Loading...
20121203172116088.pdfKLANDAU ASSOCIATES TECHNICAL MEMORANDUM UWCAWkNtk I GEOIEQNXAL I NA11M RMIRCES I TO: Leonard Yarberry, Building Official City of Edmonds Development Services Department, Building Division FROM: Dennis R. Stettler, P.E. DATE: November 30, 2012 6 Maw RE: COMPLETENESS REVIEW ('10 Rvlcr--" SUBMITTAL PACKAGE FOR EARTH SUBSIDENCE AND LANDSLIDE HAZARD McDONOUGH SFR DETACHED GARAGE — 16115 75 TH PLACE WEST EDMONDS, WASHINGTON This technical memorandum provides our assessment of the completeness of the geotechnical portions of the permit submittal package submitted to the City of Edmonds (City) for the proposed McDonough detached garage within the Earth Subsidence and Landslide Hazard Area (ESLHA) of North Edmonds. This completeness review was accomplished in accordance with Task Order No. 12-04 of Landau Associates' On -Call Geotechnical and Environmental. Engineering Services Agreement with the City. The completeness review is not intended to be a thorough review of the permit submittal package; instead, it is intended to be a cursory review to assess whether the submittal appears to contain the necessary information in order to complete a geotechnical peer review in accordance with Edmonds Community Development Code (ECDC) Chapter 19.10. As a guide in assessing the completeness of the package, we referred to the ESLHA Permit Submittal Checklist. The submittal package contains a letter from the geotechnical engineer dated November 12, 2012 that references a geotechnical report dated August 28, 2012. The August report was not included in the submittal package, but a report from the same consultant for a different development on Soundview Lane dated September 28, 2012 was included instead. We assume that the Soundview Lane report was mistakenly submitted instead of the report for the subject property. On the basis of our cursory review, and assuming that the August 28, 2012 geotechnical report will be a part of the submittal package subject to review, it appears that the submittal package contains the geotechnical, architectural, civil, and structural drawings, and other supporting documents appropriate to assess the planned construction within the ESLHA. Out cursory review did not identify other missing items that are required under ECDC 19.10. Of course, once the more detailed geotechnical peer review is underway, there may be specific items within the submitted documents that need to be clarified or addressed in order to complete the geotechnical peer review. 130 2nd Avenue South o Edmonds, WA 98020 o (425) 778.0907 a fax (425) 778-6409 a www.landauinc,com Please contact us if you have any questions regarding this completeness review and when you are ready for us to commence our geotechnical peer review. DRS/rgm 11/30/12 P:\074\173\FileRoom\R\CompletenessReAew_tm.doc LANDAU ASSOCIATES