Loading...
20060831165313.pdfo� EDS City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION Fsr aqo (425) 771-0220 DATE: August 31, 2006 TO: Steve Hansen 1060 Spruce St Edmonds, WA 98020 FROM: Jenny Readwin, Plans ECf RE: Plan Check 4 2006-0923 Project: Addition Project Address: 1060 Spruce St. During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) ok 2) Specify nailing of (5) 2x10 beam above the basement near the stair. Provide complete gravity (beam) calculations for all proposed beams and headers. 3) ok 4) Specify foundation supporting the triple studs carrying down the middle of the ridge beam down to the existing 6x6 posts to verify that the existing foundation is adequate to carry additional loads. Add all foundation information to the basement plan to show how all loads are being carried to bearing. There are some posts that do not show anything supporting them.