bld20100999-Read_2.pdf City of Edmonds TH 121 5AVENUE NORTH •EDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT EngineeringDivision Plan Review Corrections Plan Check :Date: #BLD2010 0999April 5, 2011 Project Name/Address: Read –9947 Water St Contact Person/Address/Fax: W.Glen & Debbie Read –wglenread@gmail.com Reviewer:Jennifer LambertDivision:Engineering During review of the subject submittal,it was found that the following information, corrections, or clarifications wouldneed to be addressed. Our handouts can be found online at the City of Edmonds web site www.ci.edmonds.wa.usunder City Government/Development Services/Engineering Division. st 1Review –February 18, 2011 nd 2Review –April 5, 2011 Grading / Erosion Control Plan 1. OK Site Plan 1.4/5/11 –Comment was not addressed. 2/18/11 –Comment: During the short plat improvements, Phase I, a portion of Water St was widened and a storm line was installed. Please show all improvements on the plan. 2.4/5/11 –Comment was not addressed. There was an error in the comment on 2/18/11. Please show the outfall pipe on the westsideof the catch basin and the storm line across OceanAve. 2/18/11 –Comment: The catch basin located at the southwest corner of Ocean Ave and Water St has an outfall pipe on the east side of the catch basin. Please show this storm line and include the invert elevation for this line. 3.OK DATE MAILED/FAXED4/6/2011PAGE ____ OF ___ 15 4.OK 5.4/5/11 –Comment was not addressed. 2/18/11 –Comment: Please show/list the impervious surface calculationsin the tableas shown below. TypeArea (square Feet) Line Exempt 1. ExemptNon-Exempt Replaced 2. New 3. Total Replaced +New (Non- 4. Exempt) = (add numbers in blue boxes) 6.OK 7.OK 8.OK 9.OK 10.4/5/11 –Comment was not addressed. 2/18/11 –Comment: Please clarify what is intended by the note, “All utilities to service proposed lot 1 & 2 will be taken from existing locations within Water St.”. 11.4/5/11 –Comment was not addressed. 2/18/11 –Comment: There appears to be a proposed fence on the landscape plan; however, not shown on the site plan. a.Show the fence on the site plan. b.The gate must be 18’from edge of right-of-way. c.The gate must open into private property. d.Fence shall be located entirely on private property. Sheet 1 of 2 -Site Development (Plot) Plan 1.OK 2.OK 3.OK 4.OK 5.OK DATE MAILED/FAXED4/6/2011PAGE ____ OF ___ 25 6.OK 7.OK 8.OK 9.OK 10.OK Utilities 1.OK 2.OK 3.OK 4.OK 5.OK. Drainage 1.OK 2.OK 3.OK 4.OK Sheet 2 of 2 -Site Development (Plot) Plan 1.OK 2.OK Traffic Impact Analysis: Per Chapter 18.82 –Traffic Impact Fees of the Edmonds Community Development Code (ECDC), traffic impact fees shall be required. 1.OK Drainage/DetentionReviewcomments from Storm Water Engineer,Jerry Shuster: 4/5/11 Comments–Conveyed to Rob Long from Jerry Shuster via phone. DATE MAILED/FAXED4/6/2011PAGE ____ OF ___ 35 Comments dated 2/18/11 Below: For this permit I reviewed the following: Engineering and Drainage Report for Read Residence, Lot 1 MacDonald Short Plat,9221 Water Street, Edmonds, Washington, October 2010, LSA. Plan sheets 1 & 2 for the same. Engineering and Drainage Report This short plat is vested under the former drainage code (used prior to the adoption of the new code in June 2010) and creates 5,000 square feet or more of new impervious surface.The former codestipulates thata for site of thissize, the drainage report mustinclude a discussion of complying withMinimum Requirements 2 -10 contained in ECDC 18.30.060.B.This drainage report does not include such a discussion but should. The designed infiltration trench for the west basin is less than 50 feet from the toe of the slope.This is not allowed under the 1992 Ecology Stormwater Manual, even though it has been approved by a geotechnical engineer.The City will not approve a design that has a potential for destabilizing the slope over a long period of time that may impact the railroad right of way.It carries toomuch liability for the City.In addition, the engineering instructions in the approved short plat specifies detentionof stormwater offfrom thisnew lot not infiltration.Reconfigure the flow control systems so stormwater management is provided entirely through detention. The modeling for the design detention system for the east basin useshydrologicGroupC soils when the geotechnical report confirms the site hasGroup A soils.The report says that theGroup C soils were used because the underlying soils were dense.This is not acceptable.Group C soils result in more runoff thanGroup A soils in the predevelopment condition, thus resulting in a smaller detention system. Since the soils are dense, the City will allow the modeling using GroupB soils.These soils are described as typically between 10 and 20% clay and 50 to 90% sand (USDA, NRCS, Part 630 Hydrology, National Engineering Handbook, May 2007).This description fits the soilsin by the geotechnical report.For Group B soils use a CN = 72 for the pre-developed condition and CN = 80 for grass for the post development condition (CN= 98 for impervious). The downstream drainage description on page F-1 appears to be incorrect.As described, the current drainage off the vegetated site diffusely flows to the west into the BNSF ditch on the east side of the tracks.The ditch drains to the south (not north)to an 18 inch concrete culvert that goes under the tracks into Puget Sound.Once the site is developed, the flow from the detention system(s) will be concentrated in the existing outfall intothe railroad ditch from theCity's catch basin onthe SE corner of Water St & Ocean Ave (CB with rim elevation 32.91 on plan sheet 1).This CB has a 12 inch dia. concrete pipe that discharges from the hillside ABOVE the railroad ditch (pipe not shown on Plan Sheet 1).Thisdischarge from the side of the bank appears to cause erosion from the bank under current conditions.Re-assess the downstream analysis and the potential for erosion in the BNSF right-or-way. Plan sheets 1 & 2 Review of the storm drainage plan sheets will occur once the commentsfor theDrainage report are addressed. DATE MAILED/FAXED4/6/2011PAGE ____ OF ___ 45 Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator.Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE MAILED/FAXED4/6/2011PAGE ____ OF ___ 55