the size of the Traffic Division needs to maintained or expanded in order to provide sufficient enforcement for all the modes of transportation throughout the City. The Police Department may also look into obtaining additional radar feedback trailers so additional stretches can be monitored during same time periods. o Crashes addressed  some of the collisions as a result of speeding may have been addressed through enforcement. However, the Police Department can’t be on City streets at all times enforcing. 6. Short / Long Walkway projects listed in 2015 Transportation Plan o Description: install sidewalk along various stretches throughout the City (priority 1 in Long and Short Walkway list in Plan) o Crashes addressed  no fatal / serious injury collisions occurred between 2012 and 2016 along those stretches but sidewalk need to be installed to provide safer pedestrian conditions and deter from any pedestrian collisions from 6.3.a Packet Pg. 102 Attachment: Draft 2018 Transportation Safety Plan (Presentation of the Transportation Safety Plan) 11 happening in the future (as result of them potentially walking in the travel lanes). 7. Roadway Projects identified in the 2015 Transportation Plan(page 3-61 & 3-62) o Description: as a result of the collision history, concurrency, and multimodal elements, the following projects were identified in the Plan:  220th St. SW @ 76th Ave. W Intersection Improvements  Main St. @ 9th Ave. Intersection Improvements  196th Ave. W @ 88th Ave. W Intersection Improvements  84th Ave. W Corridor Improvements from 238th St. SW to 212th St. SW  228th St. SW Corridor Improvements from Hwy 99 to 95th Pl. W  SR-104 @ 238th St. SW o Crashes addressed  multiple minor injury accidents, greater than 1.5 collisions per million entering vehicles, or among the highest total collisions within the City II. Priority rating of all identified improvements The priority of the proposed improvements was determined based on the following criterias: - Safety: how many collisions does this project address? * 5 points: more than 5 fatal / serious injury collisions or > 1.5 collisions per million entering vehicles * 3 points: between 2 and 5 fatal / serious injury collisions or between 1 and 1.5 collisions per million entering vehicles or * 1 point: less than 1 collision per million entering vehicle or less than 2 fatal / serious injury collisions - Multimodal Elements: how many modes of transportation are impacted? * 5 points: all modes impacted / in support of Complete Streets Policy * 3 points: included non-motorized transportation elements * 1 point: does not include multimodal elements 6.3.a Packet Pg. 103 Attachment: Draft 2018 Transportation Safety Plan (Presentation of the Transportation Safety Plan) 12 - Cost / Magnitude: how would project compete during grant application process for high cost projects / local funding opportunities for low cost projects? - 5 points: high eligibility or low cost project - 3 points: medium eligibility - 1 point: low eligibility Rank Project Safety Multimodal/ Complete Streets Elements Cost / Magnitude TOTAL 1 Highway 99 Project 5 5 5 15 2 Traffic Signal Re-timing / additional signage 5 3 5 13 3 220th @ 76th Intersection Improvements 5 3 5 13 4 Expansion of education program 3 3 5 11 5 Main @ 9th Intersection Improvements 3 3 5 11 6 196th @ 88th Intersection Improvements 3 3 3 9 7 84th Ave. Corridor Improvements 3 3 3 9 8 228th Corridor Improvements 3 3 3 9 9 New traffic signal at Hwy 99 @ 234th St. SW 1 3 3 7 10 Short / Long Walkway projects 1 3 3 7 11 SR-104 @ 238th Intersection Improvements 3 3 1 7 12 Traffic Calming Program 1 5 1 7 13 Additional Enforcement 1 1 1 3 ALL YELLOW HIGHLIGHTED PROJECTS ARE HIGH COST PROJECT (> $500,000 project) The Highway 99 project is the priority project based on the safety elements, multimodal elements, and grant eligibility. All other projects in the list are also considered priority projects and future grant applications will be submitted once a detailed evaluation has been completed to determine which project will score the highest (based on specific program). For low cost projects, attempts will be made at the local level to maintain or add them to future budget cycles. This plan will be updated every two years to identify the priority projects / revise the list (based on the updated crash history) and identify new risks / necessary countermeasures. Regular updates will help improve the safety of our transportation system and help reach the State goal. A contribution from all the elements listed above is needed in order to improve the overall safety of transportation system. 6.3.a Packet Pg. 104 Attachment: Draft 2018 Transportation Safety Plan (Presentation of the Transportation Safety Plan) 13 6.3.a Packet Pg. 105 Attachment: Draft 2018 Transportation Safety Plan (Presentation of the Transportation Safety Plan) City Council Agenda Item Meeting Date: 04/10/2018 Report on Final Construction Costs for the Frances Anderson Center Bandshell Replacement Project Staff Lead: Rob English Department: Engineering Preparer: Megan Luttrell Background/History On September 27, 2016 Council awarded a contract to K-A General Construction Contractor, LLC in the amount of $141,420.33 for the Frances Anderson Center Bandshell Replacement Project. On January 3, 2017 Council authorized the budget amendment of $48,000 from December 2016 to be classified as management reserve, for the purpose of following the purchasing policies. On February 7, 2017, Council authorized an additional $32,000 for management reserve. Staff Recommendation Forward this item to the April 17, 2018 consent agenda for Council acceptance. Narrative On October 27, 2016, K-A General Construction Contractor, LLC was given the Notice to Proceed for construction, stipulating 90 working days for completion. The project scope included demolition of the existing bandshell, site preparation for the new structure, erection of the new Owner furnished bandshell and related site improvements. The contract award amount was $141,420.33 and Council approved a management reserve of $12,880.00. During the course of the contract, five revised-cost change orders totaling $72,051.87 were written against the project. A reconciliation change order for $7,499.86 was written for project closeout. The project is complete and the final cost paid to K-A General Construction Contractor, LLC was $220,972.06. 6.4 Packet Pg. 106 City Council Agenda Item Meeting Date: 04/10/2018 Presentation of a Supplemental Agreement with Murraysmith for the 2019 Sewerline Replacement Staff Lead: Rob English Department: Engineering Preparer: Megan Luttrell Background/History On March 21, 2017, Council approved a Professional Services Agreement with Murraysmith to provide design services for the 2018 and 2019 Sewerline Replacement Projects. On March 6, 2018, Council approved a Supplemental Agreement with Murraysmith to provide design services for the 2019 Sewerline Replacement Project. Staff Recommendation Forward this item to the consent agenda for approval at the April 17, 2018, Council meeting. Narrative The City issued a Request for Qualifications (RFQ) in November 2016 to hire a consultant to provide design engineering services for the 2018 and 2019 Sewerline Replacement Projects. The City received statements of qualifications from nine engineering firms and the selection committee selected Murraysmith (formerly MSA) to provide design engineering services for the 2018 and 2019 Sewerline Replacement Projects. On March 21, 2017 Council approved Murraysmith to be the consultant to provide design services for the 2018 and 2019 Sewerline Replacement Projects and authorized the mayor to sign the Professional Services Agreement for the projects that were scheduled to be designed as part of the 2018 Sewerline Replacement Project. On March 6, 2018, Council approved Supplemental Agreement #1 to design the 2019 sewerline projects. The City negotiated a consultant fee of $201,365 to complete this work. The majority of the 2019 work will be funded by the Sewer Utility Fund and a small portion will be paid by the Water Utility fund for one site where watermain will be replaced. The proposed Supplemental Agreement #2 adds two more sites to the overall project design. These two reaches were added to the 2019 sewerline project after videos were performed in Mid-March. The videos showed one reach as heavily corroded, which does not allow our staff to do their standard cleaning maintenance without heavily damaging the pipe. The other showed a significant sag in a long portion of the pipe, which increases the chance of blockages and backups. Both pipe segments will require that new pipe be installed. The additional cost for Supplement #2 is $48,355 bringing the entire Contract amount to $524,105. 6.5 Packet Pg. 107 Attachments: Supplemental Agreement with Murraysmith Site Map 6.5 Packet Pg. 108 Original Contract No. Supplemental Agreement 2 No. CITY OF EDMONDS 121 5TH AVENUE NORTH · EDMONDS, WA 98020 · 425-771-0220 · FAX 425-672-5750 Website: www.edmondswa.gov PUBLIC WORKS DEPARTMENT Engineering Division DAVE EARLING MAYOR SUPPLEMENTAL AGREEMENT 2 TO PROFESSIONAL SERVICES AGREEMENT 2019 Sewerline Replacement Project WHEREAS, the City of Edmonds, Washington, hereinafter referred to as the “City”, and Murraysmith, hereinafter referred to as the “Consultant”, entered into an underlying agreement for design, engineering and consulting services with respect to a project known as 2019 Sewerline Replacement Project, dated March 29, 2017 and amended on March 20, 2018: and WHEREAS, two additional sites have been identified to create a design, bid, build package for projects to be constructed in 2019 (Phase 2); NOW, THEREFORE, In consideration of mutual benefits occurring, it is agreed by and between the parties thereto as follows: 1. The underlying Agreement of March 29, 2017 between the parties, as amended by Supplemental Agreement No. 1 dated March 20, 2018 incorporated by this reference as fully as if herein set forth, is amended in, but only in, the following respects: 1.1 Scope of Work. The Scope of Work set forth in the underlying agreement shall be amended to include the additional services and material necessary to accomplish the stated objectives as outlined in the attached Exhibit A incorporated by this reference as fully as if herein set forth. 1.2 The $274,385 amount set forth in paragraph 2A of the underlying Agreement and stated as an amount which shall not be exceeded, and which was increased by $201,365 by Supplemental Agreement No. 1, is hereby amended to include an additional not to exceed amount of $48,355 for the additional scope of work identified in Exhibit A to this supplemental agreement. As a result of this supplemental agreement, the total contract amount is increased to a new total not-to-exceed amount of $524,105 ($274,385, plus $201,365, plus $48,355). 6.5.a Packet Pg. 109 Attachment: Supplemental Agreement with Murraysmith [Revision 1] (Supp. Murraysmith for 2019 Sewerline Replacement) \\edmsvr-deptfs\Engineering\Staff\Megan\Engineering Admin\PROJECTS\E8GA.2019 Sewerline Replacement\Murraysmith.Supp 2.doc 1.3 Exhibit B to the underlying agreement, as amended by Supplemental Agreement No. 1, consisting of the rate and cost reimbursement schedule is hereby further amended to include the form set forth on the attached Exhibit B to this Supplemental Agreement No. 2, incorporated by this reference as fully as if herein set forth. 2. In all other respects, the underlying agreement between the parties shall remain in full force and effect, amended as set forth in Supplemental Agreement Nos. 1 and 2, but only as set forth herein. DONE this day of , 20 . CITY OF EDMONDS MURRAYSMITH By: By: Mayor David O. Earling Title: ATTEST/AUTHENTICATE: ________________________________ Scott Passey, City Clerk APPROVED AS TO FORM: Office of the City Attorney 6.5.a Packet Pg. 110 Attachment: Supplemental Agreement with Murraysmith [Revision 1] (Supp. Murraysmith for 2019 Sewerline Replacement) \\edmsvr-deptfs\Engineering\Staff\Megan\Engineering Admin\PROJECTS\E8GA.2019 Sewerline Replacement\Murraysmith.Supp 2.doc STATE OF WASHINGTON ) )ss COUNTY OF ) On this day of , 20____, before me, the under-signed, a Notary Public in and for the State of Washington, duly commissioned and sworn, personally appeared , to me known to be the of the corporation that executed the foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he/she was authorized to execute said instrument and that the seal affixed is the corporate seal of said corporation. WITNESS my hand and official seal hereto affixed the day and year first above written. NOTARY PUBLIC My commission expires: 6.5.a Packet Pg. 111 Attachment: Supplemental Agreement with Murraysmith [Revision 1] (Supp. Murraysmith for 2019 Sewerline Replacement) City of Edmonds MURRAYSMITH 2019 Sewer Replacement, Supplement #2 April 2018 Page 1 SCOPE OF WORK CITY OF EDMONDS 2019 SANITARY SEWER REPLACEMENT PROJECT SUPPLEMENT #2 - ADDITIONAL SITES ENGINEERING SERVICES BACKGROUND Murraysmith, Inc. is currently under contract for preliminary and final design engineering services for the 2019 Sanitary Sewer Replacement project. This current work program includes seven individual project sites at various locations within the City’s collection system. The City would like to add two sites to the 2019 Sanitary Sewer Replacement project. This scope of work includes preliminary and final design engineering service for the two additional sites. The specific project locations are described below and as shown in the attached documents, as provided by the City. • Site 8: 80th Ave. W, at the intersection with 189th Pl. SW • Site 9: 195th St. SW, at the intersection with 76th Ave. W SCOPE OF WORK Task 1 - Project Management and Coordination This task provides for additional management of the project and coordination with the project team associated with adding the two sites. Elements of this task will include: 1.1 Correspondence and Coordination with City - All communication will be coordinated through the City’s Project Manager. Correspondence with the City Project Manager via phone conversations and e-mail will include the communication of project decisions, project status, work activities, and issues requiring City input. 1.2 Not Used 1.3 Kick-off and Project Coordination Meetings – Further participate in project kick-off meeting with City staff and key team members to discuss the project, review project schedule and discuss key elements of the project. In addition, further participate in up to four (4) project coordination or review meetings with City staff to discuss project elements. 1.4 Quality Assurance/Quality Control (QA/QC) - Perform in-house quality assurance reviews of all deliverables. Murraysmith Deliverables to City: • Deliverables and information associated with the addition of the two project sites will be incorporated into the deliverables of the original scope of work for the 2019 Sanitary Sewer Replacement project. EXHIBIT A 6.5.a Packet Pg. 112 Attachment: Supplemental Agreement with Murraysmith [Revision 1] (Supp. Murraysmith for 2019 Sewerline Replacement) City of Edmonds MURRAYSMITH 2019 Sewer Replacement, Supplement #2 April 2018 Page 2 Task 2 – Data Gathering and Utility Coordination This task consists of data gathering and utility coordination work associated with the two additional sites. Elements of this task will include: 2.1 Data Collection and Review - Work under this subtask includes gathering and reviewing all relevant data to complete the preliminary engineering tasks. A number of documents and reports will be requested and reviewed as part of this task, including record drawings and CCTV inspections and deficiency reports. Murraysmith will develop a formal “Request for Information” process and coordinate with the City during data collection to ensure all necessary information is gathered for the project. This will also include obtaining the City of Lynnwood’s construction standards. 2.2 Utility Coordination and Analysis - Acquire utility system mapping, perform a utility conflict analysis and identify potential utility conflicts. Develop a list of potential conflict locations to obtain specific utility information, including dimensions, location and depth, utilizing potholing techniques on an as-needed basis. City Responsibilities: • City to provide CCTV inspection and deficiency reports • City to provide all available as-built documents for City facilities Murraysmith Deliverables to City: • Deliverables and information associated with the addition of the two project sites will be incorporated into the deliverables of the original scope of work for the 2019 Sanitary Sewer Replacement project. Task 3 – Preliminary Design This task provides for preliminary engineering design services for the proposed two additional project sites and includes the following elements: 3.1 Plans (30% Design Completion Level) - Using the project information developed in the previous tasks, prepare preliminary design drawings to the 30% design completion level. Preliminary drawings will show plan and profile views and major project elements. Drawings will be developed at 1-inch = 20-feet scale in AutoCAD electronic format. The drawings will be prepared and submitted to the City for review and comment. 3.2 Engineer’s Opinion of Probable Construction Cost - A preliminary engineer’s opinion of probable construction cost to 30% design completion level will be developed and include a schedule of estimated quantities, unit prices, and total preliminary construction cost for the project. Assumptions: • Murraysmith will follow the City’s cost estimating policy in preparing the Engineer’s Opinion of Probable Construction Cost. • Cost estimates for each site will be prepared as separate bid schedules. 6.5.a Packet Pg. 113 Attachment: Supplemental Agreement with Murraysmith [Revision 1] (Supp. Murraysmith for 2019 Sewerline Replacement) City of Edmonds MURRAYSMITH 2019 Sewer Replacement, Supplement #2 April 2018 Page 3 City Responsibilities: • Complete review of the preliminary design drawings, engineer’s opinion of probable construction cost and all supporting documentation with verbal or written comments. City review period is assumed to be 2 weeks. Murraysmith Deliverables to City: • Deliverables and information associated with the addition of the two project sites will be incorporated into the deliverables of the original scope of work for the 2019 Sanitary Sewer Replacement project. Task 4 – Final Design This task will produce final plans for the project with direction from the preliminary design work task for the two additional sites that will be incorporated into the 2019 Sewer Replacement bid package. Final design plans will be presented at the 60% and 90% completion level for review by the City. Final bid ready plans at the 100% completion level will incorporate all prior review comments and will be suitable for bidding. Elements of this task will include: 4.1 Plans, Specifications, and Estimate (60% and 90% Design Completion Level) A. The preliminary design drawings (30% design completion level) will be revised and further developed to incorporate comments from the City’s review of the preliminary design. Develop design plans and engineer’s opinion of probable construction cost to approximately 60% and 90% design completion level. A total of two additional drawings with sewer plan and profile are anticipated. B. Murraysmith will prepare technical specifications and appendices to support the additional of the two sites. Specifications will be prepared based on the WSDOT Standard Specifications, latest edition. C. An engineer’s opinion of probable construction cost will be developed and will include a schedule of estimated quantities, unit prices, and total construction cost for the two additional sites. D. Submit 60% and 90% design package, including complete plan set, specifications, project schedule and engineer’s opinion of probable construction cost, to the City for review and comment. 4.2 Final Bid Ready Plans, Specifications & Estimate A. The 90% design package will be revised and further developed to incorporate comments from the City’s review of the 90% design. Develop design plans, project schedule and engineer’s opinion of probable construction cost that are ready for bidding. Revise bid proposal quantities to reflect a bid-ready design package. B. Submit stamped and signed bid-ready Contract Documents to City for distribution. 6.5.a Packet Pg. 114 Attachment: Supplemental Agreement with Murraysmith [Revision 1] (Supp. Murraysmith for 2019 Sewerline Replacement) City of Edmonds MURRAYSMITH 2019 Sewer Replacement, Supplement #2 April 2018 Page 4 4.3 Constructability Review - Provide a limited constructability review of the proposed improvements in support of the City’s constructability review and identify issues that could affect the construction of the improvements as designed or the construction schedule. 4.4 Not used 4.5 Coordination with the City of Lynnwood – Site 9 discharges into the City of Lynnwood’s collection system. Contact the City of Lynnwood to review the project and identify any project constraints or requirements. Assumptions: • Murraysmith shall apply a Washington Professional Engineer’s stamp with signature and date on the final bid-ready edition of the sewer design plans and specifications. • City will take the lead in preparing permits and coordinating project elements with key stakeholders, including franchised utilities and public as affected by the project. • Review comments will be received in a complete, single submittal. Multiple rounds of review comments on the same design completion submittal are not anticipated. • The need for restoration plans is not anticipated. The Contractor shall be responsible for restoration in accordance with the specifications. • Contractor shall be responsible for the development of traffic control and erosion control plans. • Murraysmith will follow the City’s cost estimating policy in preparing the Engineer’s Opinion of Probable Construction Cost. • Cost estimates and design plans for each site will be prepared as separate bid schedules. City Responsibilities: • Complete technical review of the documents at 60% and 90% design completion level with verbal or written comments. City review period for the submittal is 2 weeks. • City to provide a constructability review of the proposed improvements. • City will take the lead in coordinating any State and Federal permits. Murraysmith Deliverables to City: • Deliverables and information associated with the addition of the two project sites will be incorporated into the deliverables of the original scope of work for the 2019 Sanitary Sewer Replacement project. Task 5 –Support During Bid Period (Limited) This task includes supporting the City on an as-needed basis in providing assistance associated with the two additional project sites during bidding of the project. Anticipated elements of this task include: 5.1 Bidder Inquiries and Addenda - Respond to questions from bidders, subcontractors, equipment suppliers and other vendors regarding the project, plans and specifications. Maintain a written record of communications during the bidding process. Prepare and issue any addenda as necessary to clarify the contract documents. Assumptions: 6.5.a Packet Pg. 115 Attachment: Supplemental Agreement with Murraysmith [Revision 1] (Supp. Murraysmith for 2019 Sewerline Replacement) City of Edmonds MURRAYSMITH 2019 Sewer Replacement, Supplement #2 April 2018 Page 5 • Murraysmith’s support services during bidding will be performed up to the extent of the fee estimate for the Bidding Support task, unless otherwise approved in advance by the City through a budget amendment or authorization to invoice against the Unanticipated Task Reserve budget. Murraysmith Deliverables to City: • Deliverables and information associated with the addition of the two project sites will be incorporated into the deliverables of the original scope of work for the 2019 Sanitary Sewer Replacement project. Task 6 –Support During Construction (Limited) This task represents minimal involvement by Murraysmith, associated with the two additional project sites, during construction in support of the City’s on-site inspector and construction management staff. Murraysmith’s services will be provided on an as-needed basis and will be limited to incidental support and periodic collaboration with the City and the construction contractor, all at the direction of the City. Anticipated elements of this task will include: 6.1 Not Used 6.2 Clarifications and Changes - At the request of the City, Murraysmith will assist with issuing clarifications to the construction contractor and producing design changes if necessary. 6.3 Record Drawings (As-built Drawings) - Prepare record drawings in AutoCAD to indicate changes made during construction, based on notes and sketches provided by the City. Assumptions: • Murraysmith’s support services during construction will be performed up to the extent of the fee estimate for the Construction Management Assistance task, unless otherwise approved in advance by the City through a budget amendment or authorization to invoice against the Unanticipated Task Reserve budget. • For the purpose of developing this scope of work and associated fee estimate, two (2) clarifications. • Geotechnical monitoring and compaction testing services during construction will be provided by a firm retained by the City. City Responsibilities: • City will provide the initial review of all requests for information. • City will provide on-site inspection and will take the lead in administrating and managing the construction contract and communicating with the construction contractor. • City will provide a single copy of complete and fully-coordinated construction markups for production of record drawings. Murraysmith Deliverables to City: • Deliverables and information associated with the addition of the two project sites will be incorporated into the deliverables of the original scope of work for the 2019 Sanitary Sewer Replacement project. 6.5.a Packet Pg. 116 Attachment: Supplemental Agreement with Murraysmith [Revision 1] (Supp. Murraysmith for 2019 Sewerline Replacement) City of Edmonds MURRAYSMITH 2019 Sewer Replacement, Supplement #2 April 2018 Page 6 Task 7 – Surveying Services (Subconsultant Services) This task will provide surveying and base mapping services for the two additional sites prepared by a licensed professional surveyor, which will be used to produce the design plans for the project. Surveying will be conducted by Murraysmith’s subconsultant Duane Hartman & Associates, Inc. (DHA). Murraysmith will coordinate the extent of the survey and review and provide comment on the base mapping to the surveyor. This task includes the following elements: 7.1 Control - Horizontal control (NAD 83/91) and vertical control (NAVD 88) shall be established from the nearest approved City control monument for each of the various project sites. Control monument selection and survey methodology to be used shall be coordinated with and approved by the City prior to beginning the control survey. All survey control work shall be recorded in a field book. 7.2 Utility Locates – Order and perform design locates (surface markings) of all known underground utilities and coordinate with City crews to physically locate all water service and sewer connections in the field, and incorporate those locations into the base maps. All other underground utility lines and services to be approximated based on painted surface markings and/or existing record as-built drawings obtained. 7.3 Survey Scope – Show all known utilities including individual service lines, water meters, curb stops, water and gas valves, manholes, catch basins, power poles, buried power lines, etc. Survey the painted utility locate marks and coordinate the survey with utility locate personnel. Provide invert elevations of pipes, swales, ditches, or other conveyances for surface runoff, and lid and invert elevations for catch basins and manholes. Show right-of-way, centerline, property boundaries and easements on plans. Locate and map all private structures within City right-of-way and easements. Show property lines and field check street addresses. 7.4 Base Mapping - The preliminary survey base map will be submitted electronically for review in PDF format. Base mapping will be provided at a scale of 1-inch = 20-feet and topographic contours at 2-foot intervals. Provide full-size hard copies of the final survey control drawing for project use. Assumptions: • Right-of-way limits will be shown using available GIS and AutoCAD information • Surveyor will provide private utility locator to perform locating services City Responsibilities: • City crews to locate and surface mark all water service connections and sewer laterals in advance of field surveys • Review electronic copy of base map and provide written comments • Coordinate right-of-entry for surveying on private property Murraysmith Deliverables to City: 6.5.a Packet Pg. 117 Attachment: Supplemental Agreement with Murraysmith [Revision 1] (Supp. Murraysmith for 2019 Sewerline Replacement) City of Edmonds MURRAYSMITH 2019 Sewer Replacement, Supplement #2 April 2018 Page 7 • Deliverables and information associated with the addition of the two project sites will be incorporated into the deliverables of the original scope of work for the 2019 Sanitary Sewer Replacement project. Task 8 – Geotechnical Engineering and Environmental Support (Subconsultant Services) This task will provide geotechnical engineering services for the two additional sites in accordance with the City’s policy for Geotechnical Engineering Requirements for Utility Projects. The geotechnical engineering work will be conducted by Murraysmith’s subconsultant, Landau Associates, and will include field investigations (borings), laboratory testing, technical evaluation, and design recommendations. Murraysmith will coordinate proposed exploration boring locations and review and provide comment on the Geotechnical Report. This task includes the following elements: 8.1 Preliminary Site Assessment - Review geologic maps, soil surveys, and available geotechnical reports in the vicinity regarding subsurface soil and groundwater conditions. Review available reports and the Department of Ecology’s data base to assess the potential for encountering contaminated soils. Prepare traffic control plan and obtain right-of-way permitting for geotechnical investigation field work. Obtain utility clearance and review utility locates performed under the previous task. Perform site visit and assessment. 8.2 Geotechnical Field Study - Explore subsurface soil and groundwater conditions along the proposed alignment by drilling up to two (2) exploration borings approximately 10 to 20 feet below ground surface. Borings will be located in close proximity to the proposed sewer line replacement. It is anticipated that traffic control equipment and flaggers will be necessary for this work. The drilling, sampling, and groundwater observations will be accomplished under the direction of an experienced geotechnical engineer or engineering geologist from Landau Associates. A detailed log of materials and conditions uncovered during the course of the work will be maintained. Field testing shall be according to appropriate ASTM Standards and soil samples will be collected and transported to a laboratory for further testing. Once the samples are collected, each boring will be backfilled with imported materials and patched with concrete as applicable. 8.3 Data Reduction and Laboratory Analysis - Laboratory tests will be conducted to provide data on the important physical characteristics of the soils for engineering studies and analyses. The laboratory tests will be limited to standard classification tests, such as moisture content, particle size distribution and triaxial strength tests, as appropriate. 8.4 Geotechnical Report - Engineering analysis and evaluation of data obtained in prior subtasks will be performed and incorporated into the Geotechnical Report identified in the original scope of work for the 2019 Sanitary Sewer Replacement project. Assumptions: • Field investigation services will be scheduled to allow City to provide adequate notification to public • Up to two exploration borings are anticipated 6.5.a Packet Pg. 118 Attachment: Supplemental Agreement with Murraysmith [Revision 1] (Supp. Murraysmith for 2019 Sewerline Replacement) City of Edmonds MURRAYSMITH 2019 Sewer Replacement, Supplement #2 April 2018 Page 8 City Responsibilities: • City crews to locate and surface mark all water service connections and sewer laterals in advance of borings • Provide right-of-way use permit and City owned utility locates for exploration program • Review proposed boring locations and make site visit to confirm proposed exploration program • Provide available existing geotechnical investigation documents from past projects within the project vicinity Murraysmith Deliverables to City: • Deliverables and information associated with the addition of the two project sites will be incorporated into the deliverables of the original scope of work for the 2019 Sanitary Sewer Replacement project. Task 9 – Not Used Task 10 – Unanticipated Task Reserve (As Needed) A reserve budget amount has been included in the fee estimate for work under this task, which may include additional unanticipated work not specifically identified in the scope of work tasks defined above. Such work items will be undertaken only after written authorization from the City. ESTIMATED SCHEDULE Murraysmith shall begin work immediately upon receipt of Notice to Proceed from the City and incorporate this work into the 2019 Sanitary Sewer Replacement project schedule. 6.5.a Packet Pg. 119 Attachment: Supplemental Agreement with Murraysmith [Revision 1] (Supp. Murraysmith for 2019 Sewerline Replacement) Princ. Princ.Prof.Eng.Tech.Admin.Eng. VIEng. VEng. IVDes. IIIVII$248$239$152$134$143$99TJP TCL SMT DJB HCM ANB2DHALandauMileageCADDPrint & ReproductionTask 1 - Project Management and Coordination1.1Correspondence and Coordination w/City31371,439$ -$ -$ -$ 10$ 1,449$ 1.2Not Used 0-$ -$ -$ -$ 10$ 10$ 1.3Kick-off and Project Coordination Meetings224800$ -$ -$ -$ 800$ 1.4QA/QC41271,535$ -$ -$ -$ 10$ 1,545$ Subtotal927000183,774$ -$ -$ -$ -$ -$ 30$ 3,804$ Task 2 - Data Gathering and Utility Coordination2.1Data Collection and Review1236954$ -$ -$ -$ 10$ 964$ 2.2Utility Coordination and Analysis25181,117$ -$ -$ 43$ -$ 1,160$ Subtotal104810142,071$ -$ -$ -$ -$ 43$ 10$ 2,124$ Task 3 - Preliminary Design3.130% Plans3668233,604$ -$ 144$ -$ 3,748$ 3.2Engineer's Opinion of Const. Cost1135802$ -$ -$ -$ -$ 802$ Subtotal407980284,406$ -$ -$ -$ -$ 144$ -$ 4,550$ Task 4 - Final Design4.1Plans, Specs, & Estimate (60%, 90%)2101412385,608$ -$ 216$ -$ 5,824$ 4.2Final Bid Ready PS&E1467182,661$ -$ 126$ -$ 2,787$ 4.3Constructability Review1113639$ -$ -$ -$ -$ 639$ 4.4Not Used 0-$ -$ -$ -$ -$ -$ 4.5Coordination with the City of Lynnwood66121,716$ -$ -$ -$ -$ 1,716$ Subtotal4121261907110,624$ -$ -$ -$ -$ 342$ -$ 10,966$ Task 5 - Support during Bid Perioed (Limited)5.1Bidder Inquiries and Addenda112116910$ -$ 18$ -$ 928$ Subtotal1012116910$ -$ -$ -$ -$ 18$ -$ 928$ Task 6 - Support during Construction (Limited)6.1Not Used 0-$ -$ -$ -$ -$ 6.2Clarifications and Changes122271,106$ -$ -$ 36$ -$ 1,142$ 6.3Record Drawings1236849$ -$ -$ 54$ -$ 903$ Subtotal103450131,955$ -$ -$ -$ -$ 90$ -$ 2,045$ Task 7 - Surveying Services (Subconsultant)1124572$ 7,382$ 7,382$ 36$ 7,990$ Subtotal0011204572$ 7,382$ -$ 7,382$ -$ 36$ -$ 7,990$ Task 8 - Geotech Eng (Subconsultant)1214686$ 9,262$ 9,262$ -$ -$ 9,948$ Subtotal1021004686$ -$ 9,262$ 9,262$ -$ -$ -$ 9,948$ Task 9 - Not Used0-$ -$ -$ -$ -$ -$ -$ Subtotal0000000-$ -$ -$ -$ -$ -$ -$ -$ Task 10 - Unanticipated Task Reserve (As Needed)6,000$ -$ -$ -$ -$ 6,000$ Subtotal00000006,000$ -$ -$ -$ -$ -$ -$ 6,000$ TOTAL213465136115830,998$ 7,382$ 9,262$ 16,644$ -$ 673$ 40$ 48,355$ ExpensesMileage:Current IRS Rate ($0.545/mile)CADD Hardware/Software:$18.00/hourPrinting and Reproduction:At CostTASKMURRAYSMITH LABOR HOURSESTIMATED FEESTotal HoursMurraysmith LaborSubconsultantsSubconsultantTotalExpensesTotalEXHIBIT B-1CITY OF EDMONDSSUPPLEMENT #2 - ADDITIONAL SITESPROPOSED FEE ESTIMATE2019 SANITARY SEWER REPLACEMENT PROJECTCity of EdmondsApril 2018MURRAYSMITHEngineers/Planners2019 Sewer Replacement, Supplement #2Page 1 6.5.aPacket Pg. 120Attachment: Supplemental Agreement with Murraysmith [Revision 1] (Supp. Murraysmith for 2019 Sewerline Replacement) City of Edmonds Mapbook 2019 Sewerline Replacement Project Sites Site 1 Site 4 Site 5 Site 7 (Survey Only) Site 6 Site 3 Site 2 Supplement 2 ew Site 8 DrSupplement 2 Site 9 76th Ave WMain St 196th St SW Oly m pic Vi Pine St 84th Ave W220th St SW88th Ave W208th St SW 7 4 t h A v e W68th Ave W9th Ave NBowdoin Wy 212th St SW Dayton St T a lbo t R d N 205th St/244th St SW3rdAveS Lund's Gulch Rd Olympic Ave200th St SW 168th St SW 224th St SW Timber Ln80thAveW95th Pl W75th PL W96th Ave W72nd Ave WMe a do wdaleRd Maplewood DrSunset Ave N206th St SW Meadow d ale B e achRd 66th Ave WN 205th St/244th St SW74th Ave W80th Ave W§¨¦I-5 ¯99 ¯104 ¯524 ¯104 ¯104 6.5.b Packet Pg. 121 Attachment: Site Map [Revision 1] (Supp. Murraysmith for 2019 Sewerline Replacement) City Council Agenda Item Meeting Date: 04/10/2018 Civic Stadium project demolition closeout Staff Lead: Carrie Hite Department: Parks, Recreation & Cultural Services Preparer: Carrie Hite Background/History The stadium was identified to be demolished in the Civic Park Master Plan, and as such in the Comprehensive Plan Staff Recommendation Review closeout request and forward to the consent agenda. Narrative Civic stadium, although near and dear to many hearts in Edmonds, was beyond repair and identified to be demolished as part of the Civic Park Master Plan. The City Council adopted $135,000 in the budget for the demolition. This included the $35,000 from the RCO grant for acquisition that was leftover and was reimbursable. The City originally received an engineer's estimate of $300,000 for demolition. We decided to solicit this from the small works roster, in hopes that it would come in under this threshold. We strategically solicited a few contractors to visit the site and share their thoughts about cost. We did get some feedback that it could be as low as $75,000 for demolition. When we went out to bid, we listed the project cost in a range of $75K-$300K. We received a low bid from CGI International for $63,422.50. After thorough vetting, the Mayor signed a contract for this amount for the demolition of the grandstand. We also entered into a zero sum contract with Ballard Re-Use to remove the wood seating elements for recycle. Once Ballard Re-Use was on site removing the wood seating, there was evidence of major bug damage to the wood. This was so significant that Ballard Re-Use could not take the wood. We entered into a change order for $11,900.21 for CGI to remove the seating elements and take the wood to recycle. This amount covered labor and disposal fees. The total amount paid to CGI was $75,322.71. They have completed the project closeout paperwork. We are asking Council's acceptance of this project. 6.6 Packet Pg. 122 City Council Agenda Item Meeting Date: 04/10/2018 Final Acceptance of the 228th St. SW Corridor Improvements Project Staff Lead: Rob English Department: Engineering Preparer: Megan Luttrell Background/History On May 5, 2015, Council awarded the construction contract to Rodarte Construction, Inc in the amount of $5,205,040.13 and authorized a $498,700 management reserve for changes and unforeseen conditions during construction. Staff Recommendation Forward this item to the April 17, 2018, consent agenda for City Council acceptance. Narrative This project constructed the missing link of roadway on 228th St from State Route (SR) 99 to 76th Ave and installed two new traffic signals at the intersections of SR99 / 228th St. and 76th Ave/ 228th St. The center median was extended on a portion of SR99 to restrict left turns and improve safety. Sidewalks and bike lanes were added along the new section of 228th St. The project also reconstructed and paved 228th St/Lakeview Drive in the City of Mountlake Terrace. The project was funded by a federal transportation safety grant, City of Mountlake Terrace, City Funds 112 (Street), 421 (Water) and 423 (Sewer). The 228th St. Corridor Improvements were combined with the SR99 Illumination Phase 3 project. The Phase 3 improvements installed 19 new decorative pedestrian and roadway street lights with banner arms on SR99 between 220th St and 212th St. Substantial completion of the work was granted May 11, 2016 and physical completion was achieved on April 18, 2017. During the course of the contract, nine change orders were executed for a total of $241,918.36. A final Reconciliation change order for a decrease of ($234,151.60) adjusted the contract price to reflect the actual quantities paid in the contract. The final cost paid to Rodarte Construction was $5,212,806.99. The final project cost was therefore $7,766.23 above the original contract award or an increase of 0.15%. 6.7 Packet Pg. 123 City Council Agenda Item Meeting Date: 04/10/2018 Engineering Analysis and Preliminary Design for the WWTP Phase 6 Energy Energy Conservation Project - Carbon Recovery Staff Lead: Phil Williams, Public Works Director Department: Public Works & Utilities Preparer: Pamela Randolph Background/History See Narrative Staff Recommendation Authorize the Mayor to sign a contract with the State Department of Enterprise Services for $236,000. Narrative The Wastewater Treatment Plant currently utilizes a Sanitary Sewage Sludge Incinerator (SSI) to combust solids before final disposal to the landfill. The SSI and all of the support equipment were originally installed 30 years ago and will need to be replaced in approximately 5-7 years based on current Federal air quality regulations. In addition, several major components of this system are no longer supported, which makes repairs very costly. The current system is inefficient in terms of electrical usage and requires the addition of supplemental fuel oil to begin the combustion process every day. It does not recover any usable by-products, thus increasing the City’s carbon footprint. In addition, EPA has imposed new, very stringent regulatory requirements which make compliance virtually impossible. The increased cost for regulatory compliance alone (sampling, testing and reporting) exceeds $125,000 per year. City Council Resolution No. 1389, which commits to achieving or exceeding, at the local level, the goals established in the Paris Climate Accord, adds additional motivation to begin development of the next- generation biosolids processing and disposal system for our regional Wastewater Treatment Plant. Initial research, technical information requests, and evaluation (established via an RFQ process which included proposers from across the USA) have lead us to a new technology that we are confident will meet the goal and intent of Resolution No. 1389. It will significantly reduce operating, regulatory and disposal expense to Wastewater treatment rate payers. Equipment must fit within the existing footprint of the Plant and allow for full redundancy and reliability. The best available and most energy-efficient technology we have found involves a two-step process- sludge drying and pyrolysis. This two-step process creates a Class A dried product and a “biochar,” which are well established green renewable products that negate the “cradle to grave” risks associated with biosolids. The process is considered “net zero” or energy neutral, and the biochar byproduct can be used in City parks and/or marketed as a soil conditioner or amendment. 6.8 Packet Pg. 124 To reduce financial and operational risks, and to build upon the recent success of prior energy-related projects, we are proposing use of an Energy Savings Performance (ESP) contract through the State Energy Program to develop this project. ESP projects are delivered with guaranteed not-to-exceed pricing, guaranteed performance of the new systems and guaranteed energy savings which are measured and verified. An additional benefit of the ESP project approach is the availability of third party incentive funding for the most efficient projects. This approach has demonstrated a significant impact on our efficiency, resulting in a declining trend in energy use at the Plant and reduction of our carbon footprint, despite growing connected population and demands on our wastewater system. With the completion of the scope of work and contract with the Department of Enterprise Services, the City will be presented with an engineering analysis, a preliminary design package and a ”not-to-exceed” construction budget for planning and implementation. The 2018 budget appropriated $250,000 for this study and pre-design effort. Attachments: 2018573Aagraf K5211 IAA 2018573Afndaf Edmonds WWTP Ph 6_Incinerator_Audit Proposal_Rev C 6.8 Packet Pg. 125 Authorization No. 2018-573 A (1) Page 1 of 2 ENERGY SERVICES AUTHORIZATION NO. 2018-573 A (1) Edmonds WWTP Phase 6 Energy Project – Carbon Recovery City of Edmonds April 5, 2018 MASTER ENERGY SERVICES AGREEMENT NO. 2017-193 A (1) The Owner and the Energy Services Company (ESCO) named below do hereby enter into this Authorization under terms described in the following sections: Authorization to Proceed Project Conditions Compensation for Energy Services I. AUTHORIZATION TO PROCEED: Energy Services Company: Owner: Ameresco, Inc. City of Edmonds 222 Williams Avenue South, Suite 100 acting through the Renton, WA 98057 Department of Enterprise Services Telephone No. (206) 522-4270 Energy Program Fax No. (425) 687-3173 PO Box 41476 E-Mail gthorsland@ameresco.com Olympia, WA 98504 By By Name Name Roger A. Wigfield, P. E. Title Title Energy Program Manger Date Date State of Washington Contractor’s License No. AMEREI*004PZ State of Washington Revenue Registration No. 602 062 980 Federal Tax Identification No. 04-3512838 MWBE Certification No. II. COMPENSATION FOR ENERGY SERVICES: COMPENSATION Basic Services Current New Previous Energy Audit and Energy Services Proposal $ 61,600.00 $ 61,600.00 $ 0.00 Preliminary Design $ 174,400.00 $ 174,400.00 $ 0.00 Construction Management $ 0.00 $ 0.00 $ 0.00 Overhead and Profit $ 0.00 $ 0.00 $ 0.00 Grand Total (Plus WSST as applicable) $ 236,000.00 $ 236,000.00 $ 0.00 Value of this Amendment = $236,000.00 (Plus Washington State Sales Tax) 6.8.a Packet Pg. 126 Attachment: 2018573Aagraf (Phase 6 Energy - Carbon Recovery) Authorization No. 2018-573 A (1) Page 2 of 2 III. PROJECT CONDITIONS: The Project Conditions contained in the Master Energy Services Agreement will be used unless specifically changed herein. The cost effectiveness criteria for this project are per the Ameresco, Inc. proposal dated March 10, 2018. IV. SCOPE OF WORK: Per the ESCO proposal dated March 10, 2018, conduct a Detailed Investment Grade Energy Audit of City of Edmonds, Waste Water Treatment Plant, to identify cost effective energy conservation measures and present a written Energy Services Proposal, including all energy audit documentation. The ESCO shall prepare the final Energy Services Proposal, detailing the actual energy services and ESCO equipment to be provided, energy savings and cost guarantees, measurement and verification plans, and commissioning plans for the proposed measures. Measures will include items that save energy, water and other resources. The Cost Effectiveness Criteria for this project shall be as established in the Master Energy Services Agreement or as modified in Section III above. In addition, provide preliminary design of a city selected pyrolysis and dryer system as a replacement for the existing incinerator. V. SCHEDULE FOR COMPLETION Final completion of Investment Grade Energy Audit and preliminary design on or before September 1, 2018. 2018573Aagraf 6.8.a Packet Pg. 127 Attachment: 2018573Aagraf (Phase 6 Energy - Carbon Recovery) INTERAGENCY AGREEMENT NO. K5211 Page 1 (7-26-2017) State of Washington ENERGY PROGRAM Department of Enterprise Services P.O. Box 41476 Olympia, WA 98504-1476 INTERAGENCY AGREEMENT IAA No.: K5211 CITY OF EDMONDS 7110 210th Street SW Edmonds, WA 98020 Effective Date: April 5, 2018 INTERAGENCY AGREEMENT BETWEEN CITY OF EDMONDS AND WASHINGTON STATE DEPARTMENT OF ENTERPRISE SERVICES Pursuant to RCW Chap. 39.34, this Interagency Agreement (“Agreement”) is made and entered into by and between the State of Washington acting by and through the Energy Program of the Department of Enterprise Services, a Washington State governmental agency (“Enterprise Services”) and the City of Edmonds a Washington State governmental agency (“Client Agency”) and is dated and effective as of April 5, 2018. R E C I T A L S A. Enterprise Services, through its Energy Program (“Energy Program”), helps owners of public facilities reduce energy and operational costs. The Energy Program is a national leader in developing and managing energy savings performance contracts that help reduce energy and operational costs pertaining to publicly-owned facilities. B. Upgrading to energy efficient infrastructure helps reduce long-term operations and maintenance costs. This allows owners to be better financial stewards while achieving their mission, so that Washington is a better place to live, learn, and work. C. Acting as the owner’s advocate, the Energy Program delivers professional expertise and contract management services. By leveraging capital investments, owners can achieve efficiencies, improve facilities, and yield carbon reductions in their publicly-owned facilities. The Energy Program also creates value to owners by managing risk through guaranteed total project costs, equipment performance, and energy savings. D. Client Agency, an owner of a public facility, desires to contract with Energy Program to access and obtain certain Energy Program Services. E. The purpose of this Agreement is to establish a vehicle for the Energy Program to provide future energy/utility conservation project management services to Client Agency and to authorize the development of the energy services proposal in a cost-effective, efficient manner as set forth herein. 6.8.b Packet Pg. 128 Attachment: K5211 IAA (Phase 6 Energy - Carbon Recovery) INTERAGENCY AGREEMENT NO. K5211 Page 2 (7-26-2017) A G R E E M E N T NOW THEREFORE, in consideration of the mutual covenants and agreements set forth herein, the parties agree as follows: 1. TERM. The term of this Agreement commences on April 5, 2018, and ends on December 31, 2021. 2. STATEMENT OF WORK; COMPENSATION. Energy Program shall provide the following services, for the following compensation, to Client Agency. a. SERVICES. Upon request by Client Agency, and amendment to this Agreement to specify the individual Energy/Utility Conservation Project(s), Enterprise Services shall furnish the necessary personnel and services and otherwise do all things necessary for or incidental to the performance of the Project Management Services set forth in Attachment A and the Measurement & Verification Services set forth in Attachment C. Unless otherwise specified, Energy Program shall be responsible for performing all fiscal and program responsibilities as set forth herein. b. COMPENSATION. Compensation under this Agreement shall be by amendment to this Agreement for each authorized project. Each amendment shall include a payment schedule for the specific project. i. Project Management Services (Attachment A): For Project Management Services provided by Energy Program, Client Agency shall pay Enterprise Services a project management fee for services based on the total project value per the project management fees schedule set forth in Attachment B. ii. Termination Fee: If Client Agency, after authorizing an investment grade audit and energy services proposal, decides not to proceed with an energy/utility conservation project that meets Client Agency’s cost effective criteria, then the Client Agency will be charged a termination fee as set forth in Attachment B. The termination fee shall be based on the estimated total project value outlined in the energy services proposal prepared by the ESCO. iii. Measurement & Verification Services (Attachment C): If Measurement and Verification Services beyond the first three years following the Notice of Commencement of Energy Services are requested by Client Agency, Client Agency shall pay Energy Program $2,000.00 annually for each year that such Measurement and Verification Services are provided. c. PAYMENT FOR ESCO SERVICES. In the event that Client Agency authorizes Energy Program to contract with an ESCO, pursuant to an Enterprise Services Master Energy Services Agreement for ESCO Services, Client Agency shall make payment for such contracted services directly to the ESCO, after Energy Program has reviewed, verified, and sent such invoices to Client Agency for payment. 6.8.b Packet Pg. 129 Attachment: K5211 IAA (Phase 6 Energy - Carbon Recovery) INTERAGENCY AGREEMENT NO. K5211 Page 3 (7-26-2017) d. FURTHER ASSURANCES. Client Agency shall provide the Energy Services Company (ESCO) with any additional necessary or desired contract language to comply with Client Agency’s obligations pertaining to its use of federal, state, or other grants, funding restrictions, or unique contract/entity requirements. The ESCO and their subcontractors are required to comply with all applicable federal regulations and reporting procedures. e. MANAGING COMPLIANCE WITH STATE AND FEDERAL LAW. In all ESCO project agreements pertaining to this Agreement, the Energy Program will require ESCO compliance with applicable federal and state laws and state policies including, but not limited to, the following: 1. RCW Title 39 and 43 2. ADA Requirements 3. Buy America 4. Davis-Bacon 5. Prevailing Wage 6. DBE Participation 7. Apprentice Participation The Energy Program will collect and provide the weekly-certified payroll to Client Agency. Client Agency, however, shall remain responsible for any documentation required by Client Agency’s funding source. All federal verification, investigation, survey, reporting and enforcement requirements when there is a possible violation shall remain the responsibility of the federal grant recipient (Client Agency) unless negotiated by the Energy Program and added by amendment to this Agreement. In the event that the Energy Program becomes aware of a possible violation, it will notify the Client Agency. 3. INVOICES; BILLING. a. BILLING PROCEDURE. Energy Program shall submit a single invoice to the Client Agency upon substantial completion of each authorized project, unless a project specified a special billing condition in the Amendment. Substantial completion of the project will include the delivery and acceptance of the notice of commencement of energy cost savings issued by the ESCO. Each invoice will clearly indicate that it is for the services rendered in performance under this Agreement and shall reflect this Agreement and Amendment number. Energy Program will invoice for any remaining services within sixty (60) days of the expiration or termination of this Agreement. b. PAYMENT PROCEDURE. Client Agency shall pay all invoices received from Energy Program within ninety (90) days of receipt of properly executed invoice vouchers. c. BILLING DETAIL. Each invoice submitted to Client Agency by Energy Program shall include information as is necessary for Client Agency to determine the exact nature of all expenditures. At a minimum, the invoice shall reference this Agreement and include the following:  The date(s) such services were provided  Brief description of the services provided  Total invoice amount 6.8.b Packet Pg. 130 Attachment: K5211 IAA (Phase 6 Energy - Carbon Recovery) INTERAGENCY AGREEMENT NO. K5211 Page 4 (7-26-2017) d. BILLING ADDRESS. Invoices shall be delivered to Client Agency electronically to: Email: pamela.randolph@ci.edmonds.wa.us 4. AGREEMENT MANAGEMENT. The parties hereby designate the following agreement administrators as the respective single points of contact for purposes of this Agreement, each of whom shall be the principal contact for business activities under this Agreement. The parties may change administrators by written notice as set forth below. Any notices required or desired shall be in writing and sent by U.S. mail, postage prepaid, or sent via email, and shall be sent to the respective addressee at the respective address or email address set forth below or to such other address or email address as the parties may specify in writing: Enterprise Services Client Agency Attn: Todd Flynn Energy Project Manager Energy Program Washington Dept. of Enterprise Services PO Box 41476 Olympia, WA 98504-1476 Tel: (360) 407-9375 Email: todd.flynn@des.wa.gov Attn: Pamela Randolph City of Edmonds 7110 21th Street SW Edmonds, WA 98020 Tel: (425) 771-0237 Email: pamela.randolph@ci.edmonds.wa.us Notices shall be deemed effective upon the earlier of receipt, if mailed, or, if emailed, upon transmission to the designated email address of said addressee. The Client Agency representative shall be responsible for working with Energy Program, approving billings and expenses submitted by Energy Program, and accepting any reports from Energy Program. The Energy Program representative shall be the contact person for all communications regarding the conduct of work under this Agreement. 5. RECORDS RETENTION. a. AGREEMENT AVAILABILITY. Prior to its entry into force, this Agreement shall be posted on the parties’ websites or other electronically retrievable public source as required by RCW 39.34.040. b. RECORDS RETENTION. Each party shall each maintain records and other evidence that sufficiently and properly reflect all direct and indirect costs expended by either party in the performance and payment of the services described herein. These records shall be subject to inspection, review, or audit by personnel of both parties, other personnel duly authorized by either party, the Office of the State Auditor, and officials authorized by law. Such 6.8.b Packet Pg. 131 Attachment: K5211 IAA (Phase 6 Energy - Carbon Recovery) INTERAGENCY AGREEMENT NO. K5211 Page 5 (7-26-2017) records shall be retained for a period of six (6) years following expiration or termination of this Agreement or final payment for any service placed against this Agreement, whichever is later; Provided, however, that if any litigation, claim, or audit is commenced prior to the expiration of this period, such period shall extend until all such litigation, claims, or audits have been resolved. c. PUBLIC INFORMATION. This Agreement and all related records are subject to public disclosure as required by Washington’s Public Records Act, RCW chapter 42.56. Neither party shall release any record that would, in the judgment of the party, be subject to an exemption from disclosure under the Public Records Act, without first providing notice to the other party within ten (10) business days of the receipt of the request. The parties will discuss appropriate actions to be taken, including release of the requested information, seeking a protective order, or other action prior to the release of records. Should one party choose to seek a protective order, it shall do so at its sole expense. 6. RESPONSIBILITY OF THE PARTIES. Each party to this Agreement assumes responsibility for claims and/or damages to persons and/or property resulting from any act or omission on the part of itself, its employees, or its agents. Neither party assumes any responsibility to the other party for any third party claims. 7. DISPUTE RESOLUTION. The parties shall use their best, good faith efforts cooperatively and collaboratively to resolve any dispute that may arise in connection with this Agreement as efficiently as practicable, and at the lowest possible level with authority to resolve such dispute. The parties shall make a good faith effort to continue without delay to carry out their respective responsibilities under this Agreement while attempting to resolve any such dispute. If, however, a dispute persists and cannot be resolved, it may be escalated within each organization. In such situation, upon notice by either party, each party, within five (5) business days shall reduce its description of the dispute to writing and deliver it to the other party. The receiving party then shall have three (3) business days to review and respond in writing. In the event that the parties cannot then agree on a resolution of the dispute, the parties shall schedule a conference between the respective senior managers of each organization to attempt to resolve the dispute. In the event the parties cannot agree on a mutual resolution within fifteen (15) business days, the parties shall abide by the Governor’s dispute resolution process (RCW 43.17.330), if applicable, or collectively shall appoint a third party to evaluate and resolve the dispute and such dispute resolution shall be final and binding on the parties hereto. 8. TERMINATION FOR CONVENIENCE. Except as otherwise provided in this Agreement, either party may terminate this Agreement upon thirty (30) calendar days prior written notification. Upon such termination, the parties shall be liable only for performance rendered or costs incurred in accordance with the terms of this Agreement prior to the effective date of such termination. 6.8.b Packet Pg. 132 Attachment: K5211 IAA (Phase 6 Energy - Carbon Recovery) INTERAGENCY AGREEMENT NO. K5211 Page 6 (7-26-2017) 9. GENERAL PROVISIONS. a. COMPLIANCE WITH LAW. The Parties shall comply with all applicable law. b. INTEGRATED AGREEMENT. This Agreement constitutes the entire agreement and understanding of the parties with respect to the subject matter and supersedes all prior negotiations, representations, and understandings between them. There are no representations or understandings of any kind not set forth herein. c. AMENDMENT OR MODIFICATION. Except as set forth herein, this Agreement may not be amended or modified except in writing and signed by a duly authorized representative of each party hereto. d. AUTHORITY. Each party to this Agreement, and each individual signing on behalf of each party, hereby represents and warrants to the other that it has full power and authority to enter into this Agreement and that its execution, delivery, and performance of this Agreement has been fully authorized and approved, and that no further approvals or consents are required to bind such party. e. NO AGENCY. The parties agree that no agency, partnership, or joint venture of any kind shall be or is intended to be created by or under this Agreement. Neither party is an agent of the other party nor authorized to obligate it. f. GOVERNING LAW. The validity, construction, performance, and enforcement of this Agreement shall be governed by and construed in accordance with the laws of the State of Washington, without regard to its choice of law rules. g. JURISDICTION & VENUE. In the event that any action is brought to enforce any provision of this Agreement, the parties agree to submit to exclusive in personam jurisdiction in Thurston County Superior Court for the State of Washington and agree that in any such action venue shall lie exclusively at Olympia, Washington. h. EXHIBITS. All exhibits referred to herein are deemed to be incorporated in this Agreement in their entirety. i. CAPTIONS & HEADINGS. The captions and headings in this Agreement are for convenience only and are not intended to, and shall not be construed to, limit, enlarge, or affect the scope or intent of this Agreement nor the meaning of any provisions hereof. j. ELECTRONIC SIGNATURES. A signed copy of this Agreement or any other ancillary agreement transmitted by facsimile, email, or other means of electronic transmission shall be deemed to have the same legal effect as delivery of an original executed copy of this Agreement or such other ancillary agreement for all purposes. 6.8.b Packet Pg. 133 Attachment: K5211 IAA (Phase 6 Energy - Carbon Recovery) INTERAGENCY AGREEMENT NO. K5211 Page 7 (7-26-2017) k. COUNTERPARTS. This Agreement may be executed in any number of counterparts, each of which shall be deemed an original and all of which counterparts together shall constitute the same instrument which may be sufficiently evidenced by one counterpart. Execution of this Agreement at different times and places by the parties shall not affect the validity thereof so long as all the parties hereto execute a counterpart of this Agreement. EXECUTED AND EFFECTIVE as of the day and date first above written. CITY OF EDMONDS STATE OF WASHINGTON DEPARTMENT OF ENTERPRISE SERVICES BY: By: Name: Name: Roger A. Wigfield Title: Title: Energy Program Manager Date: Date: K5211 IAA 6.8.b Packet Pg. 134 Attachment: K5211 IAA (Phase 6 Energy - Carbon Recovery) INTERAGENCY AGREEMENT NO. K5211 Page 8 (7-26-2017) ATTACHMENT A – OF WORK Energy/Utility Conservation Projects PROJECT MANAGEMENT SERVICES Statewide Energy Performance Contracting Program Energy Program will provide the following project management services for each specific project for the Client Agency. Each individual project shall be authorized by an amendment to this Agreement. 1. Assist the Client Agency in the selection of an Energy Service Company (ESCO) consistent with the requirements of RCW 39.35A for local governments; or 39.35C for state agencies and school districts. 2. Assist in identifying potential energy/utility conservation measures and estimated cost savings. 3. Negotiate scope of work and fee for an ESCO audit of the facility(s). 4. Assist in identifying appropriate project funding sources and assist with obtaining project funding. 5. Assist in negotiating the technical, financial and legal issues associated with ESCO’s Energy Services Proposal. 6. Review and recommend approval of ESCO energy/utility audits and Energy Services Proposals. 7. Provide assistance during the design, construction and commissioning processes. 8. Review ESCO invoice voucher(s) received for reasonableness and forward to Client Agency for review and payment. 9. Assist with final project acceptance. 10. Review up to the first three years of the ESCO’s annual Measurement and Verification (M&V) reports for completeness and accuracy. Review any ESCO guarantee compared to reported results and resolve differences, if needed. Review and approve ESCO invoice vouchers for payment by the Client Agency. 11. Provide other services as required to complete a successful energy performance contract. 6.8.b Packet Pg. 135 Attachment: K5211 IAA (Phase 6 Energy - Carbon Recovery) INTERAGENCY AGREEMENT NO. K5211 Page 9 (7-26-2017) ATTACHMENT B – FEE SCHEDULE ___ use biennium, i.e. 2017-19 Interagency Reimbursement Costs for Project Management Fees to Administer Energy/Utility Conservation Projects PROJECT TOTAL PROJECT VALUE MANAGEMENT FEE TERMINATION 5,000,001…....6,000,000.................................. $68,800................................ 25,700 4,000,001........5,000,000................................... 67,700................................ 25,400 3,000,001…....4,000,000................................... 66,700................................ 25,000 2,000,001…....3,000,000................................... 62,500................................ 23,400 1,500,001…....2,000,000................................... 58,300................................ 21,800 1,000,001…....1,500,000................................... 51,600................................ 19,300 900,001. … 1,000,000................................... 43,800................................ 16,400 800,001……...900,000................................... 41,300................................ 15,400 700,001……...800,000................................... 38,300................................ 14,400 600,001……...700,000................................... 36,500................................ 13,700 500,001……...600,000................................... 33,800................................ 12,600 400,001……...500,000................................... 30,200................................ 11,300 300,001……...400,000................................... 25,800................................ 9,700 200,001……...300,000................................... 20,700................................. 7,700 100,001……...200,000................................... 14,400................................. 5,400 50,001……...100,000..................................... 7,800................................. 3,500 20,001…….....50,000..................................... 4,200................................. 2,000 The project management fee on projects over $6,000,000 is 1.15% of the project cost. The maximum Energy Program termination fee is $25,700. 1. These fees cover project management services for energy/utility conservation projects managed by Enterprise Services’ Energy Program. 2. Termination fees cover the selection and project management costs associated with managing an ESCO's investment grade audit and energy services proposal. No termination fee will be charged unless the client agency decided not to proceed to construction based on an energy services proposal that identifies projects that met the Client Agency’s cost effectiveness criteria. 3. If the project meets the Client Agency’s cost effectiveness criteria and the Client Agency decides not to move forward with a project, then the Client Agency will be invoiced per Attachment B Termination or $25,700 whichever is less. If the Client Agency decides to proceed with the project then the Agreement will be amended per Attachment B for Project Management Fee. 4. If the audit fails to produce a project that meets the Client Agency’s established cost effectiveness criteria, then there is no cost to the Client Agency and no further obligation by the Client Agency. 6.8.b Packet Pg. 136 Attachment: K5211 IAA (Phase 6 Energy - Carbon Recovery) INTERAGENCY AGREEMENT NO. K5211 Page 10 (7-26-2017) ATTACHMENT C – SCOPE OF WORK Energy/Utility Conservation Projects MEASUREMENT & VERIFICATION SERVICES Statewide Energy Performance Contracting Program If requested, Energy Program will provide the following measurement and verification services for each year beyond the first three years following the Notice of Commencement of Energy Savings by the ESCO for the specific Client Agency project: 1. Review the ESCO’s annual Measurement and Verification (M&V) report for completeness and accuracy. Review any ESCO guarantee compared to reported results and resolve differences, if needed. Review and approve any ESCO invoice vouchers for payment by the Client Agency. 2. Where necessary, review Client Agency facility operations including any changes in operating hours, changes in square footage, additional energy consuming equipment and negotiate changes in baseline energy use with the ESCO and the Client Agency that may impact achieved energy savings. 3. Attend a meeting or meetings with the Client Agency and the ESCO to review and discuss the annual M&V report. 6.8.b Packet Pg. 137 Attachment: K5211 IAA (Phase 6 Energy - Carbon Recovery) April 5, 2018 TO: Pamela Randolph, City of Edmonds FROM: Andrea Faust, Contracts Specialist, (360) 407-9365 RE Agreement No. 2018-573 A (1) Edmonds WWTP Phase 6 Energy Project – Carbon Recovery IAA No. K5211 Ameresco, Inc. SUBJECT: Funding Approval The Dept. of Enterprise Services (DES), Energy Program, requires funding approval for the above referenced contract documents. The amount required is as follows (see page 2 for funding detail): Energy Audit and Energy Services Proposal $ 61,600.00 ESCO Professional Services $ 174,400.00 Total Funding $ 236,000.00 In accordance with the provisions of RCW 43.88, the signature affixed below certifies to the DES Energy Program that the above identified funds are appropriated, allotted or that funding will be obtained from other sources available to the using client/agency. The using/client agency bears the liability for any issues related to the funding for this project By Name / Title Date Please sign and return this form to E&AS. If you have any questions, please call me. 2018573Afndaf 6.8.c Packet Pg. 138 Attachment: 2018573Afndaf (Phase 6 Energy - Carbon Recovery) 222 Williams Avenue South, Suite 100 Renton, WA 98057 P: 206 522 4270 F: 425 687 3171 ameresco.com March 10, 2018 Mr. Todd Flynn Department of Enterprise Services 1500 Jefferson Street SE PO Box 41012 Olympia, WA 98504-1401 SUBJECT: Energy Audit Fee Proposal City of Edmonds – Wastewater Treatment Plant Phase 6 – Incinerator Replacement Dear Todd: We are pleased to submit this proposal for the audit phase of the City of Edmonds Wastewater Treatment Plant Phase 6 Energy Efficiency Upgrades. Ameresco will provide engineering services for the subject project in accordance with the following: Engineering Services A. Audit Phase Services will include: Ameresco will undertake an Energy Audit of the Facilities. The Energy Audit will identify cost effective Energy Conservation Measures (ECM’s). Ameresco will present to the Owner a written Energy Services Proposal, including the Energy Audit Documentation. The Energy Services Proposal will set forth at least the following: 1) A description of the systems which will receive ESCO Equipment and ESCO Services; 2) The Cost Effective ECM’s to be installed or caused to be installed by Ameresco and a description of the ECM's analyzed but disqualified under the cost effectiveness criteria; 3) The services that Ameresco will perform on or in the Facility, including but not limited to engineering, construction management, the operations and maintenance procedures for use on ESCO Equipment, training for Facility personnel, providing warranty service, and equipment maintenance; 4) The Maximum Allowable Project Cost, itemized in detail; 5) Recommendations for replacement of Existing Equipment, along with recommendations for improvements to Existing Equipment and Operating Conditions; 6) The Baseline Energy Consumption for the identified systems, computed from monitoring building systems for 2-4 weeks and annualizing with historical data and including the data, methodology and variables used to compute the Baseline, and the Baseline calendar period which will not be less than twelve (12) months; 6.8.d Packet Pg. 139 Attachment: Edmonds WWTP Ph 6_Incinerator_Audit Proposal_Rev C (Phase 6 Energy - Carbon Recovery) Edmonds Wastewater Treatment Plant Phase 6 ESCO Page 2 of 5 7) The estimated Energy Savings and Energy Cost Savings that are expected to result from the installation of Ameresco Equipment and from Ameresco Service, and an explanation of the method used to make the estimate; 8) The method by which Energy Savings and Energy Cost Savings will be calculated during the term of the Energy Services Agreement; 9) A description of how Ameresco will finance its acquisition of Equipment and when title to the Equipment will pass to the Owner; 10) A description of how the Energy Cost Savings will be guaranteed by Ameresco; 11) A description of how Ameresco proposes to be compensated; 12) The term of the Energy Services Agreement; 13) The Termination Value for each year during the term of the Energy Services Agreement; 14) The schedule for project completion; 15) The nature and extent of work and equipment that Ameresco anticipates it will receive from other firms under sub-contract; 16) Preliminary measurement & verification (M&V) plan: Ameresco will provide on-going measurement and verification to help ensure the predicted savings are achieved throughout the first 1 year of the agreement. Post installation Measurement and Verification (M&V) will be performed based on the International Performance Measurement and Verification Protocol (IPMVP) – Option A (Retrofit Isolation-Key Parameter Measurement), and on Section IX – Method of Calculating Energy Savings and Energy Cost Savings. Ameresco will attend one annual meeting to review the Measurement & Verification results and reconcile energy savings. 17) Preliminary Design: Ameresco proposes to provide a preliminary design in sufficient detail to obtain contractor cost estimates and to develop a project budget that would be used in the Energy Services Proposal. This would provide funding to perform in-house design as well as hire design sub-consultants for mechanical, electrical, structural, process design and regulatory research such as Department of Ecology and PSCAA air permitting. The Preliminary Design becomes the property of the client regardless of the decision to proceed with the construction project. (Identified as item B in fee schedule below.) a) Audit phase design efforts or “Phase I” design will produce a preliminary design for the installation of the City-selected pyrolysis system, dryer, and ancillary equipment and its integration into the existing WWTP process and incinerator room. Phase I will include the preparation of a Basis of Design (BOD) technical memorandum and an Engineering Report in compliance with WAC 173-240-070. The BOD technical memorandum will be included in the Engineering Report, as well as, the code review, permit feasibility analysis, and construction sequencing analysis as described below. b) Developing the BOD will include review of recent plant telemetry for biosolids processing rate in order to update plant solids loading calculations and to determine capacity/sizing of the new system. (The plant SCADA monitoring data gathered since the Dewatering screw presses became operational suggest higher solids loading than previously assumed.) c) The engineering report will also include an overview of the selected technology, application and performance at other installations, and review of testing data (from site samples) used for sizing and verification of technological applicability to satisfy the new and developmental technology requirement(s) for submission of data per the Orange Book. d) Phase I will also include the preparation of pre-design drawings and review of the Ameresco-prepared Construction Work Scope Narrative. During this phase, Coal Creek Environmental will provide permitting assistance and coordination with applicable permitting agencies to assess air emissions permitting requirements. e) Preliminary design includes the development of 30% design drawings for the installation of selected equipment within the existing WWTP incinerator room. The 30% drawings will 6.8.d Packet Pg. 140 Attachment: Edmonds WWTP Ph 6_Incinerator_Audit Proposal_Rev C (Phase 6 Energy - Carbon Recovery) Edmonds Wastewater Treatment Plant Phase 6 ESCO Page 3 of 5 show general equipment sizing, layout, and configuration within the incinerator room. The 30% drawings will include general, demolition, process mechanical, structural, electrical, plumbing, fire suppression, and HVAC drawings. f) In the audit phase cost budgets for the “Phase II” design services will be developed. Phase II design would include the detailed design for the installation of the selected process equipment and its integration into the existing WWTP process, WWTP building structure and building mechanical systems, and WWTP building electrical systems. Phase II will also include engineering services during construction, start-up and commissioning engineering support, and project close-out. (Phase II design IS NOT included in this audit fee proposal.) Conservation measures will include items that save energy, water or other resources (including various operational cost savings measures associated with operating the existing biosolids incinerator). The Energy Audit will provide detailed documentation of fieldwork for the audit, calculation input and output in support of the recommendations made in the Energy Services Proposal, economic and engineering assumptions, sketches, floor plans and any other information developed in the course of the Audit. Cost Effectiveness Criteria It is understood that the cost effectiveness criteria for this project is as follows: 1. Future post-project cash flow, including utility bill savings, maintenance and operational savings, and financing costs will be neutral or positive with respect to pre-project cash flow, assuming a finance term of no more than 15 years and an annual energy cost escalation of 1.5%. 2. The selected Energy Conservation Measures (ECMs) will be evaluated as a bundle in determining whether or not they meet the cost-effectiveness criteria. 3. The total cost of implementing the ECMs will include the cost of the investment grade audit, design, labor and materials, construction management, DES fees, ESCO fees, bonding, permits, taxes, and other costs that may be agreed to. 4. All utility rebates, State grants, or other rebates and grants associated with the proposed bundle of ECMs will be deducted from the cost of implementing them before determining their cost-effectiveness. 5. No more than 90% of the energy cost savings and 100% of the maintenance and operational cost savings (purchased parts and service contracts, but not internal labor costs) will be used for the purpose of determining cost-effectiveness. Ameresco does not guarantee the maintenance cost savings. 6. The finance period for the proposed bundle of ECMs may not exceed their average useful life. If Ameresco develops a project that meets the cost effectiveness criteria, the client is responsible for the full amount of the audit; the item A “Energy Audit” fee can either be rolled into the construction contract or be paid in full by the client. 6.8.d Packet Pg. 141 Attachment: Edmonds WWTP Ph 6_Incinerator_Audit Proposal_Rev C (Phase 6 Energy - Carbon Recovery) Edmonds Wastewater Treatment Plant Phase 6 ESCO Page 4 of 5 Fee for Engineering Services: A. Basis and amount: Fixed Fee for Services A) Energy Audit: $61,600 B) Preliminary Design: $174,400 C) TOTAL: $236,000 It is understood by Ameresco that payment and terms are contingent upon the requirements set forth in the Energy Services Proposal. Furthermore, it is understood by Ameresco that item B “Preliminary Design” is a deliverable that becomes the property of the City and that Ameresco shall be paid $174,400 upon delivery of the Preliminary Design package. Schedule for Engineering Services: The Energy Audit will be complete by August 15th, 2018. Preliminary results of the audit are intended to be provided to Edmonds in mid-July so that scope and costs can be evaluated and adjusted as necessary by early August. To meet this schedule, Ameresco would use ‘working drawings’ created by BHC to develop cost estimates. The formal preliminary design drawings and engineering report by BHC for “Phase 1” will be completed by September 1st, 2018. We at Ameresco, Inc. appreciate the opportunity to provide these services. If this proposal for Audit Services is satisfactory, please forward contract documents. Sincerely, Ameresco, Inc. Grant A. Thorsland Regional Manager - Northwest Attachments: Fee Proposal, Conservation Measure Lists Exhibit A – BHC Consultants Scope of Work Exhibit B – BHC Consultants Preliminary Design Budget 6.8.d Packet Pg. 142 Attachment: Edmonds WWTP Ph 6_Incinerator_Audit Proposal_Rev C (Phase 6 Energy - Carbon Recovery) Edmonds Wastewater Treatment Plant Phase 6 ESCO Page 5 of 5 Project:Wastewater Treatment Plant Phase 6 – Incinerator Replacement Date:3/10/2018 Hourly Summary: TASK Project Manager Construction Manager Project Engineer Field Audit Technician / TAB / Cx Admin. Assistant Total Hours Field/Audit 55 18 77 18 0 168 Analysis/Calculations 55 0 66 0 4 126 Evaluation of ECMs 27 27 9 0 0 62 Report Write-up 24 0 9 0 0 33 Customer Presentation 18 18 9 0 4 49 Travel 22 11 27 4 0 64 Total Hours:201 73 197 22 9 503 Hourly Rate:130$ 120$ 120$ 105$ 75$ Estimated Fee for Services:26,194$ 8,768$ 23,648$ 2,325$ 664$ 61,600$ Item A - Energy Audit Fee 61,600$ Item B - Preliminary Design Services (sub-consultants)174,400$ Total Audit Fee - Energy Project:236,000$ Project:Wastewater Treatment Plant Phase 6 – Incinerator Replacement Date:3/10/2018 Waste Water Treatment Plant Mechanical Conservation Measures Rank SOLIDS-M1 Centrisys-Bioforcetech - Evaluate replacement of existing fluidized bed incinerator with a gas-fired dryer and Bioforcetech Pyrolysis system for decomposition of biosolids through a non-incineration process which yields a "green" renewable biproduct known as Biochar. - The measure will include the dewatered cake hopper, "schwing" pump, drying, odor control modification, product conveyance to haul-away bin, control strategy development and integration to scada, and staff training. - The measure will save energy and offset operating costs associated with the current incinerator which is aged and increasingly more costly to operate. 3 PAYBACK RANK NOTES: 1) Measures that are likely to pay for themselves through energy savings and utility incentives. 2) Measures that may pay for themselves, or may require some capital infusion 3) Measures that will require significant ( >50%) capital infusion 6.8.d Packet Pg. 143 Attachment: Edmonds WWTP Ph 6_Incinerator_Audit Proposal_Rev C (Phase 6 Energy - Carbon Recovery) City Council Agenda Item Meeting Date: 04/10/2018 Special Event Contracts Staff Lead: Carrie Hite Department: Parks, Recreation & Cultural Services Preparer: Carrie Hite Background/History Every year, the Council reviews and approves the City's special event contracts for five of the larger events in the City. Staff Recommendation Review and forward to the consent agenda. Narrative Attached are the following special event contracts: 1. Taste Edmonds 2. Car Show 3. Fourth of July 4. Edmonds Market 5. Edmonds Arts Festival Foundation We had no large substantive changes to any of these contracts. We made a few minor changes, namely: 1. We clarified language on the two sections having to do with recycling. Steve Fisher updated some clarifying language. 2. We have added language to disallow any type of stakes or rods being driven into the ground without coordinating with our Park Maintenance or City Electrician. 3. We added a few minor operational items to some of the contracts based on last year's debrief. All parties have reviewed these agreements and they are ready for the City's review and subsequent approval. Attachments: 2018 Classic Car Show Final Draft 2018 Contract EAF Final all 2018 July 4 Contract Final all comments redline 2018 Market Contract Final 2018 Taste Contract Final Draft 6.9 Packet Pg. 144 1 CONTRACT BETWEEN THE CITY OF EDMONDS AND THE GREATER EDMONDS CHAMBER OF COMMERCE September 9, 2018 The following is an agreement (“Agreement”) between CITY OF EDMONDS ("City"), and the GREATER EDMONDS CHAMBER OF COMMERCE ("Chamber") (collectively, the “Parties”). WHEREAS, the Chamber has proposed to hold a public event known as the Edmonds Chamber of Commerce Classic Car Show (“Classic Car Show” or “Event”); WHEREAS, the City Council finds that the “Classic Car Show” provides distinct benefits to the City by showcasing the City while providing a unique recreational opportunity for its citizens; and WHEREAS, the City Council finds that such an event enhances tourism and promotes economic development as well as providing an opportunity for good clean fun to its citizens; NOW, THEREFORE, in consideration of the promises, covenants, conditions and performances set forth below, the Parties hereto agree as follows: 1. City and Chamber agree that: 1.1 City shall provide use of the following surfaces by Chamber for the Classic Car Show: • “Center Round” around the fountain in downtown Edmonds at 5th Avenue and Main Street, • Main Street from the East side of its intersection with 3rd Avenue to the West side of its intersection with 6th Avenue, • 4th Avenue S. from the South side of its intersection with Bell Street to the North side of its intersection with Dayton Street, and again from the South side of its intersection with Dayton Street to approximately 100 feet south down 4th Avenue, • 5th Avenue, from the North side of its intersection with Walnut Street to the North side of its intersection of the northern leg of Bell Street, • Dayton Street, from the West side of 5th Avenue to the East side of 4th Avenue, • Dayton Street, from the East side of 5th Avenue to immediately east of 529 Dayton Street, • City Hall parking lot located immediately South of the City Hall building at 121 5th Avenue N and the parking lot under City Hall, 6.9.a Packet Pg. 145 Attachment: 2018 Classic Car Show Final Draft (Special Event Contracts) 2 • On street parking spaces on 5th Ave N from Bell Street to Seville driveway, 217 5th Ave N (west), and Bell Street to the Public Safety parking lot access midblock (east). (The above areas shall be hereinafter referred to as the “City-Provided Site.”) 1.2 One or several days before the Event, City shall place signs so as to clear the City- Provided Site of all vehicles from 2:00 a.m. on the date of the event until 7:00 p.m. on the same day. The Main and 5th closure to the most northern portion of Bell shall be until 8:00 p.m. 1.3 City shall provide barriers near the following 13 locations for street closures required to contain the City-Provided Site described in Paragraph 1.1: Pine and 5th, to close 5th Avenue north to Walnut, Maple and 5th, to close Maple Street east of 5th Avenue Dayton and 6th, to allow local access only on Dayton between 6th Avenue & 5th Avenue Dayton and 5th, to close 5th Avenue north and south of Dayton Street Dayton and 5th, to close Dayton east and west of 5th Avenue Dayton and 4th, to close Dayton east of 4th Avenue Walnut and 5th, to close 5th Avenue north and south of Walnut Street Main and 5th, to close 5th Avenue to the most northern portion of Bell Main and 6th, to close Main Street west of 6th Avenue Main and 3rd, to close Main Street east of 3rd Avenue 4th and Bell, to close 4th Avenue south of Bell Street 4th and Dayton, to close 4th Avenue north and south of Dayton Street; and On 4th, to close 4th Avenue 100 ft. immediately south of Dayton 1.4 City shall arrange for access control of 5th Avenue South at Walnut Street from 8:30 a.m. until 11:30 a.m. on the date of the Event. Chamber will be responsible for paying the actual cost of the overtime wages incurred by the City of the police officer to be stationed at the intersection. This intersection will not be closed to general traffic east and west, but access will be controlled and may be limited during this time period to allow for the safe staging of Event vehicles. There will be a committee member at the intersection with the police officer to designate which vehicles will be part of the Event. 1.5 Above barriers shall be delivered so as to allow Chamber to position such barriers at 5:00 a.m. the day of the Event. The number of barriers left by City at each of the eight locations shall be sufficient to provide adequate street closure. Chamber shall remove same barriers at 7:00 p.m. on the same day. 1.6 City shall also provide street closure barriers for the purpose described in Paragraph 1.7 near the following intersections: Maple Street and 6th Avenue, to close Maple west of 6th; and Alder Street and 6th Avenue, to close Alder west of 6th. 6.9.a Packet Pg. 146 Attachment: 2018 Classic Car Show Final Draft (Special Event Contracts) 3 1.7 Chamber shall position such barriers at 5:00 a.m. the day of the Event so as to provide adequate street closures and prevent traffic from 6th Avenue to turn onto Maple Street or Alder Street from 5:00 a.m. until 10:00 a.m. Chamber shall remove such barriers at 10:00 a.m. on the same day. 1.8 On the day of the event, Chamber shall place traffic cones on the center-dividing line of 5th Avenue between Pine Street and Walnut Street from 5:00 a.m. until 10:00 a.m. 1.9 Chamber shall obtain any necessary Street Use Permits and pay the required fees. Police, Fire, and Public Works will meet with Chamber of Commerce officials to resolve any remaining or potential issues of traffic control and barricades prior to the event, but shall have no authority to waive the requirements of city ordinance or state law. Chamber shall establish a sixteen foot (16’) fire lane down the middle of each street on which Classic Car Show cars will be parked for emergency vehicle access throughout the day of event. Chamber car show staff and ambassadors will ensure that no cars encroach upon this fire lane. 1.10 The Chamber shall be permitted to establish and operate five outdoor dining gardens within the City-Provided Site during the Event. These gardens shall not exceed 15’ x 25’ in dimension, and shall be fenced in a manner that clearly establishes and distinguishes their boundaries. Maximum capacity of the dining gardens shall be determined by the Edmonds Fire Marshall. Dining gardens shall provide tables, chairs and umbrellas for use by their diners. No alcohol shall be served or permitted in the dining gardens. Food and non-alcoholic drinks may be served in the dining gardens, but no food preparation shall be permitted therein. Dining gardens shall be sponsored by local restaurants, and shall be located near each sponsoring restaurant. Dining gardens shall open no earlier than 4AM and shall close no later than 5:00 p.m. during the Event. Chamber shall inform all food vendors of the applicable requirements for food vending at the Event, as set forth by Snohomish County Fire District 1, and shall be responsible for ensuring that food vendors follow such requirements. 1.11 All use and configuration of structures, booths and other temporary facilities used in the event shall be inspected and reviewed by Edmonds Fire Marshall, Police Chief, Building Official and Parks and Recreation Director or their designees to determine whether the facilities in use comply with the provisions of State and local law, as well as to insure that no lasting or permanent damage shall be done to any public facility or property. Edmonds Fire Marshal shall inspect the facilities prior to the opening to the general public on or before 7:00 a.m., September 9, 2018, as the Parties shall agree and note all potential problems. Prior to the opening of the event, Chamber shall correct all problems. In the event that such problems are not corrected, City may at its sole discretion cancel such event or prohibit the attendance of the general public in certain areas, if in the opinion of the Fire Marshal and at the sole discretion of City, anything that threatens life, health or property shall appear. 1.12 City has the right to check the noise level of any amplified sound equipment or other source and require that the volume be reduced if it exceeds the safety limits recommended by the Snohomish County Department of Health or levels set forth in the ordinances of the City of Edmonds. 6.9.a Packet Pg. 147 Attachment: 2018 Classic Car Show Final Draft (Special Event Contracts) 4 1.13 Chamber shall obtain and note on the back of the Classic Car Show registration card, which is posted on the dashboard of cars on display, at least one cell phone number for the car’s owner, to allow the Chamber to contact the owners when away from their cars. 2. Chamber Responsibilities In addition to the above and in consideration of the use of the facilities and services above described, Chamber agrees to the following: 2.1 The Chamber shall provide a Certificate of Insurance evidencing commercial general liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and $2,000,000 aggregate for personal injury, bodily injury and property damage. City shall be named as an additional insured on the Commercial General Liability insurance policy and a copy of the endorsement naming City as additional insured shall be attached to the Certificate of Insurance. The insurance policy shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer’s liability. The City shall be named as an insured on the Chamber’s General Liability insurance policy. The insurance policy shall contain, or be endorsed to contain that the Chamber’s insurance coverage shall be primary insurance. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be in excess of the Chamber’s insurance and shall not contribute to it. The Chamber shall provide a certificate of insurance evidencing the required insurance before using the property described herein. Insurance shall be placed with insurers with a current A.M. Best rating of not less than A:VII. 2.2 The Chamber agrees that the Classic Car Show is a public event. The Chamber further agrees that areas constituting the City-Provided Site that are covered under this Agreement, including but not limited to public right of way, streets, sidewalks, parks, parking lots, gardens, meeting halls and squares, are traditional public forums. As a result, the Chamber shall permit citizens attending events open to the general public at City-Provided Site during the Classic Car Show to exercise therein their protected constitutional right to free speech without interference. 2.3 The City has enacted Ordinance 3749 restricting the use of single-use plastic checkout bags. The restrictions do not apply to plastic bags used to carry out cooked food or provided solely for produce, bulk food or meat. The Chamber will encourage its vendors to comply with the purposes of the ordinance by utilizing paper bags or encouraging the use of reusable totes whenever practicable. 2.4 The Chamber shall defend, indemnify and hold the City, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits, including attorney fees, arising from or in connection with the Chamber’s performance, or nonperformance, of this Agreement, except to the extent that claims, injuries, damages, losses or suits are caused by the sole negligence of the City, its officers, officials, employees or volunteers. This promise to indemnify and hold harmless shall include a waiver by the Chamber of the immunity provided under Title 51 RCW, but only to the extent necessary to fully effectuate this promise. This provision shall survive the termination and/or expiration of this Agreement. 2.5 The Parties acknowledge that pursuant to the provisions of Initiative 901 as codified in Chapter 70.160 RCW (herein after the "smoking ban"), smoking is prohibited in indoor areas, 6.9.a Packet Pg. 148 Attachment: 2018 Classic Car Show Final Draft (Special Event Contracts) 5 within 25 feet of vents or entrances and in outdoor areas where public employees of the City, and employees of any vendor at the event or of the contracting organization are required to be. This general description of the provisions of the initiative is included for the purpose of reference and is not intended to expand or contract the obligations created by the smoking ban. The Chamber warrants that it will comply with the smoking ban and will utilize the services and advice of the Snohomish County Health District in assuring compliance during the event described in this Agreement. 2.6 Chamber shall provide any and all security services necessary to reasonably secure the area and facilities provided, including the City-Provided Site. City shall have no responsibility or liability for the provision of security services nor shall it be liable for any loss or damage incurred by Chamber or the participants in this Event. 2.7 Chamber shall provide a fire watch for all times in and around the booths and displays open to the general public as a part of this Event. 2.8 Chamber shall provide sufficient wash stations and approximately 10 sani-cans that may be placed on site the night preceding the Event. Garbage service shall be contracted and paid for by Chamber. Chamber will place 25 garbage and recycle containers around downtown for garbage collection 2.9 Upon completion of the Event, Chamber shall make adequate provisions for the cleanup of all sites provided under the terms of this Agreement so as to restore them to the same state of cleanliness as existed the night prior to the Event. Cleanup of all relevant street pavements shall be completed by 7:00 p.m. on that day. Cleanup of sidewalks shall be completed by 11:00 p.m. on that day. Cleanup areas include the City-Provided Site as described in Section 1 and all streets immediately surrounding the Event perimeter. A final inspection of the Event area shall be conducted by a designated City official to determine if all areas are clean and returned to their original condition. 2.10 Chamber shall pay City all permit fees for the above-mentioned facility use and services at least ten (10) days prior to the Event, and shall reimburse City for the actual costs of supplies or services furnished by City (excluding those agreed to in Section 1) within thirty (30) days of mailing of a final bill by the City, provided such supplies and services are approved and listed by all Parties to this Agreement in a signed addendum to this Agreement prior to the date which they purport to be required. 2.11 Colored banners or flags may not be placed in the existing holes in the public sidewalk designated for the American flag program. 3. Miscellaneous. 3.1 Entire agreement, integration and amendment. This Agreement contains the entire agreement and understanding between the Parties relating to the rights and obligations created hereby, and supersedes all prior and contemporaneous negotiations, understandings, and agreements, written or oral, between the Parties. Any prior discussions or understandings are deemed merged with the provisions herein. This Agreement shall not be amended, assigned or otherwise changed or transferred except in writing with the express written consent of the Parties hereto. Any action to 6.9.a Packet Pg. 149 Attachment: 2018 Classic Car Show Final Draft (Special Event Contracts) 6 interpret or enforce this Agreement shall be brought before the Superior Court of Snohomish County, Washington, and the Parties agree that, as between them, all matters shall be resolved in that venue. 3.2 Force majeure. The Parties shall not be liable for failure to perform or delay in performance due to fire, flood, strike or other labor difficulty, act of God, act of any governmental authority, riot, embargo, fuel or energy shortage, car shortage, wrecks or delays in transportation, or due to any other cause beyond the Parties’ reasonable control. In the event of delay in performance due to any such cause, the date of delivery or time for completion will be extended by a period of time reasonably necessary to overcome the effect of such delay. 3.3 Termination. The City shall have the right, in its sole and absolute discretion, to unilaterally terminate this Agreement should the same become necessary to protect public health, safety or welfare; in which case, the City shall provide written notice of the same to the Chamber. 3.4 Relationship between the Parties. Nothing in this Agreement shall be interpreted to or in fact create an agency or employment relationship between the Parties. No officer, official, agent, employee or representative of the Chamber shall be deemed to be the same of the City for any purpose. The Chamber alone shall be solely responsible for all acts of its officers, officials, agents, employees, representatives and subcontractors during the performance of this Agreement. DATED this ______ day of ________________, 2018. CITY OF EDMONDS: GREATER EDMONDS CHAMBER OF COMMERCE: David O. Earling, Mayor Greg Urban, President and CEO ATTEST/AUTHENTICATED: Scott Passey, City Clerk APPROVED AS TO FORM: Office of the City Attorney 6.9.a Packet Pg. 150 Attachment: 2018 Classic Car Show Final Draft (Special Event Contracts) 7 6.9.a Packet Pg. 151 Attachment: 2018 Classic Car Show Final Draft (Special Event Contracts)  Incorporated August 11, 1890  Sister City - Hekinan, Japan CONTRACT CITY OF EDMONDS, WASHINGTON AND EDMONDS ARTS FESTIVAL ASSOCIATION, INCORPORATED June 6 – 19, 2018 The following is an agreement ("Agreement") between the CITY OF EDMONDS (hereinafter referred to as the "City"), and the EDMONDS ARTS FESTIVAL ASSOCIATION, INCORPORATED (hereinafter referred to as the "Festival Association") (collectively, the "Parties"). WHEREAS, the Festival Association has for many years sponsored a public event known as the Edmonds Arts Festival which provides educational and artistic benefits to the citizens of Edmonds; WHEREAS, the City Council finds that in addition to providing an educational opportunity, the Edmonds Arts Festival showcases Edmonds' artists and helps promote tourism and thereby the economy of Edmonds; and WHEREAS, the City Council finds that the considerations to be provided to the Festival Association by the City are more than adequately recompensed by the compensation provided by the Festival Association and from the public benefits received by the citizens of the City; NOW, THEREFORE, in consideration of the promises, covenants, conditions and performances set forth below, the Parties hereto agree as follows: 1. Responsibilities of the City (certain Festival Association obligations included). 1.1 The City shall provide the following spaces at the Frances Anderson Center to the Festival Association: June 6th at 10:00pm to June 19th at 5:00pm Rooms 114, 115, 123, 206, 207, 208, 209 (parallel bars will not be taken down), 210A & 302 for nonpublic use. June 6th at 10:00pm to June 18th at midnight Gym June 7th at 11:30am to June 19th at 5:00pm Room 112 June 13th at 7:00am to June 18th at midnight Playfield, courtyard and amphitheater The playfield shall be used for Artwork Booths. The City may sprinkle the field prior to the Festival to reduce dust. The playfield irrigation system shall be turned off by 8:00 a.m. on June 12, 2018. The Festival Association agrees to cover the infield dirt only. CITY OF EDMONDS 700 MAIN ST | EDMONDS, WA 98020 | 425.771.0230 | FAX 425.771.0253 DAVE EARLING MAYOR PARKS, RECREATION AND CULTURAL SERVICES DEPARTMENT 6.9.b Packet Pg. 152 Attachment: 2018 Contract EAF Final all (Special Event Contracts)  Incorporated August 11, 1890  Sister City - Hekinan, Japan The courtyard area (West of the outdoor stage) may be used for a food concession area. The City shall provide up to fifteen (15) picnic tables at the concession area and up to fifteen (15) garbage cans around the outside area. The Festival Association shall also provide crew members to assist with the moving and placement of picnic tables and garbage cans. The Festival Association shall be responsible for providing a dumpster for trash and grease traps for waste water disposal. The Festival Association shall provide the City with a list of supplies (trash can liners, paper towels, etc.) which the City shall order. The Festival Association will pay the invoices for all supplies in a timely fashion. Under no circumstances shall the Festival Association have access to Rooms 210 and 211. 1.2 The City shall provide the following spaces at the Edmonds Library Plaza to the Festival Association to be used for special functions: June 7th at 8:30am to June 18th at midnight. Plaza Room June 12th at 8:30am to June 18th at midnight. Plaza Patio 1.3 The City shall provide the use of Civic Center Playfeld to the Festival Association as follows: June 13th at 12:00pm until June 18th at 8:00am The field shall be used exclusively for all-day parking of exhibitors and staff. Use shall be of the soccer/football field (excluding all turf areas). All vehicles must vacate the field by date/time noted here. The entrance adjacent to the Boys & Girls Club is prohibited except for emergency use. 1.4 All of the rooms identified herein shall be under the exclusive control of the Festival Association during the period identified due to the high value of the arts and crafts works that shall be located therein. The City shall make its best efforts to limit foot traffic not related to the Festival Association. 1.5 The City will check out two sets of the required keys plus three additional room keys to the Festival Association President, or designee, who shall be responsible for security of all Festival Association displays and supplies. 1.6 The City grants the Festival Association permission to cover the vending machines from June 13th at noon until June 17, 2018. 1.7 The City shall grant the Festival Association, on June 13th, exclusive control of the hallways serving the rooms it is allowed to use for that evening starting at 5:00 p.m. During this time, the Festival Association shall hold the Gallery Opening from 5:30pm to midnight. The Fire Marshall will do an inspection of the tented area(s) prior to the start of the party for life safety issues. Alcohol may be served at the Opening, so long as the Festival Association obtains all required state licenses and approvals to serve alcohol. These will be furnished to the City at least one week in advance. The lighted display shall be reserved for the use of the 6.9.b Packet Pg. 153 Attachment: 2018 Contract EAF Final all (Special Event Contracts)  Incorporated August 11, 1890  Sister City - Hekinan, Japan Festival Association. The City shall provide ample trash cans for the evening of June 13, 2018. Clean up shall be the responsibility of the Festival Association. 1.8 Eighth Avenue shall be closed between Main Street and Dayton Street for an additional food concession area and eating tables from June 13 at 8:00am until June 18th at noon. The City shall provide and install safety barriers at both ends of the closed street. The Festival Association shall obtain a street closure permit as a part of its obligations under paragraph 2.10. EAFF will ensure that these safety barriers are kept in place and filled with water for the duration of the event. 1.9 Except as provided below, the City grants the Festival Association the exclusive use of the parking lot between the Anderson Center and the Edmonds Library for permit parking from June 13th until through June 18th, 2018, provided, however, that the Festival Association shall provide nine parking permits and marked stalls for Library staff/patrons, which include three handicapped parking stalls. The Dayton Street book drop and the Library receiving area must remain open at all times. The City shall provide official handicapped parking signs. One load/unload space each will be marked on Dayton and Main Street, and up to two spaces on 8th Avenue. 1.10 The City shall install Edmonds Arts Festival street banners at all approved sites. One additional banner on the east wall of the Frances Anderson Center will be installed by the City. The Festival Foundation will provide a site map where these are to be installed. 1.11 The City shall provide (one) 200-amp panel of electrical service for (the festival); the Festival Association must supply any additional power. A Festival Association representative and a City Public Works representative will meet prior to June 7, 2018, to draw up an interior and exterior electrical plan. The Festival Association is responsible for notifying PUD of hookups and scheduling inspection of temporary panels (including any necessary permits). The City shall provide the City Electrician on an “on Call” basis, and is subject to reimbursement from the Festival Association for time and materials, minimum 4- hour Overtime Callback. The City Electrician shall have final say in all electrical matters. (No ground penetrations are allowed unless authorized first by the City electrician and City Parks Department). Any unauthorized ground penetrations may be subject to fine and/or damage cost recovery from the Festival Association). (It is not allowed to fasten anything to the buildings, structures or trees, doing so may result in damage cost recovery and /or fine). 1.12 The Festival Association must have temporary panels and power poles removed by noon on June 20, 2018. 1.13 The City shall supply a list of acceptable compostable and recyclable foodware items and of suppliers for the compostable items to strongly encourage their use. The City shall provide signage for the on-site collection containers, and any additional containers, if needed. 2. Responsibilities of the Festival Association. 2.1 The Festival Association will operate the Edmonds Arts Festival consistent with its educational purposes and shall not illegally discriminate in the provision of the event or in its entrance requirements against any person or organization in violation of state or federal statute or local ordinance. 2.2 In addition, the Parties acknowledge that, pursuant to the provisions of Initiative 901 as codified in Chapter 70.160 RCW (herein after the "smoking ban"), smoking is prohibited in 6.9.b Packet Pg. 154 Attachment: 2018 Contract EAF Final all (Special Event Contracts)  Incorporated August 11, 1890  Sister City - Hekinan, Japan indoor areas, within 25 feet of vents or entrances and in outdoor areas where public employees of the City and employees of any vendor at the event or of the contracting organization are required to be. This general description of the provisions of the initiative is included for the purpose of reference and is not intended to expand or contract the obligations created by the smoking ban. The Festival Association warrants that it will comply with the smoking ban and will utilize the services and advice of the Snohomish County Health District in assuring compliance during the event described in this Agreement. 2.3 The Festival Association agrees that the Edmonds Arts Festival is a public event. The Festival Association further agrees that areas provided by the City that are covered under this Agreement, including but not limited to public right of way, streets, sidewalks, parks, parking lots, gardens, meeting halls and squares, are traditional public forums. As a result, the Festival Association shall permit citizens attending events open to the general public during the Edmonds Arts Festival to exercise therein their protected constitutional right to free speech without interference on City property. 2.4 RCW 70.93.093 concerning event recycling became effective in Washington on July 22, 2007. The EAFF will place clearly marked recycling containers throughout the Event area for the collection of aluminum cans, glass or plastic bottles from event participants, and arrange for recycling services. 2.5 The City has enacted Ordinance 3749 restricting the use of single-use plastic checkout bags. The restrictions do not apply to plastic bags used to carry out cooked food or provided solely for produce, bulk food or meat. The Festival Association will encourage its vendors to comply with the purposes of the ordinance by utilizing paper bags or encouraging the use of reusable totes whenever practicable. 2.6 Pursuant to the City’s Resolution 1357, the goal of which is to promote the use of certifiable compostable food service wares and packaging, food vendors at this public event are strongly encouraged to provide certifiable compostable food service wares to package and present food to event participants. In anticipation of future City restrictions vendors are also encouraged to reduce or eliminate the automatic provision of beverage straws. Aluminum and steel cans, plastic bottles and certain plastic cups that are accepted as recyclable, can continue to be acceptable for vendor use. When certifiable compostable food service wares and packaging are used, and recyclable containers are offered, event organizers will provide for the on-site collection of compostable and recyclable materials from event participants, using designated color-coded collection containers. Event organizers shall ensure that on-site collection containers are serviced properly and continually during the event. EAFF representative shall meet with the City’s Recycling Coordinator or representative prior to May 30 2018, in order to be educated on the 3-container system to maximize diversion of compostable and recyclable materials from the garbage. 2.7 Displays and artworks shall not be hung from conduits or sprinkler pipes. Exits and exit signage shall not be obstructed except with specific approval of the Fire Marshal or his designee. Nothing shall be attached to any piece of art displayed by the City, or on any metal surface, within the Edmonds Art Festival premises made available by the City to the Festival Association and covered by this Agreement. The Festival Association shall be responsible for removing all paint, wires, and modifications made to the building for the Festival and restoring the premises to its original condition. No stakes shall be used on grassy areas of the Plaza. A Festival Association representative shall meet with a member of the City's Parks and Recreation Department prior to June 7, 2018 and on June 20, 2018 to inspect the facility 6.9.b Packet Pg. 155 Attachment: 2018 Contract EAF Final all (Special Event Contracts)  Incorporated August 11, 1890  Sister City - Hekinan, Japan to document the "original" and post event condition of the Anderson Center, the Plaza Rooms, and outside areas. 2.8 The Festival Association will provide sufficient portable sani-cans and wash stations. The Festival Association will take over cleaning and stocking the restrooms from June 13th at 5:00pm until June 18, 2018. The City shall provide one mop, pail, and broom to use for cleanup, supplies for the toilet facilities, and keys to dispensers. The Festival Association shall meet with the City’s Lead Custodian to review cleaning expectations prior to event. In the event of a call-out during the event, the Festival Association shall reimburse the City for time and materials, at a minimum rate of 4-hour Overtime Callback. 2.9 The Festival Association shall provide manpower to assist with the tear- down of Room 207, date and time TBA prior to June 7, 2018. Also, City clients shall have access to the weight room (200A) for drop-in use up until 1:00 p.m., Wednesday, June 13, 2018, and starting again at 8:30 a.m., Tuesday, June 19, 2018. The clients shall use the alternate Main Street entrance (no access through the gym). The City shall secure the hallway between the gymnasium and the weight room by 12:00 noon, Friday, June 8. The hallway must be opened by 2:00 p.m., June 13 and must remain open, clear and unobstructed for egress during the Edmonds Arts Festival. 2.10 Permits: The Festival Association shall be responsible for all required city and state permits. The Festival Association shall submit all required application(s) and fees(s) for the Street Banner Permits provided for by this Agreement. All permits will be arranged through a designated representative of the City. The Festival Association is responsible for obtaining any necessary permits for serving alcohol on the premises from the state. 2.11 The Festival Association shall post "NO DOGS" signs on the Edmonds Arts Festival grounds and the Civic Center Playfield as per City Ordinance. The Festival Association shall notify vendors of this ordinance as part of their registration instructions, and also inform vendors that this ordinance will be enforced. This provision shall not apply to service animals. 2.12 Clean-Up: The Festival Association shall be responsible for clean-up of the festival grounds, indoor spaces, and Civic Center Playfield as follows: 1) Restore all areas to their original condition 2) Pick up all trash and remove all items and equipment related to the Edmonds Arts Festival by 5:00 p.m., June 19, 2018 (including grounds and buildings). 3) Plaza room carpet shall be professionally cleaned so that it is dry and ready for use by 8:30am on Tuesday, June 19, 2018. 4) Carpet/rugs, hard floor surfaces, and stairs shall be professionally cleaned, and otherwise restored to their original condition (with the exception of the gym) no later than June 20th at noon. 5) Restroom facilities shall be professionally cleaned and ready for public use no later than June 18th at 6:00am. 6) Power wash cleaning of the following: a. All paved food concession areas 6.9.b Packet Pg. 156 Attachment: 2018 Contract EAF Final all (Special Event Contracts)  Incorporated August 11, 1890  Sister City - Hekinan, Japan b. Edmonds Library Plaza patio c. All pedestrian walkways/steps around amphitheater, Frances Anderson Center, and Library Plaza area 7) Wash east-facing windows on the first and second floor of the Frances Anderson Center by 4:00pm on June 19, 2018. (Care must be taken particularly with the Daycare windows below ground level which have exhaust fans that are not able to be sealed). 8) Install drain guards on all affected storm drains prior to the beginning of the Festival, and for removing them after clean-up is complete. Drain guards will be provided by the City. Power washed materials (litter, etc.) must be collected and disposed of and not pushed to adjacent areas. 9) Disposal of waste water shall be according to the City policy using grease traps provided, cleaned and picked up, by the Festival Association. 2.13 Fire Watch: The Festival Association shall provide a fire watch for all times the buildings and displays are open to the general public. The Fire Marshall or representative shall inspect the Frances Anderson Center with the Festival Association President, or designated representative, prior to June 7, 2018 and any potential problems will be noted and reported to the City prior to Fire Marshall's briefing. At 9:00am on June 15, 2018 Fire Marshal shall brief designated representatives of the Festival Association of the location and use of fire service features (fire extinguishers, pull stations, etc.) in the Anderson Center and Edmonds Plaza Room as well as inspect for any electrical and fire safety hazards. The Festival Association President and appointed representatives will be the responsible Festival Association individuals for performing fire prevention and fire watch activities. 2.14 The Festival Association shall insure that: 1) Kilns, barbecues, forges and other sources of heat shall be insulated from turfed areas to prevent the heat from killing the grass and sterilizing the soil. All heat producing appliances in locations other than the food vending area shall be approved by the Fire Department and may require conditions for their acceptable use. Food vendor installations will be inspected prior to the Edmonds Arts Festival opening. Tarps, tents, canopies and covers shall be listed and labeled for flame resistance. 2) Vehicles shall only be allowed on turfed areas to load and unload, with adjacent streets and Civic Center Soccer Playfield (dirt field) used for parking during the Edmonds Arts Festival. Food Court concessions will use the Main Street entrance for loading and unloading. The Festival Association shall notify all individual residents of the affected areas of 8th Avenue and provide general notice to all the citizens of the closure of 8th Avenue. 3) Gate control and parking supervision is provided at Civic Center Playfield to ensure orderly and efficient parking, and restrict parking to the sand/dirt surface within the track area. Use of the jogging track, tennis courts, softball field, and Boy' & Girls' Club activities should not be impacted. The Festival Association may be charged time and/or materials to return the area to its original condition. 4) Precaution and measures are taken to prevent from water entering into the interior of the Frances Anderson Center buildings. 6.9.b Packet Pg. 157 Attachment: 2018 Contract EAF Final all (Special Event Contracts)  Incorporated August 11, 1890  Sister City - Hekinan, Japan 2.15 Fees: The Festival Association shall pay a fee of $6,600.00 ($5,960 for Anderson Center, under stage storage, Plaza Room and environs + $640 for Civic Center Playfield) to the City for the use and services of the above mentioned facilities in this Contract no later than May 7, 2018. The Festival Association shall pay directly to the contractor for supplies provided through the City for the actual cost of supplies furnished by the City within thirty (30) days of mailing of a final bill by the City. 2.16 Damage Deposit: The Festival Association shall submit a cleaning/damage deposit of $1,000.00 to the City no later than May 7, 2018. The deposit shall be refunded to the Festival Association if, upon inspection, all is in order, or a prorated portion thereof as may be necessary to reimburse the City for loss or cleaning and supply costs. 2.17 The Festival Association shall defend, indemnify and hold the City, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits, including attorney fees, arising from or in connection with the Festival Association's performance, or nonperformance, of this Agreement, except to the extent that claims, injuries, damages, losses or suits are caused by the sole negligence of the City, its officers, officials, employees or volunteers. This promise to indemnify and hold harmless shall include a waiver by the Festival Association of the immunity provided under Title 51 RCW, but only to the extent necessary to fully effectuate this promise. This provision shall survive the termination and/or expiration of this Agreement. 2.18 The Festival Association shall provide a Certificate of Insurance evidencing insurance written on an occurrence basis with limits no less than $3,000,000 combined single limit per occurrence and $3,000,000 aggregate for personal injury, bodily injury and property damage. The City shall be named as an additional insured on the Commercial General Liability insurance policy and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The insurance policy shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. The City shall be named as an insured on the Festival Association's General Liability insurance policy. The insurance policy shall contain, or be endorsed to contain that the Festival Association's insurance coverage shall be primary insurance. Any insurance, or insurance pool coverage maintained by the City shall be in excess of the Festival Association's insurance and shall not contribute to it. The Festival Association shall provide a certificate of insurance evidencing the required insurance before using the premises described herein. Insurance shall be placed with insurers with a current A.M. Best rating of not less than A:VII. 2.19 Notices. All requests for additional services and concerns of the Festival Association shall be directed by the Festival Association President to the City's designated representative, Parks Deputy Director 425-771-0230. 3. Miscellaneous 3.1 Entire agreement, integration and amendment. This Agreement contains the entire agreement and understanding between the Parties relating to the rights and obligations created hereby, and supersedes all prior and contemporaneous negotiations, understandings, and agreements, written or oral, between the Parties. Any prior discussions or understandings are deemed merged with the provisions herein. This Agreement shall not be amended, assigned or otherwise changed or transferred except in writing with the express written consent of the Parties hereto. Any action to interpret or enforce this Agreement shall 6.9.b Packet Pg. 158 Attachment: 2018 Contract EAF Final all (Special Event Contracts)  Incorporated August 11, 1890  Sister City - Hekinan, Japan be brought before the Superior Court of Snohomish County, Washington, and the Parties agree that, as between them, all matters shall be resolved in that venue. 3.2 Force ma jeure. The Parties shall not be liable for failure to perform or delay in performance due to fire, flood, strike or other labor difficulty, act of God, act of any governmental authority, riot, embargo, fuel or energy shortage, car shortage, wrecks or delays in transportation, or due to any other cause beyond the Parties' reasonable control. In the event of delay in performance due to any such cause, the date of delivery or time for completion will be extended by a period of time reasonably necessary to overcome the effect of such delay. 3.3 Relationship between the Parties. Nothing in this Agreement shall be interpreted to or in fact create an agency or employment relationship between the Parties. No officer, official, agent, employee or representative of the Festival Association shall be deemed to be the same of the City for any purpose. The Festival Association alone shall be solely responsible for all acts of its officers, officials, agents, employees, representatives and subcontractors during the performance of this Agreement. DATED this ____ day of ____________, 20___. CITY OF EDMONDS: EDMONDS ARTS FESTIVAL ASSOCIATION: ________________________________ By: __________________________________ David O. Earling, Mayor Its: __________________________________ Date: _________________________________ ATTEST/ AUTHENTICATED: __________________________________ Scott Passey, City Clerk APPROVED AS TO FORM: __________________________________ Office of the City Attorney 6.9.b Packet Pg. 159 Attachment: 2018 Contract EAF Final all (Special Event Contracts) 1 CONTRACT THE CITY OF EDMONDS, WASHINGTON AND GREATER EDMONDS CHAMBER OF COMMERCE Wednesday, July 4, 2018 The following is an agreement (“Agreement”) between the CITY OF EDMONDS (hereinafter referred to as “City”) and the GREATER EDMONDS CHAMBER OF COMMERCE (hereinafter referred to as “Chamber”) (collectively, the “Parties”). WHEREAS, the Chamber proposes to conduct a public celebration honoring Independence Day - 4th of July through a parade and fireworks display; and WHEREAS, the City Council finds that it is in the public interest to participate in the sponsorship of such events by providing the consideration set forth in this Agreement in order to enhance the safety of the public celebrations for its citizens and to offer a reasonable alternative to the use of private fireworks which the Council finds in many situations to be unsafe; NOW, THEREFORE, in consideration of the promises, covenants, conditions and performances set forth below, the Parties hereto agree as follows: 1. Responsibilities of the City City shall provide: 1.1 Use of City streets as diagrammed in Exhibit A - Parade Route, for parade to occur on July 4, 2018. City will provide traffic barriers and will set up and take down City’s sound system to be located at the Edmonds Theater. City shall put up banners at approved sites. 1.2 Use of Civic Center Playfield for setup to start at 8:00 a.m. on July 3, and Fireworks to occur at approximately 10 p.m., July 4, 2018. 1.3 Use of 6th Avenue South between Bell Street and Sprague Street from 3:00 p.m. until 11:00 p.m (vendors setup at this location starting at 3pm). 1.4 Barricades at 6th Avenue South and Bell and 6th Avenue South and Sprague. If barricades are not set up by the City by 3:00 pm, the Chamber can move the barricades in the street at 3:00 pm. 1.5 A power hookup at the west end of the former grandstand and power for the band. 1.6 Two signs at each entrance to the Park indicating no fireworks, pets or alcohol allowed. 1.7 Clean up and removal of the sand from the pyrotechnic display area. 6.9.c Packet Pg. 160 Attachment: 2018 July 4 Contract Final all comments redline (Special Event Contracts) 2 1.8 The City shall supply a list of acceptable compostable and recyclable food ware items and of suppliers for the compostable items to strongly encourage their use. The City shall provide signage for the on-site collection containers, and any additional containers, if needed. 1.9 The City shall mark the safe distance perimeter from the pyrotechnic staging area, where the Chamber will place fencing (230’ radius) Section 2.7. 1.10 To pick up, deliver, and return to storage in City Park gazebo and Parks Maintenance area all needed 3’ X 10’ and 10’ X 10’ staging sections. 1.11 The City shall supply a list of acceptable compostable and recyclable food ware items and of suppliers for the compostable items to strongly encourage their use. The City shall provide signage for the on-site collection containers, and any additional containers, if needed. 2. Responsibilities of the Chamber 2.1 To assume all responsibility for coordination of the 4th of July Parade, including but not limited to hiring off-duty police officers to police the route and assuring that all participants are informed of and abide by the parade rules to insure that no participants draw people viewing the parade onto the parade route. 2.2 To obtain the necessary Street Banner Application (from Public Works 425-771- 0235) and Parade Permit (Police Department 425-771-0200). Fees for the preceding two permits will be waived for this event. A Street Use Permit is not needed. Chamber will ensure that pyrotechnic provider submits Application for Fireworks Display Permit accompanied by a $30.00 public display permit fee (Fire Marshal 425-771-0215). A copy of their State pyrotechnic license shall be provided with their application. The Chamber shall obtain ASCAP and any other copyright licenses necessary. 2.3 To provide for security and sani-cans along the parade route and fireworks display. 2.4 Consult with City Electrician and Parks Maintenance Manager before installing any electrical service or stakes in the ground. The City Electrician shall have final say in all electrical matters. No ground penetrations are allowed unless authorized first by the City electrician and City Parks Departmen). Any unauthorized ground penetrations may be subject to fine and/or damage cost recovery from the Chamber). (It is not allowed to fasten anything to the buildings, structures or trees, doing so may result in damage cost recovery and /or fine). City staff will coordinate any utility locates. 2.5 To install fencing that clearly delineates spectator areas from fireworks staging areas. 2.6 To provide 10 yards of sand for the pyrotechnic display. 6.9.c Packet Pg. 161 Attachment: 2018 July 4 Contract Final all comments redline (Special Event Contracts) 3 2.7 To assume all responsibility for fireworks display. A State-licensed pyrotechnics operator shall abide by local ordinances and make necessary permit applications for local approval. State guidelines and operational requirements shall be adhered to for safe operation of fireworks. 2.8 To authorize a maximum of three stationary self-contained vendors on closed sections of 5th or Main Streets off the parade route. No vendors will be authorized along the parade route, and no more than twenty vendors will be authorized on 6th Avenue South between Bell Street and Sprague for the evening fireworks. Vendors shall operate at specified locations and shall not block park entrances or fire hydrants. Vendors must be self-contained; no power hookups are available for vendors. Vendors are responsible for having appropriate permits and for compliance with all local and state requirements. 2.9 To provide a Certificate of Insurance evidencing commercial general liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and $2,000,000 aggregate for personal injury, bodily injury and property damage. City shall be named as an additional insured on the Commercial General Liability insurance policy and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The insurance policy shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability. The City shall be named as an insured on the Chamber’s General Liability insurance policy. The insurance policy shall contain, or be endorsed to contain that the Chamber’s insurance coverage shall be primary insurance. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be in excess of the Chamber’s insurance and shall not contribute to it. The Chamber shall provide a certificate of insurance evidencing the 789 required insurance before using the property described herein. Insurance shall be placed with insurers with a current A.M. Best rating of not less than A:VII. 2.10 To remove all garbage to the size of a cigarette butt, including metal and litter debris, equipment, and any and all other items made necessary by or used in the provision of this event. 2.11 The Chamber agrees that the 4th of July celebration is a public event. The Chamber further agrees that areas constituting the City-Provided Site that are covered under this Agreement, including but not limited to public right of way, streets, sidewalks, parks, parking lots, gardens, meeting halls and squares, are traditional public forums. As a result, the Chamber shall permit citizens attending events open to the general public at City-Provided Site during the 4th of July celebration to exercise therein their protected constitutional right to free speech without interference. 2.12 The City has enacted Ordinance 3749 restricting the use of single-use plastic checkout bags. The restrictions do not apply to plastic bags used to carry out cooked food or provided solely for produce, bulk food or meat. The Chamber of Commerce will encourage its vendors to comply with the purposes of the ordinance by utilizing paper bags or encouraging the use of reusable totes whenever practicable. 6.9.c Packet Pg. 162 Attachment: 2018 July 4 Contract Final all comments redline (Special Event Contracts) 4 2.13 RCW 70.93.093 concerning event recycling became effective in Washington on July 22, 2007. The Chamber will place clearly marked recycling containers throughout the Event area for the collection of aluminum cans, glass or plastic bottles from event participants, and arrange for recycling services. 2.14 Pursuant to the City’s Resolution 1357, the goal of which is to promote the use of certifiable compostable food service wares and packaging, food vendors at this public event are strongly encouraged to provide certifiable compostable food service wares to package and present food to event participants. In anticipation of future City restrictions vendors are also encouraged to reduce or eliminate the automatic provision of beverage straws. Aluminum and steel cans, plastic bottles and certain plastic cups that are accepted as recyclable, can continue to be acceptable for vendor use. When certifiable compostable food service wares and packaging are used, and recyclable containers are offered, event organizers will provide for the on-site collection of compostable and recyclable materials from event participants, using designated color-coded collection containers. Event organizers shall ensure that on-site collection containers are serviced properly and continually during the event. A Chamber representative shall meet with the City’s Recycling Coordinator or representative prior to June 30 2018, in order to be educated on the 3-container system to maximize diversion of compostable and recyclable materials from the garbage. 2.15 The Chamber shall defend, indemnify and hold the City, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits, including attorney fees, arising from or in connection with the Chamber’s performance, or nonperformance, of this Agreement, except to the extent that claims, injuries, damages, losses or suits are caused by the sole negligence of the City, its officers, officials, employees or volunteers. This promise to indemnify and hold harmless shall include a waiver by the Chamber of the immunity provided under Title 51 RCW, but only to the extent necessary to fully effectuate this promise. This provision shall survive the termination and/or expiration of this Agreement. 2.16 The Parties acknowledge that pursuant to the provisions of Initiative 901 as codified in Chapter 70.160 RCW (herein after the "smoking ban"), smoking is prohibited in indoor areas, within 25 feet of vents or entrances and in outdoor areas where public employees of the City, and employees of any vendor at the event or of the contracting organization are required to be. This general description of the provisions of the initiative is included for the purpose of reference and is not intended to expand or contract the obligations created by the smoking ban. The Chamber warrants that it will comply with the smoking ban and will utilize the services and advice of the Snohomish County Health District in assuring compliance during the event described in this Agreement. 2.17 The Chamber shall be responsible to restore all public spaces to their original condition, including removing and disposing of any and all litter and trash. 6.9.c Packet Pg. 163 Attachment: 2018 July 4 Contract Final all comments redline (Special Event Contracts) 5 3. Miscellaneous. 3.1 Entire agreement, integration and amendment. This Agreement contains the entire agreement and understanding between the Parties relating to the rights and obligations created hereby, and supersedes all prior and contemporaneous negotiations, understandings, and agreements, written or oral, between the Parties. Any prior discussions or understandings are deemed merged with the provisions herein. This Agreement shall not be amended, assigned or otherwise changed or transferred except in writing with the express written consent of the Parties hereto. Any action to interpret or enforce this Agreement shall be brought before the Superior Court of Snohomish County, Washington, and the Parties agree that, as between them, all matters shall be resolved in that venue. 3.2 Force majeure. The Parties shall not be liable for failure to perform or delay in performance due to fire, flood, strike or other labor difficulty, act of God, act of any governmental authority, riot, embargo, fuel or energy shortage, car shortage, wrecks or delays in transportation, or due to any other cause beyond the Parties’ reasonable control. In the event of delay in performance due to any such cause, the date of delivery or time for completion will be extended by a period of time reasonably necessary to overcome the effect of such delay. 3.3 Relationship between the Parties. Nothing in this Agreement shall be interpreted to or in fact create an agency or employment relationship between the Parties. No officer, official, agent, employee or representative of the Chamber shall be deemed to be the same of the City for any purpose. The Chamber alone shall be solely responsible for all acts of its officers, officials, agents, employees, representatives and subcontractors during the performance of this Agreement. 6.9.c Packet Pg. 164 Attachment: 2018 July 4 Contract Final all comments redline (Special Event Contracts) 6 DATED this ______ day of ________________, 2018. CITY OF EDMONDS: GREATER EDMONDS CHAMBER OF COMMERCE: David O. Earling, Mayor Greg Urban, President and CEO ATTEST/AUTHENTICATED: Scott Passey, City Clerk APPROVED AS TO FORM: Office of the City Attorney 6.9.c Packet Pg. 165 Attachment: 2018 July 4 Contract Final all comments redline (Special Event Contracts) 7 6.9.c Packet Pg. 166 Attachment: 2018 July 4 Contract Final all comments redline (Special Event Contracts) 8 4th of July Parade Participant’s Map Up to twenty vendors will be on the east and west side of 6th. They will not block entrances or fire hydrants. Civic Center Playfield Sprague Bell 6th Avenue Greater Edmonds Chamber of Commerce 4th of July Fireworks and Evening Festivities Vendor Area on 6th Ave. N 6.9.c Packet Pg. 167 Attachment: 2018 July 4 Contract Final all comments redline (Special Event Contracts) 1 CONTRACT CITY OF EDMONDS, WASHINGTON AND EDMONDS-SOUTH SNOHOMISH COUNTY HISTORICAL SOCIETY May 5-October 6, 2018 The following is an agreement (“Agreement”) between the CITY OF EDMONDS (hereinafter referred to as the “City”), and the EDMONDS-SOUTH SNOHOMISH COUNTY HISTORICAL SOCIETY (hereinafter referred to as the “Historical Society”) (collectively, the “Parties”). WHEREAS, the Edmonds South County Historical Society has operated in the past a spring and summer market, providing a marketplace for Edmonds residents to display their wares, which uniquely promotes artists and other small business persons and their products; WHEREAS, the City Council finds that in addition to providing an opportunity for economic development and a recreational resource to the citizens of Edmonds, the event promotes tourism to the community and could provide an initial springboard for the development of a small business; and WHEREAS, the City Council finds that the considerations the City provides are more than adequately recompensed by the promises of the Historical Society and the public benefit to be derived from this Agreement; NOW, THEREFORE, in consideration of the promises, covenants, conditions and performances set forth below, the Parties hereto agree as follows: 1. Responsibilities of the City. 1.1 Garden Market (May 5 through June 9): The City shall provide use of the right of way, Bell Street between 5th and 6th Avenues for farmer/producer based vendors each Saturday. 1.2 Summer Market (June 16 through October 6): • The City shall provide use of the right of way, Bell Street between 5th and 6th Avenues and 5th Avenue between Bell and Main Streets, by the Historical Society for the “Summer Market” event, each Saturday (Exception: No Summer Market August 12 during Taste of Edmonds). • The City shall allow vendor parking on the south, east and west sides of the police parking lot each Saturday (Exception: No Summer Market August 11 during Taste of Edmonds). • All use and configuration of tents and other temporary facilities used in this event shall be inspected and reviewed prior to the event by Edmonds Fire Marshal or designated representative, in accordance with the provisions of the Open Air Market Ordinance. Tarps, tents, canopies and covers shall be tested and labeled for fire resistance. Also, all participants shall be required to adhere to all provisions of State and local law to insure that no lasting or permanent damage is done to any public facility or property. The Fire Marshal or the City, in accordance with its lawful authority under statute and ordinance, may use their discretion to cancel this event or to prohibit the attendance of the general public in certain areas when doing so would be a violation of state law or local ordinance. 6.9.d Packet Pg. 168 Attachment: 2018 Market Contract Final (Special Event Contracts) 2 • The City shall install Summer Market banners as provided by Historical Society at approved sites. Historical Society shall obtain a Street Banner Permit and pay the required fee. • The City shall place three barricades behind the Museum prior to May 5 for the duration of the Market. • The City shall install appropriate “No Parking Saturdays” signage on Bell Street by May 1 and on 5th Avenue South by June 12. 1.3 The City shall supply a list of acceptable compostable and recyclable food ware items and of suppliers for the compostable items to strongly encourage their use. The City shall provide signage for the on-site collection containers, and any additional containers, if needed. 2. Responsibilities of the Historical Society. 2.1 Garden Market (May 5 through June 9) and Summer Market (June 16 through October 6): • Set up hours begin at 6:00 a.m. on Saturdays on 5th Avenue and 7:00 a.m. on Saturdays on Bell Street. • During the Summer Market, the sections of the Police parking lot not used by the Market will be reserved for police parking only. Parking restrictions will be posted and vendor and customer parking shall not be allowed in this area. Violators may be towed at their own expense. • For Garden Market and Summer Market, parking restrictions shall be posted indicating violators will be towed. Police Department will attempt to notify owners. If not located by 6:30 a.m. police will proceed to have violating vehicles towed. • For Garden Market and Summer Market, street barricades are in place at 6:00 a.m. on Saturday and removed by 5:00 p.m. Exception: During the Summer Market, the street barricade at 5th Avenue and Main Street will not be placed until after Sound Disposal enters 5th Avenue to access the alley next to the Museum for Saturday morning pickup. Sound Disposal will enter 5th Avenue from Main Street and access the alley by 8:00 a.m. at the latest. • Historical Society shall obtain necessary Street Use Permits for Summer Market. 2.2 The Historical Society shall provide a Certificate of Insurance evidencing commercial general liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and $5,000,000 aggregate for personal injury, bodily injury and property damage. The City shall be named as an additional insured on the Commercial General Liability insurance policy and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The insurance policy shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer’s liability. The City shall be named as an insured on the Historical Society’s General Liability insurance policy. The insurance policy shall contain, or be 6.9.d Packet Pg. 169 Attachment: 2018 Market Contract Final (Special Event Contracts) 3 endorsed to provide that the Historical Society’s insurance coverage shall be primary insurance. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be in excess of the Historical Society’s insurance and shall not contribute to it. The Historical Society shall provide a certificate of insurance evidencing the required insurance before using the property described herein. Insurance shall be placed with insurers with a current A.M. Best rating of not less than A: VII. 2.3 The Historical Society agrees that the Market is a public event. The Historical Society further agrees that areas constituting the City-Provided Site that are covered under this Agreement, including but not limited to public right of way, streets, sidewalks, parks, parking lots, gardens, meeting halls and squares, are traditional public forums. As a result, the Historical Society shall permit citizens attending events open to the general public at a City-Provided Site during the Market to exercise therein their protected constitutional right to free speech without interference. 2.4 The City has enacted Ordinance 3749 restricting the use of single-use plastic checkout bags. The restrictions do not apply to plastic bags used to carry out cooked food or provided solely for produce, bulk food or meat. The Historical Society will encourage its vendors to comply with the purposes of the ordinance by utilizing paper bags or encouraging the use of reusable totes whenever practicable. 2.5 RCW 70.93.093 concerning event recycling became effective in Washington on July 22, 2007. The Historical Society will place clearly marked recycling containers throughout the Event area for the collection of aluminum cans, glass or plastic bottles from event participants, and arrange for recycling services. 2.6 Pursuant to the City’s Resolution 1357, the goal of which is to promote the use of certifiable compostable food service wares and packaging, food vendors at this public event are strongly encouraged to provide certifiable compostable food service wares to package and present food to event participants. In anticipation of future City restrictions vendors are also encouraged to reduce or eliminate the automatic provision of beverage straws. Aluminum and steel cans, plastic bottles and certain plastic cups that are accepted as recyclable, can continue to be acceptable for vendor use. When certifiable compostable food service wares and packaging are used, and recyclable containers are offered, event organizers will provide for the on-site collection of compostable and recyclable materials from event participants, using designated color-coded collection containers. Event organizers shall ensure that on-site collection containers are serviced properly and continually during the event. The Historical Society representative shall meet with the City’s Recycling Coordinator or representative prior to May 1, 2018, in order to be educated on the 3-container system to maximize diversion of compostable and recyclable materials from the garbage. 2.7 The Historical Society shall defend, indemnify and hold the City, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits, including attorney fees, arising from or in connection with the Historical Society’s performance, or nonperformance, of this Agreement, except to the extent that claims, injuries, damages, losses or suits are caused by the sole negligence of the City, its officers, officials, employees or volunteers. This promise to indemnify and hold harmless shall include a waiver by the Historical Society of the immunity provided under Title 51 RCW, but only to the extent necessary to fully effectuate this promise. This provision shall survive the termination and/or expiration of this Agreement. 6.9.d Packet Pg. 170 Attachment: 2018 Market Contract Final (Special Event Contracts) 4 2.8 Neither the Historical Society nor any of its officers, agents, or employees shall discriminate in the provision of services under this Agreement against any individual, partnership, or corporation based upon race, religion, sex, creed, place of origin, or any other form of discrimination prohibited by federal, state or local law. 2.9 In addition, the Parties acknowledge that pursuant to the provisions of Initiative 901 as codified in Chapter 70.160 RCW (hereinafter the “smoking ban”), smoking is prohibited in indoor areas, within 25 feet of vents or entrances and in outdoor areas where public employees of the City, and employees of any vendor at the event or of the contracting organization are required to be. This general description of the provisions of the initiative is included for the purpose of reference and is not intended to expand or contract the obligations created by the smoking ban. The Historical Society warrants that it will comply with the smoking ban and will utilize the services and advice of the Snohomish County Health District in assuring compliance during the event described in this Agreement. 2.10 Historical Society agrees to the following Market days: Garden Market: Saturdays, May 5 through June 9, 2018 Summer Market: Saturdays, June 16 through October 6, 2018 (No Market August 11 during Taste of Edmonds). Historical Society agrees to the following Market hours of operation: Garden Market open: 9:00 a.m.-2:00 p.m. Set up: 7:00 a.m.-9:00 a.m. Takedown: 2:00 p.m.-3:30 p.m. Summer Market open: 9:00 a.m.-3:00 p.m. Set up: 6:00 a.m.-9:00 a.m. (6:00 a.m. start on 5th Avenue; 7:00 a.m. start on Bell Street) Takedown: 3:00 p.m.-4:30 p.m. 2.11 The City shall have no responsibility or liability for the provision of security services nor shall it be liable for any loss or damage incurred by the Historical Society or the participants in this event. 2.12 Historical Society shall provide fire watch for all times in and around the booths and displays open to the general public as part of this event. 2.13 Historical Society shall provide a portable sani-can on Bell Street at a location to be agreed upon by the City and the Historical Society. 2.14 Individual vendors are responsible for packing out all of their own garbage. Historical Society may deposit up to twelve (12) thirty-three gallon bags of garbage generated in their area in the dumpster located in the Public Safety Center’s trash enclosure that abuts Fire Station 17. 6.9.d Packet Pg. 171 Attachment: 2018 Market Contract Final (Special Event Contracts) 5 2.15 Historical Society shall arrange for and pay for a recycling container(s) from Sound Disposal. Container(s) shall be stored and serviced in the Public Safety Center’s trash enclosure that abuts Fire Station 17. 2.16 Upon the completion of the event, Historical Society shall make adequate provisions for the cleanup and restoration of all sites rented or provided under terms of this Agreement. 2.17 Historical Society shall pay the City all permit fees, in accordance with provisions of open air market, Ordinance #3015, for the above-mentioned facilities use and services at least ten (10) days prior to the event. 2.18 Colored flags or banners may not be placed in the existing holes in the public sidewalk designated for the American flag program. 2.19 No ground penetrations are allowed unless authorized first by the City electrician and City Parks Department. Any unauthorized ground penetrations may be subject to fine and/or damage cost recovery from the Historical Society. It is not allowed to fasten anything to the buildings, structures or trees, doing so may result in damage cost recovery and /or fine. 3. Miscellaneous. 3.1 Entire Agreement, integration and amendment. This Agreement contains the entire agreement and understanding between the Parties relating to the rights and obligations created hereby, and supersedes all prior and contemporaneous negotiations, understandings, and agreements, written or oral, between the Parties. Any prior discussions or understandings are deemed merged with the provisions herein. This Agreement shall not be amended, assigned or otherwise changed or transferred except in writing with the express written consent of the Parties hereto. Any action to interpret or enforce this Agreement shall be brought before the Superior Court of Snohomish County, Washington, and the Parties agree that, as between them, all matters shall be resolved in that venue. 3.2 Force majeure. The Parties shall not be liable for failure to perform or delay in performance due to fire, flood, strike or other labor difficulty, act of God, act of any governmental authority, riot, embargo, fuel or energy shortage, car shortage, wrecks or delays in transportation, or due to any other cause beyond the Parties’ reasonable control. In the event of delay in performance due to any such cause, the date of delivery or time for completion will be extended by a period of time reasonably necessary to overcome the effect of such delay. 3.3 Relationship between the Parties. Nothing in this Agreement shall be interpreted to or in fact create an agency or employment relationship between the Parties. No officer, official, agent, employee or representative of the Historical Society shall be deemed to be the same of the City for any purpose. The Historical Society alone shall be solely responsible for all acts of its officers, officials, agents, employees, representatives and subcontractors during the performance of this Agreement. 6.9.d Packet Pg. 172 Attachment: 2018 Market Contract Final (Special Event Contracts) 6 DATED this ______ day of ________________ 2018. CITY OF EDMONDS: EDMONDS-SOUTH SNOHOMISH COUNTY HISTORICAL SOCIETY: David O. Earling, Mayor By: Its: Date: ATTEST/AUTHENTICATED: Scott Passey, City Clerk APPROVED AS TO FORM: Office of the City Attorney 6.9.d Packet Pg. 173 Attachment: 2018 Market Contract Final (Special Event Contracts) 1 CONTRACT CITY OF EDMONDS, WASHINGTON AND GREATER EDMONDS CHAMBER OF COMMERCE August 8-14, 2018 The following is an agreement (“Agreement”) between CITY OF EDMONDS (hereinafter referred to as the “City”), and the GREATER EDMONDS CHAMBER OF COMMERCE (hereinafter referred to as the “Chamber”) (collectively, the “Parties”). WHEREAS, the Greater Edmonds Chamber of Commerce has for a number of years conducted a public event known as “Taste Edmonds” and proposes to do so again in 2018; WHEREAS; the City Council finds that Taste Edmonds provides distinct benefits to the City by showcasing Edmonds’ restaurants and other local businesses while providing a unique recreational opportunity for its citizens; and WHEREAS, the City Council finds that such an event enhances tourism and promotes economic development as well as providing an opportunity for good clean fun to its citizens; NOW, THEREFORE, in consideration of the promises, covenants, conditions and performances set forth below, the Parties hereto agree as follows: 1. Responsibilities and Rights of City 1.1 City shall provide use of surfaces on Civic Center Field (excluding the tennis courts), Bell Street including Centennial Plaza between 5th & 6th Avenues, and 6th Avenue from Main Street north to Daley Street, and south approximately 80’ to first drive on west side for use by Chamber for “Taste Edmonds” event (the “Event”), so as to allow for the following: (a) The Event setup shall begin on Wednesday, August 8, 2018, at 7:00 a.m. Barricades to be in place at 7:00 a.m. (b) All surfaces listed shall remain available to the “Taste Edmonds” until final cleanup by Tuesday, August 14, 2018, at noon. (c) City shall designate eight (8) additional handicapped parking spaces to be located in an area to be agreed upon by City and Chamber officials. 1.2 All use and configuration of structures, booths and other permanent or temporary facilities used in the Event may be inspected and reviewed by City Fire Chief, Police Chief, Building Official and Parks and Recreation Director or their designees to determine the facilities in use comply with the provisions of State and local law, as well as to insure that no lasting or permanent damage shall be done to any public facility or property. 1.3 Edmonds Fire Marshal shall inspect the facilities prior to the opening to the general public on or before 10:00 a.m., August 10, 2018, as the Parties shall agree and note all potential 6.9.e Packet Pg. 174 Attachment: 2018 Taste Contract Final Draft (Special Event Contracts) 2 problems. Prior to the opening of the Event, Chamber shall correct all problems related to fire safety. In the event that such problems are not corrected, City may at its sole discretion cancel the Event or prohibit the attendance of the general public in certain areas, if in the opinion of the Fire Marshal and at the sole discretion of City, any violation or other condition that threatens life, health or property has not been corrected. 1.4 City shall provide barricades and barricade placement and removal for the Event. 1.5 City shall provide padlocks as required on location for tennis courts and other areas from which public access is restricted during the Event. City shall also provide removal of the padlocks. 1.6 City shall provide water access on the south fence near the petanque corts for use by the food vendors. 1.7 City shall provide access to storage area of portable stage to beer garden at time of stage installation and at time of stage removal. 1.8 City shall provide basketball hoop removal and re-installation on basketball courts located near the Boys & Girls Club building. 1.9 City shall install Taste Edmonds street banners as provided by Chamber at approved sites. Chamber shall obtain a Street Banner Permit and pay the required fee. 1.10 City has the right to check the noise level of any amplified sound equipment or other source and require that the volume be reduced if it exceeds the safety limits recommended by the Seattle King County Department of Health or levels set forth in the ordinances of the City of Edmonds. 1.11 City shall provide and oversee police supervision of the Event under the command of the Chief of Police or his designee. Police staffing levels and fees to be paid to the City will be mutually determined by the Chief of Police, or his designee, and the President and CEO of the Chamber. 1.12 The City shall supply a list of acceptable compostable and recyclable food ware items and of suppliers for the compostable items to strongly encourage their use. The City shall provide signage for the on-site collection containers, and any additional containers, if needed. 2. Responsibilities and Rights of Chamber 2.1 The Chamber shall provide a Certificate of Insurance evidencing commercial general liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and $2,000,000 aggregate for personal injury, bodily injury and property damage. City shall be named as an additional insured on the Commercial General Liability insurance policy and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The insurance policy shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer’s liability. The City shall be named as an insured on the Chamber’s General Liability insurance policy. The insurance policy shall contain, or be endorsed to contain that the 6.9.e Packet Pg. 175 Attachment: 2018 Taste Contract Final Draft (Special Event Contracts) 3 Chamber’s insurance shall be the primary insurance. Any insurance, self insurance, or insurance pool coverage maintained by the City shall be in excess of the Chamber’s insurance and shall not contribute to it. The Chamber shall provide a certificate of insurance evidencing the required insurance before using the property described herein. Insurance shall be placed with insurers with a current A.M. Best rating of not less than A:VII. 2.2 The Chamber agrees that the Taste Edmonds is a public event. The Chamber further agrees that areas constituting the City-Provided Site that are covered under this Agreement, including but not limited to public right of way, streets, sidewalks, parks, parking lots, gardens, meeting halls and squares, are traditional public forums. As a result, the Chamber shall permit citizens attending events open to the general public at City-Provided Site during the Taste Edmonds to exercise therein their protected constitutional right to free speech without interference in a designated free speech zone that does not violate fire and ADA codes. 2.3 The City has enacted Ordinance 3749 restricting the use of single-use plastic checkout bags. The restrictions do not apply to plastic bags used to carry out cooked food or provided solely for produce, bulk food or meat. The Chamber of Commerce will encourage its vendors to comply with the purposes of the ordinance by utilizing paper bags or encouraging the use of reusable totes whenever practicable. 2.4 RCW 70.93.093 concerning event recycling became effective in Washington on July 22, 2007. The Chamber will place clearly marked recycling containers throughout the Event area for the collection of aluminum cans, glass or plastic bottles from event participants, and arrange for recycling services. 2.5 Pursuant to the City’s Resolution 1357, the goal of which is to promote the use of certifiable compostable food service wares and packaging, food vendors at this public event are strongly encouraged to provide certifiable compostable food service wares to package and present food to event participants. In anticipation of future City restrictions vendors are also encouraged to reduce or eliminate the automatic provision of beverage straws. Aluminum and steel cans, plastic bottles and certain plastic cups that are accepted as recyclable, can continue to be acceptable for vendor use. When certifiable compostable food service wares and packaging are used, and recyclable containers are offered, event organizers will provide for the on-site collection of compostable and recyclable materials from event participants, using designated color-coded collection containers. Event organizers shall ensure that on- site collection containers are serviced properly and continually during the event. The Chamber representative shall meet with the City’s Recycling Coordinator or representative prior to July 31, 2018, in order to be educated on the 3-container system to maximize diversion of compostable and recyclable materials from the garbage. 2.6 The Chamber shall defend, indemnify and hold the City, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits, including attorney fees, arising from or in connection with the Chamber’s performance, or nonperformance, of this Agreement, except to the extent that claims, injuries, damages, losses or suits are caused by the sole negligence of the City, its officers, officials, employees or volunteers. This promise to indemnify and hold harmless shall include a waiver by the Chamber of the immunity provided under Title 51 RCW, but only to the extent necessary to fully effectuate this promise. This provision shall survive the termination and/or expiration of this Agreement. 6.9.e Packet Pg. 176 Attachment: 2018 Taste Contract Final Draft (Special Event Contracts) 4 2.7 Chamber may in its discretion limit the participation of any vendor who produces duplication in order to adequately recognize limitations of space, failure to comply with applicable State or local health, liquor, or other requirements of law, and in order to provide an adequate and interesting diversity compatible with the recreation of the citizens of Edmonds. 2.8 Neither Chamber nor any of its officers, agents, or employees shall discriminate in the provision of service under this Agreement against any individual, partnership, or corporation based upon race, religion, sex, creed, place of origin, or any other form of discrimination prohibited by federal, state or local law. 2.9 The Parties acknowledge that pursuant to the provisions of Initiative 901 as codified in Chapter 70.160 RCW (herein after the "smoking ban"), smoking is prohibited in indoor areas, within 25 feet of vents or entrances and in outdoor areas where public employees of the City, and employees of any vendor at the Event or of the contracting organization are required to be. This general description of the provisions of the initiative is included for the purpose of reference and is not intended to expand or contract the obligations created by the smoking ban. The Chamber warrants that it will comply with the smoking ban and will utilize the services and advice of the Snohomish County Health District in assuring compliance during the Event described in this Agreement. 2.10 Chamber shall obtain any necessary Street Use and Parks Facility Use Permits and pay the required fees. (See site plan attached as Exhibit “A”). 2.11 Chamber shall post "NO DOGS" signs on the Taste grounds and the Civic Center Field as per City Ordinance. The Chamber shall notify vendors of this ordinance as part of their registration instructions, and also inform vendors that this ordinance will be enforced. This provision shall not apply to service animals for the disabled. 2.12 Chamber shall restrict field parking to approved areas. Chamber shall have security at permit parking entrance area to limit public access. City has the right to close the parking area for the Event if parking is not limited to the agreed upon area. 2.13 Chamber shall ensure that all booths/beer garden/wine garden have the necessary state permits for serving and selling alcohol. Chamber agrees to make its best effort to prevent service of alcohol to minors, including segregation of the beer garden and wine garden, posting security at the entrances of the beer garden and wine garden and checking identification in accordance with common practice. Chamber shall obtain any copyright licenses necessary for presenting licensed live and recorded music. 2.14 Chamber agrees to the following general open hours of the Taste Edmonds: Friday, August 10, 2018: 11:00 a.m.-10:00 p.m. Saturday, August 11, 2018: 11:00 a.m.-10:00 p.m. Sunday, August 12, 2018: 11:00 a.m.-7:00 p.m. Chamber agrees to keep the hours of operation in the Beer Garden and Wine Garden within the following schedule: 6.9.e Packet Pg. 177 Attachment: 2018 Taste Contract Final Draft (Special Event Contracts) 5 Friday, August 10, 2017: 11:00 a.m.-10:00 p.m. (Last call 9:30 p.m., no service after 9:45 p.m.) Saturday, August 11, 2017: 11:00 a.m.-10:00 p.m. (Last call 9:30 p.m., no service after 9:45 p.m.) Sunday, August 12, 2017: 11:00 a.m.-7:00 p.m. (Last call 6:30 p.m., no service after 6:45 p.m.) 2.15 Chamber shall provide any and all security services necessary during the night time hours (night time hours being defined as those hours which the Event is not in operation), sufficient to reasonably secure the area and facilities provided. City shall have no responsibility or liability for the provision of security services nor shall it be liable for any loss or damage incurred by Chamber or the participants in the Event. 2.16 Chamber shall provide a fire watch for all times in and around the booths and displays open to the general public as a part of the Event. 2.17 Chamber shall provide a sufficient number of portable sani-cans and wash stations. 2.18 Chamber shall provide fence installation and removal at the Beer Garden and Wine Gardens. 2.19 Chamber is responsible for contracting with appropriate vendors for power. No power is available from the Civic Center complex. 2.20 Chamber will arrange for a walk through with the City electrician to get approval for the accommodation of power and electricity needs. The City Electrician shall have final say in all electrical matters. No ground penetrations are allowed unless authorized first by the City electrician and City Parks Department. Any unauthorized ground penetrations may be subject to fine and/or damage cost recovery from the Chamber. It is not allowed to fasten anything to the buildings, structures or trees, doing so may result in damage cost recovery and /or fine. 2.21 Chamber shall provide labor and equipment for the portable Beer Garden pouring station (PS) to: (1) pickup the PS elements at the City’s storage location, (2) set up the PS, (3) take down the PS, (4) cleanup the PS elements, and (5) return the PS elements to the City’s storage location. 2.22 Garbage service shall be contracted and paid for by Chamber. 2.23 Upon the completion of the Event, Chamber shall make adequate provisions for the cleanup and restoration of all sites rented or provided under the terms of this Agreement, including steam cleaning and pressure washing whenever required for all hard surfaces impacted by the Event. Storm drains are to be covered with filter fabric to capture grease and debris. 2.24 Cleanup areas include area as described in paragraph 1.1 and all streets immediately surrounding the Event perimeter. 2.25 All garbage to the size of a cigarette butt, debris, litter, equipment, and any other and all other items made necessary by or used in the provision of the Event shall be picked up and removed by 12:00 noon, Tuesday, August 15, 2018. 6.9.e Packet Pg. 178 Attachment: 2018 Taste Contract Final Draft (Special Event Contracts) 6 2.26 A final inspection of the Event area shall be conducted by City Parks Maintenance Division to determine if all areas are clean and returned to their original condition. 2.27 Chamber shall submit a cleaning/damage deposit of $1,500.00 to City prior to Monday, July 10, 2018. The deposit shall be refunded to Chamber if, upon inspection, all is in order, or a prorated portion thereof as may be necessary to reimburse City for loss or cleaning costs. 2.28 Chamber shall pay City all permit fees for the above-mentioned facility use ($1,440.00 facility rental) prior to Monday, July 9, 2018, and shall reimburse City for the actual costs of supplies or services furnished by City, unless otherwise established, within thirty (30) days of mailing of a final bill by the City. 2.29 Colored banners or flags may not be placed in the existing holes in the public sidewalk designated for the American flag program. 3. Miscellaneous. 3.1 Entire agreement, integration and amendment. This Agreement contains the entire agreement and understanding between the Parties relating to the rights and obligations created hereby, and supersedes all prior and contemporaneous negotiations, understandings, and agreements, written or oral, between the Parties. Any prior discussions or understandings are deemed merged with the provisions herein. This Agreement shall not be amended, assigned or otherwise changed or transferred except in writing with the express written consent of the Parties hereto. Any action to interpret or enforce this Agreement shall be brought before the Superior Court of Snohomish County, Washington, and the Parties agree that, as between them, all matters shall be resolved in that venue. 3.2 Force majeure. The Parties shall not be liable for failure to perform or delay in performance due to fire, flood, strike or other labor difficulty, act of God, act of any governmental authority, riot, embargo, fuel or energy shortage, car shortage, wrecks or delays in transportation, or due to any other cause beyond the Parties’ reasonable control. In the event of delay in performance due to any such cause, the date of delivery or time for completion will be extended by a period of time reasonably necessary to overcome the effect of such delay. 3.3 Relationship between the Parties. Nothing in this Agreement shall be interpreted to or in fact create an agency or employment relationship between the Parties. No officer, official, agent, employee or representative of Chamber shall be deemed to be the same of the City for any purpose. The Chamber alone shall be solely responsible for all acts of its officers, officials, agents, employees, representatives and subcontractors during the performance of this Agreement. 6.9.e Packet Pg. 179 Attachment: 2018 Taste Contract Final Draft (Special Event Contracts) 7 DATED this ______ day of ________________, 2018. CITY OF EDMONDS: GREATER EDMONDS CHAMBER OF COMMERCE: David O. Earling, Mayor Greg Urban, President and CEO ATTEST/AUTHENTICATED: Scott Passey, City Clerk APPROVED AS TO FORM: Office of the City Attorney 6.9.e Packet Pg. 180 Attachment: 2018 Taste Contract Final Draft (Special Event Contracts) 8 Exhibit A 2018 Taste of Edmonds site plan 6.9.e Packet Pg. 181 Attachment: 2018 Taste Contract Final Draft (Special Event Contracts) City Council Agenda Item Meeting Date: 04/10/2018 RCO Grants Resolution Staff Lead: Carrie Hite Department: Parks, Recreation & Cultural Services Preparer: Carrie Hite Background/History Every even year, the Recreation Conservation Office administers grants for local parks acquisition and development. Council is requested to acknowledge these applications by resolution. Staff Recommendation Discuss and forward to full council to approve the resolution. Narrative Washington State Recreation Conservation Office administers a grant program for local parks every even year. This year, 2018, the City would like to submit for five grants for two parks projects that are currently in the City's CIP and PROS plan, and are being planned. The five grants are as follows: 1. 18-1379 D Downtown Civic Park Development: This is a Land and Water Conservation Fund Grant for the maximum allowable, $500,000. This will go toward the development of Civic park. The LWCF does fund local parks projects, but the funds are limited. This is a long shot, but we will be somewhat competitive. 2. 18-1380 D Civic Park Athletic Fields Development: This is a Youth Athletic Fields grant for the maximum allowable of $350,000. This will be applied to the Civic Park development, and more specifically to the soccer/multi use field, lighting, skatepark, tennis/pickleball courts and sport court. 3. 18-1370 D Civic Park Development: This is a Washington Wildlife and Recreation Program ( WWRP) Local Parks grant for the maximum allowable, $500,000. This grant fund the development of local parks. This will also be for Civic Park Development. 4. 18-1381 D Edmonds Waterfront Trail Connection: This is a WWRP Trail grant, for the maximum of $750,000. This will be used for the walkway trail connecting the missing link along the waterfront. 5. 18-1595 D Edmonds Waterfront Walkway Completion: This is a WWRP Water Access grant, for the maximum of $500,000. This will be used to match the trail grant and to complete the waterfront walkway missing link. All of these grants require a 1:1 match, and will be for funding in mid 2019 - 2021. 6.10 Packet Pg. 182 Attached is the resolution for submittal of these grants. Additionally, the sample project agreement is attached for Council's information. Attachments: RCO Resoulution for all grants SampleProjAgreement 6.10 Packet Pg. 183 Recreation and Conservation Office Applicant Resolution/Authorization Organization Name: City of Edmonds Resolution No. _______________________ Project(s) Number(s), and Name(s) 18-1379 D Downtown Civic Park Development 18-1380 D Civic Park Athletic Fields Development 18-1370 D Civic Park Development 18-1381 D Edmonds Waterfront Trail Completion 18-1595 D Edmonds Waterfront Walkway Completion This resolution/authorization authorizes the person identified below (in section 2) to act as the authorized representative/agent on behalf of our organization and to legally bind our organization with respect to the above Project(s) for which we seek grant funding assistance managed through the Recreation and Conservation Office (Office). WHEREAS, state grant assistance is requested by our organization to aid in financing the cost of the Project(s) referenced above; NOW, THEREFORE, BE IT RESOLVED that: 1. Our organization has applied for or intends to apply for funding assistance managed by the Office for the above “Project(s).” 2. David O. Earling, Mayor of Edmonds is authorized to act as a representative/agent for our organization with full authority to bind the organization regarding all matters related to the Project(s), including but not limited to, full authority to: (1) approve submittal of a grant application to the Office, (2) enter into a project agreement(s) on behalf of our organization, (3) sign any amendments thereto on behalf of our organization, (4) make any decisions and submissions required with respect to the Project(s), and (5) designate a project contact(s) to implement the day-to-day management of the grant(s). 3. Our organization has reviewed the sample project agreement on the Recreation and Conservation Office’s WEBSITE at: https://rco.wa.gov/documents/manuals&forms/SampleProjAgreement.pdf. We understand and acknowledge that if offered a project agreement to sign in the future, it will contain an indemnification and legal venue stipulation (applicable to any sponsor) and a waiver of sovereign immunity (applicable to Tribes) and other terms and conditions substantially in the form contained in the sample project agreement and that such terms and conditions of any signed project agreement shall be legally binding on the sponsor if our representative/agent enters into a project agreement on our behalf. The Office reserves the right to revise the project agreement prior to execution and shall communicate any such revisions with the above authorized representative/agent before execution. 4. Our organization acknowledges and warrants, after conferring with its legal counsel, that its authorized representative/agent has full legal authority to enter into a project agreement(s) on its behalf, that includes indemnification, waiver of sovereign immunity (as may apply to Tribes), and stipulated legal venue for lawsuits and other terms substantially in the form contained in the sample project agreement or as may be revised prior to execution. 5. Grant assistance is contingent on a signed project agreement. Entering into any project agreement with the Office is purely voluntary on our part. 6.10.a Packet Pg. 184 Attachment: RCO Resoulution for all grants (RCO Grants Resolution) 6. Our organization understands that grant policies and requirements vary depending on the grant program applied to, the grant program and source of funding in the project agreement, the characteristics of the project, and the characteristics of our organization. 7. Our organization further understands that prior to our authorized representative/agent executing the project agreement(s), the RCO may make revisions to its sample project agreement and that such revisions could include the indemnification, the waiver of sovereign immunity, and the legal venue stipulation. Our organization accepts the legal obligation that we shall, prior to execution of the project agreement(s), confer with our authorized representative/agent as to any revisions to the project agreement from that of the sample project agreement. We also acknowledge and accept that if our authorized representative/agent executes the project agreement(s) with any such revisions, all terms and conditions of the executed project agreement (including but not limited to the indemnification, the waiver of sovereign immunity, and the legal venue stipulation) shall be conclusively deemed to be executed with our authorization. 8. Any grant assistance received will be used for only direct eligible and allowable costs that are reasonable and necessary to implement the project(s) referenced above. 9. Our organization acknowledges and warrants, after conferring with its legal counsel, that no additional legal authorization beyond this authorization is required to make the indemnification, the waiver of sovereign immunity (as may apply to Tribes), and the legal venue stipulation substantially in form shown on the sample project agreement or as may be revised prior to execution legally binding on our organization upon execution by our representative/agent. 10. If match is required for the grant, we understand our organization must certify the availability of match at least one month before funding approval. In addition, our organization understands it is responsible for supporting all non-cash matching share commitments to this project should they not materialize. 11. Our organization acknowledges that if it receives grant funds managed by the Office, the Office will pay us on only a reimbursement basis. We understand reimbursement basis means that we will only request payment from the Office after we incur grant eligible and allowable costs and pay them. The Office may also determine an amount of retainage and hold that amount until the Project is complete. 12. Our organization acknowledges that any property owned by our organization that is developed, renovated, enhanced, or restored with grant assistance must be dedicated for the purpose of the grant in perpetuity unless otherwise allowed by grant program policy, or Office in writing and per the project agreement or an amendment thereto. 13. This resolution/authorization is deemed to be part of the formal grant application to the Office. 14. Our organization warrants and certifies, after conferring with its legal counsel, that this resolution/authorization was properly and lawfully adopted following the requirements of our organization and applicable laws and policies and that our organization has full legal authority to commit our organization to the warranties, certifications, promises and obligations set forth herein. This application authorization was adopted by our organization during the meeting held: Location : City of Edmonds Council Chambers, 250 5th Avenue N, Edmonds, Wa. 98020 Date: April 17, 2018 Signed and approved on behalf of the resolving body of the organization by the following authorized member(s): 6.10.a Packet Pg. 185 Attachment: RCO Resoulution for all grants (RCO Grants Resolution) Signed Title Date Washington State Attorney General’s Office Approved as to form ____________________1/19/18_____________________ Assistant Attorney General Date You may reproduce the above language in your own format; text however may not change. 6.10.a Packet Pg. 186 Attachment: RCO Resoulution for all grants (RCO Grants Resolution) Recreation and Conservation Funding Board • Salmon Recovery Funding Board Washington Invasive Species Council • Governor’s Salmon Recovery Office Habitat and Recreation Lands Coordinating Group STATE OF WASHINGTON RECREATION AND CONSERVATION OFFICE Natural Resources Building P.O. Box 40917 Olympia, WA 98504-0917 1111 Washington St. S.E. Olympia, WA 98501 (360) 902-3000 TTY: (360) 902-1996 Fax: (360) 902-3026 E-mail: Info@rco.wa.gov Web site: www.rco.wa.gov January 2018 Hello: The following project agreement is the contract a sponsor of a funded project and the Recreation and Conservation Office (RCO) will sign to guide and govern project implementation and obligations that extend after the contract has ended. RCO does not negotiate project conditions. This agreement was revised in January 2018. RCO suggests that all potential sponsors read and understand the terms of the agreement. A few considerations are below: • The first three pages of the agreement are dependent upon your project type and grant category. Once you have a funded project, specific information on these pages will auto- populate based upon answers you provided in your application. • The remaining pages of the agreement are the Standard Terms and Conditions, which are the same across all funded projects. There may be sections of the Standard Terms and Conditions that do not apply to your proposal based upon the type of project you are conducting and the funding you are receiving. For example, Section 22 is entitled PROVISIONS FOR BOATING PROJECT GRANTS and only would apply to your proposal if it was a project that supported recreational boating. If you have questions as you review the agreement, please contact your assigned RCO outdoor grants manager. Thank you. RCO 6.10.b Packet Pg. 187 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: Project Sponsor:Project Number: Approval Date:Project Title: PARTIES OF THE AGREEMENTA. This Agreement sets out the terms and conditions by which a grant is made from the of the State of Washington. The grant is administered by the Recreation and Conservation Office (RCO) to the Sponsor for the project named above per the director’s authority granted in RCW 79A.25.020. B. PURPOSE OF AGREEMENT C. DESCRIPTION OF PROJECT The period of performance begins on (project start date) and ends on (project end date). No allowable cost incurred before or after this period is eligible for reimbursement unless specifically provided for by written amendment or addendum to this Agreement or specifically provided for by policies published in RCO manuals as of the effective date of this agreement. The Sponsor must request extensions of the period of performance at least 60 days before the project end date. The Sponsor has obligations beyond this period of performance as described in Section F: Long-Term Obligations. D.PERIOD OF PERFORMANCE E. STANDARD TERMS AND CONDITIONS INCORPORATED The Standard Terms and Conditions of the Project Agreement are hereby incorporated by reference as part of this Agreement. F. LONG-TERM OBLIGATIONS The total grant award provided by the funding board for this project shall not exceed $. The funding board shall not pay any amount beyond that approved for grant funding of the project and within the funding board’s percentage as identified below. The Sponsor shall be responsible for all total project costs that exceed this amount. The minimum matching share provided by the Sponsor shall be as indicated below: G. PROJECT FUNDING Percentage Dollar Amount Source of Funding Project Sponsor Total Project Cost H. FEDERAL FUND INFORMATION All rights and obligations of the parties under this Agreement are further specified in and shall be interpreted in light of the Sponsor’s application and the project summary and eligible scope activities under which the Agreement has been approved as well as documents produced in the course of administering the Agreement, including the eligible scope activities, the milestones report, progress reports, and the final report. Provided, to the extent that information contained in such documents is irreconcilably in conflict with this Agreement, it shall not be used to vary the terms of the Agreement, unless those terms are shown to be subject to an unintended error or omission. This “Agreement” as used here and elsewhere in this document, unless otherwise specifically stated, has the meaning set forth in the definitions of the Standard Terms and Conditions. I. RIGHTS AND OBLIGATIONS INTERPRETED IN LIGHT OF RELATED DOCUMENTS Page 1 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 188 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: Except as provided herein, no amendment (including without limitation, deletions) of any of the terms or conditions of this Agreement will be effective unless provided in writing signed by all parties. Extensions of the period of performance and minor scope adjustments consented to in writing (including email) by the Sponsor need only be signed by RCO’s director or designee, unless otherwise provided for in another agreement a Sponsor has with the RCO. This exception does not apply to a federal government Sponsor or a Sponsor that requests and enters into a formal amendment for extensions or minor scope adjustments. It is the responsibility of a Sponsor to ensure that any person who signs an amendment on its behalf is duly authorized to do so, and such signature shall be binding on the Sponsor if the representative/agent signing has been authorized to do so by Applicant Resolution/Authorization provided to the RCO and such Applicant Resolution/Authorization has not been withdrawn by the governing body in a subsequent resolution. Any amendment to this Agreement, unless otherwise expressly stated, shall be deemed to include all current federal, state, and local government laws and rules, and funding board policies applicable and active and published in RCO manuals or on the RCO Website in effect as of the effective date of the amendment, without limitation to the subject matter of the amendment. Provided, any update in law, rule, policy or a manual that is incorporated as a result of an amendment shall apply only prospectively and shall not require that an act previously done in compliance with existing requirements be redone. J.AMENDMENTS TO AGREEMENT This agreement is governed by, and the Sponsor shall comply with, all applicable state and federal laws and regulations, including any applicable policies published in RCO manuals or on the RCO Website as exist on the effective date of this Agreement and any amendments to this Agreement. Provided, any update in law, rule, policy or a manual that is incorporated as a result of an amendment shall apply only prospectively and shall not require that an act previously done in compliance with existing requirements be redone. K.COMPLIANCE WITH APPLICABLE STATUTES, RULES, AND RCFB-SRFB POLICIES L. SPECIAL CONDITIONS AGREEMENT CONTACTS The parties will provide all written communications and notices under this Agreement to the mail address or the email address listed below if not both: Project Contact Address: Title: Name: Natural Resources Building PO Box 40917 Olympia, Washington 98504-0917 M. Email: These addresses and contacts shall be effective until receipt by one party from the other of a written notice of any change. Decisions relating to the Agreement must be made by the Authorized Representative/Agent, who may or may not be the Project Contact for purposes of notices and communications. N. ENTIRE AGREEMENT This Agreement, with all amendments and attachments, constitutes the entire Agreement of the parties. No other understandings, oral or otherwise, regarding this Agreement shall exist or bind any of the parties. O.EFFECTIVE DATE This Agreement, for project , shall be subject to the written approval of the RCO’s authorized representative and shall not be effective and binding until the date signed by both the Sponsor and the RCO, whichever is later (effective date). Reimbursements for eligible and allowable costs incurred within the period of performance identified in Section D: PERIOD OF PERFORMANCE are allowed only when this Agreement is fully executed and an original is received by RCO. Page 2 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 189 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: Title: Name: (printed) Date:By: The Sponsor has read, fully understands, and agrees to be bound by all terms and conditions as set forth in this Agreement and the STANDARD TERMS AND CONDITIONS OF THE PROJECT AGREEMENT. The signators listed below represent and warrant their authority to bind the parties to this Agreement. Assistant Attorney General Date:By: Pre-approved as to form: Date:By: Page 3 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 190 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: Table of Contents Funding Board Project Agreement 1 Standard Terms and Conditions of the Project Agreement 6 CITATIONS, HEADINGS AND DEFINITIONSSECTION 1. 6 PERFORMANCE BY THE SPONSORSECTION 2. 10 ASSIGNMENTSECTION 3. 10 RESPONSIBILITY FOR PROJECTSECTION 4. 10 INDEMNIFICATIONSECTION 5. 11 INDEPENDENT CAPACITY OF THE SPONSORSECTION 6. 11 CONFLICT OF INTERESTSECTION 7. 12 COMPLIANCE WITH APPLICABLE LAWSECTION 8. 12 RECORDSSECTION 9. 13 PROJECT FUNDINGSECTION 10. 14 PROJECT REIMBURSEMENTSSECTION 11. 14 ADVANCE PAYMENTSSECTION 12. 16 RECOVERY OF PAYMENTSSECTION 13. 16 COVENANT AGAINST CONTINGENT FEESSECTION 14. 17 INCOME (AND FEES) AND USE OF INCOMESECTION 15. 17 PROCUREMENT REQUIREMENTSSECTION 16. 18 TREATMENT OF EQUIPMENT AND ASSETSSECTION 17. 18 RIGHT OF INSPECTIONSECTION 18. 19 STEWARDSHIP AND MONITORINGSECTION 19. 19 PREFERENCES FOR RESIDENTSSECTION 20. 20 ACKNOWLEDGMENT AND SIGNSSECTION 21. 20 PROVISIONS FOR BOATING PROJECT GRANTSSECTION 22. 20 PROVISIONS APPLYING TO DEVELOPMENT, MAINTENANCE, RENOVATION, AND RESTORATION PROJECTS SECTION 23. 21 PROVISIONS APPLYING TO ACQUISITION PROJECTSSECTION 24. 21 LONG-TERM OBLIGATIONS OF THE PROJECTS AND SPONSORSSECTION 25. 23 CONSTRUCTION, OPERATION, USE AND MAINTENANCE OF ASSISTED PROJECTS SECTION 26. 24 RECORDED NOTICE OF GRANTSECTION 27. 25 PROVISIONS RELATED TO CORPORATE (INCLUDING NONPROFIT) SPONSORS SECTION 28. 25 Page 4 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 191 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: PROVISIONS FOR FEDERAL SUBAWARDS ONLYSECTION 29. 25 PROVISIONS FOR BOATING INFRASTRUCTURE GRANTSSECTION 30. 28 PROVISIONS FOR FIREARMS AND ARCHERY RANGE RECREATION PROJECTS ONLY SECTION 31. 28 PROVISIONS FOR LAND AND WATER CONSERVATION FUND PROJECTS ONLY SECTION 32. 29 PROVISIONS FOR FARM AND FOREST ACCOUNT PROJECTS (FARMLAND AND FORESTLAND PRESERVATION PROJECTS ONLY) SECTION 33. 29 PROVISIONS FOR SALMON RECOVERY FUNDING BOARD PROJECTS ONLYSECTION 34. 29 PROVISIONS FOR PUGET SOUND ACQUISITION AND RESTORATION PROJECTS ONLY SECTION 35. 30 ORDER OF PRECEDENCESECTION 36. 34 LIMITATION OF AUTHORITYSECTION 37. 35 WAIVER OF DEFAULTSECTION 38. 35 APPLICATION REPRESENTATIONS – MISREPRESENTATIONS OR INACCURACY OR BREACH SECTION 39. 35 SPECIFIC PERFORMANCESECTION 40. 35 TERMINATION AND SUSPENSIONSECTION 41. 35 DISPUTE HEARINGSECTION 42. 36 ATTORNEYS’ FEESSECTION 43. 37 GOVERNING LAW/VENUESECTION 44. 37 PROVISIONS APPLICABLE ONLY IF FEDERALLY RECOGNIZED INDIAN TRIBE IS THE SPONSOR SECTION 45. 37 SEVERABILITYSECTION 46. 38 Page 5 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 192 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: Project Number:Project Sponsor: Standard Terms and Conditions of the Project Agreement Approval Date:Project Title: CITATIONS, HEADINGS AND DEFINITIONSSECTION 1. A.Any citations referencing specific documents refer to the current version on the effective date of this Agreement or the effective date of any amendment thereto. B.Headings used in this Agreement are for reference purposes only and shall not be considered a substantive part of this Agreement. C.Definitions. As used throughout this Agreement, the following terms shall have the meaning set forth below: acquisition project – A project that purchases or receives a donation of fee or less than fee interests in real property. These interests include, but are not limited to, conservation easements, access/trail easements, covenants, water rights, leases, and mineral rights. Agreement or project agreement – The document entitled “Funding Board Project Agreement” accepted by all parties to the present transaction, including without limitation these Standard Terms and Conditions of the Project Agreement, all attachments, addendums, and amendments, and any intergovernmental agreements or other documents that are incorporated into the Funding Board Project Agreement subject to any limitations on their effect. applicant – Any party that meets the qualifying standards, including deadlines, for submission of an application soliciting a grant of funds from the funding board. application – The documents and other materials that an applicant submits to the RCO to support the applicant’s request for grant funds; this includes materials required for the “Application” in the RCO’s automated project information system, and other documents as noted on the application checklist including but not limited to legal opinions, maps, plans, evaluation presentations and scripts. Authorized Representative/Agent – A Sponsor’s agent (employee, political appointee, elected person, etc.) authorized to be the signatory of this Agreement and any amendments requiring a Sponsor signature. This person has the signature authority to bind the Sponsor to this Agreement, grant, and project. Boating Infrastructure Grant (BIG) – A program administered through the United States Fish and Wildlife Service. C.F.R. – Code of Federal Regulations contractor – An entity that receives a contract from a Sponsor related to performance of work or another obligation under this Agreement. Page 6 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 193 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: conversion – A conversion occurs 1) when facilities acquired, developed, renovated or restored within the project area are changed to a use other than that for which funds were approved, without obtaining prior written formal RCO or board approval, 2) when property interests are conveyed to a third party not otherwise eligible to receive grants in the program from which funding was approved without obtaining prior written formal RCO or board approval, or 3) when obligations to operate and maintain the funded property are not complied with after reasonable opportunity to cure. development project – A project that results in the construction of, or work resulting in, new elements, including but not limited to structures, facilities, and/or materials to enhance outdoor recreation resources. director – The chief executive officer of the Recreation and Conservation Office or that person’s designee. education project – A project that provides information, education, and outreach programs for the benefit of outdoor recreationists. education and enforcement project – A project that provides information, education, and outreach programs; encourages responsible recreational behavior, and may provide law enforcement for the benefit of outdoor recreationists. effective date – The date when the signatures of all parties to this agreement are present in the agreement. enhancement project – 1) A project that brings a site back to its historic function as part of a natural ecosystem or that improves the ecological functionality of a site, or 2) a project that (i) supports hatchery reform to improve hatchery effectiveness to minimize impacts to wild fish populations, (ii) ensures compatibility between hatchery production and salmon recovery programs, or (iii) supports sustainable fisheries (WAC 420.04.010). equipment – Tangible personal property (including information technology systems) having a useful service life of more than one year and a per-unit acquisition cost which equals or exceeds the lesser of the capitalization level established by the Sponsor or $5,000 (2 C.F.R. § 200.33 (2013)). funding board or board – The board that authorized the funds in this Agreement, either the Recreation and Conservation Funding Board (RCFB) created under RCW 79A.25.110, or the Salmon Recovery Funding Board (SRFB) created under RCW 77.85.110. grant program – The source of the grant funds received. May be an account in the state treasury, or a grant category within a larger grant program, or a federal source. indirect cost – Costs incurred for a common or joint purpose benefitting more than one cost objective, and not readily assignable to the cost objectives specifically benefitted, without effort disproportionate to the results achieved (2 C.F.R. § 200.56 (2013)). long-term compliance period – The period of time after the project end date or end of the period of performance (depending on the project types and grant program). During this period, the Sponsor has continuing obligations under the Agreement. This period may have a nonspecific end date (in perpetuity) or an expressly specified number of years. long-term obligations – Sponsor’s obligations after the project end date, as specified in the Agreement and applicable regulations and policies. landowner agreement – An agreement that is required between a Sponsor and landowner for projects located on land not owned, or otherwise controlled, by the Sponsor. Page 7 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 194 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: maintenance – A project that maintains existing areas and facilities through repairs and upkeep for the benefit of outdoor recreation or salmon recovery. maintenance and operation – A project that maintains and operates existing areas and facilities through repairs, upkeep, and routine services for the benefit of outdoor recreationists. match or matching share – The portion of the total project cost provided by the Sponsor. milestone – An important event with a defined date to track an activity related to implementation of a funded project and monitor significant stages of project accomplishment. monitoring project – Means a project that tracks the effectiveness of salmon recovery restoration actions, or provides data on salmon populations or their habitat conditions. monitoring and research project – Means a project that tracks the effectiveness of salmon recovery restoration actions, or provides data on salmon populations or their habitat conditions. Office – Means the Recreation and Conservation Office or RCO. notice of grant – As required by RCO or another authority, a document that has been legally recorded in the county or counties where the project property is located that describes the grant funded project located on the property, the funding sources, and agencies responsible for awarding the grant. pass-through entity – A non-Federal entity that provides a subaward to a subrecipient to carry out part of a Federal program (2 C. F. R. § 200.74 (2013)). If this Agreement is a federal subaward, RCO is the pass-through entity. period of performance – The period beginning on the project start date and ending on the project end date. planning (RCFB projects only) – A project that results in one or more of the following: a study, a plan, construction plans and specifications, and permits to increase the availability of outdoor recreational resources. planning (SRFB projects only) – A project that results in a study, assessment, project design, or inventory. pre-agreement cost – A project cost incurred before the period of performance. primary Sponsor – The Sponsor who is not a secondary Sponsor and who is specifically identified in the Agreement as the entity to which RCO grants funds to and authorizes and requires to administer the grant. This administration includes but is not limited to acting as the fiscal agent for the grant (e.g. requesting and accepting reimbursements, submitting reports). Primary Sponsor includes its officers, employees, agents and successors. project – An undertaking that is, or may be, funded in whole or in part with funds administered by RCO on behalf of the funding board. project area, RCFB – A geographic area that delineates a grant assisted site which is subject to project agreement requirements (WAC 286.04.010). Page 8 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 195 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: project area, SRFB – The area consistent with the geographic limits of the scope of work of the project and subject to project agreement requirements. For restoration projects, the project area must include the physical limits of the project's final site plans or final design plans. For acquisition projects, the project area must include the area described by the legal description of the properties acquired for or committed to the project (WAC 420.04.010). project cost – The total allowable costs incurred under this Agreement and all required match share and voluntary committed matching share, including third-party contributions (2 C.F.R. § 200.83 (2013)). project end date – The specific date identified in the Agreement on which the period of performance ends, as may be changed by amendment. This date is not the end date for any long-term obligations. project start date – The specific date identified in the Agreement on which the period of performance starts. research project – Means a project that studies salmon and the effectiveness of recovery restoration efforts on the population or habitat condition. RCO – Recreation and Conservation Office – The state office that provides administrative support to the Recreation and Conservation Funding Board and Salmon Recovery Funding Board. RCO includes the director and staff, created by RCW 79A.25.110 and 79A.25.150 and charged with administering this Agreement by RCW 77.85.110 and 79A.25.240. reimbursement – RCO’s payment of funds from eligible and allowable costs that have already been paid by the Sponsor per the terms of the Agreement. renovation project – A project intended to improve an existing site or structure in order to increase its useful service life beyond current expectations or functions. This does not include maintenance activities to maintain the facility for its originally expected useful service life. restoration project – A project that brings a site back to its historic function as part of a natural ecosystem or improving the ecological functionality of a site. restoration and enhancement project – A project that brings a site back to its historic function as part of a natural ecosystem or that improves the ecological functionality of a site or a larger ecosystem which improvement may include benefiting fish stocks. RCFB – Recreation and Conservation Funding Board RCW – Revised Code of Washington Recreational Trails Program (RTP) – A Federal Highways Administration grant program. secondary Sponsor – One of two or more Sponsors who is not a primary Sponsor. Only the primary Sponsor may be the fiscal agent for the project. Sponsor – A Sponsor is an organization that is listed in and has signed this Agreement. Sponsor Authorized Representative/Agent – A Sponsor’s agent (employee, political appointee, elected person, etc.) authorized to be the signatory of this Agreement and any amendments requiring a Sponsor signature. This person has the signature authority to bind the Sponsor to this Agreement, grant, and project. SRFB – Salmon Recovery Funding Board Page 9 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 196 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: subaward – Funds allocated to the RCO from another organization, for which RCO makes available to or assigns to another organization via this Agreement. Also, a subaward may be an award provided by a pass-through entity to a subrecipient for the subrecipient to carry out part of any award received by the pass-through entity. It does not include payments to a contractor or payments to an individual that is a beneficiary of a federal or other program. A subaward may be provided through any form of legal agreement, including an agreement that the pass-through entity considers a contract. Also see 2 C.F.R. § 200.92 (2013). For federal subawards, a subaward is for the purpose of carrying out a portion of a Federal award and creates a federal assistance relationship with the subrecipient (2 C.F.R. § 200.330 (2013)). If this Agreement is a federal subaward, the subaward amount is the grant program amount in Section G: Project Funding. subrecipient – Subrecipient means an entity that receives a subaward. For non-federal entities receiving federal funds, a subrecipient is an entity that receives a subaward from a pass-through entity to carry out part of a federal program; but does not include an individual that is a beneficiary of such program. A subrecipient may also be a recipient of other federal awards directly from a federal awarding agency (2 C.F.R. § 200.93 (2013)). If this Agreement is a federal subaward, the Sponsor is the subrecipient. useful service life – Period during which an asset or property is expected to be useable for the purpose it was acquired, developed, renovated, and/or restored per this Agreement. WAC – Washington Administrative Code. PERFORMANCE BY THE SPONSORSECTION 2. The Sponsor shall undertake the project as described in this Agreement, and in accordance with the Sponsor's proposed goals and objectives described in the application or documents submitted with the application, all as finally approved by the funding board. All submitted documents are incorporated by this reference as if fully set forth herein. Timely completion of the project and submission of required documents, including progress and final reports, is important. Failure to meet critical milestones or complete the project, as set out in this Agreement, is a material breach of the Agreement. ASSIGNMENTSECTION 3. Neither this Agreement, nor any claim arising under this Agreement, shall be transferred or assigned by the Sponsor without prior written consent of the RCO. RESPONSIBILITY FOR PROJECTSECTION 4. While the funding board undertakes to assist the Sponsor with the project by providing a grant pursuant to this Agreement, the project itself remains the sole responsibility of the Sponsor. The funding board undertakes no responsibilities to the Sponsor, or to any third party, other than as is expressly set out in this Agreement. The responsibility for the implementation of the project is solely that of the Sponsor, as is the responsibility for any claim or suit of any nature by any third party related in any way to the project. When a project is Sponsored by more than one entity, any and all Sponsors are equally responsible for the project and all post-completion stewardship responsibilities and long-term obligations unless otherwise stated in this Agreement. The RCO has no responsibility for reviewing, approving, overseeing or supervising design or construction of the project and leaves such review, approval, oversight and supervision exclusively to the Sponsor and others with expertise or authority. In this respect, the RCO will act only to confirm at a general, lay, and nontechnical level, solely for the purpose of compliance and payment and not for safety or suitability, that the project has apparently been completed as per the Agreement. Page 10 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 197 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: INDEMNIFICATIONSECTION 5. The Sponsor shall defend, indemnify, and hold the State and its officers and employees harmless from all claims, demands, or suits at law or equity arising in whole or in part from the actual or alleged acts, errors, omissions or negligence in connection with this Agreement (including without limitation all work or activities thereunder), or the breach of any obligation under this Agreement by the Sponsor or the Sponsor’s agents, employees, contractors, subcontractors, or vendors, of any tier, or any other persons for whom the Sponsor may be legally liable. Provided that nothing herein shall require a Sponsor to defend or indemnify the State against and hold harmless the State from claims, demands or suits based solely upon the negligence of the State, its employees and/or agents for whom the State is vicariously liable. Provided further that if the claims or suits are caused by or result from the concurrent negligence of (a) the Sponsor or the Sponsor’s agents, employees, contractors, subcontractors or vendors, of any tier, or any other persons for whom the Sponsor is legally liable, and (b) the State its employees and agents for whom it is vicariously liable, the indemnity obligation shall be valid and enforceable only to the extent of the Sponsor’s negligence or the negligence of the Sponsor’s agents, employees, contractors, subcontractors or vendors, of any tier, or any other persons for whom the Sponsor may be legally liable. This provision shall be included in any agreement between Sponsor and any contractors, subcontractor and vendor, of any tier. The Sponsor shall also defend, indemnify, and hold the State and its officers and employees harmless from all claims, demands, or suits at law or equity arising in whole or in part from the alleged patent or copyright infringement or other allegedly improper appropriation or use of trade secrets, patents, proprietary information, know-how, copyright rights or inventions by the Sponsor or the Sponsor’s agents, employees, contractors, subcontractors or vendors, of any tier, or any other persons for whom the Sponsor may be legally liable, in performance of the work under this Agreement or arising out of any use in connection with the Agreement of methods, processes, designs, information or other items furnished or communicated to the State, its agents, officers and employees pursuant to the Agreement. Provided, this indemnity shall not apply to any alleged patent or copyright infringement or other allegedly improper appropriation or use of trade secrets, patents, proprietary information, know-how, copyright rights or inventions resulting from the State’s, its agents’, officers’ and employees’ failure to comply with specific written instructions regarding use provided to the State, its agents, officers and employees by the Sponsor, its agents, employees, contractors, subcontractors or vendors, of any tier, or any other persons for whom the Sponsor may be legally liable. As part of its obligations provided above, the Sponsor specifically assumes potential liability for actions brought by the Sponsor’s own employees or its agents against the State and, solely for the purpose of this indemnification and defense, the Sponsor specifically waives any immunity under the state industrial insurance law, RCW Title 51. The funding board and RCO are included within the term State, as are all other agencies, departments, boards, councils, committees, divisions, bureaus, offices, societies, or other entities of state government. INDEPENDENT CAPACITY OF THE SPONSORSECTION 6. The Sponsor and its employees or agents performing under this Agreement are not officers, employees or agents of the funding board or RCO. The Sponsor will not hold itself out as nor claim to be an officer, employee or agent of RCO, a funding board or of the state of Washington, nor will the Sponsor make any claim of right, privilege or benefit which would accrue to an employee under RCW 41.06 or Section 30B. The Sponsor is responsible for withholding and/or paying employment taxes, insurance, or deductions of any kind required by federal, state, and/or local laws. Page 11 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 198 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: CONFLICT OF INTERESTSECTION 7. Notwithstanding any determination by the Executive Ethics Board or other tribunal, RCO may, in its sole discretion, by written notice to the Sponsor terminate this Agreement if it is found after due notice and examination by RCO that there is a violation of the Ethics in Public Service Act, RCW 42.52; or any similar statute involving the Sponsor in the procurement of, or performance under, this Agreement. In the event this Agreement is terminated as provided herein, RCO shall be entitled to pursue the same remedies against the Sponsor as it could pursue in the event of a breach of the Agreement by the Sponsor. The rights and remedies of RCO provided for in this clause shall not be exclusive and are in addition to any other rights and remedies provided by law or this Agreement. COMPLIANCE WITH APPLICABLE LAWSECTION 8. In implementing the Agreement, the Sponsor shall comply with all applicable federal, state, and local laws (including without limitation all applicable ordinances, codes, rules, and regulations). Such compliance includes, without any limitation as to other applicable laws, the following laws: A.Nondiscrimination Laws. The Sponsor shall comply with all applicable federal, state, and local nondiscrimination laws and/or policies, including but not limited to: the Americans with Disabilities Act; Civil Rights Act; and the Age Discrimination Act. In the event of the Sponsor’s noncompliance or refusal to comply with any nondiscrimination law or policy, the Agreement may be rescinded, cancelled, or terminated in whole or in part, and the Sponsor may be declared ineligible for further grant awards from the funding board. The Sponsor is responsible for any and all costs or liability arising from the Sponsor’s failure to so comply with applicable law. B.Secular Use of Funds. No funds awarded under this grant may be used to pay for any religious activities, worship, or instruction, or for lands and facilities for religious activities, worship, or instruction. Religious activities, worship, or instruction may be a minor use of the grant supported recreation and conservation land or facility. C.Wages and Job Safety. The Sponsor agrees to comply with all applicable laws, regulations, and policies of the United States and the State of Washington or other jurisdiction which affect wages and job safety. The Sponsor agrees when state prevailing wage laws (RCW 39.12) are applicable, to comply with such laws, to pay the prevailing rate of wage to all workers, laborers, or mechanics employed in the performance of any part of this contract, and to file a statement of intent to pay prevailing wage with the Washington State Department of Labor and Industries as required by RCW 39.12.040. The Sponsor also agrees to comply with the provisions of the rules and regulations of the Washington State Department of Labor and Industries. 1.Exception, Service Organizations of Trail and Environmental Projects (RCW 79A.35.130). If allowed by state and federal law and rules, participants in conservation corps programs offered by a nonprofit organization affiliated with a national service organization established under the authority of the national and community service trust act of 1993, P.L. 103-82, are exempt from provisions related to rates of compensation while performing environmental and trail maintenance work provided: (1) The nonprofit organization must be registered as a nonprofit corporation pursuant to RCW 24.03; (2) The nonprofit organization's management and administrative headquarters must be located in Washington; (3) Participants in the program must spend at least fifteen percent of their time in the program on education and training activities; and (4) Participants in the program must receive a stipend or living allowance as authorized by federal or state law. Participants are exempt from provisions related to rates of compensation only for environmental and trail maintenance work conducted pursuant to the conservation corps program. Page 12 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 199 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: D.Archaeological and Cultural Resources. RCO facilitates the review of applicable projects for potential impacts to archaeological sites and state cultural resources. The Sponsor must assist RCO in compliance with Governor’s Executive Order 05-05 or the National Historic Preservation Act before and after initiating ground-disturbing activity or construction, repair, installation, rehabilitation, renovation, or maintenance work on lands, natural resources, or structures. The funding board requires documented compliance with Executive Order 05-05 or Section 106 of the National Historic Preservation Act, whichever is applicable to the project. If a federal agency declines to consult, the Sponsor shall comply with the requirements of Executive Order 05-05. In the event that archaeological or historic materials are discovered during project activities, work in the location of discovery and immediate vicinity must stop instantly, the area must be secured, and notification must be provided to the following: concerned Tribes’ cultural staff and cultural committees, RCO, and the State Department of Archaeology and Historic Preservation. If human remains are discovered during project activity, work in the location of discovery and immediate vicinity must stop instantly, the area must be secured, and notification provided to the concerned Tribe’s cultural staff and cultural committee, RCO, State Department of Archaeology, the coroner and local law enforcement in the most expeditious manner possible according to RCW 68.50. E.Restrictions on Grant Use. No part of any funds provided under this grant shall be used, other than for normal and recognized executive-legislative relationships, for publicity or propaganda purposes, or for the preparation, distribution, or use of any kit, pamphlet, booklet, publication, radio, television, or video presentation designed to support or defeat legislation pending before the U.S. Congress or any state legislature. No part of any funds provided under this grant shall be used to pay the salary or expenses of any Sponsor, or agent acting for such Sponsor, related to any activity designed to influence legislation or appropriations pending before the U.S. Congress or any state legislature. F.Debarment and Certification. By signing the Agreement with RCO, the Sponsor certifies that neither it nor its principals nor any other lower tier participant are presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from participation in this transaction by Washington State Labor and Industries. Further, the Sponsor agrees not to enter into any arrangements or contracts related to this Agreement with any party that is on Washington State Department of Labor and Industries’ “Debarred Contractor List.” RECORDSSECTION 9. A.Digital Records. If requested by RCO, the Sponsor must provide a digital file(s) of the project property and funded project site in a format specified by the RCO. B.Maintenance. The Sponsor shall maintain books, records, documents, data and other evidence relating to this Agreement and performance of the services described herein , including but not limited to accounting procedures and practices which sufficiently and properly reflect all direct and indirect costs of any nature expended in the performance of this Agreement. Sponsor shall retain such records for a period of six years from the date RCO deems the project complete, as defined in Section 11: PROJECT REIMBURSEMENTS. If any litigation, claim or audit is started before the expiration of the six (6) year period, the records shall be retained until all litigation, claims, or audit findings involving the records have been resolved. Page 13 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 200 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: C.Access to Records and Data. At no additional cost, the records relating to the Agreement, including materials generated under the Agreement, shall be subject at all reasonable times to inspection, review or audit by RCO, personnel duly authorized by RCO, the Office of the State Auditor, and federal and state officials so authorized by law, regulation or agreement. This includes access to all information that supports the costs submitted for payment under the grant and all findings, conclusions, and recommendations of the Sponsor’s reports, including computer models and methodology for those models. D.Public Records. Sponsor acknowledges that the funding board is subject to RCW 42.56 and that this Agreement and any records Sponsor submits or has submitted to the State shall be a public record as defined in RCW 42.56. RCO administers public records requests per WAC 286-06 and 420-04. Additionally, in compliance with RCW 77.85.130(8), Sponsor agrees to disclose any information in regards to expenditure of any funding received from the SRFB. By submitting any record to the State, Sponsor understands that the State may be requested to disclose or copy that record under the state public records law, currently codified at RCW 42.56. The Sponsor warrants that it possesses such legal rights as are necessary to permit the State to disclose and copy such document to respond to a request under state public records laws. The Sponsor hereby agrees to release the State from any claims arising out of allowing such review or copying pursuant to a public records act request, and to indemnify against any claims arising from allowing such review or copying and pay the reasonable cost of state’s defense of such claims. PROJECT FUNDINGSECTION 10. A.Authority. This Agreement is funded through a grant award from the recreation and conservation funding board per WAC 286 and/or the salmon recovery funding board per WAC 420. The director of RCO enters into this Agreement per delegated authority in RCW 79A.25.020 and 77.85.120. B.Additional Amounts. The funding board shall not be obligated to pay any amount beyond the dollar amount as identified in this Agreement, unless an additional amount has been approved in advance by the funding board or director and incorporated by written amendment into this Agreement. C.Before the Agreement. No expenditure made, or obligation incurred, by the Sponsor before the project start date shall be eligible for grant funds, in whole or in part, unless specifically provided for by funding board policy, such as a waiver of retroactivity or program specific eligible pre-Agreement costs. For reimbursements of such costs, this Agreement must be fully executed and an original received by RCO. The dollar amounts identified in this Agreement may be reduced as necessary to exclude any such expenditure from reimbursement. D.Requirements for Federal Subawards. Pre-Agreement costs before the federal award date in Section H: FEDERAL FUND INFORMATION are ineligible unless approved by the federal award agency (2 C.F.R § 200.458 (2013)). E.After the Period of Performance. No expenditure made, or obligation incurred, following the period of performance shall be eligible, in whole or in part, for grant funds hereunder. In addition to any remedy the funding board may have under this Agreement, the grant amounts identified in this Agreement shall be reduced to exclude any such expenditure from participation. PROJECT REIMBURSEMENTSSECTION 11. Page 14 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 201 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: A.Reimbursement Basis. This Agreement is administered on a reimbursement basis per WAC 286-13 and/or 420-12. Only the primary Sponsor may request reimbursement for eligible and allowable costs incurred during the period of performance. The primary Sponsor may only request reimbursement after (1) this Agreement has been fully executed and (2) the Sponsor has remitted payment to its vendors. RCO will authorize disbursement of project funds only on a reimbursable basis at the percentage as defined in Section G: PROJECT FUNDING. Reimbursement shall not be approved for any expenditure not incurred by the Sponsor or for a donation used as part of its matching share. RCO does not reimburse for donations. All reimbursement requests must include proper documentation of expenditures as required by RCO. B.Reimbursement Request Frequency. The primary Sponsor is required to submit a reimbursement request to RCO, at a minimum for each project at least once a year for reimbursable activities occurring between July 1 and June 30 or as identified in the milestones. Sponsors must refer to the most recently published/adopted RCO policies and procedures regarding reimbursement requirements. C.Compliance and Payment. The obligation of RCO to pay any amount(s) under this Agreement is expressly conditioned on strict compliance with the terms of this Agreement and other agreements between RCO and the Sponsor. D.Retainage Held Until Project Complete. RCO reserves the right to withhold disbursement of the total amount of the grant to the Sponsor until the project has been completed. A project is considered "complete" when: 1.All approved or required activities outlined in the Agreement are done; 2.On-site signs are in place (if applicable); 3.A final project report is submitted to and accepted by RCO; 4.Any other required documents and media are complete and submitted to RCO; 5.A final reimbursement request is submitted to RCO; 6.The completed project has been accepted by RCO; 7.Final amendments have been processed; 8.Fiscal transactions are complete, and 9.RCO has accepted a final boundary map, if requested by RCO, for which the Agreement terms will apply in the future. 10.Notice of Grant (if applicable) filed with the county lands records office and a stamped copy received by RCO E.Requirements for Federal Subawards: Match. The Sponsor’s matching share must comply with 2 C.F.R. § 200.306 (2013). Any shared costs or matching funds and all contributions, including cash and third party in-kind contributions, can be accepted as part of the Sponsor’s matching share when such contributions meet all of the following criteria: 1.Are verifiable from the non-Federal entity's (Sponsor’s) records; 2.Are not included as contributions for any other Federal award; 3.Are necessary and reasonable for accomplishment of project or program objectives; Page 15 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 202 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: 4.Are allowable under 2 C.F.R. Part 200, Subpart E—Cost Principles (2013); 5.Are not paid by the Federal Government under another Federal award, except where the Federal statute authorizing a program specifically provides that Federal funds made available for such program can be applied to matching or cost sharing requirements of other Federal programs; 6.Are provided for in the approved budget when required by the Federal awarding agency identified in Section H: FEDERAL FUND INFORMATION of this Agreement; and 7.Conform to other provisions of 2 C.F.R. Part 200, Subpart D—Post Federal Award Requirements (2013), as applicable. F.Requirements for Federal Subawards: Close out. Per 2 C.F.R § 200.343 (2013), the non-Federal entity (Sponsor) must: 1.Submit, no later than 90 calendar days after the end date of the period of performance, all financial, performance, and other reports as required by the terms and conditions of the Federal award. The Federal awarding agency or pass-through entity (RCO) may approve extensions when requested by the Sponsor. 2.Liquidate all obligations incurred under the Federal award not later than 90 calendar days after the end date of the period of performance as specified in the terms and conditions of the Federal award. 3.Refund any balances of unobligated cash that the Federal awarding agency or pass-through entity (RCO) paid in advance or paid and that are not authorized to be retained by the non-Federal entity (Sponsor) for use in other projects. See OMB Circular A-129 and see 2 C.F.R § 200.345 Collection of amounts due (2013), for requirements regarding unreturned amounts that become delinquent debts. 4.Account for any real and personal property acquired with Federal funds or received from the Federal Government in accordance with 2 C.F.R §§ 200.310 Insurance coverage through 200.316 Property rust relationship and 200.329 Reporting on real property (2013). ADVANCE PAYMENTSSECTION 12. Advance payments of or in anticipation of goods or services are not allowed unless approved by the RCO director and are consistent with legal requirements and Manual 8: Reimbursements. See WAC 420-12. RECOVERY OF PAYMENTSSECTION 13. A.Recovery for Noncompliance. In the event that the Sponsor fails to expend funds under this Agreement in accordance with state and federal laws, and/or the provisions of the Agreement, or meet its percentage of the project total, RCO reserves the right to recover grant award funds in the amount equivalent to the extent of noncompliance in addition to any other remedies available at law or in equity. B.Overpayment Payments. The Sponsor shall reimburse RCO for any overpayment or erroneous payments made under the Agreement. Repayment by the Sponsor of such funds under this recovery provision shall occur within 30 days of demand by RCO. Interest shall accrue at the rate of twelve percent (12%) per annum from the time that payment becomes due and owing. Page 16 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 203 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: C.Requirements for Federal Subawards. RCO, acting as a pass-through entity, may impose any of the remedies as authorized in 2 C.F.R §§ 200.207 Specific conditions and/or 200.338 Remedies for noncompliance (2013). COVENANT AGAINST CONTINGENT FEESSECTION 14. The Sponsor warrants that no person or selling agent has been employed or retained to solicit or secure this Agreement on an agreement or understanding for a commission, percentage, brokerage or contingent fee, excepting bona fide employees or bona fide established agents maintained by the Sponsor for the purpose of securing business. RCO shall have the right, in the event of breach of this clause by the Sponsor, to terminate this Agreement without liability or, in its discretion, to deduct from the Agreement grant amount or consideration or recover by other means the full amount of such commission, percentage, brokerage or contingent fee. INCOME (AND FEES) AND USE OF INCOMESECTION 15. RCFB Projects. See WAC 286-13-110 for additional requirements for projects funded from the RCFB. A.Income. 1.Farm and Forest Account (Farmland and Forestland Preservation Grants). Excepted from this section is income generated and fees paid on/for properties which received funds from the Farm and Forest Account (RCW 79A.15.130). 2.Firearms and Archery Range Recreation Projects. Excepted from this section are safety classes (firearm and/or hunter) for which a facility/range fee must not be charged (RCW 79A.25.210). 3.Compatible source. The source of any income generated in a funded project or project area must be compatible with the funding source and the Agreement and any policies adopted by the RCFB or SRFB. B.Use of Income. Subject to any limitations contained in applicable state or federal law and applicable rules and policies, income or fees generated at a project work site (including entrance, utility corridor permit, cattle grazing, timber harvesting, farming, etc.) during or after the reimbursement period cited in the Agreement, must be sed to offset: 1.The Sponsor’s matching resources; 2.The project’s total cost; 3.The expense of operation, maintenance, stewardship, monitoring, and/or repair of the facility or program assisted by the funding board grant; 4.The expense of operation, maintenance, stewardship, monitoring, and/or repair of other similar units in the Sponsor’s system; 5.Capital expenses for similar acquisition and/or development and renovation; and/or 6.Other purposes explicitly approved by RCO C.Fees. User and/or other fees may be charged in connection with land acquired or facilities developed, maintained, renovated, or restored with funding board grants if the fees are consistent with the: 1.Grant program laws, rules, policies, and funding board policies; Page 17 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 204 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: 2.Value of any service(s) furnished; 3.Value of any opportunities furnished; and 4.Prevailing range of public fees in the state for the activity involved. D.Requirements for Federal Subawards. Sponsors must also comply with 2 C.F.R. § 200.307 Program income (2013). PROCUREMENT REQUIREMENTSSECTION 16. A.Procurement Requirements. If the Sponsor has, or is required to have, a procurement process that follows applicable state and/or federal law or procurement rules and principles, it must be followed, documented, and retained. If no such process exists the Sponsor must follow these minimum procedures: 1.Publish a notice to the public requesting bids/proposals for the project; 2.Specify in the notice the date for submittal of bids/proposals; 3.Specify in the notice the general procedure and criteria for selection; and 4.Sponsor must contract or hire from within its bid pool. If bids are unacceptable the process needs to be repeated until a suitable bid is selected. 5.Comply with the same legal standards regarding unlawful discrimination based upon race, gender, ethnicity, sex, or sex-orientation that are applicable to state agencies in selecting a bidder or proposer. Alternatively, Sponsor may choose a bid from a bidding cooperative if authorized to do so. This procedure creates no rights for the benefit of third parties, including any proposers, and may not be enforced or subject to review of any kind or manner by any entity other than the RCO. Sponsors may be required to certify to the RCO that they have followed any applicable state and/or federal procedures or the above minimum procedure where state or federal procedures do not apply. B.Requirements for Federal Subawards. 1.For all Federal subawards except RTP projects, non-Federal entities (Sponsors) must follow 2 C.F.R §§ 200.318 General procurement standards through 200.326 Contract Provisions (2013). 2.For RTP subawards, Sponsors follow such policies and procedures allowed by the State when procuring property and services under a Federal award (2 C.F.R § 1201.317 (2013)). State procurement policies are in subsection A of this section. TREATMENT OF EQUIPMENT AND ASSETSSECTION 17. Equipment shall be used and managed only for the purpose of this Agreement, unless otherwise provided herein or in published funding board policies, or approved by RCO in writing. Page 18 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 205 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: A.Discontinued Use. Equipment obtained under this Agreement shall remain in the possession of the Sponsor for the duration of the project, or RULES of applicable grant assisted program. When the Sponsor discontinues use of the equipment for the purpose for which it was funded, RCO may require the Sponsor to deliver the equipment to RCO, or to dispose of the equipment according to RCO published policies. B.Loss or Damage. The Sponsor shall be responsible for any loss or damage to equipment. C.Requirements for Federal Subawards. Except in the RTP, procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award or match for the award, until disposition takes place will, at a minimum, meet the following requirements (2 C.F.R § 200.313 (2013)): 1.Property records must be maintained that include a description of the property, a serial number or other identification number, the source of funding for the property (including the Federal Award Identification Number), who holds title, the acquisition date, and cost of the property, percentage of Federal participation in the project costs for the Federal award under which the property was acquired, the location, use and condition of the property, and any ultimate disposition data including the date of disposal and sale price of the property. 2.A physical inventory of the property must be taken and the results reconciled with the property records at least once every two years. 3.A control system must be developed to ensure adequate safeguards to prevent loss, damage, or theft of the property. Any loss, damage, or theft must be investigated. 4.Adequate maintenance procedures must be developed to keep the property in good condition. 5.If the non-Federal entity is authorized or required to sell the property, proper sales procedures must be established to ensure the highest possible return. D.Requirements for RTP Subawards. 1.The subrecipient (Sponsor) shall follow such policies and procedures prescribed by and allowed by the State, as well as federal law and federal rules issued by the Federal Highways Administration and 2 CFR 200. 2.Sponsor may be required to pay prevailing wage rates as required by the Davis Bacon Act as amended. RIGHT OF INSPECTIONSECTION 18. The Sponsor shall provide right of access to the project to RCO, or any of its officers, or to any other authorized agent or official of the state of Washington or the federal government, at all reasonable times, in order to monitor and evaluate performance, long-term obligations, compliance, and/or quality assurance under this Agreement. If a landowner agreement or other form of control and tenure as described in Section 23.C: Control and Tenure has been executed, it will further stipulate and define the funding board and RCO’s right to inspect and access lands acquired or developed with funding board assistance. STEWARDSHIP AND MONITORINGSECTION 19. Page 19 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 206 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: Sponsor agrees to perform monitoring and stewardship functions as stated in funding board policy, this Agreement, or as otherwise directed by RCO consistent with existing policies. Sponsor further agrees to utilize, where applicable and financially feasible, any monitoring protocols recommended by the funding board. PREFERENCES FOR RESIDENTSSECTION 20. Sponsors shall not express a preference for users of grant assisted projects on the basis of residence (including preferential reservation, membership, and/or permit systems) except that reasonable differences in admission and other fees may be maintained on the basis of residence. Fees for nonresidents must not exceed twice the fee imposed on residents. Where there is no fee for residents but a fee is charged to nonresidents, the nonresident fee shall not exceed the amount that would be imposed on residents at comparable state or local public facilities. ACKNOWLEDGMENT AND SIGNSSECTION 21. A.Publications. The Sponsor shall include language which acknowledges the funding contribution of the applicable grant program to this project in any release or other publication developed or modified for, or referring to, the project during the project period and in the future. B.Signs. 1.During the period of performance through the period of long-term obligation, the Sponsor shall post openly visible signs or other appropriate media at entrances and other locations on the project area that acknowledge the applicable grant program's funding contribution, unless exempted in funding board policy or waived by the director; and 2.During the period of long-term obligation, the Sponsor shall post openly visible signs or other appropriate media at entrances and other locations to notify the public of the availability of the site for reasonable public access. C.Ceremonies. The Sponsor shall notify RCO no later than two weeks before a dedication ceremony for this project. The Sponsor shall verbally acknowledge the applicable grant program’s funding contribution at all dedication ceremonies. D.Federally Funded Projects. When issuing statements, press releases, requests for proposals, bid solicitations, and other documents describing a project funded in whole or in part with federal money provided for in this grant, Sponsors shall clearly state: 1.The fund source; 2.The percentage of the total costs of the project that is financed with federal money; 3.The dollar amount of federal funds for the project; and 4.The percentage and dollar amount of the total costs of the project that is financed by nongovernmental sources. PROVISIONS FOR BOATING PROJECT GRANTSSECTION 22. If requested by RCO, or required per state or federal law or rule with respect to any project or project element that supports recreational boating, Sponsor shall manage the project or project element per federal rules to include 2 C.F.R. Part 200, and place a United States Coast Guard (or other federal agency) logo and funding program information at the project site. Page 20 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 207 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: PROVISIONS APPLYING TO DEVELOPMENT, MAINTENANCE, RENOVATION, AND RESTORATION PROJECTS SECTION 23. The following provisions shall be in force only if the project described in this Agreement is for construction of land or facilities in a development, maintenance, renovation or restoration project: A.Operations and Maintenance. Properties, structures, and facilities developed, maintained, or operated with the assistance of money granted by the board and within the project area shall be built, operated, and maintained according to applicable regulations, laws, building codes, and health and public safety standards to assure a reasonably safe condition and to prevent premature deterioration (WAC 286.13.130). It is the Sponsor’s sole responsibility to ensure the same are operated and maintained in a safe and operable condition. The RCO does not conduct safety inspections or employ or train staff for that purpose. B.Document Review and Approval. Prior to commencing construction or finalizing the design, the Sponsor agrees to submit one copy of all construction and restoration plans and specifications to RCO for review solely for compliance with the scope of work to be identified in the Agreement. RCO does not review for, and disclaims any responsibility to review for safety, suitability, engineering, compliance with code, or any matters other than the scope so identified. Although RCO staff may provide tentative guidance to a Sponsor on matters related to site accessibility by persons with a disability, it is the Sponsor’s responsibility to confirm that all legal requirements for accessibility are met even if the RCO guidance would not meet such requirements. 1.Change orders that impact the amount of funding or changes to the scope of the project as described to and approved by the funding board or RCO must receive prior written approval of the board or RCO. C.Control and Tenure. The Sponsor must provide documentation that shows appropriate tenure (such as landowner agreement, long-term lease, easement, or fee simple ownership) for the land proposed for construction. The documentation must meet current RCO requirements identified in the appropriate grant program policy manual as of the effective date of this Agreement and determines the long-term compliance period unless otherwise approved by the board. D.Nondiscrimination. Except where a nondiscrimination clause required by a federal funding agency is used, the Sponsor shall insert the following nondiscrimination clause in each contract for construction of this project: "During the performance of this contract, the contractor agrees to comply with all federal and state nondiscrimination laws, regulations and policies.” E.Use of Best Management Practices. Sponsors are encouraged to use best management practices including those developed as part of the Washington State Aquatic Habitat Guidelines (AHG) Program. AHG documents include “Integrated Streambank Protection Guidelines”, 2002; “Land Use Planning for Salmon, Steelhead and Trout: A land use planner’s guide to salmonid habitat protection and recovery”, 2009”, “Protecting Nearshore Habitat and Functions in Puget Sound”, 2010; “Stream Habitat Restoration Guidelines”, 2012; “Water Crossing Design Guidelines”, 2013; and “Marine Shoreline Design Guidelines”, 2014. These documents, along with new and updated guidance documents, and other information are available on the AHG Web site. Sponsors are also encouraged to use best management practices developed by the Washington Invasive Species Council (WISC) described in “Reducing Accidental Introductions of Invasive Species” which is available on the WISC Web site. PROVISIONS APPLYING TO ACQUISITION PROJECTSSECTION 24. Page 21 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 208 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: The following provisions shall be in force only if the project described in this Agreement is an acquisition project (including projects with any acquisition component): A.Evidence of Land Value. Before disbursement of funds by RCO as provided under this Agreement, the Sponsor agrees to supply documentation acceptable to RCO that the cost of the property rights acquired has been established according to funding board policy. B.Evidence of Title. The Sponsor agrees to provide documentation that shows the type of ownership interest for the property that has been acquired. This shall be done before any payment of financial assistance. C.Legal Description of Real Property Rights Acquired. The legal description of the real property rights purchased with funding assistance provided through this Agreement (and protected by a recorded conveyance of rights to the State of Washington) shall be delivered to RCO before final payment. D.Conveyance of Rights to the State of Washington. When real property rights (both fee simple and lesser interests) are acquired, the Sponsor agrees to execute an appropriate document conveying certain rights and responsibilities to RCO, on behalf of the State of Washington. These documents include a Deed of Right, Assignment of Rights, Easements and/or Leases as described below. The Sponsor agrees to use document language provided by RCO, to record the executed document in the County where the real property lies, and to provide a copy of the recorded document to RCO. The document required will vary depending on the funding board project type, the real property rights being acquired and whether or not those rights are being acquired in perpetuity. 1.Deed of Right. The Deed of Right conveys to the people of the state of Washington the right to preserve, protect, access, and/or use the property for public purposes consistent with the funding source and project agreement. See WAC 286 or 420. Sponsors shall use this document when acquiring real property rights that include the underlying land. This document may also be applicable for those easements where the Sponsor has acquired a perpetual easement for public purposes. 2.Assignment of Rights. The Assignment of Rights document transfers certain rights to RCO and the state such as public access, access for compliance, and enforcement. Sponsors shall use this document when an easement or lease is being acquired under this Agreement. The Assignment of Rights requires the signature of the underlying landowner and must be incorporated by reference in the easement document. 3.Easements and Leases. The Sponsor may incorporate required language from the Deed of Right or Assignment of Rights directly into the easement or lease document, thereby eliminating the requirement for a separate document. Language will depend on the situation; Sponsor must obtain RCO approval on the draft language prior to executing the easement or lease. E.Real Property Acquisition and Relocation Assistance. 1.Federal Acquisition Policies. When federal funds are part of this Agreement, the Sponsor agrees to comply with the terms and conditions of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, 84 Stat. 1894 (1970)--Public Law 91-646, as amended, and applicable regulations and procedures of the federal agency implementing that Act. Page 22 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 209 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: 2.State Acquisition Policies. When state funds are part of this Agreement, the Sponsor agrees to comply with the terms and conditions of the Uniform Relocation Assistance and Real Property Acquisition Policy of the State of Washington, Chapter 8.26 RCW, and Chapter 468-100 WAC. 3.Housing and Relocation. In the event that housing and relocation costs, as required by federal law set out in subsection (1) above and/or state law set out in subsection (2) above, are involved in the execution of this project, the Sponsor agrees to provide any housing and relocation assistance required. F.Buildings and Structures. In general, grant funds are to be used for outdoor recreation, conservation, or salmon recovery. Sponsors agree to remove or demolish ineligible structures. Sponsor must consult with RCO regarding treatment of such structures and compliance with Section 8.D Archeological and Cultural Resources. G.Hazardous Substances. 1.Certification. The Sponsor shall inspect, investigate, and conduct an environmental audit of the proposed acquisition site for the presence of hazardous substances, as defined in RCW 70.105D.020(13), and certify: a.No hazardous substances were found on the site, or b.Any hazardous substances found have been treated and/or disposed of in compliance with applicable state and federal laws, and the site deemed “clean.” 2.Responsibility. Nothing in this provision alters the Sponsor's duties and liabilities regarding hazardous substances as set forth in RCW 70.105D. 3.Hold Harmless. The Sponsor will defend, protect and hold harmless the State and any and all of its employees and/or agents, from and against any and all liability, cost (including but not limited to all costs of defense and attorneys' fees) and any and all loss of any nature from any and all claims or suits resulting from the presence of, or the release or threatened release of, hazardous substances on the property the Sponsor is acquiring, except to the extent, if any, that the State, its officers and agents caused or contributed to the release . The funding board and RCO are included within the term State, as are all other agencies, departments, boards, councils, committees, divisions, bureaus, offices, societies, or other entities of state government. H.Requirements for Federal Subawards. The non-federal entity (Sponsor) must submit reports at least annually on the status of real property in which the federal government retains an interest, unless the federal interest in the real property extends 15 years or longer. In those instances where the federal interest attached is for a period of 15 years or more, the federal awarding agency or the pass-through entity (RCO), at its option, may require the Sponsor to report at various multi-year frequencies (e.g., every two years or every three years, not to exceed a five-year reporting period; or a federal awarding agency or RCO may require annual reporting for the first three years of a federal award and thereafter require reporting every five years) (2 C.F.R § 200.329 (2013)). LONG-TERM OBLIGATIONS OF THE PROJECTS AND SPONSORSSECTION 25. A.Long-Term Obligations of RCFB Projects. Sponsor shall comply with WAC 286-13-160, 170, and 180. B.Long-Term Obligations of SRFB Projects. Sponsor shall comply with WAC 420. Page 23 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 210 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: C.Perpetuity. For acquisition, development, and restoration projects, or a combination thereof, unless otherwise allowed by policy, program rules, or this Agreement, or approved in writing by RCO or the funding board, RCO requires that the project area continue to function as intended after the period of performance in perpetuity. D.Conversion. The Sponsor shall not at any time convert any real property (including any interest therein) or facility acquired, developed, renovated, and/or restored pursuant to this Agreement, unless provided for in applicable statutes, rules, and policies. Conversion includes, but is not limited to, putting such property to uses other than those purposes for which funds were approved or transferring such property to another entity without prior approval via a written amendment to the Agreement. Also see WAC Title 286 or 420 and applicable policies. All real property or facilities acquired, developed, renovated, and/or restored with funding assistance shall remain in the same ownership and in public use/access status in perpetuity unless otherwise expressly provided in the Agreement or applicable policy or unless a transfer or change in use is approved by the funding board through an amendment. Failure to comply with these obligations is a conversion. Further, if the project is subject to operation and or maintenance obligations, the failure to comply with such obligations, without cure after a reasonable period as determined by the RCO, is a conversion. Determination of whether a conversion has occurred shall be based upon this Agreement , applicable law and RCFB/SRFB policies. For acquisition projects that are expressly term limited in the Agreement, such as one involving a lease or a term-limited restoration, renovation or development project or easement, the restriction on conversion shall apply only for the length of the term, unless otherwise provided in this Agreement, by funding board policy, other RCO approved written documents, or required by applicable state or federal law. When a conversion has been determined to have occurred, the Sponsor is required to remedy the conversion per established funding board policies, and the board or RCO may pursue such remedies as are allowed by law and board policies, and/or this Agreement. CONSTRUCTION, OPERATION, USE AND MAINTENANCE OF ASSISTED PROJECTSSECTION 26. The following provisions shall be in force only if the project described in this Agreement is an acquisition, development, maintenance, renovation, or restoration project: A.Property and facility operation and maintenance. Sponsor must ensure that properties or facilities assisted with funding board funds, including undeveloped sites, are built, operated, used, and maintained: 1.According to applicable federal, state, and local laws and regulations, including public health standards and building codes; 2.In a reasonably safe condition for the project’s intended use; 3.Throughout its estimated useful service life so as to prevent undue deterioration; 4.In compliance with all federal and state nondiscrimination laws, regulations and policies. B.Open to the public. Unless otherwise specifically provided for in the Agreement of funding board policies, and in compliance with applicable statutes, rules, and funding board policies, facilities must be open and accessible to the general public, and must: Page 24 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 211 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: 1.Be constructed, maintained, and operated to meet or exceed the minimum requirements of the most current guidelines or rules, local or state codes, Uniform Federal Accessibility Standards, guidelines, or rules, including but not limited to: the International Building Code, the Americans with Disabilities Act, and the Architectural Barriers Act, as amended and updated. 2.Appear attractive and inviting to the public except for brief installation, construction, or maintenance periods. 3.Be available for appropriate use by the general public at reasonable hours and times of the year, according to the type of area or facility, unless otherwise stated in RCO manuals, by a decision of the board, or by RCO in writing. Sponsor shall notify the public of the availability for use by posting and updating that information on its website and by maintaining at entrances and/or other locations openly visible signs with such information. RECORDED NOTICE OF GRANTSECTION 27. At the request of RCO, Sponsor shall record a notice of grant on the property and shall submit to the RCO a recorded and registry stamped copy of such notice. The purpose of the notice of grant is to ensure that the present and future use of the facility is and shall remain subject to the terms and conditions described in this Agreement. The notice of grant shall be in a format specified by RCO. PROVISIONS RELATED TO CORPORATE (INCLUDING NONPROFIT) SPONSORSSECTION 28. A corporate Sponsor, including any nonprofit Sponsor, shall: A.Maintain corporate status with the state, including registering with the Washington Secretary of State’ s office, throughout the Sponsor’s obligation to the project as identified in the Agreement. B.Notify RCO before corporate dissolution at any time during the period of performance or long-term obligations. Within 30 days of dissolution the Sponsor shall name a qualified successor that will agree in writing to assume any on-going project responsibilities, and transfer all property and assets to the successor. A qualified successor is any party eligible to apply for funds in the subject grant program and capable of complying with the terms and conditions of this Agreement. RCO will process an amendment transferring the Sponsor’s obligation to the qualified successor if requirements are met. C.Maintain sites or facilities open to the public and may not limit access to members. PROVISIONS FOR FEDERAL SUBAWARDS ONLYSECTION 29. The following provisions shall be in force only if the project described in this Agreement is funded with a federal subaward as identified in Section H: FEDERAL FUND Information: A.Sub-Recipient (Sponsor) must comply with the cost principles of 2 C.F.R. Part 200 Subpart E (2013). Unless otherwise indicated, the cost principles apply to the use of funds provided under this Agreement to include match and any in-kind matching donations. The applicability of the cost principles depends on the type of organization incurring the costs. B.Binding Official. Per 2 CFR 200.415, Sponsor certifies through its actions or those of authorized staff, at the time of a request for reimbursement, the following: “To the best of my knowledge and belief that the report is true, complete, and accurate, and the expenditures, disbursements and cash receipts are for the purposes and objectives set forth in the terms and conditions of the Federal award. I am aware that any false, fictitious, or fraudulent information, or the omission of any material fact, may subject me to criminal, civil or administrative penalties for fraud, false statements, false claims or otherwise. (U.S. Code Title 18, Section 1001 and Title 31, Sections 3729-3730 and 3801-3812).” Page 25 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 212 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: C.Equal Employment Opportunity. Except as otherwise provided under 41 C.F.R. Part 60, all contracts that meet the definition of “federally assisted construction contract” in 41 C.F.R. § 60-1.3 must include the equal opportunity clause provided under 41 C.F.R. § 60- 1.4(b), in accordance with Executive Order 11246, Equal Employment Opportunity (30 Fed. Reg. 12319, 12935, 3 C.F.R. Part, 1964-1965 Comp., p. 339), as amended by Executive Order 11375, Amending Executive Order 11246 Relating to Equal Employment Opportunity, and implementing regulations at 41 C.F.R. Part 60 (Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor). See 2 C.F.R. Part 200, Appendix II, paragraph C. 1.Federally Assisted Construction Contract. The regulation at 41 C.F.R. § 60-1.3 defines a “federally assisted construction contract” as any agreement or modification thereof between any applicant and a person for construction work which is paid for in whole or in part with funds obtained from the Government or borrowed on the credit of the Government pursuant to any Federal program involving a grant, contract, loan, insurance, or guarantee, or undertaken pursuant to any Federal program involving such grant, contract, loan, insurance, or guarantee, or any application or modification thereof approved by the Government for a grant, contract, loan, insurance, or guarantee under which the applicant itself participates in the construction work. 2.Construction Work. The regulation at 41 C.F.R. § 60-1.3 defines “construction work” as the construction, rehabilitation, alteration, conversion, extension, demolition or repair of buildings, highways, or other changes or improvements to real property, including facilities providing utility services. The term also includes the supervision, inspection, and other onsite functions incidental to the actual construction. D.Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by federal program legislation, all prime construction contracts in excess of $2,000 awarded by non-federal entities (Sponsors) must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3148) as supplemented by Department of Labor regulations (29 C.F.R. § 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction”). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. The non-federal entity (Sponsor) must place a copy of the current prevailing wage determination issued by the Department of Labor in each solicitation. The decision to award a contract or subcontract must be conditioned upon the acceptance of the wage determination. The non-Federal entity (Sponsor) must report all suspected or reported violations to the federal awarding agency identified in Section H: Federal Fund Information. The contracts must also include a provision for compliance with the Copeland “Anti-Kickback” Act (40 U. S. C. 3145), as supplemented by Department of Labor regulations (29 C.F.R Part 3, “Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States”). The Act provides that each contractor or subrecipient (Sponsor) must be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he or she is otherwise entitled. The non-Federal entity (Sponsor) must report all suspected or reported violations to the Federal awarding agency identified in Section H: Federal Fund Information. Page 26 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 213 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: E.Contract Work Hours and Safety Standards Act (40 U.S.C. 3701-3708). Where applicable, all contracts awarded by the non-federal entity (Sponsor) in excess of $100,000 that involve the employment of mechanics or laborers must include a provision for compliance with 40 U.S.C. 3702 and 3704, as supplemented by Department of Labor regulations (29 C.F.R. Part 5). Under 40 U.S.C. 3702 of the Act, each contractor must be required to compute the wages of every mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than one and a half times the basic rate of pay for all hours worked in excess of 40 hours in the work week. The requirements of 40 U.S.C. 3704 are applicable to construction work and provide that no laborer or mechanic must be required to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or contracts for transportation or transmission of intelligence. F.Rights to Inventions Made Under a Contract or Agreement. If the Federal award meets the definition of “funding agreement” under 37 C.F.R § 401.2(a) and the recipient or subrecipient (Sponsor) wishes to enter into a contract with a small business firm or nonprofit organization regarding the substitution of parties, assignment or performance of experimental, developmental, or research work under that “funding agreement,” the recipient or subrecipient (Sponsor) must comply with the requirements of 37 C.F.R Part 401, “Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements,” and any implementing regulations issued by the awarding agency. G.Clean Air Act (42 U.S.C. 7401-7671q.) and the Federal Water Pollution Control Act (33 U.S.C. 1251-1387), as Amended. Contracts and subgrants of amounts in excess of $150,000 must contain a provision that requires the non-Federal award to agree to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. 7401-7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. 1251-1387). Violations must be reported to the Federal awarding agency identified in Section H: Federal Fund Information and the Regional Office of the Environmental Protection Agency (EPA). H.Byrd Anti-Lobbying Amendment (31 U.S.C. 1352). By signing this Agreement, the Sponsor certifies (per the certification requirements of 31 U.S.C.) that none of the funds that the Sponsor has (directly or indirectly) received or will receive for this project from the United States or any agency thereof, have been used or shall be used to engage in the lobbying of the Federal Government or in litigation against the United States. Such lobbying includes any influence or attempt to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this project. Contractors that apply or bid for an award exceeding $100,000 must file the required certification. Each tier certifies to the tier above that it will not and has not used federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any federal contract, grant or any other award covered by 31 U.S.C. 1352. Each tier must also disclose any lobbying with non-federal funds that takes place in connection with obtaining any federal award. Such disclosures are forwarded from tier to tier up to the non-federal award. Page 27 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 214 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: I.Procurement of Recovered Materials. A non-federal entity (Sponsor) that is a state agency or agency of a political subdivision of a state and its contractors must comply with section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act. The requirements of Section 6002 include procuring only items designated in guidelines of the Environmental Protection Agency (EPA) at 40 C.F.R part 247 that contain the highest percentage of recovered materials practicable, consistent with maintaining a satisfactory level of competition, where the purchase price of the item exceeds $10,000 or the value of the quantity acquired during the preceding fiscal year exceeded $10,000; procuring solid waste management services in a manner that maximizes energy and resource recovery; and establishing an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines. J.Required Insurance. The non-federal entity (Sponsor) must, at a minimum, provide the equivalent insurance coverage for real property and equipment acquired or improved with federal funds as provided to property owned by the non-federal entity. Federally-owned property need not be insured unless required by the terms and conditions of the Federal award (2 C.F.R § 200.310 (2013)). K.Debarment and Suspension (Executive Orders 12549 and 12689). The Sponsor must not award a contract to parties listed on the government-wide exclusions in the System for Award Management (SAM), in accordance with the Office of Management and Budget (OMB) guidelines at 2 C.F.R § 180 that implement Executive Orders 12549 (3 C.F.R part 1986 Comp., p. 189) and 12689 (3 C.F.R part 1989 Comp., p. 235), “Debarment and Suspension.” SAM Exclusions contains the names of parties debarred, suspended, or otherwise excluded by agencies, as well as parties declared ineligible under statutory or regulatory authority other than Executive Order 12549. L.Conflict of Interest. Sponsor agrees to abide by the conflict of interest policy and requirements of the federal funding agency established pursuant to 2 C.F.R 200. PROVISIONS FOR BOATING INFRASTRUCTURE GRANTSSECTION 30. A.Use of Sport Fish Restoration Logo. Per 50 CFR 86 Sec 75 and 76, the user of the logo must indemnify and defend the United States and hold it harmless from any claims, suits, losses, and damages from; any allegedly unauthorized use of any patent, process, idea, method, or device by the user in connection with its use of the logo, or any other alleged action of the user; and any claims, suits, losses, and damages arising from alleged defects in the articles or services associated with the logo. No one may use any part of the logo in any other manner unless the United States Fish and Wildlife Service’s Assistant Director for Wildlife and Sport Fish Restoration or Regional Director approves in writing. PROVISIONS FOR FIREARMS AND ARCHERY RANGE RECREATION PROJECTS ONLYSECTION 31. The following provisions shall be in force only if the project described in this Agreement is funded from the Firearms and Archery Range Recreation Account. A.Liability Insurance. The Sponsor of a firearms or archery range recreation project shall procure an endorsement, or other addition, to liability insurance it carries, or shall procure a new policy of liability insurance, in a total coverage amount the Sponsor deems adequate to ensure it will have resources to pay successful claims of people who may be killed or injured, or suffer damage to property, while present at the range facility to which this grant is related, or by reason of being in the vicinity of that facility; provided that the coverage shall be at least one million dollars ($1,000,000) for the death of, or injury to, each person. B.Insurance Endorsement. The liability insurance policy, including any endorsement or addition, shall name Washington State, the funding board, and RCO as additional insured and shall be in a form approved by the funding board or director. Page 28 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 215 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: C.Length of Insurance. The policy, endorsement or other addition, or a similar liability insurance policy meeting the requirements of this section, shall be kept in force throughout the Sponsor's obligation to the project as identified in this Agreement in Section F. LONG-TERM OBLIGATIONS. D.Notice of Cancellation. The policy, as modified by any endorsement or other addition, shall provide that the issuing company shall give written notice to RCO not less than thirty (30) calendar days in advance of any cancellation of the policy by the insurer, and within ten (10) calendar days following any termination of the policy by the Sponsor. E.Government Agencies. The requirement of Subsection A through D above shall not apply if the Sponsor is a federal, state, or municipal government which has established a program of self-insurance or a policy of self-insurance with respect to claims arising from its facilities or activities generally, including such facilities as firearms or archery ranges, when the applicant declares and describes that program or policy as a part of its application to the funding board. F.Sole Duty of the Sponsor. By this requirement, the funding board and RCO does not assume any duty to any individual person with respect to death, injury, or damage to property which that person may suffer while present at, or in the vicinity of, the facility to which this grant relates. Any such person, or any other person making claims based on such death, injury, or damage, must look to the Sponsor, or others, for any and all remedies that may be available by law. PROVISIONS FOR LAND AND WATER CONSERVATION FUND PROJECTS ONLYSECTION 32. If the project has been approved by the National Park Service, US Department of the Interior, for funding assistance from the federal Land and Water Conservation Fund (LWCF), the “Project Agreement General Provisions” of the LWCF are made part of this Agreement and incorporated herein. The Sponsor shall abide by these LWCF General Provisions, in addition to this Agreement, as they now exist or are hereafter amended. Further, the Sponsor agrees to provide RCO with reports or documents needed to meet the requirements of the LWCF General Provisions. PROVISIONS FOR FARM AND FOREST ACCOUNT PROJECTS (FARMLAND AND FORESTLAND PRESERVATION PROJECTS ONLY) SECTION 33. The following sections will not apply to Farmland and Forestland Preservation Projects if covered separately in a recorded RCO approved Agricultural Conservation Easement, or Forest Conservation Easement (or other method): A.Section 15 - Income and Income Use; B.Section 19 - Stewardship and Monitoring; C.Section 21 - Acknowledgement and Signs; D.Section 24 -- Provisions Applying To Acquisition Projects, Sub-sections D, F, and G; E.Section 25C -Perpetuity; and F.Section 26 -- Construction, Operation, Use and Maintenance of Assisted Projects. PROVISIONS FOR SALMON RECOVERY FUNDING BOARD PROJECTS ONLYSECTION 34. Page 29 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 216 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: For habitat restoration projects funded in part or whole with federal funds administered by the SRFB the Sponsor shall not commence with clearing of riparian trees or in-water work unless either the Sponsor has complied with 50 C.F.R. § 223.203 (b)(8) (2000), limit 8 or until an Endangered Species Act consultation is finalized in writing by the National Oceanic and Atmospheric Administration. Violation of this requirement may be grounds for terminating this Agreement. This section shall not be the basis for any enforcement responsibility by RCO. PROVISIONS FOR PUGET SOUND ACQUISITION AND RESTORATION PROJECTS ONLYSECTION 35. The following provisions shall be in force only if the project described in this Agreement is funded in part or wholly from the Puget Sound Acquisition and Restoration program. The Sponsor agrees to the following terms and conditions: A.Cost Principles/Indirect Costs For State Agencies. GRANT RECIPIENT agrees to comply with the cost principles of 2 CFR 200 Subpart E as appropriate to the award. In addition to the US Environmental Protection Agency’s General Terms and Conditions “Indirect Cost Rate Agreements ,” if the recipient does not have a previously established indirect cost rate, it agrees to prepare and submit its indirect cost rate proposal in accordance with 2 CFR 200 Appendix VII. B.Credit and Acknowledgement. In addition to Section 21: Acknowledgement and Signs, materials produced must display both the Environmental Protection Agency (EPA) and Puget Sound Partnership (PSP) logos and the following credit line: "This project has been funded wholly or in part by the United States Environmental Protection Agency. The contents of this document do not necessarily reflect the views and policies of the Environmental Protection Agency, nor does mention of trade names or commercial products constitute endorsement or recommendation for use.” This requirement is for the life of the product, whether during or after the Agreement period of performance. C.Hotel Motel Fire Safety Act. Sponsor agrees to ensure that all conference, meeting, convention, or training space funded in whole or part with federal funds, complies with the federal Hotel and Motel Fire Safety Act (PL 101-391, as amended). Sponsors may search the Hotel-Motel National Master List @ http://www.usfa.dhs.gov/applications/hotel to see if a property is in compliance or to find other information about the Act. D.Drug Free Workplace Certification. Sub-recipient (Sponsor) shall make an ongoing, good faith effort to maintain a drug-free workplace pursuant to the specific requirements set forth in 2 C.F.R. Part 1536 Subpart B. Additionally, in accordance with these regulations, the recipient organization shall identify all known workplaces under its federal awards, and keep this information on file during the performance of the award. Sponsors who are individuals must comply with the drug-free provisions set forth in 2 C.F.R. Part 1536 Subpart C. The consequences for violating this condition are detailed under 2 C.F.R. Part 1536 Subpart E. E.Management Fees. Management fees or similar charges in excess of the direct costs and approved indirect rates are not allowable. The term “management fees or similar charges” refers to the expenses added to direct costs in order to accumulate and reserve funds for ongoing business expenses, unforeseen liabilities or for other similar costs that are not allowable. Management fees or similar charges may not be used to improve or expand the project funded under this Agreement, except for the extent authorized as a direct cost of carrying out the scope of work. F.Trafficking in Persons and Trafficking Victim Protection Act of 2000 (TVPA). This provision applies only to a sub-recipient (Sponsor), and all sub-awardees of sub-recipient (Sponsor), if any. Sub-recipient (Sponsor) shall include the following statement in all sub-awards made to any private entity under this Agreement. Page 30 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 217 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: “You as the sub-recipient, your employees, sub-awardees under this award, and sub-awardees’ employees may not engage in severe forms of trafficking in persons during the period of time that the award is in effect; procure a commercial sex act during the period of time that the award is in effect; or use forced labor in the performance of the award or sub-awards under this Award.” The sub-recipient (Sponsor), and all sub-awardees of sub-recipient (Sponsor) must inform RCO immediately of any information you receive from any source alleging a violation of this prohibition during the award term. The federal agency funding this Agreement may unilaterally terminate, without penalty, the funding award if this prohibition is violated, Section 106 of the Trafficking Victims Protection Act of 2000, as amended. G.Lobbying. The chief executive officer of this recipient agency (Sponsor) shall ensure that no grant funds awarded under this Agreement are used to engage in lobbying of the Federal Government or in litigation against the United States, unless authorized under existing law. The recipient (Sponsor) shall abide by its respective Cost Principles (OMB Circulars A-21, A-87, and A-122), which generally prohibits the use of federal grant funds for litigation against the United States, or for lobbying or other political activities. The Sponsor agrees to comply with 40 C.F.R. Part 34, New Restrictions on Lobbying. Sponsor shall include the language of this provision in award documents for all sub-awards exceeding $100,000, and require that sub-awardees submit certification and disclosure forms accordingly. In accordance with the Byrd Anti-Lobbying Amendment, any Sponsor who makes a prohibited expenditure under 40 C.F.R. Part 34 or fails to file the required certification or lobbying forms shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each expenditure. All contracts awarded by Sponsor shall contain, when applicable, the anti-lobbying provisions as stipulated in the Appendix at 40 C.F.R. Part 30. Pursuant to Section 18 of the Lobbying Disclosure Act, Sponsor affirms that it is not a non-profit organization described in Section 501(c)(4) of the Internal Revenue Code of 1986; or that it is a non-profit organization described in Section 501(c)(4) of the code but does not and will not engage in lobbying activities as defined in Section 3 of the Lobbying Disclosure Act. H.Reimbursement Limitation. If the Sponsor expends more than the amount of RCO funding in this Agreement in anticipation of receiving additional funds from the RCO, it does so at its own risk. RCO is not legally obligated to reimburse the Sponsor for costs incurred in excess of the RCO approved budget. I.Disadvantaged Business Enterprise Requirements. The Sponsor agrees to comply with the requirements of EPA’s Utilization of Small, Minority and Women’s Business Enterprises in procurements made under this award. J.Minority and Women’s Business Participation. Sponsor agrees to solicit and recruit, to the maximum extent possible, certified minority owned (MBE) and women owned (WBE) businesses in purchases and contracts initiated after the effective date of this Agreement. These goals are expressed as a percentage of the total dollars available for purchase or agreement and are as follows: Purchased Goods 8% MBE 4% WBE Page 31 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 218 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: Purchased Services 10% MBE 4% WBE Professional Services 10% MBE 4% WBE Meeting these goals is voluntary and no agreement award or rejection shall be made based on achievement or non-achievement of the goals. Achievement of the goals is encouraged, however, and Sponsor and ALL prospective bidders or people submitting qualifications shall take the following affirmative steps in any procurement initiated after the effective date of this Agreement: 1.Include qualified minority and women’s businesses on solicitation lists. 2.Assure that qualified minority and women’s business are solicited whenever they are potential sources of services or supplies. 3.Divide the total requirements, when economically feasible, into smaller tasks or quantities, to permit maximum participation by qualified minority and women’s businesses. 4.Establish delivery schedules, where work requirements permit, which will encourage participation of qualified minority and women’s businesses. 5.Use the services and assistance of the State Office of Minority and Women’s Business Enterprises (OMWBE) and the Office of Minority Business Enterprises of the U.S. Department of Commerce, as appropriate. K.MBE/WBE Reporting. In accordance with the deviation from 40 C.F.R. §33.502, signed November 8, 2013, DBE reporting is limited to annual reports and only required for assistance agreements where one or more the following conditions are met: 1.There are any funds budgeted in the contractual/services, equipment or construction lines of the award; 2.$3,000 or more is included for supplies; or 3.There are funds budgeted for subawards or loans in which the expected budget(s) meet the conditions as 4.Described in items (a) and (b). When completing the form, recipients (Sponsors) should disregard the quarterly and semi-annual boxes in the reporting period Section 1B of the form. For annual submissions, the reports are due by October 30th of each year or 90 days after the end of the project period, whichever comes first. The reporting requirement is based on planned procurements. Recipients (Sponsors) with funds budgeted for non-supply procurement and/or $3,000 or more in supplies are required to report annually whether the planned procurements take place during the reporting period or not. If no procurements take place during the reporting period, the recipient should check the box in Section 5B when completing the form. MBE/WBE reports should be sent to the DBE Coordinator in the Sponsor’s region. Contact information can be found at http://www.epa.gov/osbp/contactpage.htm. The coordinators also can answer any questions. Page 32 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 219 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: Final MBE/WBE reports must be submitted within 90 days after the project period of the grant ends. To be in compliance with regulations, the Sponsor must submit a final MBE/WBE report. Non-compliance may impact future competitive grant proposals. The current EPA Form 5700-52A can be found at the EPA Office of Small Business Program’s Home Page at http://www.epa.gov/osbp/dbe_reporting.htm. L.Procurement involving an EPA Financial Assistance Agreement. Pursuant to 40 C.F.R. § 33.301, the Sponsor agrees to make the following six good faith efforts whenever procuring construction, equipment, services and supplies under an EPA financial assistance agreement, and to require that sub-recipients (Sponsors), and prime contractors also comply. Records documenting compliance with the six good faith efforts shall be retained: 1.Ensure Disadvantaged Business Enterprise (DBEs) are made aware of contracting opportunities to the fullest extent practicable through outreach and recruitment activities. For Indian Tribal, State and Local and Government Sponsors, this will include placing DBEs on solicitation lists and soliciting them whenever they are potential sources. 2.Make information on forthcoming opportunities available to DBEs and arrange time frames for contracts and establish delivery schedules, where the requirements permit, in a way that encourages and facilitates participation by DBEs in the competitive process. This includes, whenever possible, posting solicitations for bids or proposals for a minimum of 30 calendar days before the bid or proposal closing date. 3.Consider in the contracting process whether firms competing for large contracts could subcontract with DBEs. For Indian Tribal, State and local Government Sponsors, this will include dividing total requirements when economically feasible into smaller tasks or quantities to permit maximum participation by DBEs in the competitive process. 4.Encourage contracting with a consortium of DBEs when an agreement is too large for one of these firms to handle individually. 5.Use the services and assistance of the Small Business Administration (SBA) and the Minority Business Development of the Department of Commerce. 6.If the Sponsor awards subcontracts, require the Sponsor to take the steps in paragraphs (a) through (e) of this section. M.Lobbying & Litigation. By signing this Agreement, the Sponsor certifies that none of the funds received from this Agreement shall be used to engage in the lobbying of the Federal Government or in litigation against the United States unless authorized under existing law. The chief executive officer of this Sponsor agency shall ensure that no grant funds awarded under this Agreement are used to engage in lobbying of the Federal Government or in litigation against the United States unless authorized under existing law. The Sponsor shall abide by its respective Attachment in 2 C.F.R. Part 200, which prohibits the use of federal grant funds for litigation against the United States or for lobbying or other political activities. For subawards exceeding $100,000, EPA requires the following certification and disclosure forms: 1.Certification Regarding Lobbying, EPA Form 6600-06: http://www.epa.gov/ogd/AppKit/form/Lobbying_sec.pdf 2.Disclosure of Lobbying Activities, SF LLL: http://www.epa.gov/ogd/AppKit/form/sflllin_sec.pdf Page 33 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 220 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: 3.Legal expenses required in the administration of Federal programs are allowable. Legal expenses for prosecution of claims against the Federal Government are unallowable. N.Payment to Consultants. EPA participation in the salary rate (excluding overhead) paid to individual consultants retained by recipients (Sponsors) or by a recipients’ (Sponsor’s) contractors or subcontractors shall be limited to the maximum daily rate for Level IV of the Executive Schedule (formerly GS-18), to be adjusted annually. This limit applies to consultation services of designated individuals with specialized skills who are paid at a daily or hourly rate. This rate does not include transportation and subsistence costs for travel performed (the recipient will pay these in accordance with his/her normal travel reimbursement practices). Subagreements with firms for services that are awarded using the procurement requirements in 40 C.F.R. Parts 30 or 31, are not affected by this limitation unless the terms of the contract provide the recipient (Sponsor) with responsibility for the selection, direction and control of the individual who will be providing services under the contract at an hourly or daily rate of compensation. See 40 C.F.R. § 30.27(b) or 40 C.F.R. § 31.369(j), as applicable, for additional information. As of January 1, 2014, the limit is $602.24 per day $75.28 per hour. O.Peer Review. Where appropriate, prior to finalizing any significant technical products the Principal Investigator (PI) of this project must solicit advice, review, and feedback from a technical review or advisory group consisting of relevant subject matter specialists. A record of comments and a brief description of how respective comments are addressed by the PI will be provided to the Project Monitor prior to releasing any final reports or products resulting from the funded study. P.International Travel (Including Canada). All International Travel must be approved by the US Environmental Protection Agency’s Office of International and Tribal Affairs (OITA) BEFORE travel occurs. Even a brief trip to a foreign country, for example to attend a conference, requires OITA approval. Please contact your Partnership Project manager as soon as possible if travel is planned out of the country, including Canada and/or Mexico, so that they can submit a request to the EPA Project Officer if they approve of such travel. Q.Unliquidated Obligations (ULO). Sub-recipients, and all sub-awardees of Sub-Recipients, if any, should manage their agreement and subaward funding in ways that reduce the length of time that federal funds obligated and committed to subaward projects are unspent (not yet drawn down through disbursements to sub-recipients and sub-awardees). ORDER OF PRECEDENCESECTION 36. This Agreement is entered into, pursuant to, and under the authority granted by applicable federal and state laws. The provisions of the Agreement shall be construed to conform to those laws. In the event of a direct and irreconcilable conflict between the terms of this Agreement and any applicable statute, rule, or policy or procedure, the conflict shall be resolved by giving precedence in the following order: 1.Federal law and binding executive orders; 2.Code of federal regulations; 3.Terms and conditions of a grant award to the state from the federal government; 4.Federal grant program policies and procedures adopted by a federal agency that are required to be applied by federal law; 5.State law (constitution, statute); Page 34 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 221 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: 6.Washington Administrative Code; 7.Funding board or RCO policies. LIMITATION OF AUTHORITYSECTION 37. Only RCO’s Director or RCO’s delegate by writing (delegation to be made prior to action) shall have the authority to alter, amend, modify, or waive any clause or condition of this Agreement; provided that any such alteration, amendment, modification, or waiver of any clause or condition of this Agreement is not effective or binding unless made as a written amendment to this Agreement and signed by the RCO Director or delegate. WAIVER OF DEFAULTSECTION 38. Waiver of any default shall not be deemed to be a waiver of any subsequent default. Waiver or breach of any provision of the Agreement shall not be deemed to be a waiver of any other or subsequent breach and shall not be construed to be a modification of the terms of the Agreement unless stated to be such in writing, signed by the director, or the director’s designee, and attached as an amendment to the original Agreement. APPLICATION REPRESENTATIONS – MISREPRESENTATIONS OR INACCURACY OR BREACH SECTION 39. The funding board and RCO rely on the Sponsor’s application in making its determinations as to eligibility for, selection for, and scope of, funding grants. Any misrepresentation, error or inaccuracy in any part of the application may be deemed a breach of this Agreement. SPECIFIC PERFORMANCESECTION 40. The funding board and RCO may enforce this Agreement by the remedy of specific performance, which usually will mean completion of the project as described in this Agreement and/or enforcement of long-term obligations. However, the remedy of specific performance shall not be the sole or exclusive remedy available to RCO. No remedy available to the funding board or RCO shall be deemed exclusive. The funding board or RCO may elect to exercise any, a combination of, or all of the remedies available to it under this Agreement, or under any provision of law, common law, or equity, including but not limited to seeking full or partial repayment of the grant amount paid and damages. TERMINATION AND SUSPENSIONSECTION 41. The funding board and RCO will require strict compliance by the Sponsor with all the terms of this Agreement including, but not limited to, the requirements of the applicable statutes, rules and all funding board and RCO policies, and with the representations of the Sponsor in its application for a grant as finally approved by the funding board. For federal awards, notification of termination will comply with 2 C.F.R. § 200.340. A.For Cause. 1.The funding board or the director may suspend or terminate the obligation to provide funding to the Sponsor under this Agreement: a.If the Sponsor breaches any of the Sponsor's obligations under this Agreement; b.If the Sponsor fails to make progress satisfactory to the funding board or director toward completion of the project by the completion date set out in this Agreement . Included in progress is adherence to milestones and other defined deadlines; or c.If the primary and secondary Sponsor(s) cannot mutually agree on the process and actions needed to implement the project; Page 35 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 222 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: 2.Prior to termination, the RCO or the funding board shall notify the Sponsor in writing of the opportunity to cure. If corrective action is not taken within 30 days or such other time period that the director or board approves in writing, the Agreement may be terminated. In the event of termination, the Sponsor shall be liable for damages or other relief as authorized by law and/or this Agreement. 3.RCO reserves the right to suspend all or part of the Agreement, withhold further payments, or prohibit the Sponsor from incurring additional obligations of funds during the investigation of any alleged breach and pending corrective action by the Sponsor, or a decision by the RCO to terminate the Contract. B.For Convenience. Except as otherwise provided in this Agreement, RCO may, by ten (10) days written notice, beginning on the second day after the mailing, terminate this Agreement, in whole or in part when it is in the best interest of the state. If this Agreement is so terminated, RCO shall be liable only for payment required under the terms of this Agreement prior to the effective date of termination . A claimed termination for cause shall be deemed to be a "Termination for Convenience" if it is determined that: 1.The Sponsor was not in default; or 2.Failure to perform was outside Sponsor’s control, fault or negligence. C.Rights of Remedies of the RCO. 1.The rights and remedies of RCO provided in this Agreement are not exclusive and are in addition to any other rights and remedies provided by law. 2.In the event this Agreement is terminated by the funding board or director , after any portion of the grant amount has been paid to the Sponsor under this Agreement, the funding board or director may require that any amount paid be repaid to RCO for redeposit into the account from which the funds were derived. However, any repayment shall be limited to the extent it would be inequitable and represent a manifest injustice in circumstances where the project will fulfill its fundamental purpose for substantially the entire period of performance and of long-term obligation. D.Non Availability of Funds. The obligation of the RCO to make payments is contingent on the availability of state and federal funds through legislative appropriation and state allotment. If amounts sufficient to fund the grant made under this Agreement are not appropriated to RCO for expenditure for this Agreement in any biennial fiscal period, RCO shall not be obligated to pay any remaining unpaid portion of this grant unless and until the necessary action by the Legislature or the Office of Financial Management occurs. If RCO participation is suspended under this section for a continuous period of one year, RCO’s obligation to provide any future funding under this Agreement shall terminate. Termination of the Agreement under this section is not subject to appeal by the Sponsor. 1.Suspension: The obligation of the RCO to manage contract terms and make payments is contingent upon the state appropriating state and federal funding each biennium. In the event the state is unable to appropriate such funds by the first day of each new biennium RCO reserves the right to suspend the Agreement, with ten (10) days written notice, until such time funds are appropriated. Suspension will mean all work related to the contract must cease until such time funds are obligated to RCO and the RCO provides notice to continue work. DISPUTE HEARINGSECTION 42. Page 36 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 223 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: Except as may otherwise be provided in this Agreement, when a dispute arises between the Sponsor and the funding board, which cannot be resolved, either party may request a dispute hearing according to the process set out in this section. Either party’s request for a dispute hearing must be in writing and clearly state: A.The disputed issues; B.The relative positions of the parties; C.The Sponsor’s name, address, project title, and the assigned project number. In order for this section to apply to the resolution of any specific dispute or disputes, the other party must agree in writing that the procedure under this section shall be used to resolve those specific issues. The dispute shall be heard by a panel of three persons consisting of one person chosen by the Sponsor, one person chosen by the director, and a third person chosen by the two persons initially appointed. If a third person cannot be agreed on, the third person shall be chosen by the funding board’s chair. Any hearing under this section shall be informal, with the specific processes to be determined by the disputes panel according to the nature and complexity of the issues involved. The process may be solely based on written material if the parties so agree. The disputes panel shall be governed by the provisions of this Agreement in deciding the disputes. The parties shall be bound by the decision of the disputes panel, unless the remedy directed by that panel shall be without the authority of either or both parties to perform, as necessary, or is otherwise unlawful. Request for a disputes hearing under this section by either party shall be delivered or mailed to the other party. The request shall be delivered or mailed within thirty (30) days of the date the requesting party has received notice of the action or position of the other party which it wishes to dispute. The written agreement to use the process under this section for resolution of those issues shall be delivered or mailed by the receiving party to the requesting party within thirty (30) days of receipt by the receiving party of the request. All costs associated with the implementation of this process shall be shared equally by the parties. ATTORNEYS’ FEESSECTION 43. In the event of litigation or other action brought to enforce contract terms, each party agrees to bear its own attorney fees and costs. GOVERNING LAW/VENUESECTION 44. This Agreement shall be construed and interpreted in accordance with the laws of the State of Washington. In the event of a lawsuit involving this Agreement, venue shall be in Thurston County Superior Court if legally proper; otherwise venue shall be in a county where the project is situated, if venue there is legally proper, and if not, in a county where venue is legally proper. The Sponsor, by execution of this Agreement acknowledges the jurisdiction of the courts of the State of Washington. PROVISIONS APPLICABLE ONLY IF FEDERALLY RECOGNIZED INDIAN TRIBE IS THE SPONSOR SECTION 45. In the cases where this Agreement is between the funding board (which includes the State of Washington for purposes of this Agreement) and a federally recognized Indian Tribe, the following terms and conditions apply, but only between those parties: Page 37 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 224 Attachment: SampleProjAgreement (RCO Grants Resolution) USFS Number: Project Number: A.Notwithstanding the above venue provision, if the State of Washington intends to initiate legal action against a federally recognized Indian tribe relating to the performance, breach, or enforcement of this Agreement, it shall so notify the Tribe. If the Tribe believes that a good faith basis exists for subject matter jurisdiction of such an action in federal court, the Tribe shall so notify the State within five days of receipt of such notice and state the basis for such jurisdiction. If the Tribe so notifies the State, the State shall bring such action in federal court, otherwise the State may sue the Tribe in the Thurston County Superior Court, or such other superior court where venue is proper, if not proper in Thurston County. Interpretation of the Agreement shall be according to applicable State law, except to the extent preempted by federal law. In the event suit is brought in federal court and the federal court determines that it lacks subject matter jurisdiction to resolve the dispute between the State and Tribal Party, then the State may bring suit in Thurston County Superior Court or such other superior court where venue is proper, if not proper in Thurston County. B.Any judicial award, determination, order, decree or other relief, whether in law or equity or otherwise, resulting from such actions under subsection A above, shall be binding and enforceable on the parties. Any money judgment or award against a Tribe, tribal officers, or employees, or the State of Washington, its agencies, or its officers and employees may exceed the amount of funding awarded under this Agreement. C.As requested by RCO, the Tribe shall provide to RCO its governing requirements and procedures for entering into Agreement with RCO and waiving its sovereign immunity. In addition, the tribe shall provide to RCO all authorizations the Tribe requires to authorize the person(s) signing the Agreement on the Tribe’s behalf to bind the Tribe and waive the Tribe’s sovereign immunity as provided herein. D.The Tribe hereby waives its sovereign immunity for suit in federal and state court for the limited purposes of allowing the State to bring and prosecute to completion such actions relating to the performance, breach, or enforcement of this Agreement as provided in subsection A above, and to bring actions to enforce any judgment arising from such actions. This waiver is not for the benefit of any third party and shall not be enforceable by any third party or by any assignee of the parties. In any enforcement action, the parties shall bear their own enforcement costs, including attorneys’ fees. For purposes of this provision, the State includes the funding board, the RCO, and any other state agencies as the term “agency” is broadly understood to include, but not be limited to, departments, commissions, boards, divisions, bureaus, committees, offices, councils, societies, etc. SEVERABILITYSECTION 46. The provisions of this Agreement are intended to be severable. If any term or provision is illegal or invalid for any reason whatsoever, such illegality or invalidity shall not affect the validity of the remainder of the Agreement. Page 38 of 38RCO Revision Date: 1/11/18 6.10.b Packet Pg. 225 Attachment: SampleProjAgreement (RCO Grants Resolution) City Council Agenda Item Meeting Date: 04/10/2018 Civic Field PSA for design services Staff Lead: Carrie Hite Department: Parks, Recreation & Cultural Services Preparer: Carrie Hite Background/History Civic Center Field was acquired by the City from the Edmonds School District on February 9, 2016. The PROS plan and Parks CIP have both identified the City's goals of master planning and developing this property once acquired. The City published an RFQ/SOQ on February 12th, 2016 for firms to submit their qualifications for all three phases of Civic Park Master Plan and Development. Council awarded the contract to Walker Macy in May of 2016. After a robust public process, Council adopted the Civic Master Plan in March 2017. In 2017, the City contracted with Walker Macy to complete the geo technical work and survey work, for both the sewer line replacement and for park planning purposes. In 2017, the City contracted with Walker Macy to complete the demolition plans for the stadium. Council adopted the CIP and the budget, with $710,000 allocated for Civic Center Complex project in 2018. Staff Recommendation Forward to full council on consent. Narrative To begin the process of the master plan and development for Civic, staff published an RFQ to solicit bids for qualified entities to submit proposals outlining three phases of work. Specifically, the RFQ/SOQ included the following language: PRELIMINARY SCOPE OF WORK The following is a preliminary scope of work that may be modified during contract negotiations with the selected consultant. The preliminary scope of work is intended to outline and describe the range of tasks anticipated for the project, but is not intended to be complete. It is anticipated that planning, design, and construction will be completed within three major phases as described below. Public involvement will be an element of each phase. Phase 1 - Inventory, site assessment, and development of a park design program Phase 2 - Schematic design and implementation program Phase 3 -Design development, permitting, bidding, and construction support 6.11 Packet Pg. 226 The selected consultant shall initially complete the Phase 1 and Phase 2 scope of work. The City of Edmonds reserves the right to award additional work for future phases to the same firm, or another firm, as necessary to complete the project. Phase 3 will be contingent upon securing necessary funding, and would include design development, permitting, construction documents, construction monitoring and observation. The RFQ was published on February 12, 2016, with submittals due on March 8th. There were eight total submittals. Staff created an objective scoring matrix representing the criteria in the RFQ. After scoring, staff invited three firms to interview with a citizen and staff committee. After the interviews, the committee unanimously recommended contracting with Walker Macy for this work. Walker Macy presented the Preferred Master Plan for Civic Field to City Council on January 17, 2017. The presentation summarized the project background, schedule, and community input received over the course of an eight month planning process. Additional direction from City Council at the January 17th meeting included support for a landscaped buffer in lieu of a physical fence around the perimeter of the park, support for the 6th Avenue Promenade ROW Improvements, and a Council recommendation to remove the easternmost tennis court and explore a less intrusive/more aesthetically pleasing fence for the remaining court. The Civic Park Master Plan was approved in March 2017, and officially adopted in the City’s Comprehensive Plan in late 2017. The City seeks to contract with Walker Macy to begin Phase 3 of the project; Design development, permitting, bidding, and construction support. City staff, including parks and engineering, has met several times with Walker Macy to help develop the scope of work. Walker Macy coordinated a pre DRC meeting in order to reflect the work necessary to complete the design and construction in their scope of work. Attached is the scope of work, which represents approximately 10% of the construction costs. In addition, attached is also a DRAFT budget for Civic Center Development, design and construction. This is very preliminary, but it will give Council the opportunity to review and discuss options and ideas. Attached: PSA for Walker Macy Walker Macy Proposal Walker Macy Fee Detail Final SOQ for Civic Civic Master Plan Final DRAFT Civic proposed budget Attachments: DRAFT Walker Macy Civic Center Playfield PSA 3.29.18 Final for Council 180320 SD-CA Civic Field Proposal 180320 Civic Field Fee Detail SD-CA 6.11 Packet Pg. 227 Civic Final SOQ 170227_ECCP_Master_Plan_Final_optimized DRAFT Civic Proposed Budget 6.11 Packet Pg. 228 1 PROFESSIONAL SERVICES AGREEMENT THIS AGREEMENT (“Agreement”) is made and entered into between the City of Edmonds, a Washington municipal corporation, hereinafter referred to as the "City", and Walker Macy, hereinafter referred to as the "Consultant". WHEREAS, the City desires to engage the professional services and assistance of a consulting firm to provide landscape architectural services with respect to the Civic Center Playfield project (“Project”); NOW, THEREFORE, in consideration of mutual benefits accruing, it is agreed by and between the parties hereto as follows: 1. Scope of work. The scope of work shall include all services and material necessary to accomplish the above mentioned objectives in accordance with the Scope of Services that is marked as Exhibit A, attached hereto and incorporated herein by this reference. 2. Payments. The Consultant shall be paid by the City for completed work for services rendered under this Agreement as provided hereinafter. Such payment shall be full compensation for work performed or services rendered and for all labor, materials, supplies, equipment and incidentals necessary to complete the work. A. Payment for work accomplished under the terms of this Agreement shall be on a time and expense basis as set forth on the Fee Schedule set forth in Exhibit B, attached hereto and incorporated herein by this reference; provided, in no event shall the payment for work performed pursuant to this Agreement exceed the sum of One Million Two Hundred Eight Thousand One Hundred Eighty Five Dollars ($1,208,185.00) plus expenses, not to exceed an additional Twenty Five Thousand Dollwar ($25,000). B. All vouchers shall be submitted by the Consultant to the City for payment pursuant to the terms of this Agreement. The City shall pay the appropriate amount for each voucher to the Consultant. The Consultant may submit vouchers to the City biweekly during the progress of the work for payment of completed phases of the project. Billings shall be reviewed in conjunction with the City's warrant process. No billing shall be considered for payment that has not been submitted to the City three days prior to the scheduled cut-off date. Such late vouchers will be checked by the City and payment will be made in the next regular payment cycle. C. The costs records and accounts pertaining to this Agreement are to be kept available for inspection by representatives of the City for a period of three years after final payment. Copies shall be made available upon request. 3. Ownership and use of documents. All research, tests, surveys, preliminary data and any and all other work product prepared or gathered by the Consultant in preparation for the services rendered by the Consultant under this Agreement shall be and are the property of the Consultant, provided, however, that: 6.11.a Packet Pg. 229 Attachment: DRAFT Walker Macy Civic Center Playfield PSA 3.29.18 Final for Council (Civic Field PSA for design services) A. All final reports, presentations and testimony prepared by the Consultant shall become the property of the City upon their presentation to and acceptance by the City and shall at that date become the property of the City. B. The City shall have the right, upon reasonable request, to inspect, review and copy any work product during normal office hours. Documents prepared under this agreement and in the possession of the Consultant may be subject to public records request and release under Chapter 42.56 RCW. C. In the event that the Consultant shall default on this Agreement, or in the event that this contract shall be terminated prior to its completion as herein provided, the work product of the Consultant, along with a summary of work done to date of default or termination, shall become the property of the City and tender of the work product and summary shall be a prerequisite to final payment under this contract. The summary of work done shall be prepared at no additional cost. 4. Time of performance. The Consultant shall perform the work authorized by this Agreement promptly in accordance with the receipt of the required governmental approvals. The parties agree that the categories of services set forth in the Scope of Services shall be undertaken on the following schedule (including payments anticipated in each calendar year): 2018: 1. Project Startup: $31,823 2. Schematic Design: $159,872 3. 30% Design Development: $190,572 4. 10% Contingency Fund: $38,227 Total: $420,494 (plus expenses) 2019: 1. 50/90/100% Design Construction Documentation: $475,588 2. Permitting: $34,056 3. Bidding: $20,178 4. 10% Contingency Fund: $52,982 Total: $582,804 (plus expenses) 2020: 1. Services During Construction: $174,194 2. Project Closeout: $12,067 3. 10% Contingency Fund: $18,626 Total: $204,887 (plus expenses) 5. Indemnification / Hold harmless agreement. The Consultant shall defend, indemnify and hold the City, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses, demands, or suits at law or equity arising from the acts, errors or omissions of the Consultant in the performance of this Agreement, except for injuries and damages caused by the sole negligence of the City. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for 6.11.a Packet Pg. 230 Attachment: DRAFT Walker Macy Civic Center Playfield PSA 3.29.18 Final for Council (Civic Field PSA for design services) damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, and volunteers, the Consultant’s liability, including the duty and cost to defend, hereunder shall be only to the extent of the Consultant’s negligence. The Consultant shall comply with all applicable sections of the applicable Ethics laws, including RCW 42.23, which is the Code of Ethics for regulating contract interest by municipal officers. The Consultant specifically assumes potential liability for actions brought by the Consultant’s own employees against the City and, solely for the purpose of this indemnification and defense, the Consultant specifically waives any immunity under the state industrial insurance law, Title 51 RCW. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement. 6. General and professional liability insurance. The Consultant shall obtain and keep in force during the term of the Agreement, or as otherwise required, the following insurance with companies or through sources approved by the State Insurance Commissioner pursuant to Title 48 RCW. Insurance Coverage A. Worker’s compensation and employer’s liability insurance as required by the State. B. Commercial general liability and property damage insurance in an aggregate amount not less than two million dollars ($2,000,000) for bodily injury, including death and property damage. The per occurrence amount shall be written with limits no less than one million dollars ($1,000,000). C. Vehicle liability insurance for any automobile used in an amount not less than a one million dollar ($1,000,000) combined single limit. D. Professional liability insurance in the amount of one million dollars ($1,000,000). Excepting the Worker’s Compensation Insurance and Professional Liability Insurance secured by the Consultant, the City will be named on all policies as an additional insured. The Consultant shall furnish the City with verification of insurance and endorsements required by the Agreement. The City reserves the right to require complete, certified copies of all required insurance policies at any time. All insurance shall be obtained from an insurance company authorized to do business in the State of Washington. The Consultant shall submit a verification of insurance as outlined above within fourteen days of the execution of this Agreement to the City. No cancellation of the foregoing policies shall be effective without thirty days prior notice to the City. The Consultant’s professional liability to the City shall be limited to the amount payable under this Agreement or one million dollars ($1,000,000), whichever is the greater, unless modified elsewhere in this Agreement. In no case shall the Consultant’s professional liability to third parties be limited in any way. 7. Discrimination prohibited. Consultant shall not discriminate against any employee or applicant for employment because of race, color, religion, national origin, age, sex, sexual orientation, marital status, veteran status, liability for service in the armed forces of the 6.11.a Packet Pg. 231 Attachment: DRAFT Walker Macy Civic Center Playfield PSA 3.29.18 Final for Council (Civic Field PSA for design services) United States, disability, or the presence of any sensory, mental or physical handicap, or any other protected class status, unless based upon a bona fide occupational qualification. 8. Consultant is an independent contractor. The parties intend that an independent contractor relationship will be created by this Agreement. No agent, employee or representative of the Consultant shall be deemed to be an agent, employee or representative of the City for any purpose. Consultant shall be solely responsible for all acts of its agents, employees, representatives and subcontractors during the performance of this Agreement. 9. City approval of work and relationships. Notwithstanding the Consultant's status as an independent contractor, results of the work performed pursuant to this Agreement must meet the approval of the City. During pendency of this Agreement, the Consultant shall not perform work for any party with respect to any property located within the City of Edmonds or for any project subject to the administrative or quasijudicial review of the City without written notification to the City and the City’s prior written consent. 10. Termination. This being an Agreement for professional services, either party may terminate this Agreement for any reason upon giving the other party written notice of such termination no fewer than ten (10) days in advance of the effective date of said termination. 11. Integration. The Agreement between the parties shall consist of this document, the Scope of Work attached hereto as Exhibit A, and the Fee Schedule attached hereto as Exhibit B. These writings constitute the entire Agreement of the parties and shall not be amended except by a writing executed by both parties. In the event of any conflict between this written Agreement and any provision of Exhibits A or B, this Agreement shall control. 12. Changes/Additional Work. The City may engage Consultant to perform services in addition to those listed in this Agreement, and Consultant will be entitled to additional compensation for authorized additional services or materials. The City shall not be liable for additional compensation until and unless any and all additional work and compensation is approved in advance in writing and signed by both parties to this Agreement. If conditions are encountered which are not anticipated in the Scope of Work, the City understands that a revision to the Scope of Work and fees may be required. Provided, however, that nothing in this paragraph shall be interpreted to obligate the Consultant to render or the City to pay for services rendered in excess of the Scope of Work in Exhibit A unless or until an amendment to this Agreement is approved in writing by both parties. 13. Standard of Care. Consultant represents that Consultant has the necessary knowledge, skill and experience to perform services required by this Agreement. Consultant and any persons employed by Consultant shall use their best efforts to perform the work in a professional manner consistent with sound practices, in accordance with the schedules herein and in accordance with the usual and customary professional care required for services of the type described in the Scope of Work. 14. Non-waiver. Waiver by the City of any provision of this Agreement or any time limitation provided for in this Agreement shall not constitute a waiver of any other provision. 6.11.a Packet Pg. 232 Attachment: DRAFT Walker Macy Civic Center Playfield PSA 3.29.18 Final for Council (Civic Field PSA for design services) 15. Non-assignable. The services to be provided by the Consultant shall not be assigned or subcontracted without the express written consent of the City. 16. Covenant against contingent fees. The Consultant warrants that s/he has not employed or retained any company or person, other than a bona fide employee working solely for the Consultant, to solicit or secure this Agreement, and that s/he has not paid or agreed to pay any company or person, other than a bona fide employee working solely for the Consultant, any fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent upon or resulting from the award of making of this Agreement. For breach or violation of this warranty, the City shall have the right to annul this Agreement without liability or, in its discretion to deduct from the contract price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. 17. Compliance with laws. The Consultant in the performance of this Agreement shall comply with all applicable Federal, State or local laws and ordinances, including regulations for licensing, certification and operation of facilities, programs and accreditation, and licensing of individuals, and any other standards or criteria as described in the Agreement to assure quality of services. The Consultant specifically agrees to pay any applicable business and occupation (B & O) taxes which may be due on account of this Agreement. 18. Notices. Notices to the City of Edmonds shall be sent to the following address: City of Edmonds 121 Fifth Avenue North Edmonds, WA 98020 Notices to the Consultant shall be sent to the following address: Walker Macy 105 S. Main Street, Suite 205 Seattle, WA 98104 Receipt of any notice shall be deemed effective three days after deposit of written notice in the U.S. mails, with proper postage and properly addressed. DATED THIS _______ DAY OF __________________, 2018. CITY OF EDMONDS WALKER MACY By By David O. Earling, Mayor Its 6.11.a Packet Pg. 233 Attachment: DRAFT Walker Macy Civic Center Playfield PSA 3.29.18 Final for Council (Civic Field PSA for design services) ATTEST/AUTHENTICATED: APPROVED AS TO FORM: ________________________________ ________________________________ Scott Passey, City Clerk Office of the City Attorney STATE OF WASHINGTON ) )ss COUNTY OF ) On this day of , 2018, before me, the undersigned, a Notary Public in and for the State of Washington, duly commissioned and sworn, personally appeared , to me known to be the of the corporation that executed the foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he/she was authorized to execute said instrument and that the seal affixed is the corporate seal of said corporation. WITNESS my hand and official seal hereto affixed the day and year first above written. NOTARY PUBLIC My commission expires: 6.11.a Packet Pg. 234 Attachment: DRAFT Walker Macy Civic Center Playfield PSA 3.29.18 Final for Council (Civic Field PSA for design services) March 20, 2018 Carrie Hite Parks, Recreation and Cultural Services Director City of Edmonds 700 Main Street Edmonds, WA 98020 RE: Edmonds Civic Center Playfield Improvements – P3282.01 Dear Carrie, We appreciate the opportunity to submit the following proposal for providing landscape architectural services for the redevelopment of Civic Center Playfield. PROJECT UNDERSTANDING AND TEAM ROLES: 1. The project transforms the existing Civic Center Playfield into a new 8 acre park with site improvements that include a multi-use plaza, a permanent skatepark and pumptrack with integrated viewing areas, a water feature, multi-use lawn and playfields, one playground, six petanque courts, one multi-use court, one shade pavilion structure (including restrooms and storage), walking/jogging paths, exercise stations, picnic area, youth bouldering wall, lawn terraces, berms, planting, lighting, stormwater gardens and all related utilities that are commensurate with the Master Plan, dated February 2017. Limits of park improvements are illustrated in Exhibit A, attached. 2. Walker Macy proposes the following sub-consultant team to assist us on the project: • Architect: ORA Architects • Civil and Structural Engineers: KPFF Consulting Engineers • Mechanical and Plumbing Engineer: Notkin-Wood Harbinger • Electrical Engineer: Reyes Engineering • Lighting Designer: FMS • Cost Consulting: JMB Consulting • Fountain Designer: STO Design • Irrigation Consultant: Design Two Four Two Six • Skatepark Consultant: Grindline • Geotechnical Consultant: Landau 3. Walker Macy's role will be to provide the following: • We will work directly with The City of Edmonds and the design team during the effort to ensure a comprehensive approach to the work, and will provide leadership at meetings with client, City, and community groups. 6.11.b Packet Pg. 235 Attachment: 180320 SD-CA Civic Field Proposal (Civic Field PSA for design services) Civic Center Playfield March 16, 2018 Page 2 of 11 • Detailed planning and site design for all park improvements, access and circulation for Civic Center Playfield • Walker Macy, in collaboration with the design team, will document surface improvements including vehicular and pedestrian paving, planting, grading, irrigation, water feature, sports courts and fields, playground, youth climbing wall, skatepark integration and site furnishings for areas within our scope. • Walker Macy will document all site demolition with Civil engineer review. • Walker Macy, in collaboration with KPFF, will advance the design of 6th Avenue (The Market Promenade), to a Schematic Design level and 7th Avenue through Construction Administration as an optional additional service. Note, this assumes that ROW work is integrated with park design efforts to reduce cost. If ROW work became a separate effort, fee estimates would require revision. 4. The team’s skatepark consultant will provide consultation, design guidance and architectural drawings for the skatepark and/or pumptrack. 5. The City of Edmonds will lead and apply for all applicable grants. Walker Macy will support this effort with required graphics, narratives, and cost estimates. 6. The team’s architect will provide: a. Architectural drawings and CAD files for the design for a new shade pavilion with integrated restrooms. b. Documentation for the demolition of the existing shed c. Not included in this estimate are renovation of the existing Field House, work on a Boys and Girls Club facility or footprint that differs from the Master Plan, or integration of the shade pavilion and restroom structure with a future Boys and Girls Club facility. 7. The team’s civil engineer will document and provide CAD files for all right-of-way requirements, erosion and sedimentation control, stormwater features and all utilities. a. We will collaborate with the civil engineer for stormwater quality features per City of Edmonds code requirements. b. The City of Edmonds requires a civil engineer's stamp on all final grading plans. Therefore we propose to transfer our detailed grading documents after 50% CD to the civil engineer for final construction documentation, in coordination with Walker Macy. c. ROW Improvements along 6th and 7th Avenue. See attached limit of work and additional services enumerated below. 8. The team’s fountain designer will provide water feature design services and mechanical, electrical and plumbing design guidance, in coordination with related sub consultants, and documentation for the water feature. 9. The team’s mechanical engineer will provide mechanical and plumbing design guidance, specification and technical review in coordination with related sub-consultants. 6.11.b Packet Pg. 236 Attachment: 180320 SD-CA Civic Field Proposal (Civic Field PSA for design services) Civic Center Playfield March 16, 2018 Page 3 of 11 10. The team’s lighting designer will provide lighting design services for pedestrian, architectural, sports, and feature lighting, including fixture proposals, photometric assessments, technical drawings, and specifications in coordination with Walker Macy and related sub consultants. 11. The team’s irrigation consultant will provide irrigation design, layout and technical documentation. The irrigation consultant will also provide CAD files of the irrigation locations for coordination with Walker Macy. 12. The team’s electrical engineer will document all routing and controls for electrical services, layouts and vaults for site lighting features, including sports field and court lighting. The electrical engineer will also provide CAD files of the electrical fixture locations for coordination with Walker Macy. 13. The team’s geotechnical engineer will document recommendations for surface, subsurface and groundwater conditions for proposed work and features, including demolition. The geotechnical engineer will provide or review drawings as required, including earthwork loading, drainage and foundations. 14. The team’s cost estimating consultant will provide statements of probable costs at Schematic Design and 90% construction documents. 15. Walker Macy will submit a packet to the City for review following Schematic Design, 30%(Design Development) and 90%(Construction Documentation) milestones. The City will provide a single collated set of comments to Walker Macy within 40 days of each submittal. Other milestones will conclude with design team review only. 16. All activities and fees necessary to obtain permits will be by The City of Edmonds and the Owner. Walker Macy and the design team will provide drawings for inclusion in the permit applications. We assume permit drawings will be derivatives of our working plans. SCOPE OF WORK: Based on our understanding of the project, and the information provided, we propose the following scope of work: 1. Project Start-up (April - May 2018) 1.1 Attend one conference call with client to discuss scope, budget and schedule. 1.2 Review survey and geotechnical reports, budget information, code requirements, permit requirements and other project background material made available to Walker Macy. 1.3 Coordinate scope of work and attend meetings as needed with sub-consultants. 1.4 Coordinate and lead team kick-off meeting with sub-consultants 1.5 Attend and document one (1) project kick-off meeting with client, in Edmonds, to review design efforts and to coordinate our work. 1.6 Confirm reclaimed timber and seat board inventory for potential use in the park. Meetings Summmary: • One (1) conference call meeting with client to discuss scope, budget and schedule 6.11.b Packet Pg. 237 Attachment: 180320 SD-CA Civic Field Proposal (Civic Field PSA for design services) Civic Center Playfield March 16, 2018 Page 4 of 11 • One (1) kick-off meeting with client in Edmonds • One (1) consultant team kickoff meeting ( additional subconsultant meetings as needed) 2. Schematic Design (June - August 2018) 2.1 Refine and/or revise site design to accommodate findings from survey and geotech reports and changes to program since Master Plan was published Create CAD base files. 2.2 Park feature design development, including water feature, skatepark, playground, exercise stations and scramble wall. 2.3 Design team meetings and coordination of site work across all disciplines. 2.4 Attend and document one (1) meeting with the client in Edmonds, followed by weekly conference calls. 2.5 Attend and document one (1) Project Advisory Meeting, in Edmonds. 2.6 Attend and document one (1) meeting with the Edmonds Petanque Club. 2.7 Attend and document one (1) meeting with Edmonds Skatepark Committee. 2.8 Attend and document one (1) meeting with Edmonds Chamber of Commerce regarding event planning. 2.9 Attend one (1) meetings with Public Works and Engineering to coordinate Schematic Design of The Market Promenade – 6th Street Improvements (per optional services). 2.10 Review Edmonds standard documentation and drawing format requirements and revise drawing formats as needed. 2.11 Prepare documentation for and attend one (1) Edmonds Internal Parks and Planning review in Edmonds after SD submittal. 2.12 Attend one (1) City Council Meeting in Edmonds. 2.13 Attend and document one (1) meeting with the Boys and Girls Club in Edmonds. 2.14 Prepare/attend/document one (1) art meeting with Edmonds Cultural Services Manager. 2.15 Provide 100% Schematic Design Submittal with the following deliverables: • CAD Base drawings for team coordination • Updated Illustrative Site Plan • Area take-offs diagram • Materials Plan / Site Plan • Up to three (3) CAD Sections / Elevations, as needed to convey design intent • Grading Concept Plan for Civic Center Playfield • Schematic Design Grading Concept for 6th Avenue (per additional services) • Narrative / basis of design memo • Image boards describing proposed materials and plant typologies • (1) Updated birdseye perspective rendering 6.11.b Packet Pg. 238 Attachment: 180320 SD-CA Civic Field Proposal (Civic Field PSA for design services) Civic Center Playfield March 16, 2018 Page 5 of 11 • Stormwater concept plan • Plan, roof plan and sections of pavilion • Skatepark plan • Lighting concept plan • Water feature concept plan • 100% SD Cost Estimate, including delineated budget** Meetings Summary: • One (1) meeting with client in Edmonds • Weekly conference calls with client • One (1) Project Advisory Committee Meeting in Edmonds • One (1) City Council Meeting in Edmonds • One (1) meeting with Edmonds Petanque Club in Edmonds. • One (1) meeting with Edmonds Skatepark Committee in Edmonds • One (1) Chamber of Commerce Meeting in Edmonds • One (1) meeting for City of Edmonds internal (Parks and Planning) review in Edmonds • One (1) meeting with City of Edmonds Public Works to coordinate 6th Avenue Improvements (per additional services). • One (1) meeting with the Boys and Girls Club 3. 30% (Design Development, September – November 2018) No City review following 30% milestone, submittal is for internal review purposes only) 3.1 Incorporate and/or respond to Schematic Design submittal City review comments. City to provide one collated set of comments for response. 3.2 Attend one (1) meeting with client to review the schematic design phase and discuss construction budget for the site and landscape improvements, design development goals and schedule. 3.3 Review Schematic Design cost estimate and contribute to Value Engineering efforts by amending landscape scope as required to bring project into budget goals. 3.4 Lead team design development and coordination. Coordinate technical documentation for grading plan, demolition, layout, architectural, civil/stormwater, planting, irrigation and lighting plans in coordination with consultant team. 3.5 Attend one (1) meeting with the Edmonds Petanque Club to review and refine court design. 3.6 Attend one (1) meeting with Edmonds Skatepark Committee to review and refine skatepark/pumptrack design. 3.7 Consult on arts integration plan with Edmonds Cultural Services Manager. 3.8 Attend meeting and follow up with artist(s) to discuss concepts and park design integration. 3.9 Review and incorporate Edmonds standard details and related requirements. 3.10 Attend one (1) meeting with City in Edmonds to review 30% plans and outstanding issues 6.11.b Packet Pg. 239 Attachment: 180320 SD-CA Civic Field Proposal (Civic Field PSA for design services) Civic Center Playfield March 16, 2018 Page 6 of 11 3.11 Submit internal 30% Design. Deliverables include: • Demolition Plans • Civil Utility and Stormwater Plans • Grading Plans • Materials Plans, including Lighting and Furnishings • Planting Area Plans noting plant types (e.g., tree, shrub, groundcover); not specific plant species. • Irrigation Conceptual Zone Plans (includes point of connection, mainline routing, and irrigation value locations). • Architectural Plans • Lighting Plans • Electrical Plans • Mechanical Cut Sheets and Plans • Water Feature Plans • Skatepark Plans • Draft basis of design memo summarizing assumptions, design intent, code requirements and draft specifications. • Draft specifications, including Division One. Meetings Summary: • Two (1) client review meetings in Edmonds. • Weekly conference calls with client • One (1) meeting with Edmonds Petanque Club • One (1) meeting with Edmonds Skatepark Committee • One (1) meeting with Edmonds internal review committee (Parks and Planning) in Edmonds to review 30% DD submittal. 4. 50%, 90% and 100% Design Construction Documentation (December 2018 - August 2019) City Review after 90% only. 4.1 Attend two (2) coordination meetings with The City of Edmonds. 4.2 After 30% and 90% submittals, review the construction budget, schedule and milestones. Attain approval from City to proceed with 100% Construction Documentation. 4.3 Lead design development and coordination of technical documents in coordination with consultant team. 4.4 Coordinate artist integration for each phase. 4.5 Produce 50%, 90% and 100% Construction Documents. Deliverables include: • Site Demolition Plans • Site Civil Plans and Details • Site Grading Plans • Site Materials and Furnishings Plans 6.11.b Packet Pg. 240 Attachment: 180320 SD-CA Civic Field Proposal (Civic Field PSA for design services) Civic Center Playfield March 16, 2018 Page 7 of 11 • Site Layout Plans • Soil Plans and Details • Planting Plans and Details • Irrigation plans and Details • Site Construction Details • Site Structural Plans and Details • Architectural Plans and Details • Lighting Plans and Details • Electrical Plans and Details • Water Feature Plans and Details • Skatepark Plans and Details • Specifications, including Division1 Specifications. 4.6 Submit 90% documents to City for review. The 50% and 100% milestones will be used for internal team review and QA/QC only. 4.7 Develop cost estimate at 90% submittal. 4.8 Complete geotech review at 50% internal review. 4.9 One (1) meeting with Edmonds Skatepark Committee after 50% review. 4.10 Prior to 100% submittal, contribute to Value Engineering efforts by amending landscape scope and drawings as required to bring project into budget goals. Value engineering drawing revisions after 90% Construction Documentation are not included in this scope of work. Meeting summary: • Two (2) client review meetings, in Edmonds. • One (1) meetings with Edmonds Skatepark Committee 5. Permitting (April – November 2019) 5.1 Submit preliminary and final stamped and signed documents to the client as required for permitting. The permits currently anticipated for this project are all under one umbrella permit package and include: a. ROW development (per optional services) b. Grading and park features c. Building plans d. Utility plans 5.2 Respond to permit comments during permitting. 5.3 Revise drawings and resubmit to the permit center if required. 6. Bidding (September - November 2019) 6.11.b Packet Pg. 241 Attachment: 180320 SD-CA Civic Field Proposal (Civic Field PSA for design services) Civic Center Playfield March 16, 2018 Page 8 of 11 6.1 Produce Bid Set documents, based on 100% construction documents, including Division 1 Specifications. 6.2 Attend pre-bid conference. 6.3 Prepare addenda during bid period as necessary. 6.4 Assist in review of bids. Deliverables: • Permit drawings based on Construction Documents. Meetings: • One (1) pre-bid conference in Edmonds. 7. Services During Construction (December 2019 – December 2020) 7.1 Develop “For Construction” set of Construction Documents. 7.2 Attend (1) pre-construction meeting. 7.3 Review product submittals and shop drawings; respond to requests for information, produce change orders and clarification drawings as needed. 7.4 Attend twenty two (22) project meetings and Construction Observation site visits (one every other week), particularly at the following milestones: • Review of rough grading. • Review of hardscape layout. • Perform one nursery visits at milestones to review and tag plant material. • Review irrigation mainline layout and open mainline trenching. • Review of finish grading. • Review tree and/or plant material layout. • Review irrigation coverage. • Stormwater system review (civil) • Artwork integration review/observation • Additional milestones as defined by sub-consultants 7.5 Attend (1) substantial completion walk-through and develop a punch list. 7.6 Attend (1) final acceptance walk-through to review completion of the punch list. 7.7 Attend (1) warranty walk-through and develop a warranty list. 8. Project Closeout 8.1 Prepare record documents for all work within our scope based on contractor provided record drawings in CAD format. FEES: 6.11.b Packet Pg. 242 Attachment: 180320 SD-CA Civic Field Proposal (Civic Field PSA for design services) Civic Center Playfield March 16, 2018 Page 9 of 11 We propose the following fees: 1. Project Start Up $31,823.00 2. Schematic Design $159,872.00 3. Design Development (30%) $190,572.00 4. Construction Documents (50/90/100%) $475,588.00 5. Permitting $34,056.00 6. Bidding $20,178.00 7. Service During Construction $174,194.00 8. Project Close-Out $12,067.00 Subtotal: $1,098,350.00 9. 10% Design Contingency $109,835.00 Total: $1,208,185.00 plus expenses We propose to bill monthly on a percentage of completion per phase. Expenses are additional, and will be billed at 1.1 times our cost. OPTIONAL SERVICES: Based on our understanding of the project, and the information provided, we propose the following Optional Services. We propose to bill monthly on a percentage of completion per phase. Expenses are additional, and will be billed at cost. Project Understanding, Team Roles, and Assumptions enumerated in this Scope of Work shall also apply to these optional services. Parking Impact Study Conduct parking impact study related to Civic Center Playfield improvements. Walker Macy proposes Fehr & Peers to assist with the study. See attached proposal. Estimated Fee: $25,600 ROW Improvements Study grading on 6th Avenue to determine feasibility of The Market Promenade and flush curb condition to a Schematic Design Level. Develop and document ROW improvements, per the approved Master Plan along 7th Avenue and 6th Avenue (from back-of-curb on the park-side) through Construction Administration. Estimated Fee: $51,775.00 10% Design Contingency $5,178.00 Total: $56,953.00 ASSUMPTIONS: 1. Our proposal is based on the above scope of work, attached limit of work, and a project construction budget not to exceed $10M. 2. Recent geotechnical investigation revealed conditions that may increase construction cost significantly above prior estimate. Reductions in park program or phasing may be required. Areas of park that require redesign may require additional services. 6.11.b Packet Pg. 243 Attachment: 180320 SD-CA Civic Field Proposal (Civic Field PSA for design services) Civic Center Playfield March 16, 2018 Page 10 of 11 3. The siting, if any, and scale of the future Boys and Girls Club will be determined prior to Schematic Design phase initiation. Redesigns for Club siting may require additional services. 4. All work in the right-of-way along 6th and 7th Avenues, as well as pedestrian crossings on 6th and 7th Avenues, are listed as optional services and are not included in the base scope and fee. 5. Changes to overhead power and other utilities along rights-of-way are not included in this scope of work. 6. Construction drawings will be provided or based upon Walker Macy standards. 8. Revisions to the construction documents due to value engineering which occur after 90% submittal will require Walker Macy to evaluate potential impact to fees. 9. Site visits in addition to those identified will require Walker Macy to evaluate potential impact to fees. 10. Walker Macy will provide complete Division One specifications (based on templates provided by the City of Edmonds) and will manage the submittal and RFI process. Walker Macy will attend all meetings outlined in the scope of work. Meetings beyond those noted will be additional services and will be billed as time and materials. 11. This proposal assumes the project will be constructed in one phase. If the project is broken into multiple design or construction phases, scope and fees will be re-evaluated. 12. Project is scheduled to be completed by December 2020. If project extends substantially beyond the scheduled date additional scope and fees will be re-evaluated. 13. The project team cost estimator will develop landscape and site improvements, quantity take-offs, and unit pricing. This information will be provided to Walker Macy for review as noted in the scope above. Walker Macy and the design team will evaluate quantities and unit cost and provide comments to client. 15. Design review services are not currently part of the proposed scope of services. 16. LEED documentation is not currently a part of the proposed scope of services. 17. Walker Macy is not responsible for verifying the accuracy of Contractors’ record documents. 19. Walker Macy will provide typed CSI-formatted specifications. 20. City arborist will provide assessment of existing trees within proposed limits of work. 21. KPFF provided the City of Edmonds a schematic side sewer stub location on 11.30.17 for the future restroom and water feature. We assume the new 8 inch SS Main and stub outs will be in place prior to construction of Civic Field and be completed by the COE. Future coordination for this 8 inch SS Main will include coordination at the view terraces.” 22. City review and feedback duration is assumed at 40 days. If this review period extends substantially beyond the expected duration, impacts to team fees and project schedule will be re-evaluated. Please contact me if you have any questions, require clarification, or if we can be of further assistance. We look forward to working with you on the Civic Center Playfield Improvement Project. Sincerely, WALKER MACY 6.11.b Packet Pg. 244 Attachment: 180320 SD-CA Civic Field Proposal (Civic Field PSA for design services) Civic Center Playfield March 16, 2018 Page 11 of 11 Chris Jones Principal cjones@walkermacy.com Approved: __________________________________ _____________ Name and title Date 6.11.b Packet Pg. 245 Attachment: 180320 SD-CA Civic Field Proposal (Civic Field PSA for design services) EDMONDS CIVIC PLAYFIELD FEE PROPOSAL, BASE SCOPE SD-CAPIC QA/QC PM STAFF Civil Structural Architecture SkateparkWater Feature Irrigation Lighting Geotech Cost Est Mech/Plmb Electrical$140 $125 $80 $75 KPFF KPFF ORA Grindline STO 2426 FMS Landau JMBNotkin‐Wood‐HarbingerReyes1.1Attend (1) conference call with Client to discuss scope/budget/sched 4 8 81.2Team review/intro to background material (survey, geotech, MP) &  revise plans, 6 24 16 910.80$                 1,650.00$           2,818.20$          247.50$             1.3Coordinate scope of work and schedule with subconsultants 8 40 01,980.00$          3,465.00$          1.4Conduct (1)  team kickoff meeting  with subs10 8 8 1,100.00$              550.00$              385.00$              550.00$             4.5Attend and document (1) kickoff Client meeting in Edmonds 10 6 8 770.00$              1,540.00$          346.50$             1.6Confirm reclaimed bench material and inventory  for park use 0 2 20Expenses  0  Total WM Hours38 08842WM Fee/Hr 5320 $0 $7,040 $3,150Subtotal Cost WMTotal Consultant Fee $2,010.80 $770.00 $2,200.00 $1,925.00 $5,348.20 $0.00 $0.00 $0.00 $0.00$247.50 $3,811.50Total Cost for Startup Phase2.1Refine and revise site technical drawings to accommodate MP final changes20 42436495.00$             2.2Park feature design development ( water feature, skatepark, playground, exercise station and scramble wall)20 24 36 550.00$              1,677.50$           4,038.10$           561.00$              8,030.00$           1,259.50$           1,045.00$          2.3Design team meetings and coordination of site work across all disciplines 8 24 16 1,650.00$           1,650.00$           275.00$              1,259.50$           346.50$             2.4Prepare/attend/document (1) Client meeting in Edmonds4 12 8 550.00$             2.4aWeekly conference calls with COE12 24 162.5Prepare/attend/document (1) Project Advisory Committee Meeting in Edmonds612162.6Prepare/attend/document (1)  meeting with Petanque Club2642.7Prepare/attend/document (1) meeting/presentation with Skatepark Committee6 12 16 770.00$             2.8Prepare/attend/document (1) meeting with Chamber of Commerce2642.1Review Edmonds documentation and drawing standards 2 8 16 1,320.00$              550.00$             220.00$             2.11City Parks and Planning review after SD submittal ‐ in Edmonds4842.12Prepare/attend/document (1) City Council Meeting4442.13Prepare/attend/document (1) Boys and Girls Club Meeting in Edmonds4 12 8 550.00$             2.14Prepare/attend/document (1) Art meeting with Edmonds Cultural Services Mgr2642.15Provide 100% Schematic Design Submittal:Updated CAD Bases4 8 36 4,400.00$              4,400.00$          Illustrative Plan41632Area Takeoffs diagram124Materials Plan/Site Plan6 2 30 401,138.50$          (3) CAD Sections/Elevations 6 1 12 32 550.00$                 5,500.00$          Grading Concept Plan ‐ Park16 43040Grading Concept Plan ‐  6th & 7th Avenue (moved to ROW breakout) 0000 ‐$                       ‐$                    Stormwater Concept Plan6 2 16 16 5,500.00$             Project Narrative/Memo8123,520.00$           786.50$              1,138.50$          Image Boards46121,045.00$          (1) Updated Birdseye Perspective rendering2 24 40 1,650.00$           1,540.00$          Cost Estimate2 2 10 2 1,100.00$           605.00$              14,300.00$         198.00$              1,138.50$          Expenses 0Total WM Hours 155 15 348 442WM Fee/Hr $21,700 $1,875 $27,840 $33,150Subtotal Cost WMTotal Consultant Fee $11,770.00 $2,200.00 $14,300.00 $3,987.50 $5,688.10 $836.00 $13,200.00 $0.00 $14,300.00 $3,723.50 $5,302.00Subtotal Cost for SD Phase3.1Incorporate and/or respond to Schematic Design City comments.  16 2 32 32 2,200.00$              1,100.00$           935.00$              550.00$              440.00$              935.00$              841.50$             3.2Attend one (1) meeting with client to review SD & outstanding issues 4 12 8 1,100.00$             3.3Amend landscape scope to meet value engineering efforts 20412$16,313$31,823Task 3:  30% Design Development (Sep ‐ Nov 2018)Consultants$84,565$75,307$159,872CIVIC FIELD FEE PROPOSAL (3/15/2018)Walker MacyTask One: Project Start‐Up (Apr ‐ May 2018Task 2:  Schematic Design (Jun‐Aug 2018)$15,510 Walker Macy, Confidential3/20/2018Page 16.11.cPacket Pg. 246Attachment: 180320 Civic Field Fee Detail SD-CA (Civic Field PSA for design services) EDMONDS CIVIC PLAYFIELD FEE PROPOSAL, BASE SCOPE SD-CAPIC QA/QC PM STAFF Civil Structural Architecture SkateparkWater Feature Irrigation Lighting Geotech Cost Est Mech/Plmb Electrical$140 $125 $80 $75 KPFF KPFF ORA Grindline STO 2426 FMS Landau JMBNotkin‐Wood‐HarbingerReyesConsultantsCIVIC FIELD FEE PROPOSAL (3/15/2018)Walker Macy3.4Team design development & coordination, technical drawing set creation 64 60 68 8,525.00$              1,650.00$           2,750.00$           550.00$              935.00$              3,300.00$          3.5Attend one (1) meeting with Edmonds Petanque Club 4 12 83.6Attend one (1) meeting with edmonds Skatepark6 12 12 385.00$             3.7Consult on arts integration plan with Edmonds Cultural Services Mgr2643.8Attend meeting & followup with artist to discuss concepts and park design integration2643.9Review/incorporate edmonds standard details and related requirements 2 1 4 3 1,100.00$              550.00$             3.10Attend one meeting with City of Edmonds to review 30% drawing set 8 8 2 1,100.00$             3.1130% Design Deliverables:Demolition Plans2818Civil Utility and Stormwater Plans4 188Grading Plans14 12856Materials Plans, including lighting and furnishings 14 1 24 32Planting Plans (zones/types)26 38 62Irrigation Plans4 184814.00$             Architectural Plans10 1 38 12 4,070.00$          Lighting Plans, controls & systems4116813,970.00$        Electrical Plans4 1883,646.50$          Mechanical Cut Sheets and plans03,850.00$          Water Feature Plans411682,692.80$          2,420.00$          Skatepark Plans4 1 16 8 2,530.00$          Draft Basis of Design Memo (design intent, code requirements) 4 116 880.00$              1,320.00$           335.50$              3,300.00$          Draft Specifications + Including Div 116 16 24 8 1,760.00$              550.00$              2,640.00$           1,540.00$           1,980.00$          Internal Review16 2 32 8 1,650.00$              550.00$              550.00$             880.00$              990.00$             Geotech Review4 2 16 8 440.00$                 1,430.00$           550.00$             2,326.50$          Expenses  0Total WM Hours 240 33 452 401WM Fee/Hr $33,600 $4,125 $36,160 $30,075Subtotal Cost WMTotal Consultant Fee  $17,875.00 $1,430.00 $9,900.00 $7,150.00 $3,792.80 $1,254.00 $19,800.00 $2,326.50 $0.00 $9,025.50 $14,058.00Subtotal Cost for DD (30% Design) Phase4.1Attend two (2) meetings with the City of Edmonds & review with consultants 10 20 10 1,100.00$             4.230% & 90% incorporation of City comments/responses 30 4 60 60 4,950.00$              1,650.00$           1,650.00$           412.50$              550.00$              1,166.00$           1,430.00$           396.00$              1,155.00$          4.2a30% & 90% project budget and schedule review & consultant coordination 4 24 2,200.00$             880.00$             4.3Lead design development & coordination of  technical drawings 804 320 420 10,120.00$         1,980.00$           2,200.00$           3,080.00$           605.00$             2,200.00$          4.4Coordinate artist integration for each phase (minimal technical drawing scope) 9 124184.5Produce and submit 50,90,100 Construction Documents:Demolition Plans12 3 24 48 550.00$                Civil Plans and Details14 3 48 24 33,000.00$           Grading Plans18 8 52 70 10,780.00$           Site Materials and Furnishings Plans12 83244Site Layout Plans16 81840Site Soil Plans8 2 24 24Planting Plans and Details28 23256Irrigation Plans and Details16 356405,555.00$          Site Construction Details64 8 140 160Site Structural Plans and Details12 32424Architectural Plans and Details24 3 48 32 14,300.00$         18,040.00$        Lighting Plans and Details28 3 40 24 1,320.00$          12,100.00$        Electrical Plans and Details840248,250.00$          Water Feature Plans and Details84024Skatepark Plans and Details12 40 48 6,380.00$           5,300.90$          Specifications  ‐ Including Division 114 60 40 12 2,750.00$              2,200.00$           3,850.00$           550.00$              8,800.00$           1,320.00$           8,250.00$          4.6Submit 90% documents for city review2444.7Develop 90% Cost Estimate 5 2 16 4 550.00$              770.00$              990.00$              12,100.00$         462.00$              990.00$             4.8Geotech Review (50% only)4 2 16 8 880.00$             2,326.50$          4.9Attend (1) meeting with  Skatepark Committee4 8 12 192.50$             4.10Contribute to Value Engineering Efforts12 24 38 550.00$              220.00$              550.00$              880.00$              1,452.00$          $103,960$86,612$190,572Task 4: 50%, 90%, 100% Design (Dec 2018‐Aug 2019) Walker Macy, Confidential3/20/2018Page 26.11.cPacket Pg. 247Attachment: 180320 Civic Field Fee Detail SD-CA (Civic Field PSA for design services) EDMONDS CIVIC PLAYFIELD FEE PROPOSAL, BASE SCOPE SD-CAPIC QA/QC PM STAFF Civil Structural Architecture SkateparkWater Feature Irrigation Lighting Geotech Cost Est Mech/Plmb Electrical$140 $125 $80 $75 KPFF KPFF ORA Grindline STO 2426 FMS Landau JMBNotkin‐Wood‐HarbingerReyesConsultantsCIVIC FIELD FEE PROPOSAL (3/15/2018)Walker MacyExpenses 0Total WM Hours 454 127 1214 1268WM Fee/Hr 63560 $15,875 $97,120 $95,100Subtotal Cost WMTotal Consultant Fee  $55,330.00 $30,690.00 $26,400.00 $10,725.00 $9,480.90 $7,326.00 $24,200.00 $3,778.50 $12,100.00 $3,058.00 $20,845.00Subtotal Cost for CD Phase5.1Permit preparation / documentation12 2 32 40 1,980.00$           660.00$              1,045.00$           542.30$              418.00$             990.00$             5.2Respond to permit comments during permitting8 2 16 36 1,650.00$              660.00$              440.00$              220.00$              542.30$              418.00$              825.00$              1,650.00$          5.3Reivise drawings and resubmit to the permit center if requried.  4 2 16 16 2,750.00$              660.00$             825.00$              1,650.00$          Expenses (Include expenses that are in addition to travel and reproduction costs) 0Total WM Hours24 66492WM Fee/Hr 3360 $750 $5,120 $6,900Subtotal Cost WMTotal Consultant Fee  $4,400.00 $3,300.00 $1,100.00 $1,265.00 $1,084.60 $836.00 $1,650.00 $0.00 $0.00 $0.00 $4,290.00Subtotal Cost for Permitting Phase6.1Produce bid set documents2 1 6 40 880.00$              715.00$              660.00$              418.00$              825.00$              2,200.00$          6.2Attend pre‐bid conference4166.3Prepare addenda during bid period as necessary. 2 1 6 38 220.00$              275.00$              825.00$              510.40$              1,980.00$          6.4Assist in review of bids2 1 2 440.00$                 550.00$              220.00$              110.00$             Expenses 0Total WM Hours10 42078WM Fee/Hr 1400 $500 $1,600 $5,850Subtotal Cost WMTotal Consultant Fee  $440.00 $550.00 $1,100.00 $1,045.00 $935.00 $418.00 $1,650.00 $0.00 $0.00 $510.40 $4,180.00Subtotal Cost for Bidding Phase7.1Develop "For Construction" set of Construction Documents 2 1 4 12 1,650.00$          2,202.20$           550.00$             7.2Attend one pre‐construction meeting4 4 4 550.00$                 550.00$              550.00$             7.3Review product submittals and shop drawings; RFI's; ASI's 32 80 146 220 11,550.00$            2,200.00$           6,050.00$           935.00$              3,850.00$           1,672.00$           5,280.00$           1,991.00$           4,180.00$          7.4Attend (22) meetings (observation/coordination/documentation of weekly site visits) 32 176 88 3,300.00$              1,100.00$           4,400.00$           1,100.00$           4,400.00$           748.00$             7.4aReview rough grading8 4 12 24 1,100.00$             7.4bReview of hardscape layout8 4 12 127.4c(1)  nursery site visits8 2847.4dReview irrigation mainline layout2 446836.00$             7.4eReview finish grading (Civil & LA)8 4 12 12 1,100.00$             7.4fReview tree and or plant material layout8 4 12 127.4gReview irrigation coverage (irrigation & LA)8 488836.00$             7.4iStructural Observation (Structural)0 550.00$             7.4jSupervise final targeting and adj of adjustable fixtures (Lighting) 01,320.00$          7.4kStormwater system review (Civil)0 1,100.00$             7.4lArtwork integration review/observation411687.5Attend one substantial completion walk through8 12 4 1,100.00$              550.00$              440.00$              510.40$             7.6Attend one final acceptance walk through8 12 4 1,100.00$              440.00$             748.00$              385.00$             7.7Attend one warranty walk8 24 4 440.00$             Expenses (Include expenses that are in addition to travel and reproduction costs) 0Total WM Hours 148 108 462 422WM Fee/Hr 20720 $13,500 $36,960 $31,650Subtotal Cost WMTotal Consultant Fee  $20,900.00 $3,850.00 $13,200.00 $2,805.00 $5,460.40 $3,344.00 $11,000.00 $0.00 $0.00 $5,689.20 $5,115.00Subtotal Cost for CA Phase8.1Prepare record documents, OM manuals, etc.4 14 30 2,500.00$              1,000.00$           1,500.00$           760.00$              637.00$              1,000.00$          Expenses (Include expenses that are in addition to travel and reproduction costs) 0Task 6:  Bidding (Sep ‐ Nov 2019)Task 7:  Services During Construction (Dec 2019 ‐ Dec 2020)Task 8:  Project Close Out$71,364$174,194$10,828$20,178$102,830$271,655$203,933$475,588$16,130$17,926$34,056$9,350Task 5:  Permitting (Apr ‐ Nov 2019) Walker Macy, Confidential3/20/2018Page 36.11.cPacket Pg. 248Attachment: 180320 Civic Field Fee Detail SD-CA (Civic Field PSA for design services) EDMONDS CIVIC PLAYFIELD FEE PROPOSAL, BASE SCOPE SD-CAPIC QA/QC PM STAFF Civil Structural Architecture SkateparkWater Feature Irrigation Lighting Geotech Cost Est Mech/Plmb Electrical$140 $125 $80 $75 KPFF KPFF ORA Grindline STO 2426 FMS Landau JMBNotkin‐Wood‐HarbingerReyesConsultantsCIVIC FIELD FEE PROPOSAL (3/15/2018)Walker MacyTotal WM Hours 4 0 14 30WM Fee/Hr 560 $0 $1,120 $2,250Subtotal Cost WM $2,500.00 $0.00 $1,000.00 $1,500.00 $0.00 $760.00 $0.00 $0.00 $0.00 $637.00 $1,000.00Total Consultant Fee  $2,750.00 $0.00 $1,100.00 $1,650.00 $0.00 $836.00 $0.00 $0.00 $0.00 $700.70 1,100.00$          Subtotal Cost for Closeout PhaseTotal for Project$115,475.80 $42,790.00 $69,300.00 $30,552.50 $31,790.00 $14,850.00 $71,500.00 $6,105.00 $26,400.00 $22,954.80 $58,701.50With additional COE 10% design contingency$1,098,350$1,208,185$8,137$3,930$12,067 Walker Macy, Confidential3/20/2018Page 46.11.cPacket Pg. 249Attachment: 180320 Civic Field Fee Detail SD-CA (Civic Field PSA for design services) EDMONDS CIVIC PLAYFIELD FEE PROPOSAL, RIGHT-OF-WAY SCOPE SD-CAPIC QA/QC PM STAFF Civil Structural Architecture SkateparkWater Feature Irrigation Lighting Geotech Cost Est Mech/Plmb Electrical$140 $125 $80 $75 KPFF KPFF ORA Grindline STO 2426 FMS Landau JMBNotkin‐Wood‐HarbingerReyesExpenses (Include expenses that are in addition to travel and reproduction costs)  Expenses 0000Total WM Hours $0 $0 $0 $0WM Fee/HrSubtotal Cost WMTotal Consultant Fee 2.20Study 6th and 7th grading, crossings and utilities for mkt st potential and coordinate with City12 40 12 3,850.00$              2.10Prepare/attend/document  (1) meetings with Public Works and Engineering for 6th Ave Coor42642.12Document City Parks and Planning SD review comments for ROW22.16Provide 100% Schematic Design Submittal:Update CAD Bases and plan drawings246(2) CAD Street and Park Edge Sections 48Grading Concept Plan ‐  6th & 7th Avenue 4 1 12 8 3,850.00$              Cost Estimate 14Expenses 4,400.00$           Total WM Hours 23 3 72 38WM Fee/Hr $3,220 $375 $5,760 $2,850Subtotal Cost WMTotal Consultant Fee  $7,700.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4,400.00 $0.00 $0.00Subtotal Cost for SD Phase7th Avenue21224Expenses Total WM Hours 2 0 12 24WM Fee/Hr $280 $0 $960 $1,800Subtotal Cost WMTotal Consultant Fee  $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Subtotal Cost for DD (30% Design) Phase7th Avenue4 14 38 1,650.00$              Expenses Total WM Hours 4 0 14 38WM Fee/Hr $560 $0 $1,120 $2,850Subtotal Cost WMTotal Consultant Fee  $1,650.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Subtotal Cost for CD Phase8Permit preparation / documentation 2 8 14 220.00$                 5.3Respond to permit comments during permitting 2 2 4Task 5:  Permitting (Apr ‐ Nov 2019)Task 4: 50%, 90%, 100% Design (Dec 2018‐Aug 2019)$4,530$1,650$6,180$0$0Task 3:  30% Design Development (Sep ‐ Nov 2018)$3,040$0$3,040CIVIC FIELD FEE PROPOSAL ROW ADD SERVICES (3/15/2018)ConsultantsTask One: Project Start‐Up (Apr ‐ May 2018$0$12,205$12,100$24,305Task 2:  Schematic Design (Jun‐Aug 2018) Walker Macy, Confidential3/20/2018Page 56.11.cPacket Pg. 250Attachment: 180320 Civic Field Fee Detail SD-CA (Civic Field PSA for design services) EDMONDS CIVIC PLAYFIELD FEE PROPOSAL, RIGHT-OF-WAY SCOPE SD-CA5.4Reivise drawings and resubmit to the permit center if requried. 244Expenses Total WM Hours 6 0 14 22WM Fee/Hr $840 $0 $1,120 $1,650Subtotal Cost WMTotal Consultant Fee  $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00 $0.00Subtotal Cost for Permitting Phase6.1Produce bid set documents4 220.00$                 6.2Attend pre‐bid conference6.3Prepare addenda during bid period as necessary. 66.4Assist in review of bids4Expenses Total WM Hours 0 0 14 0WM Fee/Hr $0 $0 $1,120 $0Subtotal Cost WMTotal Consultant Fee  $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00 $0.00Subtotal Cost for Bidding Phase7.1Develop "For Construction" set of Construction Documents 1 2 2 660.00$                 7.2Attend one pre‐construction meeting127.3Review product submittals and shop drawings; RFI's; ASI's 1 2 4,950.00$              7.4Attend (22) project meetings/observation visits on site (weekly) & other coordination 1,100.00$              7.4aReview rough grading1 2 1,100.00$              7.4bReview of hardscape layout127.4dReview irrigation mainline layout127.4eReview finish grading127.4fReview tree and or plant material layout 1 87.4gReview irrigation coverage187.4iStructural Observation7.4jSupervise final targeting and adj of adjustable fixtures7.5Attend one substantial completion walk through 1 27.6Attend one final acceptance walk through 1 27.7Attend one warranty walk12Expenses Total WM Hours 0 12 36 2WM Fee/Hr $0 $1,500 $2,880 $150Subtotal Cost WMTotal Consultant Fee  $7,810.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Subtotal Cost for CA PhaseKUPrepare record documents, OM manuals, etc. 2 2 4Expenses Total WM Hours2024WM Fee/Hr $280 $0 $160 $300Subtotal Cost WMTotal Consultant Fee  $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ‐$                     Subtotal Cost for Closeout PhaseTotal for Project (Sum of Phase Subtotals)$17,600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4,400.00 $0.00 $0.00With additional 10% Design Contingency $56,953$740$0$740$51,775Task 8:  Project Close Out$4,530$7,810$12,340Task 7:  Services During Construction (Dec 2019 ‐ Dec 2020)$1,120$220$1,340$3,610$220$3,830Task 6:  Bidding (Sep ‐ Nov 2019) Walker Macy, Confidential3/20/2018Page 66.11.cPacket Pg. 251Attachment: 180320 Civic Field Fee Detail SD-CA (Civic Field PSA for design services) 1 REQUEST FOR QUALIFICATIONS CIVIC FIELD MASTER PLAN The Civic Field Master Plan will provide the City of Edmonds with a schematic design for a signature park in the heart of downtown Edmonds. Leased for decades, Civic Field was recently acquired by the City from the Edmonds School District. It was once recreational fields and field house for a Junior High complex. The City has been operating this property as a park since 1975. It has been a long time priority in the Parks, Recreation & Open Space Plan to acquire Civic Field to ensure that it remains accessible to the community as a key asset, providing both passive and active recreation. It is 7.92 acres and is the last large piece of open space available in downtown Edmonds. This park is located a block from the downtown commercial area and the surrounding area is mainly condominiums and townhomes. Civic Field is a central, highly visited site that many Edmonds residents value as a city park. The site currently includes a playground, basketball and tennis courts, football field, soccer fields, track, skate park, petanque courts, portable restrooms, and stadium. The former Junior High fieldhouse on the site is leased by the Edmonds Boys & Girls Club. The site is currently used for sports, community events such as the 4th of July, Taste of Edmonds, Wenatchee Youth Circus, and by local youth organizations, schools, walking/running groups, and recreation programs. The City would like to preserve this recreational and community asset. The scope of work is to work with the community to explore program components and concepts to create a preferred schematic design for Civic Field. The entire park site would be included in the consideration and analysis of the schematic design. PRELIMINARY SCOPE OF WORK The following is a preliminary scope of work that may be modified during contract negotiations with the selected consultant. The preliminary scope of work is intended to outline and describe the range of tasks anticipated for the project, but is not intended to be complete. It is anticipated that planning, design, and construction will be completed within three major phases as described below. Public involvement will be an element of each phase. Phase 1 – Inventory, site assessment, and development of a park design program Phase 2 - Schematic design and implementation program Phase 3 –Design development, permitting, bidding, and construction support The selected consultant shall initially complete the Phase 1 and Phase 2 scope of work. The City of Edmonds reserves the right to award additional work for future phases to the same firm, or another firm, as necessary to complete the project. 6.11.d Packet Pg. 252 Attachment: Civic Final SOQ (Civic Field PSA for design services) 2 Phase 3 will be contingent upon securing necessary funding, and would include design development, permitting, construction documents, construction monitoring and observation. Public Involvement This project needs to include significant public involvement, with an emphasis on collaboration with a project advisory committee, the Planning Board, City Council, identified stakeholders, and interested citizens. Tasks may include: • Develop and implement a public involvement process that encourages the participation of all interested parties. • Attend periodic meetings of the Planning Board and City Council to provide project updates and gather input. • Attend and facilitate multiple public workshops to keep community members informed and to solicit input from the public during the planning and design process. • Provide graphic and written information as required to support the public outreach efforts of the City. • Create an online presence, virtual open houses, and other avenues with which to increase public participation. Phase I – Develop Park Design Concept - Tasks may include: • Participate in a kickoff meeting with the project advisory committee to review project parameters, gather available materials, identify additional information requirements, review preliminary community involvement strategy, and establish project timeline and products. • Conduct site visit with Parks staff. • Gather a site inventory identifying and locating natural and man-made features. Include topography, wetlands, streams, vegetation, utilities, structures, and other features as necessary for the purposes of master planning and permitting. • Gather and review relevant background materials relating to the project. Communicate and coordinate with various local, state, and federal permitting authorities necessary for understanding regulatory issues and constraints. • Conduct meetings (or phone interviews) with agency representatives from Parks, Engineering, Public Works, Planning and key stakeholders. • Facilitate and conduct public workshops to ascertain public sentiment towards needs, desires, opportunities and constraints. • Based upon the results of site analysis, technical input, stakeholder interviews, project advisory committee input and public workshops, develop a preliminary Park Design Program detailing proposed park uses, design character and design criteria. Design Program review and approval process to include Public Workshop(s), Planning Board, and City Council (for final approval). Phase II – Develop Schematic Design - Tasks may include: • Assist the Project Advisory Committee in establishing evaluation criteria for schematic designs. 6.11.d Packet Pg. 253 Attachment: Civic Final SOQ (Civic Field PSA for design services) 3 • Prepare at least three schematic designs based upon the approved design program. Prepare conceptual level line-item construction cost estimates for each design. Assist staff in preparing operational/maintenance cost models. • Prepare a narrative which summarizes the existing conditions, design alternatives, cost implications and regulatory criteria, and identifies issues which require further study at the next stage of project development. • Meet with the Planning Board to review the schematic designs using the evaluation criteria established earlier. • Meet with the Parks staff team to review the schematic designs. • Conduct community workshops to solicit input on the schematic designs. • Meet with City, County, State, and Federal permitting authorities to review initial schematic design direction. • Meet with the Project Advisory Committee to review comments from workshop and to solicit direction on draft schematic designs. • Provide updates to the Planning Board and City Council. • Create a draft schematic design based upon the preferred elements from the designs and consistent with the approved design program. Update cost estimate and operational models. • Create a draft implementation strategy/phasing program for development of the park that identifies priorities for improvements, responsibilities for improvements and a timeline for implementing improvements. • Identify scope and schedule of permitting process. • Attend meetings with the Parks staff team to review the draft schematic design and phasing program. • Conduct community workshops to solicit input on the draft schematic design and phasing program. • Meet City permitting authorities to review the draft schematic design and phasing program. • Meet with the Planning Board to present the draft schematic design and phasing program for Board’s recommendation to the City Council. • Refine the draft schematic design and phasing program incorporating gathered input. • Revise cost estimates. • Meet with the Project Advisory Committee to review workshop comments. • Refine final schematic design. • Prepare SEPA Checklist if needed. TENTATIVE SCHEDULE The following schedule contains major milestones and may be modified as a result of consultant proposals and contract negotiations: • February 12, 2016: SOQ published • March 8, 2016 (4:00 pm PST) - SOQ Submittal Deadline • March 18, 2016 - City to short-list for interviews • Week of March 28 - Consultant Interviews • April 4-8, 2016 - Consultant Selection 6.11.d Packet Pg. 254 Attachment: Civic Final SOQ (Civic Field PSA for design services) 4 • April 2016 - Contracting process • May - June 2016: Project Start; Survey, Inventory and Site Analysis • July – August 2016 - Initial Public Meetings, Planning Board and City Council Approval of Design Program, Develop Schematic Designs • September - October 2016 – Public review and comment; Design refinement • October - December 2016 – Planning Board and City Council approval of Schematic Design Statement of Qualifications Submission Requirements All submittals must be in conformance with the requirements set forth in this SOQ. Qualifications submitted electronically should be 8-1/2” x 11” format and shall not exceed twenty (20) single sided pages. A front cover, back cover, and a maximum two-page cover letter may be submitted in additional to the twenty (20) single sided pages. If a paper copy is submitted, pages should be printed double sided. At a minimum, the following information shall be submitted: • An organizational chart and biographies for your project team, including all sub- consultants. • A statement of the percentage of time your proposed key resources will have available to devote to the project. • Your firm’s identification of the critical work elements and how your team would address these issues. • A discussion of your firm’s approach to the project and your plan to produce the required documents. • A proposed schedule for completing the work, including intermediate project stages leading to a final project and in sufficient detail to allow an assessment of the firm’s ability to provide the resources necessary to meet the schedule. • References from past similar projects. Provide the contact name and number of the owner, or if not available, a contact name and number of the current most knowledgeable person associated with the project. Submittals Qualifications titled “SOQ: Civic Field Master Plan” may be submitted as an email attachment in PDF or MS Word format to: carrie.hite@edmondswa.gov. Note that faxed proposals or electronic proposals submitted as compressed files will not be accepted. OR One (1) unbound original and four (4) digital storage devices (CD or USB Flash Drive) in PDF or MS Word format mailed or delivered to: City of Edmonds Attn: Cynthia Cruz 700 Main Street Edmonds, WA 98020 6.11.d Packet Pg. 255 Attachment: Civic Final SOQ (Civic Field PSA for design services) 5 Contact For additional information concerning this SOQ, any other aspect of the selection process or the project in general, please contact via email: Carrie Hite, Parks, Recreation and Cultural Services Director, carrie.hite@edmondswa.gov. All questions must be submitted by email and must be received prior to 4:00 pm PST on February 29, 2016. Answers will be released to all interested parties prior to noon on March 1, 2016. Absolutely no communication shall occur regarding this SOQ, including requests for information, or speculation between Offeror’s or any of their individual members and any City elected official or employee other than those named above. Failure to comply with this provision may result in Offeror’s proposal being removed from consideration. Any cost incurred by Offeror in preparation, transmittal, or presentation of any information or material submitted in response to the SOQ shall be borne solely by the Offeror. Right to Reject Submittals The City reserves the right to reject any and all submittals at any time with no penalty, or to waive immaterial defects and minor irregularities in any submittal. Submittal Disposition All material submitted in response to this SOQ shall become the property of the City. Project Contract The Offeror will be required to use the City of Edmonds Professional Services Agreement [Attachment A] and accept all language contained within. Any Offeror that has significant reservations concerning using this agreement should not submit on this request. Consultant Selection Criteria Consultants will be evaluated on the following items: • Responsiveness to the requirements of this SOQ • Understanding of project scope and project requirements including discussion of firm’s approach to the project • Ability to meet the project schedule, within budget • Expertise of key personnel – provide a biography, educational background, number of years with this firm/other firms, and three (3) project references with contact information. Also discuss other responsibilities assigned to key staff and their availability for this project. • Proposed use of sub-consultants – If sub-consultants are proposed, explain how the work process and communication between the Firm and the sub-consultant will be managed. Discuss the sub-consultants experience and availability for the project. • Response of references from past similar projects. 6.11.d Packet Pg. 256 Attachment: Civic Final SOQ (Civic Field PSA for design services) 6 Short List After review of the submittals by the Owner’s Selection Committee, the three (3) highest ranked firms will be notified and invited to participate in a short list/final selection phase. It is intended that the final selection phase will include the following steps: • Notification: Written notification of the three top-ranked firms. • Interview will consist of: Presentation/Discussion: A 1-hour presentation/discussion question and answer period will be scheduled and conducted in Edmonds. Final Selection Process: After the presentations and discussions are completed, the Selection Committee will rank the firms interviewed. The qualifications, proposal and presentation/discussion will be weighted equally and be scored as follows: 1. Responsiveness to SOQ 5 pts 2. Previous experience in similar projects 20 pts 3. Understanding of project scope and requirements 25 pts 4. Ability to meet schedule/budget 10 pts 5. Expertise of key personnel/Project Manager 20 pts 6. References from past projects 20 pts Negotiation/Scope Development: The top-ranked firm will be notified in writing and be asked to meet and submit their prospective scope of services, schedule and a fee proposal. If, after negotiation and consideration, the Owner is unable to reach an acceptable agreement with the top-ranked firm, the Owner will terminate negotiations with the top-ranked firm and, at its sole discretion, may enter into negotiations with the second ranked firm and/or withhold the award for any reason and/or elect not to proceed with any of the proponents and/or re-solicit via a new SOQ. Final Selection: Once an agreement is reached with a preferred A/E firm, the Owner’s Purchasing Agent will provide a professional Services Agreement for signatures and full execution. A Notice to Proceed will be issued to formally begin work. --END— 6.11.d Packet Pg. 257 Attachment: Civic Final SOQ (Civic Field PSA for design services) EDMONDS CIVIC CENTER PLAYFIELD MASTER PLAN City of Edmonds, Washington March 2017 6.11.e Packet Pg. 258 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 6.11.e Packet Pg. 259 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) ACKNOWLEDGMENTS Walker | Macy - Landscape Architecture, Project Lead Chris Jones, Principal Lara Rose, Design Principal Ann Marie Schneider, Project Manager, Landscape Designer Alyssa Machle John, Landscape Designer Enviroissues - Public Outreach / WBE Ara Swanson, Associate Harrison Price, Project Coordinator ORA - Architecture Owen Richards, AIA, LEED AP Steven Lazen, AIA Emily Perchlik, Assoc. AIA JMB Consulting Group, LLC - Cost Estimating Jon Bayles, Principal Herrera Environmental Consultants - Permitting Shelby Petro, Wetland Scientist, Env. Permit Coordinator City of Edmonds Mayor Dave Earling Edmonds City Council Edmonds Planning Board Project Advisory Committee Consultant Team Kyla Blair Barbara Chase Mike Echelbarger Kristiana Johnson Lesly Kaplan John McGibbon Joe McIalwain Bob Rinehart Emily Scott Doug Sheldon Steve Shelton Valerie Stewart Dave Teitzel Dick Van Hollebeke Diana White Alex Witenberg Pat Woodell Carrie Hite, Director, Parks, Recreation & Cultural Services (PRCS) Renee McRae, Deputy Director, (PRCS) Frances Chapin, Arts & Culture Manager, (PRCS) Rich Lindsay, Park Maintenance Manager, (PRCS) Rob Chave, Planning Manager Kernen Lien, Senior Planner Todd Cort, Recreation Coordinator Phil Williams, Public Works & Utilities Director Mike DeLilla, Senior Utilities Engineer Shane Hope, Director, Development Services Rich Lindsay, Parks Maintenance Manager Rob English, City Engineer Jennifer Lambert, Engineering Technician City Staff 6.11.e Packet Pg. 260 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 4 Edmonds Civic Center Playfield Master Plan 6.11.e Packet Pg. 261 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 5 Table of Contents Introduction .......................................................................................................................6 SITE BACKGROUND & ANALYSIS ��������������������������������������������������9 History ..............................................................................................................................10 Existing Conditions ........................................................................................................10 Related Studies & Plans ................................................................................................11 Context .............................................................................................................................12 DESIGN DEVELOPMENT + COMMUNITY ENGAGEMENT ������������19 Process & Schedule .......................................................................................................20 Deed Restrictions ...........................................................................................................21 Park Activities & Amenities ...........................................................................................22 Existing Uses ..............................................................................................................22 Potential New Uses...................................................................................................24 Open House 1, June 2016 ............................................................................................25 Format & Objective ...................................................................................................25 Informational Boards ...............................................................................................25 Content .......................................................................................................................25 Interactive Boards .....................................................................................................26 Program Models / Games ........................................................................................27 Additional Outreach .................................................................................................27 Participation and Attendance ................................................................................28 Feedback ....................................................................................................................28 DESIGN ALTERNATIVES .................................................................................................30 Option 1 - Meadow Loop ........................................................................................30 Option 2 - Activity Central .......................................................................................32 Events ...............................................................................................................................34 Current Events ...........................................................................................................34 Design Alternative Event Overlays .........................................................................35 Open House 2, August 2016 ........................................................................................36 Format & Objective ...................................................................................................36 Small Group Discussions .........................................................................................36 Participation and Attendance ................................................................................38 Feedback ....................................................................................................................39 MASTER PLAN �����������������������������������������������������������������������������41 Hybrid design ..................................................................................................................42 Aerial View ..................................................................................................................43 Examples of Signature Features ............................................................................43 Master Plan Views ..........................................................................................................46 Master Plan Event Overlays ..........................................................................................48 Small to Medium Size Events Within the Park ....................................................48 Large Events and the 6th Avenue Market Promenade ......................................49 Architectural Elements ..................................................................................................50 Boys and Girls Club Expansion ...............................................................................50 Examples of Signature Features ............................................................................51 Shade Pavilion ...........................................................................................................51 Open House 3, October, 2016 ......................................................................................52 Format .........................................................................................................................52 Participation and Attendance ................................................................................53 Phasing .............................................................................................................................54 Supplemental Information ..........................................................................................55 Alley Buffers ................................................................................................................55 Utilities and City Planning .......................................................................................55 Parking Considerations ..........................................................................................55 Tennis / Sports Fencing ...........................................................................................55 Street Improvements ....................................................................................................56 6th Avenue Market Promenade .............................................................................56 7th Avenue Street Improvements ..........................................................................57 6.11.e Packet Pg. 262 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 6 Edmonds Civic Center Playfield Master Plan Civic Center Playfield is an eight acre park in the heart of downtown Edmonds that straddles the boundary between residences, civic amenities and the downtown commercial district. Well-loved and used by residents of all ages, it is home to the Boys and Girls Club, the Petanque Club, athletic fields, a playground, a skatepark, tennis courts and several of Edmonds largest annual festivals such as the Taste of Edmonds and the 4th of July Fireworks. Originally the Edmonds High School sports facility in the 1930’s, the site has served as a recreational and event space for decades while the population of Edmonds has continued to grow and develop around it. The City has been operating and maintaining the property for public use since 1975, with no investment of capital funds and little change to the layout since its former use by Edmonds High School. In the 2014 Parks, Recreation and Open Space Plan (PROS Plan), Civic Center Playfield was identified as a key asset and securing the park, that had been leased from the Edmonds School District for 40 years, was deemed a priority. In direct response, the City of Edmonds acquired the property in the fall of 2015 with grant assistance from the Washington State Recreation Conservation Office and the Snohomish Conservation Futures Program, thereby ensuring that the site will remain accessible to the community, providing both passive and active recreation. In April 2016, through a Request For Qualifications and interview process, Walker Macy, a Landscape Architecture and Urban Design firm, was hired by the Edmonds Parks. Recreation and Cultural Services (EPRCS) department to lead the Civic Center Playfield Master Planning effort. The project goal was to work with the City of Edmonds and the Edmonds community to design a Master Plan that envisions Civic Center Playfield as a signature park in the heart of downtown Edmonds. The project undertook a rigorous public engagement process, including three public open houses, three online open houses, stakeholder interviews and a series of meetings with the Project Advisory Committee, the Parks and Recreation Staff, the City Council and the Planning Board in order to create a plan inspired by the community’s desires and reflecting public sentiment and feedback. Several iterations of design and feedback were presented, tested and reviewed, resulting in a schematic design that integrates active program, civic engagement and beautiful landscape spaces. The Civic Center Playfield Master Plan embraces the potential of this downtown park to contribute to a sense of community identity and civic pride while promoting active, healthy lifestyles, energizing the local economy and bolstering the city’s growing reputation as a destination on Puget Sound. The legacy of the park as an iconic place for gathering, celebration and enhanced daily life is intended to serve Edmonds for generations to come. INTRODUCTION 6.11.e Packet Pg. 263 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) Sprague St Sprague St Daley St Bell St Edmonds St 6th Ave N7th Ave N7 SITE PLAN The Great Lawn The Meadows The Market Promenade6.11.e Packet Pg. 264 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 8 Edmonds Civic Center Playfield Master Plan 6.11.e Packet Pg. 265 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) Edmonds Historical Museum Farmer’s Market & Future Veterans Plaza Edmonds City Hall Library Frances Anderson Center Main Street Shops Boys & Girls Club Edmonds Center For The Arts 4TH AVE SBELL ST MAIN ST5TH AVE 3RD AVE S 6TH AVE7TH AVE ARTS CORRIDORLEGEND HISTORIC SITES DESTINATIONS**********************N 9Site Background & Analysis SITE BACKGROUND & ANALYSIS 6.11.e Packet Pg. 266 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 10 Edmonds Civic Center Playfield Master Plan Civic Center Playfield was the athletic grounds for Edmonds High School, originally built a block from the site at 410 Fourth Avenue North, now the Edmonds Center for the Arts. Prior to recreational development it’s believed to have been a marshy field. In 1957 the high school relocated to the Holmes Corner neighborhood at 76th and 212th. The City has operated the property as a park since 1975 with minimal change to its amenities or use. HISTORY Today, the eight acre site includes a playground, basketball and tennis courts, football field, soccer fields, track, skate park, petanque courts, portable restrooms, and two structures - the grandstand and the Boys and Girls Club (former high school field house). Civic Center Playfield is currently used for neighborhood recreation, community sports team practices and games by local organizations such as Sno-King Youth Club and EPRCS recreation programs. It also hosts events such as the 4th of July, Taste of Edmonds, Edmonds Arts Festival parking and the Wenatchee Youth Circus. There are two structures on site, the field house, most likely built after 1935 when the district acquired the property, was remodeled in 1999 and is currently leased to the Edmonds Boys and Girls Club. The grandstand, also over 50 years old, is still used on occasion for events and also serves as storage for a number of local organizations. The Edmonds Boys & Girls Club has occupied the field house since 1968. It’s currently operating at full capacity, serving approximately 150 children. Activities offered at the Boys & Girls Club include arts and crafts, computer use, homework help, volleyball and basketball, arts and music, snacks and meals. The building presently contains spaces typical in most Club facilities - ground floor offices, a small game/recreation room, computer lab area, restrooms, storage and service spaces. The upper floor, includes a gym and additional storage. The Boys & Girls Club is in conversation with EPRCS and the City to discuss the needs and plans of the organization in conjunction with the park redesign. The field house would likely require expansion if it is to continue to serve the growing needs of the Club. In a City of Edmonds Historic Preservation Commission Special Meeting on June 29, 2016, a majority of the Commissioners “voiced support for retaining the field house structure due to its significance to the community and because it echoes what Edmonds used to look like in the 1920’s and 1930’s.” The Commission also discussed the historic value of the entire site and the importance to the community of “retaining some of it’s historic [] flavor” as the park design continues (see Appendix for full HPC Meeting Minutes). The State of Washington Department of Archaeology and Historic Preservation recently ruled that the grandstand is not of historic significance and the State of Washington Recreation Conservation Office has approved the removal of the structure. A structural review was also completed during the Master Plan effort with the conclusion that significant upgrades are needed to meet both structural and accessibility compliance (see full grandstand structural evaluation in Appendix). EXISTING CONDITIONS 1930’s - courtesy of the Sno-Isle Musem Edmonds- Kingston Ferry 2015 - Google Earth 1950’s 6.11.e Packet Pg. 267 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 11Site Background & Analysis Prior studies were consulted by the project team during the master planning process. These include: • 4th Ave implementation Plan • 4th Ave Arts Corridor Plan • Parks, Recreation and Open Space Plan (PROS Plan), February 2014 • City of Edmonds Comprehensive Plan • Edmonds Cultural Plan, February 2014 • Edmonds Transportation Plan • Edmonds Strategic Plan • The Edmonds Waterfront Access Alternatives Study RELATED STUDIES & PLANS Field house 2nd floor gymnasium Field house 1st floor entry area Grandstand Panorama taken from the playground at the south east corner of the site. The grandstand is to the left and back of the field house is left of center. Field house (Boys & Girls Club) entrance 6.11.e Packet Pg. 268 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) YOST PARK EDMONDS MARSH CITY PARK CIVIC FIELD FRANCES ANDERSON CENTER DOWNTOWN EDMONDS BRACKETT’S LANDING SHORELINE SANCTUARY CONSERVATION AREA SH E L L C R E E K N 12 Edmonds Civic Center Playfield Master Plan URBAN ECOLOGIES A sizeable public open space in downtown Edmonds, Civic Center Playfield serves a unique role that differs from other parks in the vicinity. It’s urban context, flatness and lack of tree cover set it apart from Yost Park and the Shell Creek corridor, Edmonds Marsh, and Brackett’s Landing, all of which are larger in scale and provide important eco-destinations and habitat. City Park offers undulating topography and significant tree canopy resulting in a more passive park experience with some active play area, while the nearby Frances Anderson Center hosts a green space with more intimate neighborhood-scale activity, recreation and gathering. CONTEXT 6.11.e Packet Pg. 269 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) BEST VIEWS ARE FROM EAST EDGE PANORAMIC VIEWS OVER PARK N 13Site Background & Analysis SITE VIEWS Spectacular views of the Puget Sound and the Olympic mountain range are a signature feature of the City of Edmonds. The east edge of Civic Center Playfield offers glimpses of the Olympic peaks due to it’s slightly higher elevation and the parks grand, open scale. Also noteworthy are the panoramic views from the streets and residences on the high slopes directly east of the park where the park grounds become foreground. 6.11.e Packet Pg. 270 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) MULTI-FAMILY MULTI-FAMILY SINGLE FAMILY CIVIC N 14 Edmonds Civic Center Playfield Master Plan PARK EDGES AND CURRENT ZONING Civic Center Playfield is nestled between residential and civic zones and will be most successful if designed to respond to its adjacencies. The east side of the park is single-family residential while the north and south edges of the park consist of more dense multi-unit housing. The west edge is made up of predominantly civic institutions such as the police and fire stations, City Hall and the Edmonds Center for the Arts while also being at the edge of the downtown commercial district. 6.11.e Packet Pg. 271 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 1/4 mile 5-minute walk 4TH AVE NMAIN ST DAYTON ST3RD AVE N RAILROAD AVE 5TH AVE S6TH AVE S3RD AVE S7TH AVE N 2ND AVE N SUNSET AVE N LEGEND EXISTING BIKE ROUTE PROPOSED BIKE ROUTE BUS STOP FERRY ROUTE AMTRAK/LINK ROUTE Brackett’s Landing Shoreline Sanctuary Ferry Terminal Library Main Street Shops TO KI N G S T O N TO SEATTLETO EVERETTEdmonds Center For The Arts Frances Anderson Center Amtrak/ LINK Station N 15Site Background & Analysis TRANSIT CONNECTIONS Civic Center Playfield is within walking distance of most downtown amenties and a short bike ride for many residents. It is also in close proximity to regional transit, including the Ferry Terminal to Kingston and the Amtrak/Sound Transit commuter station to Seattle and Everett. 6.11.e Packet Pg. 272 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) Edmonds Historical Museum Farmer’s Market & Future Veterans Plaza Edmonds City Hall Library Frances Anderson Center Main Street Shops Boys & Girls Club Edmonds Center For The Arts 4TH AVE SBELL ST MAIN ST5TH AVE 3RD AVE S 6TH AVE7TH AVE ARTS CORRIDORLEGEND HISTORIC SITES DESTINATIONS**********************N 16 Edmonds Civic Center Playfield Master Plan DOWNTOWN CONNECTIONS & DESTINATIONS Civic Center Playfield is a key component in a community circuit connecting local residences and civic destinations such as the Edmonds Farmers Market, the Sno-Isle Library, the Frances Anderson Center and downtown shops and restaurants. The park also has the potential to serve as part of an arts and culture plan with the evolving 4th Avenue Arts Corridor connecting Main Street to the Edmonds Center for the Arts. 6.11.e Packet Pg. 273 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) PETER KIRK PARKKIRKLAND, WA 12.5 ACRES CIVIC FIELDEDMONDS, WA 8 ACRES CAL ANDERSON PARKSEATTLE, WA 7.5 ACRES EDMONDS CITY PARKEDMONDS, WA 14 ACRES BELLEVUE DOWNTOWN PARKBELLEVUE, WA 21 ACRES DISCOVERY GREEN HOUSTON, TX 12 ACRES 17Site Background & Analysis SCALE COMPARISON Parks similar to Civic Center Playfield, or known to local residents, were studied by the design team and shared with the public to facilitate understanding and discussion of the parks’ program. 6.11.e Packet Pg. 274 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 18 6.11.e Packet Pg. 275 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 19 DESIGN DEVELOPMENT + COMMUNITY ENGAGEMENT 6.11.e Packet Pg. 276 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 20 Public Involvement City Briefings Edmonds Civic Center Playfield Master Plan PROCESS & SCHEDULE The Civic Center Playfield Master Plan project team undertook a rigorous public engagement process that included three public open houses (offered both in-person and online); on- site postings, stakeholder interviews and outreach meetings. As a result, the design process was highly integrated with public engagement opportunities and public feedback shaped both the methods of design as well as the final plan. Stakeholders included the Boys and Girls Club, who currently lease the Field House on-site; recreational groups that use the fields such as Sno-King Youth Club and the Edmonds Petanque Club; groups that host events currently held at the park or nearby such as the Edmonds Chamber of Commerce (Taste of Edmonds), the Edmonds Art Festival and Festival Foundation; and other civic organizations directly effected by the park’s potential transformation such as the Edmonds Arts Commission, the Museum/Market Board; City Council and Planning Board members; Edmonds Center for the Arts; Economic Development Commission; Floretum Garden Club; Historic Preservation Commission; and City staff. Community feedback and design team progress was discussed in regular briefings to City Council, the Planning Board, Edmonds Parks, Recreation and Cultural Services, and the Project Advisory Committee. The Project Advisory Committee was comprised of a broad selection of community representatives and leaders with varying interests selected to provide guidance to the project team. Each public open house addressed a different project milestone and incorporated, as well as solicited, feedback from the community. Online open houses were launched immediately following each in-person open house and were accessible for a minimum of two weeks. Project description, progress, schedule, open house results, and meeting minutes were posted publicly, and regularly, on the city’s splash page at: http://www.edmondswa.gov/parks-recreation-departments/civic- center-master-plan.html The project was organized into three phases that corresponded with each Open House. All events took place in 2016 unless otherwise noted. Mayor Dave Earling speaking at the first Open House on June 23rd, 2016. Mayor Earling provided introductions to all three Open Houses. Park Activities (Program) • PAC kickoff meeting: May 12 • Stakeholder Meetings: May 17 & 23 • Open House #1: June 23 • PAC meeting: July 7 • Planning Board Meeting: July 27 • City Council Meeting: August 9 Master Plan Alternatives • Open House #2: August 24 • PAC Meeting: September 1 • Planning Board Meeting: September 14 • City Council Meeting: September 27 Hybrid Master Plan • Open House #3: October 19 • PAC Meeting: October 25 • Planning Board Meeting, Wednesday, November 9 • City Council Meeting: January 17,2017 • City Council Adoption: March 7, 2017 Stakeholder Interviews Public Open Houses Planning Board City Council Project Advisory Committee 6.11.e Packet Pg. 277 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 2 ACRES EXEMPT FROM DEED RESTRICTIONS PROJECT SITE (8 ACRES)6TH AVE NDEED RESTRICTIONS (6 ACRES) 21Design Development + Community Engagement DEED RESTRICTIONS The planning effort considered the full site with special consideration for six of the acres that fall under Conservation Easement Deed restrictions as outlined by the Washington State Recreation Conservation Office and The Snohomish Conservation Futures Program. • Not more than 10% impervious surface (excluding pathways) • Must be preserved as open space • No synthetic turf • No buildings (restrooms allowed but apply to impervious calculations) • Shade structures are permitted • Multi-use open grass areas are allowed • Temporary festival use can be accommodated • No temporary or permanent parking is allowed 6.11.e Packet Pg. 278 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 22 • Taste of Edmonds • 4th of July Fireworks • Wenatchee Youth Circus • Sports tournaments • Arts Festival (parking) • Boys & Girls Club (Field House) • Grand Stand • Storage • Soccer/Lacrosse Fields (2 - 1 Adult and 1 Youth) • Tennis Courts (2) • Petanque Courts (4) • Basketball Courts (2) • Baseball/Softball Field (1) • Skate Park Edmonds Civic Center Playfield Master Plan PARK ACTIVITIES & AMENITIES Existing Uses Existing Civic Center Playfield amenities include a large multi- use lawn with sports fields, a 400-meter track, a playground and various courts that accommodate a number of activities. Uses for the park were categorized into active, passive, civic and event spaces and the community was engaged to determine what existing program should remain and what new program was desired. Parking is not currently provided in the park while storage space exists below the Grand Stand, within the Field House and the shed. These uses were also put forth for discussion. Active Active Events Other Events CivicPassive petanque basketball tennis soccerlacrossefootball soccerlacrossefootball baseball playground track skatepark 6.11.e Packet Pg. 279 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 1 2 3 4 5 6 8 7 9 11 12 13 14 15 16 17 18 19 20 21 22 1 HAINES WHARF PARKVIEW POINT | PICNIC AREA | PLAYGROUND | WILDLIFE | TRAILS | RESTROOMS 2 STAMM OVERLOOK PARKVIEW POINT | WILDLIFE 3 HUTT PARKTRAILS | WILDLIFE 4 SEAVIEW PARKPICNIC AREA | PLAYGROUND | TRAILS | BASKETBALL | TENNIS | SOCCER | BASEBALL/SOFTBALL | RESTROOMS 5 SIERRA PARKPICNIC AREA | PLAYGROUND | TRAILS | BASKETBALL | SOCCER | BASEBALL/SOFTBALL | RESTROOMS 9 CIVIC FIELD PLAYGROUND | RUNNING TRACK | BASKETBALL | TENNIS | FOOTBALL | SOCCER | BASEBALL/SOFTBALL| SKATEPARK | PETANQUE 17 EDMONDS CITY PARKPICNIC SHELTERS | PLAYGROUND (2) | TRAILS | SOCCER | WATER PLAY | OUTDOOR PERFORMANCE SPACE | HORSESHOES | RESTROOMS EDMONDS MEMORIAL CEMETERY & COLUMBARIUM20 HICKMAN PARK PICNIC SHELTERS | PLAYGROUND |TRAILS | SOCCER | BASEBALL/SOFTBALL | BASKETBALL | RESTROOMS21 22 MATHAY-BALLINGER PARK PICNIC AREA | PLAYGROUND | BASKETBALL PINE STREET PARKPICNIC AREA | PLAYGROUND | BASEBALL/SOFTBALL | RESTROOMS18 19 7TH & ELM PARKOPEN SPACE 11 HUMMINGBIRD HILL PARKPICNIC AREA | PLAYGROUND | BASKETBALL 10 FRANCES ANDERSON CENTERPICNIC AREA | PLAYGROUND | BASEBALL | SOCCER | ART| RESTROOMS 12 PINE RIDGE PARKTRAILS | WILDLIFE 13 HAZEL MILLER PLAZAOUTDOOR PERFORMANCE SPACE | ART | DOWNTOWN GATHERING AREA 14 YOST PARKPICNIC AREA | PLAYGROUND | TRAILS | BASKETBALL | TENNIS | OUTDOOR POOL | WILDLIFE | RESTROOMS 15 MARINA BEACH PARKPICNIC AREA | PLAYGROUND | VOLLEYBALL | KITE FLYING | BOAT LAUNCH | BARBECUE STANDS | VIEW CORRIDOR | RESTROOMS 16 EDMONDS MARSHTRAILS | WILDLIFE | VIEW CORRIDOR 6 MAPLEWOOD HILL PARKPICNIC AREA | PLAYGROUND | TRAILS | WILDLIFE 7 OLYMPIC BEACH PARKPICNIC AREA | WALKWAY | ART | MARINE SANCTUARY | FISHING | RESTROOMS 8 BRACKETT’S LANDING NORTH & SOUTH / UNDERWATER PARKPICNIC AREA | TRAILS | VIEW POINT | ART | RESTROOMS | MARINE SANCTUARY | SCUBA DIVING 10 N 23 ToTal FaciliTies For local Parks and schools combined (including ccP) 2 2 4 2 1 1 2 10 7 4 10 11 2 10 Soccer Fields (Adult + Youth): .... Tennis Courts: ................................ Petanque: ...................................... Basketball Courts: ....................... Baseball/Softball Fields (Adult + Youth): ............ Skate Park: .................................... Pickleball: ...................................... number aT civic cenTer PlayField Design Development + Community Engagement Parks in the greater Edmonds area were reviewed to understand nearby amenities available to residents, to help identify priorities and to facilitate discussion about the potential future uses of the park. 6.11.e Packet Pg. 280 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 24 Edmonds Civic Center Playfield Master Plan Potential New Uses In addition to existing uses, new ideas for park activities were put forth for community feedback in Open House 1. Ideas came from interests expressed by the community, stakeholders and the design team. Proposed uses included: • exercise path (informal track) • creative play (informal playground, nature play, etc.) • seasonal games (shuffle board, ping pong, etc.) • classes (yoga, tai chi, etc.) • activities clubhouse • concessions Active Events Civic Passive • multi-use lawn • horticultural gardens • stormwater gardens • berms • shade trees • picnic areas • strolling paths • shade pavilion • plaza • cafe • water feature • performance space • permanent art • temporary art • promenade • covered market space • museum display • restrooms • theater performances • markets • music • culinary events • art installations • fun-runs 6.11.e Packet Pg. 281 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 25Design Development + Community Engagement Format & Objective The first in-person Open House on June 23, 2016, consisted of a presentation, Q&A, and a series of informational and interactive boards for participant engagement. The online version provided the same content in an electronic format. The objective of the session was to gauge community interest in specific park amenities and activities and to begin to develop a sense of identity (theme) for the park. • Informational boards about the site background, existing conditions, restrictions, context and scale. • Interactive boards allowing participants to “vote” for favored activities and themes as well as comment directly on an aerial of the site. • Interactive models (3) that allowed participants to better understand the scale of different existing and proposed programs and how much the park could accommodate. • Comment forms for additional written feedback. Content Informational Boards (see detailed summary in Appendix) OPEN HOUSE 1, JUNE 2016 6.11.e Packet Pg. 282 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 26 Edmonds Civic Center Playfield Master Plan Interactive Boards Five boards were placed at the back of the room and offered opportunity for a range of input from participants. Design staff were also available for discussion and questions. 6.11.e Packet Pg. 283 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 27Design Development + Community Engagement Participants at Public Open House #1 working with site program models to understand the scale of different park programs. Youth from the Student Conservation Association were engaged and took turns testing out ideas on the models. Program Models / Games Additional Outreach Participants were able to test out ideas and gain a better understanding of the size and compatibility of different park activities by placing scaled model pieces on top of corresponding site aerials. This was also a way to explore the flexibility of different programs to serve a variety of uses, for example plaza space that also serves as performance space or multi-use lawn that can also host events. Youth from the Student Conservation Association were engaged in an additional outreach event hosted by Edmonds Parks, Recreation and Cultural Services. Park opportunities were discussed and students were encouraged to engage with the model to test their ideas. The twelve students in attendance encouraged prioritizing year-round active uses including games, concessions and a zip line. 6.11.e Packet Pg. 284 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) ActiveCivicPassive Edmonds Civic Center Playfield Master Plan 7/12/2016 Open House #1 Feedback Statistics In‐Person Attendance: 131 Signed In 141 Counted by Parks Staff (exclusive of staff and consultants) Website analytics (June 24 – July 7)  212 unique visitors  243 sessions  1,350 total page views  5.74 pages viewed per session (average)  Average session duration: 00:05:00  180 responses received (for all questions asked). Theme In‐Person Votes Online Votes Total Active 53 21 74 Passive 50 12 62 Civic 20 3 23 Activity Type (Current v. Possible)Category Activity In Preson Votes Online Votes Total Votes Possibilities active restrooms 41 36 77 Current Activities active petanque 43 33 76 Possibilities active jogging/walking path 43 28 71 Current Activities active soccer 35 32 67 Possibilities passive shade trees 29 27 56 Current Activities active skate park 25 25 50 Current Activities active playground 21 29 50 Current Activities active tennis 24 25 49 Current Activities arch B&G Club 16 32 48 Possibilities passive strolling paths 28 19 47 Possibilities passive multi‐use lawn 17 25 42 Current Activities active formal track 15 25 40 Possibilities events performances (sm. music+theater) 10 29 39 Possibilities passive horticultural gardens 18 17 35 Current Activities active baseball 14 20 34 Possibilities civic market 5 29 34 Current Activities active basketball 13 18 31 Current Activities arch Grand Stands 16 14 30 Possibilities civic performance space 12 17 29 Possibilities active creative play 15 13 28 Possibilities passive picnic areas 12 15 27 Possibilities active seasonal games 16 10 26 Possibilities passive stormwater gardens 13 13 26 Possibilities civic permanent art 10 16 26 Possibilities civic water feature 10 15 25 Possibilities passive shade pavilion 8 13 21 Possibilities passive berms 8 12 20 Current Activities active lacrosse 2 18 20 Possibilities civic promenade 9 10 19 Possibilities active clubhouse 10 9 19 Possibilities active on‐site parking 4 15 19 Possibilities civic plaza 12 6 18 Possibilities events art installations 4 14 18 Possibilities civic café 13 4 17 Page 1 28 Attendance and participation in Open House 1 was impressive and demonstrated the communities passion for the future of Civic Center Playfield. Three ideas were put forth as over-arching themes for the park. The feedback received expressed the desire for the new park to be characterized primarily as active, with passive as a close second and civic garnering the least interest. Participation and Attendance Themes (Priorities) Attendance: • 131 signed in • 141 attended (See detailed summary in Appendix) Online Open House (6/24/2016-7/7/2016) In-Person Open House, June 23, 2016 Statistics: • 1,350 total page views • 180 responses received Feedback 6.11.e Packet Pg. 285 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) Edmonds Civic Center Playfield Master Plan7/12/2016Open House #1 Feedback StatisticsIn‐Person Attendance:131 Signed In141 Counted by Parks Staff (exclusive of staff and consultants)Website analytics (June 24 – July 7) 212 unique visitors 243 sessions  1,350 total page views  5.74 pages viewed per session (average)  Average session duration: 00:05:00  180 responses received (for all questions asked). Theme In‐Person Votes Online Votes Total Active 53 21 74 Passive 50 12 62 Civic 20 3 23 Activity Type (Current v. Possible)Category Activity In Preson Votes Online Votes Total Votes Possibilities active restrooms 41 36 77 Current Activities active petanque 43 33 76 Possibilities active jogging/walking path 43 28 71 Current Activities active soccer 35 32 67 Possibilities passive shade trees 29 27 56 Current Activities active skate park 25 25 50 Current Activities active playground 21 29 50 Current Activities active tennis 24 25 49 Current Activities arch B&G Club 16 32 48 Possibilities passive strolling paths 28 19 47 Possibilities passive multi‐use lawn 17 25 42 Current Activities active formal track 15 25 40 Possibilities events performances (sm. music+theater) 10 29 39 Possibilities passive horticultural gardens 18 17 35 Current Activities active baseball 14 20 34 Possibilities civic market 5 29 34 Current Activities active basketball 13 18 31 Current Activities arch Grand Stands 16 14 30 Possibilities civic performance space 12 17 29 Possibilities active creative play 15 13 28 Possibilities passive picnic areas 12 15 27 Possibilities active seasonal games 16 10 26 Possibilities passive stormwater gardens 13 13 26 Possibilities civic permanent art 10 16 26 Possibilities civic water feature 10 15 25 Possibilities passive shade pavilion 8 13 21 Possibilities passive berms 8 12 20 Current Activities active lacrosse 2 18 20 Possibilities civic promenade 9 10 19 Possibilities active clubhouse 10 9 19 Possibilities active on‐site parking 4 15 19 Possibilities civic plaza 12 6 18 Possibilities events art installations 4 14 18 Possibilities civic café 13 4 17 Page 1 29 Activities Over 40 activities were solicited for feedback and then tracked and summarized to help the design team prioritize elements for the new park design. The activities with the greatest number of votes are shown below (see full results are in the Appendix). Note, there was no way of prohibiting multiple votes so counts are taken as reasonable, rather than absolute, gauges of public interest. buildings buildings lighting disc golf leave as-is pickleball volleyball sustainability horticultural gardens market all ages jungle gym museum display covered market ethno-botanic gardens and more... underground parking 6.11.e Packet Pg. 286 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) LANDSCAPE BUFFER MULTI-USE LAWN CIVIC EDGE30 Edmonds Civic Center Playfield Master Plan Meadow Loop Precedents The following images, from existing parks, are intended to give a sense of the general character of the proposed features. Meadows and gardens Promenade / flexible-use market space Creative, integrated play areas Shade pavilion and plaza Multi-use lawn Passive landscape gardens DESIGN ALTERNATIVES Option 1 - Meadow Loop Based on community input, the design team developed two master plan alternatives, each intended to emphasize one of the two main themes that emerged from community input, active versus passive, and to encourage further discussion on these two topics. The final plan would eventually emerge as a hybrid between these two alternatives, as informed by the community process. The design concept for the Meadow Loop provides a generous landscape buffer on the residential edges of the park and a more civic edge along 6th Avenue, while more intense uses are concentrated in the central multi-use lawn. This option introduces more passive landscape features into the park perimeter, including meadows, berms and stormwater gardens that frame the central active space. This option features jogging and walking paths with exercise stations around a central lawn area large enough to accommodate the same level of soccer usage that occurs now. A wide, promenade-style sidewalk along 6th Avenue allows for strolling or markets and includes a plaza and shade pavilion that could accommodate food concessions, movable tables and chairs, and a small water feature. This scheme also includes a small amount of other recreational program - multi- use courts and petanque - that flank the community hubs at either end of the civic edge. 6.11.e Packet Pg. 287 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) walking/jogging paths HIGH LOWMEDIUM 31Design Development + Community Engagement meadow looP siTe Plan communiTy hubs connecTions acTiviTy Zones multi-use lawn / playfields multi-use courts berms water feature/plaza Field House(B&G Club or cafe)promenadewalking/jogging paths existing trees petanque shade pavilion & restroom Sprague St Sprague St Edmonds St6th Ave N7th Ave Nobstacle courseor exercise stations meadows & gardens stormwater gardens play grounds 6.11.e Packet Pg. 288 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) LANDSCAPE BUFFER NEIGHBORHOOD CONNECTION ACTIVE RECREATION 32 Edmonds Civic Center Playfield Master Plan Activity Central Precedents The following images, from existing parks, are intended to give a sense of the general character of the proposed features. Option 2 - Activity Central The design concept for Activity Central creates a generous neighborhood connection along the old Sprague Street right-of-way and allocates the southern portion to active recreation space while creating a quieter landscape buffer to the north. This option maximizes recreational activities and facilitates spectatorship. It includes a 200-meter track, multi-use lawn for soccer and other sports, and viewing terraces that offer views of both mountains and playfields. Option 2 also includes petanque groves, a skate park, and four multi-use courts around an expanded Field House that could potentially house the Boys and Girls Club or a cafe and restrooms. The north portion of the park is still fairly active but more landscaped in character, and includes a picnic or performance pavilion and multi-generational play and exercise areas. The main path across the park offers a clear connection from the residential neighborhood to the 4th Avenue Arts Corridor and other civic destinations. This path also offers the potential for bringing markets and other events into the park. Shade pavilion and picnic area Lawn terraces for spectating and views Small plaza with interactive water featureAll-ages recreation Landscape integrated play Game courts within shade trees and planting beds. 6.11.e Packet Pg. 289 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) HIGH LOW MEDIUMwalking/jogging paths 33Design Development + Community Engagement Sprague St Sprague St Edmonds St6th Ave N7th Ave Nwalking/jogging circuit 200-meter track promenade petanque grove parking basketball sand volleyball tennis plaza skatepark multi-use lawn / playfields picnic terrace view terraces existing trees play grounds exercise stations expanded Field House(B&G Club, and/or cafe, restroom) communiTy hubs connecTions acTiviTy Zones acTiviTy cenTral siTe Plan Landscape integrated play Game courts within shade trees and planting beds. 6.11.e Packet Pg. 290 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) PARK BOUNDARY 34 Edmonds Civic Center Playfield Master Plan Current Events There are currently a number of events that take place at Civic Center Playfield. These include: • The Taste of Edmonds - an annual festival held in August that utilizes most of the park and hosts a number of vendors, activities and performances. This event generates significant revenue for the Edmonds Chamber of Commerce who would like to see it continue. Conversation with the Edmonds Chamber of Commerce is ongoing and the organization is open to discussion about how the event could evolve with the park, including reviewing inefficiencies with the festival layout and the potential to move vendor parking off-site. • 4th of July Fireworks - during the day, a parade begins at 6th Avenue adjacent to the park. At night, spectators fill the park to watch the fireworks. • Sports tournaments - the Sno-King Youth Club and other organizations sometimes host sports tournaments on the grounds. • Arts Festival (parking) - The annual Arts Festival in late June is held at the nearby Frances Anderson Center and the Civic Center Playfield is used by participants for vendor parking and camping . • Wenatchee Youth Circus EVENTS 6.11.e Packet Pg. 291 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) MEADOW LOOP EVENT OVERLAY Large Event Space 50,000 SF Large Event Space 50,000 SF Large Tent 10,000 SF Stage600 SF Small Performance Space6,000 SF Temporary Bleachers Temporary Bleachers Temporary Bleachers Temporary Bleachers Ice Skating RinkMarket Market Market Market Market Market 35Ice Skating Rink Market Market Market Market Market Market Ice Skating Rink Market Market Market Market Market Market Ice Skating Rink Market Market Market Market Market Market Ice Skating Rink Market Market Market Market Market Market Design Development + Community Engagement Throughout the design process, careful consideration was given to providing flexible use spaces that could accommodate a variety of types and scales of events. Ongoing conversation with the community and stakeholders about current and future event uses will continue as the park design develops. To facilitate conversation about event use, the following diagrams were presented in Open House 2 to illustrate the amount of park space available . Design Alternative Event Overlays Ice Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketFLEXIBLE USE EVENT SPACE ACTIVITY CENTRAL EVENT OVERLAY FLEXIBLE USE EVENT SPACE 6.11.e Packet Pg. 292 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 36 Edmonds Civic Center Playfield Master Plan Format & Objective The second in-person Open House on August 24, 2016, included the presentation of two alternative park designs, Q&A, and small group discussions with a final report back to the larger group. The online version provided the same content in an electronic format. The objective of the session was to encourage dialogue about differing themes and park program elements and to garner community feedback on the direction of design development so that a final hybrid plan could be developed. The following questions were asked as a starting point for in- person feedback and discussion as well as online comments: Large side-by-side plan drawings were provided for each of 16 tables at the In-Person Open House and attendees split themselves into groups of 8-12 to discuss the similarities and differences between the design alternatives and share their interests and visions for the park. The group overwhelmingly agreed to extend the time of the in-person Open House to allow each table to report back on the outcome of their discussions with the larger group. In-person attendees watching presentation at Open House 2. Resident and local business owner Rick Steve’s sharing the outcome of their small group discussion. Small Group Discussions (see detailed summary in Appendix) OPEN HOUSE 2, AUGUST 2016 • Which alternative park plan do you prefer? • Please share your thoughts about Option 1. What do you like or dislike about this option? • Please share your thoughts about Option 2. What do you like or dislike about this option? • Are there park elements not shown in either option that you would like to see? • Additional comments were encouraged. 6.11.e Packet Pg. 293 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) Sprague St Sprague St Edmonds St 6th Ave N7th Ave Nwalking/jogging circuit 200m track promenade petanquegroves parking basketball sand volleyball tennis plaza skate park multi-use lawn / playfields picnic terrace view terraces existing trees play grounds exercise stations expanded Field House (B&G Club, and/or cafe, restroom) multi-use lawn / playfields multi-use courts berms water feature/plaza Field House(B&G Club or cafe)promenadewalking/jogging paths existing trees petanque shade pavilion & restroom Sprague St Sprague St Edmonds St 6th Ave N7th Ave Nobstacle courseor exercise stations meadows & gardens stormwater gardens play grounds 37Design Development + Community Engagement • multi-use lawn/play fields (2 small or 1 large soccer field) • walking/jogging paths • 11/2 multi-use courts • 4 petanque courts • berms • obstacle course with exercise stations • meadows and gardens • playgrounds • existing fieldhouse / Boys & Girls Club • shade pavilion & restrooms • plaza with water feature or art installation • multi-use lawn/playfields (1 large + 1 small soccer field) • walking/jogging circuit • 2 multi-use courts • 2 tennis courts • 8 petanque courts • 200-meter track • skatepark • playground • sand volleyball • parking • exercise stations • expanded Field House for B&G Club / Cafe / restrooms • picnic terrace with shade pavilion • plaza with small, interactive water feature ACTIVITY CENTRAL FEATURES MEADOW LOOP FEATURES 6.11.e Packet Pg. 294 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 38 Edmonds Civic Center Playfield Master Plan Participation and Attendance (see detailed summary in Appendix) Participants in the In-Person Open House small group discussion. • 1,057 visitors • 379 responses • 88 Prefer Option 1 (23.9%) • 280 Prefer Option 2 (76.1%) Age • Over 70: 38 (17.7%) • 45-69: 81 (37.7%) • 30-44: 80 (37.2%) • 18-29: 7 (3.3%) • Under 18: 5 (2.3%) Option 1: 178 (35%) • In-person – 90 (64%) • Online – 88 (24%) Option 2: 330 (65%) • In-person – 50 (36%) • Online – 280 (77%) Online Open House (8/24/2016-9/7/2016) Approximately 160 attendees 16 Discussion Tables Preferred Plan (by majority at table): • Option 1: 8 (50%) • Option 2: 4 (25%) • Split: 2 (12.5%) • Unclear: 2 (12.5%) Individual Comment Cards: • Option 1 preferred: 5 • Option 2 preferred: 3 • Undecided / Unclear: 3 In-Person Open House, August 24, 2016 Approximation of Combined Results 6.11.e Packet Pg. 295 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 39Design Development + Community Engagement Feedback (see detailed summary in Appendix) • Additional restrooms • Benches and/or seating areas • Lighting • Additional covered athletic facility and market space • Stage • ADA accessibility • 400-meter track Most consistent comments across both Open Houses Common elements not shown that respondents would like to see • Like the lawn terraces • Skatepark should remain in the park • Option 1 curves are nice but want more active program like in Option 2 Common reasons respondents preferred Option 1 Common reasons respondents preferred Option 2 • Free-flowing structure, layout • Walking paths • Water feature and plaza • Open green spaces and lawn • Reduced number of petanque courts • No track • View terraces • Long walking and running paths • Focus on fields and athletic facilities • Expanded Boys and Girls Club • Skate park • Potential for large events • More spaces for families and children • Track 6.11.e Packet Pg. 296 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 40 6.11.e Packet Pg. 297 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 41 MASTER PLAN 6.11.e Packet Pg. 298 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 42 Edmonds Civic Center Playfield Master Plan The refined park plan features recreation and activities for all ages in a beautiful park setting. The plan includes three different zones that each provide a unique experience: “The Meadows”, “The Great Lawn” and “The Market Promenade”. The Meadows provide both passive and active enjoyment and encourage exploration. This area of the park includes gently rolling hills, meandering paths, and landscaped buffers at all residential edges of the park. Special features include a 1/3 mile measured walking/jogging path, playground, skatepark, picnic lawn, youth climbing wall and exercise areas set within planted areas and low berms. The Great Lawn is designed to support soccer in multiple configurations as well as other field sports and casual recreation. Lawn terraces offer mountain views and provide spectator seating for field events, concerts and festivals alike. Street improvements to 6th Avenue are seamlessly integrated with the park’s western edge to provide a generous promenade- style sidewalk for markets, parades and festivals. A multi-use plaza and shade pavilion, with restrooms and storage, provide space for outdoor seating, water play, interactive art, and the potential to host small performances, and civic events. The existing Field House continues to serve the Boys and Girls Club as conversations continue about the potential for expansion or new construction. A 12,000 SF addition to the existing Field House is delineated on the Master Plan as a potential option congruous with the park design. The 6th Street area also includes a range of multi-use recreation spaces: petanque and multi-use courts for tennis, basketball and pickleball. The park is designed to be flexible and accommodates a substantial amount of activity, but will also be beautiful at quieter times. All paths are accessible, and park and sport lighting will be provided throughout. The park is also designed to be economically and environmentally sustainable - multiple locations are identified for stormwater treatment and careful consideration will be given to site conditions and amenities needed to support recreation and event use. The Petanque Grove features six full-size petanque courts to support both the Edmonds Petanque Club and the greater community. Located at the southwest corner of the park and the 6th Avenue promenade, the Grove will serve as a community cornerstone and welcoming gateway defined by aggregate courts set within seasonal planting beds, shade trees and integrated seating. HYBRID DESIGN restrooms petanque jogging/walking paths soccer shade trees skate park playground tennis Boys &Girls Club multi-use lawn formal track small performance space gardens From total list of 40 activities, 36 are accommodated in the hybrid plan Included in Hybrid PlanVotes 77 76 71 67 56 50 50 49 48 42 40 39 35 Top 10 activities (from Open House #1) Themes / Priorities as voted on by the community and carefully considered in the hybrid plan: 1st: Active 2nd: Passive 3rd: Civic How we responded to what we heard: 6.11.e Packet Pg. 299 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) Aerial View 43Master Plan The Great Lawn Downtown Edmonds The Meadows The Marke t P r o m e n a d e Gardens with Integrated Play Berms Multi-use Lawn & Sports FieldsSpectator & View Terraces Jogging/walking paths with all-ages exercise stations Examples of Signature Features Landscape Integrated SkateparkMarket Promenade & Plaza Creative Play Grounds & Water Feature Youth Climbing Wall The following images, from existing parks, are intended to give a sense of the general character of the proposed features. 6.11.e Packet Pg. 300 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) CONNECTIONS walking/jogging paths FRAMEWORK MULTI-USE LAWN LANDSCAPE BUFFER CIVIC EDGECOMMUNITY HUBS 44 Edmonds Civic Center Playfield Master Plan The continued presence of the Boys and Girls Club at Civic Center Playfield is desired by all parties. Conversation with the Club is ongoing to determine a short and long term solution that will allow the Boys and Girls Club to remain at Civic Center Playfield and to grow and integrate facilities as the park develops. Two options for potential Club expansion were proposed by the design team and presented at Open House 3 (see page 50, Architectural Elements, for details). Option one, a 12,000 SF extension with possible renovation of the existing field house, is delineated on the preferred site plan. The potential expansion, it’s location, scale and relationship to the park and the field house, will be further reviewed and developed in the next phase of design. Boys & Girls Club shade pavilion, restrooms and storage 12,000 SF potential Boys & Girls Club expansion 6.11.e Packet Pg. 301 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) PREFERRED SITE PLAN The Great Lawn The Meadows The Market PromenadeDaley St Bell St6th Ave Ndeed restriction boundary 45 1 1 9 9 2 2 10 10 3 3 11 11 4 4 12 12 5 5 13 13 6 6 14 14 7 7 15 15 8 8 16 16 17 17 18 18 Master Plan art & stormwater opportunity tennis/multi-use court (optional outlined) 1/3 mile jogging & walking path exercise station youth climbing wall picnic meadow berms playground view terraces stormwater gardens field lighting petanque grove shade pavilion, restrooms & storage multi-use plaza with water feature or interactive art Boys and Girls Club or cafe & concessions multi-use court (potential 12,000 SF Boys & Girls Club expansion) skatepark multi-use playfields park property lineSprague St Sprague St Edmonds St 7th Ave N6.11.e Packet Pg. 302 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 46 Edmonds Civic Center Playfield Master Plan Playground Sprague Street Connector 7th Avenu e Multi-use LawnStormwater Gardens Field Lighting** ** Number of posts and placement to be determined Youth Climbing WallMeadow Planting Picnic MeadowBermsViewing Terraces 1/3 mileJogging-Walking Path Exercise Stations MASTER PLAN VIEWS 6.11.e Packet Pg. 303 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 47Master Plan Plaza, Interactive Art or Water Feature Shade Pavilion with Restrooms & Storage6th Ave Market Promenade Petanque Groves Art Opportunity 6th Avenue Field House(Boys & Girls Club) Multi-use Court (Potential Boys & Girls Club Expansion) Stormwater Gardens Multi-use CourtSkatepark 6.11.e Packet Pg. 304 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 48Ice Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketEdmonds Civic Center Playfield Master Plan MASTER PLAN EVENT OVERLAYS Small to Medium Size Events Within the Park Significant community and stakeholder interest was expressed in hosting more small to medium size events and performances at the park. The 6th Avenue plaza and promenade areas, Petanque grove, picnic meadow, lawn terraces and corresponding playfield were all designed as flexible use spaces that could be ideal for a variety of smaller-scale gatherings, concerts, performances, markets or events. The final park design will also provide distributed utility services for facilitating all scales of event use. Markets Small-Medium Performances Small Performances Wine Garden, etc. 12,000 SF potential B&G Club expansion 6.11.e Packet Pg. 305 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 49Ice Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarketMarketMarketMarketMarketMarketIce Skating RinkMarket Market Market Market Market Market Ice Skating RinkMarket Market Market Market Market Market Ice Skating RinkMarket Market Market Market Market Market Ice Skating RinkMarket Market Market Market Market Market Master Plan Large Events and the 6th Avenue Market Promenade The park has a long-standing tradition of hosting some of the city’s most iconic large events. The new park plan offers a large amount of flexible use space that can accommodate festivals, markets, parades and more. The maximum amount of area for a single large event is outlined below and demonstrates the ability of the park to accommodate key existing program elements for the Taste of Edmonds. Conversations are ongoing with the Edmonds Chamber of Commerce and other stakeholders on the potential reconfiguration of the Taste of Edmonds, the Edmonds Arts Festival and the 4th of July parade and fireworks to best utilize the new park design. Use of this zone contingent on coordination with fire department Large-Scale Events 12,000 SF potential B&G Club expansion 6.11.e Packet Pg. 306 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) BOYS & GIRLS CLUB OPTION 1 - PREFERRED BOYS & GIRLS CLUB OPTION 2 50 Edmonds Civic Center Playfield Master Plan ARCHITECTURAL ELEMENTS Boys and Girls Club Expansion The Boys and Girls Club has been occupying the field house since 1968 and have expressed a preference to remain in the park. However, with the current enrollment of 150 children, they have reached full capacity in the 9,500 SF facility. Typical Boys and Girls Club facilities range from 18-25,000 SF and the Club will need more space if it is to continue to grow. At the time of the master plan, there was no formal long-range plan for the Club expansion or relocation but the design team explored Club facility expansion options that could be integrated and/or phased-in with the new design. Owen Richards Architecture (ORA) created conceptual massing studies for two options - a 12,000 SF expansion that creates an entry courtyard adjacent to the existing Field House, and a 20,0000 SF alternative building. Creating integrated indoor/outdoor spaces, a bright new gym and open and inviting volumes that could both complement and offset the Field House were a priority. MASSING STUDY FOR 12,000 SF EXPANSION MASSING STUDY FOR 20,000 SF EXPANSION The proposed building locations and footprints were presented for discussion and feedback at Open House 3 and the consensus was that the larger footprint in option 2 consumed too much of the park. The smaller footprint is shown in the Preferred Master Plan for future discussion as the park design advances. Field House Field House (included for scale) 20,000 SF potential Boys & Girls Club alternative Field House removed shade pavilion, restrooms and storage shade pavilion, restrooms and storage 12,000 SF potential Boys & Girls Club expansion 6.11.e Packet Pg. 307 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 51Master Plan Shade PavilionENLARGED SITE PLAN MASSING STUDY FOR SHADE PAVILION WITH RESTROOMS A new shade pavilion and restrooms were strongly supported by the community. The design team was primarily focused on the scale and siting of the structure but also began to explore its potential character and ability to serve as gateway to the park and iconic gathering space. Potential uses include seating area, market cover and other small performance or event use. existing field house shade pavilion, restrooms and storage Examples of Signature Features 12,000 SF potential Boys & Girls Club expansion The following images, from existing pavilions, are intended to give a sense of the general character of the proposed structure. 6.11.e Packet Pg. 308 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 52 Edmonds Civic Center Playfield Master Plan OPEN HOUSE 3, OCTOBER, 2016 Format The meeting consisted of opening remarks by Mayor Dave Earling, a presentation by the design team, a brief Q&A session and an open house during which attendees were able to: • Discuss the hybrid design and design elements with other members of the community • Provide feedback on the hybrid design to the project staff • Ask questions and talk with project staff and PAC members • Submit written comments about the hybrid design First draft of the hybrid master plan that was presented and discussed at Open House #3. Principals Lara Rose and Chris Jones of Walker Macy and participants at Open House 3 discussing the Hybrid Plan during the Q&A session. (see detailed summary in Appendix) The following questions were asked as a starting point for in- person feedback and discussion as well as online comments: • Please share your thoughts, what do you like or dislike about the plan? • Which elements of the new park design would bring you to the park most often? • Are there park elements not shown that you would like to see? • Additional Comments were encouraged. 6.11.e Packet Pg. 309 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 53 I like... I don’t like... Master Plan Participation and Attendance (see detailed summary in Appendix) • Like the integrated activities • Like the curves, paths, and passive areas • Northern skatepark location is an issue for residents • We should leave the park as is • Good compromise; thoughtful incorporation of community feedback • Not enough sports/playfields and too much passive area • Not enough passive area and too much sports/playfields • Petanque grove is nice but would like larger tournament area • Formal track should be included • Like the 1/3 mile walking/jogging path • 6th Avenue market promenade and plaza will be a great asset • Concerns about buffers, noise, dogs, lighting and other design details • Approximately 101 attended • 347 visitors (majority were nearby residents who had not attended any of the in-person Open Houses • 156 responses Age Range: • Over 70: 6 (7.4%) • 45-69: 39 (48.1%) • 30-44: 33 (40.7%) • 18-29: 0 (0%) • Under 18: 2 (2.5%) A broad range of comments were received, similar to prior feedback� Overall sentiment was that the hybrid plan is successful at incorporating community feedback and will be a great asset to the city. In-Person Open House October 19, 2016 Online Open House October 19 - November 4, 2016 6.11.e Packet Pg. 310 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) 54 Edmonds Civic Center Playfield Master Plan PHASING Potential implementation could be considered in three phases with the flexibility to prioritize these phases in any order depending on alignment with city initiatives and budget. The boundaries of the phasing would shift slightly depending on the order of construction as described below: • Phase A includes the more civic uses of the park up to the back-of-curb along 6th Avenue. This area includes a majority of park’s hardscape as well as the architectural features and the Petanque Grove. (Note: if this phase follows Phase C, it is recommended that the park-side portion of the promenade be completed along with 6th Avenue). • Phase B is the heart of the park and involves more site grading and softer landscape features as well as the Sprague Street connection and the sidewalk along 7th Avenue. (Note, if this phase precedes Phase A it is recommended that the Sprague Street connection be completed all the way to 6th Avenue). • Phase C represents the 6th Avenue “Market Promenade” from back-of-curb on the park side and includes the pedestrian crossings at Sprague Street and the full right-of-way for all edges not along the park. (Note: if Phase C precedes Phase A it is recommended that the park-side portion of the promenade be completed along with the 6th Avenue improvements). PHASE A PHASE BPHASE C6.11.e Packet Pg. 311 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) PROPOSED TYPICAL BUFFER SECTION 55Master Plan SUPPLEMENTAL INFORMATION New stormwater code is scheduled to be published in January, 2017. Alignment with this plan will happen in the Design Development phase of the Civic Center Playfield. The city is planning to install a new sewer line between 6th and 7th Avenues that would cross Civic Center Playfield from east to west within the old Edmonds Street right-of-way. There is flexibility on the exact location within that zone and the park design will collaborate with the Edmonds Public Works and Utilities department to determine the final locations of any structures and assess other impacts to the park design.The adjacent residential community expressed concerns about the high fencing around the tennis courts and the potential to obstruct views. The design team responded with examples of fencing with low visual impacts that was well received.Parking concerns were raised as a discussion point in several of the Civic Center Playfield Master Plan meetings and Open Houses. The consensus of the community was that park property should be retained as public open space and not allocated to parking. The design team has recommended that parallel street parking along 6th and 7th Avenues remain with further study to determine amount and locations for designated ADA and loading access areas. Alley Buffers Parking Considerations Utilities and City Planning Tennis / Sports Fencing 14’ Min. Planted Buffer8’ Jogging/Walking PathPlanted Berms 17’Alley Existing Fence The design team has proposed that the existing 8’ chain link fence that surrounds the park be removed. The fence was erected while the property served as school grounds and is in poor condition. Community concerns were raised about buffering between the park interior and the residential alleys to the north and south of the site for safety and security purposes. The design team has advised that dense planting offers a more inviting and attractive condition while still providing effective buffers. The suggested condition below demonstrates a 14’ minimum width. City Council voted in favor of replacing the fence with a vegetated buffer.` The suggestion of back-in angle parking was made but the design team feels strongly that this causes pedestrian and vehicular safety concerns as well as negatively impacts the park edge condition. It is highly recommended that the City of Edmonds undertake a city- wide parking study to identify needs and determine options. The design team also recommends that bus transit routes be reviewed to consider a future bus stop at Civic Center Playfield. 6.11.e Packet Pg. 312 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) SECTION KEY MAP A SECTION A: 6TH AVENUE MARKET PROMENADE B 56 Edmonds Civic Center Playfield Master Plan The 6th Avenue/Market Promenade is envisioned as a ‘Festival Street’ that could host special events through temporary closure to vehicular traffic. The proposed right-of-way features a raised roadway that is level with the surrounding sidewalk between Daley and Bell Streets to create a more pedestrian- friendly park edge and entrance. The street would incorporate special paving, flush curbs, street trees, planting and space for market tents and other activities. Additional benefits include: • Providing clear connections between the park, downtown Edmonds and Edmonds Center for the Arts. • Balancing the uses of the street for walking, driving, transit, cycling, emergency services, parking, drop-offs, etc. • Creating an attractive and engaging gateway to the park. • Traffic calming to promote safety of pedestrians and vehicles. 6th Avenue Market Promenade STREET IMPROVEMENTS Note: Existing conditions and dimensions are approximate. 6.11.e Packet Pg. 313 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) SECTION B: 7TH AVENUE STREET IMPROVEMENTS 7th Avenue looking north at Edmonds Street 57Master Plan The existing sidewalk and street trees along 7th Avenue place the pedestrians on a narrow sidewalk at the edge of the curb. The master plan recommends that the lane widths be reconsidered to allow the street trees and planting to create a buffer between the curb and the sidewalk. Curb bump-outs and a designated pedestrian street crossing at the Sprague Street Connector entrance would also provide safer and more direct park access for residents. 7th Avenue Street Improvements Note: Existing conditions and dimensions are approximate. 6.11.e Packet Pg. 314 Attachment: 170227_ECCP_Master_Plan_Final_optimized (Civic Field PSA for design services) DRAFT Civic Proposed Budget – March 2018 Expenditures Total 2017 2018 2019 2020 Total all years Geotech and Survey 40,000 40,000 Stadium removal 135,000 35,000 100,000 RCO support 25,000 25,000 A&E 1,208,185 475,000 525,000 208,000 Permitting 35,000 35,000 Construction 10,515,000 10,515,000 Engineering Staff 180,000 40,000 40,000 100,000 12,138,185 75,000 640,000 565,000 10,858,000 12,138,000 Total Revenue Fund 125 140,000 500,000 500,000 Fund 126 210,000 335,000 City GF 2,000,000 RCO 35,000 Park Impact Fees 500,000 Local Parks 1,350,000 State Leg Direct 500,000 Snohomish County 1,000,000 Hazel Miller Foundation 500,000 500,000 500,000 Private/Voted and/or bonded funds 3,568,000 Total 175,000 3,210,000 4,350,000 4,403,000 12,138,000 Shaded boxes are goals and to be determined. 6.11.f Packet Pg. 315 Attachment: DRAFT Civic Proposed Budget (Civic Field PSA for design services) City Council Agenda Item Meeting Date: 04/10/2018 Report on Public Works committee agenda items Staff Lead: Rob English Department: Engineering Preparer: Rob English Background/History On March 13, 2018, this item was presented to the Public Works and Parks Committee. Staff Recommendation For Information and Discussion. Narrative At the request of the Parks and Public Works Committee, staff prepared the attached report (Exhibit A) showing the type and frequency of items that were presented to the committee in 2017. The committee requested this information to identify routine agenda items that could be administratively approved without City Council action. The goal is to reduce the number of items being reviewed by the committee. Staff’s initial recommendation to the PPW committee was the following: Grant Mayor Authorization: 1. Accept street dedications 2. Accept acquisition of right of way or easements that are less than $100,000 in value 3. Authorize the surplus of equipment 4. Authorize the purchase of vehicles or equipment that are programmed in the current year's budget. 5. Approve Supplemental Agreements that are anticipated and included in the current year's budget and do not require a budget amendment. Examples: a. Multi-year design or construction management services on annual capital replacement/maintenance programs that are in the current year's budget. b. Construction support services for the designer of record on projects that are in the current year's budget. c. Final design phase after preliminary design on projects that are in the current year's budget and less than $400,000. Consent Agenda Approval 1. Final Acceptance of Projects The PPW committee discussed the information with staff and were willing to add items that could be approved administratively. The items were professional service agreements over the current $100,000 7.1 Packet Pg. 316 limit and final acceptance of projects with the understanding that staff would provide an annual report on accepted projects. The PPW committee had discussion about increasing the threshold for administrative approvals on professional service agreements and supplemental agreements. The PPW committee recommended this item be presented to the Finance Committee for input on how much to increase the thresholds. Staff prepared a new set of recommendations (Exhibit B) for the Finance Committee to review, based on input from the PPW committee. The new recommendations include financial thresholds, shown in bold, that will be discussed at the Finance Committee. Attachments: Exhibit A - Council History Sorted 2017 040518.DATA Exhibit B - Council History Sorted 2017 040518.SUMMARY 7.1 Packet Pg. 317 1 No.Date Item Amount Item Description Committee/ Study Presentation Consent Action Committee Recommendation to Full Council 1 5/9/2017 Agreement 250,000.00$ Presentation of a Complete Streets Grant Agreement with the Transportation Improvement Board (TIB)PPP 10 min 2 11/14/2017 Agreement 50,000.00$ Authorization for the Mayor to sign an Agreement with the State of Washington Department of Ecology for a Municipal Stormwater Capacity Grant PPP 10 min forwarded item to full Council for review 3 10/24/2017 Agreement Wayside Horn & BNSF Agreements PPP 10 min 4 11/28/2017 Agreement Agreement with Edmonds School District for transfer of a fleet of bicycles purchased using funds from the Madrona School Safe Routes to Schools grant.PPP 10 min 5 4/18/2017 Agreement Wastewater Treatment, Disposal and Transport Contract Extension Study 10 min Delayed 6 4/25/2017 Agreement Wastewater Treatment, Disposal and Transport Contract Extension Study 10 min 7 1/24/2017 Agreement Authorization for the Mayor to sign an Interlocal Agreement between the City of Lynnwood and the City of Edmonds for joint funding of the Recycling Coordinator Study 5 min authorized Mayor to sign agreement 8 2/28/2017 Agreement SnoPUD Redundancy Power Agreement - WWTP Study 10 min Postponed to a future meeting 9 5/23/2017 Annual Report Briefing on the 2018-2023 Six-Year Transportation Improvement Program PPP 20 min Full Council 10 6/13/2017 Annual Report Presentation of the Traffic Impact Fee Annual Report PPP 10 min 11 2/14/2017 Construction Contract 1,204,916.00$ Report on Bids for the Highway 99 Pipe Rehabilitation Project Study 10 min forwarded to following weeks agenda by full Council 12 3/7/2017 Construction Contract 4,435,239.62$ Report on Bids opened March 2, 2017 for the 76th Ave & 212th St. Intersection Improvements Project Study 10 min forwarded to following weeks agenda by full Council 13 4/25/2017 Construction Contract 2,003,518.00$ Report on construction bids received for the 2017 Waterline Replacement Project Study 10 min forwarded to following meeting consent agenda for approval 14 5/9/2017 Construction Contract Report on construction bids for the 238th Street Walkway Project (Edmonds Way to SR99)PPP 10 min 15 7/25/2017 Discussion Pine Street Lighting Discussion PPP 20 min 16 8/8/2017 Discussion Pine Street Lighting Discussion PPP 20 min 17 8/8/2017 Discussion Sunset Ave Parking PPP 20 min 18 10/10/2017 Discussion Fishing Pier Rehabilitation Project PPP 10 min 19 9/26/2017 Equipment Surplus Authorization to contract with James G. Murphy to sell surplus city equipment PPP 10 min 20 3/28/2017 Equipment Surplus Authorization to contract with James G. Murphy to sell surplus city vehicles and surplus city equipment Study 5 min forwarded to following meeting consent agenda for approval 21 4/18/2017 Equipment Surplus Authorization to contract with James G. Murphy to sell surplus city vehicles and surplus city equipment Study 10 min forwarded to following meeting consent agenda for approval 22 5/23/2017 Final Accpetance Report of final construction costs for the 105th / 106th Avenues West Low Impact Development Stormwater Infrastructure Improvements Project PPP 10 min Consent 23 6/27/2017 Final Accpetance Report of final construction costs for the Citywide CIPP Sewer Rehabilitation Project -- Hwy 99 Pipe Rehabilitation Phase PPP 10 min 24 8/22/2017 Final Accpetance Final Acceptance of the 220th Street SW Overlay Project from 84th to 76th Avenue West PPP 5 min 25 11/28/2017 Final Accpetance Final Acceptance of Madronna Walkway PPP 10 min 26 2/28/2017 Final Accpetance Final Acceptance of the 2016 Waterline Replacement Project Study 10 min 27 4/11/2017 Final Accpetance Report on Final Construction Costs for the 238th St. SW Walkway and Drainage Improvements Project Study 10 min 28 4/18/2017 Final Accpetance Report on construction bids received for the 2017 Sewer Line Replacement Project Study 10 min forwarded to following meeting consent agenda for approval 29 2/28/2017 Final Accpetance Report of final construction costs for the Dayton Street Plaza and acceptance of project 5 min x 30 3/7/2017 Final Accpetance Final Acceptance of the 2016 Waterline Replacement Project x 31 7/11/2017 Final Accpetance Report of final construction costs for the Citywide CIPP Sewer Rehabilitation Project -- Hwy 99 Pipe Rehabilitation Phase x 32 9/5/2017 Final Accpetance Acceptance of the220th Street SW Overlay Project from 84th to 76th Avenues W x 33 10/24/2017 Final Accpetance Final Acceptance of the Phase I CIPP Sewer Rehabilitation Project (Insituform Technologies)x 34 12/5/2017 Final Accpetance Final Acceptance of Madrona Walkway x 35 1/3/2017 Funding Request 48,000.00$ Frances Anderson Center Bandshell Replacement Project Management Reserve Study 10 min Approved 7.1.a Packet Pg. 318 Attachment: Exhibit A - Council History Sorted 2017 040518.DATA (Report on Public Works committee 2 No.Date Item Amount Item Description Committee/ Study Presentation Consent Action Committee Recommendation to Full Council 36 9/12/2017 Funding Request 31,000.00$ Edmonds Veteran's Plaza Update and Request PPP 15 min forwarded item to full Council for review 37 11/28/2017 Funding Request Contract Change Order for 76th Ave/212th St Intersection Improvement Project Finance 10 min 38 11/28/2017 Funding Request Contract Change Order for 76th Ave/212th St Intersection Improvement Project PPP 10 min 39 6/13/2017 Ordinance Proposed Noise Ordinance PPP 10 min 40 6/27/2017 Ordinance Proposed Noise Ordinance PPP 15 min 41 9/26/2017 Ordinance Ordinance amending Section 8.16.040 of the Edmonds City Code (ECC), amending the speed limit along a section of SR-524 (5min) 3. 318 Howell Street Dedication PPP 10 min 42 6/20/2017 Ordinance Proposed Noise Ordinance 20 min x 43 7/11/2017 Planning Document Presentation of 2017 Comprehensive Water System Plan PPP 10 min 44 10/10/2017 Planning Document Professional Services Agreement with MIG for the ADA Transition Plan PPP 10 min 45 11/6/2017 Planning Document Presentation of the Proposed 2018-2023 Capital Facilities Plan/Capital Improvement Program Study 30 min 46 10/24/2017 Planning Document Presentation of the ADA Transition Plan 30 min 47 11/6/2017 Planning Document Adopt and approve the 2017 Comprehensive Water System Plan 15 min x 48 10/24/2017 Prof Serv Agreement 917,374.00$ Presentation of a Professional Services Agreement with Parametrix for Pre-Design and Permitting Activities on the Edmonds Street Waterfront Connector Project PPP 15 min 49 11/14/2017 Prof Serv Agreement 917,374.00$ Authorize the Mayor to sign a Local Agency Professional Services Agreement with Parametrix for the Edmonds Street Waterfront Connector Project PPP 10 min 50 8/22/2017 Prof Serv Agreement 467,517.00$ Authorization for Mayor to sign Local Agency Professional Services Consultant Agreement with SCJ Alliance for the Highway 99 Revitalization / Gateway Project PPP 10 min forwarded item to full Council for review 51 3/14/2017 Prof Serv Agreement 389,580.00$ Presentation of a Local Agency Agreement for Construction Management Support Services for the 76th Ave and 212th St Intersection Improvement/Bike2Health Project Study 10 min forwarded to following weeks agenda by full Council 52 1/24/2017 Prof Serv Agreement 361,000.00$ Presentation of a Professional Services Agreement with The Blueline Group for the 2018 Waterline Replacement Project Study 10 min Approved 53 3/14/2017 Prof Serv Agreement 274,385.00$ Presentation of a Professional Services Agreement with Murray Smith and Associates for design services for the 2018 Sewer Replacement Project Study 10 min forwarded to following weeks agenda by full Council 54 8/22/2017 Prof Serv Agreement Recommendation of Consultant for Pre-Design and Permitting Activities for the Edmonds Street Waterfront Connector Project PPP 5 min 55 7/11/2017 Right of Way Easement Presentation of utility easements and temporary construction easements at 7521 212th St. SW and 7525 212th St. SW for the 76th Ave. W @ 212th St. SW Intersection Improvements project PPP 10 min 56 9/26/2017 Right of Way Easement Street Right of Way Dedication for 8632 184th St. SW PPP 10 min 57 9/26/2017 Right of Way Easement Accept Easement for an Emergency Fire Lane as part of the Woodway Court II Plat PPP 10 min 58 10/10/2017 Right of Way Easement Utility Easements for existing utilities within the Providence/Verdant Health & Swedish/Stevens Campus PPP 10 min 59 10/10/2017 Right of Way Easement Authorization for Mayor to approve recording of a public pedestrian easement along Edmonds Way adjacent to 10032 Edmonds Way PPP 10 min 60 4/25/2017 Right of Way Easement Presentation of a Right of Way Dedication Deed from Edmonds School District for 236th St. at the Madrona School Property Study 10 min forwarded to following meeting consent agenda for approval 61 2/21/2017 Street Vacation 92nd Avenue West Street Vacation (10 min.)Study 10 min 62 6/27/2017 Supplemental Agmt 814,219.00$ Presentation of a Supplemental Agreement with David Evans & Associates for the 76th Ave & 212th St. Intersection Improvements Project PPP 10 min forwarded to following meeting consent agenda for approval 63 5/9/2017 Supplemental Agmt 526,020.00$ Presentation of a Supplemental Agreement with BHC Consultants for the Dayton Street Utility Replacement Project (3rd Ave to 9th Ave)PPP 10 min Forwarded to Consent 64 3/28/2017 Supplemental Agmt 314,200.00$ Presentation of a Supplemental Agreement with The Blueline Group to provide Capital Project Construction Management, Engineering & Inspection Services for 2017 Study 10 min forwarded to following meeting consent agenda for approval 65 3/28/2017 Supplemental Agmt 310,313.00$ Presentation of a Supplemental Agreement with Murray, Smith & Associates for the Five Corners Reservoir Recoating Project Study 10 min forwarded to following meeting consent agenda for approval 66 11/14/2017 Supplemental Agmt 302,739.00$ Authorize Mayor to sign a Supplemental Agreement with BergerABAM for the Fishing Pier Rehabilitation Project PPP 10 min forwarded item to full Council for review 67 11/14/2017 Supplemental Agmt 238,300.00$ Authorization for the Mayor to sign a Supplemental Agreement with The Blueline Group (Blueline) to provide professional services for the 2019 Waterline Replacement Project. PPP 10 min forwarded item to full Council for review 7.1.a Packet Pg. 319 Attachment: Exhibit A - Council History Sorted 2017 040518.DATA (Report on Public Works committee 3 No.Date Item Amount Item Description Committee/ Study Presentation Consent Action Committee Recommendation to Full Council 68 5/9/2017 Supplemental Agmt 223,582.00$ Presentation of a Supplemental Agreement with Tetra Tech for the Lift Station #1 Basin and Flow Study PPP 10 min 69 6/13/2017 Supplemental Agmt 148,437.00$ Presentation of a Supplemental Agreement with HWA GeoSciences for the Fishing Pier Rehabilitation Project PPP 10 min forwarded to following meeting consent agenda for approval 7.1.a Packet Pg. 320 Attachment: Exhibit A - Council History Sorted 2017 040518.DATA (Report on Public Works committee Item Qty Percentage of PPP/Study Agreement 8 11.6% Annual Report 2 2.9% Construction Contract 4 5.8% Discussion 4 5.8% Equipment Surplus 3 4.3% Final Acceptance 13 18.8% Funding Requests 4 5.8% Ordinance 4 5.8% Planning Document 5 7.2% Prof Serv Agreements 7 10.1% Right of Way Easement 6 8.7% Street Vacation 1 1.4% Supplemental Agmt 8 11.6% 100.0% Staff Recommendation: 2017 Public Works Items - Council Study Session/Committee a. Multi-year design or construction management services on annual capital replacement/maintenance programs that are in the current year's budget. b. Construction support services for the designer of record on projects that are in the current year's budget. c. Final design phase after preliminary design on projects that are in the current year's budget. A. Grant Mayor Authorization: 1. Accept street dedications. 3. Authorize the surplus of equipment. 2. Accept acquisition of right of way or easements that are less than $100,000 in value. 6. Approve Supplemental Agreements that are anticipated and included in the current year's budget, do not require a budget amendment and are less than $400,000. Examples: 4. Authorize the purchase of vehicles or equipment that are programmed in the current year's budget and are less than $400,000 5. Approve Professional Service Agreements that are anticipated and included in the current year's budget, do not require a budget amendment, and are less than $400,000. 5. Final Acceptance of Project. Staff will provide an annual report on accepted capital projects. 7.1.b Packet Pg. 321 Attachment: Exhibit B - Council History Sorted 2017 040518.SUMMARY (Report on Public Works committee agenda items) City Council Agenda Item Meeting Date: 04/10/2018 Capital Asset Policy and Resolution for Adoption Staff Lead: Dave Turley Department: Administrative Services Preparer: Dave Turley For review and move to next week's agenda. Attachments: CapitalAssetPolicyFeb2018 7.2 Packet Pg. 322 1 RESOLUTION NO. XXXX A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING THE CAPITAL ASSET POLICY AS ATTACHED HERTO. WHEREAS, the City of Edmonds is committed to the highest standards of responsible financial management; and WHEREAS, the City Council Finance Committee reviewed the Capital Asset Policy at the February 13, 2018 Finance Committee meeting; and WHEREAS, best practice shows that finance related policies should be formally adopted by Resolution; now therefore, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. ADOPT THE CITY OF EDMONDS CAPITAL ASSET POLICY. The city council hereby adopts the following attached document: City of Edmonds Capital Asset Policy to read as set forth in Attachment A hereto, which is attached hereto and incorporated herein by this reference as if set forth in full. 1. RESOLVED this 20TH day of February 2018. CITY OF EDMONDS _______________________ MAYOR, DAVE EARLING ATTEST: CITY CLERK, SCOTT PASSEY FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: RESOLUTION NO. XXXX 7.2.a Packet Pg. 323 Attachment: CapitalAssetPolicyFeb2018 (Capital Asset Policy and Resolution) Attachment A 2 City of Edmonds Capital Asset Policy February 20, 2018 Resolution # XXXX 7.2.a Packet Pg. 324 Attachment: CapitalAssetPolicyFeb2018 (Capital Asset Policy and Resolution) Attachment A 3 1.0 PURPOSE: To establish a Policy providing stewardship over the City’s capital assets, as well as the capitalization and depreciation or amortization of capital purchases over time, as appropriate. 2.0 ORGANIZATION AFFECTED: All City funds. 3.0 REFERENCES: RCW 43.09.200 Budgetary, Accounting, and Reporting System (BARS) Manual, Part 3, Chapter 3, Capital Assets Budgetary, Accounting, and Reporting System (BARS) Manual, Part Three, Chapter 7, Capital Assets and Internal Service Funds Office of Management and Budget, 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards Office of Management and Budget, 2 CFR 225, Cost Principles for State, Local, and Indian Tribal Governments Edmonds City Code, Chapter 3 4.0 CAPITAL ASSET POLICY: 4.1 Capital Assets – General capital assets are those assets not specifically related to activities reported in the proprietary funds. The capital assets purchased or constructed by a governmental fund are recorded as expenditures in the fund at the time the related purchases are made; however, the associated capital assets are reported in the governmental activities column of the government-wide statement of net assets while not reported in the fund balance sheets. 4.2 The City classifies assets with an estimated useful life in excess of one year as capital assets. Land and works of art are capitalized at cost with no minimum threshold. Buildings, improvements, intangible assets, and machinery and equipment are capitalized when their cost meets or exceeds $5,000. Infrastructure assets are capitalized when their cost meets or exceeds $50,000. 4.3 Costs of normal maintenance and repair for assets are not capitalized. However, any improvement that increases an asset’s value, capacity or materially extends its life is added to that asset’s capitalized costs. 4.4 Equipment acquired through capital lease agreements and land purchased through conditional sales contracts are reported as general capital assets in the government- 7.2.a Packet Pg. 325 Attachment: CapitalAssetPolicyFeb2018 (Capital Asset Policy and Resolution) Attachment A 4 wide statement of net assets. In the governmental fund financial statements, lease and contract payments are reported as expenditures. 4.5 The City will complete an inventory of all capital assets no later than January 31st for the previous calendar year. Any adjustments to the Capital Asset List (e.g. additions, transfers, or disposals) must be communicated to the Finance Director no later than February 15th. The Finance Director must be notified immediately if it is discovered that any asset has been stolen, has been taken out of service, or has become impaired. Each department will maintain their own inventory of small and attractive assets and perform these same procedures to their small and attractive asset inventory. 4.6 In accordance with federal requirements, the City will specifically identify in its inventory any equipment or real property purchased with federal funds. The City will inventory all assets with a cost greater than $5,000 per unit purchased with federal funds at least once every two years, in accordance with 2 CFR 200.313. Upon completion of any Federal award, or when a capital asset is no longer needed and has been declared to be surplus, the appropriate federal agency will be contacted regarding the appropriate disposition of any assets that were purchased with federal funds. 4.7 All project costs related to the construction of any asset, including infrastructure, are included in construction in progress during the construction process and are capitalized upon completion of the project. These costs generally include amounts paid for work done by outside contractors, materials and supplies furnished by the City, labor of City employees, and project management costs. Some costs will be direct costs and readily assignable while some will be indirect costs, which should be allocated to benefited assets in a reasonable manner. Costs incurred during construction must be reported as Construction in Progress if construction has not been completed by year end. Once completed, the Construction in Progress asset is reclassified to the appropriate asset category, e.g. Buildings, Infrastructure, Sidewalks, or Machinery and Equipment. Long-range or advance planning costs and costs incurred to conduct feasibility studies or government compliance studies must be capitalized only when it can be shown that they provide benefits to existing or future capital assets. 4.8 The Construction in Progress schedule must be reviewed and reconciled no later than January 31st for the previous calendar year. The Finance Department will perform a secondary review of the reconciliation to ensure it is performed accurately and completely by reviewing documentation to confirm the date that assets were substantially complete. 4.9 Transfers of assets between departments or funds are allowed by mutual agreement of the departments. The department transferring the assets must notify the Finance Director of the transfer within thirty days of the transfer. 7.2.a Packet Pg. 326 Attachment: CapitalAssetPolicyFeb2018 (Capital Asset Policy and Resolution) Attachment A 5 4.10 When a department decides to dispose of an asset in any manner, the department Director must notify the Finance Director and the City Council of their intent to dispose of the asset. In accordance with Edmonds City Code, any such sale or disposal must be approved by the City Council prior to disposal. 4.11 Capital assets acquired or constructed by the proprietary funds are capitalized in those funds at historical cost. Contributed assets are recorded at their estimated fair value as of the date acquired. The estimated value of donated assets is recorded as contributed capital by the fund which receives them. 4.12 Land and construction in progress are not depreciated. Buildings, equipment, non-building improvements and intangible assets are depreciated using the straight line method, using varying estimated service lives for individual assets and asset classifications depending on particular characteristics of an asset and factors surrounding its anticipated use. Depreciation is reported as part of the related program expense column on the government-wide statement of activities and as a fund expense in the proprietary funds, while not reported in the fund statements of governmental funds. Capital assets are reported net of accumulated depreciation on the government-wide statement of net assets and in the proprietary fund statement of net assets, while not reported in the governmental fund balance sheets. 4.13 Small and attractive assets should be identified and tracked by each Department Director or their designee using cost/benefit principles. The cost/benefit analysis should consider the cost of the item, its apparent susceptibility to loss or theft, and the likelihood of theft. Based on this analysis, the Director or designee shall prepare a list that is updated at least annually of the Department’s small and attractive items, the asset’s cost, its custodian, and its location. The Department shall conduct an inventory at least annually, no later than January 31st, of the assets on the list. The list shall be retained by the Department according to State records retention requirements or completion of the relevant State audit, whichever is longer. Lost or missing assets must be immediately reported to the Finance Director. Finance Department staff may periodically audit these records at the discretion of the Finance Director. 4.14 The average service lives used to calculate depreciation for specific types of assets are summarized below: Asset Type Est. Service Life (Yrs) Buildings 30-50 Improvements other than Buildings 20-40 Furniture and Fixtures 5-10 Cars 5-10 Vans, Trucks, Trailers 5-20 Data Processing Equipment 3-10 Infrastructure 20-100 7.2.a Packet Pg. 327 Attachment: CapitalAssetPolicyFeb2018 (Capital Asset Policy and Resolution) Attachment A 6 Sidewalks 30 Machinery and Equipment 5-20 Intangible Assets 20-30 5.0 DEFINITIONS: 5.1 "Assets" – All land, buildings, improvements, infrastructure, permanent works of art and historic collections and equipment purchased, donated, constructed, or acquired by the City. 5.2 "Capital Assets" – Land and improvements to land, including right of ways and easements; permanent artwork and historic collections of any value; improvements and infrastructure; buildings, their furnishings, fixtures, and furniture; equipment, machinery, vehicles, and tools; intangible assets such as water rights, and computer software; with a value of $5,000 or more for non-infrastructure or $50,000 or more per item for infrastructure, and having a useful life exceeding one year from the date of acquisition. 5.3 "Control" – Being in charge of, and having the authority to manage the asset. Having custodial responsibility of the asset includes but is not limited to the caring, keeping, safeguarding and protecting the asset. 5.4 "Infrastructure" – Roads, bridges, sidewalks, water lines, sewers, and drainage systems. 5.5 "Small and Attractive Assets" – Assets that are particularly at risk or vulnerable to loss and cost less than the capitalization threshold of $5,000 and have a life expectancy of more than one year. Small and attractive assets are those that may not be missed immediately if stolen, or may expose the City to liability if lost. Due to their sensitive nature, all guns that cost less than $5,000 are included in the definition of small and attractive assets, as well as all computer equipment that cost less than $5,000 if it contains sensitive information. Other assets are included in this definition only when their cost is greater than $1,000 but less than $5,000. Examples of these other assets include photographic equipment, tools, equipment, Unmanned Aircraft Systems (drones), and small machinery. 7.2.a Packet Pg. 328 Attachment: CapitalAssetPolicyFeb2018 (Capital Asset Policy and Resolution) City Council Agenda Item Meeting Date: 04/10/2018 First Quarter 2018 Budget Amendment Staff Lead: Scott James Department: Administrative Services Preparer: Debra Sharp Background/History Amend the 2018 Budget Ordinance No. 4096 Staff Recommendation Staff recommends that Council forward the First Quarter 2018 Budget Amendment to full Council for presentation and approval of Ordinance No. XXXX amending the 2018 Budget. Narrative There are a total of 15 budget amendments. Five of the amendments are for the General Fund. Two of the five will reduce the ending fund balance by $27,077. They include the citywide ORCA card program and the on-call development engineering services decision packages. The bridge loan to the Edmonds Center for the Arts is included in the budget amendment. The net effect on the General Fund ending fund balance is zero as the loan is to be repaid by the end of 2018. The Parks Department is moving $8,000 from repair and maintenance to supplies for the waterfront bench replacements. The final amendment for the General Fund is a request for an additional half time permit coordinator in the building department, which will be offset by new revenues. Two of the amendments move budgeted street projects between REET 1 and Fund 112 due to TIB grant requirements, which are detailed in the decision packages. There is a third request that effects REET 1. The Parks Department is requesting budget to fund a capital project management consultant. A similar request was originally included in the proposed 2018 budget but removed when the Capital Projects Manager was rejected. There are five utility decision packages. Four of the decision packages are for capital projects. The fifth utility decision package includes a request to hire an additional wastewater treatment plant operator. The position would be fully funded with salary savings. There is a schedule of the savings attached to the decision package. The final two decision packages include transfers. The first is the transfer from the General Fund to the three new funds. The transfers out of the General Fund were included in the original budget but we need to add the transfers into the three new funds. There is also a transfer moving the original $200,000 for the Marsh that sits in the Parks Construction Fund into the newly established Marsh Fund. 7.3 Packet Pg. 329 Attachments: 2018 1st Quarter Budget Amendment Ordinance 7.3 Packet Pg. 330 1 ORDINANCE NO. _______ AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING ORDINANCE NO. 4096 AS A RESULT OF UNANTICIPATED TRANSFERS AND EXPENDITURES OF VARIOUS FUNDS, AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. WHEREAS, previous actions taken by the City Council require Interfund Transfers and increases in appropriations; and WHEREAS, state law requires an ordinance be adopted whenever money is transferred from one fund to another; and WHEREAS, the City Council has reviewed the amended budget appropriations and information which was made available; and approves the appropriation of local, state, and federal funds and the increase or decrease from previously approved programs within the 2018 Budget; and WHEREAS, the applications of funds have been identified; THEREFORE, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. Section 1. of Ordinance No. 4096 adopting the final budget for the fiscal year 2018 is hereby amended to reflect the changes shown in Exhibits A, B, C, D, E and F adopted herein by reference. 7.3.a Packet Pg. 331 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) 2 Section 2. Effective Date. This ordinance, being an exercise of a power specifically delegated to the City legislative body, is not subject to referendum, and shall take effect five (5) days after passage and publication of an approved summary thereof consisting of the title. APPROVED: MAYOR, DAVE EARLING ATTEST/AUTHENTICATE: CITY CLERK, SCOTT PASSEY APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY: APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY: BY JEFF TARADAY FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: PUBLISHED: EFFECTIVE DATE: ORDINANCE NO. 7.3.a Packet Pg. 332 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) 3 SUMMARY OF ORDINANCE NO. __________ of the City of Edmonds, Washington On the ____ day of ___________, 2018, the City Council of the City of Edmonds, passed Ordinance No. _____________. A summary of the content of said ordinance, consisting of the title, provides as follows: AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING ORDINANCE NO. 4096 AS A RESULT OF UNANTICIPATED TRANSFERS AND EXPENDITURES OF VARIOUS FUNDS, AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. The full text of this Ordinance will be mailed upon request. DATED this _____ day of ________________, 2018. CITY CLERK, SCOTT PASSEY 7.3.a Packet Pg. 333 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “A”: Budget Amendment Summary (April 2018) 4 2018 2018 FUND FUND BEGINNING ENDING NO.DESCRIPTION FUND BALANCE REVENUE EXPENDITURES FUND BALANCE 001 GENERAL FUND 8,848,530 39,484,055 44,253,738 4,078,847 009 LEOFF-MEDICAL INS. RESERVE 651,630 285,650 294,270 643,010 011 RISK MANAGEMENT RESERVE FUND 881,320 19,180 - 900,500 012 CONTINGENCY RESERVE FUND 5,430,360 64,750 49,584 5,445,526 014 HISTORIC PRESERVATION GIFT FUND 7,410 5,170 5,400 7,180 017 MARSH RESTORATION & PRESERVATION FUND - 300,000 - 300,000 018 EDMONDS HOMELESSNESS RESPONSE FUND - 250,000 - 250,000 019 EDMONDS OPIOID RESPONSE FUND - 250,000 - 250,000 104 DRUG ENFORCEMENT FUND 111,460 130,560 103,252 138,768 111 STREET FUND 751,270 1,784,270 1,856,507 679,033 112 COMBINED STREET CONST/IMPROVE 960,515 3,634,203 3,747,838 846,880 117 MUNICIPAL ARTS ACQUIS. FUND 503,752 146,200 183,892 466,060 118 MEMORIAL STREET TREE 18,480 400 - 18,880 120 HOTEL/MOTEL TAX REVENUE FUND 82,000 87,960 90,550 79,410 121 EMPLOYEE PARKING PERMIT FUND 62,380 25,640 26,880 61,140 122 YOUTH SCHOLARSHIP FUND 14,910 850 1,000 14,760 123 TOURISM PROMOTIONAL FUND/ARTS 58,610 30,520 29,700 59,430 125 PARK ACQ/IMPROVEMENT 1,864,140 1,446,880 2,733,000 578,020 126 SPECIAL CAPITAL FUND 2,037,992 1,448,300 2,435,147 1,051,145 127 GIFTS CATALOG FUND 261,230 53,810 70,900 244,140 130 CEMETERY MAINTENANCE/IMPROV 225,425 180,170 213,509 192,086 136 PARKS TRUST FUND 156,800 3,150 - 159,950 137 CEMETERY MAINTENANCE TRUST FD 941,518 33,360 - 974,878 138 SISTER CITY COMMISSION 6,080 10,170 10,500 5,750 211 LID FUND CONTROL 16,210 14,400 16,450 14,160 231 2012 LTGO DEBT SERVICE FUND - 708,700 708,700 - 332 PARKS CONSTRUCTION 1,925,658 1,621,977 2,346,881 1,200,754 421 WATER 16,542,613 9,660,690 13,434,675 12,768,628 422 STORM 9,619,892 5,317,996 6,953,660 7,984,228 423 SEWER / TREATMENT PLANT 40,160,311 11,917,843 14,166,002 37,912,152 424 BOND RESERVE FUND 842,990 1,991,530 1,991,520 843,000 511 EQUIPMENT RENTAL FUND 8,236,930 1,624,640 1,662,265 8,199,305 512 Technology Rental Fund 201,600 1,268,390 1,335,413 134,577 617 FIREMEN'S PENSION FUND 222,880 69,690 75,218 217,352 Totals 101,644,896 83,871,104 98,796,451 86,719,549 7.3.a Packet Pg. 334 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “B”: Budget Amendments by Revenue (April 2018) 5 ORD. NO.ORD. NO.ORD. NO.ORD. NO.2018 FUND FUND 4089 4094 4096 Amended NO.DESCRIPTION 1/1/2018 1/1/2018 3/2/2018 4/2018 Budget 001 General Fund 38,783,555$ -$ 18,000$ 682,500$ 39,484,055$ 009 Leoff-Medical Ins. Reserve 285,650 - - - 285,650 011 Risk Management Reserve Fund 19,180 - - - 19,180 012 Contingency Reserve Fund 64,750 - - - 64,750 014 Historic Preservation Gift Fund 5,170 - - - 5,170 017 Marsh Restoration & Preservation Fund - - - 300,000 300,000 018 Edmonds Homelessness Response Fund - - - 250,000 250,000 019 Edmonds Opioid Response Fund - - - 250,000 250,000 104 Drug Enforcement Fund 130,560 - - - 130,560 111 Street Fund 1,784,270 - - - 1,784,270 112 Combined Street Const/Improve 2,942,656 - 659,547 32,000 3,634,203 117 Municipal Arts Acquis. Fund 146,200 - - - 146,200 118 Memorial Street Tree 400 - - - 400 120 Hotel/Motel Tax Revenue Fund 87,960 - - - 87,960 121 Employee Parking Permit Fund 25,640 - - - 25,640 122 Youth Scholarship Fund 850 - - - 850 123 Tourism Promotional Fund/Arts 30,520 - - - 30,520 125 Park Acq/Improvement 1,446,880 - - - 1,446,880 126 Special Capital Fund 1,448,300 - - - 1,448,300 127 Gifts Catalog Fund 53,810 - - - 53,810 130 Cemetery Maintenance/Improv 180,170 - - - 180,170 136 Parks Trust Fund 3,150 - - - 3,150 137 Cemetery Maintenance Trust Fd 33,360 - - - 33,360 138 Sister City Commission 10,170 - - - 10,170 211 Lid Fund Control 14,400 - - - 14,400 231 2012 LTGO Debt Service fund 708,700 - - - 708,700 332 Parks Construction 1,494,534 - 127,443 - 1,621,977 421 Water 9,660,690 - - - 9,660,690 422 Storm 5,317,996 - - - 5,317,996 423 Sewer / Treatment Plant 11,566,980 - 350,863 - 11,917,843 424 Bond Reserve Fund 1,991,530 - - - 1,991,530 511 Equipment Rental Fund 1,624,640 - - - 1,624,640 512 Technology Rental Fund 1,268,390 - - - 1,268,390 617 Firemen'S Pension Fund 69,690 - - - 69,690 Totals 81,200,751$ -$ 1,155,853$ 1,514,500$ 83,871,104$ 7.3.a Packet Pg. 335 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “C”: Budget Amendments by Expenditure (April 2018) 6 ORD. NO.ORD. NO.ORD. NO.ORD. NO.2018 FUND FUND 4089 4094 4096 0 Amended NO.DESCRIPTION 1/1/2018 1/1/2018 3/2/2018 4/2018 Budget 001 General Fund 43,086,131$ 272,000$ 186,030$ 709,577$ 44,253,738$ 009 Leoff-Medical Ins. Reserve 294,270 - - - 294,270 011 Risk Management Reserve Fund - - - - - 012 Contingency Reserve Fund 49,584 - - - 49,584 014 Historic Preservation Gift Fund 5,400 - - - 5,400 017 Marsh Restoration & Preservation Fund - - - - - 018 Edmonds Homelessness Response Fund - - - - - 019 Edmonds Opioid Response Fund - - - - - 104 Drug Enforcement Fund 103,252 - - - 103,252 111 Street Fund 1,856,507 - - - 1,856,507 112 Combined Street Const/Improve 2,823,041 - 670,547 254,250 3,747,838 117 Municipal Arts Acquis. Fund 182,480 - 1,412 - 183,892 120 Hotel/Motel Tax Revenue Fund 90,550 - - - 90,550 121 Employee Parking Permit Fund 26,880 - - - 26,880 122 Youth Scholarship Fund 1,000 - - - 1,000 123 Tourism Promotional Fund/Arts 29,700 - - - 29,700 125 Park Acq/Improvement 2,432,040 - 300,960 - 2,733,000 126 Special Capital Fund 1,734,535 - 782,862 (82,250) 2,435,147 127 Gifts Catalog Fund 45,900 - - 25,000 70,900 130 Cemetery Maintenance/Improv 197,514 - 15,995 - 213,509 136 Parks Trust Fund - - - - - 137 Cemetery Maintenance Trust Fd - - - - - 138 Sister City Commission 10,500 - - - 10,500 211 Lid Fund Control 16,450 - - - 16,450 231 2012LTGO Debt Service Fund 708,700 - - - 708,700 332 Parks Construction 1,982,160 - 164,721 200,000 2,346,881 421 Water 12,270,201 - 1,025,274 139,200 13,434,675 422 Storm 6,562,877 - 273,583 117,200 6,953,660 423 Sewer / Treatment Plant 13,066,764 - 1,092,038 7,200 14,166,002 424 Bond Reserve Fund 1,991,520 - - - 1,991,520 511 Equipment Rental Fund 1,662,265 - - - 1,662,265 512 Technology Rental Fund 1,191,113 - 144,300 - 1,335,413 617 Firemen'S Pension Fund 75,218 - - - 75,218 Totals 92,496,552$ 272,000$ 4,657,722$ 1,370,177$ 98,796,451$ 7.3.a Packet Pg. 336 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “D”: Budget Amendment Summary (April 2018) 7 Fund Number Change in Beginning Fund Balance Revenue Expense Change in Ending Fund Balance 001 - 682,500 709,577 (27,077) 017 - 300,000 - 300,000 018 - 250,000 - 250,000 019 - 250,000 - 250,000 112 - 32,000 254,250 (222,250) 126 - - (82,250) 82,250 127 - - 25,000 (25,000) 332 - - 200,000 (200,000) 421 - - 139,200 (139,200) 422 - - 117,200 (117,200) 423 - - 7,200 (7,200) Total Change - 1,514,500 1,370,177 144,323 7.3.a Packet Pg. 337 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “E”: New Items for Council to Consider (April 2018) 8 Budget Amendment for:First Quarter Item Description: Department: Division: Title: Preparer: Department Account Number: Budget Amendment Type? What is the nature of the expenditure?On-Going Is the Expenditure Operating or Capital?Operating Fill In Item Description[s] Baseline Budget 2018 2019 2020 2021 2022 0 24,000 24,720 25,462 26,225 27,012 0 6,000 6,180 6,365 6,556 6,753 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sub-Total $0 $30,000 $30,900 $31,827 $32,782 $33,765 $30,000 $30,900 $31,827 $32,782 $33,765 Revenue and Ending Cash 2018 2019 2020 2021 2022 Ending Cash: Decrease (Increase)0 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 Grants/Contributions 0 0 0 0 0 General Fund Subsidy 0 0 0 0 0 New Revenue 15,000 15,450 15,914 16,391 16,883 New Revenue 15,000 15,450 15,914 16,391 16,883 Total Revenue and Ending Cash $30,000 $30,900 $31,827 $32,782 $33,765 62 001.000.62.524.20.11.00 If previously discussed, date(s) of discussion: 001.000.62.524.20.23.00 New Item For Council To Consider Building permit activity has far exceeded the projections for the past several years and is expected to continue beyond this year. This has resulted in an increase in revenues and it has resulted in permit loads that exceed the ability of staff to meet expected service levels in the Permit Center. The addition of a half time permit coordinator will bring the total for Building Division coordinator positions to 3.0 FTE and will allow for more effective permit processing and customer service. Development Services GENERALBuildingFund Name:Permit Coordinator Leif Bjorback Total Expenses Comments 001.000.322.10.000.00 001.000.345.83.000.00 7.3.a Packet Pg. 338 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “E”: New Items for Council to Consider (April 2018) 9 Budget Amendment for:First Quarter Item Description: Department: Division: Title: Preparer: Department Account Number: Budget Amendment Type? What is the nature of the expenditure?One-Time Is the Expenditure Operating or Capital?Operating Fill In Item Description[s] Baseline Budget 2018 2019 2020 2021 2022 5,000 15,177 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sub-Total $5,000 $15,177 $0 $0 $0 $0 $20,177 $0 $0 $0 $0 Revenue and Ending Cash 2018 2019 2020 2021 2022 Ending Cash: Decrease (Increase)12,677 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 Other 2,500 0 0 0 0 Other 0 0 0 0 0 Total Revenue and Ending Cash $15,177 $0 $0 $0 $0 Monthly CT Rebate Total Expenses Comments 001.000.39.508.00.00.00 n/a New Item For Council To Consider If previously discussed, date(s) of discussion: Interfund Services 001.000.67.518.21.49.00 This amendment will provide ORCA Pass to all City Employees, providing service to all Sound Transit, Community Transit,and other transit service throughout the County / connecting to other Counties, covering the 1-year period from April 2018 through April 2019 (in support of the City's CTR program in an effort to reduce greenhouse gas emissions). The cost comparison for this card is $100 when purchased in bulk vs. $2,500 when bought individually (for identical services). Public Works GENERALEngineeringFund Name:Citywide ORCA Card Bertrand Hauss 7.3.a Packet Pg. 339 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “E”: New Items for Council to Consider (April 2018) 10 Budget Amendment for:First Quarter Item Description: Department: Division: Title: Preparer: Department Account Number: Budget Amendment Type? What is the nature of the expenditure?One-Time Is the Expenditure Operating or Capital?Capital Fill In Item Description[s] Baseline Budget 2018 2019 2020 2021 2022 10,000 0 0 0 0 10,000 0 0 0 0 Const Roadway - 112.000.68.595.33.65.00 12,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sub-Total $0 $32,000 $0 $0 $0 $0 $32,000 $0 $0 $0 $0 Revenue and Ending Cash 2018 2019 2020 2021 2022 Ending Cash: Decrease (Increase)0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 New Revenue 32,000 0 0 0 0 Other 0 0 0 0 0 Total Revenue and Ending Cash $32,000 $0 $0 $0 $0 Inter Serv Roadway - 112.000.68.542.33.41.67 This amendment will provide funding to close-out the project and complete the final reimbursements to the granting agencies. Public Works STREET CONSTRUCTION Engineering Fund Name:228th St. Corridor Improvements Rob English E7AC/i018 New Item For Council To Consider If previously discussed, date(s) of discussion: Fed 112.000.333.20.205.08 Prof Serv Roadway - 112.000.68.595.33.65.41 Total Expenses Comments 7.3.a Packet Pg. 340 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “E”: New Items for Council to Consider (April 2018) 11 Budget Amendment for:First Quarter Item Description: Department: Division: Title: Preparer: Department Account Number: Budget Amendment Type? What is the nature of the expenditure?One-Time Is the Expenditure Operating or Capital?Capital Fill In Item Description[s] Baseline Budget 2018 2019 2020 2021 2022 2,500 (2,500)0 0 0 0 Professional Serv Rdwy-112.000.68.595.33.65.41 25,250 (25,250)0 0 0 0 0 0 0 0 0 0 10,958 0 0 0 0 0 85,250 0 0 0 0 0 0 0 0 0 0 0 10,593 0 0 0 0 0 87,250 0 0 0 0 0 0 0 0 0 0 0 5,000 0 0 0 0 0 65,250 0 0 0 0 0 0 0 0 0 0 0 2,500 2,500 0 0 0 0 Prof Serv Cap Sidewalks-126.000.68.595.61.65.41 20,000 25,250 0 0 0 0 0 0 0 0 0 0 Sub-Total $314,551 $0 $0 $0 $0 $0 $314,551 $0 $0 $0 $0 Revenue and Ending Cash 2018 2019 2020 2021 2022 Ending Cash: Decrease (Increase)27,750 0 0 0 0 Ending Cash: Decrease (Increase)(27,750)0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 Other 0 0 0 0 0 Other 0 0 0 0 0 Total Revenue and Ending Cash $0 $0 $0 $0 $0 New Item For Council To Consider If previously discussed, date(s) of discussion: Professional Services (Storm)422.000.72.594. Professional Services (Water)421.000.74.594.34.65.41 Interfund Services (Storm)422.000.72.531.31.41.67 Inter Serv Sidewalks - 126.000.68.542.61.41.67 Interfund Serv Rdwy - 112.000.68.542.33.41.67 This amendment will program REET funds, that were originally allocated for the 238th St Walkway project (Hwy 99 and SR 104), to the Dayton St project. The TIB funds that were designated to pay for design and construction of a new sidewalk on Dayton St., west of 8th Avenue have been transferred to the 238th St. Walkway project (Hwy 99 and SR104) to replace REET funds previously allocated to the project. Please see the 238th St Walkway decision package regarding that project. Public Works REET 1EngineeringFund Name:Dayton 3rd to 9th Utility Replacement Michele (Mike) De Lilla E5JB/c482 Interfund Services 423.200.75.535.35.41.67 Professional Services 423.200.75.594.35.65.41 Interfund Services (Water)421.000.74.534.34.41.67 Total Expenses Comments 126.000.39.508.30.00.00 112.000.68.508.30.00.00 7.3.a Packet Pg. 341 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “E”: New Items for Council to Consider (April 2018) 12 Budget Amendment for:First Quarter Item Description: Department: Division: Title: Preparer: Department Account Number: Budget Amendment Type? What is the nature of the expenditure?One-Time Is the Expenditure Operating or Capital?Capital Fill In Item Description[s] Baseline Budget 2018 2019 2020 2021 2022 0 140,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sub-Total $0 $140,000 $0 $0 $0 $0 $140,000 $0 $0 $0 $0 Revenue and Ending Cash 2018 2019 2020 2021 2022 Ending Cash: Decrease (Increase)140,000 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 Grants/Contributions 0 0 0 0 0 General Fund Subsidy 0 0 0 0 0 New Revenue 0 0 0 0 0 Other 0 0 0 0 Total Revenue and Ending Cash $140,000 $0 $0 $0 $0 This project amount was subtracted from fund 126 during the budget process in order to allocate it for a Capital Project Manager. Since this position wasn't funded, these funds need to be reallocated into both the Waterfront Redevelopment Project and Civic Field development. These were originally identified to pay for Engineering services internal fees for review and capital project management for these two projects. There was $40,000 allocated for Civic and $100,000 allocated for the Waterfront redevelopment project. Both these projects will still need capital project management services whether Engineering has the capacity or we outsource it. Parks, Recreation & Cultural Services REET 1ParksFund Name:Capital Project Management Services Ccruz for Carrie Hite Total Expenses 126.000.64.594.76.65.41 New Item For Council To Consider If previously discussed, date(s) of discussion: 126.000.64.594.76.65.41 Comments 126.000.39.508.30.00.00 7.3.a Packet Pg. 342 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “E”: New Items for Council to Consider (April 2018) 13 Budget Amendment for:First Quarter Item Description: Department: Division: Title: Preparer: Department Account Number: Budget Amendment Type? What is the nature of the expenditure?One-Time Is the Expenditure Operating or Capital?Operating Fill In Item Description[s] Baseline Budget 2018 2019 2020 2021 2022 8,000 (8,000)0 0 0 0 0 8,000 0 0 0 0 0 25,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sub-Total $0 $25,000 $0 $0 $0 $0 $25,000 $0 $0 $0 $0 Revenue and Ending Cash 2018 2019 2020 2021 2022 Ending Cash: Decrease (Increase)25,000 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 Grants/Contributions 0 0 0 0 0 General Fund Subsidy 0 0 0 0 0 New Revenue 0 0 0 0 0 Other 0 0 0 0 0 Total Revenue and Ending Cash $25,000 $0 $0 $0 $0 Total Expenses Comments 127.000.64.508.30.00.00 001.000.64.576.80.31.00 127.000.64.575.50.31.00 New Item For Council To Consider This decision package is to help fund the purchase of 11 new benches at Brackett's Landing North. The Council authorized $8,000 previously for repairs & maintenance for powder coating. Since that time, we have further evaluated the benches and are recommending replacement. An additional $25,000 is needed for replacement. Since these benches have reached their almost 20 years of life, we will be reaching out to the original purchasers to re-adopt. If they don't want to re-adopt these benches, we have a fairly lengthy waitlist of people who would like to purchase a waterfront bench. These funds are being reqeusted out of the bench donation fund which will then be replenished when we adopt out the new benches. Parks, Recreation & Cultural Services GIFTS CATALOGParksFund Name:Waterfront Bench Replacements Ccruz for Carrie Hite 001.000.64.576.80.48.00 If previously discussed, date(s) of discussion: 127.000.64.575.40.31.00 7.3.a Packet Pg. 343 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “E”: New Items for Council to Consider (April 2018) 14 Budget Amendment for:First Quarter Item Description: Department: Division: Title: Preparer: Department Account Number: Budget Amendment Type? What is the nature of the expenditure?One-Time Is the Expenditure Operating or Capital?Operating Fill In Item Description[s] Baseline Budget 2018 2019 2020 2021 2022 8,840 14,400 0 0 0 0 4,420 7,200 0 0 0 0 4,420 7,200 0 0 0 0 4,420 7,200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sub-Total $22,100 $36,000 $0 $0 $0 $0 $58,100 $0 $0 $0 $0 Revenue and Ending Cash 2018 2019 2020 2021 2022 Ending Cash: Decrease (Increase)7,200 0 0 0 0 Ending Cash: Decrease (Increase)7,200 0 0 0 0 Ending Cash: Decrease (Increase)7,200 0 0 0 0 Ending Cash: Decrease (Increase)14,400 0 0 0 0 New Revenue 0 0 0 0 0 Other 0 0 0 0 0 Total Revenue and Ending Cash $36,000 $0 $0 $0 $0 Professional Services 423.000.75.535.80.41.00 Total Expenses Comments 421.000.74.508.00.00.00 422.000.72.508.00.00.00 423.000.75.508.00.00.00 001.000.39.508.00.00.00 Professional Services 001.000.67.518.21.41.00 Professional Services 421.000.74.534.80.41.00 Professional Services 422.000.72.531.90.41.00 This budget amendment will provide on-call professional services to support the Engineering Division with the review and inspection of private development work. The 2018 budget includes an Engineering Tech II or III position which has not yet been filled. In addition, development and implementaton of the new Trakit permit system has shifted work assignments of one existing staff member away from review and inspection work. Professional services will be provided to maintain customer service levels. The expenditures will be off-set by the Utility Funds (60%) and General Fund (40%). Public Works GENERALEngineeringFund Name:On-Call Development Engineering Services Rob English New Item For Council To Consider If previously discussed, date(s) of discussion: 7.3.a Packet Pg. 344 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “E”: New Items for Council to Consider (April 2018) 15 Budget Amendment for:First Quarter Item Description: Department: Division: Title: Preparer: Department Account Number: Budget Amendment Type? What is the nature of the expenditure?One-Time Is the Expenditure Operating or Capital?Capital Fill In Item Description[s] Baseline Budget 2018 2019 2020 2021 2022 0 30,000 0 0 0 0 0 90,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sub-Total $0 $120,000 $0 $0 $0 $0 $120,000 $0 $0 $0 $0 Revenue and Ending Cash 2018 2019 2020 2021 2022 Ending Cash: Decrease (Increase)120,000 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 Other 0 0 0 0 0 Other 0 0 0 0 0 Total Revenue and Ending Cash $120,000 $0 $0 $0 $0 Total Expenses Comments 421.000.74.508.00.00.00 Professional Services (Storm)422.000.72.594. Construction(Storm)422.000.72.594.31.65.20 TBD New Item For Council To Consider If previously discussed, date(s) of discussion: Interfund Services (Water)421.000.74.534.34.41.67 Professional Services (Water)421.000.74.594.34.65.41 Construction(Water)421.000.74.594.34.65.10 Interfund Services (Storm)422.000.72.531.31.41.67 Replacement of waterline adjacent to Swedish Hospital Campus and replacement and upsizing the City Owner watermain on Swedish campus. This will also improve overall access for maintenance and allow our operations department to maintain the hospital's water meter without shutting down water service to the main hospital tower. Design is slated for this year with construction planned for 2019. Public Works WATER Engineering Fund Name:Swedish and 76th WL Replacement Michele (Mike) De Lilla 7.3.a Packet Pg. 345 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “E”: New Items for Council to Consider (April 2018) 16 Budget Amendment for:First Quarter Item Description: Department: Division: Title: Preparer: Department Account Number: Budget Amendment Type? What is the nature of the expenditure?One-Time Is the Expenditure Operating or Capital?Capital Fill In Item Description[s] Baseline Budget 2018 2019 2020 2021 2022 35,726 0 0 0 0 0 260,000 0 0 0 0 0 0 0 0 0 0 0 0 2,000 0 0 0 0 0 10,000 0 0 0 0 0 0 0 0 0 0 Sub-Total $295,726 $12,000 $0 $0 $0 $0 $307,726 $0 $0 $0 $0 Revenue and Ending Cash 2018 2019 2020 2021 2022 Ending Cash: Decrease (Increase)12,000 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 Other 0 0 0 0 0 Other 0 0 0 0 0 Total Revenue and Ending Cash $12,000 $0 $0 $0 $0 If previously discussed, date(s) of discussion: Interfund Services 423.200.75.535.35.41.67 Budget amendment to reflect the water utility fund monies needed for the design phase portion to replace the watermain at the Maplewood site as part of the Sewer Replacement Project. Public Works SEWER / TREATMENT PLANT Engineering Fund Name:2019 SS Replacement Michele (Mike) De Lilla E8GA c516 New Item For Council To Consider Professional Services 423.200.75.594.35.65.41 Total Expenses Comments Water Fund Construction 423.200.75.594.35.65.00 Interfund Services (Water)421.000.74.534.34.41.67 Professional Services (Water)421.000.74.594.34.65.41 Construction(Water)421.000.74.594.34.65.10 7.3.a Packet Pg. 346 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “E”: New Items for Council to Consider (April 2018) 17 Budget Amendment for:First Quarter Item Description: Department: Division: Title: Preparer: Department Account Number: Budget Amendment Type? What is the nature of the expenditure?One-Time Is the Expenditure Operating or Capital?Capital Fill In Item Description[s] Baseline Budget 2018 2019 2020 2021 2022 60,542 0 0 0 0 0 203,015 0 0 0 0 0 1,777,538 0 0 0 0 0 0 2,000 0 0 0 0 0 10,000 0 0 0 0 0 98,000 0 0 0 0 0 0 0 0 0 0 Sub-Total $2,041,095 $110,000 $0 $0 $0 $0 $2,151,095 $0 $0 $0 $0 Revenue and Ending Cash 2018 2019 2020 2021 2022 Ending Cash: Decrease (Increase)110,000 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 Other 0 0 0 0 0 Other 0 0 0 0 0 Other 0 0 0 0 0 Other 0 0 0 0 0 Total Revenue and Ending Cash $110,000 $0 $0 $0 $0 422.000.72.508.00.00.00 Michele (Mike) De Lilla If previously discussed, date(s) of discussion: Total Expenses Comments Professional Services (Storm)422.000.72.594. Construction(Storm)422.000.72.594.31.65.20 E6JC/c493 Interfund Services (Water)421.000.74.534.34.41.67 New Item For Council To Consider Professional Services (Water)421.000.74.594.34.65.41 Construction(Water)421.000.74.594.34.65.10 Interfund Services (Storm)422.000.72.531.31.41.67 Budget amendment to reflect the storm utility fund monies needed to replace the storm pipe at the PRV 13 site, near the intersection of 185th PL SW and 88th Ave W, as part of the Water Replacement Project Public Works WATER Engineering Fund Name:2018 Waterline Replacement 7.3.a Packet Pg. 347 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “E”: New Items for Council to Consider (April 2018) 18 Budget Amendment for:First Quarter Item Description: Department: Division: Title: Preparer: Department Account Number: Budget Amendment Type? What is the nature of the expenditure?On-Going Is the Expenditure Operating or Capital?Operating Fill In Item Description[s] Baseline Budget 2018 2019 2020 2021 2022 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sub-Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Revenue and Ending Cash 2018 2019 2020 2021 2022 Ending Cash: Decrease (Increase)0 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 City Edmonds Contribution 0 0 0 0 0 City of Mountlake Terrace 0 0 0 0 0 Olympic View Water District 0 0 0 0 0 Ronald Wastewater 0 0 0 0 0 Total Revenue and Ending Cash $0 $0 $0 $0 $0 If previously discussed, date(s) of discussion: 423.000.76.535.80 423.000.75.597.35.55.23 Transfer from Sewer New Item For Council To Consider Total Expenses 423.100.374.07.030.00 Comments 423.000.75.508.00.00.00 423.100.397.38.423.20 423.100.374.07.010.00 423.100.374.07.020.00 We are anticipating 2 - 3 retirements in the coming year (3 operators are eligble for retirement next year) and would like to hire an additional operator for training to ensure we meet our permit compliance, do not overwork current staff and to establish a good transfer of information. Entry level operators (depending on their experience) could require 1 -3 years additional training before they are fully able to work alone and make process decisions. The position will funded through the savings of two vacant positions (WWTP Supervisor and WWTP Operator). 2018 Saving are estimated at $111,848 and expenses for the new position (includes benefit estimate of 45%) would be $43,655 for the remainder of 2018 leaving an overall savings of $68,193. This additional savings will be available in 2019 in case the timing on expected retirements is inaccurate. Public Works SEWER / TREATMENT PLANT WWTP Fund Name:WW P Operator Pamela Randolph 7.3.a Packet Pg. 348 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “E”: New Items for Council to Consider (April 2018) 19 Salary Savings vs. Cost for Additional Operator for Remainder of 2018 3/27/18 JT (includes 3% Cert III Pay)K Step 1 K Step 2 Jun-Nov 2018 (12 Pay Periods) Dec 2018 (2 Pay Periods) Per Pay Period $3,118.33 $4,595.36 $2,488.50 $2,611.00 Pay Periods Subtotal $31,183.30 $45,953.60 $24,885.00 $5,222.00 Benefits $14,032.49 $20,679.12 $11,198.25 $2,349.90 Subtotals $45,215.79 $66,632.72 $36,083.25 $7,571.90 Totals JT + Curt Totals $111,848.51 Operator 1 Totals $43,655.15 SAVINGS $68,193.36 NOTE: Standby, Shift Differential and Longevity are not included. $43,655.15 OPERATOR 1 SAVINGS Jan-May 2018 (10 Pay Periods) CURT ZUVELA COST $111,848.51 7.3.a Packet Pg. 349 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “F”: Previously Discussed by Council (February 2018) 20 Budget Amendment for:First Quarter Item Description: Department: Division: Title: Preparer: Department Account Number: Budget Amendment Type? What is the nature of the expenditure?One-Time Is the Expenditure Operating or Capital?Operating Fill In Item Description[s] Baseline Budget 2018 2019 2020 2021 2022 0 650,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sub-Total $0 $650,000 $0 $0 $0 $0 $650,000 $0 $0 $0 $0 Revenue and Ending Cash 2018 2019 2020 2021 2022 Ending Cash: Decrease (Increase)0 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 Grants/Contributions 0 0 0 0 0 General Fund Subsidy 0 0 0 0 0 New Revenue 650,000 0 0 0 0 Other 0 0 0 0 0 Total Revenue and Ending Cash $650,000 $0 $0 $0 $0 31 001.000.39.575.20.52.00 Previously Discussed By Council Council has passed Resolution #1406 authorizing the City to provide a series of bridge loans to the Edmonds Center for the Arts. This decision package is to give budget authority to make these loans. City to be fully reimbursed by the ECA during 2018, so this appropriation should have no effect on ending cash. Finance & Info Services GENERALFinance & Info Services Fund Name:Bridge Loan to ECA Dave Turley If previously discussed, date(s) of discussion:Mar 27 2018 Total Expenses Comments 001.000.369.91.000.00 7.3.a Packet Pg. 350 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “F”: Previously Discussed by Council (February 2018) 21 Budget Amendment for:First Quarter Item Description: Department: Division: Title: Preparer: Department Account Number: Budget Amendment Type? What is the nature of the expenditure?One-Time Is the Expenditure Operating or Capital?Operating Fill In Item Description[s] Baseline Budget 2018 2019 2020 2021 2022 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sub-Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Revenue and Ending Cash 2018 2019 2020 2021 2022 Ending Cash: Decrease (Increase)(100,000)0 0 0 0 Ending Cash: Decrease (Increase)(250,000)0 0 0 0 Ending Cash: Decrease (Increase)(250,000)0 0 0 0 New Revenue 100,000 0 0 0 0 New Revenue 250,000 0 0 0 0 New Revenue 250,000 0 0 0 0 Total Revenue and Ending Cash $0 $0 $0 $0 $0 If previously discussed, date(s) of discussion:Dec 5 2017 39 Previously Discussed By Council Total Expenses 019.000.397.66.001.00 Comments 017.000.64.508.40.00.00 018.000.39.508.40.00.00 019.000.39.508.40.00.00 017.000.397.76.001.00 018.000.397.65.001.00 Council passed ordinance #4089 "Adopting the City Budget for Fiscal Year Commencing 2018" in December of 2017. One item in the final adopted budget provided for a transfer from the General Fund to the new Marsh Fund of $100,000, the Edmonds Homelessness Response Fund of $250,000 and the new Edmonds Opioid Response Fund of $250,000. Since the new funds had not been established yet only the transfer out of the General Fund was included in the budget ordinance. This decision package adds the transfer into the three new funds. Finance & Info Services MULTIPLE FUNDSNon-Departmental Fund Name:Council-directed Contributions Dave Turley 7.3.a Packet Pg. 351 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “F”: Previously Discussed by Council (February 2018) 22 Budget Amendment for:First Quarter Item Description: Department: Division: Title: Preparer: Department Account Number: Budget Amendment Type? What is the nature of the expenditure?One-Time Is the Expenditure Operating or Capital?Operating Fill In Item Description[s] Baseline Budget 2018 2019 2020 2021 2022 0 200,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sub-Total $0 $200,000 $0 $0 $0 $0 $200,000 $0 $0 $0 $0 Revenue and Ending Cash 2018 2019 2020 2021 2022 Ending Cash: Decrease (Increase)200,000 0 0 0 0 Ending Cash: Decrease (Increase)(200,000)0 0 0 0 Grants/Contributions 0 0 0 0 0 General Fund Subsidy 0 0 0 0 0 New Revenue 0 0 0 0 0 Other 200,000 0 0 0 0 Total Revenue and Ending Cash $200,000 $0 $0 $0 $0 This budget amendment moves the $200,000 that Council allocated for the Marsh in 2012 to the new Marsh fund. Parks, Recreation & Cultural Services PARKS CONSTRUCTION Parks Fund Name:Transfer of Funds from 332 to 017 Ccruz for Carrie Hite Total Expenses Previously Discussed By Council If previously discussed, date(s) of discussion:Mar 6 2018 Interfund Transfer 332.000.64.597.76.55.17 017.000.397.76.332.00 Comments 332.000.64.508.30.00.00 017.000.64.508.40.00.00 7.3.a Packet Pg. 352 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) EXHIBIT “F”: Previously Discussed by Council (February 2018) 23 Budget Amendment for:First Quarter Item Description: Department: Division: Title: Preparer: Department Account Number: Budget Amendment Type? What is the nature of the expenditure?One-Time Is the Expenditure Operating or Capital?Capital Fill In Item Description[s] Baseline Budget 2018 2019 2020 2021 2022 27,985 (17,650)0 0 0 0 Prof Serv Cap Sidewalks-126.000.68.595.61.65.41 3,240 (3,240)0 0 0 0 229,110 (229,110)0 0 0 0 0 0 0 0 33,053 0 0 0 0 0 3,000 60,665 0 0 0 0 Const Proj Sidewalks -112.000..68.595.61.65.00 264,213 189,335 0 0 0 0 0 0 0 0 7,000 0 0 0 0 1,492 0 0 0 0 62,219 0 0 0 0 0 0 0 0 Sub-Total $631,312 $0 $0 $0 $0 $0 $631,312 $0 $0 $0 $0 Revenue and Ending Cash 2018 2019 2020 2021 2022 Ending Cash: Decrease (Increase)(250,000)0 0 0 0 Ending Cash: Decrease (Increase)250,000 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 Ending Cash: Decrease (Increase)0 0 0 0 0 New Revenue 0 0 0 0 0 Other 0 0 0 0 0 Total Revenue and Ending Cash $0 $0 $0 $0 $0 Inter Serv Sidewalks - 126.000.68.542.61.41.67 The City received a $250K TIB grant in 2017 which is in fund balance. This amendment will program the grant money to be used for the 238th St Walkway (Hwy 99-SR104) project in Fund 112 instead of the Dayton St. project. The City must expend the TIB funds on a completed project by August of this year to be eligible for the next round of TIB funding. The 238th St. Walkway will be completed by this deadline and the Dayton St. project will not be finished until the end of 2019. This amendment also removes the $250K originally budgeted for the project from REET. Public Works REET 1EngineeringFund Name:238th St. Walkway (Hwy 99-SR104) Rob English E6DA/c485 Previously Discussed By Council If previously discussed, date(s) of discussion:Mar 6 2018 Total Expenses Const Proj Sidewalks - 126.000.68.595.61.65.00 Inter Serv Sidewalks - 112.000.68.542.61.41.67 Prof Serv Sidewalks - 112.000.68.595.61.65.41 Interfund Service - 422.000.72.531.70.41.67 Prof Serv Cap -422.000.72.594.31.65.41 Const Projects - 422.000.72.594.31.65.20 Comments 126.000.39.508.30.00.00 112.000.68.508.30.00.00 7.3.a Packet Pg. 353 Attachment: 2018 1st Quarter Budget Amendment Ordinance (First Quarter 2018 Budget Amendment) City Council Agenda Item Meeting Date: 04/10/2018 Ordinance to Repeal CC Chapter 3.04 to be replaced later with Resolution Staff Lead: Dave Turley Department: Administrative Services Preparer: Dave Turley Background/History City Code Chapter 3.04 was adopted by ordinance to establish guidance for financial reporting. Best practice is to adopt financial reporting guidelines by resolution rather than by ordinance. Staff Recommendation Review and approve a new ordinance, which will repeal CC Chapter 3.04, and send to full council for approval. Narrative City Code Chapter 3.04 was adopted by ordinance to establish guidance for financial reporting. Best practice is to adopt financial reporting guidelines by resolution rather than by ordinance. A resolution to establish financial reporting guidelines will be proposed once this ordinance has been repealed. Attachments: Ordinance repealing CC Chapter 3.04 7.4 Packet Pg. 354 ORDINANCE NO. 14XX AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, REPEALING EDMONDS CITY CODE CHAPTER 3.04; PROVIDING FOR SEVERABILITY; AND SETTING AN EFFECTIVE DATE. WHEREAS, the City of Edmonds is committed to the highest standards of responsible financial management; and WHEREAS, Chapter 3.04 of the Edmonds City Code, adopted by Ordinance No. 3789, regards financial reporting; and WHEREAS, the City of Edmonds has determined that internal financial reporting requirements are more appropriately adopted by resolution than by ordinance; and WHEREAS, the City of Edmonds has determined to repeal Chapter 3.04 of the Edmonds City Code; THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. Repealer. The following are hereby repealed: A. Chapter 3.04 of the ECC, entitled Financial Reporting. Section 2. Severability. If any section, subsection, clause, sentence, or phrase of this ordinance should be held invalid or unconstitutional, such decision shall not affect the validity of the remaining portions of this ordinance. Section 3. Effective Date. This ordinance, being an administrative function of the city council, is not subject to referendum and shall take effect five (5) days after passage and publication of an approved summary thereof consisting of the title. 7.4.a Packet Pg. 355 Attachment: Ordinance repealing CC Chapter 3.04 (Ordinance to Repeal CC Chapter 3.04) APPROVED: MAYOR DAVE EARLING ATTEST/AUTHENTICATED: CITY CLERK, SCOTT PASSEY APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY: BY JEFF TARADAY FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: PUBLISHED: EFFECTIVE DATE: ORDINANCE NO. 7.4.a Packet Pg. 356 Attachment: Ordinance repealing CC Chapter 3.04 (Ordinance to Repeal CC Chapter 3.04) 3 SUMMARY OF ORDINANCE NO. __________ of the City of Edmonds, Washington On the ____ day of ___________, 2018, the City Council of the City of Edmonds, passed Ordinance No. _____________. A summary of the content of said ordinance, consisting of the title, provides as follows: AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, REPEALING EDMONDS CITY CODE CHAPTER 3.04; PROVIDING FOR SEVERABILITY; AND SETTING AN EFFECTIVE DATE. The full text of this Ordinance will be mailed upon request. DATED this _____ day of ________________, 2018. CITY CLERK, SCOTT PASSEY 7.4.a Packet Pg. 357 Attachment: Ordinance repealing CC Chapter 3.04 (Ordinance to Repeal CC Chapter 3.04) City Council Agenda Item Meeting Date: 04/10/2018 February 2018 Monthly Financial Report Staff Lead: Dave Turley Department: Administrative Services Preparer: Sarah Mager Background/History N/A Staff Recommendation Review and Move to Full Council on Consent Narrative February 2018 Monthly Financial Report Attachments: February 2018 Monthly Financial Report 7.5 Packet Pg. 358 CITY OF EDMONDS MONTHLY BUDGETARY FINANCIAL REPORT FEBRUARY 2018 7.5.a Packet Pg. 359 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 1 Page 1 of 1 Fund No.Title 2018 Adopted Budget 2/28/2017 Revenues 2/28/2018 Revenues Amount Remaining % Received 001 GENERAL FUND 38,783,555$ 4,590,134$ 4,464,993$ 34,318,562$ 12% 009 LEOFF-MEDICAL INS. RESERVE 285,650 1,643 1,925 283,725 1% 011 RISK MANAGEMENT FUND 19,180 3,004 4,557 14,623 24% 012 CONTINGENCY RESERVE FUND 64,750 7,417 27,463 37,287 42% 014 HISTORIC PRESERVATION GIFT FUND 5,170 24 37 5,133 1% 016 BUILDING MAINTENANCE - 211,428 - - 0% 104 DRUG ENFORCEMENT FUND 130,560 26,867 40,113 90,447 31% 111 STREET FUND 1,784,270 318,923 241,944 1,542,326 14% 112 COMBINED STREET CONST/IMPROVE 1 2,942,656 290,267 1,474,166 1,468,490 50% 117 MUNICIPAL ARTS ACQUIS. FUND 146,200 1,615 11,234 134,966 8% 118 MEMORIAL STREET TREE 400 56 89 311 22% 120 HOTEL/MOTEL TAX REVENUE FUND 87,960 11,531 11,834 76,126 13% 121 EMPLOYEE PARKING PERMIT FUND 25,640 8,824 8,566 17,074 33% 122 YOUTH SCHOLARSHIP FUND 850 122 169 681 20% 123 TOURISM PROMOTIONAL FUND/ARTS 30,520 3,988 9,616 20,904 32% 125 REAL ESTATE EXCISE TAX 2 1,446,880 219,814 212,366 1,234,514 15% 126 REAL ESTATE EXCISE TAX 1, PARKS ACQ FUND 1,448,300 220,765 214,974 1,233,326 15% 127 GIFTS CATALOG FUND 53,810 21,844 26,800 27,010 50% 129 SPECIAL PROJECTS FUND - 121 - - 0% 130 CEMETERY MAINTENANCE/IMPROVEMT 180,170 46,070 23,246 156,924 13% 136 PARKS TRUST FUND 3,150 479 787 2,363 25% 137 CEMETERY MAINTENANCE TRUST FD 33,360 8,006 7,029 26,331 21% 138 SISTER CITY COMMISSION 10,170 20 38 10,132 0% 140 BUSINESS IMPROVEMENT DISTRICT - 34,752 38,064 (38,064) 0% 211 L.I.D. FUND CONTROL 14,400 - - 14,400 0% 231 2012 LT GO DEBT SERVICE FUND 708,700 - - 708,700 0% 332 PARKS CAPITAL CONSTRUCTION FUND 1,494,534 61,857 61,565 1,432,969 4% 411 COMBINED UTILITY OPERATION - 23,241 22,121 (22,121) 0% 421 WATER UTILITY FUND 2 9,660,690 1,277,091 1,428,116 8,232,574 15% 422 STORM UTILITY FUND 2 5,317,996 954,684 1,035,660 4,282,336 19% 423 SEWER/WWTP UTILITY FUND 3 11,566,980 2,062,692 1,766,219 9,800,761 15% 424 BOND RESERVE FUND 1,991,530 1 1 1,991,529 0% 511 EQUIPMENT RENTAL FUND 1,624,640 312,408 310,116 1,314,524 19% 512 TECHNOLOGY RENTAL FUND 1,268,390 197,670 212,190 1,056,201 17% 617 FIREMEN'S PENSION FUND 69,690 688 1,074 68,616 2% 81,200,751$ 10,918,041$ 11,657,074$ 69,543,677$ 14% 3 Differences primarily due to a timing difference for Contributed Capital Billings in 2018. CITY OF EDMONDS REVENUES BY FUND - SUMMARY 2 Differences primarily due to a 9% increase in water, and a 10% increase in storm base rates in 2018. 1 Differences primarily due to Grant Billings in 2018 for 2017 in an amount of $1.4M; these are adjusted for CAFR purposes. 7.5.a Packet Pg. 360 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 2 Page 1 of 1 Fund No.Title 2018 Adopted Budget 2/28/2017 Expenditures 2/28/2018 Expenditures Amount Remaining % Spent 001 GENERAL FUND 43,358,131$ 7,118,110$ 7,074,254$ 36,283,877$ 16% 009 LEOFF-MEDICAL INS. RESERVE 294,270 49,402 73,844 220,426 25% 011 RISK MANAGEMENT FUND - 80,601 - - 0% 012 CONTINGENCY RESERVE FUND 49,584 - - 49,584 0% 014 HISTORIC PRESERVATION GIFT FUND 5,400 - - 5,400 0% 016 BUILDING MAINTENANCE - 23,071 - - 0% 104 DRUG ENFORCEMENT FUND 103,252 15,640 32,939 70,313 32% 111 STREET FUND 1,856,507 344,298 383,171 1,473,336 21% 112 COMBINED STREET CONST/IMPROVE 4 2,823,041 141,041 464,746 2,358,295 16% 117 MUNICIPAL ARTS ACQUIS. FUND 182,480 6,293 5,657 176,823 3% 120 HOTEL/MOTEL TAX REVENUE FUND 90,550 3,481 4,977 85,573 5% 121 EMPLOYEE PARKING PERMIT FUND 26,880 - - 26,880 0% 122 YOUTH SCHOLARSHIP FUND 1,000 214 225 775 23% 123 TOURISM PROMOTIONAL FUND/ARTS 29,700 1,190 1,891 27,809 6% 125 REAL ESTATE EXCISE TAX 2 2,432,040 150,011 94,912 2,337,128 4% 126 REAL ESTATE EXCISE TAX 1, PARKS ACQ FUND 1,734,535 - 400 1,734,135 0% 127 GIFTS CATALOG FUND 45,900 102 - 45,900 0% 130 CEMETERY MAINTENANCE/IMPROVEMT 197,514 27,911 22,719 174,795 12% 138 SISTER CITY COMMISSION 10,500 21 - 10,500 0% 140 BUSINESS IMPROVEMENT DISTRICT - 2,120 4,972 (4,972) 0% 211 L.I.D. FUND CONTROL 16,450 - - 16,450 0% 231 2012 LT GO DEBT SERVICE FUND 708,700 - - 708,700 0% 332 PARKS CAPITAL CONSTRUCTION FUND 1,982,160 44,321 12,012 1,970,148 1% 421 WATER UTILITY FUND 12,270,201 923,929 942,009 11,328,192 8% 422 STORM UTILITY FUND 6,562,877 527,093 579,783 5,983,094 9% 423 SEWER/WWTP UTILITY FUND 13,066,764 1,073,319 1,115,818 11,950,946 9% 424 BOND RESERVE FUND 1,991,520 - - 1,991,520 0% 511 EQUIPMENT RENTAL FUND 1,662,265 277,646 132,960 1,529,305 8% 512 TECHNOLOGY RENTAL FUND 1,191,113 177,236 204,078 987,035 17% 617 FIREMEN'S PENSION FUND 75,218 14,694 15,670 59,548 21% 92,768,552$ 11,001,743$ 11,167,038$ 81,601,514$ 12% CITY OF EDMONDS EXPENDITURES BY FUND - SUMMARY 4 Difference between 2017 and 2018 is primarily due to 2017 expenses paid in 2018; these are adjusted for CAFR purposes. 7.5.a Packet Pg. 361 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 3 Page 1 of 3 Title 2018 Adopted Budget 2/28/2017 Revenues 2/28/2018 Revenues Amount Remaining % Received TAXES: REAL PERSONAL / PROPERTY TAX 10,367,860$ 78,899$ 77,917$ 10,289,943$ 1% EMS PROPERTY TAX 4,027,540 23,613 29,567 3,997,973 1% VOTED PROPERTY TAX 2,500 6,313 1,205 1,295 48% LOCAL RETAIL SALES/USE TAX 5 7,275,000 1,307,546 1,321,958 5,953,042 18% NATURAL GAS USE TAX 7,140 2,022 - 7,140 0% 1/10 SALES TAX LOCAL CRIM JUST 730,000 124,449 135,008 594,992 18% ELECTRIC UTILITY TAX 1,611,600 382,822 380,238 1,231,362 24% GAS UTILITY TAX 620,200 203,652 187,404 432,796 30% SOLID WASTE UTILITY TAX 321,600 54,268 55,922 265,678 17% WATER UTILITY TAX 1,201,100 175,456 177,974 1,023,126 15% SEWER UTILITY TAX 769,800 113,469 126,840 642,960 16% STORMWATER UTILITY TAX 406,200 82,882 91,355 314,845 22% T.V. CABLE UTILITY TAX 867,200 144,913 140,469 726,731 16% TELEPHONE UTILITY TAX 1,093,200 199,068 183,702 909,498 17% PULLTABS TAX 56,600 12,853 13,021 43,579 23% AMUSEMENT GAMES 40 - - 40 0% LEASEHOLD EXCISE TAX 263,600 64,626 65,553 198,047 25% 29,621,180 2,976,850 2,988,133 26,633,047 10% LICENSES AND PERMITS: FIRE PERMITS-SPECIAL USE 250 - 125 125 50% POLICE - FINGERPRINTING 300 138 120 180 40% PROF AND OCC LICENSE-TAXI 330 - - 330 0% AMUSEMENTS 6,330 3,625 2,475 3,855 39% VENDING MACHINE/CONCESSION 50,000 917 558 49,442 1% FRANCHISE AGREEMENT-COMCAST 721,000 184,984 177,926 543,074 25% FRANCHISE FEE-EDUCATION/GOVERNMENT 42,600 7,034 3,465 39,135 8% FRANCHISE AGREEMENT-VERIZON/FRONTIER 105,500 25,768 26,966 78,534 26% FRANCHISE AGREEMENT-BLACKROCK 18,600 3,768 3,734 14,866 20% OLYMPIC VIEW WATER DISTRICT FRANCHISE 263,800 - 67,668 196,132 26% GENERAL BUSINESS LICENSE 121,600 47,238 61,634 59,966 51% DEV SERV PERMIT SURCHARGE 64,940 11,995 12,410 52,530 19% NON-RESIDENT BUS LICENSE 69,000 32,000 29,850 39,150 43% RIGHT OF WAY FRANCHISE FEE 12,000 11,880 50,292 (38,292) 419% BUILDING STRUCTURE PERMITS 700,600 89,754 101,440 599,160 14% ANIMAL LICENSES 24,500 8,058 5,680 18,820 23% STREET AND CURB PERMIT 40,000 5,580 8,340 31,660 21% OTR NON-BUS LIC/PERMITS 14,500 2,415 3,266 11,234 23% 2,255,850 435,153 555,949 1,699,901 25% INTERGOVERNMENTAL: DOJ 15-0404-0-1-754 - BULLET PROOF VEST 7,930 5,949 - 7,930 0% TARGET ZERO TEAMS GRANT 4,000 1,030 - 4,000 0% HIGH VISIBILITY ENFORCEMENT 7,100 - 556 6,544 8% PUD PRIVILEDGE TAX 198,000 - - 198,000 0% MVET/SPECIAL DISTRIBUTION 12,790 2,828 2,924 9,866 23% JUDICIAL SALARY CONTRIBUTION-STATE 16,716 4,179 4,138 12,578 25% CRIMINAL JUSTICE-SPECIAL PROGRAMS 43,700 10,290 10,592 33,108 24% MARIJUANA ENFORCEMENT 23,700 - - 23,700 0% DUI - CITIES 3,000 1,560 1,525 1,475 51% LIQUOR EXCISE TAX 203,000 45,915 48,005 154,995 24% LIQUOR BOARD PROFITS 350,600 - - 350,600 0% INTERLOCAL GRANTS - 110,000 - - 0% VERDANT INTERLOCAL GRANTS 2,000 - 5,810 (3,810) 291% 872,536 181,751 73,550 798,986 8% REVENUES - GENERAL FUNDCITY OF EDMONDS 5 2018 Local Retail Sales/Use Tax revenues are $14,411 higher than 2017 revenues. Please also see pages pages 18 & 19. 7.5.a Packet Pg. 362 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 4 Page 2 of 3 Title 2018 Adopted Budget 2/28/2017 Revenues 2/28/2018 Revenues Amount Remaining % Received CHARGES FOR GOODS AND SERVICES: RECORD/LEGAL INSTRUMENTS 2,500 611 440 2,061 18% ATM SURCHARGE FEES 400 64 65 336 16% CREDIT CARD FEES 10,000 1,398 1,766 8,234 18% D/M COURT REC SER 400 77 20 380 5% WARRANT PREPARATION FEE - - 884 (884) 0% IT TIME PAY FEE - - 162 (162) 0% MUNIC.-DIST. COURT CURR EXPEN 300 30 22 278 7% SALE MAPS & BOOKS 100 23 14 86 14% CLERKS TIME FOR SALE OF PARKING PERMITS 25,100 - - 25,100 0% BID SUPPLIES REIMBURSEMENT 600 - - 600 0% PHOTOCOPIES 1,000 14 118 882 12% POLICE DISCLOSURE REQUESTS 4,000 590 25 3,975 1% ENGINEERING FEES AND CHARGES 200,000 19,433 23,950 176,050 12% ELECTION CANDIDATE FILING FEES - - 1,486 (1,486) 0% SNO-ISLE 78,000 18,982 22,526 55,474 29% PASSPORTS AND NATURALIZATION FEES 23,000 4,600 3,150 19,850 14% POLICE SERVICES SPECIAL EVENTS 30,000 - - 30,000 0% CAMPUS SAFETY-EDM. SCH. DIST.66,280 - - 66,280 0% WOODWAY-LAW PROTECTION 60,000 10,527 12,095 47,905 20% MISCELLANEOUS POLICE SERVICES 1,500 - - 1,500 0% DUI EMERGENCY FIRE SERVICES 100 - - 100 0% FIRE PROTECTION & EMS FOR DUI - 11 - - 0% FIRE DISTRICT #1 STATION BILLINGS 50,000 13,796 14,095 35,905 28% LEGAL SERVICES - - 83 (83) 0% ADULT PROBATION SERVICE CHARGE 48,600 9,134 6,906 41,694 14% BOOKING FEES 3,000 604 278 2,722 9% FIRE CONSTRUCTION INSPECTION FEES 15,560 2,550 3,790 11,770 24% EMERGENCY SERVICE FEES 4,500 525 451 4,049 10% EMS TRANSPORT USER FEE 826,000 231,032 182,866 643,134 22% FLEX FUEL PAYMENTS FROM STATIONS 2,500 434 832 1,668 33% ANIMAL CONTROL SHELTER 250 15 - 250 0% ZONING/SUBDIVISION FEE 80,250 15,220 17,780 62,470 22% PLAN CHECKING FEES 428,000 90,659 37,762 390,238 9% FIRE PLAN CHECK FEES 8,000 1,380 2,410 5,590 30% PLANNING 1% INSPECTION FEE 1,600 - - 1,600 0% S.E.P.A. REVIEW 5,000 1,340 2,010 2,990 40% CRITICAL AREA STUDY 14,000 1,985 2,200 11,800 16% DV COORDINATOR SERVICES 11,460 1,910 - 11,460 0% GYM AND WEIGHTROOM FEES 12,000 2,625 3,171 8,829 26% LOCKER FEES - 15 - - 0% PROGRAM FEES 910,100 155,147 157,094 753,006 17% TAXABLE RECREATION ACTIVITIES 1,300 276 141 1,159 11% WINTER MARKET REGISTRATION FEES 5,000 - - 5,000 0% BIRD FEST REGISTRATION FEES 1,250 - - 1,250 0% INTERFUND REIMBURSEMENT-CONTRACT SVCS 2,043,950 262,532 161,346 1,882,604 8% 4,975,600 847,538 659,937 4,315,663 13% CITY OF EDMONDS REVENUES - GENERAL FUND 7.5.a Packet Pg. 363 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 5 Page 3 of 3 Title 2018 Adopted Budget 2/28/2017 Revenues 2/28/2018 Revenues Amount Remaining % Received FINES AND FORFEITURES: PROOF OF VEHICLE INS PENALTY 5,000 896 1,643 3,357 33% TRAFFIC INFRACTION PENALTIES 215,000 33,930 44,741 170,259 21% NC TRAFFIC INFRACTION 34,000 5,129 5,511 28,489 16% CRT COST FEE CODE LEG ASSESSMENT (LGA)20,700 3,316 5,864 14,836 28% NON-TRAFFIC INFRACTION PENALTIES 400 - - 400 0% OTHER INFRACTIONS '04 3,400 641 114 3,286 3% PARKING INFRACTION PENALTIES 48,000 9,660 25,795 22,205 54% PARK/INDDISZONE 2,600 750 183 2,417 7% DWI PENALTIES 6,000 1,496 1,509 4,491 25% DUI - DP ACCT 2,000 329 163 1,837 8% CRIM CNV FEE DUI 200 39 7 193 4% DUI - DP FEE - - 117 (117) 0% OTHER CRIMINAL TRAF MISDEM PEN 135 51 46 89 34% CRIMINAL TRAFFIC MISDEMEANOR 8/03 36,000 7,199 4,875 31,125 14% CRIMINAL CONVICTION FEE CT 2,600 439 553 2,047 21% CRIM CONV FEE CT 1,600 281 166 1,434 10% OTHER NON-TRAF MISDEMEANOR PEN 100 - - 100 0% OTHER NON TRAFFIC MISD. 8/03 9,300 1,677 2,862 6,438 31% COURT DV PENALTY ASSESSMENT 600 87 93 507 16% CRIMINAL CONVICTION FEE CN 1,100 142 353 747 32% CRIM CONV FEE CN 500 83 96 404 19% CRIMINAL COSTS-RECOUPMENTS - 1,620 - - 0% PUBLIC DEFENSE RECOUPMENT 18,500 3,187 2,976 15,524 16% CREDIT CARD FEE 6,000 1,499 1,880 4,120 31% COURT COST RECOUPMENT 5,000 - 1,361 3,639 27% COURT INTERPRETER COSTS - 3 - - 0% BUS. LICENSE PERMIT PENALTY 11,000 4,530 6,700 4,300 61% MISC FINES AND PENALTIES 2,000 720 - 2,000 0% 431,735 77,706 107,608 324,127 25% MISCELLANEOUS: INVESTMENT INTEREST 156,840 18,730 29,824 127,016 19% INTEREST ON COUNTY TAXES 7,130 710 1,377 5,753 19% INTEREST - COURT COLLECTIONS 6,500 985 1,095 5,405 17% PARKING 15,600 2,821 2,031 13,569 13% SPACE/FACILITIES RENTALS 147,000 6,148 6,443 140,558 4% BRACKET ROOM RENTAL 5,000 600 660 4,340 13% LEASES LONG-TERM 185,000 30,950 31,870 153,130 17% OTHER RENTS & USE CHARGES 2,400 - - 2,400 0% DONATION/CONTRIBUTION - - 303 (303) 0% PARKS DONATIONS 4,350 3,050 1,380 2,970 32% BIRD FEST CONTRIBUTIONS 1,500 - 200 1,300 13% VOLUNTEER PICNIC CONTRIBUTIONS 1,000 - - 1,000 0% POLICE CONTRIBUTIONS FROM PRIV SOURCES 1,000 - - 1,000 0% SALE OF JUNK/SALVAGE 300 - 58 242 19% SALES OF UNCLAIM PROPERTY 3,000 465 728 2,272 24% CONFISCATED AND FORFEITED PROPERTY 2,000 - - 2,000 0% OTHER JUDGEMENT/SETTLEMENT 2,000 7 - 2,000 0% POLICE JUDGMENTS/RESTITUTION 200 20 - 200 0% CASHIER'S OVERAGES/SHORTAGES - 99 5 (5) 0% OTHER MISC REVENUES 2,000 4,989 2,214 (214) 111% SMALL OVERPAYMENT 30 - 12 18 40% NSF FEES - PARKS & REC 120 - - 120 0% NSF FEES - MUNICIPAL COURT 300 14 35 265 12% US BANK REBATE 7,500 1,549 1,582 5,918 21% 550,770 71,136 79,816 470,954 14% TRANSFERS-IN: INTERFUND TRANSFER FROM FUND 012 49,584 - - 49,584 0% TRANSFER FROM FUND 127 26,300 - - 26,300 0% 75,884 - - 75,884 0% TOTAL GENERAL FUND REVENUE 38,783,555$ 4,590,134$ 4,464,993$ 34,318,562$ 12% CITY OF EDMONDS REVENUES - GENERAL FUND 7.5.a Packet Pg. 364 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 6 Page 1 of 6 Title 2018 Adopted Budget 2/28/2017 Expenditures 2/28/2018 Expenditures Amount Remaining % Spent GENERAL FUND EXPENDITURES (001) SALARIES AND WAGES 15,486,346$ 2,307,211$ 2,320,037$ 13,166,309$ 15% OVERTIME 493,580 84,446 105,762 387,818 21% HOLIDAY BUY BACK 243,389 881 - 243,389 0% BENEFITS 6,165,380 889,782 913,735 5,251,645 15% UNIFORMS 88,785 6,459 16,791 71,994 19% SUPPLIES 360,580 48,804 55,273 305,307 15% SMALL EQUIPMENT 56,160 4,226 6,234 49,926 11% PROFESSIONAL SERVICES 3,760,005 317,133 329,598 3,430,407 9% COMMUNICATIONS 166,585 15,384 13,448 153,137 8% TRAVEL 55,330 2,093 6,585 48,745 12% EXCISE TAXES 6,500 - 369 6,131 6% ADVERTISING - 532 - - 0% RENTAL/LEASE 1,988,447 283,641 329,796 1,658,651 17% INSURANCE 624,530 616,495 437,253 187,277 70% UTILITIES 457,800 65,138 75,261 382,539 16% REPAIRS & MAINTENANCE 598,713 90,850 88,583 510,130 15% MISCELLANEOUS 492,320 73,530 91,777 400,543 19% INTERGOVERNMENTAL SERVICES 9,857,590 2,266,505 2,250,525 7,607,065 23% INTERGOVERNMENTAL PAYMENTS 45,000 - - 45,000 0% INTERFUND SUBSIDIES 1,824,370 45,000 - 1,824,370 0% LAND 200,000 - - 200,000 0% BUILDINGS 60,000 - - 60,000 0% MACHINERY/EQUIPMENT 128,721 - 33,227 95,494 26% GENERAL OBLIGATION BOND PRINCIPAL 176,340 - - 176,340 0% OTHER INTEREST & DEBT SERVICE COSTS 500 - - 500 0% INTEREST ON LONG-TERM EXTERNAL DEBT 21,160 - - 21,160 0%43,358,131$ 7,118,110$ 7,074,254$ 36,283,877$ 16% LEOFF-MEDICAL INS. RESERVE (009) BENEFITS 184,000$ 37,743$ 45,043$ 138,957$ 24% PENSION AND DISABILITY PAYMENTS 102,990 11,659 28,801 74,190 28% PROFESSIONAL SERVICES 7,000 - - 7,000 0% MISCELLANEOUS 280 - - 280 0%294,270$ 49,402$ 73,844$ 220,426$ 25% RISK MANAGEMENT RESERVE FUND (011) MISCELLANEOUS -$ 80,601$ -$ -$ 0%-$ 80,601$ -$ -$ 0% CONTINGENCY RESERVE FUND (012) INTERFUND SUBSIDIES 49,584$ -$ -$ 49,584$ 0% 49,584$ -$ -$ 49,584$ 0% HISTORIC PRESERVATION GIFT FUND (014) SUPPLIES 100$ -$ -$ 100$ 0% PROFESSIONAL SERVICES 200 - - 200 0% MISCELLANEOUS 5,100 - - 5,100 0% 5,400$ -$ -$ 5,400$ 0% BUILDING MAINTENANCE SUBFUND (016) PROFESSIONAL SERVICES -$ 6,362$ -$ -$ 0% REPAIR & MAINTENANCE - 16,709 - - 0% -$ 23,071$ -$ -$ 0% DRUG ENFORCEMENT FUND (104) FUEL CONSUMED 3,000$ 335$ -$ 3,000$ 0% SMALL EQUIPMENT 5,000 - - 5,000 0% COMMUNICATIONS 2,230 267 - 2,230 0% REPAIR/MAINT 800 - - 800 0% MISCELLANEOUS 20,000 5,000 - 20,000 0% INTERGOVERNMENTAL SERVICES 72,222 10,038 32,939 39,283 46% 103,252$ 15,640$ 32,939$ 70,313$ 32% EXPENDITURES BY FUND - DETAIL CITY OF EDMONDS 7.5.a Packet Pg. 365 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 7 Page 2 of 6 Title 2018 Adopted Budget 2/28/2017 Expenditures 2/28/2018 Expenditures Amount Remaining % Spent STREET FUND (111) SALARIES AND WAGES 551,495$ 89,404$ 86,585$ 464,910$ 16% OVERTIME 24,400 6,071 5,322 19,078 22% BENEFITS 286,892 45,237 43,848 243,044 15% UNIFORMS 6,000 117 858 5,142 14% SUPPLIES 310,000 28,315 27,197 282,803 9% SMALL EQUIPMENT 20,000 - - 20,000 0% PROFESSIONAL SERVICES 16,050 1,303 4,426 11,624 28% COMMUNICATIONS 4,500 500 784 3,716 17% TRAVEL 1,000 - - 1,000 0% RENTAL/LEASE 187,150 29,828 30,944 156,206 17% INSURANCE 113,230 110,508 156,645 (43,415) 138% UTILITIES 273,170 23,947 25,562 247,608 9% REPAIRS & MAINTENANCE 45,000 8,343 860 44,140 2% MISCELLANEOUS 8,000 725 139 7,861 2% INTERGOVERNMENTAL SERVICES 5,000 - - 5,000 0% GENERAL OBLIGATION BOND PRINCIPAL 3,970 - - 3,970 0% INTEREST 650 - - 650 0% 1,856,507$ 344,298$ 383,171$ 1,473,336$ 21% COMBINED STREET CONST/IMPROVE (112) PROFESSIONAL SERVICES 310,258$ 135,957$ -$ 310,258$ 0% REPAIRS & MAINTENANCE 300,000 5,084 - 300,000 0% INTERFUND SUBSIDIES 47,910 - - 47,910 0% LAND 25,000 - - 25,000 0% CONSTRUCTION PROJECTS 2,064,963 - 464,746 1,600,217 23% INTERGOVERNMENTAL LOANS 72,220 - - 72,220 0% INTEREST 2,690 - - 2,690 0% 2,823,041$ 141,041$ 464,746$ 2,358,295$ 16% MUNICIPAL ARTS ACQUIS. FUND (117) SUPPLIES 4,900$ -$ 18$ 4,882$ 0% SMALL EQUIPMENT 1,700 - - 1,700 0% PROFESSIONAL SERVICES 166,900 5,325 4,670 162,230 3% TRAVEL 80 - 9 71 11% RENTAL/LEASE 2,000 - - 2,000 0% REPAIRS & MAINTENANCE 300 - - 300 0% MISCELLANEOUS 6,600 968 960 5,640 15% 182,480$ 6,293$ 5,657$ 176,823$ 3% HOTEL/MOTEL TAX REVENUE FUND (120) PROFESSIONAL SERVICES 86,300$ 3,481$ 4,977$ 81,323$ 6% MISCELLANEOUS 250 - - 250 0% INTERFUND SUBSIDIES 4,000 - - 4,000 0% 90,550$ 3,481$ 4,977$ 85,573$ 5% EMPLOYEE PARKING PERMIT FUND (121) SUPPLIES 1,790$ -$ -$ 1,790$ 0% PROFESSIONAL SERVICES 25,090 - - 25,090 0% 26,880$ -$ -$ 26,880$ 0% YOUTH SCHOLARSHIP FUND (122) MISCELLANEOUS 1,000$ 214$ 225$ 775$ 23% 1,000$ 214$ 225$ 775$ 23% TOURISM PROMOTIONAL FUND/ARTS (123) PROFESSIONAL SERVICES 28,200$ 1,190$ 1,891$ 26,309$ 7% MISCELLANEOUS 1,500 - - 1,500 0% 29,700$ 1,190$ 1,891$ 27,809$ 6% REAL ESTATE EXCISE TAX 2 (125) SUPPLIES 21,000$ 15,315$ 10,087$ 10,913$ 48% PROFESSIONAL SERVICES 65,040 38,260 3,781 61,259 6% REPAIRS & MAINTENANCE 600,000 - - 600,000 0% BUILDINGS 150,000 - - 150,000 0% CONSTRUCTION PROJECTS 1,596,000 96,436 81,045 1,514,955 5% 2,432,040$ 150,011$ 94,912$ 2,337,128$ 4% CITY OF EDMONDS EXPENDITURES BY FUND - DETAIL 7.5.a Packet Pg. 366 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 8 Page 3 of 6 Title 2018 Adopted Budget 2/28/2017 Expenditures 2/28/2018 Expenditures Amount Remaining % Spent REAL ESTATE EXCISE TAX 1, PARKS ACQ (126) PROFESSIONAL SERVICES 144,205$ -$ 400$ 143,805$ 0% REPAIRS & MAINTENANCE 604,000 - - 604,000 0% INTERFUND SUBSIDIES 135,130 - - 135,130 0% CONSTRUCTION PROJECTS 824,350 - - 824,350 0% GENERAL OBLIGATION BONDS 23,100 - - 23,100 0% INTEREST 3,750 - - 3,750 0% 1,734,535$ -$ 400$ 1,734,135$ 0% GIFTS CATALOG FUND (127) SUPPLIES 12,500$ 102$ -$ 12,500$ 0% PROFESSIONAL SERVICES 6,500 - - 6,500 0% MISCELLANEOUS 600 - - 600 0% INTERFUND SUBSIDIES 26,300 - - 26,300 0% 45,900$ 102$ -$ 45,900$ 0% CEMETERY MAINTENANCE/IMPROVEMENT (130) SALARIES AND WAGES 91,711$ 12,618$ 12,451$ 79,260$ 14% OVERTIME 3,500 670 161 3,339 5% BENEFITS 38,253 5,837 5,629 32,624 15% UNIFORMS 1,000 - - 1,000 0% SUPPLIES 7,000 122 32 6,968 0% SUPPLIES PURCHASED FOR INVENTORY/RESALE 20,000 455 1,479 18,521 7% PROFESSIONAL SERVICES 4,200 4,172 176 4,024 4% COMMUNICATIONS 1,410 206 267 1,143 19% TRAVEL 500 - - 500 0% RENTAL/LEASE 11,640 1,798 1,940 9,700 17% UTILITIES 3,800 305 362 3,438 10% REPAIRS & MAINTENANCE 500 - - 500 0% MISCELLANEOUS 14,000 1,727 222 13,778 2% 197,514$ 27,911$ 22,719$ 174,795$ 12% SISTER CITY COMMISSION (138) SUPPLIES 1,500$ 21$ -$ 1,500$ 0% TRAVEL 4,500 - - 4,500 0% MISCELLANEOUS 4,500 - - 4,500 0% 10,500$ 21$ -$ 10,500$ 0% BUSINESS IMPROVEMENT DISTRICT FUND (140) PROFESSIONAL SERVICES -$ 2,120$ 4,657$ (4,657)$ 0% MISCELLANEOUS - - 315 (315) 0% -$ 2,120$ 4,972$ (4,972)$ 0% LID FUND CONTROL (211) INTERFUND SUBSIDIES 16,450$ -$ -$ 16,450$ 0% 16,450$ -$ -$ 16,450$ 0% 2012 LTGO DEBT SERVIC FUND (231) GENERAL OBLIGATION BOND 589,630$ -$ -$ 589,630$ 0% INTEREST 118,580 - - 118,580 0% OTHER INTEREST & DEBT SERVICE COSTS 490 - - 490 0% 708,700$ -$ -$ 708,700$ 0% PARKS CONSTRUCTION FUND (332) PROFESSIONAL SERVICES 7,160$ 1,289$ -$ 7,160$ 0% CONSTRUCTION PROJECTS 1,975,000 43,031 12,012 1,962,988 1% 1,982,160$ 44,321$ 12,012$ 1,970,148$ 1% CITY OF EDMONDS EXPENDITURES BY FUND - DETAIL 7.5.a Packet Pg. 367 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 9 Page 4 of 6 Title 2018 Adopted Budget 2/28/2017 Expenditures 2/28/2018 Expenditures Amount Remaining % Spent WATER FUND (421) SALARIES AND WAGES 828,440$ 131,057$ 135,818$ 692,622$ 16% OVERTIME 24,000 5,871 4,295 19,705 18% BENEFITS 392,984 60,306 53,339 339,645 14% UNIFORMS 4,000 - 752 3,248 19% SUPPLIES 220,000 15,444 8,587 211,413 4% FUEL CONSUMED - - 70 (70) 0% WATER PURCHASED FOR RESALE 1,800,000 217,458 223,744 1,576,256 12% SUPPLIES PURCHASED FOR INVENTORY/RESALE 170,000 41,126 20,331 149,669 12% SMALL EQUIPMENT 11,000 - - 11,000 0% PROFESSIONAL SERVICES 749,976 84,876 54,141 695,835 7% COMMUNICATIONS 30,000 2,992 2,831 27,169 9% TRAVEL 200 - - 200 0% EXCISE TAXES 400,000 61,086 70,882 329,118 18% RENTAL/LEASE 144,907 24,097 24,073 120,834 17% INSURANCE 56,050 58,214 56,738 (688) 101% UTILITIES 35,000 4,204 4,773 30,227 14% REPAIRS & MAINTENANCE 239,500 12,218 12,634 226,866 5% MISCELLANEOUS 84,785 23,094 22,742 62,043 27% INTERGOVERNMENTAL SERVICES 30,000 6,429 4,384 25,616 15% INTERFUND TAXES 1,209,700 175,456 177,974 1,031,726 15% INTERFUND SUBSIDIES 644,620 - - 644,620 0% MACHINERY/EQUIPMENT 15,000 - - 15,000 0% CONSTRUCTION PROJECTS 4,570,779 - 63,902 4,506,877 1% GENERAL OBLIGATION BONDS 2,670 - - 2,670 0% REVENUE BONDS 344,650 - - 344,650 0% INTERGOVERNMENTAL LOANS 25,840 - - 25,840 0% INTEREST 236,100 - - 236,100 0% 12,270,201$ 923,929$ 942,009$ 11,328,192$ 8% STORM FUND (422) SALARIES AND WAGES 677,138$ 103,948$ 108,572$ 568,566$ 16% OVERTIME 6,000 3,761 1,182 4,818 20% BENEFITS 356,297 48,518 55,310 300,987 16% UNIFORMS 6,500 312 809 5,691 12% SUPPLIES 46,000 9,280 4,704 41,296 10% SMALL EQUIPMENT 4,000 1,418 - 4,000 0% PROFESSIONAL SERVICES 637,834 124,573 49,361 588,473 8% COMMUNICATIONS 3,200 261 523 2,677 16% TRAVEL 4,300 - - 4,300 0% EXCISE TAXES 55,000 7,903 8,658 46,342 16% RENTAL/LEASE 250,767 43,606 41,340 209,427 16% INSURANCE 71,540 72,028 178,798 (107,258) 250% UTILITES 10,500 1,590 1,660 8,840 16% REPAIR & MAINTENANCE 15,000 11,698 9,490 5,510 63% MISCELLANEOUS 88,500 9,774 10,441 78,059 12% INTERGOVERNMENTAL SERVICES 150,000 5,542 10,878 139,122 7% INTERFUND TAXES AND OPERATING ASSESSMENT 406,100 82,882 91,355 314,745 22% INTERFUND SUBSIDIES 298,500 - - 298,500 0% MACHINERY/EQUIPMENT 315,000 - - 315,000 0% CONSTRUCTION PROJECTS 2,733,121 - 6,704 2,726,417 0% GENERAL OBLIGATION BONDS 97,320 - - 97,320 0% REVENUE BONDS 168,360 - - 168,360 0% INTERGOVERNMENTAL LOANS 32,070 - - 32,070 0% INTEREST 129,830 - - 129,830 0% 6,562,877$ 527,093$ 579,783$ 5,983,094$ 9% EXPENDITURES BY FUND - DETAIL CITY OF EDMONDS 7.5.a Packet Pg. 368 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 10 Page 5 of 6 Title 2018 Adopted Budget 2/28/2017 Expenditures 2/28/2018 Expenditures Amount Remaining % Spent SEWER FUND (423) SALARIES AND WAGES 1,793,854$ 281,651$ 271,735$ 1,522,119$ 15% OVERTIME 95,000 15,948 16,333 78,667 17% BENEFITS 821,233 126,856 123,082 698,151 15% UNIFORMS 9,500 3,240 2,520 6,980 27% SUPPLIES 432,200 26,277 42,091 390,109 10% FUEL CONSUMED 80,000 12,995 8,629 71,371 11% SUPPLIES PURCHASED FOR INV OR RESALE 4,000 - - 4,000 0% SMALL EQUIPMENT 50,000 600 9,486 40,514 19% PROFESSIONAL SERVICES 1,273,094 120,902 111,886 1,161,208 9% COMMUNICATIONS 43,000 4,134 4,589 38,411 11% TRAVEL 5,000 - - 5,000 0% EXCISE TAXES 200,000 30,241 38,095 161,906 19% RENTAL/LEASE 310,809 50,939 51,357 259,452 17% INSURANCE 109,270 115,442 117,717 (8,447) 108% UTILITIES 1,217,860 91,125 90,191 1,127,669 7% REPAIR & MAINTENANCE 340,000 33,841 32,779 307,221 10% MISCELLANEOUS 105,450 9,982 28,696 76,754 27% INTERGOVERNMENTAL SERVICES 168,000 35,678 33,228 134,772 20% INTERFUND TAXES AND OPERATING ASSESSMENT 763,000 113,469 126,840 636,160 17% INTERFUND SUBSIDIES 1,500,134 - - 1,500,134 0% MACHINERY/EQUIPMENT 10,000 - - 10,000 0% CONSTRUCTION PROJECTS 3,256,570 - 6,565 3,250,005 0% GENERAL OBLIGATION BONDS 148,140 - - 148,140 0% REVENUE BONDS 77,010 - - 77,010 0% INTERGOVERNMENTAL LOANS 171,890 - - 171,890 0% INTEREST 81,750 - - 81,750 0% 13,066,764$ 1,073,319$ 1,115,818$ 11,950,946$ 9% BOND RESERVE FUND (424) REVENUE BONDS 710,020$ -$ -$ 710,020$ 0% INTEREST 1,281,500 - - 1,281,500 0% 1,991,520$ -$ -$ 1,991,520$ 0% EXPENDITURES BY FUND - DETAIL CITY OF EDMONDS 7.5.a Packet Pg. 369 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 11 Page 6 of 6 Title 2018 Adopted Budget 2/28/2017 Expenditures 2/28/2018 Expenditures Amount Remaining % Spent EQUIPMENT RENTAL FUND (511) SALARIES AND WAGES 250,519$ 39,438$ 41,139$ 209,380$ 16% OVERTIME 2,000 - - 2,000 0% BENEFITS 114,956 17,348 17,737 97,219 15% UNIFORMS 1,000 44 90 910 9% SUPPLIES 110,000 6,535 10,555 99,445 10% FUEL CONSUMED 1,000 - - 1,000 0% SUPPLIES PURCHASED FOR INVENTORY/RESALE 268,000 27,548 15,683 252,317 6% SMALL EQUIPMENT 58,000 463 68 57,932 0% PROFESSIONAL SERVICES 44,000 352 1,977 42,023 4% COMMUNICATIONS 3,000 293 296 2,704 10% TRAVEL 1,000 - - 1,000 0% RENTAL/LEASE 9,780 2,406 1,578 8,202 16% INSURANCE 29,010 26,351 29,464 (454) 102% UTILITIES 14,000 2,085 2,701 11,300 19% REPAIRS & MAINTENANCE 60,000 4,894 6,832 53,168 11% MISCELLANEOUS 12,000 - - 12,000 0% INTERGOVERNMENTAL SERVICES 2,500 - - 2,500 0% MACHINERY/EQUIPMENT 681,500 149,891 4,841 676,659 1% 1,662,265$ 277,646$ 132,960$ 1,529,305$ 8% TECHNOLOGY RENTAL FUND (512) SALARIES AND WAGES 283,742$ 46,679$ 46,557$ 237,185$ 16% OVERTIME 2,000 - 755 1,245 38% BENEFITS 98,101 15,371 15,619 82,482 16% SUPPLIES 5,000 3,216 815 4,185 16% SMALL EQUIPMENT 300,000 1,565 16,435 283,565 5% PROFESSIONAL SERVICES 114,000 1,829 344 113,656 0% COMMUNICATIONS 58,770 7,929 6,916 51,854 12% TRAVEL 1,500 - - 1,500 0% RENTAL/LEASE 6,810 1,126 954 5,856 14% REPAIRS & MAINTENANCE 260,190 29,352 112,264 147,926 43% MISCELLANEOUS 5,000 70,170 3,419 1,581 68% MACHINERY/EQUIPMENT 56,000 - - 56,000 0% 1,191,113$ 177,236$ 204,078$ 987,035$ 17% FIREMEN'S PENSION FUND (617) BENEFITS 23,000$ 6,416$ 7,414$ 15,586$ 32% PENSION AND DISABILITY PAYMENTS 51,018 8,278 8,255 42,763 16% PROFESSIONAL SERVICES 1,200 - - 1,200 0% 75,218$ 14,694$ 15,670$ 59,548$ 21% TOTAL EXPENDITURE ALL FUNDS 92,768,552$ 11,001,743$ 11,167,038$ 81,601,514$ 12% CITY OF EDMONDS EXPENDITURES BY FUND - DETAIL 7.5.a Packet Pg. 370 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 12 Page 1 of 1 Title 2018 Adopted Budget 2/28/2017 Expenditures 2/28/2018 Expenditures Amount Remaining % Spent CITY COUNCIL 580,919$ 44,954$ 43,001$ 537,918$ 7% OFFICE OF MAYOR 297,088 46,116 47,920 249,168 16% HUMAN RESOURCES 467,314 63,054 73,258 394,056 16% MUNICIPAL COURT 1,105,852 170,699 159,028 946,824 14% CITY CLERK 694,248 115,829 116,550 577,698 17% FINANCE 1,237,786 199,380 210,861 1,026,925 17% CITY ATTORNEY 847,480 133,495 136,648 710,832 16% NON-DEPARTMENTAL 13,571,547 2,992,431 2,811,392 10,760,155 21% POLICE SERVICES 11,294,351 1,625,589 1,788,816 9,505,535 16% COMMUNITY SERVICES/ECONOMIC DEV.583,461 82,958 85,170 498,291 15% DEVELOPMENT SERVICES 3,144,570 416,189 378,818 2,765,752 12% PARKS & RECREATION 4,348,100 525,411 530,383 3,817,717 12% PUBLIC WORKS 3,085,252 437,997 418,918 2,666,334 14% FACILITIES MAINTENANCE 2,100,163 264,009 273,490 1,826,673 13% 43,358,131$ 7,118,110$ 7,074,254$ 36,283,877$ 16% Title 2018 Adopted Budget 2/28/2017 Expenditures 2/28/2018 Expenditures Amount Remaining % Spent WATER UTILITY FUND 12,270,201$ 923,929$ 942,009$ 11,328,192$ 8% STORM UTILITY FUND 6,562,877 527,093 579,783 5,983,094 9% SEWER/WWTP UTILITY FUND 13,066,764 1,073,319 1,115,818 11,950,946 9% BOND RESERVE FUND 1,991,520 - - 1,991,520 0% 33,891,362$ 2,524,341$ 2,637,611$ 31,253,751$ 8% EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN SUMMARY EXPENDITURES - UTILITY- BY FUND IN SUMMARY CITY OF EDMONDS CITY OF EDMONDS 7.5.a Packet Pg. 371 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 13 Page 1 of 4 Title 2018 Adopted Budget 2/28/2017 Expenditures 2/28/2018 Expenditures Amount Remaining % Spent CITY COUNCIL SALARIES 169,808$ 25,956$ 24,558$ 145,250$ 14% OVERTIME 1,000 - - 1,000 0% BENEFITS 119,687 17,014 14,821 104,866 12% SUPPLIES 2,000 210 - 2,000 0% PROFESSIONAL SERVICES 237,160 - - 237,160 0% COMMUNICATIONS 3,000 300 300 2,700 10% TRAVEL 6,700 45 315 6,385 5% RENTAL/LEASE 16,064 1,430 2,707 13,357 17% REPAIRS/MAINTENANCE 500 - - 500 0% MISCELLANEOUS 25,000 - 300 24,700 1% 580,919$ 44,954$ 43,001$ 537,918$ 7% OFFICE OF MAYOR SALARIES 208,326$ 33,740$ 34,721$ 173,605$ 17% BENEFITS 53,611 8,194 8,308 45,303 15% SUPPLIES 1,500 57 94 1,406 6% PROFESSIONAL SERVICES 2,000 1,582 - 2,000 0% COMMUNICATION 1,400 218 107 1,293 8% TRAVEL 4,000 - 239 3,761 6% RENTAL/LEASE 21,801 2,058 3,512 18,289 16% MISCELLANEOUS 4,450 267 940 3,510 21% 297,088$ 46,116$ 47,920$ 249,168$ 16% HUMAN RESOURCES SALARIES 249,577$ 37,738$ 38,023$ 211,554$ 15% BENEFITS 84,882 13,230 14,502 70,380 17% SUPPLIES 2,300 112 - 2,300 0% SMALL EQUIPMENT 300 - - 300 0% PROFESSIONAL SERVICES 78,000 2,264 8,024 69,976 10% COMMUNICATIONS 700 102 102 598 15% TRAVEL 1,000 - 350 650 35% RENTAL/LEASE 25,525 4,103 4,550 20,975 18% REPAIR/MAINTENANCE 7,850 7,056 7,326 524 93% MISCELLANEOUS 17,180 (1,550) 381 16,799 2% 467,314$ 63,054$ 73,258$ 394,056$ 16% MUNICIPAL COURT SALARIES 587,898$ 108,999$ 92,597$ 495,301$ 16% OVERTIME 800 14 - 800 0% BENEFITS 245,141 39,391 37,349 207,792 15% SUPPLIES 9,600 582 1,113 8,487 12% SMALL EQUIPMENT 1,000 - - 1,000 0% PROFESSIONAL SERVICES 91,925 11,359 10,674 81,251 12% COMMUNICATIONS 2,700 122 256 2,444 9% TRAVEL 6,500 19 390 6,110 6% RENTAL/LEASE 71,204 6,663 11,991 59,213 17% REPAIR/MAINTENANCE 4,263 252 - 4,263 0% MISCELLANEOUS 14,000 3,298 4,658 9,342 33% MACHINERY/EQUIPMENT 70,821 - - 70,821 0% 1,105,852$ 170,699$ 159,028$ 946,824$ 14% EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN DETAIL CITY OF EDMONDS 7.5.a Packet Pg. 372 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 14 Page 2 of 4 Title 2018 Adopted Budget 2/28/2017 Expenditures 2/28/2018 Expenditures Amount Remaining % Spent CITY CLERK SALARIES AND WAGES 342,766$ 54,402$ 57,532$ 285,234$ 17% BENEFITS 162,547 24,445 25,246 137,301 16% SUPPLIES 10,240 642 1,014 9,226 10% PROFESSIONAL SERVICES 28,310 5,866 2,097 26,213 7% COMMUNICATIONS 50,000 6,102 4,082 45,918 8% TRAVEL 1,000 - - 1,000 0% RENTAL/LEASE 64,305 7,745 10,763 53,542 17% REPAIRS & MAINTENANCE 31,080 15,297 14,603 16,477 47% MISCELLANEOUS 4,000 1,331 1,213 2,787 30% 694,248$ 115,829$ 116,550$ 577,698$ 17% FINANCE SALARIES 821,066$ 116,061$ 120,225$ 700,841$ 15% OVERTIME 4,500 - - 4,500 0% BENEFITS 284,724 36,874 38,550 246,174 14% SUPPLIES 7,350 645 555 6,795 8% SMALL EQUIPMENT 5,400 - 392 5,008 7% PROFESSIONAL SERVICES 9,300 100 - 9,300 0% COMMUNICATIONS 2,000 152 112 1,888 6% TRAVEL 3,100 139 366 2,734 12% RENTAL/LEASE 48,146 5,650 8,275 39,871 17% REPAIR/MAINTENANCE 38,500 39,608 41,121 (2,621) 107%MISCELLANEOUS 13,700 150 1,265 12,435 9% 1,237,786$ 199,380$ 210,861$ 1,026,925$ 17% CITY ATTORNEY PROFESSIONAL SERVICES 847,480$ 133,495$ 136,648$ 710,832$ 16% 847,480$ 133,495$ 136,648$ 710,832$ 16% NON-DEPARTMENTAL BENEFITS - UNEMPLOYMENT -$ 315$ 2,370$ (2,370)$ 0% SUPPLIES 5,000 85 387 4,613 8% PROFESSIONAL SERVICES 717,430 27,098 78,127 639,303 11% EXCISE TAXES 6,500 532 369 6,131 6% RENTAL/LEASE 10,307 4,747 1,720 8,587 17% INSURANCE 624,530 616,495 437,253 187,277 70% MISCELLANEOUS 164,070 39,733 40,640 123,430 25% INTERGOVT SERVICES 9,776,340 2,258,427 2,250,525 7,525,815 23% ECA LOAN PAYMENT 45,000 - - 45,000 0% INTERFUND SUBSIDIES 1,824,370 45,000 - 1,824,370 0% LAND 200,000 - - 200,000 0% GENERAL OBLIGATION BOND 176,340 - - 176,340 0% INTEREST ON LONG-TERM DEBT 21,160 - - 21,160 0% FISCAL AGENT FEES 500 - - 500 0% 13,571,547$ 2,992,431$ 2,811,392$ 10,760,155$ 21% CITY OF EDMONDS EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN DETAIL 7.5.a Packet Pg. 373 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 15 Page 3 of 4 Title 2018 Adopted Budget 2/28/2017 Expenditures 2/28/2018 Expenditures Amount Remaining % Spent POLICE SERVICES SALARIES 6,560,766$ 967,258$ 1,013,269$ 5,547,497$ 15% OVERTIME 463,280 81,075 98,821 364,459 21% HOLIDAY BUYBACK 243,389 881 - 243,389 0% BENEFITS 2,543,628 375,391 399,413 2,144,215 16% UNIFORMS 78,650 5,836 14,327 64,323 18% SUPPLIES 86,500 11,064 10,929 75,571 13% SMALL EQUIPMENT 28,610 3,535 4,593 24,017 16% PROFESSIONAL SERVICES 123,420 14,452 19,563 103,857 16% COMMUNICATIONS 32,000 3,808 3,610 28,390 11% TRAVEL 19,310 1,431 3,531 15,779 18% RENTAL/LEASE 984,878 140,810 163,662 821,216 17% REPAIR/MAINTENANCE 15,120 1,611 3,022 12,098 20% MISCELLANEOUS 46,350 10,357 20,848 25,502 45% INTERGOVTL SERVICES 10,550 8,078 - 10,550 0% MACHINERY/EQUIPMENT 57,900 - 33,227 24,673 57% 11,294,351$ 1,625,589$ 1,788,816$ 9,505,535$ 16% COMMUNITY SERVICES/ECON DEV. SALARIES 238,449$ 38,535$ 39,294$ 199,155$ 16% BENEFITS 76,571 11,799 12,354 64,217 16% SUPPLIES 7,000 6,757 5,620 1,380 80% SMALL EQUIPMENT 800 - - 800 0% PROFESSIONAL SERVICES 233,400 23,156 23,417 209,983 10% COMMUNICATIONS 1,490 116 117 1,373 8% TRAVEL 2,000 - - 2,000 0% RENTAL/LEASE 13,751 1,676 2,041 11,710 15% REPAIR/MAINTENANCE 500 - - 500 0% MISCELLANEOUS 9,500 920 2,327 7,173 24% 583,461$ 82,958$ 85,170$ 498,291$ 15% DEVELOPMENT SERVICES/PLANNING SALARIES 1,599,298$ 230,106$ 229,850$ 1,369,448$ 14% OVERTIME 1,300 1,507 4,074 (2,774) 313% BENEFITS 619,023 83,462 86,746 532,277 14% UNIFORMS 500 - - 500 0% SUPPLIES 16,100 2,018 1,490 14,610 9% SMALL EQUIPMENT 6,100 475 - 6,100 0% PROFESSIONAL SERVICES 646,380 66,431 24,413 621,967 4% COMMUNICATIONS 9,000 686 694 8,306 8% TRAVEL 4,750 106 1,326 3,424 28% RENTAL/LEASE 156,959 26,744 25,974 130,985 17% REPAIRS & MAINTENANCE 31,100 - - 31,100 0% MISCELLANEOUS 54,060 4,655 4,251 49,809 8% 3,144,570$ 416,189$ 378,818$ 2,765,752$ 12% ENGINEERING SALARIES 1,661,359$ 238,687$ 216,018$ 1,445,341$ 13% OVERTIME 5,000 104 838 4,162 17% BENEFITS 710,496 96,795 89,800 620,696 13% UNIFORMS 360 - - 360 0% SMALL EQUIPMENT 2,200 216 - 2,200 0% PROFESSIONAL SERVICES 13,840 4,867 4,408 9,432 32% COMMUNICATIONS 16,625 1,150 1,168 15,457 7% TRAVEL 600 - - 600 0% RENTAL/LEASE 120,624 14,992 19,964 100,660 17% REPAIR/MAINTENANCE 2,600 - - 2,600 0% MISCELLANEOUS 37,500 2,102 1,986 35,514 5% 2,571,204$ 358,913$ 334,182$ 2,237,022$ 13% CITY OF EDMONDS EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN DETAIL 7.5.a Packet Pg. 374 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 16 Page 4 of 4 Title 2018 Adopted Budget 2/28/2017 Expenditures 2/28/2018 Expenditures Amount Remaining % Spent PARKS & RECREATION SALARIES 2,048,165$ 292,672$ 287,889$ 1,760,276$ 14% OVERTIME 10,000 1,041 1,102 8,898 11% BENEFITS 847,782 118,308 116,433 731,349 14% UNIFORMS 6,275 443 822 5,453 13% SUPPLIES 117,390 14,335 21,696 95,694 18% SMALL EQUIPMENT 7,750 - - 7,750 0% PROFESSIONAL SERVICES 575,160 13,974 22,210 552,950 4% COMMUNICATIONS 30,320 713 728 29,592 2% TRAVEL 4,870 353 69 4,801 1% RENTAL/LEASE 264,378 41,792 43,880 220,498 17% PUBLIC UTILITY 175,000 21,898 22,607 152,393 13% REPAIR/MAINTENANCE 37,700 8,564 - 37,700 0% MISCELLANEOUS 92,610 11,319 12,947 79,663 14% INTERGOVTL SERVICES 70,700 - - 70,700 0% BUILDINGS 60,000 - - 60,000 0% 4,348,100$ 525,411$ 530,383$ 3,817,717$ 12% PUBLIC WORKS SALARIES 279,248$ 47,499$ 45,977$ 233,271$ 16% OVERTIME 200 - - 200 0% BENEFITS 92,055 14,996 17,160 74,895 19% SUPPLIES 8,600 742 867 7,733 10% SMALL EQUIPMENT 1,000 - - 1,000 0% PROFESSIONAL SERVICES 200 17 16 184 8% COMMUNICATIONS 1,350 74 75 1,275 6% TRAVEL 500 - - 500 0% RENTAL/LEASE 122,195 15,338 20,205 101,990 17% PUBLIC UTILITY 2,800 418 437 2,363 16% REPAIR/MAINTENANCE 1,000 - - 1,000 0% MISCELLANEOUS 4,900 - - 4,900 0% 514,048$ 79,084$ 84,736$ 429,312$ 16% FACILITIES MAINTENANCE SALARIES 719,620 115,561 120,085 599,535 17% OVERTIME 7,500 706 927 6,573 12% BENEFITS 325,233 49,567 50,683 274,550 16% UNIFORMS 3,000 181 1,641 1,359 55% SUPPLIES 87,000 11,556 11,507 75,493 13% SMALL EQUIPMENT 3,000 - 1,249 1,751 42% PROFESSIONAL SERVICES 156,000 12,472 - 156,000 0% COMMUNICATIONS 16,000 1,842 2,097 13,903 13% TRAVEL 1,000 - - 1,000 0% RENTAL/LEASE 68,310 9,893 10,552 57,758 15% PUBLIC UTILITY 280,000 42,822 52,217 227,783 19% REPAIR/MAINTENANCE 428,500 18,462 22,510 405,990 5% MISCELLANEOUS 5,000 948 20 4,980 0% BUILDINGS - - - - 0% 2,100,163$ 264,009$ 273,490$ 1,826,673$ 13% TOTAL GENERAL FUND EXPENDITURES 43,358,131$ 7,118,110$ 7,074,254$ 36,283,877$ 16% CITY OF EDMONDS EXPENDITURES - GENERAL FUND - BY DEPARTMENT IN DETAIL 7.5.a Packet Pg. 375 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 17 General Fund Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 1,952,471$ 1,952,471$ 2,195,035$ 12.42% February 4,695,259 2,742,788 4,464,993 -4.90% March 7,013,659 2,318,400 6,669,693 -4.90% April 10,657,081 3,643,423 10,134,434 -4.90% May 18,033,626 7,376,545 17,149,216 -4.90% June 20,067,978 2,034,352 19,083,798 -4.90% July 22,073,023 2,005,045 20,990,511 -4.90% August 24,364,311 2,291,289 23,169,430 -4.90% September 26,369,296 2,004,984 25,076,085 -4.90% October 29,120,780 2,751,485 27,692,630 -4.90% November 36,636,945 7,516,165 34,840,185 -4.90% December 38,783,555 2,146,610 36,881,520 -4.90% Real Estate Excise Tax 1 & 2 Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 219,352$ 219,352$ 251,030$ 14.44% February 381,613 162,261 407,050 6.67% March 588,896 207,283 628,149 6.67% April 780,860 191,964 832,908 6.67% May 1,005,087 224,227 1,072,081 6.67% June 1,248,349 243,262 1,331,558 6.67% July 1,653,074 404,724 1,763,259 6.67% August 1,929,331 276,257 2,057,931 6.67% September 2,197,100 267,769 2,343,547 6.67% October 2,416,963 219,864 2,578,066 6.67% November 2,630,341 213,377 2,805,666 6.67% December 2,800,000 169,659 2,986,634 6.67% *The monthly budget forecast columns are based on a five-year average. 2018 City of Edmonds, WA Monthly Revenue Summary-General Fund 2018 City of Edmonds, WA Monthly Revenue Summary-Real Estate Excise Tax 0 5,000,000 10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC General Fund Current Year Budget Prior Year 0 500,000 1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Real Estate Excise Tax 1 & 2 Current Year Budget Prior Year 7.5.a Packet Pg. 376 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 18 SALES TAX SUMMARY Wholesale Trade, $24,832 Communications, $21,028 Clothing and Accessories, $20,170 Accommodation, $2,901 Construction Trade, $122,485 Health & Personal Care, $21,171 Automotive Repair, $14,215 Amusement & Recreation, $6,571 Business Services, $43,389 Gasoline, $2,848 Retail Food Stores, $25,424 Retail Automotive, $107,652 Manufacturing, $5,814 Eating & Drinking, $73,560 Others, $2,010 Misc Retail, $91,878 Sales Tax Analysis By Category Current Period: January 2018 Year-to-Date Total $585,948 $5,325,287 $5,840,764 $6,741,838 $6,905,122 $7,395,114 $1,321,958 0 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000 2013 2014 2015 2016 2017 YTD 2018 Annual Sales Tax Revenue 7.5.a Packet Pg. 377 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 19 Sales and Use Tax Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 552,482$ 552,482$ 585,948$ 6.06% February 1,249,207 696,725 1,321,958 5.82% March 1,777,304 528,097 1,880,810 5.82% April 2,272,493 495,189 2,404,837 5.82% May 2,906,618 634,125 3,075,891 5.82% June 3,468,607 561,989 3,670,609 5.82% July 4,058,559 589,952 4,294,918 5.82% August 4,707,320 648,761 4,981,462 5.82% September 5,334,689 627,369 5,645,367 5.82% October 5,989,537 654,848 6,338,352 5.82% November 6,670,224 680,687 7,058,680 5.82% December 7,275,000 604,776 7,698,677 5.82% Gas Utility Tax Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 88,482$ 88,482$ 97,973$ 10.73% February 187,698 99,217 187,404 -0.16% March 267,256 79,558 266,836 -0.16% April 335,144 67,888 334,617 -0.16% May 387,986 52,843 387,377 -0.16% June 424,966 36,979 424,298 -0.16% July 453,766 28,800 453,053 -0.16% August 477,013 23,247 476,264 -0.16% September 498,430 21,418 497,648 -0.16% October 523,180 24,749 522,358 -0.16% November 561,415 38,235 560,533 -0.16% December 620,200 58,785 619,226 -0.16% *The monthly budget forecast columns are based on a five-year average. 2018 City of Edmonds, WA Monthly Revenue Summary-Sales and Use Tax 2018 City of Edmonds, WA Monthly Revenue Summary-Gas Utility Tax 0 1,000,000 2,000,000 3,000,000 4,000,000 5,000,000 6,000,000 7,000,000 8,000,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Sales and Use Tax Current Year Budget Prior Year 0 100,000 200,000 300,000 400,000 500,000 600,000 700,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Gas Utility Tax Current Year Budget Prior Year 7.5.a Packet Pg. 378 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 20 Telephone Utility Tax Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 101,864$ 101,864$ 94,392$ -7.34% February 202,129 100,265 183,702 -9.12% March 294,029 91,900 267,225 -9.12% April 390,095 96,066 354,534 -9.12% May 478,713 88,617 435,072 -9.12% June 568,042 89,329 516,258 -9.12% July 652,808 84,766 593,297 -9.12% August 740,812 88,004 673,278 -9.12% September 832,244 91,432 756,375 -9.12% October 920,171 87,927 836,287 -9.12% November 1,003,763 83,592 912,258 -9.12% December 1,093,200 89,437 993,542 -9.12% Electric Utility Tax Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 171,906$ 171,906$ 169,967$ -1.13% February 353,028 181,122 380,238 7.71% March 518,242 165,214 558,185 7.71% April 683,645 165,403 736,337 7.71% May 824,846 141,201 888,421 7.71% June 940,385 115,539 1,012,865 7.71% July 1,050,933 110,549 1,131,934 7.71% August 1,157,071 106,138 1,246,253 7.71% September 1,262,180 105,109 1,359,463 7.71% October 1,372,403 110,223 1,478,181 7.71% November 1,490,337 117,934 1,605,205 7.71% December 1,611,600 121,263 1,735,815 7.71% *The monthly budget forecast columns are based on a five-year average. 2018 City of Edmonds, WA Monthly Revenue Summary-Telephone Utility Tax 2018 City of Edmonds, WA Monthly Revenue Summary-Electric Utility Tax 0 200,000 400,000 600,000 800,000 1,000,000 1,200,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Telephone Utility Tax Current Year Budget Prior Year 0 200,000 400,000 600,000 800,000 1,000,000 1,200,000 1,400,000 1,600,000 1,800,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Electric Utility Tax Current Year Budget Prior Year 7.5.a Packet Pg. 379 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 21 Meter Water Sales Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 671,144$ 671,144$ 686,803$ 2.33% February 1,136,017 464,873 1,148,411 1.09% March 1,808,515 672,498 1,828,246 1.09% April 2,250,797 442,282 2,275,354 1.09% May 2,907,543 656,746 2,939,265 1.09% June 3,420,955 513,413 3,458,279 1.09% July 4,227,120 806,165 4,273,239 1.09% August 4,933,718 706,598 4,987,547 1.09% September 5,902,426 968,708 5,966,823 1.09% October 6,565,192 662,766 6,636,821 1.09% November 7,332,394 767,202 7,412,393 1.09% December 7,804,500 472,106 7,889,650 1.09% Storm Water Sales Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 293,128$ 293,128$ 287,956$ -1.13% February 924,642 631,514 913,794 7.71% March 1,217,367 292,725 1,203,085 7.71% April 1,476,942 259,575 1,459,614 7.71% May 1,769,842 292,900 1,749,078 7.71% June 2,030,237 260,395 2,006,418 7.71% July 2,324,515 294,278 2,297,243 -1.17% August 2,956,345 631,830 2,921,660 -1.17% September 3,248,569 292,224 3,210,456 -1.17% October 3,508,364 259,794 3,467,203 -1.17% November 3,801,321 292,958 3,756,723 -1.17% December 4,061,395 260,074 4,013,746 -1.17% *The monthly budget forecast columns are based on a five-year average. 2018 City of Edmonds, WA Monthly Revenue Summary-Meter Water Sales 2018 City of Edmonds, WA Monthly Revenue Summary-Storm Water Sales 0 1,000,000 2,000,000 3,000,000 4,000,000 5,000,000 6,000,000 7,000,000 8,000,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Meter Water Sales Current Year Budget Prior Year 0 500,000 1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 3,500,000 4,000,000 4,500,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Storm Water Sales Current Year Budget Prior Year 7.5.a Packet Pg. 380 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 22 Unmeter Sewer Sales Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 691,863$ 691,863$ 707,735$ 2.29% February 1,253,067 561,204 1,269,207 1.29% March 1,943,785 690,719 1,968,822 1.29% April 2,507,611 563,825 2,539,910 1.29% May 3,199,180 691,569 3,240,387 1.29% June 3,770,233 571,053 3,818,795 1.29% July 4,484,245 714,012 4,542,004 1.29% August 5,054,160 569,916 5,119,261 1.29% September 5,782,066 727,906 5,856,542 1.29% October 6,358,537 576,471 6,440,439 1.29% November 7,064,218 705,680 7,155,208 1.29% December 7,629,500 565,282 7,727,772 1.29% City of Edmonds, WA Monthly Revenue Summary-Unmeter Sewer Sales 2018 *The monthly budget forecast columns are based on a five-year average. 0 1,000,000 2,000,000 3,000,000 4,000,000 5,000,000 6,000,000 7,000,000 8,000,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Unmeter Sewer Sales Current Year Budget Prior Year 7.5.a Packet Pg. 381 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 23 General Fund Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 5,316,556$ 5,316,556$ 4,000,420$ -24.76% February 7,792,189 2,475,633 7,074,254 -9.21% March 11,495,338 3,703,149 10,436,212 -9.21% April 15,367,243 3,871,905 13,951,379 -9.21% May 17,687,264 2,320,020 16,057,644 -9.21% June 21,498,333 3,811,069 19,517,579 -9.21% July 25,125,385 3,627,052 22,810,452 -9.21% August 29,053,727 3,928,342 26,376,856 -9.21% September 32,438,650 3,384,923 29,449,907 -9.21% October 35,238,871 2,800,221 31,992,130 -9.21% November 39,282,633 4,043,762 35,663,318 -9.21% December 43,358,131 4,075,498 39,363,320 -9.21% Non-Departmental Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 2,794,624$ 2,794,624$ 1,916,589$ -31.42% February 3,044,628 250,004 2,811,392 -7.66% March 4,413,137 1,368,509 4,075,065 -7.66% April 5,814,624 1,401,487 5,369,190 -7.66% May 5,951,884 137,260 5,495,935 -7.66% June 7,381,423 1,429,540 6,815,963 -7.66% July 8,479,231 1,097,808 7,829,673 -7.66% August 9,744,718 1,265,487 8,998,216 -7.66% September 10,680,274 935,556 9,862,103 -7.66% October 11,097,303 417,029 10,247,185 -7.66% November 12,374,586 1,277,283 11,426,621 -7.66% December 13,571,547 1,196,961 12,531,887 -7.66% *The monthly budget forecast columns are based on a five-year average. 2018 City of Edmonds, WA Monthly Expenditure Report-General Fund 2018 City of Edmonds, WA Monthly Expenditure Report-Non-Departmental 0 5,000,000 10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC General Fund Current Year Budget Prior Year 0 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000 12,000,000 14,000,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Non-Departmental Current Year Budget Prior Year 7.5.a Packet Pg. 382 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 24 City Council Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 39,156$ 39,156$ 20,137$ -48.57% February 81,707 42,551 43,001 -47.37% March 131,158 49,452 69,027 -47.37% April 177,465 46,306 93,398 -47.37% May 223,060 45,595 117,394 -47.37% June 282,118 59,058 148,475 -47.37% July 332,530 50,412 175,006 -47.37% August 383,904 51,375 202,044 -47.37% September 442,045 58,140 232,643 -47.37% October 480,175 38,130 252,710 -47.37% November 530,273 50,099 279,077 -47.37% December 580,919 50,646 305,731 -47.37% Office of Mayor Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 24,264$ 24,264$ 23,355$ -3.75% February 49,615 25,351 47,920 -3.42% March 74,439 24,823 71,896 -3.42% April 98,806 24,367 95,431 -3.42% May 123,154 24,348 118,948 -3.42% June 147,440 24,286 142,404 -3.42% July 172,527 25,087 166,634 -3.42% August 197,868 25,341 191,109 -3.42% September 222,303 24,435 214,710 -3.42% October 247,077 24,774 238,637 -3.42% November 271,327 24,250 262,059 -3.42% December 297,088 25,761 286,940 -3.42% *The monthly budget forecast columns are based on a five-year average. 2018 City of Edmonds, WA Monthly Expenditure Report-City Council 2018 City of Edmonds, WA Monthly Expenditure Report-Office of Mayor 0 100,000 200,000 300,000 400,000 500,000 600,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC City Council Current Year Budget Prior Year 0.00 50,000.00 100,000.00 150,000.00 200,000.00 250,000.00 300,000.00 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Office of Mayor Current Year Budget Prior Year 7.5.a Packet Pg. 383 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 25 Human Resources Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 35,915$ 35,915$ 36,984$ 2.98% February 75,981 40,066 73,258 -3.58% March 115,825 39,843 111,673 -3.58% April 150,473 34,648 145,079 -3.58% May 187,400 36,927 180,683 -3.58% June 225,139 37,738 217,069 -3.58% July 264,377 39,239 254,901 -3.58% August 302,046 37,669 291,220 -3.58% September 338,631 36,585 326,494 -3.58% October 377,307 38,676 363,783 -3.58% November 412,924 35,616 398,123 -3.58% December 467,314 54,390 450,564 -3.58% Municipal Court Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 82,608$ 82,608$ 80,036$ -3.11% February 175,964 93,357 159,028 -9.62% March 269,619 93,655 243,668 -9.62% April 356,946 87,327 322,590 -9.62% May 446,138 89,192 403,198 -9.62% June 534,494 88,356 483,049 -9.62% July 623,552 89,059 563,536 -9.62% August 718,039 94,486 648,928 -9.62% September 811,352 93,313 733,260 -9.62% October 908,794 97,442 821,323 -9.62% November 1,003,801 95,007 907,186 -9.62% December 1,105,852 102,051 999,415 -9.62% *The monthly budget forecast columns are based on a five-year average. 2018 City of Edmonds, WA Monthly Expenditure Report-Human Resources 2018 City of Edmonds, WA Monthly Expenditure Report-Municipal Court 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 450,000 500,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Human Resources Current Year Budget Prior Year 0 200,000 400,000 600,000 800,000 1,000,000 1,200,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Municipal Court Current Year Budget Prior Year 7.5.a Packet Pg. 384 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 26 Community Services/Economic Development Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 35,087$ 35,087$ 43,517$ 24.03% February 77,643 42,556 85,170 9.69% March 121,352 43,709 133,117 9.69% April 180,892 59,539 198,428 9.69% May 219,287 38,395 240,546 9.69% June 261,452 42,165 286,799 9.69% July 306,988 45,536 336,749 9.69% August 357,000 50,012 391,610 9.69% September 405,705 48,705 445,037 9.69% October 456,792 51,087 501,076 9.69% November 512,749 55,957 562,458 9.69% December 583,461 70,712 640,025 9.69% City Clerk Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 61,607$ 61,607$ 61,232$ -0.61% February 117,510 55,903 116,550 -0.82% March 173,888 56,379 172,469 -0.82% April 232,177 58,288 230,281 -0.82% May 285,659 53,483 283,327 -0.82% June 337,760 52,100 335,002 -0.82% July 393,593 55,833 390,379 -0.82% August 451,730 58,137 448,041 -0.82% September 508,091 56,361 503,942 -0.82% October 576,461 68,371 571,754 -0.82% November 635,542 59,080 630,352 -0.82% December 694,248 58,706 688,579 -0.82% *The monthly budget forecast columns are based on a five-year average. 2018 City of Edmonds, WA Monthly Expenditure Report-Community Services/Economic Development 2018 City of Edmonds, WA Monthly Expenditure Report-City Clerk 0 100,000 200,000 300,000 400,000 500,000 600,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Community Services/Economic Development Current Year Budget Prior Year 0 100,000 200,000 300,000 400,000 500,000 600,000 700,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC City Clerk Current Year Budget Prior Year 7.5.a Packet Pg. 385 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 27 Technology Rental Fund Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 128,112$ 128,112$ 144,135$ 12.51% February 268,331 140,218 204,078 -23.95% March 346,703 78,372 263,684 -23.95% April 422,093 75,390 321,022 -23.95% May 482,647 60,554 367,076 -23.95% June 547,148 64,501 416,132 -23.95% July 642,431 95,282 488,599 -23.95% August 749,888 107,457 570,325 -23.95% September 852,606 102,717 648,446 -23.95% October 928,166 75,560 705,913 -23.95% November 1,013,348 85,182 770,698 -23.95% December 1,191,113 177,765 905,897 -23.95% Finance Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 124,798$ 124,798$ 125,728$ 0.75% February 223,504 98,706 210,861 -5.66% March 319,397 95,892 301,330 -5.66% April 425,251 105,855 401,196 -5.66% May 523,182 97,931 493,587 -5.66% June 620,315 97,133 585,226 -5.66% July 716,459 96,144 675,931 -5.66% August 814,575 98,117 768,498 -5.66% September 925,150 110,574 872,817 -5.66% October 1,031,905 106,755 973,534 -5.66% November 1,131,680 99,774 1,067,664 -5.66% December 1,237,786 106,106 1,167,769 -5.66% *The monthly budget forecast columns are based on a five-year average. 2018 City of Edmonds, WA Monthly Expenditure Report-Technology Rental Fund 2018 City of Edmonds, WA Monthly Expenditure Report-Finance Prior Year amounts are from the Information Services Budget 0 200,000 400,000 600,000 800,000 1,000,000 1,200,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Technology Rental Fund Current Year Budget Prior Year 0 200,000 400,000 600,000 800,000 1,000,000 1,200,000 1,400,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Finance Current Year Budget Prior Year 7.5.a Packet Pg. 386 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 28 City Attorney Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 70,623$ 70,623$ 46,119$ -34.70% February 141,247 70,623 136,648 -3.26% March 211,870 70,623 204,972 -3.26% April 282,493 70,623 273,297 -3.26% May 353,117 70,623 341,621 -3.26% June 423,740 70,623 409,945 -3.26% July 494,363 70,623 478,269 -3.26% August 564,986 70,623 546,593 -3.26% September 635,610 70,623 614,917 -3.26% October 706,233 70,623 683,242 -3.26% November 776,856 70,623 751,566 -3.26% December 847,480 70,623 819,890 -3.26% Police Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 889,068$ 889,068$ 871,900$ -1.93% February 1,784,246 895,177 1,788,816 0.26% March 2,672,941 888,695 2,679,788 0.26% April 3,565,257 892,316 3,574,389 0.26% May 4,451,291 886,034 4,462,692 0.26% June 5,370,025 918,734 5,383,779 0.26% July 6,283,947 913,922 6,300,042 0.26% August 7,183,331 899,385 7,201,730 0.26% September 8,094,615 911,283 8,115,348 0.26% October 9,104,818 1,010,204 9,128,139 0.26% November 10,340,935 1,236,117 10,367,422 0.26% December 11,294,351 953,416 11,323,280 0.26% *The monthly budget forecast columns are based on a five-year average. 2018 City of Edmonds, WA Monthly Expenditure Report-City Attorney 2018 City of Edmonds, WA Monthly Expenditure Report-Police 0 100,000 200,000 300,000 400,000 500,000 600,000 700,000 800,000 900,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC City Attorney Current Year Budget Prior Year 0 1,000,000 2,000,000 3,000,000 4,000,000 5,000,000 6,000,000 7,000,000 8,000,000 9,000,000 10,000,000 11,000,000 12,000,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Police Current Year Budget Prior Year 7.5.a Packet Pg. 387 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 29 Development Services Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 229,796$ 229,796$ 175,855$ -23.47% February 476,824 247,028 378,818 -20.55% March 741,769 264,945 589,308 -20.55% April 981,744 239,975 779,958 -20.55% May 1,244,897 263,153 989,023 -20.55% June 1,493,252 248,355 1,186,332 -20.55% July 1,748,980 255,728 1,389,498 -20.55% August 2,027,962 278,982 1,611,138 -20.55% September 2,283,249 255,287 1,813,955 -20.55% October 2,560,699 277,450 2,034,378 -20.55% November 2,848,669 287,970 2,263,159 -20.55% December 3,144,570 295,901 2,498,241 -20.55% Parks & Recreation Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 289,086$ 289,086$ 258,749$ -10.49% February 591,117 302,031 530,383 -10.27% March 912,673 321,556 818,901 -10.27% April 1,231,231 318,558 1,104,728 -10.27% May 1,578,687 347,456 1,416,485 -10.27% June 1,924,949 346,262 1,727,171 -10.27% July 2,399,547 474,598 2,153,006 -10.27% August 2,939,948 540,401 2,637,884 -10.27% September 3,316,363 376,415 2,975,624 -10.27% October 3,650,261 333,898 3,275,216 -10.27% November 3,951,786 301,524 3,545,760 -10.27% December 4,348,100 396,314 3,901,355 -10.27% *The monthly budget forecast columns are based on a five-year average. 2018 City of Edmonds, WA Monthly Expenditure Report-Development Services 2018 City of Edmonds, WA Monthly Expenditure Report-Parks & Recreation -100,000 200,000 500,000 800,000 1,100,000 1,400,000 1,700,000 2,000,000 2,300,000 2,600,000 2,900,000 3,200,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Development Services Current Year Budget Prior Year 0 500,000 1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 3,500,000 4,000,000 4,500,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Parks & Recreation Current Year Budget Prior Year 7.5.a Packet Pg. 388 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 30 Public Works Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 42,035$ 42,035$ 42,488$ 1.08% February 85,654 43,620 84,736 -1.07% March 128,689 43,035 127,309 -1.07% April 171,578 42,889 169,738 -1.07% May 214,645 43,067 212,343 -1.07% June 257,701 43,056 254,938 -1.07% July 301,222 43,521 297,992 -1.07% August 343,666 42,444 339,981 -1.07% September 384,825 41,159 380,698 -1.07% October 426,961 42,136 422,383 -1.07% November 469,006 42,045 463,976 -1.07% December 514,048 45,042 508,536 -1.07% Facilities Maintenance Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 164,689$ 164,689$ 133,250$ -19.09% February 332,420 167,731 273,490 -17.73% March 509,854 177,434 419,469 -17.73% April 679,027 169,173 558,652 -17.73% May 851,467 172,439 700,522 -17.73% June 1,002,627 151,161 824,885 -17.73% July 1,200,111 197,483 987,360 -17.73% August 1,359,814 159,704 1,118,751 -17.73% September 1,542,717 182,903 1,269,230 -17.73% October 1,711,435 168,718 1,408,038 -17.73% November 1,898,800 187,365 1,562,188 -17.73% December 2,100,163 201,363 1,727,854 -17.73% *The monthly budget forecast columns are based on a five-year average. 2018 City of Edmonds, WA Monthly Expenditure Report-Public Works 2018 City of Edmonds, WA Monthly Expenditure Report-Facilities Maintenance 0 100,000 200,000 300,000 400,000 500,000 600,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Public Works Current Year Budget Prior Year 0 200,000 400,000 600,000 800,000 1,000,000 1,200,000 1,400,000 1,600,000 1,800,000 2,000,000 2,200,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Facilities Maintenance Current Year Budget Prior Year 7.5.a Packet Pg. 389 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 31 Engineering Cumulative Monthly YTD Variance Budget Forecast Budget Forecast Actuals % January 198,227$ 198,227$ 164,481$ -17.02% February 393,972 195,745 334,182 -15.18% March 606,539 212,567 514,490 -15.18% April 823,792 217,253 698,772 -15.18% May 1,030,869 207,078 874,423 -15.18% June 1,250,453 219,584 1,060,682 -15.18% July 1,460,494 210,041 1,238,847 -15.18% August 1,682,651 222,157 1,427,289 -15.18% September 1,896,727 214,076 1,608,876 -15.18% October 2,116,435 219,708 1,795,241 -15.18% November 2,330,526 214,090 1,976,841 -15.18% December 2,571,204 240,678 2,180,994 -15.18% *The monthly budget forecast columns are based on a five-year average. City of Edmonds, WA Monthly Expenditure Report-Engineering 2018 0 300,000 600,000 900,000 1,200,000 1,500,000 1,800,000 2,100,000 2,400,000 2,700,000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Engineering Current Year Budget Prior Year 7.5.a Packet Pg. 390 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 32 INVESTMENT PORTFOLIO SUMMARY Years Agency/Investment Purchase to Par Market Maturity Coupon Issuer Type Price Maturity Value Value Date Rate FFCB Bonds 995,820 0.38 1,000,000 995,682 07/18/18 0.75% FFCB Bonds 2,010,790 0.83 2,000,000 1,992,248 12/28/18 1.42% FFCB Bonds 2,000,000 0.91 2,000,000 1,986,898 01/25/19 1.23% FICO Bonds 1,009,725 1.15 1,035,000 1,011,893 04/25/19 1.42% FNMA Bonds 999,750 1.29 1,000,000 990,187 06/13/19 1.40% FHLB Bonds 1,000,400 1.31 1,000,000 989,076 06/20/19 1.40% FHLMC Bonds 995,970 1.59 1,000,000 983,979 10/02/19 1.25% FNMA Bonds 1,994,310 1.66 2,000,000 1,968,348 10/28/19 1.35% FNMA Bonds 997,300 2.08 1,000,000 981,276 03/30/20 1.38% FHLB Bonds 2,003,780 2.08 2,000,000 1,962,990 03/30/20 1.45% FNMA Bonds 2,000,000 2.08 2,000,000 1,972,906 03/30/20 1.65% FHLMC Bonds 2,003,868 2.16 2,000,000 1,963,820 04/28/20 1.35% FNMA Bonds 1,000,000 2.34 1,000,000 971,027 06/30/20 1.38% FNMA Bonds 1,000,000 2.34 1,000,000 971,027 06/30/20 1.38% FHLB Bonds 3,000,000 2.37 3,000,000 2,921,043 07/13/20 1.20% RFCS Bonds 1,999,698 2.38 2,120,000 2,005,842 07/15/20 1.60% FHLB Bonds 2,000,000 2.42 2,000,000 1,972,476 07/30/20 1.75% FNMA Bonds 1,000,000 2.50 1,000,000 976,122 08/28/20 1.40% FNMA Bonds 1,000,000 2.50 1,000,000 976,122 08/28/20 1.40% FHLMC Bonds 999,500 2.84 1,000,000 979,699 12/30/20 1.75% FNMA Bonds 2,005,474 2.89 2,000,000 1,926,482 01/19/21 1.50% FM Bonds 2,000,000 3.09 2,000,000 1,952,708 04/01/21 1.87% FHLB Bonds 2,000,000 3.32 2,000,000 1,972,280 06/22/21 2.18% FHLMC Bonds 2,000,000 3.75 2,000,000 1,966,416 11/26/21 2.13% FHLMC Bonds 999,400 3.84 1,000,000 974,573 12/30/21 2.00% FHLMC Bonds 1,000,000 3.99 1,000,000 987,358 02/25/22 2.15% TOTAL SECURITIES 40,015,786 2.2 40,155,000 39,352,478 Washington State Local Gov't Investment Pool 8,394,069 8,394,069 Demand 1.47% Snohomish County Local Gov't Investment Pool 8,861,211 8,861,211 Demand 1.53% TOTAL PORTFOLIO 57,410,280$ 56,607,758$ As of February 28, 2018 City of Edmonds Investment Portfolio Detail RFCS, 5% FHLMC, 20% FFCB, 12% FICO, 3%FHLB, 25% FM, 5% FNMA, 30% Issuer Diversification Checking, $2.8 , 5% State LGIP, $8.4 , 14% County LGIP, $8.9 , 15% Bonds, $40.2 , 66% Cash and Investment Balances (in $ Millions) 7.5.a Packet Pg. 391 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 33 INVESTMENT PORTFOLIO SUMMARY $74,830 $163,214 $335,926 $423,816 $653,690 $158,739 $- $100,000 $200,000 $300,000 $400,000 $500,000 $600,000 $700,000 $800,000 2013 2014 2015 2016 2017 YTD 2018 Annual Interest Income 0.0%0.1%0.2%0.3%0.4%0.5%0.6%0.7%0.8%0.9%1.0%1.1%1.2%1.3%1.4%1.5%1.6%1.7%1.8%1.9%2.0% March May July September November January Edmonds Rate of Return Compared to Benchmark (Rolling 12 months) 6 Month Treasury Rate (Benchmark)City Blended Rate 0.00% 0.50% 1.00% 1.50% 2.00% 2.50% $- $5,000,000 $10,000,000 $15,000,000 $20,000,000 0-6 Mo 6-12 Mo 12-18 Mo 18-24 Mo 24-30 Mo 30-36 Mo 36-42 Mo 42-48 Mo Maturity Distribution and Rate of Return 7.5.a Packet Pg. 392 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 34 GENERAL FUND OVERVIEW 12/31/2017 1/1/2018 2/28/2018 Q1 YTD 001-General Fund 10,254,267$ 5,788,782$ 7,645,005$ (2,609,262)$ 009-Leoff-Medical Ins. Reserve 417,153 374,490 345,235 (71,918) 011-Risk Management Fund 902,700 906,173 907,257 4,557 012-Contingency Reserve Fund 5,440,511 5,461,442 5,467,974 27,463 014-Historic Preservation Gift Fund 7,357 7,385 7,394 37 016-Building Maintenance (32,823) (53,826) (32,823) - Total General Fund & Subfunds 16,989,165$ 12,484,446$ 14,340,042$ -$ (2,649,123)$ GENERAL FUND & SUBFUNDS FUND BALANCES CHANGE IN FUND BALANCES ---- ACTUAL -------- ACTUAL ---- $16.99 $12.48 $14.34 - 4 8 12 16 20 Dec 2017 Jan 2018 Feb 2018MillionsGeneralFund & Subfunds *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. The beginning fund balances for 2018 are preliminary, these will be updated after the completion of the 2017 Financial Statements. 7.5.a Packet Pg. 393 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 35 GOVERNMENTAL FUNDS OVERVIEW 12/31/2017 1/1/2018 2/28/2018 Q1 YTD General Fund & Subfunds 16,989,165$ 12,484,446$ 14,340,042$ (2,649,123)$ Special Revenue 8,434,678 8,100,782 9,739,105 1,304,427 Debt Service 3,812 3,812 3,812 - Capital Projects 1,544,084 1,558,935 1,593,637 49,553 Total Governmental Funds 26,971,739$ 22,147,976$ 25,676,596$ -$ (1,295,143)$ CHANGE IN FUND BALANCESGOVERNMENTAL FUNDS FUND BALANCES ---- ACTUAL -------- ACTUAL ---- $16.99 $12.48 $14.34 $8.43 $8.10 $9.74 $0.00 $0.00 $0.00 $1.54 $1.56 $1.59 - 4 8 12 16 20 Dec 2017 Jan 2018 Feb 2018Millions General Fund & Subfunds Special Revenue Debt Service Capital Projects Governmental Fund Balances-By Fund GroupGovernmentalFund Balances-By Fund Group $26.97 $22.15 $25.68 - 6 12 18 24 30 Dec 2017 Jan 2018 Feb 2018MillionsGovernmentalFund Balances -Combined *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. The beginning fund balances for 2018 are preliminary, these will be updated after the completion of the 2017 Financial Statements. 7.5.a Packet Pg. 394 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 36 SPECIAL REVENUE FUNDS OVERVIEW 12/31/2017 1/1/2018 2/28/2018 Q1 YTD 104 - Drug Enforcement Fund 692$ (19,283)$ 7,867$ 7,175$ 111 - Street Fund 1,102,078 848,033 960,851 (141,227) 112 - Combined Street Const/Improve 646,550 516,097 1,655,970 1,009,420 117 - Municipal Arts Acquis. Fund 533,207 531,867 538,784 5,577 118 - Memorial Street Tree 18,350 18,421 18,439 89 120 - Hotel/Motel Tax Revenue Fund 82,356 73,491 89,214 6,857 121 - Employee Parking Permit Fund 69,293 77,083 77,860 8,566 122 - Youth Scholarship Fund 15,347 15,399 15,291 (56) 123 - Tourism Promotional Fund/Arts 59,886 63,601 67,611 7,725 125 - Real Estate Tax 2 1,901,003 1,908,304 2,018,457 117,454 126 - Real Estate Excise Tax 1 2,408,253 2,417,297 2,622,827 214,574 127 - Gifts Catalog Fund 265,666 282,451 292,466 26,800 130 - Cemetery Maintenance/Improvement 188,886 188,639 189,413 527 136 - Parks Trust Fund 155,907 156,506 156,694 787 137 - Cemetery Maintenance Trust Fund 938,109 942,835 945,139 7,029 138 - Sister City Commission 7,598 7,627 7,636 38 140 - Business Improvement Disrict 41,495 72,412 74,587 33,092 Total Special Revenue 8,434,678$ 8,100,782$ 9,739,105$ -$ 1,304,427$ GOVERNMENTAL SPECIAL REVENUE FUND BALANCES CHANGE IN FUND BALANCES ---- ACTUAL -------- ACTUAL ---- $8.43 $8.10 $9.74 - 3 6 9 12 15 Dec 2017 Jan 2018 Feb 2018Millions Special Revenue Special Revenue Funds *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. The beginning fund balances for 2018 are preliminary, these will be updated after the completion of the 2017 Financial Statements. 7.5.a Packet Pg. 395 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 37 ENTERPRISE FUNDS OVERVIEW 12/31/2017 1/1/2018 2/28/2018 Q1 YTD 421 - Water Utility Fund 17,309,617$ 17,120,532$ 17,795,724$ 486,106$ 422 - Storm Utility Fund 10,613,813 9,978,318 11,069,690 455,877 423 - Sewer/WWTP Utility Fund 41,320,720 41,096,302 41,971,121 650,401 424 - Bond Reserve Fund 843,960 843,961 843,961 1 411 - Combined Utility Operation - 12,401 22,121 22,121 Total Enterprise Funds 70,088,109$ 69,051,513$ 71,702,616$ -$ 1,614,507$ ENTERPRISE FUNDS FUND BALANCES CHANGE IN FUND ---- ACTUAL -------- ACTUAL ---- $22,121 $17,795,724 $11,069,690 $41,971,121 $843,961 $211,885 0 5,000,000 10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 Combined Utility Water Storm Sewer/WWTP Bond Reserve Firemen's Pension Fund Enterprise and Agency Fund Balances as of February 28, 2018 *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. The beginning fund balances for 2018 are preliminary, these will be updated after the completion of the 2017 Financial Statements. 7.5.a Packet Pg. 396 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 38 SUMMARY OVERVIEW 12/31/2017 1/1/2018 2/28/2018 Q1 YTD Governmental Funds 26,971,739$ 22,147,976$ 25,676,596$ (1,295,143)$ Enterprise Funds 70,088,109 69,051,513 71,702,616 1,614,507 Internal Services Fund 8,655,914 8,691,186 8,841,182 185,267 Agency Funds 226,480 218,324 211,885 (14,596) Total City-wide Total 105,942,243$ 100,108,998$ 106,432,279$ -$ 490,036$ CITY-WIDE FUND BALANCES ---- ACTUAL ---- CHANGE IN FUND BALANCES ---- ACTUAL ---- $1,593,637 $3,812 $74,587 $7,636 $945,139 $156,694 $189,413 $292,466 $2,622,827 $2,018,457 $67,611 $15,291 $77,860 $89,214 $18,439 $538,784 $1,655,970 $960,851 $7,867 $- $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 $3,000,000 $3,500,000 Parks Capital Construction Fund L.I.D. Fund Control Business Improvement District Sister City Commission Cemetery Maintenance Trust Fund Parks Trust Fund Cemetery Maintenance/Improvement Gifts Catalog Fund Real Estate Excise Tax 1, Parks Acq Real Estate Excise Tax 2 Tourism Promotional Fund/Arts Youth Scholarship Fund Employee Parking Permit Fund Hotel/Motel Tax Revenue Fund Memorial Street Fund Municipal Arts Acquis. Fund Combined Street Const/Improve Fund Street Fund Drug Enforcement Fund Governmental Fund Balances (Excluding General Fund) as of February 28, 2018 *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. The beginning fund balances for 2018 are preliminary, these will be updated after the completion of the 2017 Financial Statements. 7.5.a Packet Pg. 397 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) 39 INTERNAL SERVICE FUNDS OVERVIEW 12/31/2017 1/1/2018 2/28/2018 Q1 YTD 511 - Equipment Rental Fund 8,401,805$ 8,474,865$ 8,578,961$ 177,156$ 512 - Technology Rental Fund 254,109 216,321 262,221 8,112 Total Internal Service Funds 8,655,914$ 8,691,186$ 8,841,182$ -$ 185,267$ INTERNAL SERVICE FUNDS FUND BALANCES CHANGE IN FUND BALANCES ---- ACTUAL -------- ACTUAL ---- $8,401,805 $8,474,865 $8,578,961 $254,109 $216,321 $262,221 - 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000 Dec 2017 Jan 2018 Feb 2018 511 - Equipment Rental Fund 512 - Technology Rental Fund Internal Service Fund Balances *Please note that these revenues and expenses occur within annual cycles. This Interim Report is not adjusted for accruals or those annual cycles. The beginning fund balances for 2018 are preliminary, these will be updated after the completion of the 2017 Financial Statements. 7.5.a Packet Pg. 398 Attachment: February 2018 Monthly Financial Report (February 2018 Monthly Financial Report) City Council Agenda Item Meeting Date: 04/10/2018 Proposed Mid-Cycle Building and Fire Code Amendment Staff Lead: Kevin Zweber, Assistance Chief, Fire Prevention Department: Fire Services Preparer: Scott Passey Background/History N/A Staff Recommendation Receive information on the proposed code amendment and consider adoption at future Council meeting. Narrative This proposal is a combined effort of the Fire Marshal and Building Official. The intent of is proposal is to reduce the square footage threshold related to commercial fire sprinklers and fire alarm systems. It also contains changes related to fire department connections, some clarification in the public and private fire hydrant section, and the addition of Appendixes I (Fire protection systems-noncompliant conditions) and L (air systems in high rise structures). Attachments: EDM mid-cycle abreviated proposal TITLE 19 IBC Sprinkler Update 2018 EDM mid-cycle amdmt presentation 8.1 Packet Pg. 399 1 PROPOSED FIRE/BUILDING CODE AMENDMENT Only the sections being modified are shown. Underline is proposed new language, strike through is proposed deleted language. Chapter 19.25 FIRE CODE Sections: 19.25.000 International Fire Code adopted. 19.25.005 Section amendments. 19.25.010 Department of fire prevention. 19.25.015 Definitions. 19.25.020 Permits. 19.25.025 Charges for fire review and inspection. 19.25.030 Modifications, interpretations and appeals. 19.25.035 Automatic sprinkler systems. Fire Protection Systems. 19.25.036 Dwelling fire sprinkler systems and connection fees. 19.25.040 Fire protection water supplies. 19.25.045 Charges for water mains and hydrants. 19.25.050 Mains and service lines. 19.25.055 Location of public hydrants. 19.25.060 Location of private hydrants. 19.25.065 Hydrant specifications. 19.25.070 Penalties. 19.25.000 International Fire Code adopted. Under the statutory authority of RCW 19.27.031 and 19.27.074, the International Fire Code (IFC), 2015 Edition, as published by the International Code Council including amendments set forth in Chapter 51-54A WAC, and subsequently revised by this chapter, is hereby adopted including all referenced standards, Appendix B, and C., I, and L. 19.25.005 Section amendments. C. Chapter 5, Fire Service Features. Section 503 Fire Apparatus Access Roads. The following sections are adopted as originally set forth in the IFC with the exception of 503.2.2: 1. Section 503.1 Where required. 2. Section 503.1.1 Buildings and facilities. 8.1.a Packet Pg. 400 Attachment: EDM mid-cycle abreviated proposal (Proposed Mid-Cycle Building and Fire Code Amendment) 2 3. Section 503.1.2 Additional access. 4. Section 503.1.3 High-piled storage. 5. Section 503.2 Specifications. 6. Section 503.3 Marking. 7. Section 503.4 Obstruction of fire apparatus access roads. Section 503.2.2 is amended to read: Authority. The fire code official shall have the authority to require an increase in the minimum access widths where they are inadequate for fire or rescue operations, and the authority to decrease the minimum access widths where other fire protection features are provided. 8. Section 507.5.1.1 is amended to read: Hydrants for sprinkler and standpipe systems. Buildings equipped with a Fire Department Connection (FDC) shall have a fire hydrant within 50 feet of the FDC or as approved by the fire code official. D. Chapter 9, Fire Protection Systems 1. Section 903.2 is amended to read: Where Required. Approved automatic fire sprinkler systems in new and existing buildings and structures shall be provided in the locations in sections 903.2.1 through 903.2.13. 2. Section 903.2.13 is added. Automatic fire sprinkler systems shall be provided as required by ECDC 19.25.035A. 3. Section 903.3.7 is amended to read: Fire department connections shall be installed in accordance with Section 912 and ECDC 19.25.035B. 4. Section 907.2 is amended to read: Where required – New and existing buildings and structures. An approved fire alarm system installed in accordance with this code and NFPA 72 shall be provided in Sections 907.2.1 through 907.2.24 and provide occupant notification in accordance with Section 907.5, unless other requirements are provided by another section of this code. 5. Section 907.2.24 is added. Fire alarm and detection system shall be provided as required by ECDC 19.25.035C. DE. Chapter 36, Marinas. Replaced in entirety by Chapter 19.65 ECDC. EF. Chapter 56, Explosives and Fireworks. Section 5601.1.3 Fireworks. Replaced by Chapter 5.27 ECC. FG. Chapter 57 Flammable and Combustible Liquids. Sections 5704.2.9.6.1 (outside) and 5706.2.4.4 (inside) Locations where above-ground tanks are prohibited. Class I and II flammable liquids in aboveground storage tanks are restricted for the protection of residential districts and shall be no more than 1,000 gallons capacity in residential zones designated by the city. GH. Chapter 61 Liquefied Petroleum Gases. Section 6104.2 Maximum capacity within established limits. The maximum capacity for each installation is restricted for the protection of residential districts within the city and shall be no more than 500 gallons water capacity in residential zones designated by the city. 8.1.a Packet Pg. 401 Attachment: EDM mid-cycle abreviated proposal (Proposed Mid-Cycle Building and Fire Code Amendment) 3 [Ord. 3926 § 1 (Exh. A), 2013; Ord. 3798 § 1, 2010]. 19.25.035 Fire Protection Systems. Automatic sprinklers systems. An automatic sprinkler system shall be installed and maintained throughout every building constructed under the International Residential Code containing five or more attached dwelling units Residential or quick response standard sprinkler heads shall be used in accordance with their approved listing in the dwelling. [Ord. 3926 § 1 (Exh. A), 2013; Ord. 3798 § 1, 2010]. A. Automatic Fire Sprinklers: In addition to the requirements of Section 903.2, an approved automatic fire sprinkler system shall be installed and maintained throughout all buildings, structures, floors, and suites described in this section. If conflicts exist between the IFC and this section, this section shall prevail. All sprinklers shall be installed per the applicable NFPA and South County Fire’s (SCF) fire sprinkler standard. For the purposes of 19.25.035, spaces separated by fire walls, fire barriers, fire partitions and fire-resistance-rated horizontal assemblies noted in IBC Chapter 7 shall not be considered to be separate buildings. Partial area automatic sprinkler systems are prohibited except where approved by the fire code official. 1. In every building constructed under the International Residential Code containing five or more attached dwelling units. One and two family dwellings located 500 or greater feet from a public or private hydrant. Residential or quick response standard sprinkler heads shall be used in accordance with their approved listing in the dwelling. 2. In all new buildings and structures with a fire area of 5,000 or greater square feet, regardless of type or use. 3. In existing buildings, structures, or suites that undergo an addition where the new total fire area is 5,000 square feet or greater. Exception: One and two family dwellings. 4. When required by the International Existing Building Code (IEBC) for existing buildings and structures undergoing additions, alteration, repairs, or changes of occupancy. The classification of work level shall be determined by the building and fire code official. 5. In existing buildings, structures, or suites having an existing automatic fire sprinkler system that does not protect all areas, when the unprotected areas undergo an alteration, repair, modification, or similar improvement requiring a building permit, those unprotected areas shall be provided with protection as approved by the fire code official. 6. Where required fire access road grade is 12 percent or greater. 7. When adequate fire protection is not available for vehicles parked in an open-air parking garage from fire apparatus at street level, approved dry standpipes shall be installed. B. Fire Department Connections (FDC): 1. FDCs shall be installed remote from the building, out of the collapse zone, in an approved location along a public street or fire apparatus access road and within 50 feet of a fire hydrant or as approved by the fire code official. Exception: In the downtown core, where a building fronts a public sidewalk, FDC’s shall be located on the face of the building. 8.1.a Packet Pg. 402 Attachment: EDM mid-cycle abreviated proposal (Proposed Mid-Cycle Building and Fire Code Amendment) 4 2. FDC’s shall be installed in accordance with the applicable NFPA and SCF’s fire sprinkler standard. C. Fire Alarms and Detection Systems: In addition to the requirements of Section 907.2, an approved, monitored automatic fire alarm system shall be installed and maintained throughout all buildings, structures, floors, and suites described in this section. If conflicts exist between the IFC and this section, this section shall prevail. Fire alarm systems shall be installed per NFPA 72 and SCF’s fire alarm standard. Partial area fire alarm systems are prohibited except where approved by the fire code official. Exception: Structures regulated by the International Residential Code. 1. In all new buildings and structures with a fire area of 3,000 or greater square feet, regardless of type or use. 2. In existing buildings and structures that undergo an addition where the new total fire area is 3,000 square feet or greater. 3. When required by the International Existing Building Code (IEBC) for existing buildings and structures undergoing additions, alterations, repairs or changes of occupancy. The classification of work level shall be determined by the building and fire code official. 4. In existing buildings, structures or suites having an existing fire alarm system that does not protect all areas, when the building, structure, or suite undergoes an alteration, repair, modification, or similar improvement requiring a building permit, unprotected areas shall be provided with protection as approved by the fire code official. 5. In existing buildings, structures, suites, or areas that undergo additions, alterations, repair or modification that have fire sprinkler protection and lacks a fire alarm system. 6. In building or suite provided with a fire alarm system, fire detection system, or supervised sprinkler system, but lacks adequate occupant notification appliances, audio/visual devices shall be installed as required by NFPA 72 and SCF’s fire alarm standard. Systems and their components shall be listed and approved for the purpose for which they are installed. All new alarm systems shall be addressable and each device shall have its own address and shall annunciate individual addresses to an approved central station. All means of communication between the FACP and the central station shall be of a method approved by the fire code official and be provided with a minimum of 24 hours standby power. Only components that are serviceable by a fire alarm technician shall be part of the means of communication located on the protected premises. The fire code official shall maintain a list of approved communication means. Partial area fire alarm and detection systems are prohibited except where approved by the fire code official. D. Systems out of service. For the first 48 hours, the owner may provide a competent adult to serve as a fire watch. After the initial 48 hours, the fire watch must be provided by a licensed and bonded private security company until the system is returned to full service. The owner must furnish the fire 8.1.a Packet Pg. 403 Attachment: EDM mid-cycle abreviated proposal (Proposed Mid-Cycle Building and Fire Code Amendment) 5 marshal with the name and contact information of the competent adult and/or security company within eight hours of implementing a fire watch. Fire watch must comply with SCF’s fire watch standard. 19.25.055 Location of public hydrants. A. Public hydrants are those owned by the city. B. All public fire hydrants shall be installed at street intersections where possible. Public hydrant spacing shall be measured along vehicle access routes. C. In areas zoned for one and two single-family residential use, public hydrants shall have a maximum lateral spacing of 600 feet with no lot or parcel in excess of 300 feet from a fire hydrant. be spaced no more than 600 feet apart. If dead-end streets, or driveways, singly or in combination, are over 300 feet long, additional public hydrant(s) shall be installed so that the public hydrant spacing is not over 600 feet. D. In areas other than one and two single-family residential, public fire hydrants shall have a maximum lateral spacing of 300 feet with no structure in excess of 150 feet from a fire hydrant. be spaced an average of 300 feet apart. If dead-end streets, or driveways, singly or in combination, are over 150 feet long, additional public hydrant(s) shall be installed so that the public hydrant spacing is not over 300 feet. [Ord. 3926 § 1 (Exh. A), 2013; Ord. 3798 § 1, 2010]. 19.25.060 Location of private hydrants. A. A private hydrant is privately owned, but is subject to the use of by the city for inspection and testing at reasonable times, and for fire suppression at any time. All private hydrants shall be connected to the city water main through a privately owned and maintained double detector check valve assembly. B. All buildings except one single and two-family dwellings that are located so that a portion is more than 200 feet from a street, as measured along vehicle access routes, shall have private fire hydrants located at the building. Single One and two-family dwellings with a fire-flow calculation area greater than 4,800 square feet may require a private hydrant. C. Buildings having required fire flows of 3,000 gallons per minute may have fire hydrants on one side of the building only. There shall never be fewer than two fire hydrants for any building larger than 5,000 square feet in the first floor area including covered parking and storage. When the required fire flow is 3,000 gallons per minute or greater, the fire hydrants shall be served by a looped main around the building or complex of buildings. D. Fire hydrants shall be spaced on an average 300 feet around the perimeter line, 50 feet out of the buildings. All hydrants shall be placed in locations accessible to fire department vehicles adjacent to fire apparatus access roads. The fire marshal shall determine the location of fire hydrants depending on utility, topography and building location for maximum fire protection. [Ord. 3926 § 1 (Exh. A), 2013; Ord. 3798 § 1, 2010]. ADDITIONAL INFORMATION FIRE SPRINKLER TAX DEDUCTIONS • Cost Recover Section 13201 – Previously sprinkler systems in commercial structures were depreciated over a 39-year time horizon and residential structures over 27.5 years. Under the 8.1.a Packet Pg. 404 Attachment: EDM mid-cycle abreviated proposal (Proposed Mid-Cycle Building and Fire Code Amendment) 6 new law any sprinkler system installed after September 27, 2017 in either a commercial or residential structure until December 31, 2022 will be able to be fully expensed. Therefore, the property owner will be able to immediately write off the full cost of the sprinkler system. After 2022 the ability to deduct the cost is as follows: 2023 80% 2024 60% 2025 40% 2026 20% 2027 The depreciation schedule will revert back to 39 and 27.5 years for commercial and residential properties (respectively) • Small Business Section 179 Expensing – Previously qualified small businesses were allowed to fully expense purchases such as computers, equipment and light duty vehicles up to an annual cap of $500,000. Under the new law Congress has added fire protection as an eligible expenditure under section 179 of the tax code. Congress also increased the cap to $1 million as the amount that a small business can deduct in a single year. This provision applies only to commercial structures and cannot be used for retrofitting sprinklers into residential structures. However, critical occupancies such as entertainment venues could easily be done under this provision. This change is also a permanent law and unlike section 13201 is not gradually phased out over time. 8.1.a Packet Pg. 405 Attachment: EDM mid-cycle abreviated proposal (Proposed Mid-Cycle Building and Fire Code Amendment) 19.00.025 (Revised ) 19-10 gutters, sidewalks, paved streets, water lines, sewer lines, and storm drainage have been signed as approved by the city engineer. 3. With such phased approval, a performance bond shall be posted with the city pursuant to Chapter 17.10 ECDC, to cover the estimated cost of construction to city standards for the improvements. L. Section 110.3.3, Lowest floor elevation, is amended to read: In flood hazard areas, upon placement of the lowest floor, including the basement, and prior to further vertical construction, the elevation certification required in Section 1612.5 shall be submitted to the building official. Prior to final inspection approval, the building official shall require an elevation certificate based on finished construction prepared and sealed by a State licensed land surveyor. M. Section 113, Board of Appeals, is deleted and replaced by Chapter 19.80 ECDC. N. Section 501.2, Address Identification, is amended to read: Approved numbers or addresses shall be installed by the property owner for new and existing buildings in such a position as to be clearly visible and legible from the street or roadway fronting the property. Letters or numbers on the building shall be a minimum six (6) inches in height and stroke a minimum of .75 inch of a contrasting color to the building base color. Where public or private access is provided and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. This means of premises identification does not preclude approved identification also affixed to structure. O. Section 903.2 is amended to read: Where Required. Approved automatic fire sprinkler systems in new buildings and structures shall be provided in the locations described in Sections 903.2.1 through 903.2.13. P. Section 903.2.13 is added. Automatic fire sprinkler systems shall be provided as required by ECDC 19.25.035A. Q. Section 903.3.7 is amended to read: Fire department connections shall be installed accordance with Section 912 and ECDC 19.25.035B. R. Section 907.2 is amended to read: Where required – new buildings and structures. An approved fire alarm system installed in accordance with this code and NFPA 72 shall be provided in new buildings and structures in accordance with Sections 907.2.1 through 907.2.24 and provide occupant notification in accordance with Section 907.5, unless other requirements are provided by another section of this code. S. Section 907.2.24 is added. Fire alarm and detection system shall be provided as required by ECDC 19.25.035C. T. Section 1612.1.1, Residential Structures, is added and reads: Construction or reconstruction of residential structures is prohibited within designated floodways, except for (i) repairs, reconstruction, or improvements to a structure which do not increase the ground floor area; and (ii) repairs, reconstruction or improvements to a structure, the cost of which does not exceed 50 percent of the market value of the structure either, (A) before the repair, or reconstruction is started, or (B) if the structure has been damaged, and is being restored, before the damage occurred. Any project for improvement of a structure to correct existing violations of State or local health, sanitary, or safety code specifications which have been identified by the local code enforcement official and which are the minimum 8.1.b Packet Pg. 406 Attachment: TITLE 19 IBC Sprinkler Update 2018 (Proposed Mid-Cycle Building and Fire Code Amendment) Edmonds Community Development Code 19.00.025 19-11 (Revised ) necessary to assure safe living conditions, or to structures identified as historic places, may be excluded from the 50 percent calculation. U. Section 1612.4.1, Lowest Floor Elevation, is added and reads: For buildings in all structure categories located in the Coastal High Hazard Areas and Coastal A Flood Zones, the elevation of the lowest floor shall be a minimum of two feet above the base flood elevation, as determined from the applicable FEMA flood hazard map. U. Section 3108.1.1, Radio, television and cellular communication related equipment and devices, is added and reads: A permit shall be required for the installation or relocation of commercial radio, television or cellular tower support structures including monopoles, whip antennas, panel antennas, para- bolic antennas and related accessory equipment, and accessory equipment shelters (regardless of size) including roof mounted equipment shelters. W. Section 3109.2, Applicability and maintenance, is added and reads: 1. Swimming pools, hot tubs and spas of all occupancies shall comply with the requirements of this section and other applicable sections of this code. 2. It is the responsibility of the owner to maintain a swimming pool, hot tub or spa in a clean and sanitary condition and all equipment shall be maintained in a satisfactory operating condition when the swimming pool, hot tub or spa is in use. A swimming pool, hot tub or spa that is neglected, not secured from public entry and/or not maintained in a clean and sanitary condition or its equipment in accord with manufacturers recommendations shall be determined to be a hazard to health and safety and shall be properly mitigated to the satisfaction of the building official. X. Section 3109.3, Location and Setbacks, is added and reads: Swimming pools, hot tubs and spas shall meet requirements of the zoning code of the city of Edmonds. 1. Minimum setbacks are measured from property lines to the inside face of the pool, hot tub or spa as required by the zoning code for accessory structures. 2. All other accessory buildings and equipment shall meet the normally required setbacks for accessory structures in the zone in which they are located. Y. Section 3109.4, Tests and cross-connection devices, is added and reads: 1. All swimming pool, hot tub and spa piping shall be inspected and approved before being covered or concealed. 2. Washington State Department of Health approved cross connection devices are required to be provided on potable water systems when used to fill any swimming pool, hot tub or spa. Z. Section 3109.5, Wastewater disposal, is added and reads: 8.1.b Packet Pg. 407 Attachment: TITLE 19 IBC Sprinkler Update 2018 (Proposed Mid-Cycle Building and Fire Code Amendment) 19.00.025 (Revised ) 19-12 A means of disposal of the total contents of the swimming pool, hot tub or spa (including partial or periodic emptying) shall be reviewed and approved by the public works director. 1. No direct connection shall be made between any swimming pool, hot tub or spa to any storm drain, city sewer main, drainage system, seepage pit, underground leaching pit, or sub-soil drain. 2. A sanitary tee (outside cleanout installed on the main building side sewer line) shall be provided for draining of treated water into the city sanitary sewer system. AA. Section 3109.9, Inspection requirements, is added and reads: The appropriate city inspector shall be notified for the following applicable inspections: 1. Footing, wall, pre-form, pre-gunite, erosion control, underground plumbing, sanitary extension and cleanout, mechanical pool equipment, gas piping, mechanical enclosure location, cross connection and final inspection. 2. An initial cross connection control installation inspection is required by the city cross connection control specialist prior to final installation approval. 3. All backflow assemblies shall be tested by state certified backflow assembly testers upon initial installation and then annually thereafter. Copies of all test reports shall be submitted to the city water division for review and approval. BB. Appendix E, Accessibility Requirements, is amended by deleting Sections E107, E108, E110 and E111. CC. Appendix G, Flood-Resistant Construction, is amended by addition of new section: Section G301.1(4) Where base flood elevation data has not been provided or is not available from another authoritative source, it shall be generated for subdivision proposals and other proposed developments which contain at least 50 lots or 5 acres, whichever is less. DD. Appendix H, Signs, is amended as follows: 1. Section H101.2, Signs exempt from permits, is replaced by subsection (E)(1)(p) of this section. 2. Section H101.2.1, Prohibited signs, is added and reads as follows: a. It is unlawful for any person to advertise or display any visually communicated message, by letter or pictorially, of any kind on any seating bench, or in direct connection with any bench. b. All signs not expressly permitted by Chapter 20.60 ECDC. c. Signs which the city engineer determines to be a hazard to vehicle or pedestrian traffic because they resemble or obscure a traffic control device, or pose a hazard to a pedestrian walkway or because they obscure visibility needed for safe traffic passage. Such signs shall be immediately removed at the request of the city engineer. 8.1.b Packet Pg. 408 Attachment: TITLE 19 IBC Sprinkler Update 2018 (Proposed Mid-Cycle Building and Fire Code Amendment) CITY OF EDMONDS Department of Fire Prevention Building Department Proposed Code Amendment Kevin Zweber –Assistant Chief-Fire Prevention, Fire Marshal Leif Bjorback –Building Official April 10, 2018 presentation to the Edmonds City Council Public Safety Committee 8.1.c Packet Pg. 409 Attachment: EDM mid-cycle amdmt presentation (Proposed Mid-Cycle Building and Fire Presentation Key Points •Objectives. •Overview. •Commercial automatic fire sprinkler systems. •Fire department connections (FDCs). •Automatic fire alarm and detection systems. •Public and private fire hydrants. •General information. •Informational video. •Comparison chart of numerous jurisdictions. •Conclusion. 2 8.1.c Packet Pg. 410 Attachment: EDM mid-cycle amdmt presentation (Proposed Mid-Cycle Building and Fire Objectives •Educate the City Council in the area of commercial fire sprinklers and fire alarms requirements. •Introduce proposed code amendments (both International Building (IBC) and Fire Codes IFC)). 3 8.1.c Packet Pg. 411 Attachment: EDM mid-cycle amdmt presentation (Proposed Mid-Cycle Building and Fire Overview For many years, the Building and Fire Codes have required automatic fire sprinklers and fire alarms: -Commercial fire sprinkler requirements are based on building size and/or occupancy type. -Fire alarm system requirements are based on occupancy type, occupant load, and the proximity of exits. State and local jurisdictions have the authority to amend, add, or replace portions of the International Codes for local control. This proposal would lower the threshold for commercial fire sprinklers and fire alarms: -Commercial fire sprinkler threshold would be lowered in many cases from 12,000 sf to 5,000 sf. -Fire alarm threshold would be set at 3,000 sqft. This proposal would also: -Adopt two additional appendices in the IFC, one related to sprinkler maintenance and the other related to fire protection features in high rise buildings. -Modify private and public hydrant spacing language. -Reduce the distance between a fire department connection and its dedicated fire hydrant.4 8.1.c Packet Pg. 412 Attachment: EDM mid-cycle amdmt presentation (Proposed Mid-Cycle Building and Fire Overview Continued The proposed fire sprinkler requirement would only affect a small number of new buildings, those between 5,000 and 12,000 square feet, and affect a smaller number of existing buildings (at the time of addition or renovation). Fire sprinklers are relatively inexpensive compared to the total cost of a building: Approximately $2.50 -$6.50 per square foot depending on the size and type of system. The City's general facility charge does not apply to commercial fire sprinkler connections. The proposed fire alarm requirement would only affect those structures or occupancies that are from 3,000 to 5,000 square feet (if fire sprinkler portion is adopted). This proposal does not affect the following occupancies because sprinklers are already required: -Large mixed use buildings. -Apartments or condos. -Schools. -High-hazard, institutional, and large medical/mercantile or business occupancies. This proposal does not affect one and two family dwellings except where the structure is over 500’ from a fire hydrant. This is an alternative to requiring additional fire hydrant(s) which are very expensive to install. 5 8.1.c Packet Pg. 413 Attachment: EDM mid-cycle amdmt presentation (Proposed Mid-Cycle Building and Fire Automatic Fire Sprinkler Systems WHAT ARE THEY? A system of pipes installed throughout a building, connected to the public water supply that is always ready to extinguish a fire. HOW DO THEY WORK? Sprinkler heads are designed to activate at different temperatures. When a head reaches the design temperature, the head releases and water flows across the deflector thereby controlling or extinguishing the fire. Unlike Hollywood, when a fire sprinkler activates, only the sprinkler head(s) closest to the fire activate. If the fire continues to grow, additional fire sprinklers activate. 6 8.1.c Packet Pg. 414 Attachment: EDM mid-cycle amdmt presentation (Proposed Mid-Cycle Building and Fire The Benefits Of Fire Sprinklers Enhance the overall life safety of occupants and reduces property loss. Reduce environmental contamination of both the air and water. Reduces the impacts of fire on our community. 70% of businesses that experience a fire do not reopen. Fire sprinklers are 98% effective if maintained. Fire sprinklers not only reduce the size of fires, they also activate the fire alarm system which provides notificationto building occupants and provides early notification to fire resources. Reduces out of service times of fire apparatus and personnel, thereby making them available for other emergency responses. Reduces insurance premiums. Tax deductible under the new Tax Cuts and Jobs Act of 2017. 7 8.1.c Packet Pg. 415 Attachment: EDM mid-cycle amdmt presentation (Proposed Mid-Cycle Building and Fire Fire Department Connections (FDC) WHAT ARE THEY? A dry piping system that supplements afire sprinkler and/or standpipe system. HOW DO THEY WORK? When the fire truck arrives to a sprinkled building, a hose connection is made from the fire truck to the FDC and from the fire truck to the fire hydrant. The water is pumped through the Fire Engine to the FDC (at a higher pressure) which boosts the pressure in the sprinkler and/or standpipe system. The IFC currently allows the FDC to be 100’ from the fire hydrant. When an FDC is 50’ or less from a fire hydrant, one firefighter can make the connections. Any greater distance requires additional personnel. This code change has minimal impacts;it is simply a matter of coordinating the hydrant and FDC location at the time of installation. 8 8.1.c Packet Pg. 416 Attachment: EDM mid-cycle amdmt presentation (Proposed Mid-Cycle Building and Fire Automatic Fire Alarm and Detection Systems WHAT ARE THEY? A system of electrical components that detects a hazardous condition, notifies the occupants, and transmits an alarm. HOW DO THEY WORK? System activation is via a smoke/heat detector, manual pull stations, or water flow switches. System receives signals from the detection devices, activates the building notification system (horns and strobes). Transmits the alarm to a monitoring company. Shuts down or activates key building features to assist in the confinement of fire, protects occupant egress paths, and firefighting operations. These include: elevators shut down, automatic closing of fire doors, the opening/closing of HVAC dampers, and the activation of smoke control systems. 9 8.1.c Packet Pg. 417 Attachment: EDM mid-cycle amdmt presentation (Proposed Mid-Cycle Building and Fire The Benefits Of Automatic Fire Alarm AND Detection Systems Early detection of smoke and/or heat. Alerts the occupants to exit the building. Notifies fire resources, reducing response times thereby reducing damage. Reliable and dependable. Reduces insurance premiums. 10 8.1.c Packet Pg. 418 Attachment: EDM mid-cycle amdmt presentation (Proposed Mid-Cycle Building and Fire Public & Private Fire Hydrants •A public fire hydrant is owned and maintained by the City. Our proposal makes minor changes to ECDC 19.25.055. This proposal has updated code language and is easier to understand. •A private fire hydrant is privately owned, but is subject to the use of the City at any time for testing, inspection, and fire suppression. Our proposal makes minor changes to ECDC 19.25.060. This proposal has updated code language that is easier to understand. 11 8.1.c Packet Pg. 419 Attachment: EDM mid-cycle amdmt presentation (Proposed Mid-Cycle Building and Fire VIDEO We will skip to the specific times indicated. https://www.youtube.com/watch?v=TNEXZVKl5Vs&feature=youtu.be 00:17 seconds, signs of fire. 01:16 –enough smoke to activate the alarm IF the building had smoke detection. 12:30 minutes –sprinkler activation, flow switch and/or local alarm (assumed no monitoring). 16:54 minutes –noticed by a civilian, 911? 21:02 minutes –Firefighter in hallway. EARLY DETECTION + NOTIFICATION + FIRE SUPPRESSION = GREATER LEVEL OF LIFE SAFETY & LESS DAMAGE 12 8.1.c Packet Pg. 420 Attachment: EDM mid-cycle amdmt presentation (Proposed Mid-Cycle Building and Fire What Do Other Cities Do? Jurisdiction Fire Sprinkler Fire Alarm Townhome Area Threshold Threshold Threshold Separation (sqft)(sqft)(sqft)Allowed? City of Bothell 6,000 6,000 6,000 No City of Everett 5,000 3,000 5,000 No City of Kenmore 5,000 3,000 All No City of Kirkland 5,000 IFC 5,000 No City of Lynnwood 5,000 1,000 5,000 No City of Marysville 8,000 IFC 5 or more units No City of Mercer Island 5,000 3,000 5,000 No City of Monroe 5,000 IFC 5,000 No City of MLT 10,000 2,500 If access limited No City of Redmond 3,000 3,000 All No City of Shoreline 4,800 3,000 4,800 No Snohomish County 10,000 IFC If access limited No City of Woodinville 5,000 IFC 5,000 No City of Edmonds 12,000 IFC 5 or more units Yes City of Edmonds 5,000 3,000 5 or more or 5,000 No (proposed) 13 8.1.c Packet Pg. 421 Attachment: EDM mid-cycle amdmt presentation (Proposed Mid-Cycle Building and Fire Conclusion The importance of automatic fire sprinklers and fire alarms cannot be stressed enough. The benefits far outweigh the cost. This proposal: •Enhances life safety to the business owners, customers, residents, and visitors of the City of Edmonds. •Reduces property loss when fires occur. •Reduces the impacts of fires on our community; loss of businesses and employment. •Reduces environmental impacts from fires. •Helps standardize fire code amendments in South Snohomish County, thereby reducing confusion to developers, contractors, and firefighters. 14 8.1.c Packet Pg. 422 Attachment: EDM mid-cycle amdmt presentation (Proposed Mid-Cycle Building and Fire Thank You Kevin Zweber, Fire Marshal & Leif Bjorback, Building Official 15 8.1.c Packet Pg. 423 Attachment: EDM mid-cycle amdmt presentation (Proposed Mid-Cycle Building and Fire City Council Agenda Item Meeting Date: 04/10/2018 Amendments to ECC 8.48 to Address Parking Regulation Issues Staff Lead: Assistant Chief Jim Lawless Department: Police Services Preparer: James Lawless Background/History As a result of various Council mandated changes to the on street parking configuration on Sunset Ave., requisite modifications/amendments to ECC 8.48 must be made in order for those changes to be legally enforceable. Once those changes are adopted into the code, the corresponding changes can be made to on street markings and signage so that there is proper, legal notification and the regulations can be fully enforced. Staff Recommendation It is the recommendation of staff that this item be forwarded to full Council for approval. Narrative Over the course of approximately 18 - 24 months, Council authorized several pilot projects addressing various parking/pedestrian concerns be evaluated along Sunset Ave. At the present time, the Edmonds City Code contains a patchwork of parking ordinances that are not in alignment with the Council's vision for Sunset Ave. Once the final configuration was determined, including hourly parking limits, the ECC required updating in order to conform to that configuration and allow the various changes to be legally enforceable via parking citation. Once the changes are adopted, the proper signage and roadway markings can be installed to ensure proper notification to the parking public. The attached ordinance outlines the necessary changes and was prepared by the City Attorney's Office. Attachments: FINAL Ordinance Amending ECC 8.48 3.29 8.2 Packet Pg. 424 ORDINANCE NO. AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING CERTAIN SECTIONS OF ECC 8.48 TO ADDRESS PARKING REGULATION ISSUES; PROVIDING FOR SEVERABILITY; AND SETTING AN EFFECTIVE DATE. WHEREAS, certain parking regulation and enforceability issues have arisen on Sunset Avenue, and in the City of Edmonds, generally, relating in part to certain sections of the parking provisions of the Edmonds City Code (“ECC”); and WHEREAS, after review and discussion, the City Council has determined that it is appropriate to amend Chapter 8.48 ECC (“Parking”) to address these issues; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. Section 8.48.135 of the ECC Angle parking required – Designation of affected streets is hereby amended to read as follows (deleted text in strikethrough; new text in underline): 8.48.135 Angle parking required – Designation of affected streets. In accordance with the provisions of RCW 46.61.575(3) and Chapter 46.90 RCW .270(4), angle parking is permitted and required on the following streets in the designated areas and locations: A. The west side of Sunset Avenue from Edmonds Street, north for a distance of 330 feet; B.A. The north side of Bell Street from Fifth Avenue North, east for a distance of 150 feet; and C.B. The south side of Bell Street from Fifth Avenue North, east for a distance of 150 feet. [Ord. 3564 § 1, 2005]. 8.2.a Packet Pg. 425 Attachment: FINAL Ordinance Amending ECC 8.48 3.29 (Amendments to ECC 8.48 to Address Parking Regulation Issues) Section 2. Section 8.48.137 of the ECC Other than angle parking prohibited is hereby amended to read as follows (new text in underline): 8.48.137 Other than angle parking prohibited. When the city council by ordinance has designated that angle parking is required along any street or portion thereof, and when signs are erected in each block of said street or portion thereof, giving notice of such requirement, no person shall stop, stand or park any vehicle except in conformance with angle parking requirements on such signs and/or curb or pavement markings established by the traffic engineer to regulate said parking. [Ord. 3564 § 1, 2005]. Section 3. Section 8.48.167 of the ECC Parking within spaces required is hereby amended to read as follows (new text in underline): 8.48.167 Parking within spaces required. No person shall park a vehicle such that it occupies more than one marked parking space within the limited parking areas set forth in ECC 8.48.160 and 8.64.065. [Ord. 3564 § 1, 2005]. Section 4. Section 8.48.169 of the ECC Parking for disabled persons is hereby amended to read as follows (deleted text in strikethrough; new text in underline): 8.48.169 Parking for disabled persons. A. A person who has received a current and valid special disabled person’s card, decal or license plate from the Washington State Department of Licensing under RCW 46.16.381 Chapter 46.19 RCW shall be allowed to park a vehicle being used to transport such person in parking meter spaces free of charge and in nonmetered spaces for unlimited periods of time in parking zones or areas which are otherwise restricted as to the length of time parking is permitted except as otherwise provided in subsection (B) of this section. This section shall have no application to those zones or areas in which the stopping, parking or standing of all vehicles is prohibited or which are reserved for special types of vehicles. Such person shall not be permitted the foregoing privilege unless the person obtains and displays a distinguishing card, decal, or license plate issued pursuant to RCW 46.16.381 Chapter 46.19 RCW. 8.2.a Packet Pg. 426 Attachment: FINAL Ordinance Amending ECC 8.48 3.29 (Amendments to ECC 8.48 to Address Parking Regulation Issues) B. No person shall stop, stand or park a vehicle in a parking space reserved for disabled persons provided on-street or on private property without charge without obtaining and displaying a special license plate, card, or decal issued pursuant to RCW 46.16.381 Chapter 46.19 RCW; provided, pursuant to Chapter 46.19 RCW a time limitation of four hours is imposed on the use of such parking spaces for on-street parking when so signed and a time restriction of four hours is imposed on the use of nonreserved, on- street parking spaces by vehicles displaying the special parking placards when such time restriction is clearly posted. C. A parking space or stall for a disabled person shall be identified as described in RCW 46.61.581 including fine, time limitation (if applicable), and tow-away information. Notwithstanding any provision in this chapter, in accordance with RCW 46.61.581, failure of the person owning or controlling the property where required parking spaces are located to erect and maintain the sign is a Class 2 civil infraction under Chapter 7.80 RCW for each parking space that should be so designated. The person owning or controlling the property where the required parking spaces are located shall ensure that the parking spaces are not blocked or made inaccessible, and failure to do so is a Class 2 civil infraction. D. No person shall make inaccessible the access aisle located next to a space reserved for physically disabled persons. E. Notwithstanding any provision in this chapter, the city’s police department is authorized to appoint volunteers, with a limited commission, to issue notices of infractions for violations of the city’s disabled parking regulations. Volunteers must be at least 21 years of age and meet such additional qualifications as established by the city’s police department. A notice of infraction issued by a volunteer appointed under this section has the same force and effect as a notice of infraction issued by police officers and parking enforcement officers for a violation of the city’s disabled parking regulations. F. The following on-street parking stalls are designated as parking for disabled persons only: 1. The south side of James Street, 160 feet west of Sunset Avenue; 2. The west side of Railroad Avenue, 45 feet south of Main Street; 3. The west side of Second Avenue South, 102 feet south of James Street; 4. The west side of Fifth Avenue North, 85 feet south of Bell Street; 5. The west side of Sixth Avenue North, 40 feet north of Bell Street; 6. The west side of Seventh Avenue North, four stalls, 165 feet south of Sprague Street; 7. The north side of Main Street, two stalls, directly in front of Francis Anderson Center main entry; 8. The north side of Dayton Street, directly across from 720 Dayton; 9. The west side of Fifth Avenue, 30 feet south of Howell Way; 10. The west side of Second Avenue South, 32 feet south of Main Street; 11. The east side of Third Avenue South, 110 feet south of Main Street; 12. The west side of Fourth Avenue South, 95 feet south of Main Street; 13. The north side of Bell Street, 34 feet west of Fourth Avenue North; 14. The northbound Sixth Avenue, directly across from 411 Sixth Avenue, 16 feet south of alley; 8.2.a Packet Pg. 427 Attachment: FINAL Ordinance Amending ECC 8.48 3.29 (Amendments to ECC 8.48 to Address Parking Regulation Issues) 15. The westbound Edmonds Street, 30 feet west of Third Avenue North; 16. The south side of Main Street, directly in front of 414 Main Street; 17. The west side of Sunset Avenue, 33 feet north of Edmonds Street; 18. The west side of Sunset Avenue, directly in front of 322 Sunset Avenue, and 19. The west side of Sunset Avenue, directly in front of 606 Sunset Avenue. [Ord. 3564 § 1, 2005]. Section 5. Section 8.48.170 of the ECC Parking signs or other notice required is hereby amended to read as follows (new text in underline): 8.48.170 Parking signs or other notice required. Whenever by this title or any other ordinance of this city any parking time limit is imposed or parking prohibited on designated streets, it shall be the duty of the city traffic engineer to erect appropriate signs giving notice thereof; provided, however, that the city traffic engineer may designate such no parking zone by painting the curb yellow, in lieu of or in addition to posting no parking signs. The words “no parking” may also be painted on such yellow curb. Alternatively, the city traffic engineer may designate such no parking zone by painting yellow striping on the pavement. If this option is chosen, either the words “no parking” must be painted on the street adjacent to the yellow striping, or “no parking” signs must be erected adjacent to the yellow striping. No regulations imposing parking time limits or prohibiting parking shall be effective unless the signs and/or curb or pavement markings authorized herein are in place at the time of any alleged infraction. The words “Tow Away Zone” shall be added to signs in areas where impoundment is authorized under this chapter. [Ord. 3564 § 1, 2005]. Section 6. Section 8.48.210 of the ECC Failure to respond to notice of parking infraction is hereby deleted in its entirety (deleted text in strikethrough; the language is already reflected in Section 8.48.200C of the ECC): 8.48.210 Failure to respond to notice of parking infraction. RCW 46.64.020 is hereby adopted by this reference as if set forth in full herein. Pursuant to such statute and this chapter, any person who has been issued a notice of parking infraction and who willfully fails to respond as provided in this chapter shall be guilty of a misdemeanor regardless of the disposition of the notice of parking infraction. [Ord. 3564 § 1, 2005]. 8.2.a Packet Pg. 428 Attachment: FINAL Ordinance Amending ECC 8.48 3.29 (Amendments to ECC 8.48 to Address Parking Regulation Issues) Section 7. Section 8.48.320 of the ECC Pay parking stall defined is hereby amended to read as follows (new text in underline): 8.48.320 Pay parking stall defined. As used in this chapter, “pay parking stall” means a space in a pay parking lot designated by signs and/or appropriate markings on curb or pavement as a parking space. [Ord. 3564 § 1, 2005]. Section 8. Section 8.48.603 of the ECC Impounded without prior notice is hereby amended to read as follows (new text in underline): 8.48.603 Impound without prior notice. A. A vehicle may be impounded with or without citation and without giving prior notice to its owner as otherwise required by this chapter under the following circumstances: 1. When the vehicle is impeding or is likely to impede the normal flow of vehicular or pedestrian traffic; or 2. When the vehicle is illegally occupying a truck, commercial load, bus, loading, or other similar zone where, by order of the director of engineering or chiefs of police or fire, parking is limited to designated classes of vehicles or is prohibited during certain hours, or designated days, or at all times, and where such vehicle is interfering with the proper and intended use of such zones; or 3. When a vehicle without a special license plate, card, or decal indicating that the vehicle is being used to transport a disabled person as defined under Chapter 46.19 RCW, as now or hereafter amended, is parked in a stall or space clearly and conspicuously marked as being reserved for disabled persons, whether the space is located on private property without charge or on public property; or 4. When the vehicle poses an immediate danger to public safety; or 5. When a police officer has probable cause to believe that the vehicle is stolen; or 6. When a police officer has probable cause to believe that the vehicle constitutes or contains evidence of a crime, if impoundment is reasonably necessary in such instance to obtain or preserve the evidence. B. Nothing in this section shall be construed to authorize seizure of a vehicle without a warrant where a warrant would otherwise be required by law. [Ord. 3564 § 1, 2005]. Section 9. Section 8.48.607 of the ECC Redemption of impounded vehicles is hereby amended to read as follows (new text in underline): 8.2.a Packet Pg. 429 Attachment: FINAL Ordinance Amending ECC 8.48 3.29 (Amendments to ECC 8.48 to Address Parking Regulation Issues) 8.48.607 Redemption of impounded vehicles. Vehicles impounded by the city pursuant to this chapter shall be redeemed only under the following circumstances: A. An impounded vehicle may be redeemed only by the legal owner, the registered owner, a person authorized in writing by the registered owner or the vehicle’s insurer, a person who is determined and verified to have the permission of the registered owner of the vehicle, or one who has purchased a vehicle from the registered owner and who produces either proof of ownership or written authorization and signs a receipt therefor. B. Any person redeeming a vehicle properly impounded by the city shall pay the towing contractor for the costs of impoundment (removal, towing and storage) prior to redeeming such vehicle. The towing contractor shall accept payment as provided in RCW 46.55.120, as now or hereafter amended. C. Any person seeking to redeem a vehicle impounded as a result of a parking or traffic citation has a right to a municipal court hearing to contest the validity of the impoundment or the amount of towing and storage charges imposed. Any such request for hearing must be in writing, in a form approved by the municipal court and signed by such person, and received by the municipal court within 10 days after the requesting person received notice of the impound and opportunity for a hearing. Such hearing shall be provided as follows: 1. The court, within five days after receiving the request for a hearing, shall, in writing, notify the towing contractor, the person requesting the hearing if not the owner, the registered and legal owners of the vehicle, and the person or agency authorizing the impound of the hearing date and time. 2. If all the requirements to redeem the vehicle have been satisfied, the impounded vehicle shall be released to such person immediately, and a hearing as provided for in ECC 8.48.608 shall be held within 90 days of the written request for a hearing. 3. If all the requirements to redeem the vehicle have not been satisfied, the impounded vehicle shall not be released to such person until after the hearing provided pursuant to ECC 8.48.608. Such person shall have the right to a hearing within seven business days (Monday through Friday, excluding court holidays) of the court’s receipt of the written request for a hearing. 4. Any person seeking a hearing who has failed to request such hearing within 10 days of receiving notice of the opportunity therefor shall be deemed to have waived the right to a hearing, and the registered owner of the impounded vehicle shall be liable for any towing and storage fees incurred in relation to the vehicle. 5. Redemption of vehicles impounded for violations of driving with an invalidated (i.e. suspended or revoked) license shall be as provided under RCW 46.55.120. [Ord. 3564 § 1, 2005]. Section 10. Severability. If any section, sentence, clause or phrase of this ordinance should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section, sentence, clause or phrase of this ordinance. 8.2.a Packet Pg. 430 Attachment: FINAL Ordinance Amending ECC 8.48 3.29 (Amendments to ECC 8.48 to Address Parking Regulation Issues) Section 11. Effective Date. This ordinance, being legislative in nature and an exercise of a power delegated to the City as a corporate entity, is subject to initiative or referendum, and shall take effect thirty (30) days after passage and publication of an approved summary thereof consisting of the title. APPROVED: MAYOR, DAVID O. EARLING ATTEST/AUTHENTICATED: CITY CLERK, SCOTT PASSEY APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: PUBLISHED: EFFECTIVE DATE: ORDINANCE NO. 8.2.a Packet Pg. 431 Attachment: FINAL Ordinance Amending ECC 8.48 3.29 (Amendments to ECC 8.48 to Address Parking Regulation Issues) SUMMARY OF ORDINANCE NO. __________ of the City of Edmonds, Washington On the ____ day of ___________, 2018, the City Council of the City of Edmonds, passed Ordinance No. _____________. A summary of the content of said ordinance, consisting of the title, provides as follows: AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING CERTAIN SECTIONS OF ECC 8.48 TO ADDRESS PARKING REGULATION ISSUES; PROVIDING FOR SEVERABILITY; AND SETTING AN EFFECTIVE DATE. The full text of this Ordinance will be mailed upon request. DATED this _____ day of ________________, 2018. CITY CLERK, SCOTT PASSEY 8.2.a Packet Pg. 432 Attachment: FINAL Ordinance Amending ECC 8.48 3.29 (Amendments to ECC 8.48 to Address Parking Regulation Issues) City Council Agenda Item Meeting Date: 04/10/2018 Agreement With Snohomish County for Flex Funds for Social Worker Program Staff Lead: Jim Lawless Department: Police Services Preparer: James Lawless Background/History In 2017, Council identified funding (salary and benefits) for a social worker position for the City of Edmonds. That position is shared with the City of Lynnwood; the social worker is an employee of the City of Lynnwood and the City of Edmonds reimburses Lynnwood for its portion of salary/benefits. As the position has been filled, various needs have been identified that are required for the social worker to affectively address some of the issues/situations she works with. One of the primary needs is the access to funds for emergency situations (food, shelter, temporary housing/transportation). Staff Recommendation It is the recommendation of staff that this agreement be forwarded to full Council for approval and authorization for the Mayor's signature. Narrative In 2017, Council identified funding (salary and benefits) for a social worker position for the City of Edmonds. That position is shared with the City of Lynnwood; the social worker is an employee of the City of Lynnwood and the City of Edmonds reimburses Lynnwood for its portion of salary/benefits. As the position has been filled, various needs have been identified that are required for the social worker to effectively address some of the issues/situations she works with. One of the primary needs is the access to funds for emergency situations (food, shelter, temporary housing/transportation). Funds have been identified and are available through the Snohomish County Department of Human Services (Housing and Community Services) via a project entitled the First Responders Flex Fund. These funds are distributed via a grant that reimburses approved expenditures made by the receiving entity (the Edmonds Police Department). Reimbursements are filed on a monthly basis and there are quarterly reporting requirements. This agreement requires the Mayor's signature and the program will be overseen by Assistant Chief of Police Lawless. The amount of this year's grant is $7,114 and will be retroactive to January 1, 2018 for reimbursable expenses. Attachments: FLEX_fund_agreement_040518 FLEX-Fund_SigAuthForm_2018 8.3 Packet Pg. 433 Snohomish County Human Services 3000 Rockefeller Avenue, M/S 305 | Everett, WA 98201 (425) 388-7200 CONTRACT SPECIFICSContract Number: Maximum Contract Amount: Title of Project / Service: Start Date: End Date: Status Determination:CONTRACTING ORGANIZATIONAgency Name: Address: City, State & Zip: IRS Tax No. / EIN: Contact Person: Unique Entity Identifier: Telephone: Email Address:FUNDING SPECIFICSFunding Authority: CFDA No. & Title: FXQGLQJ6SHFLILFV: )HGHUDO$ward Date:COUNTYProgram Division Contact Person Contact Phone Additional terms of this Contract are set out in and governed by the following, which are incorporated herein by reference: Basic Terms and Conditions HSD-2018- , maintained on file at the Human Services Department: , maintained oQILOe at the Human Services Department:Business Associate Agreement BAA-2018- Specific Terms and Conditions Attached as Exhibit A Statement of Work Attached as Exhibit B Approved Contract Budget Attached as Exhibit C In the event of any inconsistency in this contract, the inconsistency shall be resolved by giving precedence in the following order: (a) appropriate provisions of state and federal law, (b) Specific Terms and Conditions, (c) Basic Terms and Conditions, (d) Business Associate Agreement, (e) other attachments incorporated by reference, and (f) other documents incorporated by reference. THE CONTRACTING ORGANIZATION IDENTIFIED ABOVE (HEREINAFTER REFERRED TO AS AGENCY), AND SNOHOMISH COUNTY (HEREINAFTER REFERRED TO AS COUNTY), HEREBY ACKNOWLEDGE AND AGREE TO THE TERMS OF THIS CONTRACT. SIGNATURES FOR BOTH PARTIES ARE REQUIRED BELOW. BY SIGNING, THE AGENCY IS CERTIFYING THAT IT IS NOT DEBARRED, SUSPENDED, OR OTHERWISE EXCLUDED FROM PARTICIPATING IN FEDERALLY FUNDED PROGRAMS. FOR THE CONTRACTING ORGANIZATION: FOR SNOHOMISH COUNTY: (Signature) (Date) Mary Jane Brell Vujovic, Director (Date) Department of Human Services (Title) )HGHUDO$ward ,'1R:)HGHUDO$JHQF\: 3URMHFW'HVFULSWLRQ Contact (PDLO HCS-18-70-1806-224 $7,114 First Responders Flex Fund 01/01/2018 12/31/2018 Subrecipient City of Edmonds 250 5th Ave. N. Edmonds, WA 98290 91-6001244 Jim Lawless 040172827 425-771-0207 james.lawless@edmondswa.gov RCW 82.14.460 N/A 1/10th of 1% Sales Tax N/A N/A N/A Housing and Community Services Tyler Verda tyler.verda@snoco.org 425-262-2904 127-224 127-224 Approved Invoice Attached as Exhibit D 8.3.a Packet Pg. 434 Attachment: FLEX_fund_agreement_040518 (Agreement With Snohomish County for Flex Funds for Social Worker Program) Exhibit A HCS-18-70-1806-224 City of Edmonds Page 1 of 1 EXHIBIT A SPECIFIC TERMS AND CONDITIONS FIRST RESPONDERS FLEX FUND I. TERMS AND CONDITIONS The Chemical Dependency/Mental Health Program Fund Agreement (hereinafter the Contract) is made by and between the County (hereinafter the County) and the City of Edmonds (hereinafter the City). This Contract shall be in full accordance with the Legislation, codified as Revised Code of Washington (“RCW”) Chapters 82.14.460 and all other applicable laws, ordinances, rules and regulations not inconsistent therewith, including licensing, permitting and accreditation requirements, in all activities funded in whole or in part with funds provided under this Contract. II. OTHER REVENUES The Agency certifies that work to be performed under this Contract will not supplant other existing funding sources. III. UNILATERAL AMENDMENT CLAUSE In addition to the Unilateral Amendment provisions, contained in Section XLII. B of the Basic Terms and Conditions referenced on the Contract Face Sheet, both parties agree that unilateral amendments will be used to award additional funds if they become available. IV. COST REIMBURSEMENT A. Flex Funds awarded under this Contract will be reimbursed on a cost reimbursement basis in support of the Statement of Work (Exhibit B) and the Approved Project Budget (Exhibit C). B. The City shall submit monthly requests for reimbursement using the Approved Invoice (Exhibit D) provided by the County. C. The City shall submit supporting documentation for requests for reimbursement of expenses covered by Flex Funds with the Approved Invoice (Exhibit D). This documentation shall identify the item(s) purchased and cost of expenses covered by Flex Funds. The City shall also maintain on record itemized receipts of expenses covered by Flex Funds under this Contract. 8.3.a Packet Pg. 435 Attachment: FLEX_fund_agreement_040518 (Agreement With Snohomish County for Flex Funds for Social Worker Program) Exhibit B HCS-18-70-1806-224 City of Edmonds Page 1 of 1 EXHIBIT B STATEMENT OF WORK / PROJECT DESCRIPTION FIRST RESPONDERS FLEX FUND I. DESCRIPTION The Chemical Dependency/Mental Health Program Fund will provide First Responder Flex Funds to the City in order to assist individuals/households identified as high risk for chemical dependency or mental health issues, who come into contact with First Responders/Social Workers and need assistance to abate an emergency situation. II. PROGRAM ACTIVITIES In compliance with the terms of the Contract, the City shall perform the tasks and services as follows: A. The City will develop a process and means to disburse Flex Funds to First Responders and Social Workers, not to exceed the total amount included in the Approved Project Budget (Exhibit C). B. Flex Funds will be provided to First Responders and Social Workers to procure goods and/or services directly related to the needs of individuals/households, which cannot be met through existing categorical services or formal/informal community mechanisms. Examples of such purchases may include, but are not limited to shelter, food, clothing, medical care, transportation, or other basic needs. C. Flex Funds shall not be paid directly to the individual/household receiving emergency assistance or used for the purchase of alcohol, tobacco, vaping products, or marijuana products. Supporting documentation for requests for reimbursement for expenses covered by Flex Funds must be submitted monthly, with the Approved Invoice (Exhibit D) for reimbursement. D. Priority for Flex Funds will be given to individuals/households that are imminently or literally homeless, or who are in a situation lacking critical resources (i.e. seniors in need of emergency care, an individual fleeing domestic violence). III. REPORTS The City will submit one brief narrative each quarter providing a description of at least one individual or household that was able to abate an emergency situation as a result of access to First Responder Flex Funds. 8.3.a Packet Pg. 436 Attachment: FLEX_fund_agreement_040518 (Agreement With Snohomish County for Flex Funds for Social Worker Program) Exhibit C HCS-18-70-1806-224 City of Edmonds Page 1 of 4 AGENCY NAME: 1/1/2018 to 12/31/2018 AMOUNT AMENDMENT TOTAL AMOUNT 7,114$ 7,114$ - - - - - 7,114$-$7,114$ MATCHING RESOURCES: N/A TOTAL MATCHING RESOURCES: N/A %N/A AMOUNT: N/A OTHER PROGRAM RESOURCES (Identify): AMOUNT TOTAL OTHER RESOURCES: -$ SOURCE FUNDING PERIOD MATCH REQUIREMENTS FOR CONTRACT: TOTAL FUNDS AWARDED: N/A 1/10th of 1% 1/1/2018 to 12/31/2018 REVENUE SOURCE FUNDING PERIOD EXHIBIT C CONTRACT BUDGET - COST REIMBURSEMENT FIRST RESPONDERS FLEX FUND CONTRACT PERIOD: FUNDS AWARDED UNDER CONTRACT: City of Edmonds 8.3.a Packet Pg. 437 Attachment: FLEX_fund_agreement_040518 (Agreement With Snohomish County for Flex Funds for Social Worker Program) Exhibit CHCS-18-70-1806-224City of EdmondsPage 2 of 4FUND SOURCE FUND SOURCEFUND SOURCEFUND SOURCEFUND SOURCEFUND SOURCE1/10th of 1%Salaries/Wages-$ Benefits- Supplies/Minor Equip.- Prof. Services- Postage- Telephone- Mileage/Fares- Meals- Lodging- Advertising- Leases/Rentals- Insurance- Utilities- Repairs/Maint.- Client Flex Funds- Printing- Dues/Subscrip.- Regis./Tuition- Machinery/Equip.- Administration- Indirect- Miscellaneous- Flex Funds 7,114 7,114 Misc. Construction- Acquisition- Relocation- - TOTAL 7,114$ -$ -$ -$ -$ -$ 7,114$ -$ EXPENDITURESCATEGORYTOTALOTHER RESOURCES8.3.aPacket Pg. 438Attachment: FLEX_fund_agreement_040518 (Agreement With Snohomish County for Flex Funds for Exhibit CHCS-18-70-1806-224City of EdmondsPage 3 of 4AMOUNT7,114 7,114$ TOTALCATEGORYFlex FundsNARRATIVE (provide justification describing each category supported with funds awarded under this contract) EXPENDITURE NARRATIVECost of Flex Funds distributed to First Repsonders8.3.aPacket Pg. 439Attachment: FLEX_fund_agreement_040518 (Agreement With Snohomish County for Flex Funds for Exhibit C HCS-18-70-1806-224 City of Edmonds Page 4 of 4 POSITION FUND SOURCE % OF TIME TO FUND SOURCE TOTAL MONTHLY MONTHLY CHARGE TO FUND SOURCE # OF MONTHS TOTAL CHARGE TO FUND SOURCE N/A TOTAL: $0 NOTE: Above figures may reflect rounding DETAIL SALARIES / WAGES 8.3.a Packet Pg. 440 Attachment: FLEX_fund_agreement_040518 (Agreement With Snohomish County for Flex Funds for Social Worker Program) Exhibit D HCS-18-70-1806-224 City of Edmonds Page 1 of 2 Number _______ INVOICE – Cost Reimbursement Contracts Snohomish County Human Services Department-3000 Rockefeller, M/S 305, Everett, WA 98201 Estimated: Actual: Amount of Payment: $ Agency Name and Address: Contract #: HCS-18-70-1806-224 City of Edmonds Project Title: First Responders Flex Fund 250 5th Ave. N. Contract Manager:Tyler Verda Edmonds, WA 98290 Reporting Period: To: AUTHORIZING SIGNATURE: _____________________________________ DATE: ______________ (sign in ink) SUB Account Title Current Contract To Date Contract Budget OBJ Expenditures Expenditures Budget Balance 10 Salaries/Wages 20 Personal Benefits 30 Supplies 40 Prof. Services 42 Postage 42 Telephone 43 Mileage 43 Meals 43 Lodging 44 Advertising 45 Op. Rentals/Leasing 46 Insurance 47 Utilities 48 Repair/Maintenance 49 Printing/Copying 50 Dues/Subscriptions 51 Regis./Tuition 52 Flex Funds $7,114 $7,114 TOTALS $7,114 $7,114 CONTRACTING AGENCY MATCHING FUNDS: REVIEWED FOR PAYMENT: CURRENT PERIOD: $ AUTHORIZED FUND: CONTRACT TO DATE: $ ATTACH: AGENCY CERTIFICATION FORM 8.3.a Packet Pg. 441 Attachment: FLEX_fund_agreement_040518 (Agreement With Snohomish County for Flex Funds for Social Worker Program) Exhibit D HCS-18-70-1806-224 City of Edmonds Page 2 of 2 SNOHOMISH COUNTY HUMAN SERVICES DEPARTMENT 3000 ROCKEFELLER AVENUE, M/S 305 EVERETT, WA 98201 AGENCY CERTIFICATION FORM Agency Certification: I hereby certify under penalty of perjury that the items and totals listed herein are proper charges for materials, merchandise, or services furnished to Snohomish County, and that all goods furnished and/or services rendered have been provided without discrimination on the grounds of race, creed, national origin, handicap, sex, or age. AUTHORIZING SIGNATURE: _____________________________________ DATE: ______________ (sign in ink) Voucher Invoice Total Charged To: Check #Vendor Refer.#Description Amount Non-Grant Grant (Use Additional Pages as Necessary)Total: 8.3.a Packet Pg. 442 Attachment: FLEX_fund_agreement_040518 (Agreement With Snohomish County for Flex Funds for Social Worker Program) Rev. 11/7/17 2018 Signature Authorization Form Effective January 1, 2018 through December 31, 2018 Human Services Submit completed original form to: Snohomish County Human Services, Attn: HSD Contracts, 3000 Rockefeller, M/S 305, Everett, WA 98201 Please print or type clearly all names and sign in blue ink. SECTION 1: Official Business Name of Organization Business Name: Date Submitted: Mailing Address: Street City State Zip SECTION 2: Authorizing Authority Signature Print or Type Name Title SECTION 3: Authorization to Sign Contracts / Contract Amendments Signature Print or Type Name Title SECTION 4: Authorization to Sign Invoices / Requests for Reimbursements Signature Print or Type Name Title SECTION 5: Contract Delivery Designation Email Address Print or Type Name Title 8.3.b Packet Pg. 443 Attachment: FLEX-Fund_SigAuthForm_2018 (Agreement With Snohomish County for Flex Funds for Social Worker Program) Rev. 11/7/17 Signature Authorization Form Instructions PURPOSE The Signature Authorization Form identifies the person(s) who has the authority to sign contracts, amendments and invoices/requests for reimbursement. The form also designates the email address for the authorized recipient(s) of contracts and amendments from the Human Services Department. It is important that the signatures on file with the Department are current. Whenever there is a change in an authorized signor, a new Signature Authorization Form must be completed. The new form supersedes the previous form. Additional forms may be requested by sending an email to HSD.Contracts@snoco.org or by contacting your program manager. INSTRUCTIONS Please print the Signature Authorization Form on white paper. Complete each section where indicated and sign in blue ink. Make a copy of the form for your records and return the signed original form to the address below. Electronic or photocopied forms are not accepted. Snohomish County Human Services Attn: HSD Contracts 3000 Rockefeller Avenue, M/S 305 Everett, WA 98201 SECTION 1: Official Business Name of Organization Complete organization name, mailing address and date form is submitted. SECTION 2: Authorizing Authority This section is to be completed by the person(s) who has the authority to authorize the person(s) entered in Section 3 and Section 4 to represent your organization for these actions. Usually this person(s) will be the board president, chair, director, CEO or other person(s) delegated by the ruling body of the organization to act on its behalf. SECTION 3: Authorization to Sign Contracts / Contract Amendments Complete this section with the name of the person(s) authorized by your organization and/or board of directors to sign contracts and contract amendments for all programs. SECTION 4: Authorization to Sign Invoices / Requests for Reimbursements Complete this section with the name of the person(s) authorized by your organization and/or board of directors to sign invoices requesting reimbursement of costs and services from the Snohomish County Human Services Department for all programs. SECTION 5: Contract Delivery Designation Complete this section with the name, title and email address of the person(s) who should receive (via email) contracts for your organization. Note: The Signature Authorization Form is not write-protected. Add additional lines to any section if needed. Be sure to include all of the appropriate signors to cover all contracts with the Human Services Department. 8.3.b Packet Pg. 444 Attachment: FLEX-Fund_SigAuthForm_2018 (Agreement With Snohomish County for Flex Funds for Social Worker Program) City Council Agenda Item Meeting Date: 04/10/2018 Ordinance Amending 5.34 (Domestic Violence) Staff Lead: Jim Lawless Department: Police Services Preparer: James Lawless Background/History Staff Recommendation Staff recommends and requests that this ordinance be forwarded to full Council for approval and authorization of the Mayor's signature. Narrative In recognition of various situations and dynamics that arise during domestic violence situations, the attached ordinance amends Edmonds City Code 5.34 (Domestic Violence) by adding several new subsections and defining the new crimes of "Strangulation" and "Exposing Children to Domestic Violence", both of which would be classified as a Gross Misdemeanor. Attachments: Ordinance Amending ECC 5.34 8.4 Packet Pg. 445 - 1 - ORDINANCE NO. _______ AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING THE PROVISIONS OF ECC 5.34.030 (“DOMESTIC VIOLENCE – STATE STATUTES ADOPTED BY REFERENCE”) TO ADOPT ADDITIONAL DOMESTIC VIOLENCE PROVISIONS; PROVIDING FOR SEVERABILITY; AND SETTING AN EFFECTIVE DATE. WHEREAS, the City of Edmonds has adopted certain Washington state statutes relating to domestic violence by reference in Section 5.34.030 of the Edmonds City Code (“ECC”); and WHEREAS, the Edmonds Police Department has recommended the adoption of certain additional provisions relating to domestic violence to enhance the protections provided by Section 5.34.030; and WHEREAS, after review and discussion, the City Council has determined it appropriate to amend Section 5.34.030 ECC (“Domestic Violence – State Statutes Adopted by Reference”) to adopt these additional provisions; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. Section 5.34.030 of the ECC Domestic Violence – State Statutes Adopted by Reference is hereby amended to read as follows (deleted text in strikethrough; new text in underline): 5.34.030 Domestic violence – State statutes adopted by reference. A. State Statutes Adopted by Reference. The following statutes of the state of Washington as the same exist or shall hereafter be amended are hereby adopted by reference: 8.4.a Packet Pg. 446 Attachment: Ordinance Amending ECC 5.34 (Ordinance Amending ECC 5.34 (Domestic Violence)) - 2 - RCW 10.99.020 Definitions 10.99.030 Law enforcement officers – Training, powers, duties 10.99.040 Restrictions upon and duties of court 10.99.045 Appearances by defendant – Orders prohibiting contact 10.99.050 Restriction or prohibition of contact with victim – Procedures 10.99.055 Enforcement of orders against defendants 26.50.010 Definitions 26.50.020 Commencement of action – Jurisdiction – Venue 26.50.030 Petition for an order for protection – Availability of forms and instructional brochures – Filing fee – Bond not required 26.50.040 Application for leave to proceed in forma pauperis 26.50.050 Hearing – Service – Time 26.50.060 Relief 26.50.070 Ex parte temporary order for protection 26.50.080 Issuance of order – Assistance of peace officer – Designation of appropriate law enforcement agency 26.50.090 Order – Service 26.50.100 Order – Transmittal to law enforcement agency – Record in law enforcement information system – Enforceability 26.50.110 Violation of order – Penalties 26.50.120 Violation of order – Prosecuting attorney or attorney for municipality may be requested to assist – Costs and attorney’s fees 26.50.130 Order – Modification – Transmittal 26.50.140 Peace officers – Immunity 26.50.200 Title to real estate – Effect 26.50.210 Proceedings additional 9A.36.150 Interfering with the reporting of domestic violence B. Domestic Violence Anti-Merger Clause. Every person who, in the commission of a crime of domestic violence, shall commit any other crime, may be punished therefor as well as for the crime of domestic violence, and may be prosecuted for each crime separately. C. Strangulation 1. A person is guilty of strangulation if, under circumstances not amounting to a felony, he or she assaults another by means of strangulation. 2. “Strangulation” shall mean intentionally impeding normal breathing or circulation of the blood by applying pressure on the throat or neck or by obstructing the nose or mouth of another person. 8.4.a Packet Pg. 447 Attachment: Ordinance Amending ECC 5.34 (Ordinance Amending ECC 5.34 (Domestic Violence)) - 3 - 3. Strangulation is a gross misdemeanor. D. Exposing Children to Domestic Violence. 1. A person commits the crime of exposing children to domestic violence when he or she: (a) Commits a crime of domestic violence, as defined in RCW 10.99.020; and (b) The crime is committed in the immediate presence of, or is witnessed by, the person’s or the victim’s minor child, stepchild, or a minor child residing within the household of the person or victim. 2. For the purposes of this section, “witnessed” shall mean if the crime is seen or directly perceived in any other manner by the child. 3. Exposing children to domestic violence is a gross misdemeanor. [Ord. 3143 § 1, 1997; Ord. 2531, 1985]. Section 2. Severability. If any section, sentence, clause or phrase of this ordinance should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section, sentence, clause or phrase of this ordinance. Section 3. Effective Date. This ordinance, being an administrative function of the city council, is not subject to referendum, and shall take effect five (5) days after passage and publication of an approved summary thereof consisting of the title. APPROVED: MAYOR, DAVID O. EARLING 8.4.a Packet Pg. 448 Attachment: Ordinance Amending ECC 5.34 (Ordinance Amending ECC 5.34 (Domestic Violence)) - 4 - ATTEST/AUTHENTICATED: CITY CLERK, SCOTT PASSEY APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY: BY JEFFREY B. TARADAY FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: PUBLISHED: EFFECTIVE DATE: ORDINANCE NO. 8.4.a Packet Pg. 449 Attachment: Ordinance Amending ECC 5.34 (Ordinance Amending ECC 5.34 (Domestic Violence)) - 5 - SUMMARY OF ORDINANCE NO. __________ of the City of Edmonds, Washington On the ____ day of ___________, 2018, the City Council of the City of Edmonds, passed Ordinance No. _____________. A summary of the content of said ordinance, consisting of the title, provides as follows: ORDINANCE NO. _______ AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING THE PROVISIONS OF ECC 5.34.030 (“DOMESTIC VIOLENCE – STATE STATUTES ADOPTED BY REFERENCE”) TO ADOPT ADDITIONAL DOMESTIC VIOLENCE PROVISIONS; PROVIDING FOR SEVERABILITY; AND SETTING AN EFFECTIVE DATE. The full text of this Ordinance will be mailed upon request. DATED this _____ day of ________________, 2018. CITY CLERK, SCOTT PASSEY 8.4.a Packet Pg. 450 Attachment: Ordinance Amending ECC 5.34 (Ordinance Amending ECC 5.34 (Domestic Violence))