Loading...
Ordinance 4166and ORDINANCE NO.4166 AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING THE 2019 AMENDMENTS TO THE CITY COMPREHENSIVE PLAN; AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. WHEREAS, the most significant update to the Comprehensive Plan occurred in 2015; WHEREAS, the city council adopted Resolution 1420 to docket an amendment related to the Housing Element of the Comprehensive Plan for consideration in 2019; and WHEREAS, the proposed amendment would modify an "implementation action" contained in the Housing Element; and WHEREAS, the current implementation action for housing requires a housing strategy to be developed by 2019; and WHEREAS, earlier this year, the City Council established a Citizens' Housing Commission to make recommendations on housing policy issues; and WHEREAS, the Citizens' Housing Commission will perform its work during the years 2019 and 2020; and WHEREAS, the Planning Board held a public hearing on the proposed amendment to the Housing Element on October 23, 2019; and WHEREAS, the Planning Board recommended a slightly different amendment that reflects that contemplated work of the Citizens' Housing Commission; and WHEREAS, the City Council held a public hearing on the proposed amendment to the Housing Element on November 26, 2019; and WHEREAS, the Capital Facilities Plan is amended on an annual basis; and WHEREAS, the Planning Board considered the 2019 proposed amendments to the Capital Facilities Plan Element during its meetings on October 9, 2019 and October 23, 2019; and 1 WHEREAS, the City Council held a public hearing on the Capital Facilities Plan on November 12, 2019; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. The 2019 City of Edmonds Comprehensive Plan and, specifically, the following Implementation Action from the Housing Element, is hereby amended to read as set forth below (new text shown in underline; deleted text shown in strife): Implementation Action: Develop a strategy by 201 ❑ f F : - the S Ply e a..v=d::ble housing and meeting diverse housing fieeds.Provide housing policy options by the end of2020 for City Council consideration. Section 2. The 2019 City of Edmonds Comprehensive Plan and, specifically, the Capital Facilities Plan Element, is hereby amended as described in Exhibit A, which is attached hereto and incorporated herein by this reference as if fully set forth herein. Section 3. Effective Date. This ordinance, being an exercise of a power specifically delegated to the City legislative body, is not subject to referendum and shall take effect five (5) days after passage and publication of an approved summary thereof consisting of the title. ATTEST/AUTHENTICATED: CI LERK, SCOT ASSEY APPROVED: MA 2 APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY: BY ]EF RA FILED WITH THE CITY CLERK: November 27, 2019 PASSED BY THE CITY COUNCIL: December 3, 2019 PUBLISHED: December 6, 2019 EFFECTIVE DATE: December 11, 2019 ORDINANCE NO. 4166 N SUMMARY OF ORDINANCE NO.4166 of the City of Edmonds, Washington On the 3`d day of December, 2019, the City Council of the City of Edmonds, passed Ordinance No. 4166. A summary of the content of said ordinance, consisting of the title, provides as follows: AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING THE 2019 AMENDMENTS TO THE CITY COMPREHENSIVE PLAN; AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. The full text of this Ordinance will be mailed upon request. DATED this 3`d day of December, 2019. '2 - CI Y ER , SCOT SEY CITY OF EDMONDS CAPITAL FACILITIES PLAN U~� o-V ECM Sr. 1 g9 L Rl ►M CFP GENERAL City of Edmonds Capital Facilities Plan (CFP) Parks, General, and Regional Projects (2020-2025) Current Grant Project 1 Project Name Purpose Opportunity Phase 2020-2025 Total Cost Revenue Sour 2021 2022 2023 2024 2025 2026-2040 Civic Center Development Develop the recently adopted master $3,400,000 Grants $3,400,000 plan for Civic Park. Develop plan $1,737,472 BEET 1/2 $1,737,472 adding amenities and recreation components, restrooms to RCO Local Parks Design $1,352,620 Park Impact Fees $1,352,620 accommodate increased growth. $2,000,000 GF $2,000,000 $3,700,000 G.O. Bonds or Vote $3,700,000 $400,000 Private Donation (unsecured) $400,000 $12,590,092 Total $12,590,092 $0 $0 $0 $0 $0 $12,590,092 Community Park / Athletic Complex In cooperation with ESD#15 develop $0 Capital Campaign Old Woodway High School: Phase 2 a community park and athletic RCO Phasel and 3 complex. $0 FEET 2 Complete $0 School District $0 Foundation $0 Grants $0 Total $0 $0 $0 $0 $0 $0 8M Parks & Facilities Maintenance & Replace / Renovate deteriorating $0 Public Vote Operations Building building in City Park. Unknown Conceptual $0 G.O. Bonds $0 $0 Total $0 $0 $0 $0 $0 $0 $34M Waterfront Work with Sr. Center to renovate $1,568,565 REET $1,568,565 $1,000,000 Redevelopment/Waterfront surrounding park, parking lot and RCO WWRP Design $562,500 Grants $562,500 Walkway Completion walkway. Remove creosote pier, reintroduce habitat for fish and ALEA Permitting $550,000 Park Impact Fees $550,000 wildlife. Increase access to the Snohomish Co. Construction $250,000 Grants (unsecured) $250,000 waterfront to accommodate increased growth. Connect waterfront walkway from Brackett's Landing South to Olympic Beach, including completion in front of the Ebb tide condominiums. $2,931,065 Total $2,681,065 $250,000 $1,000,000 $0 $0 $0 $3,931,065 Edmonds Crossing WSDOT Ferry / Relocate ferry terminal to Marina EIS $0 Federal (Unsecured) Multimodal Facility Beach. US DOT Completed $0 State Funds I $0 Total Unknown Public Market (Downtown Acquire and develop property for a Waterfront) year round public market. Unknown Conceptual $0 Grants I $0 Total Unknown Edmonds Marsh Estuary The Edmonds Marsh nearshore Restoration (Willow Creek estuary restoration will restore the Daylighting) natural tidal exchange between the Puget Sound and the Edmonds Marsh and is a major component of the PROS plan. The subcomponent Stormwater can be found in CFP Stormwater. Total CFP $15,521,157 1 Annual CFP Totals 1 $15,271,157 1 $250,000 1 $1,000,000 1 $0 PROJECT NAME: Civic Center Park ESTIMATED PROJECT COST: $13,100,000 IMM M91 PROJECT DESCRIPTION: The Civic Park master plan is complete and has been adopted, funds (including carryover, grants, bonds, REET, Park Impact Fee's and General Fund) have been allocated and we are prepared to go to bid in February with ground breaking in April or May of 2020. PROJECT BENEFIT/ RATIONALE: The Civic Master plan was adopted in 2017. Funds have been set aside, and grant funds secured. With the approved bonding we are ready to begin the project. This is a high priority in the PROS plan. SCHEDULE: 2020-2025 COST BREAKDOWN PROJECT 2020 2021 2022 2023 2024 2025 COST Planning and $395,000 Design Engineering $140,000 Construction $11,937,092 1 % Art $88,000 TOTAL 12,560,092 PROJECT NAME: Community Park / Athletic ESTIMATED PROJECT COST: $6-8 M Complex at the Former Woodway High School ra CIA HOGAN rC)R lER WOODWAY HIGH SCHOOL. ATHLETIC FIELD IMPROVEMENTS PRE PAnto fOX FHE E DMON DS SCHOOL DISH ICT MAY FOV PROJECT DESCRIPTION: Develop community park and regional athletic complex with lighted or unlighted fields and recreational amenities in partnership with Edmonds School District, community colleges, user groups, and other organizations. Development dependent upon successful regional capital campaign. $10m - $12M project for all 3 phases. PROJECT BENEFIT/RATIONALE: The site is currently an underutilized and under maintained facility with great potential as community multi -use active park. Site has existing controlled access, greenbelt, parking and 4-court tennis facility with substandard fields. Highly urbanized area with 150,000 residents within 5-mile radius. Future maintenance supported by user fees. Phase 1 was completed in 2015 for $4.2M, Phases 2 & 3 will be completed in the future for an additional $6-8M. SCHEDULE: 2020-2039 COST BREAKDOWN PROJECT 2020 2021 2022 2023 2024 2025 2026- COST 2039 Planning/Study Engineering & Administration Construction 1 % for Art TOTAL $6-8M " all or a portion of this project may quality for 1 % for the Arts 8 PROJECT NAME: Edmonds Marsh Estuary ESTIMATED PROJECT COST: TBD (Willow Creek Daylighting) Marsh as it existed in 1941 General Project Location PROJECT DESCRIPTION: The Edmonds Marsh near -shore estuary restoration will restore the natural tidal exchange between the Puget Sound and the Edmonds Marsh. This project will enhance its many ecological functions and wildlife found within the interior of the Marsh. Funds will be used to support the grant writing efforts. PROJECT BENEFIT/RATIONALE: The natural tidal exchange will allow juvenile Chinook salmon and other marine life to utilize the estuary. Similarly, the restoration will allow Coho and Chum salmon to again migrate into Willow Creek for spawning; note that the Willow Creek Salmon Hatchery is located adjacent to the Marsh. Conditions that support migratory birds and waterfowl will also be improved. The increased volume and rate of saltwater exchange will also allow a natural redistribution of saltwater -freshwater flora and fauna. Likewise, the increased tidal exchange will reduce the accumulation of contaminants and increase oxygenation within the Marsh. The estuarine functions including its role in the aquatic food web and the delivery of nutrients to coastal waters will also be enhanced. Importantly, the project is intended to address sea level rise impacts and enhance natural carbon sequestration (blue carbon offset). Lastly, the project will promote recreational tourism at both Marina Beach and the Marsh for all generations to enjoy, learn about, and utilize as a wildlife sanctuary in an urban environment. The project has a stormwater component which will require removal of tidal gates and a 1,600 pipe that was placed in the early 1960's as a connection between the Puget Sound and the Edmonds Marsh. The stormwater project will require cleaning out culverts on to improve hydrology and reduce flooding during high flows and engineering as provided by the companion stormwater project known as the Dayton Street Pump Station was also recently completed to assist in flooding on Dayton Street as a result of the Shellebarger Marsh. SCHEDULE: 2020 - 2025 COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Eng. & Admin. Construction 1 % for Art TOTAL PROJECT NAME: Parks & Facilities ESTIMATED PROJECT COST: $3-$4 Million Maintenance & Operations Building Building Outline Perimeter zone — 4,200 sf Existing Fence Line PROJECT DESCRIPTION: The 40 year old maintenance building in City Park is reaching the end of its useful life and is in need of major renovation or replacement. PROJECT BENEFIT/RATIONALE: Parks and Facilities Divisions have long outgrown this existing facility and need additional work areas and fixed equipment in order to maintain City parks and Capital facilities for the long term. SCHEDULE: Contingent on finding additional sources of revenue from general and real estate taxes. COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 2026-2039 Planning/Stud Eng. & Admin. Construction 1 % for Art TOTAL $3m - $4m * all or part of this Project may qualify for 1 % for the Arts 10 PROJECT NAME: Waterfront Redevelopment ESTIMATED PROJECT COST: $4,805,198 -- __.__.__ ...._ __ �78ptM� �i►,:p, Aw R— _ T i Prr�ppsed Edmards Waterfront center II sruvs: ..}pp.=y ww wn k,rii •-:, ,Kxr i� ara+ nwr ss.acc .o.wrrr err w rx M�ryrpOrldr� �.. r — wpo-.e rarq K+r+� rrra,wcn ara �----•- re+.a k,w¢',n�va, n iLSM M1opw�tl �Imn Owe Yw ♦or�.�yrro�.r.. anM vueew..�e r.n p.r.r� n r+sRfr�,-Owf yF." PROJECT DESCRIPTION: Work with Sr. Center to renovate surrounding park, parking lot, and frontage improvements. Remove creosote pier, reintroduce habitat for fish and wildlife. Increase access to the waterfront to accommodate increased growth. This project includes the Cit 's support for the parking lot and frontage improvements. PROJECT BENEFIT/ RATIONALE: Public access of waterfront and tidelands on Puget Sound. Provide a new Senior and Community Center. One of the top priorities in the PROS Ian is too en up beachfront access. SCHEDULE: 2020-2025 COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering $67,500 Construction $2,588,645 1 % for Art $24,920 TOTAL $2,681,065 all or part of this Project may qualify for 1 % for the Arts is `v: I WAMAKV oral I AMU t pr. I -t, Im I' `( 1 If 41�\I- - 1 ��'Y'i v 14 City of Edmonds Capital Facilities Plan (CFP) Transportation Projects (2019-2024) Grant Project (2020-2025) Project Name Purpose Opportunity Phase Total Cost Funding Source 2020 2021 2022 2023 2024 2025 1 2026-2040 Sayr±i, / r-it. Analvai_e St. SW from Hwy 99 to 151h PI. InstaO two-way left turn lanes and $0 (Federal or State secured) W. sidewalks to improve capacity and $11,700,000 (Federal or State unsecured) $1,000,000 $1,000,000 $9,700,000 �121tl pedestrian safety (project split with Snohomish County) Possible Grant Conceptual $0 (Local Funds) $11,700,000 Total $0 $0 $0 §1,000,000 §7'000,000 $9,700,000 $0 Highway 99 Gateway/Revitalization Install gateway elements and safety $9,428,000 (Federal or State secured) $628,000 $500,000 $2,000,000 $3,300:00.0 $1,000,000 $2,000,000 improvements along SR-99 Corridor. State $3,000,000 (Federal or State unsecured) $3,000,000 $162,000,000 Appropriation Design $290,000 (Local Funds) $290,000 $12,718,000 Total $918,000 $500,000 $2,000,000 $6,300,000 $1,000,000 $2,000,000 $162,000,000 Hwy 99 @ 2121h St SW Intersection Widen 212th St. SW to add a (Federal or State secured) Improvements westbound left turn lane for 200' storage length and an eastbound left (Federal or State unsecured) turn lane. Possible Grant Conceptual (Local Funds) Total Project Costs included in Hwy. 99 Revitalization / Gateway pro act costs Hwy. 99 0 216th St. SW Intersection Widen 216th St. SW to add a left tum (Federal or State secured) Improvement lane for eastbound and westbound movements. (Federal or State unsecured) Possible Grant Conceptual (Local Funds) Total Project Costs included in Hwy. 99 Revitalization / Gateway project costs Hwy. 99 @ 220th St. SW Intersection Widen 220th St. SW and Hwy 99 to (Federal or State secured) Improvement add awestbound right turn lane (for 325'storage length) and a soutbound (Federal or State unsecured) left turn lane (for 275'storage length). Possible Grant Conceptual (Local Funds) Total Project Costs included in Hwy. 99 Revitalization / Gateway pro act costs Hwy 99 C& 234th St. SW Traffic Signal Install new traffic signal at Hwy. 99 (Federal or State secured) 234th St. SW to provide safer vehicular / pedestrian crossings, combined with (Federal or State unsecured) comer widenings. Possible Grant Conceptual (Local Funds) Total Project Costs included in Hwy. 99 Revitalization / Gateway project costs Improve intersection safety by $0 (Federal or State secured) �SR124(196thSI.SW)/88thA.W Intersection Improvements convertinga stop controlled intersection for NB and SB movements $7g4,500 (Federal or State unsecured) $122,000 $87,500 $535,000 to a signalized intersection. Possible Grant Conceptual $156,500 (Local Funds) $71,000 $87,500 $903,000 Total $0 $0 §0 $193,000 $175,000 §535,000 $0 Main St. and 9th Ave S Install traffic signal to improve $0 (Federal or State secured) intersection of and Level of Service (mini roundabout is an alternative $896,000 (Federal or State unsecured) J J J $120,000 $776,000 solution). Possible Grant Conceptual $0 (Local Funds) $896,000 Total $120,000 $776,000 $0 $0 Ave. W @ 220th St. SW Convert split phasing operation for EB $702,000 (Federal or State secured) $400' 00 $302,000 �161h Intersection Improvements and WB movements to concurrent through movements, with protected / Secured grant $7,055,000 (Federal or State unsecured) $355,000 $6,700,000 ��$O permissive LT phasing. Conceptual $352,000 (Local Funds) $133,000 $219,000 $8,109,000 Total $0 §533,000 $876,000 §6,700,000 $0 $01 SR-104095th PI. W Intersection Convert EB and W6 LT along SR-1 $0 (Federal or State secured) Improvements to protected LT phasing; upgrade ADA $495,000 (Federal or State unsecured) $75,000 $420,000 curb ramps; and add C-Curb for access management Possible Grant Conceptual $0 (Local Funds) $495,000 Total $0 $0 $0 $75,000 $420,000 $0 $0 SR-104 0 238M St. SW Intersection Install traffic signal to improve vehicular $0 (Federal or State secured) Improvements and pedestrian safety; revise geometry to allow for safer turns. $1,311,000 (Federal or Stateunsecured) $173,000 $1,138,000 Possible Grant Conceptual $27,000 (Local Funds) $27,000 $1,338,000 Total $0 $0 SO $200'000 51,198,000 $0 $0 Olympic View Dr. @ 76th Ave. W Install traffic signal to reduce the $0 (Federal or State secured) Intersection Improvements intersection delay and improve Level of So . e. $0 (Federal or State unsecured) $1,183,000 Conceptual $0 (Local Funds) S0 Total $0 $0 $0 $0 $0 $0 $1,183,000 City of Edmonds Capital Facilities Plan (CFP) Transportation Projects (2019-2024) Grant Project (2020-2025) Project Name Purpose Opportunity Phase Total Cost Funding Source 2020 2021 2022 2023 2024 2025 1 2026.2040 84lh Ave. W (212th St. SW to 238th Install two-way left tum lanes and $0 (Federal or State secured) St. SW) sidewalk to improve capacity and pedestrian safety (split with Snohomish $0 (Federal or State unsecured) $15,441'000 County) Conceptual $0 (Local Funds) $0 Total $0 $0 $0 $0 $0 $0 §75,441,000 Ave. Intersection Implement Westgate Circulation $0 (Federal or State secured) �SR-10401001h Improvements Access Plan, midblock pedestrian crossings along 100th Ave. W, and $1,017,468 (Federal or State unsecured) $150,000 $867,468 rechannetization with bike lanes / Possible Grant Conceptual $0 (Local Funds) sharrows along 1001h Ave;. W. $1,017,468 Total $0 $0 50 $150,000 $867,468 $0 $0 SR-104 @ 76th Ave. W Intersection Add a 2nd W B left turn lane (spl0 with $0 (Federal or State secured) Improvements Shoreline). $0 (Federal or State unsecured) $3,017,000 Conceptual $0 (Local Funds) §0 Total $0 $0 $0 $0 $0 $0 $3,017,000 Olympic View Dr. 0 1741h St. SW Install traffic signal to improve Level of $0 (Federal or State secured) Intersection Improvements Sendce and intersection delay. $0 (Federal or State unsecured) Conceptual $0 (Local Funds) $610,000 $0 Total $0 $0 $O $O $0 $0 $610,000 Non -motorized Pedestrian / Sicvcle Projects Sunset Ave. Walkway from Bell St to Provide walkway on the west side of $140,195 (Federal or State secured) $140,195 Gaspers St. Sunset Ave, with various utility Possible $1,870,000 (Federal or State unsecured) $1,870,000 upgrades. RCO/TIB Grant Design $879,805 (Local Funds) $154,805 $725,000 for conslmcllon $2,890,000 Total $0 $0 SO $295,000 $2'595,000 $0 $0 �212 d St. SW from 100th Ave. W to SR-104 Improve pedestrian safety along 232nd St. SW from100th Ave. to SR-104. $0 (Federal or State secured) (Federal or State unsecured) $200,000 $1,105,000 $1,305,000 Possible Grant Conceptual $0 (Local Funds) $1,305,000 Total $0 $0 §0 §0 $200,000 $1,105,000 $0 StSW from Madrona Improve pedestrian safety along 236th $0 (Federal or State secured) �231th Elementary to 97th Ave. W St. SW, creating a safe pedestrian connection from Madrona $1,268,500 (Federal or State unsecured) $106,500 $1,182,000 Elementary Possible Grant Conceptual $106,500 (Local Funds) $106,500 $1,395,000 Total $0 $0 SO SO $213'000 $1,182,000 $0 841h Ave. W from 238th St. SW to Improve pedestrian safety along 84th $0 (Federal or State secured) 234th St. SW Ave. W. from 238th St. SW to 2341h S[. SW. $90,000 (Federal or State unsecured) $90,000 $495,000 Possible Grant Conceptual $0 (Local Funds) $90,000 Total $0 $0 §0 §0 §0 $90,000 $495,000 Both Ave;. W from 206h St SW to Improve; pedestrian safety along Both $0 (Federal or State secured) 212th St. SW Ave. W, within plan Edmonds- $1,996,000 (Federal or State unsecured) $333,000 $1,663,000 Woodway High School. Possible Grant Conceptual $0 (Local Funds) $1,996,000 Total $0 $0 $O $0 $333,000 $1,663,000 $0 Ith St. SW from 16th Ave. W to Provide safe sidewalk along a missing $0 (Federal or State secured) �21 841h Ave. W link of 2181h St. SW. from 76th Ave. to 841h Ave. $650,000 (Federal or State unsecured) $100,000 $550,000 Possible Grant Conceptual $655,000 (Local Funds) $100,000 $555,000 $1,305,000 Total $0 $0 $O $O $200,000 $1,105,000 $0 Walnut St from 3rd Ave. S to 4th Ave. Provide short missing link. $0 (Federal or State secured) S Walkway $105,000 (Federal or State unsecured) $105,000 Possible Grant Conceptual $0 (Local Funds) $105,000 Total $0 $0 $0 $105,000 $0 $0 $0 Walnut St from 61h Ave. S to Provide short missing link. $57,710 (Federal or State secured) $57,710 7th Ave. W Walkway $0 (Federal or State unsecured) Secured grant Conceptual $0 (Local Funds) $57,710 Total $57,710 $0 §0 $0 $0 $0 $0 City of Edmonds Capital Facilities Plan (CFP) Transportation Projects (2019-2024) Grant Project (2020-2025) Project Name Purpose Opportunity Phase Total Cost Funding Source 2020 2021 2022 2023 2024 2025 1 2026.2040 216th St. SW Walkway from Hwy. 99 Provide sidewalk on north side of 216th $0 (Federal or State secured) to 72nd Ave W St. SW from Hwy. 99 to 72nd Ave W $137,000 (Federal or State unsecured) $137,000 (completing missing link) Possible Grant Conceptual $20,000 (Local Funds) J J $20,000 J J $157,000 Total $0 $157,000 $0 Elm W ay from 1th Ave. S to 9th Ave. Provide sidewalk on one side of Elm $0 (Federal or State secured) S Way from 8th Ave. S to 9th Ave. S $637,000 (Federal or State unsecured) $137,000 $500,000 J Possible Grant Conceptual $193,000 (Local Funds) $38,000 $155,000 $830,000 Total $0 $0 $0 $175,000 $655,000 $0 Maplewood Dr. From Main St. to Provide safe sidewalk, connecting to $0 (Federal or State secured) 200th St. SW ex. Sidewalk along 200th St. SW (direct link to Maplewood Elementary $2,330,000 (Federal or State unsecured) $436,000 $947,000 $947,000 School). Possible Grant Conceptual $0 (Local Funds) $2'330,000 Total $0 $0 §0 $436,000 $947,000 §947,nrmJ $0 Dayton St. from 71h Ave. S to 8th Ave. Complete missing link along Dayton St. $192,290 (Federal or State secured) $192,290 S from 7th Ave. S to 8thAve. S Secured grant $0 (Federal or State unsecured) Construction $0 (Local Funds) $192,290 Total $192,290 $0 $0 $0 $0 $0 $0 95lh PI. W from 224th St. SW to Provide sidewalk on one side of 95th $0 (Federal or State secured) 220th St. SW PI. W from 224th St. SW to 220th St. $585,000 (Federal or State unsecured) $100,000 $485,000 SW completing missing link. Possible Grant Conceptual $0 (Local Funds) $585,000 Total $0 $0 §0 $100,000 $485,000 $0 $0 Railroad St. Sidewalk from Dayton St. to Main St. / SR-104 Reconstruct and widen existing sidewalk along Railroad St. Possible Grant $0 (Federal or State secured) (Federal or State unsecured) $138,400 $608,000 $746,400 Conceptual $115,600 (Local Funds) $21,60. $94,000 $862,000 Total $0 $0 $0 $160,000 $702,000 $0 $0 �SR-1 04 @ 76th Ave. W Non- Motorized Transportation Improvements Extend bike lanes within proximity of intersection and install new ADA compliant curb ramps possible Grant $0 (Federal or State secured) (Federal or State unsecured) $174,000 $986,000 J $1,160,000 Conceptual $50,000 (Local Funds) $50,000 $1,210,000 Total $0 $0 §0 $224,000 $986,000 $0 Add light poles along various $0 (Federal or State secured) Downtown Lighting Improvements stretches within Downtown Possible Grant Conceptual $1,500,000 (Federal or State unsecured) $1,500,000 Edmonds to improve $0 (Local Funds) J transportation system safety $1,500,000 Total $0 $0 $0 $1,500,000 $0 $0 SR-104 Walkway from HAWK Add sidewalk along stretches to $0 (Federal or State secured) Signal to Pine St/ Pine St. Walkway improve connectivity between Possible Grant Conceptual $480,000 (Federal or State unsecured) J J J $108,000 $372,000 J from SR-104 to 3rd Ave. S Downtown and City Park. $120,000 (Local Funds) $27,000 $93,000 $600,000 Total $135,000 $465,000 $0 Cilywide Bicycle Install bike Iona and sherow along $0 (Federal or State secured) Improvements various stretches throughout Possible Grant $0 (Federal or State unsecured) T $5,000,000 the City. Conceptual $0 (Local Funds) J J $0 Total $0 $0 $0 $5,000,000 191 StSt. SW from 80th Ave. W to Provide sidewalk on one side of 191th $0 (Federal or State secured) 76th Ave. W St. SW from Both Ave. to 76th Ave. (completing missing link) $0 (Fede ral or State unsecured) J $630,000 Conceptual $0 (Local Funds) S10 Total $0 $0 $0 $0 $0 5630,000 City of Edmonds Capital Facilities Plan (CFP) Transportation Projects (2019-2024) Grant Project (2020-2025) Project Name Purpose Opportunity Phase Total Cost Funding Source 2020 2021 2022 2023 2024 2025 1 2026-2040 104th Ave. W / Robinhood Lane from Provide sidewalk on west side of 104th $0 (Federal or State secured) 238th St. SW to 106th Ave. W Ave. from 238th St. SW to 106th Ave. W (completing missing link) $0 (Federal or State unsecured) $990,000 Conceptual $0 (Local Funds) $0 Total $0 $0 $0 $0 $0 $0 $990,000 BOth Ave. W from 2181h St. SW to Provide sidewalk on one side of 80th $0 (Federal or State secured) 220th St. SW Ave. W from 218th St. Slink) W to 220th St. SW (completing missing $0 (Federal or State unsecumd) $315,000 Conceptual $0 (Local Funds) $0 Total $0 $0 $0 $0 $0 $0 $315,000 84th Ave. W from 188th St. SW to Provide sidewalk on one side of 84th $0 (Federal or State secured) 186th St. SW Ave. W from 188th St. SW to 186th St. $315,000 SW $0 (Federal or State unsecured) Conceptual $0 (Local Funds) $0 Total $0 $0 $0 $0 $0 $0 §315,000 St. SW from Hwy. 99 to 76th Provide sidewalk on one side of 236th $0 (Federal or State secured) �231th Ave. W St. SW from Hwy. 99 to 76th Ave. W $0 (Federal or State unsecured) $765,000 Conceptual $0 (Local Funds) SO Total $0 $0 $0 $0 $0 $0 $765,000 h St. SW from Hwy. 99 to 761h Provide sidewalk on one side of 238th $0 (Federal or State secured) �231t Ave. W St. SW from Hwy. 99 to 76th Ave W $0 (Federal or State unsecured) $1,170,000 Conceptual $0 (Local Funds) $0 Total $0 $0 $0 $0 $0 $0 $1,170,000 Both Ave. W from 188th St. SW to Improve pedestrian safety along BOth $0 (Federal or State secured) Olympic View Dr. Ave. W, within pro)dmityto Seaview Elementary and Seaview Park. $1,506,000 (Federal or State unsecured) $315,000 $1,191,000 Possible Grant Conceptual $629,000 (Local Funds) $125,000 $504,000 $2,135,000 Total $0 $0 SO $440,000 51,695,000 $0 $0 189th PI. SW from 80th Ave. W to of Provide sidewalk on one Sid of 189th $0 (Federal or State secured) 76th Ave. W PI. SW from 80th Ave. W to Ave. W $0 (Fede ral or State unsecured) $585,000 Conceptual $0 (Local Funds) §0 Total $0 $0 §0 §0 §0 $0 $585,000 Ferry/Railroad Ferry Storage Improvements from Improve ferry queueing by extending $0 (Federal or State secured) Pine St. to Dayton St. ferry storage area along SR-104 (striping changes). $357,000 (Federal or State unsecured) $357,000 Conceptual $0 (Local Funds) $357,000 Total $0 $0 $0 $357,000 $0 $0 $0 Total UP 1 1 $57,078,468 1 Annual UP Totals 1 $1,168,000 1 $1,033,000 1 $2,876,000 1 $18,822,000 1 $14,852,468 1 $18,327,000 1$192,516,000 Revenue Summary by Year Totals Source 2020 2021 2022 2023 2024 2025 2026-2040 $10,520,195 tal Federal, State, other grant (Secur $878,000 $900,000 $2,302,000 $3,440,195 $1,000,000 $2,000,000 $0 $42,961,868 Total Federal & State (Unsecured) $0 $0 $355,000 $14,847,400 $11,987,468 $15,772,000 $191,906,000 $3,596,405 1 Local Funds $290,000 $133,000 $219,000 $534,405 $1,865,000 $555,000 $610,000 PROJECT NAME: 228th St. SW from Hwy. 99 ESTIMATED PROJECT COST: $11,700,000 to 95th PI. W PROJECT DESCRIPTION: Widen 228th St. SW from Hwy. 99 to 95th Pl. W to three lanes (with two-way left turn lane), with curb and gutter, sidewalk, and bike lanes. PROJECT BENEFIT/RATIONALE: This project would improve active transportation safety and traffic flows along this corridor. Community Transit would also look into creating a new east -west bus route along 228th St. SW if this project moves forward (connecting Edmonds Transit Station to Mountlake Terrace Transit Station). SCHEDULE: The design phase is scheduled to begin in 2023 (pending funding). More than half the project is within Esperance / Snohomish County. A Sound Transit System Access grant was submitted in May '19 to fully fund this project but the grant wasn't secured. Sound Transit also has funding available through ST3 to improve accessibility to the Sound Transit Station. Mukilteo and Edmonds have $40 Million in combined funding to complete projects improving access to the Sound Transit Station (for all modes of transportation). The City indicated to Sound Transit that this project should to be considered by Sound Transit and it is currently being evaluated. A final response from Sound Transit whether this project is funded or not is scheduled for late 2019. COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 2026- 2040 Planning/Study Engineering, $1,000,000 $1,000,000 Admin., & ROW Construction $9,700,000 1 % for Art TOTAL $1,000,000 $1,000,000 $9,700,000 `R PROJECT NAME: Highway 99 ESTIMATED PROJECT COST: $175,000,000 Gateway/Revitalization PROJECT DESCRIPTION: The project would include, among other features, wider replacement sidewalks or new sidewalk where none exist today, new street lighting, center medians for access control and turning movements, etc., attractive and safe crosswalks, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. PROJECT BENEFIT/RATIONALE: Improve aesthetics, safety, user experience, and access management along this corridor. In addition, economic development would be improved. SCHEDULE: The conceptual phase began in September 2017 and was completed in December 2018. An interim project has been identified with the addition of raised median along the entire corridor from 244th St. SW to 212th ST. SW (to address safety issues along the corridor). The design phase is scheduled to begin in November 2019. The addition of a traffic signal at Hwy. 99 @ 234th St. SW is also a priority project, adding a pedestrian crossing between 238th St. SW and 228th St. SW (— 1 mile distance with no crossing). $10M from a Connecting Washington allocation has been secured, with $91VI not available prior to 2021. COST BREAKDOWN PROJECT 2020 2021 2022 2023 2024 2025 2026-2040 COST Planning/Study Engineering & $60,000 $500,000 $2,000,000 $1,000,000 $2,000,000 $24,000,000 Administration & ROW Construction $858,000 6,300,000 $138,000,000 1 % for Art TOTAL $918,000 $500,000 $2,000,000 $6,300,000 $1,000,000 $2,000,000 $162,000,000 20 PROJECT NAME: Hwy. 99 @ 212th St. SW ESTIMATED PROJECT COST: $2,806,000 intersection improvements ffl�w ME i PER I M 1■M= a a z 7313 n Edmonds - Edmonds Family Clinic ei ADX Public 17-ks KENNEL Q 21192 p, Z1 St Rau 212TH 7307-er CUPIC a 7303"3' ^ n n Pool 7W4 "1" 7302 "2" PARK & RIDE 215TH W ST SW o: W 0 EIE a PLANT AEGIS SweuiSH m MDNnS CRM Pl15 ' i Sign Shop P.11.6 / 7 / 21114 / 7 / 109 / ck / g / ALLIED / ROOFING / / / B&M / CON ST 21414 / 21448 / / / NCOONRLD• / 01 1ALUE / PILLAGE / 16TH ST/SW PROJECT DESCRIPTION: Widen 21211 St. SW to add a westbound left turn lane for 200' storage length and an eastbound left turn lane for 300' storage length. Provide protected left turn phase for eastbound and westbound movements. (ROADWAY PROJECT PRIORITY in 2015 Transportation Plan: #4). The cost for the intersection improvements are included within the Hwy. 99 Revitalization / Gateway project costs. PROJECT BENEFIT/RATIONALE: Improve intersection efficiency and reduce delay. SCHEDULE: All phases are scheduled between 2023 and 2025 (unsecured funding).The project cost is split between Lynnwood and Edmonds since half the project is within Lynnwood. COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering, $175,000 $1,091,000 ROW, & Administration Construction $1,540,000 1 % for Art TOTAL $175,000 $1,091,000 $1,540,000 21 PROJECT NAME: Hwy. 99 @ 216t" St. SW ESTIMATED PROJECT COST: $2,335,000 intersection improvements W 21410 c^ w 21d021d0 21412 21405 04 w W> 2120 < MC�UHAL6' 2i43� wn � anz 150 215 AEGIS 21558 to VALUE VILLAGE ST SIN 21 B Tli 21600 {� 21619 KRUGER CLINIC f "'01 r 21632 � � - ��I16e 2 PROJECT DESCRIPTION: Widen 216t" St. SW to add a westbound left turn lane and an eastbound left turn lane. Provide protected -permissive left turn phases for eastbound and westbound movements. This project ranked #3 in the Roadway Project Priority in the 2015 Transportation Plan. The cost for the intersection improvements are included within the Hwy. 99 Revitalization / Gateway project costs. PROJECT BENEFIT/RATIONALE: Improve intersection efficiency and reduce delay. SCHEDULE: All phases are scheduled between 2023 and 2025 (unsecured funding). COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & ROW & Administration $204,000 $334,000 Construction $1,837,000 1 % for Art TOTAL $204,000 $334,000 $1,837,000 `�: PROJECT NAME: Hwy. 99 @ 220th St. SW ESTIMATED PROJECT COST: $3,215,000 intersection improvements TOP FOODS v �, 19TH sr SW / 21919 STARBU S / / 220TH ST SW I I I I 1221 I I I I I 13 _I � � l4 n III •0. 7301 W U O e S C m .M. PROJECT DESCRIPTION: Widen 220th St. SW to add Westbound right turn lane for 325' storage length. Widen SR-99 to add 2nd Southbound left turn lane for 275' storage length. (ROADWAY PROJECT PRIORITY in 2015 Transportation Plan: #2). The cost for the intersection improvements are included within the Hwy. 99 Revitalization / Gateway project costs. PROJECT BENEFIT/RATIONALE: Reduce intersection delay and improve traffic flow and safety. SCHEDULE: All Phases are scheduled between 2023 and 2025 (unsecured funding for all phases). COST BREAKDOWN PROJECT 2020 2021 2022 2023 2024 2025 COST -Planning/Study Engineering & Administration & ROW $175,000 $1,085,000 Construction $1,955,000 1 % for Art TOTAL $175,000 $1,085,000 $1,955,000 23 PROJECT NAME: Hwy. 99 @ 234th St. SW ESTIMATED PROJECT COST: $3,300,000 intersection improvements ESPE&ANCE ' I3IiN � FS 1 i711 21202 17 S-IMO PL W ircn �• �I 21]31 �33Rf1 Pt ] S'e 1'i L M1 1,03 1312 812: � •71J7C'. _ — : i31'• !911 ]y0! 7731 !$ ff -- �34TFS ST.SW _.—. } 23 a'•• 3]406■�� 1 DIM ]l1 1 1712 1� 2341� wul _ Y3U] € 7i.ti11' 131*1 !salt nb tit � �77 PROJECT DESCRIPTION: Install traffic signal at the intersection of Hwy. 99 @ 234t" St. SW to provide safer crossing of Hwy. 99 for vehicles and non -motorized transportation (project identified in Hwy. 99 Sub Area Plan). These intersection improvements are included as part of the Hwy. 99 Revitalization / Gateway project. The cost for the intersection improvements are included within the Hwy. 99 Revitalization / Gateway project costs. PROJECT BENEFIT/RATIONALE: Improve intersection safety and pedestrian conditions along the corridor. SCHEDULE: All Phases are scheduled between 2023 and 2025 (unsecured funding for all phases). COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & Administration & ROW $300,000 $300,000 Construction $1,200,000 $1,500,000 1 % for Art TOTAL $300,000 $1,500,000 $1,500,000 24 PROJECT NAME: 196th St. SW (SR-524) @ ESTIMATED PROJECT COST: $903,000 88th Ave. W Intersection Improvements 1em 3 ILU _ a_ .~a I m :VEN DAY WENTIST :HURCH 4 1eeTM sr sw PROJECT DESCRIPTION: PROJECT DESCRIPTION: Install traffic signal at the intersection of 196th St. SW @ 88th Ave. W. The modeling in the 2009 Transportation Plan indicated that restricting northbound and southbound traffic to right -turn -only (prohibiting left -turn and through movements) would also address the deficiency identified at this location through 2025. This is same alternative as one concluded by consultant in 2007 study but not recommended by City Council. This could be implemented as an alternate solution, or as an interim solution until traffic signal warrants are met. The ex. LOS is F (below City Standards: LOS D). This project was ranked #6 in the Roadway Project Priority in the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: Improve traffic flow characteristics and safety at the intersection. The improvement would modify LOS to A, but increase the delay along 196th St. SW. SCHEDULE: All project phases are scheduled between 2023 and 2025 (unsecured funding). In order to allow the installation of a traffic signal, the MUTCD traffic signal warrants must be met and the installation must be approved by WSDOT (since 196th St. SW is a State Route / SR-524). COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & $193,000 $175,000 Administration Construction $535,000 1 % for Art TOTAL $193,000 $175,000 $535,000 25 PROJECT NAME: Main St and 9t" Ave. S ESTIMATED PROJECT COST: $896,000 J __J1 MH BELL ST I - H P MAIN ST WADE JAMES _J -TH EATE R L � W� � a S H oavraN n PROJECT DESCRIPTION: Installation of a traffic signal or mini -roundabout. PROJECT BENEFIT/RATIONALE: The existing intersection is stop -controlled for all approaches and the projected intersection LOS in 2035 is LOS F (below the City's concurrency standards: LOS D). The installation of a traffic signal would improve the intersection delay to LOS B. The project ranked #4 in the Roadway Project Priority of the 2015 Transportation Plan. SCHEDULE: The design phase is scheduled to begin in 2023 and construction in 2024. (unsecured funding). COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering, $120,000 Administration & ROW Construction $776,000 1 % for Art TOTAL $120,000 $776,000 Wz: PROJECT NAME: 7611 Ave. W @ 22011 St. SW ESTIMATED PROJECT COST: Intersection Improvements $8,109,000 TOP FOODS 220TH sT SW LYNWOOD HONDA STARBU KS J PROJECT DESCRIPTION: Reconfigure eastbound lanes to a left turn lane and through / right turn lane. Change eastbound and westbound phases to provide protected -permitted phase for eastbound and westbound left turns. Provide right turn overlap for westbound movement during southbound left turn phase. (ROADWAY ROJECT PRIORITY #1 in 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: Reduce the intersection delay and improve the LOS. The projected LOS in 2035 would be improved from LOS F to LOS D. SCHEDULE: A STP Federal grant was secured in 2018 for the Design Phase (funds not available until 2021). The ROW and construction phases are currently unfunded. The design phase and ROW phases are scheduled to be completed in 2022 and construction in 2024 (pending additional grant funds). COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & ROW $533,000 $876,000 Administration Construction $6,700,000 1 % for Art TOTAL $533,000 $876,000 $6,700,000 . All or a portion of this project may quality for 1 % for the arts 27 PROJECT NAME: SR-104 @ 95t" pl. W ESTIMATED PROJECT COST: $495,000 Intersection Improvements W H r ST S a CC rn cl WESTGATE CHAPEL PROJECT DESCRIPTION: Upgrade all ADA Curb Ramps; and add C-Curb for access management. This project was identified in the SR-104 Complete Streets Corridor Analysis completed in 2015). PROJECT BENEFIT/RATIONALE: Improve intersection safety for pedestrians and vehicles. SCHEDULE: 2023-2024 unsecured funding COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & Administration & ROW $75,000 Construction $420,000 1 % for Art TOTAL $75,000 $420,000 28 PROJECT NAME: SR-104 @ 238t" St. SW ESTIMATED PROJECT COST: $1,338,000 Intersection Improvements ■ To Hwy 99 i 10 239TH ST SW PROJECT DESCRIPTION: Install traffic signal. The warrants are met for such an installation. This project was identified in the SR-104 Complete Street Corridor Analysis (completed in 2015). PROJECT BENEFIT/RATIONALE: Improve vehicular and pedestrian safety. SCHEDULE: 2023-2024 unsecured funding) COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & Administration & ROW $200,000 Construction $1,138,000 1 % for Art TOTAL $200,000 $1,138,000 29 PROJECT NAME: Olympic View Dr. @ 76th Ave. ESTIMATED PROJECT COST: W Intersection Improvements $1,183,000 N SEAVIEW PARK 3 PLSW 186TH ST SW ml I m—I PROJECT DESCRIPTION: Install traffic signal (the intersection currently stop controlled for all movements). (ROADWAY ROJECT PRIORITY in 2015 Transportation Plan: #11). PROJECT BENEFIT/RATIONALE: The improvement will reduce the intersection delay. The projected Level of Service is LOS F in 2035, which is below the City's concurrency standards (LOS D). The project will improve the Level of Service to LOS B. SCHEDULE: Engineering and Construction are scheduled between 2026 and 2040 (unsecured funding). COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 2026-2040 Planning/Study Engineering, Administration, & ROW $200,000 Construction $983,000 1 % for Art TOTAL $1,183,000 30 PROJECT NAME: 84th Ave. W (212th St. SW ESTIMATED PROJECT COST: $15,441,000 to 238th St. SW) PROJECT DESCRIPTION: Widen 84th Ave. W to (3) lanes with curb, gutter, bike lanes, and sidewalk on each side of the street. (part of this project was ranked #6 in the Long Walkway list of the 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: Improve overall safety of the transportation system along this collector street: 1) the sidewalk and bike lanes would provide pedestrians and cyclists with their own facilities and 2) vehicles making left turn will have their own lane, not causing any back-up to the through lane when insufficient gaps are provided. SCHEDULE: All project phases are scheduled between 2026 and 2040 (unsecured funding). The project costs would be split between Snohomish County and Edmonds since half the project is located within Esperance. COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 2026-2040 Planning/Study Engineering, $2,000,000 Administration, & ROW Construction $13,441,000 1 % for Art TOTAL $15,441,000 all or part of this project may qualify for 1 % for the Arts. 31 PROJECT NAME: SR-104 @ 100t" Ave. W ESTIMATED PROJECT COST: $1,017,468 Intersection Improvements / Access Management I EDMONDS WAY PROJECT DESCRIPTION: Implement Westgate Circulation Access Plan, install mid -block pedestrian crossing along 100t" Ave. W, improve safety to access the driveways within proximity to the intersection, and re -striping of 100t" Ave. W with the potential addition of bike lanes. This project was identified in the SR-104 Completed Streets Corridor Analysis completed in 2015). PROJECT BENEFIT/RATIONALE: Improve access and safety at the intersection and improve non -motorized transportation safety. SCHEDULE: All phases are scheduled between 2023 and 2024 (unsecured funding) COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 2026-2040 Planning/Study Engineering & Administration $150,000 Construction $867,468 1 % for Art TOTAL $150,000 $867,468 32 PROJECT NAME: SR-104 @ 76t" Ave. W ESTIMATED PROJECT COST: $3,017,000 Intersection Improvements a 7 N l}' ggtV ll OF`R4MP - - LAKEBASSIF46FA HAY--_---_._. Ep WMDS WAY 4 240TM PL SIY. 'I o'IS111 SW o- I so - is 202NOPL SW -1 u380 Pr, SW F _ IV ai PNoS RFC1Ntr - 7RKp BACL&GOWAY ' PROJECT DESCRIPTION: Add a 2nd left turn lane along SR-104. This project was identified in the SR-104 Complete Street Corridor Analysis (completed in 2015). PROJECT BENEFIT/RATIONALE: Improve access and safety at the intersection and improve non -motorized transportation safety. SCHEDULE: 2026-2040. The project costs would be split between Shoreline and Edmonds since half the intersection is located within Shoreline. COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 2026-2040 Planning/Study Engineering & Administration $453,000 Construction $2,564,000 1 % for Art TOTAL $3,017,000 33 PROJECT NAME: Olympic View Dr. @ 17411 St. ESTIMATED PROJECT COST: $610,000 SW Intersection Improvements ti4 J I� -L_-jJ- 7027 7003 LI Meadowdale Middle School r� ------------ J-/, Parking b ssoi St. Thomas Moore —� arrre I Catholic School Ballfieltl y / SanctuarY PROJECT DESCRIPTION: Widen Olympic View Dr. to add a northbound left turn lane for 50' storage length. Shift the northbound lanes to the east to provide an acceleration lane for eastbound left turns. Install traffic signal to increase the LOS and reduce intersection delay. (ROADWAY ROJECT PRIORITY in 2015 Transportation Plan: #13) PROJECT BENEFIT/RATIONALE: Improve intersection efficiency and safety of drivers accessing either street. SCHEDULE: Engineering and Construction are scheduled between 2026 and 2040 (unsecured funding). COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 2026-2040 Planning/Study Engineering & Administration $100,000 Construction $510,000 1 % for Art TOTAL $610,000 34 PROJECT NAME: Sunset Ave Walkway ESTIMATED PROJECT COST: $3,050,000 from Bell St to Caspers St. ♦0%�— F � �iii■■■ 1 44b' ���:�a�MAW s UHDVIEwavrs ♦ ♦ �� I■� 11111■� I � ���' IIIIIII :�1■�■1 ■ PROJECT DESCRIPTION: Provide a walkway on the west side of the street, facing waterfront (— 112 mile / more recent project). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Temporary improvements were installed in 2017 through striping, in order to evaluate the alignment of the proposed walkway and parking alternatives The design phase is scheduled to be completed in 2023. Construction isn't scheduled to occur until 2024 when utility improvements are scheduled to be completed along this stretch. No grant funding has been secured for the construction phase. COST BREAKDOWN PROJECT 2020 2021 2022 2023 2024 2025 COST Planning/Study Engineering & $295,000 Administration Construction $2,595,000 1 % for Art TOTAL $295,000 $2,595,000 * all or part of this project may qualify for 1 % for the Arts. 35 PROJECT NAME: 23211d St. SW Walkway ESTIMATED PROJECT COST: $1,305,000 from 100th Ave. W to SR-104 EDMONDS WAY W SAME iwnRs LLI L ! Ell 2 . ■ ■ Qy - 1 �i IF Al. 10 UUT H ' CHURCH, (jr ■ ■ ■ , Uj 7 , ■ AW �I o �0 c� 2 ODW' ' I ESTATES AY OLy I _ PR RK \29 9 Dorn 98 7 6 5 ' 30 2 15 3 14 7• J \32 45 32 ■ r jr `2q 7 1 nm (0) 1 � ■ � e PROJECT DESCRIPTION: Install sidewalk along 232nd St. SW from 100th Ave. W to SR-104. This project ranked #3 in the Long Walkway List of 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2024-2025 (unsecured funding) COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & Administration $200,000 Construction $1,105,000 1 % for Art TOTAL $200,000 $1,105,000 0, PROJECT NAME: 2361" St. SW Walkway ESTIMATED PROJECT COST: $1,395,000 from Madrona Elementary to 97t" Ave. W S Q PROJECT DESCRIPTION: Install sidewalk with curb and gutter along 236nd St. SW from Madrona Elementary to 97t" Ave. W. This project ranked #4 in Long Walkway list of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2024-2025 (unsecured funding) COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & Administration $213,000 Construction $1,182,000 1 % for Art TOTAL $213,000 $1,182,000 37 PROJECT NAME: 84th Ave. W Walkway ESTIMATED PROJECT COST: $585,000 from 238th St. SW to 234th ST. SW - PARK LL EonnoNos SALGALL APTS m w w LL CH RIST LN TH E RAN CH N RCH O PARK & RIDE OFFICE 23601 4 23603 SAFEWAY $ 23605 Wn L KJIHG R 23607 SUNSET 23619 0 P Q ��� R AURORA S MARKETPLACE T N FAMILY RA NCAKE U '7-77" 73$TH 5T 5w W SEOUL � 23827 PLAZA 2 23827 IL DGE 0" NORTH ry HAVEN z n MANOR w a � R p r~ } n•1L LO'N 13ROOK PROJECT DESCRIPTION: Install sidewalk along 84th Ave. W from 238th St .SW to 234th St. SW, with curb and gutter. This project ranked #5 in the Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: Begin design in 2025 (unsecured funding) COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 2026-2040 Planning/Study Engineering & Administration $90,000 Construction $495,000 1 % for Art TOTAL $90,000 $495,000 38 PROJECT NAME: 80th Ave. W Walkway ESTIMATED PROJECT COST: $1,996,000 from 206th St. SW to 212th ST. SW �IIIIIr1 �� PROJECT DESCRIPTION: Install sidewalk along 80th Ave. W from 206th St. SW to 212th St. SW with curb and gutter. This project ranked #1 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: The improvements will improve non -motorized transportation safety including for school kids due to proximity of several schools). SCHEDULE: 2024-2025 (funding unsecured). COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & Administration & ROW $333,000 Construction $1,663,000 1 % for Art TOTAL $333,000 $1,663,000 39 PROJECT NAME: 21811 St. SW Walkway ESTIMATED PROJECT COST: $1,305,000 from 76th Ave. W to 84th Ave. W WOM �ZTl7 ■�M■■EM N■N�■ ■■ � 0 Tsoer' rsos ••x• R AXT m uw osa eu>o� ER 2HOG ar EVExe NE LT CENT ER PROJECT DESCRIPTION: Install sidewalk along 218th St. SW from 76th Ave. W to 84th Ave. W with curb and gutter. This project ranked #2 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/ RATIONALE: The improvements will improve pedestrian safety. SCHEDULE: 2024-2025 unsecured funding COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & Administration & ROW $200,000 Construction $1,105,000 1 % for Art TOTAL $200,000 $1,105,000 40 PROJECT NAME: Walnut St. Walkway from 3rd ESTIMATED PROJECT COST: $105,000 Ave. S to 4th Ave. S ARTS W ENTER a Z UNDOW NEI N ALDER ALDER ST 346 414 412 410 arking 5 5 LA UJ o SOUND VIEW o: HOWELL WAY W a x v DAYTON ST OLD MILLTOWN MAPLE ST TRIC ALDER ST N W a FBECKWT'S z BAN K T- 409 530Pancak 407 540 Hau s 4003 546 0 401 w a WALNUT Sr --F GREGORY e H 525 PROJECT DESCRIPTION: Construct a missing link of sidewalk (approximately 350') on Walnut St. between 3rd Ave. S and 4th Ave. S (ranked #3 in Short Walkway Project list in 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Engineering & Construction scheduled for 2023 (unsecured funding). COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Stud Engineering & Administration $10,000 Construction $95,000 1 % for Art TOTAL $105.000 " all or part of this project may qualify for 1 % for the Arts Cy PROJECT NAME: 216th St. SW Walkway from ESTIMATED PROJECT COST: $157,000 Hwy. 99 to 72nd Ave. W 21400 � JJ 7200 B&M PARK & RIDE CONS E ar- w 21410 21408 0. MAN J � o � 21401 21412 � v M1 2140 U v 214G7 W � �507 w � W / 21511 j 21431 M DONAL6' { IL y o Y N 0 21521 N I M STEVEN 21500 E T AEGIS 215587 VALUE VILLAGE 21BTH $T Z 120 16 TJ1 :VEN5 21600 { 21619 ci' tILION KRUGER *Aq CLINIC , .01 PROJECT DESCRIPTION: Install 150' sidewalk on north side of 216th St. SW from Hwy. 99 to 72nd Ave. W (completing a missing link on north side of stretch). This project ranked #3 in the Short Walkway List (from 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: To provide a safe and desirable walking route. SCHEDULE: Engineering & Construction scheduled for 2023 (unsecured funding). COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & Administration $30,000 Construction $127,000 1 % for Art TOTAL $157,000 * all or part of this project may qualify for 1 % for the Arts [y: PROJECT NAME: Elm Way Walkway from ESTIMATED PROJECT COST: $830,000 8tn Ave. S to 9t" Ave. S IR L ■ PROJECT DESCRIPTION: Install sidewalk along Elm Way from 8t" Ave. S to 9t" Ave. S. This project ranked #6 in the Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2023-2024 (funding unsecured). COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & Administration $175,000 Construction $655,000 1 % for Art TOTAL $175,000 $655,000 43 PROJECT NAME: Maplewood Dr. Walkway ESTIMATED PROJECT COST: $2,330,000 from Main St. to 2001h St. SW PROJECT DESCRIPTION: Construct sidewalk on Maplewood Dr. from Main St. to 200th St. SW (- 2,700'). A sidewalk currently exists on 200th St. SW from Main St. to 76th Ave. W, adjacent to Maplewood Elementary School (rated #18 in the Long Walkway list of the 2015 Transportation Plan). PROJECT BENEFIT/RATIONALE: Create pedestrian connection between Maplewood Elementary School on 200th St. SW and Main St., by encouraging kids to use non -motorized transportation to walk to / from school. SCHEDULE: Engineering scheduled for 2024 and construction in 2024 / 2025 (funding unsecured). COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & $436,000 Administration Construction $947,000 $947,000 1 % for Art TOTAL $436,000 $947,000 $947,000 * all or part of this project may qualify for 1 % for the Arts. 44 PROJECT NAME:95th PI. W Walkway from ESTIMATED PROJECT COST: $585,000 224th St. SW to 220th St. SW PROJECT DESCRIPTION: Install sidewalk along 95th PI. W from 224th St. SW to 220th St. SW with curb and gutter. This project ranked #8 in the Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: Engineering is scheduled for 2023 and construction in 2024 (funding unsecured) COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & Administration $100,000 Construction $485,000 1 % for Art TOTAL $100,000 $485.000 45 PROJECT NAME: Railroad Ave. Sidewalk from ESTIMATED PROJECT COST: $862,000 Dayton St. to SR-104 bt. 4fi P❑�tio-� W NAY TON 5T a ? Fo �ONn. ea a - 041� DAYTON ST PROJECT DESCRIPTION: Install new and wider sidewalk along Railroad St. from Dayton St. to SR-104. PROJECT BENEFIT/RATIONALE: Improve non -motorized transportation safety along Railroad St. from Dayton St. to SR-104, key stretch since connects to various destination points such as Senior Center, Port of Edmonds, Downtown Edmonds... . SCHEDULE: All Phases are scheduled in 2023 and 2024 (unsecured funding for all phases). COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & Administration & ROW $160,000 Construction $702,000 1 % for Art TOTAL $160,000 $702,000 Erg, PROJECT NAME: SR-104 @ 76th Ave. W non- I ESTIMATED PROJECT COST: motorized transportation safety improvements $1,210,000 mr— Ra In a. IqN r� w MS. -V ��19 kd,jdN95 WAraFFRq .. _ � LAKE BA LINGER WAY ----- - Tm0F 0N0S WAY PLO a ,.fir r s� sw zr --�dND5 RFLIIVF LAKi iiAL1.IN PROJECT DESCRIPTION: Extend bike lanes within proximity of the intersection in northbound and southbound directions. Install APS on all corners and new ADA curb ramps. PROJECT BENEFIT/RATIONALE: Improve non -motorized transportation safety along this section of the Interurban Trail. SCHEDULE: All Phases are scheduled in 2023 and 2024 (unsecured funding for all phases). This intersection is shared with Shoreline and they own the traffic signal. COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & Administration & ROW $224,000 Construction $986,000 1 % for Art TOTAL $224,000 $986,000 47 PROJECT NAME: 191th St. SW Walkway ESTIMATED PROJECT COST: $630,000 from 80th Ave. W to 76th Ave. W 1� 192ND PL 5W PROJECT DESCRIPTION: Install sidewalk along 191th St. SW from 80th Ave. W to 76th Ave., with curb and gutter. This project ranked #8 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2026-2040 COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 2026-2040 Planning/Study Engineering & Administration $90,000 Construction $540,000 1 % for Art TOTAL $630,000 48 PROJECT NAME: 10411 Ave. W Walkway ESTIMATED PROJECT COST: $990,000 from 238th St. SW to 106th Ave. W PROJECT DESCRIPTION: Install sidewalk along 104th Ave. W from 238th ST. SW to 106th Ave. W, with curb and gutter. This project ranked #10 in the Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2026-2040 COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 2026-2040 Planning/Study Engineering & Administration $150,000 Construction $840,000 1 % for Art TOTAL $990,000 49 PROJECT NAME: 801h Ave. W Walkway ESTIMATED PROJECT COST: $315,000 from 218th St. SW to 220th St. SW --------�-ITT---------------220THSTSW- PROJECT DESCRIPTION: Install sidewalk along 80th Ave. W from 218th ST. SW to 220th ST. SW, with curb and gutter. This project ranked #7 in the Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2026-2040 COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 2026-2040 Planning/Study Engineering & Administration $55,000 Construction $260,000 1 % for Art TOTAL $315,000 50 PROJECT NAME: 84th Ave. W Walkway ESTIMATED PROJECT COST: $315,000 from 188th St. SW to 186th St. SW ■ ■ , i T r W-lb 5w r 186TH ST w m l I ■ �MM mm� IrPlfw� rl i ■drEP,Im ` ,-.1 OF ■ w _ L mmmmp r 18 TH 5 5w 9-- 75Z51Tu cr c... ` LE - - ■ r 7 ■ L ' W r r ■ r °F , r J - SFAMF W _ PROJECT DESCRIPTION: Install sidewalk along 84th Ave. W from 188th St. SW to 186th St. SW., with curb and gutter. This project ranked #5 in Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2026-2040 COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 2026-2040 Planning/Study Engineering & Administration $60,000 Construction $255,000 1 % for Art TOTAL $315,000 51 PROJECT NAME: 23611 St. SW Walkway ESTIMATED PROJECT COST: $765,000 from Hwy 99 to 76th Ave. W ■ 236TH T W 23607 23603 SAFEN 23605 E KJI 23607 NON PROJECT DESCRIPTION: Install sidewalk along 236th St. SW from Hwy 99 to 76th Ave. W. This project ranked #10 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2026-2040 COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 2026-2040 Planning/Study Engineering & Administration $115,000 Construction $650,000 1 % for Art TOTAL $765,000 52 PROJECT NAME: 23811 St. SW Walkway ESTIMATED PROJECT COST: $1,170,000 from Hwy 99 to 76th Ave. W 1 PARK r .•nrIRL NA LN ' , ■ ' EOMONOs APTS BALL ' • • 1 ��r� W w Ov NORTH m CH RIST LH THE RAN CHURCH S N PARK & RIDE R n - 2 TH T OFFICE ■ d `� ,4 , W r SAFEWAY � L KJIHG FC,� I ' L • . SUNSET '•n•1L LO•n: CEj BROOK ■ AURORA- MARKETPLACE FAMILYPANCAKE j7' � 1 ■ 238TH ST SW "' ■ ■ ■ 23821 seouL PLAZA ' ■ ► 1 23827, TRAVEL LODGE 2397 ■ -MISISON TACO TIM ■ ST. FRA NCIS MOTEL WHSE ■ . . . - ■ ■ ■ _+ K&EMOTEL 1 1 ■ ■ RT_II I F 1 ■ ■ ■ , IN ■ ■ :yA PROJECT DESCRIPTION: Install sidewalk along 238th St. SW from Hwy. 99 to 76th Ave. W This project ranked #10 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2026-2040 COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 2026-2040 Planning/Study Engineering & Administration $175,000 Construction $995,000 1 % for Art TOTAL $1,170,000 53 PROJECT NAME: 801h Ave. W / 180th St. ESTIMATED PROJECT COST: $2,135,000 SW Walkway from 188th St. SW to OVD PROJECT DESCRIPTION: Install sidewalk along 80th Ave. W from 188th St. SW to OVD. This project ranked #13 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2023-2024 (unsecured funding). COST BREAKDOWN PROJECT COST 20200 2021 2022 2023 2024 2025 2026-2040 Planning/Study Engineering, ROW, & Administration $440,000 Construction $1,695,000 1 % for Art TOTAL $440,000 $1,695,000 54 PROJECT NAME: 189th PI. SW Walkway ESTIMATED PROJECT COST: $585,000 from 80th Ave. W to 76th Ave. W PROJECT DESCRIPTION: Install sidewalk along 189th PI. SW from 80th Ave. W to 76th Ave. W. This project ranked #14 in Long Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project would improve pedestrian safety. SCHEDULE: 2026-2040 COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 2026-2040 Planning/Study Engineering & Administration $115,000 Construction $470,000 1 % for Art TOTAL $585,000 55 PROJECT NAME: Ferry Storage ESTIMATED PROJECT COST: $357,000 Improvements from Pine St. Dayton St. PROJECT DESCRIPTION: Modify existing lane channelization on SR104 to add vehicle storage for ferry users. PROJECT BENEFIT/RATIONALE: Reduce conflicts between ferry storage and access to local driveways. SCHEDULE: 2023 (unsecured funding) COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & Administration $50,000 Construction $307,000 1 % for Art TOTAL $357,000 0: PROJECT NAME: Citywide Bicycle ESTIMATED PROJECT COST: $5,000,000 Improvements Ah-z i AI _ Pnpo dBke Pekng �Bke ur.e ® EmMg 63x PaMrylLader - a.,e u,.t_ Exstig PROJECT DESCRIPTION: Installation bike lanes and sharrows along various stretches as identified on the Proposed Bike Facilities map of 2015 Transportation Plan PROJECT BENEFIT/RATIONALE: This project will create new bike connections to various destination points throughout the City (such as schools, parks, Downtown, Sound Transit Station...). The intent of this project is to get more people riding their bikes and feel more comfortable riding their bikes on the roadway (with safety improvements). SCHEDULE: 2026-204 COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 2026-2040 Planning/Study Engineering & Administration $750,000 Construction $4,250,000 1 % for Art TOTAL $5,000,000 57 PROJECT NAME: Dayton St. Walkway ESTIMATED PROJECT COST: $205,000 between 7th Ave. S to 8th Ave. S MAIN STD m Frances Anderson Center navTn" IT LU sTj _ 4 ■ F� ILI —. MAP L Q rim -� PROJECT DESCRIPTION: Install sidewalk along Dayton St between 7th Ave. S and 8th Ave. S. This missing link was identified as #1 in Short Walkway List of the 2015 Transportation Plan. PROJECT BENEFIT/RATIONALE: This project will improve pedestrian safety along this stretch. SCHEDULE: The Design was completed in 2019 and construction is scheduled for 2020. The project will be built with the Dayton St. Utility Replacements project (from 3rd Ave. S to 9th Ave. S). The funding source is a 2019 TIB Complete Street grant. COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & Administration Construction 192,290 1 % for Art TOTAL $192,290 58 PROJECT NAME: Downtown Lighting ESTIMATED PROJECT COST: $1,500,000 Improvements PROJECT DESCRIPTION: Installation of street lights along various streets within Downtown Edmonds. PROJECT BENEFIT/RATIONALE: This project will improve lighting along various stretches within Downtown where street light poles / PUD pole don't currently exist. Those improvements will improve night-time safety for all transportation system users. More users will be encouraged to use active transportation to reach their destination during those hours Sound Transit Station and many other destinations within Downtown). SCHEDULE: The design and construction phases are scheduled to take place in 2023 (unsecured funding). Sound Transit has funding available through ST3 to improve accessibility to the Sound Transit Station. Mukilteo and Edmonds have $40 Million in combined funding to complete projects improving access to the Sound Transit Station (for all modes of transportation). The City submitted this lighting project to be considered by Sound Transit and it is currently being evaluated. A final response from Sound Transit regarding the projects that will be selected is scheduled for late 2019. COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering, $100,000 Administration & ROW Construction $1,400,000 1 % for Art TOTAL $1,500,000 59 PROJECT NAME: SR-104 Walkway from ESTIMATED PROJECT COST: $600,000 HAWK signal to Pine St. / Pine St. Walkway from SR-104 to 3rd Ave. S .%, qx AH RD CITY PARK ■ 11 M 0 ERBfne ❑a J we V z 0 A a PROJECT DESCRIPTION: Installation of sidewalk with ADA curb ramps along SR-104 from the HAWK signal to Pine St. and along Pine St. from SR-104 to 3rd Ave. S PROJECT BENEFIT/RATIONALE: This project will improve pedestrian connectivity between the residential areas along 3rd Ave. S to Downtown Edmonds and City Park. SCHEDULE: The design and construction phases are scheduled to take place in 2023 and 2024 (unsecured funding). A TIB grant was submitted for this project, with a response scheduled for late 2019. COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering, Administration & ROW $135,000 Construction $465,000 1 % for Art TOTAL $135,000 $465,000 60 PROJECT NAME: Walnut St. from 6th Ave. S ESTIMATED PROJECT COST: $57,710 to 7th Ave. S 714 I � . 0 120 In � #� ALDER 5T F. �p.��� 1 ' Emmn i m A - PROJECT DESCRIPTION: Install sidewalk on the south side of Walnut St. from 6th Ave. S to 7t1 Ave. S. PROJECT BENEFIT/RATIONALE: This project will improve pedestrian safety along this stretch. SCHEDULE: The Design and construction phases are scheduled to be completed in 2020. The funding source is a 2019 TIB Complete Streets grant. COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Engineering & Administration $5,710 Construction $52,000 1 % for Art TOTAL $57,710 61 62 64 City of Edmonds Capital Facilities Plan (CFP) Stormwater Projects (2020-2025) Protect Name Purpose Grant Opportunity Grant/Date Current Project Phase (2020-2025) Total Cost Revenue Source 2020 2021 2022 2023 2024 2025 Dayton St and Hwy 104 Drainage Add lift station and other new infrastructure to reduce $0 (Federal or State secured) Improvements. intersection flooding. $0 (Federal or State unsecured) Close-out $15,000 (Debt/Stormwater Fees) $15,000 $15,000 Total $15,000 $0 $0 $0 $0 $0 Edmonds Marsh Estuary Restoration / The project will daylight Willow Creek and help begin Willow Creek/Daylighting restoration efforts in the Marsh. The project has three sub- $0 (Federal or State secured) components including (1) daylighting Willow Creek through the existing Unocal property, (2) daylighting of the Willow Creek Possible Grant/TBD Design $12,487,500 (Federal or State unsecured) $1,474,900 $5,506,300 $5,506,300 through Marina Beach Park, and (3) $3,837,500 (Debt/Stormwater) $450,000 $400,100 $1,493,700 $1,493,700 excavation/reestablishment of tidal channels within the Marsh. The project includes significant re -vegetation and mitigation within the Marsh to improve habitat conditions and, depending on the final recommended alternative, may also include significant flood wall and/or berms. This project is a component of the PROS plan (comprehensive plan) for open space, habitat and fulfills goals #1, #3 and #4. $16,325,000 Total $450,000 $1,875,000 $7,000,000 $7,000,000 $0 $0 Seaview Park Infiltration Facility Phase 2 Install additional water quality and infiltration facilities to reduce Ecology Grant Design $598,200 (Federal or State secured) $180,750 $45,750 $371,700 scourign flows in Perrinville Creek; looks to dupliacte efforts $0 (Federal or State unsecured) from Phase 1. $199,400 (Debt/Stormwater Fees) $60,250 $15,250 $123,900 $797,600 Total $241,000 $61,000 $495,600 $0 $0 $0 $17,137,600 Annual CFP Totals $706,000 $1,936,000 $7,495,600 $7,000,000 $0 $0 Revenue Summary by Year Totals Source 2020 2021 2022 2023 2024 2025 $598,200 Total Federal& State (Secured) $180,750 $45,750 $371,700 $0 $0 $0 $12,487,500 Total Federal & State (Unsecured) $0 $1,474,900 $5,506,300 $5,506,300 $0 $0 $4,051,900 Debt/ Stormwater Fees $525,250 $415,350 $1,617,600 $1,493,700 $0 $0 66 ' 00 200 _Q11 C -9tiI 1461 cw Q PROJECT DESCRIPTION: Add a lift station in the Beach Place parking lot and supporting stormwater conveyance structures. The scope also includes baffle manholes to divert flows away from Harbor Square and the Edmonds Marsh, and provide a sub -surface connection for overflows. PROJECT BENEFIT/RATIONALE: To reduce flooding at the intersection of Dayton St. and State Hwy 104. The Project is part of a series of projects recommended in the 2013 study of necessary storm water improvements related to Shellabarger Creek, Willow Creek, and Edmonds Marsh. The project is complimentary to the Willow Creek Daylighting project in that the pump is required to manage flood conditions after the daylighting project is completed. SCHEDULE: A construction contract has been awarded and is expected to be substantially complete in 2019. Total cost est. at $2.1 M; 2020 budget shown is intended for project close- out. COST BREAKDOWN PROJECT 2020 2021 2022 2023 2024 2025 COST Planning/Study Eng. & Admin. Construction $15,000 1 % for Art TOTAL $15,000 67 PROJECT NAME: Edmonds Marsh Estuary ESTIMATED PROJECT COST: $16,650,000 Restoration / Willow Creek Daylighting — Design & Construction Aerial photo of Marsh from 2018 General Project Location Marsh as it existed in 1941 Updated project concept PROJECT DESCRIPTION: The project will daylight Willow Creek and help begin restoration efforts in the Marsh. The project has three sub -components including (1) daylighting Willow Creek through the existing Unocal property, (2) daylighting of the Willow Creek through Marina Beach Park, and (3) excavation/reestablishment of tidal channels within the Marsh. The project includes significant re - vegetation and mitigation within the Marsh to improve habitat conditions and, depending on the final recommended alternative, may also include significant flood wall and/or berms. This project is a component of the PROS plan (comprehensive plan) for open space, habitat and fulfills goals #1, #3 and #4. PROJECT BENEFIT/RATIONALE: The daylighting of Willow Creek and subsequent redevelopment of Marina Beach park (not included) will help reverse the negative impacts to Willow Creek and Edmonds Marsh that occurred when Willow Creek was piped in the early 1960s. This project will provide habitat for salmonids, including rearing of juvenile Chinook. The project, along with its companion CIP project "Dayton Street Pump Station", will also help reduce the flooding problem at the intersection of SR-104 and Dayton Street. This project is a priority in the Edmonds PROS plan. SCHEDULE: 2020 - 2025 COST BREAKDOWN PROJECT COST 2020 2021 2022 2023 2024 2025 Planning/Study Eng. & Admin. $450,000 $1,875,000 Construction $7,000,000 $7,000,000 1 % for Art TOTAL $450,000 $1,875,000 $r,000,000 $7,000,000 PROJECT NAME: Seaview Park Infiltration ESTIMATED PROJECT COST: $742,700 Facility Phase 2 —P I ✓ti �� Yafhot Frederick 175th Seaview 1 Park __ 78th n 180 181 I 2nd h + ! a ono A ri 185th 172n Y o IP ............ Ip G 173 d N a Iv IP E y5 LC _ it IP IF o -4 o IF Ip 77t 1 7 h �t V l 79th J 1 Oth m Distribution Chamber — 8 rid Q` Q Diversion Structure �� IP Inspection Port O�� C ® Swirl Concentrator ss M Z (waler quahtyf tw.) Well � Modi}y flow Limits of Phase 1 i0 exist. diversion structure r Catch Basin A sketch of the project provided in grant application materials. PROJECT DESCRIPTION: The City applied for and received a grant from the Department of Ecology to design and construct an additional stormwater infiltration facility in Seaview Park. The proposal will duplicate the system successfully installed during Phase 1 and is tentatively planned for construction in 2022. PROJECT BENEFIT/RATIONALE: Urbanization of the Perrinville Creek Basin has increased flows in the creek, incision of the creek, and sedimentation in the low -gradient downstream reaches of the creek. A flow reduction study for the Perrinville Creek basin was completed in 2015. This study recommended a number of flow control and water quality projects to improve the conditions in Perrinville Creek. Control of the sediment loads in Perrinville Creek must be achieved before proceeding with additional fish habitat improvement and removal of the sediment collection structure the City currently maintains on the creek near Talbot Road. SCHEDULE: Design is anticipated to begin in 2020 with construction planned for 2022 in order to allow ample time to acquire permits and meet grant obligations during the design phase. COST BREAKDOWN PROJECT 2020 2021 2022 2023 2024 2025 COST Planning/Study Eng. & Admin. $241,000 $6,100 Construction $495,600 1 % for Art TOTAL $241,000 $6,100 $495,600 69 70 Everett Daily Herald Affidavit of Publication State of Washington } County of Snohomish } ss Leanna Hartell being first duly sworn, upon oath deposes and says: that he/she is the legal representative of the Everett Daily Herald a daily newspaper. The said newspaper is a legal newspaper by order of the superior court in the county in which it is published and is now and has been for more than six months prior to the date of the first publication of the Notice hereinafter referred to, published in the English language continually as a daily newspaper in Snohomish County, Washington and is and always has been printed in whole or part in the Everett Daily Herald and is of general circulation in said County, and is a legal newspaper, in accordance with the Chapter 99 of the Laws of 1921, as amended by Chapter 213, Laws of 1941, and approved as a legal newspaper by order of the Superior Court of Snohomish County, State of Washington, by order dated June 16, 1941, and that the annexed is a true copy of EDH883468 ORD 4165, 4166, 4167 as it was published in the regular and entire issue of said paper and not as a supplement form thereof for a period of 1 issue(s), such publication commencing on 12/06/2019 and ending on 12/06/2019 and that said newspaper was regularly distributed to its subscribers during all of said period. The amount of the fee for s ch publication is $50.68. Subscribed and sworn a me on this �J day of o7a/ Notry Public in and for the State of Washington. City of Edmonds - LEGAL ADS 114101416 SCOTT PASSEY Linda Ahiilips Notary Public State of Was#inafon MYApp-9 PR+rilmeRl Expires OW91 247. ► �. �,.J Classified Proof ORDINANCE SUMMARY ."I". Cily W Edmonds. Wdsfenplen On the 31d day of December, 2019. the City %uncli of the CRY of Etlmanne, pas sod She folaWing OrdinancM Ine summaries of said ardlnencas com i4ming of titles are pr sided as fellows: ORDINANCE Nil, 4165 AN ORDINANCE OF THE CITY OF EDMONDS. WASHINCTCN RELATING TO BUSINESS LICENSES AND AMENDING SECTIONS OF EDMONDS CITY CODE TITLE a AND EDMONDS COMMUNITY AND DEVELOPMENT CODE TITLE 28 IN ACCORDANCE WITH THE STATE OF WAWNGTON BUSINESS LICENSE SYSTEM REQUIREMENTS ORDINANCE NO.4166 AN ORDINANCE OF THE CITY OF EDMONDS. WASHINGTON. ADOPTING THE 2019 AMENDMENTS TO THE CITY COMPREHENSIVE PLAN: AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE ORDINANCE NO.4167 AN ORDINANCE OF THE CfTY OF EDMONDS, WASHMGTON, AMENDING ORDINANCE NO. 4161 A$ A RESULT OF UNANTICIPATED TRANSFERS AND EXPENDITURES OF VARIOUS FUN". AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE The Will text of these Omlrlances wig be mellod upon request. DATED 01s; 3rd day of ❑acember, 2019 CITY CLERK, SCOTT PAS SEY Published: Cocomber 6,2019, EDH883468 Proofed by Hartell, Learma, 12/06/2019 08:53:13 am Page: 2