Loading...
20080318122811.pdfofEDo City of Edmonds ell PLAN REVIEW. COMMENTS BUILDING DIVISION Fsc. t 89° (425) 771-0220 DATE: March 18, 2008 TO: Phil Kallsen phil@kallsenarchitecture.com FROM: Jenny Readwin, Plans Exams r -t RE: Plan Check # 2007-0695 Project: Launceford Addition Project Address: 15703 Soundview Place During re -review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the items below to a Permit Coordinator. 1) ok 2) ok 3) 3/18/08 Still Need. Provide letter from. Geotechnical Engineer of Record stating that they have reviewed the plans and that they are consistent with the report recommendations. 4) 3/18/08 Still Need. Special inspections are required for the following. Complete the enclosed special inspection agreement signed by the owner, the general contractor and the special inspector and submit to the City for approval prior to issuance. Special inspector must be Geotechnical Engineer of Record. • Excavation/Grading/Site prep • Soil Bearing Verification • Placement of fill and compaction • Temporary and Final Erosion Control • Subsurface drainage installation including footing drains 5) 3/18/08 See attached additional comments. See attached structural comments from city consultant. Respond to each item in writing. Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 �^ h oyt j ete r@ce n to ryte I. n et 360 874 0562 Fax 360 874 0591 To: Theresa Umbaugh 121 5th Ave, N. Edmonds, WA 98020 Re: Launceford Addition 18703 Sound View Place Edmonds, WA 98020 Plan Review # 2007-4695 EECE # EDM 08-17 Plan review number 41 Structure Area S.F. Main Floor Additions 662 Upper Floor Additions 1634 Total 2296 Garage 969 Total 3265 Upper Floor Deck 190 Grand total 3455 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural, Ventilations and Indoor Air Quality, Ordinance (V&IAQC), and Energy review requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. The review was based off the IRC 2003 as adopted by the state of Washington and the city of Edmonds since this project was grandfather under this code. ORDINANCE COMMENTS Page 2 of 4 Plan Review Number 01 EECE4: EDM 08-17 Launceford Addition 2007-0695 Sheet 2: Main Floor Plan 1. Please specify the required handrails for the exterior stairs. Hand rails are required when there is four or more risers. Nothing is shown at this time. R311.5.6 2. Please dimension the width of the stairway. It appears the width will be less than 3 feet. Please clearly add this information R311.5.1 Sheet 3: Upper Floor Plan 3. Since there is a closet being added at the Alcove this must be considered a sleeping room. Please add a smoke alarm in this room since it is required. R313 Sheet 9: Roof Plan 4. Please provide a detail on the drawing for the interface between the new and existing portion of the house. It is not clear how this will be framed. STRUCTURAL COMMENTS Plot Plan 5. Please submit design for the retaining walls shown that will be required based off this sheet. IBC 1806 Sheet 7: Foundations & Upper Floor Framing 6. Please specify the required connection of the glu-lam beams to the concrete pilaster shown on this sheet. 7. Please submit analysis for the floor ledger connections 8. At the double joist supporting the SW -3 shear wall is it being supported by the 2x10 ledger. Submit analysis for this to support the design loads. Based off the forces and analysis it appears the detail 11 will not support this force. Sheet 8. Roof Framing Plan 9. Please specify the required hanger/connections to support the 2x12 joist. 10. Please provide a detail for the lateral shear transfer of the roof diaphragm to the exterior shear wall. It was not clear how this would be accomplished based off the submitted drawings. Page 3 of 4 Plan Review Number 01 EECE#: EDM 08-17 Launceford Addition 2007-0695 11. Please provide a detail of the 4x8 beam being connected to the existing wall at grid C and grid 4. 12. Please specify the 2x10 DF2 ledger to the existing shear wall shown on this sheet along grid 4. Sheet 13: Details 13. Details 10 and Details 11: Please submit design analysis for the retaining wall. IBC 1806 14. Detail 12: Geotechnical engineer has not submitted any information's for the Rockery wall. Submit design analysis for the 12 foot rockery wall shown on this sheet. Sheet 14: Foundations Details 15. Detail 2: Please specify the required epoxy that will be used for the # 4 bars. 16. Detail 11: Please submit analysis for the retaining wall shown. IBC 1806 Sheet 15: Framing Details 17. Detail 11: Please submit analysis for the ledger attachment to the studs. Based off the span of the joist and the reactions it appears the nailing will not support the forces. NDS table 11N. 18. Detail 5: Please specify the required connections of the bottom ledger to the wall Sheet 15: Framing Details 19. Detain : Please provide analysis for the guard rail shown. Per check analysis it appears the code required 200 point load applied at the top will not be able to be resisted. Please submit analysis to justify. Sheet 19: Details 20. Detail 9: Please specify the required connection of the stair stinger to the supporting member. Nothing is specified at this time. Page 4 of 4 Plan Review Number 01 EECE#: EDM 08-17 Launceford Addition 2007-0695 VENTILATIONS AND INDOOR AIR QUALITY, ORDINANCE (V&IAQC) Sheet 10 21. Please specify the required fan for the laundry room. Nothing is specified at this time. 22. Sheet 3 implies there is a bathroom in the game room but there is not any fan specified. Please note this on the drawings. Energy General 23. I was unable to find where in the drawing the required U values were specified. Sheet 6 does not specify this. Please clarify where this information is specified. WSEC table 6-1 Sheet 9: Roof Plan 24. Please specify the required U value for the skylights purposed. Nothing is specified at this time. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 5:00 a.m. and 5:00 p.m. Hoyt Jeter, P.E. President