Loading...
bld20090259-Beeler-1.pdf City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Plan Check :Date: #2009-0259 May 7, 2009 Project Name/Address: Beeler Addition(Sunroom)______515 Seamont Lane Contact Person/Address/Fax: Thomas Beeler thomas.e.beeler@gmail.com Reviewer: JoAnne Zulauf Division:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at under City Government / Development Services Department / our website: www.ci.edmonds.wa.us Engineering Division then scroll down to Handouts: 1. Please change impervious surface calculations to read “Proposed Addition 98sf (whatever the actual roofline total square footage will be). You may add a line separately the includes the removed total of impervious if you like. 2. There is a door shown in the plans for the new sunroom. Please show on site plan any stairs, landing, sidewalk etc that will be added. Please note: Any impervious surfaces which include gravel and pavers must be added to the impervious surface calculations and shown on the site plan. 3. How will the new sunroom roof drainage be handled? Will it be tied into the existing system? If so, note on plans. If not please indicate system to be used with appropriate details. Please resubmit 3 copies of the revised plans/documents to your Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 5/7/2009 PAGE ___ OF __ 11