Loading...
00518DATE SUBMITTED 23 November 1977 ENVIRONMENTAL ASSESSMENT R' ECEIVEQ " V 2 3 1977 CRY of Ed o In order to meet the requirements of the State Environmental Pol9abtm+ & ,,i` �_, the responsible official must make a declaration of environmental impact as e-ary as -possible in the process of evaluating a project. The information in this form will be used to determine whether it will be neces- sary to require an environmental impact statement. If an impact statement is not required, a Statement of Negative Declaration will be placed in the file. i If an impact statement is required, a draft statement must be filed with this office, public notice given and a review period of 30 days allowed. The final statement and comments must be filed with the Department of Ecology, Office of the Governor and the Ecological Commission. The Edmonds Planning Staff will assist you in any way we can. in accumulating this -information and we would appreciate your cooperation. 1. Land: Area in acres 14.4 Soils type Alderwood Loanly.Rocky Silty Limitations Sliahfi Description of topography (slope) Loam To 10% on developed areas To 35%+ on undeveloped areas of site' Grading: estimated cubic yds. 2,000 c.y. Filling: estimated cubic yds. 200 c.y. 2. Water: Stream - estimated flow (gallons) per minute N/A Will stream be altered? N/A To what degree? N/A Impact on storm drainage (increase in run-off) Increased run-off from impervious surfaces. Storm drainage design to minimize off -site impact. Estimated area to be paved 1.1 Acres -- 8% (includes roofs) Shorelines: within 200 ft. of Mean Higher High Water N/A ,, i