bld20130652_Muir_ENG1.pdf City of EdmondsBLD20130652 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments PermitApplication:Date: #BLD20130652 July 18, 2013 th Project Name/Address: Muir –7700–175St SW Contact Person/Address, Fax or E-mail: Bruce O’Neil –mick@designworksconstruction.net Reviewer: JENNIFERLAMBERTDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.edmondswa.govunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: GENERAL 1)Please fill out the stormwater worksheet providedin handout #E72 and submit with plans. SITE PLAN 1)Please remove the temporary erosion control measuresand show them on the Onsite Utility Plan. 2)Please remove the utilities from the Site Plan. ONSITE UTILITY PLAN 1)Please show the year of construction for all existing impervious surfaces. 2)Please note if the driveway is to be replaced. a.If the driveway is to be widened those areas will be considered new impervious surfaces and the impervious surface calculations will need to be revised accordingly. 3)Please reference the existing drainage easement recording number. 4)Please provide a copy of the drainage easement so that it can be verified that construction of a structure within the easement is permissible. If it is not permitted by the easement, please remove/relocate the structure such that no portions of the structure arelocated within the easement. DATE E-MAILED7/19/2013PAGE (1) City of EdmondsBLD20130652 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments 5)Please show the extension of the drivewayto the new garage and revise the impervious surface calculations accordingly. 6)A minimum of 1’ of cover is required over the storm pipe when located under landscape areas; however thereappears to be less than a footof cover. Please revise to meet the minimum requirements. 7)A minimum of 2’ of cover is required over the storm pipe when located under drivableareas. If this cannot be achieved you may use ductile iron, but there must be a minimum of 1’ of cover. Please revise to meet the minimum requirements. 8)Please note what type of pipe material will be used for the storm, water, and sewer utilities. 9)Please show the water service line from the meter to the house. 10)Please show the water service line from the existing house to the proposed garage/studio. 11)Please show the sewer line from the main to the house. 12)Please show the sewer line from existing house to the proposed garage/studio. 13)Please clearly distinguish between proposed and existing utilities. 14)Please show that there is a minimum of 3’separationbetween the utilities. ***Additional storm comments to follow once the City’s Stormwater Engineer Program Manager has reviewed the Plans. If there are no additional comments from the Stormwater Engineer an email will be sent to inform you. *** Please resubmit 3 copies of the revised SitePlansand associated documents with a written response to each item to the Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at jennifer.lambert@edmondswa.govif you have specific questions regarding these plan corrections. DATE E-MAILED7/19/2013PAGE (1)