Loading...
HomeMy WebLinkAboutResolution 1442 FEES ASSOCIATE D WITH DEVELOPME NT FEES ASSOCIATED WITH DEVELOPMENT Building – Engineering – Planning - Fire 121 5th Ave N, Edmonds WA 98020 425.771.0220 FINAL DRAFT 12.04.19 FOR 2020    GENERAL DEVELOPMENT SERVICES PERMIT FEES Building / Planning / Engineering / Fire City Technology Fee for each permit application  .................................................................................. $40.00  Credit Card Transaction Fee .......................................................................................................................... 3%    Development Review Committee Meeting .................................................................................................. $0  Pre‐Application Meeting ................................................................................................................... $1,000.00    (50% applied toward future plan check fee for that specific project only)    Recording Fee (for recording documents with Snohomish County) ......................... Recording Cost + $110.00    Violation Compliance Fee ................................................................................ $250.00 or up to 5x Permit Fee    Residential State Building Code Surcharge Fee  .....................................................................................  $6.50   .................................................................................................................. Each additional dwelling unit $2.00   Commercial State Building Code Surcharge Fee ...................................................................................  $25.00   .................................................................................................................. Each additional dwelling unit $2.00  (not applicable to certain minor permits such as plumbing, mechanical, re‐roof)       PLAN REVIEW & INSPECTION FEES: Plan review is calculated at 85% of the building permit fee and includes up to 3 reviews per division/ department.     Commercial/ Multi‐family/ Residential: Plan review fee includes Building, Planning, Fire & Engineering reviews.    General plan review fee per reviewing department/division ....................................... $110.00/hr (1 hr min.)  plus peer review fee if applicable  Plan review for re‐submittals after the 3rd review .......................................................................... $110.00/hr  Development Project Peer Review (Peer Review) ................................................................................ $110.00  plus cost of consultant review fee charged for outside consultant peer review services when   City staff lacks the expertise to review a specific project or aspect of a project.    General Inspection Fee per department/division ............................................................................ $110.00/ea  Re‐Inspection Fee ............................................................................................................................. $110.00/ea  Engineering Inspection Fee* ............................................................................ 3.3% of Value of Improvements   *Applies to Civil Site Improvements, such as Subdivisions, Commercial & Multi‐Family Permits    Stormwater Engineer Review Fee ................................................................................................... $130.00/hr  Transportation Engineer Review Fee .............................................................................................. $130.00/hr  Utility Engineer Review Fee ............................................................................................................ $130.00/hr  REFUNDS: The City may authorize refunding of any permit fee paid which was erroneously paid or collected. The City  may authorize refunding of not more than 80 percent of the permit fee paid when no work has been done  under a permit issued in accordance with the applicable code(s). The City may also refund not more than 80  percent of the plan review fee paid when an application for a permit for which a plan review fee has been  paid is withdrawn or canceled before any plan reviewing is done. Refunds shall not be granted of any fee on  an expired permit. Any application for a refund must be made in writing and describe the circumstances to  justify. Refunds for permit fees covered by 19.70.025 ECDC may be authorized by the Building Official. The  Planning Manager may authorize refunds of Planning fees or service charges. The City Engineer may  authorize refunds of Engineering fees or service charges.           BUILDING PERMIT FEES      Accessory Dwelling Unit Compliance (ADU) .......................................................................................... $405.00    Adult Family Home Compliance (AFH) ................................................................................................... $550.00    Alternate Methods Review ........................................................................................ $110.00/hr + Peer Review  Appeal of Building Official Interpretation .............................................................................................. $970.00    Cellular Communication and Facilities ................................................................................................... TABLE 1  Change of Use ......................................................................................................................................... $510.00    Demolition (Residential Primary Structure) ........................................................................................... $300.00  Demolition (Commercial Primary Structure) .......................................................................................... $500.00  Demolition (Secondary Structure or Interior Only) ................................................................................. $150.00  Dock/Marina/Floats ............................................................................................................... $200.00 + TABLE 1    Fence ...................................................................................................................................................... $100.00    Hot Tub/Spa (Single‐Family) ................................................................................................................... $200.00    Manufactured Coach Installation ‐ Commercial (Federal HUD Label) ................................................... $500.00  Manufactured Home Installation (Federal HUD Label) .......................................................................... $550.00    Parking Lot ............................................................................................................................. $200.00 + TABLE 1    Re‐roof (Commercial) ...................................................... Valuation based on $2.00 per square foot + TABLE 1  Re‐roof (Residential ‐ includes sheathing) .............................................................................................. $100.00    Retaining Wall (Commercial) .......................................................................................... $740.00 + Peer Review  Retaining Wall (Residential) ............................................................................................ $300.00 + Peer Review    Solar/Photovoltaic (Residential) ............................................................................................................. $120.00  Solar/Photovoltaic (Commercial) ‐ Valuation does not include cost of solar panels or inverters ......... TABLE 1    Swimming Pool (Pre‐manufactured, above ground) .............................................................................. $120.00  Swimming Pool (In‐Ground) ................................................................................................................... TABLE 1    Temporary Certificate of Occupancy (Commercial Only – valid for 60 days) ........................................ $330.00      SIGNS:  Sign (Per sign excluding specific sign categories listed below) .............................................................. $165.00    Blade Sign (Includes all blade signs in proposal) ............................................................................................. $0   Pedestrian Sign (Includes all pedestrian signs in proposal) ..................................................................... $80.00   Pole Sign (per sign) ................................................................................................................................. $825.00   Murals (Includes all murals in a proposal) ............................................................................................. $165.00    *Planning ADB Design Review may apply      ESLHA DESIGNATED PROPERTIES:   Additional fees associated with development in the North Edmonds Earth Subsidence Landslide Hazard Area (ESLHA)    ESLHA Administrative Fee  ................................................................................................................. $2,385.00     ESLHA Consultant Review .................................................................... Full cost of review is paid by applicant.    Deposit at Application for Peer Completeness Review ...................................................................  $500.00    Deposit at Full Application  ............................................................................................................ $2,500.00    Deposit at Re‐submittal if additional Peer Review is needed  ...................................................... $1,500.00    ESLHA Minor Project Administrative Processing Fee  ........................................................................... $300.00    ESLHA Submittal Packet .........................................................................................................................  $15.00      MECHANICAL PERMITS:      BASE PERMIT FEE:  .................................................................................................................................. $50.00       UNIT FEE SCHEDULE:   For the installation or relocation of each:   FURNACE ‐ Forced‐air or gravity‐type, including ducts and appliance vents  ........................................ $30.00    AIR HANDLER ‐ Including ducts (Diffusers, blowers, etc.)      Up to and including 10,000 cfm (4719 L/s)  ..................................................................................... $30.00      Over 10,000 cfm (4719 L/s) including ducts  .................................................................................... $40.00   GAS HEATER ‐ Suspended, recessed wall or floor‐mounted unit  .......................................................... $30.00    HYDRONIC HEATING SYSTEM  ............................................................................................................... $150.00    APPLIANCE VENT ‐ (Type B, BW, L gas vent, etc.)  .................................................................................. $15.00       INCINERATOR .......................................................................................................................................... $50.00    VENTILATION AND EXHAUST      Fan connected to single duct (Bath, laundry, kitchen exhaust, etc.)  .............................................. $15.00      Each system which is not a portion of any heating or air‐conditioning system .............................  $15.00      HOOD ‐ Type 1, Type 2, Fume Hood including ducts  .......................................................................... $150.00       GAS PIPING: (New or relocated)    Gas‐Piping systems of 1 to 5 outlets  ..................................................................................................... $30.00    Each additional outlet over 5  ................................................................................................................... $5.00      BOILER OR COMPRESSOR    Up to and including 50 HP (176 KW)  ..................................................................................................... $50.00    Over 50 HP (176 kW)  ........................................................................................................................... $100.00      ABSORPTION SYSTEM, AIR CONDITIONING SYSTEM OR HEAT PUMP    Up to and including 1,750,000 Btu/h (512.9 kW) .................................................................................  $50.00    Over 1,750,000 Btu/h (512.9 kW)  ....................................................................................................... $100.00      OTHER FEES:     Commercial Plan review hourly fee  ................................................................................................ $110.00/hr    Each appliance or piece of equipment regulated by the IMC for which no other       fee is listed (Fire dampers, ductless mini‐ split systems, etc.)  .......................................................... $30.00  PLUMBING PERMITS:  BASE PERMIT FEE:  ....................................................................................................................................... $50.00      UNIT FEE SCHEDULE:   For the installation, alteration, repair, addition or relocation of each: ....................................................... $15.00    Plumbing fixture (on one trap or a set of fixtures on one trap)   Drain w/in footprint of building (rainwater systems, roof deck drains, etc.)    Water Heater (includes expansion tank)    Re‐pipe ‐ Drain, vent or water piping (each fixture served)      Water Service Line (replacement or repair)    For the installation, alteration, repair, addition or relocation of each:  Water treating equipment (water softener) .......................................................................................... $35.00    Backflow protective device ‐ 2" and smaller  ......................................................................................... $35.00    Backflow protective device ‐ Over 2"  .................................................................................................... $45.00    Graywater system or reclaimed water system (in addition to fixture fee)  ........................................... $65.00    Non‐grease waste pre‐treatment interceptor (oil/water separator, etc.) .......................................... $110.00    Medical gas piping system serving 1 to 5 inlet/outlet(s) for a specific gas ......................................... $110.00       Each additional medical gas inlet/outlet  ............................................................................................ $15.00    Grease Trap (HGI Inside Building) ......................................................................................................... $220.00    Gravity Grease Interceptor (GGI)) ........................................................................................................ $770.00    OTHER FEES:     Commercial plan review fee hourly fee  ......................................................................................... $110.00/hr    IMPACT FEES PARK IMPACT FEES: Single‐Family  ........................................................................................................ $2,734.05 per Dwelling Unit  Multi‐Family  ......................................................................................................... $2,340.16 per Dwelling Unit  Non‐Residential Development   ...................................................................................... $1.34 per square foot   Residential Administrative Fee ................................................................................................................ $50.00  Commercial Administrative Fee ............................................................................................................ $100.00    TRANSPORTATION IMPACT FEES: Refer to City Code & Handouts to calculate impact fee. The following applies in addition to impact fee:  Residential Administrative Fee ................................................................................................................ $50.00  Commercial Administrative Fee ............................................................................................................ $100.00  Independent Fee Calculation – Transportation Engineer Review  ...................................................... $260.00  plus peer review fee as applicable.    GRADING PERMIT FEES PLAN REVIEW: CUBIC YARDS PLAN REVIEW FEE  50 cubic yards or less  (when located in a designated critical area)  $55.00  51 to 100 cubic yards  $110.00  101 to 1,000 cubic yards  $220.00  1,001 to 10,000 cubic yards  $440.00  10,001 to 100,000 cubic yards $440.00 for the first 10,000 cubic yards, plus $110.00 for  each additional 10,000 yards or fraction thereof.  100,001 to 200,000 cubic yards $1,430.00 for the first 100,000 cubic yards, plus $110.00  for each additional 10,000 cubic yards or fraction thereof.  200,001 cubic yards or more $2,530.00 for the first 200,000 cubic yards, plus $110.00  for each additional 10,000 cubic yards or fraction thereof.        PERMIT FEE: CUBIC YARDS PERMIT FEE  Base Permit Fee  $35.00  50 cubic yards or less  (when located in a designated critical area) $110.00  51 to 100 cubic yards  $110.00  101 to 1,000 cubic yards $110.00 for the first 100 cubic yards, plus $25.00 for each  additional 100 cubic yards, or fraction thereof.  1,001 to 10,000 cubic yards $335.00 for the first 1,000 cubic yards, plus $45.00 for each  additional 1,000 cubic yards, or fraction thereof.  10,001 to 100,000 cubic yards $740.00 for the first 10,000 cubic yards, plus $65.00 for  each additional 10,000 cubic yards or fraction thereof.  100,001 cubic yards or more $1,325.00 for the first 100,000 cubic yards, plus $100.00 for  each additional 10,000 cubic yards or fraction thereof.  FIRE PERMIT FEES FIRE SPRINKLER PERMITS:   Residential IRC Structures    New Residential Fire Sprinkler Systems ..............................................................................................  $300.00    Residential Fire Sprinkler System Alteration ........................................................................................ $200.00      Commercial & Multi‐Family Fire Sprinkler Systems    New systems ........................................................................................................................ $300.00 + TABLE 1     Modifications:    1 to 5 sprinklers .................................................................................................................................... $250.00    6 to 25 ................................................................................................................................................... $500.00    26 or more ........................................................................................................................... $300.00 + TABLE 1    Additional inspections/plan review as required .............................................................................. $110.00/hr     FIRE ALARM PERMITS:   New fire alarm system ........................................................................................................  $300.00 + TABLE 1    Emergency Responders Radio System (DAS) .....................................................................  $100.00 + TABLE 1       Modifications:   1 to 5 initiating devices, Communicator (AES, Cellular) .....................................................................   $250.00    6 to 25, including panel replacement ................................................................................................... $500.00    26 or more ........................................................................................................................... $300.00 + TABLE 1    Additional inspections/plan review as required .............................................................................. $110.00/hr       TANK PERMITS:   Residential fill, remove or install (per each) ......................................................................................... $200.00    Commercial fill, remove or install (per each) ....................................................................................... $450.00        OTHER FIRE PERMITS:  Fire Suppression Systems:      Commercial Hood Suppression System (per system) .................................................................... $325.00      Standpipe ........................................................................................................................................ $450.00    Fire Connection..................................................................................................................................... $500.00  Fire Operational  ................................................................................................................................... $100.00          Fire fees include plan review and inspections.        PLANNING AND LAND USE FEES     GENERAL: Type I (Staff decisions, no notice) ........................................................................................................... $275.00  Type II A (Staff decisions with notice) .................................................................................................... $970.00  Type IIIA (ADB / Hearing Examiner) ........................................................... Hearing Examiner Cost + $2,000.00  Type IIIB (Hearing Examiner) ...................................................................... Hearing Examiner Cost + $2,000.00  Type IV (Rezone, Development Agreement) ....................................................................................... $7,000.00  Type V (Plan & Edmonds Community Development Code Amendments) .......................................... $7,000.00    Lot Line Adjustment ............................................................................................................................ $1,050.00  Short Subdivision Preliminary Approval .............................................................................................. $3,225.00  Short Subdivision Civil Plan Review ..................................................................................................... $3,050.00  Short Subdivision Final Approval ......................................................................................................... $1,590.00  Subdivision Preliminary Approval .............................................................. Hearing Examiner Cost + $6,510.00  Subdivision Civil Plan Review .............................................................................................................. $4,670.00  Subdivision Final Approval  ................................................................................................................. $1,590.00  Modification Request ............................................................................................................................. $970.00  Minor Change to Approved Plat ............................................................................................................. $275.00  Major Change to Approved Plat ..................................................................... Same as Original Application Fee  PRD Preliminary Approval ................................................................................................................... $6,510.00  PRD Final Approval .............................................................................................................................. $1,590.00    ADB Design Review – Signs .................................................................................................................... $970.00  Staff Design Review if project exceeds SEPA threshold ......................................................................... $970.00  Landscape Plan Inspection Fee ................................................................................................... 1% of Estimate  SEPA Review ........................................................................................................................................... $740.00  SEPA Planned Action Compliance Review (Hwy 99) .............................................................................. $275.00  EIS Review ..................................................................................................................................................... Cost    Outdoor Dining, Amateur Radio............................................................................................................. $275.00    Critical Areas Checklist Application ........................................................................................................ $110.00  Critical Areas Checklist Update ................................................................................................................ $55.00  Critical Areas Variance / Reasonable Use Application ............................... Hearing Examiner Cost + $7,640.00  Critical Areas Study Admin .............................................................................................. $110.00/hr (min. 1 hr)  Critical Areas Contingent Review (See ECDC 23.40.195 for more detail on fees) ................................ $970.00  Shoreline Contingent Review (See ECDC 24.80.100) ............................................................................. $970.00    Planning Fee not categorized ............................................................................................................ $110.00/hr  Request for Reconsideration .................................................................................................................. $275.00    Note: When an application is heard by the Hearing Examiner (HE), the cost of the hearing is billed to the applicant.  APPEALS:  Appeal of Staff Decision (Type I, II or Hearing Examiner) ...................................................................... $450.00  Appeal of Type IIIB Decision to City Council .......................................................................................... $550.00  Appeal of Notice of Civil Violation.......................................................................................................... $970.00  ADB = Architectural Design Board  EIS = Environmental Impact Statement  HE = Hearing Examiner  PRD = Planned Residential Development  SEPA = State Environmental Policy Act    ENGINEERING FEES MISCELLANEOUS FEES: Backflow Prevention Compliance Fee  ................................................... $165.00  Developers Agreements  ........................................................................ $220.00  + $110.00/hr + City Attorney Fees  Fire/ Aid Sign Address Fabrication Fee ............................................. $100.00/ea  Street Sign Fabrication Fee ............................................................... $200.00/ea  Water and Sewer Availability Letters .................................................. $65.00/ea  Latecomers Agreement .......................................................................... $220.00  + $110.00/hr + City Attorney Fees  LID Sewer Agreement  ............................................................................ $220.00  + $110.00/hr + City Attorney Fees  Variance from Underground Wiring  ..................................................... $330.00  + $110.00/hr + City Attorney Fees    GENERAL FACILITY CHARGES:  Water GFC’s are based on meter size:  Water and sewer GFC’s shall be paid by each new customer connecting to the utility systems.   Storm GFC’s shall be paid by the applicant for ESU’s added or created by development.   Meter Size   General Facility Charge   ¾”   $5,050.00    1”  $12,624.00  11/2 “  $25,248.00  2”  $40,397.00  GFC’s for Single Family Residences only: Fee is based on meter size required for domestic demand (typically ¾”).  GFC shall not be based on meter upsizing for fire sprinkler system only.   Sewer Utility GFC ........................................................... $4,417.00 per ERU  A single family residential development = 1.0 ERU per dwelling unit  A multifamily residential development = .67 ERU per dwelling unit  Applicants for non‐residential development shall pay a GFC equal to the ERU determination that is made by  the Public Works Director.   Stormwater Management GFC  ........................................ $799.00 per ESU  A single family residential development with up to 5,000 sf hard surface area = 1.0 ESU   All other construction calculated according to a ratio of 1.0 ESU per 3,000 sq ft of new, replaced or new  plus replaced impervious surface area.  RIGHT-OF-WAY FEES: Right‐of‐Way Construction Permit .................................. $330.00  + Inspection Fees  Right‐of Way Minor Construction Permit  ...................... $110.00  + Inspection Fees  Street Restoration for Water Meter Installation ......... $1,000.00  + Street Overlay Cut Penalty Fee if applicable      (Excluding Private Development Projects)  Street Overlay Cut Penalty Fee  ...................................... $220.00  + ROW Permit Fees    + Add’l per SQYD charge times overlay cut multiplier  Encroachment Permit  .................................................... $330.00  + Recording Fees  Street Use Permit ............................................................ $110.00  + Bistro Dining Fees if applicable  Bistro Dining Fees .............................................................. $30.00  Annual Fee + Monthly ROW Use Fee      @ $0.50/ SQ FT x 12.84% (leasehold tax)  Alley, Sidewalk, Parking Disruption/ Closure Fees .......... $220.00  + ROW Permit + Monthly Closure Fees  Closure fees charged for any activity that occupies or closes, sidewalks, parking spaces(s), parking lanes(s) or  other paved area of a street/road for more than 72 hours. Monthly portion of Fee [$ per month] = 1% of  assessed value per square foot of abutting property x right of way area [SF] disrupted/closed. If  disruption/closure affects any portion of the area of a parking space, the area of disruption closure is calculated  based upon the area of a full parking space.   SEWER FEES: New Commercial & Multi‐Family .................................... $220.00  + Inspection Fees   New Single Family ........................................................... $110.00  + Inspection Fees    Repair ‐ Full Line Replacement  ....................................... $110.00  + Inspection Fees   Repair ‐ Partial Line Replacement ................................... $110.00  (Includes 1 inspection        + Add’l Inspection Fees, if applicable)    Special Conditions (Grinder Pumps, Ejectors) ................. $110.00  + Sewer Fees + Utility Engineer Review   Drainage Permit (Pool, Hot Tub, Jacuzzi) .......................... $55.00  Each Occurrence        STORMWATER FEES: Stormwater Permit .......................................................... $330.00  + General Inspection Fees    WATER METER FEES:     Meter Size  Meter Fee    Installation of New Service & Meter*  3/4”    $2,920.00             1”     $2,970.00        1½”     $6,220.00        2”   $6,390.00       *General Facility Charges may apply                        GFC = General Facility Charge ESU = Equivalent Service Unit  ROW = Right of Way  ERU = Equivalent Residential Unit  General  Facility  Charges May  Apply      ICC VALUATION TABLE August 2019 Adopted by City of Edmonds effective Jan 1, 2020    Group (2018 International Building Code) IA IB IIA IIB IIIA IIIB IV VA VB  A‐1 Assembly, theaters, with stage  246.61  238.50  232.82  223.18 209.86  203.80  216.12  191.69  184.50  A‐1 Assembly, theaters, without stage  225.65  217.54  211.85  202.22  189.15  183.09  195.16  170.98  163.79  A‐2 Assembly, nightclubs  191.96  186.56  182.12  174.70  164.94  160.39  168.64  149.29  144.33  A‐2 Assembly, restaurants, bars,  banquet halls 190.96  185.56  180.12  173.70  162.94  159.39  167.64  147.29  143.33  A‐3 Assembly, churches  226.69  218.58  212.89  203.26  191.60  185.54  196.20  173.43  166.24  A‐3 Assembly, general, community halls,  libraries, museums 190.63  182.52  175.84  167.20  153.09  148.07  160.14  134.97  128.78  A‐4 Assembly, arenas  224.65  216.54  209.85  201.22  187.15  182.09 194.16  168.98  162.79  B Business  197.81  190.62  184.70  175.70  160.65  154.63  168.95  141.15  134.99  E Educational  207.77  200.59  194.83  186.43  173.71  164.91  180.01 151.89  147.25  F‐1 Factory and industrial, moderate  hazard 117.60  112.19  105.97  101.84  91.54  87.26  97.61  75.29  70.95  F‐2 Factory and industrial, low hazard  116.60  111.19  105.97  100.84  91.54  86.26  96.61  75.29  69.95  H‐1 High Hazard, explosives  109.99  104.58  99.35  94.22  85.14  79.87  89.99  68.89  0.00  H234 High Hazard  109.99  104.58  99.35  94.22  85.14  79.87  89.99  68.89  63.56  H‐5 HPM  197.81  190.62  184.70  175.70  160.65  154.63  168.95  141.15  134.99  I‐1 Institutional, supervised environment  197.83  191.05  185.12 177.91  163.28  158.81  178.06  146.98  142.33  I‐2 Institutional, hospitals  330.92  323.73  317.81  308.81  292.72  0.00  302.06  273.22  0.00  I‐2 Institutional, nursing homes  229.68  222.49  216.58  207.57  193.53  0.00  200.83  174.02  0.00  I‐3 Institutional, restrained  224.86  217.67  211.75  202.75  188.96  181.94  196.00  169.45  161.29  I‐4 Institutional, day care facilities  197.83  191.05  185.12  177.91  163.28  158.81  178.06  146.98  142.33  M Mercantile  142.95  137.54  132.11  125.68  115.38  111.83  119.62  99.73  95.77  R‐1 Residential, hotels  199.70  192.92  186.99  179.78  164.90  160.43  179.93  148.60  143.96  R‐2 Residential, multiple family  167.27  160.49  154.56  147.35  133.71  129.23  147.50  117.40  112.76  R‐3 Residential, one‐ and two‐family  154.28  150.09  146.35  142.65  137.55  133.92  140.30  128.74  121.24  R‐4 Residential, care/assisted living  facilities 197.83  191.05  185.12  177.91  163.28  158.81  178.06  146.98  142.33  S‐1 Storage, moderate hazard  108.99  103.58  97.35  93.22  83.14  78.87  88.99  66.89  62.56  S‐2 Storage, low hazard  107.99  102.58  97.35  92.22  83.14  77.87  87.99  66.89  61.56  U Utility, miscellaneous  84.66  79.81  74.65  71.30  64.01  59.80  68.04  50.69  48.30    Square Foot Construction Costs a, b, c  a. Private Garages use Utility, miscellaneous  f.  Sunroom (unheated) = $28.00  b. For shell only buildings deduct 20 percent  g. Deck Ramp, Stairs, Trellis, Porch = $20.00 per sq. ft.  c. N.P. = not permitted  h. Dock = $35.00 per sq. ft.  d. Unfinished basements (Group R‐3) = $22.45 per sq. ft.   i. Unheated Storage = $25.00 per sq. ft.  e.  Carport = $25.00 per sq. ft.            VALUATION BASED BUILDING PERMIT FEES     TABLE 1      Total Valuation**  Residential  Commercial  $1 to $500  $100 Base fee + $30  $100 Base fee + $36  $501 to $2,000  $100 Base fee + $30 for the first $500 + $3 for  each additional $100, or fraction thereof to and  including $2,000  $100 Base fee + $36 for the first $500 + $3.60 for  each additional $100, or fraction thereof to and  including $2,000  $2,001 to $25,000  $100 Base fee + $75 for the first $2,001 + $14 for  each additional $1,000, or fraction thereof to and  including $25,000  $100 Base fee + $90 for the first $2,001 + $16.80  for each additional $1,000, or fraction thereof to  and including $25,000  $25,001 to  $50,000  $100 Base fee + $400 for the first $25,001 + $10  for each additional $1,000, or fraction thereof to  and including $50,000  $100 Base fee + $480 for the first $25,001 + $12  for each additional $1,000, or fraction thereof to  and including $50,000  $50,001 to  $100,000  $100 Base fee + $650 for the first $50,001 + $7  for each additional $1,000, or fraction thereof to  and including $100,000  $100 Base fee + $780 for the first $50,001 + $8.40  for each additional $1,000, or fraction thereof to  and including $100,000  $100,001 to  $500,000  $100 Base fee + $1,000 for the first $100,001 +  $6 for each additional $1,000, or fraction thereof  to and including $500,000  $100 Base fee + $1,200 for the first $100,001 +  $7.20 for each additional $1,000, or fraction  thereof to and including $500,000  $500,001 to  $1,000,000  $100 Base fee + $3,400 for the first $500,001 +  $5 for each additional $1,000, or fraction thereof  to and including $1,000,000  $100 Base fee + $4,080 for the first $500,001 + $6  for each additional $1,000, or fraction thereof to  and including $1,000,000  $1,000,001 and  up  $100 Base fee + $5,900 for the first $1,000,000 +  $4 for each additional $1,000, or fraction thereof  $100 Base fee + $7,080 for the first $1,000,000 +  $4.80 for each additional $1,000, or fraction  thereof    The Building Valuation Data table shall be updated on January 1st of each year to the latest version as published by ICC. **See Valuation Table located on previous page.        TABLE 1 ‐ VALUATION BASED APPLICABLE PERMITS:    Commercial Structures: New, Additions & Remodels  Garages & Carports    Residential Structures: New, Additions & Remodels  Swimming Pools (In‐Ground)    Accessory Structures (Greenhouse/Shed)  Cell Communications/ Cellular Facilities    Deck, Stairs, Ramps  Other permits types as determined     Commercial: Hot/Tub and Spas, Solar/ Photovoltaic Systems, Re‐roofs & Tenant Improvements    Plus: $6.50 Residential State Surcharge Fee per permit and $2 per each dwelling unit  $25.00 Commercial State Surcharge Fee per permit and $2 per each dwelling unit