20160719091424.pdfcivil & structuralNG ,
engineering & planning
June 29, 2016
Chuck Miller, Plans Examiner
City of Edmonds, Bldg. Division
Second Floor City Hall
121 5th Ave N
Edmonds, WA 98020
RE: Plan Check BLD2016-0466
Project Name: North Sound Church Remodel TI
Project Address: 2014th Avenue N
Dear Mr. Miller,
Itemized below is our response to the review comments in the June 23, 2016 letter for the above
referenced project. Our response appears in bold.
Sheet A0.21. - Site & Code Plans & Code Analysis
1. Response per Architect.
A2.11mFlmomorm Plan
2. Response per Architect.
3. Response per Architect.
4, Response per Architect.
5. Response per Architect.
6. Response per Architect.
Sheet 51.1- Structural Notes and Schedules
1. Holdown Schedule
a. Provide on the plans the information for 'Note 4' referenced in the 'Anchor Bolt' column to
guide proper review, construction, and inspection.
Refer to updated 51.1 of the Structural drawings.
b. Note 2 - Clarify the reference to detail '4/53.1' for the installation of the 'HD' holdowns. The
detail does not appear to apply.
Refer to updated S1.1 of the Structural drawings.
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph.425,778.8500 1 f.425,778.5536
www.cgengineering.com
North Sound Church Remodel 16112.1O
Plan Review Comment Response
June 25L2O1G
Page 2 of 2
if you have -any questions or comments regarding the responses to this review please do not hesitate to
Sinceneky,
CG Engineering
-~~
C. Chevy Chase, PE�E
Principal
250 4th Avenue South, Suite 200
Edmonds VxA98OZO
pM.o2s.r7a.us0V | t425J78.ss36
ENGINEERING ph.
www.cgeng|neednA.com