Loading...
2013-0931 Dedonker SFR2.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: October 24, 2013 TO: Michael & Candace Dedonker mikebdz@gmail.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2013-0931 Project: Dedonker SFR nd Project Address: 411 2Avenue N During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ changes can be found on the plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. Items that recur on this list appear in italics. On page A0.3: 1.Attached Table 406.2 – Energy Credits (Debits) - Indicate on the plans the required energy credits to be selected per WSEC R406. No information was provided in response to the prior plan review comment. 2.Provide a completed ‘Simple Heating System Size’ worksheet (see attached) or other documentation used to determine the maximum heat output of the furnace. No information was provided in response to the prior plan review comment. On page A2.1: 3.Floor Plan – Indicate on the plans the required safety glazing per R308.4.5 for the north- most 3.0x5.0 and 3.0x2.0 windows in the west wall of the ‘Master Bath’. No information was provided in response to the prior plan review comment. 4.Floor Plan – Indicate on the plans the required safety glazing per R308.4.2 for the 3.0x5.0 window adjacent the door in the west wall of the ‘Laundry/Mud Room’. No information was provided in response to the prior plan review comment.