02.22.2013-Blueline Response Comments.pdf'TRANSMITTAL, �610 To" Jearde McConriieH DA"11L." Februmy 22, 2013 ("'0 M PA N Y City of Edmunds - ADDRESS�� 1.21 5th Ave., N. Edmonds, WA 98020 JOB 1\10.. 12-144 -t) PLN2008004-6 JOB NAN11" Shoreshire (FKA HIH - take Baflinger, Pla ENCLOSED ARE: OUL71MIMEM 02/22/13 3 Comment Response Letter- The BllUeline GrOU . P . .... . ............ . . ....... 02/22/13 �13 Full Size- Updated Civil Plans r ......... . — ....................... - - _----- ................ . . ............ . . . ...... . ............ ............. . .......... ........... . . ........... . . .................. . . . .... . ........... . . . . ............ ........... ...... . .. . . . ............................ . . . . . . . ............ . ........ . . .............................. . ............. .......... . .......... . . ........... . . ....... . . ...... . ........... __" . . . . . ........................ ------ .. . . ... . . . ................... ......... . . ................... . ........... . . .......... . ... ..... MESSAGE: Jeanie - Please let me, know if your have any questlons or need anything else. niank you, ..... .. ... . .. . .... .. ... .... .. ... ....... SENT BY� Kay"'Budnik C'C� P'CLI'! I U'l "I/ I ,[MI AFM I I I I I I flebruary 22, 201.3 Jeanie Mccm InO City of Edmonds 1.21 Sal, Ave N Edmonds, WA 98020 RE-. Slubdivision FlIe #- pin20080046 Project: Shoreshire (FFA, Hill Lake Ballinger) '7 -lot Plat Project Address: 24,223 761h Ave W Response totity of Edmonds BluelineJob No. 12-1,44. Jeanie McConnell. - This letter is in response to yow, review of the Shoreshire (FKA Hill Lake Baal nger) Pro ' lect dated February 8, 201& 'rhe plans have teem) revised per your requested revisions, BeIow is a ea list of ch cornment with our responses in bold. Reziunnses to comment letter dated February 8, 2013 2/8/2013 Thank you for providing a cost. estimate. The estirnate will be reviewed further once these plan ownments have been addressed. OK 12/3/2012 comment - Please provide an itemized engineers cost estimate, includirIg units and unit prices, for both on-site and off-site (rlght­of­way) im prove rn ents, including all utilities, traffic control, Wetland signage, fencing and restoration. Please use the King County Site Improvement Bond Quantity Worksheet and utilize the "write-in" sections where appropriate, 49 A bond is required to be placed for, all erosion control measures,, right­of-way and storm water management improvernents. Posting a bond for storrnwater systems applies to subdivisions that involve '7,000 square feet or more of land diStUrbing activity and as well as on projects in a critical area or buffer including ESU ­IA. The arnount of the bond will be based on 120% of the City approved estimate. The City will inform you of the appropriate bond amount after review of the cost estimate, Please obtain the appropriate subdivision improvement bond forms from the City. If you intend to post a bond in order to record the subdivision, the bond amount will be based on the entire scope of the project. Inspection fees for this project wiII be calculated at 2.2% of the 120% City approved estimate for all improvements, tiAJI, t, Hlw'ILI 1 ,, i"'k I (,�\/ I � � �\'G I I"d ]d N(�� Al\l I; J��[ I kl_rk A! W/,::III I I, 4(m ""M �Q, H"I d �f� d() t�, I I /\;, dW, I J f 2. 2/8/2015 - Thank you for providing a traffic control plan. Please see comments below under Sheet 15 -- Traffic Control Plan. See responses render Sheet 15 comments. 3, ok 4, ok 5. ok 5. ok 7, ok 8. ok 9. ok 12/3/2012 comment - ok The following comments are provided by Jerry Shuster, Stormwater Engineer in review of the Storm Drainage Report dated December 21, 2012. Please contact Jerry directly with any questions you may have on these comments. He can be reached via phone at 425-771-0220 or via email at 'err .shu er@edmond wa ov 1. The specified pump is an "evaporative cooling pump." Please provide evidence that the pump can move runoff containing typical concentrations of solids including tree litter without clogging. See the attached specification sheet for the Zoeller 371, 572, and 373 series pump indicating there are no screens to clog and the non -clogging vortex impeller. 2. Show and call out check/gate, all other valves and the connections between the 1.5 inch and 2 inch diameter pipes for pump system on sheet 10 or as appropriate. Completed. 3. The plans should say that the pump systems shall have an emergency backup generator to power at least one pump during a power outage, as described in the drainage report. Add this note to Sheet 10, Vault Plan View where it says "Pump Control Panel 8y others," Under the "Pump Specifications and Notes" on Sheet 10, we said that an emergency generator backup power connection will be provided at the control panel with our last submittal. We supplemented the "Pump Control Panel by Others" note with this same statement. 4. The vault and pump infrastructure should be a separate tract owned by all the lots in the subdivision. This is necessary to enforce maintenance of this private stormwater system. City is ok with easement instead of tract for drainage facilities. SHE XQfX- 11 LA 2/8/207.3 - Please see comments below under Sheet 15 - Traffic Control Plan. See responses under Sheet 15 comments. 1. ok 2. ok 3. ok 2/8/2013 - Please see comments below under Sheet 8 - Road & Storm Drainage Plan. See responses under Sheet 8 comments. 1. ok 2. ok 3. ok 4, ok 5. ok Response to City of Edmonds page 2 1. ok 2, ok 3. ok 4. ok 1. ok • 1. ok 2. ok 3. 2/8/2013 - Add note that states the contractor shall cut and cap water service lines at the main. In addition, add a note that the sanitary side sewer shall be cut and capped at the edge of the wetland buffer. We added a general mote "Utility Abandonment/Removal" on Sheet 4 with the last submittal and added separate notes to each service on the plans forthis submittal. 12/3/2012 comment - Add notes for all utilities to be abandoned/removed, including the overhead power feeds. Existing water service lines will need to be cut and capped at the main. Sanitary side sewers will need to be capped at the property line. 4. ok 5. ok 6. ok 1. 2/8/2013 - curb ramp location modified. See comments on ramp construction under Sheet 8 comments below. See responses under Sheet S comments. 12/3/2012 comment - Locate intersection curb ramps closer to 76th Ave W. 2. ok 3. ok 4. 2/8/2023 - Please show striping for travel lane, bike lane and fog line. Completed. We wilt be re -striping the existing fog line/bike lane line and centerline along the property frontage as directed by the City. 12/3/2012 comment - Provide a cross-section of 76th Ave W that includes travel lanes, bike lane, curb/gutter & sidewalk and ROW behind sidewalk. 5. ok 6. ok 7. 2/8/2013 - details added to Sheet 8 - see comment below. See responses under Sheet 8 comments. 12/3/2012 comment - Provide blow up detail of curb ramp on north side of new plat road and the adjacent driveway. What will ramps and curbing look like to accommodate the close proximity of the two? Response to City of Edmonds Page 3 SHEET .7 - GUD-CCIMPc)SI will liY i;TII.. Cf�OSSI�C pI A� 1. ok 2. ok 3. 2/8/2013 -- After further review of the sewer and storm easement areas between lots 6 & 7 and the utility systems within, it has been determined that that portion of the storm system constructed outside the public right- of-way will need to be in an easement designating the storm pump systems and outfall conveyance as privately owned and maintained. If the two easements are separated then additional width would be needed on the sewer easement to bring it to a total of 15 -feet In width. In this scenario a fence could be constructed down property lines. Alternatively, you could draft an easement proposal for review by our City attorney that designates a separate 10 -foot area to each utility stating ownership and maintenance purposes with an overlapping 20 -foot easement (encompassing the two 10 -foot easement areas) designated as access and allowing disturbance for maintenance and construction purposes. Per our phone conversation we have provided a 15 foot sewer easement that overlaps a 10 -foot private storm easement by 5 -feet as shown on the updated plans. The 3.5 -foot sewer easement is centered on the sewer main between proposed SSMH 1 and the property lime for Lot 6 to the north of SSMH 9. We also added a 10 -foot wide NDS Tuff track Orassroad raver between the existing SSMH and edge of driveway for Lot 6 for access considerations. 12/3/2012 comment -Show proposed easement areas. M I PXMI IN VN 1#11122 W-11 MV 9.1 I. ok 2. 2/8/2013 - In our meeting we discussed the depth of the proposed drywell accepting flows from CB #20422 to be at an elevation lower than the foundation proposed on Lot 1. The drywell detail provided does not seem to be consistent with this discussion. Please revise accordingly. Please also look at the option of placing the drywell to the south side of CB#20442 ... would this provide further separation from the proposed single family residence? Drywall was moved to the south with a rim/top elevation of 294'. Lot 1 has a pad elevation of 295'. 12/3/2092 comment - The City's asset management system indicates CB 20013 picks up some storm flows from a rockery drain at 181 -feet to the south of the basin. There is also an 8" CMI' pipe that is capped 52 -feet north of C8 20013. Our records do indicate connection of CB 20013 to CB 20442 as shown on the plans. The pipe discharges on or through Lot 1 and carries some road runoff as well. If CB 20013 can be connected to the existing storm system on the west side of 76th Ave W then CB 20442 can be abandoned. Otherwise the flows from this pipe system will need to be managed in an alternate way. 3. ok 4. ok S. ok 6. ok 7. ok 8, ok 9. 2/8/2013 - Overhead power lines still shown, please revise. OHP line and power pole on Lots 1 and 2 were removed from plans. 12/3/2012 comment - Remove overhead power lines from this plan sheet. 10. 2/8/2013 - Thank you for showing the location of existing signage as well as the replacement location. Please clarify what type of sign the note "relocated sign location" is referring to. Changed note to "relocated weight limit sign location". 11. 2/8/2013 - The curb ramp configuration is still being discussed. I will follow up with your shortly on this item. Per our phone conversation we left the curb ramp to the north as is and changed the curb ramp to the south back to a parallel curb ramp per COE Standard Plan E2.18. Response to City of Edmonds Page 4 2. ok 3. ok 4. ok 5. 2/8/201.3 - Thank you for submitting structural plans and calcs. The design is currently under review and any comments will follow these plan comments. OK. 12/3/2012 -Please submit structural calculations for the detention vault. If the vault is not a pre -cast vault then peer review will likely be required and cost will be pass-through to the owner/applicant. 2. 2/8/2013 - Please also add note next to the 8" RSGV caliaut to specify FL x MJ fitting. Gornpleted. 3.2/3/2012 comment - Refer to City standard detail E7.18.1 for connection to water main in 76th Ave W. In line valves on the existing main are not required and notes shall be added to plans to reflect this deviation from the standard detail. Call out parts requirements: a. 1 - 8" MJ x FL Tee b. 2 - 8" x 6" reducers PE x MJ c. 2 - 6" long body couplings d. 1 - 8" RSGV 3. ok 4. ok 5. 2/8/2013 - It doesn't took as though there is sufficient room between the back of sidewalk and the property line for the water meters. If this is the case, then additional right-of-way or easement area (specifically designated for COE) will need to be provided. We currently show 2 -feet of clearance between back of sidewalk and property line, see cross section A A and 13-B on Sheet 6. This should be sufficient for residential meter installation. 12/3/2012 comment - Water meters shall be located within the City right-of-way at back of sidewalk. 6. ok 7. 2/8/209.3 - Thank you for providing the additional information. Please revise the Di tee callout to state MJ x FL instead of FL x MJ. Please also add callout for an 8" x 4" reducer, We called out the 8"x 6" 01 tee as FL because of the reducer we would be connecting to the east side of the tee. We also calf out an adapter for the west side of the tee. The reducer would by FL x MJ. 12/3/201.2 comment - Callout all required parts for fire hydrant connection. 8. ok 9. ok 10. ok 11. ok 12. ok 13. 2/8/2013 - Response letter from Bluel€ne states: We show no obstructions at this time. Driveway for Lot 6 will provide access to SSMH #1 from the public roadway. We are waiting on staff comments about the required offset distance to run a fence parallel to the sewer main along with access requirements for fences crossing perpendicular to the easements. City response: Please see comment 3 under Sheet 7 above. See response to comment 3 under Sheet 7. 12/3/2012 comment - Access from the public road to SSMH 1 and the existing sanitary sewer manhole will need to be provided. Surface does not have to be hard surface, but nothing shall be constructed so as to block access to the manholes. 14. Ok Response to City of Edmonds Page 5 15, 2/15/2013 ,,, Please provI:de a rninirriurn 10footseparadon between Me water rnal n and safiftarysewer nlaim Sony to have missed this duan the 8ast review, Water fine was shifted north to prcivide 1.04(iot rninirriurn separation, 16. 2/8/201 3 r Please revrse the blow -off as shown at the end of: 0,)e n,vatei, mahri to bel.apped directly off the rnain donne and not out of the cap at the end of the rnain,, ("Ornpleted, J7� 2/8/20" 1.3 - DUe to the IOW VOILArne rA flows in the. sewer rnain line, please revise @H main c()nnectiolls to be wyes instead of tees, Comr,'pleted, 18. 2/8/2013 ­ Please acld note tcn ex�sting sevver rnarlhole that it shafl be re-charineed to accommodate the new flows entering the rnanhole. Per our phone convensatibn we will be using Fj PVC inside drot,'isy,,stern in the existing gnanhole and d,re elbow at tine bottom ()f the drop will sidend to the existing shelf edge requiring no channaling. 19p 2/13/2013 Addit'lorial discussions have been had regarding the connection to the existing sewer irranhole and concerns related to ground water/dewatering, soil conditions, etc. Has Your geotech looked at sods here and has any thought been given to what the trench section will look, like with construction of the sewer main? How aboUt, dewatering? Are YOU proposing to have baker tanks on site during this process'? In addition, clue to the high flows in the existing sewer main, it is now being recornmerlded that the connection at, this rnanhole rnatch at least crown of the existing pipe and maybe even be placed at an elevation above that, Thi S would certainly make connection at the manhole less complicated. Since we are now Using a drop structure in the existing rroanhole we raped the line between SSMVI-1 and the existing manhole so it runs at the 2-perrent rninlinurn, This rneans the trench forthe sewer maln YviH be approximately 7 -feet deep. Mfftest pits showed slight seep,a pges that could he controlled with proper BIVIP's as discussed 111the SWPPP, The test pits were done inAugust of 2M and the ground water seepages were not that significant to a depth of 10 -feet near the existing rnanhole. We, have provided a general note an Sheet. 1.2 9tating �contractor shaH have a baker, tank available during construction for potential ground water/dewatering needs". I_ 2/7/2013 - Please revise plan to the consistent with the sarriple trafflc, corrtrO plans provided in City handout E81, available oil tVw City website via the following link: http://www,edi"non-ds—wa-.gg-v/rilrfyi,--ig(2c;,/(-,au(2 — i (an t/Dolia ents/_Dev��.ftp i c Evi 1din DLiYL*Lic)n/fojjjLs HAL) a !(IV_wn lT — 11ni _Lient_..3e Bui _9 . ._ _(L _D(M00i R-Q-puft df a. Clearly show travel lanes, COMPIeted. b, Provide reference to channelization devices, spacing, etc. Added ,fable 6�H.-3 from COE HandomE`81, c. Provide a traffic control plan for each phase of constr(AG0011, Connection to the water main for instance, will require more than just a shoulder closure. Per our phone conversation we have shown the different construction zones forthe water line connection and water services abandonment, side sewer service abandonment, and the frontage improvements, We also reference the standard traffic contr0 plans in handout E81. 12/3/201.2 comment - Please SUbrnit a traffic control and haul route plan for review and approval. Please call or ernall Rob Long with any questions or concerns.. He car) be reached at (42 a) 216-4051, x 223 or Sincerely, THE BLUELINE GROUP .... ... .. . .... . . ...... "Forn Mohr, P E Project Engineer Revised Civil Plan Set (`3 Res�!�mnse to Cky i,,A Edrrwrais Flagc, (3 - ­ - ---------- ---- --- Produrf inforrnabon presented Mere, rofleds condiljoin M tjaw of publication, Constift fadory regadnq discrepan, cies ol i[416$6das. 7"-7 r 4' 'Y fiYAR TU: 1?0 BOX 16347, Louisvda,, KV 40,�5&0,147 SHIP TO: 3649 Cath? Rim fewd ., hvisville, KY 40277-196 1 (5022) 1181731 10V) 9A -PUMP, FIIX (!i();1) 7Ai-3624 Cast iron motor & purrip housirig wiff corrosion resistant powder coated epoxy finish, Motor ..60 11z, oil -filled, hermetically sealed, mltoamfic reset thermal overload protected. Permanenfly lubricated Upper and w loer bearings. Staw inless steel scres and handle. No sheet metal parts to rust or corrode. No screens tio (.';loq,, Glass,,Iflled, plasfic rw cn- �ogging vortex irripeller with rnetal ruse d- INaterfight neoprene "0" ring between motor- and pump housing, 20 ft. UL Listed power cord with Molded 3 -wire Jello on SilicCarbide/Carbon shaft seal, Entire unit pressure tested after assembly. Maximum temperature for efflUent or dewatedrig-­1 30DF (540C). 1%" NPT Discharge. L E- 1- ALL V `,ars k' L'r Watertight - dust fight. Manvfactufe-,xf-,Sol. . - y 17Z11WX?,g �;71N I SECHOR 2.60107 FlA2522 0 Ito Supersimles, lIM vistte"wr Web "'Ute: Wwvv.z(,)efler,cora . ......... . ... . . ...... 1311 3 7`2 A" 3 7 0- or Plifly? 11refix Idenfifirafrory see News & Vie, ws 00!j2) CONTINUOUS DUTY SIJBIWERSIBL,E PUMPS FOR DEVVATERING OR EFFLUENT EVAPORATIVE C00IJHG PUMPS FOR POULTRY APPLICKNONS AtM ( Tosied to UL778 and CSA2.2.2 108 SkvJagds) 0 ra, POWDER COATED SN/W I VORTEX TYPE IMPELI ER `371 -.3 HP, 115V ot'230VI Ph 372" - 113 Ff P, 11 5V CvMVI Ph 1713"- .4 HrJ15\/0r230V1 Ph . . . . ..... . .... . ........ . . ............. ­­.­_... . . . . . . .............. - - --------- - r() Uopyngvtl ZU09 40'Jler Co, All rights i esel red, 2, Manvfactufe-,xf-,Sol. . - y 17Z11WX?,g �;71N I SECHOR 2.60107 FlA2522 0 Ito Supersimles, lIM vistte"wr Web "'Ute: Wwvv.z(,)efler,cora . ......... . ... . . ...... 1311 3 7`2 A" 3 7 0- or Plifly? 11refix Idenfifirafrory see News & Vie, ws 00!j2) CONTINUOUS DUTY SIJBIWERSIBL,E PUMPS FOR DEVVATERING OR EFFLUENT EVAPORATIVE C00IJHG PUMPS FOR POULTRY APPLICKNONS AtM ( Tosied to UL778 and CSA2.2.2 108 SkvJagds) 0 ra, POWDER COATED SN/W I VORTEX TYPE IMPELI ER `371 -.3 HP, 115V ot'230VI Ph 372" - 113 Ff P, 11 5V CvMVI Ph 1713"- .4 HrJ15\/0r230V1 Ph . . . . ..... . .... . ........ . . ............. ­­.­_... . . . . . . .............. - - --------- - r() Uopyngvtl ZU09 40'Jler Co, All rights i esel red, >� W Lu PUMP PERFORMANCE CURVE MODELS 37113721373 12 40 35 10 30 a g u4] 25 a 6 20 0 p 15 4— to- 21 to -2 5- 371 1372 1 373 0 10 20 30 40 50 60 70 GALLONS LITERS 0 40 80 120 164 200 240 FLOW PER MINUTE 019740 TOTAL DYNAMIC HEAD/FLOW PER MINUTE EFFLUENTAND DEWATERING MODEL 371 372 Molts 373 Feet Maters Gel. Liters Gal, I Lileis Gal. Liters 5 1.5 43 163 50 1 169 69 261 1D 30 34 129 46 17a 61 234 4.6 19 72 36 144 53 201 6.'f 29 110 44 167 7.6 L 16 61 34 129 9.1 23 E7 RHead: 19.25 ft 5.9 m 30 R JDA m 38 R 11.6 m Single Seal Control Selection Pari No. Molts Phase Mode Amps 371-0002 115 1 Nonautomatic 9.7 371-0004 230 1 Nonautomatic 4.8 372-0002 115 1 Nonautomatic 6,0 372-0004 230 1 Nonautomatic 3.2 373-0002 115 1 Nonautomatic 8.5 373-0004 230 1 Nonautomatic 4.3 RK. 1F. ---T- 5](1014 i uc rvri 1 i i SK2064 � cnunarl P.1ltnslaitalionofcontrols, protecdondevices and r4rinnshould bcdmwbyaqu�iifi dlicensed &0ician. For Information on additional Zoeller products refer tocalabgOnPiggyhackvariable Level Float Alinir::iricalalid satclycodes shmddbefollovnadincluding thr.mostrecerltNational ElcoricalCode(NFC) SyAtches,FM0477;ElecbicaiAilemalor,FMO486;MochantcalAllemator,FMO495;SumpZewage r,nd the Occupational Safety and Health Att (OSHA). Basins, FM0487; and Single Phase Slmpiex Pump ConlrolfAlarm Systems, FM0732. RESERVE POWERED DESUV For unusual conditions a reserve safety factor is engineered into the design of every Zoeller pump. © Copyright 2009 Zoeller Co, All rights reserved.