Loading...
20170222152502.pdf0 February 16, 2016 To: Plans Examiner vw"",tv F O Box 3431 F)asc , /A 9930 509- 3 000 Attn: Chuck Miller Harvey Prickett Wave Design Group Via Email I q, This is response to your comments for this project. RE: REVIEW COMMENTS* BLD-2016- Tenant Improvements 5 corners Deli -Market 8406 Bowdoin Way �- ER Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until Jhg i WjUsn , ,1ginized lkiter, 6 , or w dt have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2"a Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. On sheet G-000 — Cover Sheet: Deferred (sic) Submittals - Partially resolved — Indicate on the plans the required submittal of construction documents for the proposed installation of mechanical, plumbing, and electrical systems under separate permits. While the Washington State Department of Labor of Industries has regulatory oversight of the electrical system installation, the means of compliance of the system and its components with the applicable provisions of the Washington State Energy Code (WSEC) must be represented on the plans per WSEC C103.2 — see also review note 8. The response to the earlier plan review comment states: "Response: Revised. See Sheet G-000, sheet A-121 and 2015 Washington State Energy Code Compliance Form.". The note on sheet `G-000' of the plans still appears to propose a `deferred submittal' of documents/information regarding the mechanical and plumbing work associated with the scope of work under this permit. Minor mechanical and plumbing work that is not included and represented on the plans (as required per WSEC C103.2) at the time of permit application for the building permit must be performed under a separate permit. While sheet `A-] 21' appears to represent some of the required elements of the proposed lighting installation, it does not include all of the information specified on the WSEC `Compliance Forms for Commercial Buildings including R2, R3, R4 over 3 stories and all R1' - LTG -SUM, LTG-INT-SPACE or LTG-INT-BLD, and LTG-CHK. The referenced Washington State Energy Code Compliance Form could not be found among the resubmitted construction documents. ,,,Sheel GP...0001,,�aml[ 2015 > ,,isldnigton State, Forirf,�i 2. Wall Types — Wall Type `B' — 1 Hr. Wall - Resolved - The required installation criteriaof the fasteners for the attachment of the gypsum wallboard for the fire -resistance rated wall assembly has been provided on the plans. On sheet G-001 — ADA Standards: 3. Ramps a. Resolved - The maximum slope of ramp landings has been changed on the plans. b. Resolved -- The maximum counter slope of curb ramps has been changed on the plans. 4. Detail 1 — Typ A.D.A. Restroom Plan — Hardware General Notes a. Note 1 - Resolved — The information has been changed on the plans. b. Note 4 - Resolved — The information has been eliminated from the plans. 5. Detail 2 — Typ A.D.A. Restroom Section —Resolved —The minimum required clearance width around the water closet has been changed on the plans. On sheet A-111— Floor Plan: 6. Floor Plan —Notes: Note 6 —Resolved -The wording of the readily visible sign required for the installation of key -locking hardware has been changed on theplans. On sheet A-112 — Equipment Placement Floor Plan: 7. Equipment Placement Floor Plan — Resolved — The requirement to seismically anchor any shelving/racks that exceed 6 feet in height has been indicated on the plans. On sheet A-121 — Reflected Ceiling (sic) and Lighting Plan: 8. Reflected Lighting Plan — Unresolved - Provide as part of a complete permit application submittal 2015 Washington State Energy Code (WSEC) 'Compliance Forms forCommercial Buildings including R2, R3, R4 over 3 stories and all RI ' as required for the selections noted on the `Interior and Exterior Lighting Alterations' section of the WSEC Lighting Summary — LTG -SUM. The completed forms must include `LTG-INT-SPACE', `LTG-INT- BLD', and `LTG-CHK', as applicable, at a minimum to support the proposed lighting installation. Specific attention needs to be given to the proposed track -lighting in the `Beverage Area' per WSEC C405.4. /, form `LTG-INT-SPACE' Note 7, and form `LTG-INT Page 2 of 3 BLD' Note 6. The response to the earlier plan review comment states: "Response: Revised. See Sheet G-000, sheet A-121 and 2015 Washington State Energy Code Compliance Form.". While sheet `A-121' appears to represent some of the required elements ofthe proposed lighting installation, it does not include all of the information specified on the WSEC. `Compliance Forms for Commercial Buildings including R2, R3, R4 over 3 stories and all R1' - LTG -SUM, LTG-INT-SPACE or LTG-INT-BLD, and LTG-CHK. The referenced Washington State Energy Code Compliance Form could not be found among the resubmitted construction documents. 9. RCP Legend —Resolved —The referenced code section regarding the exterior landing emergency lighting has been changed on the plans. ktin,ised. line e 2015 State is:''n a g (70(114:1 On sheet A-602 — Door & Window Schedule: 10. Door Schedule — Frames — Type — Unresolved - Clarify on the plans the door frame type callouts for the following `marked' doors: 102 — 103 —104 -105 They do not appear to reflect that suggested by the indicated frame material and referenced in detail `2/A-602'. The response to the earlier plan review comment states: "Response: Revised. See sheet A-11V% The changes on sheet `A-111' do not appear to reconcile the differences between the specified frame type (typical for `storefront' type of doors) and of that anticipated for interior doors. Page 3 of 3