Loading...
bld201301421_5th_Ave_Animal_Hospital_ENG1.pdf City of EdmondsBLD20131421 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments PermitApplication:Date: #BLD20131421February 24, 2014 thth Project Name/Address: 5Ave Animal Hospital, 310–5Ave S Contact Person/Address, Fax or E-mail: Bernand Hou –bernand@awerks.com Reviewer: JENNIFERLAMBERTDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.edmondswa.govunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: GENERAL 1)Please add a cover sheet with the following information: a.General site development plan b.Utility Purveyor information (remove from sheet C0.1). i.Please revise the phone company from Verizon to Frontier. c.Sheet index 2)Please revise the Civil Plan Sheets to start with C1.0, if possible. SITE DEVELOPMENT PLOT PLAN(Sheet C0.0 of 9) GENERAL 1)Pleaserevise the sheet title to include Demo. 2)The plans state that there will be a temporary 1:1 cut slope per Geotechnical Requirements. a.Please show a cross section of the site, sidewalk, and travel laneso that the impact to the right- of-way can be determined. b.Please note that shoring along the frontage may be required to maintain the integrity of the street. NOTES 1)Please revise note 9 to state, “Remove and replace the existing tree.” DATE E-MAILED2/24/2014PAGE (1) City of EdmondsBLD20131421 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments 2)Please add thefollowing note, “Cut and cap the existing sewer lateral and water service line at the main line.” SITE DEVELOPMENT PLOT PLAN(Sheet C0.1of 9) INSPECTION NOTES 1)Please revise note #4 to include the following, “The connection of the footing drains to a storm drainage system to be inspected by the engineering department.” 2)In note 8 you state that theinstallermust be certified with a‘UA’license.Is ‘UA’correct? Please revise if needed. ASPHALT PAVING 1)Please revise note #2to clarify that the broken asphalt pieces cannot be placed within the City right-of- way. SITE DEVELOPMENT PLOT PLAN(Sheet C0.2 of 9) 1)No Comments SITE DEVELOPMENT PLOT PLAN(Sheet C0.3 of 9) 1)Please modify Standard Detail E7.19 to be consistent with improvements shown on Sheet C1.0. a.Please also show the pressure connections (Wet Tap) on the detail. 2)Please clearly note that Standard Detail E7.19 is modified. SITE DEVELOPMENT PLOT PLAN(Sheet C0.4 of 9) 1)No Comments SITE DEVELOPMENT PLOT PLAN(Sheet C1.0 of 9) 1)Please show the grading calculations on this plan. 2)Please show the impervious surface calculationscharton this plan. 3)Please show all other utilities(water, sewer, dry utilities)“greyed out”. DATE E-MAILED2/24/2014PAGE (2) City of EdmondsBLD20131421 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments 4)CB #1 states 1”force main and MH#2 shows 4”force line. Please revise to be consistent. 5)Please label the force main in MH#2. 6)Please label the overflow line in CB#1. 7)Theplans show the tightline connected to the detention pipe in the middle of the pipe. Is the pipepre- fabricated? If not, please show the connection toa structure. 8)Please show theproposed (8) dead man anchor locations. 9)Please show the existingCity catch basinand invert elevations for all existing and proposed pipe connections. 10)It does not appear that the stormwater system was designed for the collection of groundwater. Please redesign the system to account for groundwater or show the footing drains and retaining wall drainage discharging to a separatesystem (direct connection to City systemdownstream from detention system, drywell, etc.). STORMWATER REPORT/STORMWATER PUMPDESIGN REPORT 1)The Stormwater Reporthas designed a system for 5793 sq ft of impervious surfaces; however, the impervious surface calculations showonly 1634 sq ft. Please revise the plans to be consistent. 2)The buoyantforce used for the detention pipe appears to be too large. Please review and revise as needed. 3)AStormwater pump system has been designed; however in the ‘Stormwater Pump DesignReport’it states that the pump will be bidder designed. Please remove that statement. a.The pump system design must be approved during the permit process.If after permit issuance the contractor chooses to use a different pumpsystem, the designmust besubmitted to the City as a revisionfor review and approval. SITE DEVELOPMENT PLOT PLAN(Sheet C1.1 of 9) 1)Please revise detail per comments above, as needed. DATE E-MAILED2/24/2014PAGE (3) City of EdmondsBLD20131421 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments SITE DEVELOPMENT PLOT PLAN(Sheet C2.0 of 9) GENERAL 1)Please callout the sheet #’s for the dumpster enclosure. 2)Please “grey” out thestorm system. 3)Please bold the sewer, water, and dry utilities. 4)Please revise the following note to state “Replace conc.sidewalkper COE Std. Det. E2.13”. 5)Please revise the following note to state “Replace curb and gutter per COE Std. Det. E2.8 as required by City Engineering Inspector”. 6)Please revise note #3 of the Utility Notes to reference Sheet C.03. 7)During a site visit it appears that the light pole and 3 hour parking sign appear further north (within the frontage of the subject parcel). Please verify that the location of the signs and poles on the plans are accurate and revise the plans accordingly. 8)Please show the tree grate on the plans (3’x3’). 9)Please add a note thatthedriveway slope shall not exceed 14%. 10)Per the plans a 1” high concrete berm is to be installed at the edge of pavement to prevent alley runoff flowing down the ramp. Please note that the berm is to be placed on private property. 11)The curb and gutter shown along the alley shall not be installed within the City right-of-way. a.If a curb shall be installed, avertical curb could be installed within private property. 12)Please show a fullwidthgrind and overlay for the entire length of the alley such that the grind and overlay encompasses all trenches. WATER 1)Please show inline valves near the main line connection points on the water and fire lines. 2)Please show an EZ-valve 2 inline valve insertionon the existing main north of the fire hydrant located th approximately at the SE corner of Maple St and 5Ave S. DATE E-MAILED2/24/2014PAGE (4) City of EdmondsBLD20131421 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments 3)Please revise the note, “Tap ex. main for water service…” to state “Wet tap ex. main for water service…”. 4)Please relocate the water meter to the property line. 5)Please add a note that the premise isolation with a RPBA will be installed within the building. SEWER 1)Please showa 6” cleanout in the right –of-way at the property line. a.Please add a note that a 12” cast iron lamphole cover and ½” hexboltswill be installed over the 6” cleanout. 2)Please show a wye for the connection at the main. 3)Please note that an inserta-tee will be installed for the connection of the sewer lateral at the main. DRY UTILITIES 1)Please add a note that a minimum of 3’ separation is required between the dry utilities(power, gas, phone, cable, etc.)and sewer, water, and stormand 5’from any City main lines. 2)The City will not allow private utilities within the right-of-way. a.Please verify with the utilities companies that the lines proposed will be owned and maintained by the respective utility company. 3)Please add a note on the plans that all utilities must go underground. SITE DEVELOPMENT PLOT PLAN(Sheet C3.0 of 9) 1)Thetraffic control plans provideddo not show plans consistent with the lane configuration thatexist onsite. Please revise as follows. a.Please show location of the intersection relative to the subject site as theyexist. b.Please show alllanes (travel and parking)and sidewalks. DATE E-MAILED2/24/2014PAGE (5) City of EdmondsBLD20131421 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments c.Please clearly show thework area with dimensions. This will allow the Cityto accurately review the required traffic control needed and to determine any disruptionfees that may apply. d.Please label the streets. e.Please show the pedestrian detour routes. SITE PLAN(SheetA1.1) 1)Please show the property lines in theretaining wall details. 2)Please add a note to the ‘Enlarged Site Plan’for the retaining wall to be flush withthe final grade at the property line. SITE PLAN(SheetA1.2) 1)Please removedetail1, 2, and 3. 2)Please add a note to see Civils for curb/gutter and sidewalkrequirements. 3)Please add a trash enclosure detail showing the concrete pad and enclosure dimensions. SITE PLAN(SheetA1.0) 1)Please remove this sheet and use the Civil Demolition Sheet (C0.0 of 9) for the Demo Plan. Please revise references to this sheet on all plan sheets accordingly. SITE PLAN(SheetL-0.1) 1)Please revise thetree gate to state 3’x3’both on the detailsand in the landscape plan. 2)Please add a note that all disturbed soils will be compost amended. Please resubmit 3 copies of the revised plansand associated documents with a written response to each item to a Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at jennifer.lambert@edmondswa.govif you have specific questions regarding these plan corrections. DATE E-MAILED2/24/2014PAGE (6)