Loading...
22613 95TH PL W.PDF11111111 lill 9367 22613 95TH PL W ADDRESS: 915 T�4 p I a Cie, %A/z C-t TAX ACCOUNT/PARCEL NUMBER: C�o 5 q (4 -3 Q C) ta BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) FOR: CRITICAL AREAS: OF -A' 1-'0 () (9 - 0 0 + DETERMINATION: 0 Conditional Waiver Study Required n Waiver >e,* DISCRETIONARY PERMIT #'S: cp,( 4-9 -/- s I c) p i�, DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR:— ,(,wco � PERMITS (OTHER): - PLANNING DATA CHECKLIST DATED: (010(JIVU-' SCALED PLOT PLAN DATED: SEWER LID FEE $: SHORT PLAT FILE: LOT: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #: GEOTECH REPORT DATED: STREET USE / ENCROACHMENT PERMIT #: WATER METER TAP CARD DATED: 2- LID #: BLOCK: LATEMP\DS'Ps\Forms\Sftret File Checklist.doc LU 8*, (r\:z CC LU LU *U LID OL -44 f At t T 46 It 9 in We pe7dt app rOval Proem ahaU be in retty] as allowi tenanw of . ng or perM y �qrrentb".e. . I (i r U IfINe I firl, t t., "�r (j, or si O#nditiun wh ',.h y (:u0-' 'fi- f,�! e e lication, fn4ardir, -�; wriether BtrUaurp or condit;:)n is Ahown on e site r drawing 510 - Such buiiding, stru 01- co e subipm f . WE ED BY PLAN -U I NC Zone F-6 — Er k Comer \ Fl a&- 1(Z) jetbac Amired Actual Front Sides 0/9 4.6 t =t- Rear E 9 =I- V Oth "- get* 4 31 x W A,3( /6Z,* M&N ML44+ hHOW C-0 +r- C. r A-r� CV'I- - VAK�- Uica z C�4 t LU -rim 0 a - UN r tL 00 LU 3�: —6-411-6-19-A I At f 0! -AfSfr:3-iWeK--zw -7 :ET FILE I It STRE: a !0,,?; ff(O-) t6l --9 -P, M -414 IZ7-1 /it. rlvivwz pow" PLANNING DATA STREET=FILE Name: J t-Alfot & cnay-4 orav-e, Date: 0 (o. 12, -+. 17.,,o C> (p Site Address: I .2i 5s T" W Plan Check #: BLD-2006- O-f-jD + Project Description: 140 IP Ist floor A44 + 14-4 Or porc,,�' -r revyt.� 91 fr ef I a ce, Yo of - Reduced Site Plan Provided: (NO/ NO) ��—JZoning: Map Page: (0 + Corner Lot: (YES Flag Lot: (YES /0 �4Critical Areas Determination #: f�V-A -2,09(v- 00-t-+ E StudyRequired Y-VAl-ZA�1 1+17,Vlo(p F-e-?007- 11 Waiver +9 -1. 1510 Fr- ( L.Cky) CIS4 f dP, V*a -2,Ctrcl SEPA Determination: Exempt 4. b"D ydc.�S Oy-OkCt1VJg pyDpC>SeCJ Needed (for sites with 500 cubic yards of grading or within 200 feet of Puget Sound or Lake Ballinger. Requires: (1) Fee, (2) Environmental Checklist, and (3) APO List with notarized form). Required Setbacks St et: Side: Side: 1 1.9 -+.Is Rear: E 157 ActualSetbacks St et: V Side: -K I - Side: C-7 Rear: 9 Detached Structures: de.$ Girc4e-81 Oy% t4 'Tj!� FL Rockeries: rrellises: (F:e�n c—e Bay Windows/Projecting Modulation: Stairs/Deck: Parking Required: Parking Provided: Lot Area: 01 ILI 10 ( Vr, VJ (.I .2 1+ 01 U) LotCoverage: Lot Coverage Calculations- I L41 0 C�y r5l� I +D-aAq eara!oe. I L+4 - Fort, Building Height Datum Point: vy a-Fc,.,y vvim-etv' Datum Elevation: Maximum Height: Z.5 I ( 7,!5) Actual Height: ADU Created: (YES /0 1 6VW\A/V'.. Subdivision: f2f Vit, CrCC;,t Wk- OoD P-00 - 'TFL- WS Legal Nonconforming Land Use Determination Issued: (YES /6) Other A: 10VA-11 107'."bp'!P AvTxA q(/ & YA 0 7.. V D + 10 1. t 0 12.-+. 167,G Max Ric�noi- Plan Review By: ge.;t& 63"� R) I i (o / ( a vi 91 e, X eA I ri fV C"I"fy of 0I J' CI EH: 4 gig 14 Al A, 5"1 7 L 71 L44- A J4 L L; LIT 2 1 inch equals 30 feet Gary Drake LIDARIAeriallParcel Map 22613 95th Place W. F Approximate 2-foot Contours CRA-2006-0077 Planning Division (GO f VicinitylLIDAR Map 121 5th Ave N, Edmonds WA 98020 0611912006 425.771.0220 0 A --I'(XaZ;an &ASSOCIATES,INC. 21-a-_1 GEOTECHNICAL ENGINEERING * ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION July 26, 2006 RE IM Mr. Dwight Steele R -CERIED Steele Home Service 23424 88h Ave W ?01369 Edmonds, Washington 98026 PERMIT C-00-i-4TER RE: Limited Slope Evaluation Proposed Addition Drake Residence 22613 95h Place West Edmonds, Washington Dear Mr. Nelson: KA Project No. 092-06128 P%or REET FILE RESUB JUL 2 7 2006 BUILDING DEPARTMENT CITY OF EDMONDS In accordance with your request and authorization, a geologist from our firm conducted a limited slope assessment for the referenced site on July 12, 2006. We have prepared this letter, to address the applicable elements of the Edmonds Municipal Code — Natural Resources — Chapter 23.80 — Geologically Hazardous Areas. The property is currently pending an application for a small addition of approximately 140 square feet, and a newly designed roof. The property is located at 22613 95th Place West in Edmonds, Washington. The site is currently developed and the property is well vegetated with a typical suburban lawn and landscaping. The majority of the proposed site is level. A slope break, which we understand is near the southern lot line, breaks sharply to a slope of approximately 40 to 50 percent in magnitude which terminates In a level area approximately 30 feet below. The slope is well vegetated with salal, rhododendrons and large conifers. There is an abundance of forest duff on the ground. Based on a review of the Geologic Map of the Edmonds East and part of the Edmonds West Quadrangles, Washington (Geologic Map), it appears that the property is located in an area that is on a broad expanse of Vashon Drift Glacial Till. This unit is a non -sorted mixture of gravels, sand and silt, which has been over consolidated by sub glacial pressures. The Natural Resources Conservation Service lists the soils in this area as Alderwood-Urban land complex which is a soil developed on glacial tills, and has been altered by urban development. The soil has an extreme erosion poten.tial, due to the quantity of silt and fine sand that can be found in it. During our reconnaissance of the site, we investigated the shallow slope soils by excavating shallow hand auger borings in the adjacent lawn, and on the slope near the mid point in two locations. A hand auger was used at locations near the top of slope, as well, to identify the soils. The conditions encountered in the shallow hand auger borings corresponded well to the mapped glacial till: a medium dense to dense silty sand with gravel, light grayish brown. The slope has a limited quantity of fill around the top. Offices Serving The Western United States 19501 — 144 1h Avenue NE # F-300 * Woodinville, Washington 98072 9 (425) 485-5519 * Fax (425) 485-6837 09206128.doc 0 KA Project No. 092-06128 July 26, 2006 Page No. 2 of 3 No tension cracks, active sloughs or water seepage that could be attributed to slope instability was seen. All the conifers on the site are standing straight and tall indicating that this site has not significantly moved in recent history. We found no evidence of a landslide hazard, and recognize that the soils present a limited erosion hazard. It is our opinion, based on our site observations and knowledge of the proposed construction, that subsurface exploration and detailed slope stability analyses are not required. It is also our opinion that detailed survey work and geotechnical analyses for the site slope conditions are not warranted. It is our opinion that the addition may be located as proposed, provided adequate measures are taken to minimize erosion during construction, and in terms of the maintenance of the steep slope after construction. A list of Best Management Plans for erosion control are listed below: Phase the soil, foundation, utility, and other work, requiring excavation or the disturbance of the site soils, to take place during the dry season (generally May through September). Grading activities can be undertaken during the wet season (generally October through April), but it should also be known that this may increase the overall cost of the project. All site work should be completed and stabilized as quickly as possible. Temporary stabilization can include plastic, mulch, or an acrylic such as Envirotac. Permanent stabilization can include building construction, paving, sodding, or hydroseed, provided the area is maintained so the grass can grow. Additional perimeter erosion and sediment control features may be required to reduce the possibility of sediment entering the surface water. This may include additional silt fences, construction of a perimeter berm, ditches with check dams, or ponds to allow the debris to settle out. Any runoff generated by the project should be directed to a stabilized area away from the slope. Concentrated flows of water should not be directed onto the slope for any reason. 0 All roof and footing drains should be tightlined to the storm drain system. To prevent erosion after the project, the homeowner should limit the removal of native vegetation in the area on and adjacent to the slope, although we understand that the slope is part of the adjacent property. Vegetation should not be removed from slope areas without protection of exposed soils, and immediately re-6stablishing permanent erosion control on the site. Water flow on the slope should be limited, no roof, footing, or yard drains should be directed toward or onto the slope. Based on our limited soil study, an allowable soil bearing pressure of 2,500 pounds per square foot (psf) can be used when placing footings.on undisturbed native soils at a depth of 18 inches or greater. The geotechnical information presented herein is based upon professional Interpretation utilizing standard engineering practices and a degree of conservatism deemed proper for this project. It is not warranted that such information and interpretation cannot be superseded by future geotechnical developments. We emphasize that this report is valid for this project as outlined above, and should not be used for any other site. Our report is prepared for the exclusive use of our client. No other party may rely on the product of our services unless we agree in advance to such reliance in writing. Krazan & Associates, Inc. Offices Serving The Westem United States KA Project No. 092-06128 July 26, 2006 Paize No. 3 of 3 We hope that this letter provides the information required at this time. ff you have any questions, or if we may be of further assistance, please do not hesitate to contact our office at (425) 485-5519. Respectfully submitted, K & ASSOCI IES, IN obert A. Blomquis LG Project Geologist RB/s1c Was I ERM BLOmouisT ken L. Cara I way, P.E. Geotechnical Division Manager Krazan & Associates, Inc. Offices Serving The Western United States wb-oo '1'(raZan &ASSOCIATES,INC. AM GEOTECHNICAL ENGINEERING 9 ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION July 26, 2006 Mr. Dwight Steele C Steele Home Service J UL 2 0 2006 23424 88h Ave W Edmonds, Washington 98026 PERMIT COUNTER RE:. Limited Slope Evaluation Proposed Addition D 95 Place West - Dear Mr. Nelson: KA Project No. 092-06128 RESUB JUL 2 7 2006 BUILDING DEPARTMENT CITY OF EDMONDS In accordance with your request and authorization, a geologist from our firm conducted a limited slope assessment for the referenced site on July 12, 2006. We have prepared this letter, to address the applicable elements of the Edmonds Municipal Code — Natural Resources — Chapter 23.80 — Geologically Hazardous Areas. The property is currently pending an application for a small addition of approximately 140 square feet, and a newly designed roof. The property is located at 22613 95h Place West in Edmonds, Washington. The site is currently developed and the property is well vegetated with a typical suburban lawn and landscaping. The majority of the proposed site is level. A slope break, which we understand is near the southern lot line, breaks sharply to a slope of approximately 40 to 50 percent in magnitude which terminates in a level area approximately 30 feet below. The slope is well vegetated with salal, rhododendrons and large conifers. There is an abundance of forest duff on the ground. Based on a review of the Geologic Map of the Edmonds East and part of the Edmonds West Quadrangles, Washington (Geologic Map), it appears that the property is located in an area that is on a broad expanse of Vashon Drift Glacial Till. This unit is a non -sorted mixture of gravels, sand and silt, which has been over consolidated by sub glacial pressures. The Natural Resources Conservation Service lists the soils in this area as Alderwood-Urban land complex which is a soil developed on glacial tills, and has been altered by urban development. The soil has an extreme erosion potential, due to the quantity of silt and fine sand that can be found in it. During our reconnaissance of the site, we investigated the shallow slope soils by excavating shallow hand auger borings in the adjacent lawn, and on the slope near the mid point in two locations. A hand auger was used at locations near the top of slope, as well, to identify the soils. The conditions encountered in the shallow hand auger borings corresponded well to the mapped glacial till: a medium dense to dense silty sand with gravel, light grayish brown. The slope has a limited quantity of fill around the top. Offices Serving The Western United States 19501 — 144 th Avenue NE # F-300 9 Woodinville, Washington 98072 e (425) 485-5519 e Fax (425) 485-6837 09206129.doc KA Project No. 092-06128 July 26, 2006 Page No. 2 of 3 No tension cracks, active sloughs or water seepage that could be attributed to slope instability was seen. All the conifers on the site are standing straight and tall indicating that this site has not significantly moved in recent history. We found no evidence of a landslide hazard, and recognize that the soils present a limited erosion hazard. It is our opinion, based on our site observations and knowledge of the proposed construction, that subsurface exploration and detailed slope stability analyses are not required. It is also our opinion that detailed survey work and geotechnical analyses for the site slope conditions are not warranted. It is our opinion that the addition may be located as proposed, provided adequate measures are taken to minimize erosion during construction, and in terms of the maintenance of the steep slope after construction. A list of Best Management Plans for erosion control are listed below: Phase the soil, foundation, utility, and other work, requiring excavation or the disturbance of the site soils, to take place during the dry season (generally May through September). Grading activities can be undertaken during the wet season (generally October through April), but it should also be known that this may increase the overall cost of the project. All site work should be completed and stabilized as quickly as possible. Temporary stabilization can include plastic, mulch, or an acrylic such as Envirotac. Permanent stabilization can include building construction, paving, sodding, or hydroseed, provided the area is maintained so the grass can grow. Additional perimeter erosion and sediment control features may be required to reduce the possibility of sediment entering the surface water. This may include additional silt fences, construction of a perimeter berm, ditches with check dams, or ponds to allow the debris to settle out. Any runoff generated by the project should be directed to a stabilized area away from the slope. Concentrated flows of water should not be directed onto the slope for any reason. 0 All roof and footing drains should be tightlined to the storm drain system. To prevent erosion after the project, the homeowner should limit the removal of native vegetation in the area on and adjacent to the slope, although we understand that the slope is part of the adjacent property. Vegetation should not be removed from slope areas without protection of exposed soils, and immediately re-establishing permanent erosion control on the site. Water flow on the slope should be limited, no roof, footing, or yard drains should be directed toward or onto the slope. Based on our limited soil study, an allowable soil bearing pressure of 2,500 pounds per square foot (psf) can be used when placing footings on undisturbed native soils at a depth of 18 inches or greater. The geotechnical information presented herein is based upon professional interpretation utilizing standard engineering practices and a degree of conservatism deemed proper for this project. It is not warranted that such information and interpretation cannot be superseded by future geotechnical developments. We emphasize that this report is valid for this project as outlined above, and should not be used for any other site. Our report is prepared for the exclusive use of our client. No other party may rely on the product of our services unless we agree in advance to such reliance in writing. Krazan & Associates, Inc. Offices Serving The Western United States W KA Project No. 092-06128 July 26, 2006 Page No. 3 of 3 We hope that this letter provides the information required at this time. If you have any questions, or if we may be of further assistance, please do not hesitate to contact our office at (425) 485-5519. Respectfully submitted, / K & ASSOCI ITES, IN (obert A. Blomquist, LG Project Geologist RB/s1c ;)11' q en L. Caraway, P.E. Geotechnical Division Manager Krazan & Associates, Inc. Offices Serving The Western United States Pi-liNTC-A I'S "EROSI �.0 1791A, 7- L / LU Z 0 Ai AL 61-f-T -J=TvAtw4f--�=��� - 441- goo( 0 V Me- "Nothing in this permit approval procen shall be INY( woop interpreW. as allowingor perno�tfi�-. 10 mSIBLE FOR 7 - — ---- I 0:L. nonco Q9 or. un fal;w--d bud WLGE or site ition whTis outilide t�he scope Of rMit licati0k telt&M 6w of h ether su A- g, ructureor condition is shown onthk site Ian o r4mg. Such building, structure up 0 &&NAAW Co *tio -subject of a separate t, e VED. BY PLANNlt4,' imff�,RVPIC uaa 6/q-1040 Zone' P—C-P-19 Comer Flag Setback Amired Actual Front W 1, 5 S i d es N 1 Rear E 115 Other rieight 7- 5r. 1, 7— jr X L:31 X -3 Cj� 0 -V of /M 7z 16Z, of N t4 N t< ftA1DW F-CYP set LUO aC3 z 1A X-M C�4 a, LU wo C\1 a nm- LL 00 . ....... -17 15 7—b- LQ A4 -I-( t6l, STREET FILE' 2 f IYOJ 7, t,' tY - re- W& /Pf 3 ee 1, 1 3 _4Vor