Loading...
1.9.18 - Eng. Correct. Notice BLD20150294.pdfCITY OF EDMONDS CORRECTION NOTICE ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE: February 9, 2018 PERMIT NUMBER: BLD20150294 OWNER: SITE CONTACT: Scott Delap ADDRESS: 150 Sunset TYPE OF INSPECTION: FINAL INSPECTION ❑ WORK DESCRIBED BELOW HAS BEEN INSPECTED AND APPROVED ❑ APPROVED PLANS AND PERMIT JOB CARD MUST BE AVAILABLE TO INSPECTOR ON SITE ® CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE APPROVED AND/OR THE NEXT PHASE OF WORK IS STARTED. ❑ RECALL FOR INSPECTION ❑ REINSPECTION FEE MUST BE PAID PRIOR TO NEXT INSPECTION REQUEST. ❑ STOP WORK UNTIL AUTHORIZED TO CONTINUE BY CITY INSPECTOR 1. Bio-retention cells: a. Need to provide a revision to the stormwater plan for the bioretention cells showing that they can take on the additional impervious surfaces from the exiting asphalt parking. b. Please make sure to show the impervious surface flows toward either bio-retention cell and provide the updated impervious surface numbers. i. If the bio-retention cells can receive additional impervious surfaces, washed rock should be placed at the spillways. c. Bio-retention cell near the new structure needs to have 6" of ponding depth. 2. Cleanout all the public and private catch basins and yard drains (new and existing), removing all sediment and debris. a. Catch basins - make sure all risers and storm lines are mudded. b. Yard drain frames within private concrete walkway need to be cleaned of concrete making the yard drain easily accessible. 3. RPBA/Cross-connection final needed. 4. Sewer cleanouts need to be cut down to grade at the grease trap interceptor. 5. Signage and striping a. Handicapped sign needs to be installed. b. "STAFF ONLY" striping to be installed at the required 6 stalls. c. Solid line striping needs to be provided, dividing que for "drive through" and traffic flow. d. Directional arrows, (3) need to be placed. e. Re -strip parking stalls and handicapped parking along James street. f. Re -strip yellow striping at Sunset & James. 6. Need to remove vehicular speed bump from striped walking path. 7. Extruded curb needs to be installed per plans. 8. The installed asphalt along the curb (northeast corner, within the ROW) within Sunset will need to be removed and replaced such that stormwater will flow to the catch basin nearby (deleting standing water concerns on Sunset). 9. A pavement compaction report needs to be provided for work completed within Sunset Ave as well as within James St. (installation of stormwater catch basins). 10. As -built sheets need to be provided. a. Show utilities (cleanouts, materials, depths, slopes, rim and invert elevations) as installed. b. Show any changes to the site. 11. Additional comments may need to be applied, regarding the trash enclosure. 12. Need Fire sign off 13. Need sign off from Planning. Upon completion of the above noted corrections, please call 425-771-0220, x1326 to schedule a re -inspection. Page 2 of 2