Loading...
BuiTheater1.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: June 3, 2008 TO: Tiffany Bui FAX: 425-640-5830 FROM: Ann Bullis, Assistant Building Official RE: Plan Check: 2008-0439 Project: Bui Interior Alteration th Project Address: 16105 75 Place West During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses to each comment as to how it has been addressed (support with code sections where applicable), and where changes can be found on the plans. Please submit revised plans/documents to Theresa Umbaugh, Senior Permit Coordinator. 1.The mechanical ventilation system must be shown on the plans, including supply and exhaust/return. Show the location, type and model of equipment, ductwork, and cfm of supply and exhaust air. 2.Label what type of equipment is shown in the storage room. If this is part of the mechanical ventilation system for the theater, see item #1 above.