Loading...
20150507133723964.pdf~ May S`201G 1 � �� �_�~ - �� 6;k-�u � ^ "61�� ^�—^ } � ~ City ofEdmonds l215mAve. N Edmonds, VVA9DO30 Attn: Chuck Miller Re: BLD2015-0224 BUILDING PLANS REVIEW COMMENTS 1. Permit Form: gas equipment will require 2S4,OOOBTU. Z. A[IEnergy Notes: a\ Note A,changed asrequested. b) Note C, changed as requested. c\ Note E,changed asrequested. d\ Note F,changed asrequested. 3. AC1 Mechanical & Electrical Design: a\ Note /, Changed reference todifferent floor levels. b\ Note W,Added information regarding HRV. 4. A[1Codes, References have been corrected. S. AC1Changed climate zone osrequested. 6. A2.1 Floor Plan Notes: a\ Note 8,changed asrequested. b\ Note H,changed asrequested. c) Note |, changed asrequested. d\ Note M,changed asrequested. 7. A2.1 Plumbing Notes: Note 8, Changed as requested. O. A2.1 Mechanical Notes: a) Note A,changed asrequested. b\ Note D,changed asrequested. c\ Note E,this needs tobedone asapart ofthe mechanical permit. 9. A2.1 First Floor Plan: a) Fixed section caUuut. b) Fence and gates have been identified. c\ Added safety glazing call outs. d\ CO2sensor information has been added. e\ Added safety glazing call outs. f) Space has been identified. g> One ofthe Bedroom 1caUoutshave been changed to8ednoom2. h\ Space has been identified. i} Added safety glazing call nuts. 10. A2.2Second Floor Plan: a) Section call out has been corrected. b) Window call out has been corrected. c) Added safety glazing call outs. d) Added safety glazing call outs. e) Added safety glazing call outs. 11. A2.2 Window Types, Window wrap flashing has been added to call out. 12. A3.1 Exterior Elevations, Guardrail notes have been added to plans. 13. A3.2 Exterior Elevations, Garage door location has been corrected. 14. A4.1 Building Sections: Sectionl, Deck framing direction has been corrected. 15. A4.1 Building Sections: Information has been corrected. 16. A4.1 Typical Construction Notes: Information has been corrected. 17. A4.1 Typical Construction Notes: a) Anchor bolt information has been corrected. b) Insulation has been changed as requested. 18. A5.1 Wall Sections, Insulation value has been changed. 19. S1 Structural notes have been changed. 20. S2 Details; a) Details A&B, detail callouts have been corrected. b) Detail callout has been corrected. 21. S3 Second Floor Framing Plan: a) Framing member size has been changed. b) Framing member size has been changed. c) Framing member size has been changed. d) Framing member size has been changed. 22. S3 Floor Framing Notes, Callout has been corrected. 23. S4 Roof Framing Plan: a) Framing sizes have been change to 2x & 4x 8 to accommodate R-38 Rigid insulation. b) Callout has been corrected. c) Callout has been corrected. 24. S4 Detail 8, Framing member sizes have been changed. 25. S4 Back span of framing members are shown on details. PLANNING REVIEW COMMENTS 1. Legal lot status document has been provided. 2. Dimensions of structure have been corrected. 3. Setbacks: a) Dimensions to property line from structure are shown. b) Building has been changed so support posts don't stick into building setback. c) Chimney project into setback has been dimensioned and complies with requirements. 4. Height Calculations: a) Datum point has been identified at NW corner of site. Had surveyor set a stake. b) Line types have been improved to make it easier to read. c) Height rectangle is correct. Overhangs have been reduced to 30" to comply with building area requirements. d) Base elevation is and refers to the average original grade calculation shown on AC1. They are identified with the same designation BASE ELEVATION in both locations. e) Elevations are correct. 5. Lot Coverage: complies with code. Sincerely, Steve Barnes Project Manager r ?. t