Loading...
75th Pl W-15625-BLD20080376-Rayresidence-stormwater_memo.doc CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.ci.edmonds.wa.us DATE: October 3, 2008 TO: File FROM: Jerry Shuster, P.E., Stormwater Engineering Program Manager RE: Application #: Bld20080376 Project: Ray Residence Project Address: 15625 -75th Pl. W. Item reviewed:  Drainage report dated September 15, 2008  Plan sheets 1-2 During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. The major items regarding site drainage that require revising include: connecting the piping for roof runoff to the upstream side of the proposed detention tank, providing more detail on the design of the interceptor trench, and providing a note for minimum cover on a pipe that is proposed in the right-of-way. In the erosion and sediment control plan, several steps in the construction sequence need to be added as well as more clearly defining the limits of clearing and the location and extent of the temporary filter fence. These items and minor revisions are detailed in the enclosed checklists. Please contact me at 425-771-0220 or by e-mail at shuster@ci.edmonds.wa.us if you have specific questions regarding these plan corrections.