Loading...
20151027120522.pdf510 Forsyth Lane Edmonds, WA 98020 RECEIvED October 26, 2015 OCT 2 7 2015 DEVELOPMENT §ERVICES Tana Tyler COUNTER 510 Forsyth Lane #403 Edmonds, WA 98020 The Camelot HOA Board has reviewed your proposed project scope of work as submitted;. • Remove the wall between the kitchen and dining room (floor plans are attached) • Remove the wall between the dining room and the hallway • Modify lP,w r(,place vQh Wx we(i,dhcwer • Replace t���� u . 1. ru���.,; l;ar��ia � ra lkr�sr�M, �fMh a :,md underlayment • Replan",, r.;jizm O',. coin iix,��ft p , fk'a 4s and other surfaces • Replace doors and trim • Repair drywall where necessary • Paint The board approves the Tyler Renovation project subject to the following requirements; 1. The unit owner will provide written documentation verifying the contractor's license, bonding and insurance status. 2. The unit owner will obtain a building permit from the City of Edmonds for any and all work requiring permits. 3. The unit owner will obtain electrical permit from the Department of Labor and Industries. 4. The unit owners contractors will abide by Camelot Condominium Contractor Guidelines dated July 8, 2015. S. Discuss the scope of the project during a meeting between board representatives, the unit owner, the HOA contractor, and the unit owner's contractor. Camelot CondominKi/\