Loading...
20090105162057.pdf°r eo`o G iE j cC ssT" '>> Fsr. � a90 DATE: 1-5-2009 TO: Philip Morley FROM: Pat Lawler City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 RE: Plan Check: BLD200810323 Project: Deck Project Address: 19248 NE 93' PI W During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be .found on the plans, and submit revised plans/documents to a Permit Coordinator. 1. Provide details for the deck surface material to be used. 2. Provide details for the deck guard and stair handrail material to be used: 3. The PC66 cap at detail 4/S2 is incorrectly sized for the GLB. Identify a connection that will work. 4. Provide a ledger attachment detail 5. Provide a ledger flashing detail. 6. Details 3/S 1 and 4/S 1 appear to have vertical hooks drawn in as an afterthought. Please identify the hook requirements. 7. The pressure treated posts and beams are identified as DF#2. This would be a special order item. If pressure treated HemFir is to be an option, please identify on the plans. Pat Lawler Plans Examiner 425 7710220 x1703