Loading...
06-005 Deisher.doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Plan Check : Date: # 06-005 May 12, 2006 th Project Name/Address: Deisher / 7025 174 St SW Contact Person/Address/Fax: Larry Deisher / e-mail: lpnw@verizon.net Reviewer: Jeanie McConnellDivision:Engineering During review of the subject submittal it was found that the following information, corrections, or clarifications will need to be addressed: 1.ok 2.ok 3.ok 4.ok 5.ok th 6.CMP is not an allowable pipe material for the storm run proposed crossing the 174 Street right-of-way. Also, this run of pipe shall be 12” not 8”. If 2’ of cover cannot be maintained, ductile iron pipe will be required. Pipe has been revised from 8” to 24”. Is this a typo? Only 12” is required and the plans can o be redlined to reflect this, I just wanted to make sure there wasn’t another reason for specifying 24”. 7.ok Please clarify the arrangement of storm pipe and catchbasins along the south property line. It 8. appears as though the existing CB in the right-of-way will have a 2 inlets and 1 outlet. This would include an inlet from the detention system for this SFR, an inlet from the detention of the SFR to the east and an outfall to the CB further south in the ROW. Only two i.e.’s have been provided. o It appears as though an outlet may be shown from the control structure to a direct pipe o connection to the south. It is unclear what happens to the outfall pipe from the detention system of the SFR to the east as o it flows towards the west to the existing CB in the ROW. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. DATE E-MAILED 5/12/06 PAGE __1__ OF __1__ DATE E-MAILED 5/12/06 PAGE __1__ OF __1__