Plan Review Comments
Plan Check :Date:
#BLD20150148March 2, 2015
Project Name/Address:
Lewis Addition–18910 Sound View Pl.
Contact Person/Address/Fax:
Ron McNurlenmcnurlen@comcast.net
Reviewer:Chris RiveraDivision:Engineering
During review of the subject submittal,it was found that the following information, corrections, or
clarifications wouldneed to be addressed. All Handouts referred to in these comments can be accessed at
our website: www.edmondswa.gov/under City Government / Development Services Department /
Engineering Division then scroll down to Handouts:
1)Please remove duplicate General Notes: 13-17, from the Cover Sheet.
2)Please show the location of the water service line from the water meter to the home.
3)A right of way permit is required for the use of the right of way,attached is a right of way application. Please
fill out and submit with a traffic control plan.
4)A Side Sewer Permit will need to be obtained for replacement ofthe side sewer. Attached is a side sewer
application & for your reference the Side Sewer Information handout, E71.
5)Please call outon the Drainage & Utility plansthe materialfor the side sewer. Please provide on the
Drainage &Utility plans the Sewer Cleanout Details, E6.2.and Side Sewer Relocation/Repair detail E6.3.
6)Per the Drainage Report, AppendixA-Critical Areas Report & Proposed Mitigation Planandmore
specificallypage 6,the Proposed CompensatoryMitigation Efforts,it is proposedto remove the existing
invasive non-native vegetation within the remaining stream buffer of 37.5’. Please elaborate on the note
“Limitsof Clearing”, providing a description of the type of work to be performed beyond the siltfence
within the stream buffer.Per the Planning Divisions requirement, any work performed within the stream
buffer shall be done with hand tools.
7)Per Jerry Shuster, City of Edmonds Storm Water Engineer, please provide elevations for the “Seasonal High
Ground Water” table within the infiltration gallery section details. This is to ensure that the contractor will
know the limits of the bottom of the galleries and the required separation (1’ minimum).
8)For information,this site does fall under a Small Site project Category 2, due to the total “new impervious
surface area”of 5000 sf, see Handout E72, Figure E for the definition of “new impervious surfaces” &
DATE FAXED/E-MAILED3/2/2015PAGE __1__ OF __1_
Figure Bfor Project Classification.Per Jerry Shuster, sizing factor for both Category 1 & Category 2 Site
Projects are the same, it will not impact the sizing. The submitted Drainage Report Small Site Project
Category has been redlined to reflecta Category 2 site.
9)Please call out materialfor the storm tightline.
10)If footing drains are required,please show them on the Drainage Plan,as well as where the footings will
drain.
11)Please provide elevations for the below listed.
a.Sewer invert elevations and slope.
b.Rim and invert elevations for yard drains and cleanouts.
12)Pollutiongenerating impervious surfaces (PGIS)isthose impervious surfaces considered to be a significant
source of pollutants in stormwater runoff. For a single family home this most applies to vehicular driving
surfaces, i.e. driveways. Please correct the “Impervious Area Summary Table” to limit the PGIS to just the
driveway surface area (currently listed as 2000 sf of PGIS),add the difference to the new NPGIS oryou can
eliminate the table from the site plan. The city provided Impervious Surface Table is correct, displaying a
total new impervious surface area of 5,804 sf.
13)Per Edmonds Community Development Code18.80.060C, the driveway approach must be constructed with
asphalt up to the property line. Please show this on the site plans.
14)The driveway approach width for a two car garage shall not exceed 24’, see Standard Detail E-2.26.
Regarding the proposed walkway/driveway, it would be ok to have a concrete walkway from the property
lineto the house entrance separating the driveway and walkway in order to meet the city driveway approach
standard, as well as to minimize impervious surfaces. Another option to meeting city standards would be to
widen thedriveway outside of the right of way starting at the property line.
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator.Please
contact me at 425-771-0220ext. 1339 or by email at chris.rivera@edmondswa.govif you have specific
questions regarding these plan review comments.
DATE FAXED/E-MAILED3/2/2015PAGE __1__ OF __1_