Loading...
0694_001.pdfm...........-... ..._.. _. Supplementary Report: As requested, ESNW was onsite to observe geotechnical construction. Prior to arrival of ESNW representative, the contractor had excavated a trench to tie into sanitary sewer main on 2nd Avenue as shown in sketch below. The trench was approximately 8' -deep at maximum. The contractor installed approximately 12" of 5/8 "minus" crushed rock directly over sanitary sewer PVC pipe and compacted using a "jumping jack" compactor. 1-2' loose lifts of native material was backfilled into the trench and compacted using a hoe -pack. The top approximate 12" of the trench was filled with 5/8" "minus" crushed rock as a leveling course, and compacted with a hoe -pack. Compaction tests showed adequate compaction of 95% or greater of the materials maximum dry density, at locations tested. N Z -[ESS ,� v �aCA'fIoNS TrrkN�N c m ESNW will r turn when requested. HdnteTS4mo m._ COPY TO: CONTINUED ON NEXT PAGE Field Rep. Project No. Page of Report No.. 4 Earth Solutions NWLLC HGS 2550.02 1 1 2 1805 136'" Place NE, FAX: Time On Site Time Off Site Date Day of Week Suite 201 (425) 449-4711 Bellevue, WA 98005 TOLL FREE: 1:15 pm 4:30 pm 3/13/14 THURS (425) 449-4704 (866) 366-8710 Travel Time Weather DAILY FIELD REPORT 1.0 HR CLEAR, 55° F Project Name Job Location Client / Owner Pineview 10202 nd Ave. S Edmonds _ Sundquist Homes, LLC General Contractor General Contractor's Superintendent Received Onsite By n _ Gradingg Contractor Grading Foreman __-- Checked By h Ruhnn Scott Construction Are approved Plans/Permits onsite F] YES F-] NO Project No. Permit No. ... Reference ... um Fill Test Dry % of Test Test Location Elevation Number CompactionDry Moisture Density Maximum 7Denrsity ..................... �........ Curve % lbs/ft3 Dry Density 5 SanitarySewer Tie -In _5 ................. 1 119.0 14.28 115.0 97 ___. 6 Sanita Se .._, ry wer Tie -In -3' 1 119.0 12.20 115.4 97 7 SanitarySewer Tie In - "1' _. 1 __._.... 119 0 ......._.12.87 115.5 97. m...........-... ..._.. _. Supplementary Report: As requested, ESNW was onsite to observe geotechnical construction. Prior to arrival of ESNW representative, the contractor had excavated a trench to tie into sanitary sewer main on 2nd Avenue as shown in sketch below. The trench was approximately 8' -deep at maximum. The contractor installed approximately 12" of 5/8 "minus" crushed rock directly over sanitary sewer PVC pipe and compacted using a "jumping jack" compactor. 1-2' loose lifts of native material was backfilled into the trench and compacted using a hoe -pack. The top approximate 12" of the trench was filled with 5/8" "minus" crushed rock as a leveling course, and compacted with a hoe -pack. Compaction tests showed adequate compaction of 95% or greater of the materials maximum dry density, at locations tested. N Z -[ESS ,� v �aCA'fIoNS TrrkN�N c m ESNW will r turn when requested. HdnteTS4mo m._ COPY TO: CONTINUED ON NEXT PAGE Field Rep. Project No. Page of Report No. Ir tq Earth Solutions NW«C HGS 2550.02 1 1 10 I + 1805 136" Place NE, FAX: Time On Site Time Off Site Date Day of Week Suite 201 (425) 449-4711 Bellevue, WA 98005 TOLL FREE: 2:15 pm 2:50 pm 4/8/14 TUES (425) 449-4704 (866) 366-8710 Travel Time Weather DAILY FIELD REPORT 1.0 HR L. RAIN, 55° F .... ................. _.�.._.._ ...... ....._� __ _.. .... _ _........_....._.� Project Name Job Location Client / Owner Pineview 10202 nd Ave. S Edmonds _ Sundquist Homes, LLC General Contractor General Contractors Superintendent Received Onsite By Grading Contractor Ruhnke Construction Gradin Scottg Foreman Checked B By Ki lG _ ..�. Are approved Plans/Permits onsite YES NO Project No. Permit No. ...... .... ...... Reference MaximumFill Test Dry % of Test Test Location Number Elevation Compaction Dry Moisture Density Density Maximum Curve % lbs/ft lbs/ft3 Dry Density 12 Sewer TrenchWWBackfill SG_ mmmmmIT1 119.0 10.4ITITITITIT- 1 113.6 95 13 Sewer Trench Backfill SG 1 119.0 9.60 116.3 98 .... .... Supplementary Report: As requested, ESNW was onsite to observe geotechnical construction activity. Prior to arrival of ESNW Rep, the contractor had excavated the sanitary sewer trench serving the three side sewers onsite. Upon arrival, the trench was being backfilled and compacted. Backfill material was observed to be native poorly graded sand with some silt. Backfill was installed in approximate 18" lifts and compacted using a hoe -pack followed by a large single drum vibrating roller. Trench was observed to be approximately 5' deep at its maximum depth. Compaction tests show adequate compaction of 95% or greater of the material's maximum dry density in locations tested. Approximate test locations are shown on the sketch below. T¢,ENck t CxG�4v/fTrf�n/ O C C1R ESN''i/U' will return when requested. urrter Stnoak COPY TO: CONTINUED ON NEXT PAGE ❑