Loading...
20160719091424.pdfcivil & structuralNG , engineering & planning June 29, 2016 Chuck Miller, Plans Examiner City of Edmonds, Bldg. Division Second Floor City Hall 121 5th Ave N Edmonds, WA 98020 RE: Plan Check BLD2016-0466 Project Name: North Sound Church Remodel TI Project Address: 2014th Avenue N Dear Mr. Miller, Itemized below is our response to the review comments in the June 23, 2016 letter for the above referenced project. Our response appears in bold. Sheet A0.21. - Site & Code Plans & Code Analysis 1. Response per Architect. A2.11mFlmomorm Plan 2. Response per Architect. 3. Response per Architect. 4, Response per Architect. 5. Response per Architect. 6. Response per Architect. Sheet 51.1- Structural Notes and Schedules 1. Holdown Schedule a. Provide on the plans the information for 'Note 4' referenced in the 'Anchor Bolt' column to guide proper review, construction, and inspection. Refer to updated 51.1 of the Structural drawings. b. Note 2 - Clarify the reference to detail '4/53.1' for the installation of the 'HD' holdowns. The detail does not appear to apply. Refer to updated S1.1 of the Structural drawings. 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph.425,778.8500 1 f.425,778.5536 www.cgengineering.com North Sound Church Remodel 16112.1O Plan Review Comment Response June 25L2O1G Page 2 of 2 if you have -any questions or comments regarding the responses to this review please do not hesitate to Sinceneky, CG Engineering -~~ C. Chevy Chase, PE�E Principal 250 4th Avenue South, Suite 200 Edmonds VxA98OZO pM.o2s.r7a.us0V | t425J78.ss36 ENGINEERING ph. www.cgeng|neednA.com