Loading...
BLD20070140 Phillips 8-unit 301 4th N.doc MEMORANDUM Date:March 16, 2007 To:Development Services Lead Marie Harrison From:John Westfall, Fire Marshal th Subject:BLD20070140 Phillips 8-unit Residential 301 4 Ave N. The Fire Department provides the following comments and corrections in accordance with the 2003 International Fire Code and Edmonds Community Development Code: th 1. Existing address is 301 4 Ave North. Contact Dev Services to request address change to xxx Edmonds Street in recognition of front and underground parking entries. 2. This project appears to be an 8-unit R2 Building constructed under IBC. Provide a NFPA 13R sprinkler (IFC 903.3.1.2) system throughout building up to and including 4 stories in height. Clarification of design considerations and allowances taken as a result of the installation of a sprinkler system may require the installation of an NFPA 13 system. Considerations/ conditions might include construction over allowable area and/or height, opening protection, fire-resistive substitutions, egress-spacing reductions, … IFC 903.3.1 3. Callout required permits/submittals include: a. Fire Connection Permit Callout Fire Connection Permit. Fire Connection must be submitted at the same time as your civil engineering plans. Fire connection permit is required for the installation of the underground supply for your fire protection system. Underground design must be stamped by registered PE or a Level III (WA) fire sprinkler contractor AND the installer must also stamp the plans. The installer must be either Level III or Level “U” fire sprinkler contractor licensed by the State. Provide three copies of plans showing all valves, vault location, post indicating valve, fire department connection and piping to include size and material, hydraulic calculations, thrust blocking with calculations, pipe bury depth and any and all other materials used and their fire protection listings. RCW 18.160.070 / RCW 18.27.110 b. Fire Sprinkler System Permit Callout Fire Sprinkler System permit IFC 105.7.1 c. Fire Alarm Permit Fire alarm system is required for the purposes of off-site sprinkler system monitoring, local alarm audible/visual notification and exterior audibility. IFC 903.4.2 d. Fire Protection Footprint Callout Fire Protection Footprint is required (attached). e. Fire Safety & Evacuation Guide Provide a guide which describes the location, function and use of fire protection equipment and appliances accessible to residents, including fire alarm systems, smoke alarms, and City of Edmonds Office of Fire Marshal   portable fire extinguishers in R2 apartments and condominiums. Email westfall@ci.edmonds.wa.us for example. IFC 408.9 4. Call out interior sprinkler riser area. 5. Regarding fire alarm system design: a. Collocate fire alarm control panel (FACP) with fire sprinkler riser. b. Automatic detection of common areas and manual pull stations are not required, except a smoke detector is required at the FACP and one manual pull station is required at Edmonds St entry (exit) at main level. 6. Sheets E1-E3 add note: see fire alarm permit for approved fire alarm system information (typical). 7. Provide and interconnect dwelling smoke alarms in every den/bedroom-option sleeping area. 8. Provide minimum rated 2A:10B:C portable fire extinguishers near each stair at each level. 9. Add note: New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their installed background. Address numbers shall be Arabic numerals or alphabet letters. Building numbers shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. 10. Add note: Provide Fire Department lockbox. Coordinate with Fire Department for a “Lockbox Authorization Letter” and instructions to obtain and install lockbox outside the sprinkler rooms on your site. 425.775.7720 2 Attachment: Fire Protection Footprint Cc: Mr. Tim Scott Stensland; tss@netscape.com Mr. Jim Fagerlie; Premium Construction; jim@premiumconstruction.com Engineering Program Technician Jeanne McConnell Assistant Building Official Ann Bullis 3