Loading...
BLD20110438.pdfOF EYO�� CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISSUED 7/15/2011 Permit #: BLD20110438': Expiration Date: 1/15/2012 Project Address: 1056 DALEY ST, EDMONDS Parcel No: 00434204301500 WENDY PRIEST WENDY PRIEST LEXAR HOMES 315 DALEY 315 DALEY 485 ANDIS RD EDMONDS, WA 98020 EDMONDS, WA 98020 BURLINGTON, WA 98233 ( ) - EXT: ( ) - EXT: ( ) - EXT: LICENSE 11: EXP: DEMO EXISTING SFR VALUATION: $0.00 PERMIT TYPE: 6eaw✓•'jZPv^[ a— PERMIT GROUP: 23 - Demolition GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: RETAINING WALL ROCKERY: N OCCUPANT GROUP: OCCUPANT LOAD: FENCE: N ( 0 X 0 FT.) CODE: 09 OTHER: N ---- OTHER DESC: ZONE: NUMBER OF STORIES: 0 VESTED DATE: NUMBER OF DWELLING UNITS: 0 LOT t!: BASEMENT: 0 — IST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 0 1ST FLOOR: 0 2ND FLOOR: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER. 0 3RD FLOOR. 0 GARAGE. 0 DECK: 0 OTHER: 0 FRONTSETBACK SIDE SETBACK REAR SE'TBACK REQUIRED: PROPOSED: RE UIRED: PROPOSED: RE UIRED: PROPOSED: HEIGHT ALLOWED:O PROPOSED:O RE UIRED: PROPOSED: SETBACK NOTES: 1 AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUT)YfAND ALL FEES ARE PAID. Siqnatur6 Print Name Date Release By Date ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ IBCI 101 IRC 110. ONLINE APPLICANT ASSESSOR EXOTHER —P STATUS: ISSUED BLD20110438 • *Pre -inspection required. • *Street to be cleaned of debris. • *Side sewer must be capped at property line. • *Water Service must be disconnected from Water meter and or hose bib with AVB installed. • *Dump at approved dump site only. • Refer to BLD201 10437 for erosion & sedimentation control requirements. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City ""s ability to enforce any ordinance provision. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING (425) 771-0220 EXT. 1333 1 ENGINEERING (425) 771-0220 EXT. 1326 1 FIRE (425) 775-7720 PUBLIC WORKS 425 771-0235 PRE-TREATMENT 425) 672-5755 RECYCLING 425) 275-4801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. • E -Erosion Control/Mobilization • E -Engineering Final • E -Pre -Demolition Sewer Cap • E -Pre -Demo Water Sery Discnct/AVB • E -Pre -Demo Erosion Control • B -Final Demolition °i EbMo� Inspection Comments d N BLD20110438 23 - Demolition Applied: 06/09/2011 Issued: 07/15/2011 Expires: 01/15/2012 m/p,t A90 Address: 1056 DALEY ST, EDMONDS INSPECTION DATE INSPECTOR ACTION 1001 - E -Erosion Control/Mobilization 06/25/2012 ZULAUF CMP Comment: apprvd at final 1077 - E -Engineering Final 06/25/2012 ZULAUF CMP Comment: approved at final 1078 - E -Pre -Demolition Sewer Cap 08/10/2011 LAMBERTJ CMP Comment: Verified Sewer plugged 1079 - E -Pre -Demo Water Sery Discnct/AVB 08/10/2011 LAMBERTJ CMP Comment: WSL Disconnected and water available on site. 1080 - E -Pre -Demo Erosion Control 08/10/2011 LAMBERTJ CMP Comment: TESC adequate at this time - informed contractor that silt fence was not installed per Edmonds Standards, but is OK w/it as it is but will be monitoring it. 1104 - B -Final Demolition 06/27/2012 LAWLER CMP Comment: 6/28/2012 8:06:24 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 1 of 1