Loading...
Burleigh Eng Final SP Approval.pdf CITY OF EDMONDS ENGINEERING DIVISION Date: March 7, 2017 To: Jen Machuga, Planner From: JoAnne Zulauf, Engineering Technician Subject: PLN20150047, Burleigh - Final Plat nd 22930 102 Pl W 4 lot Short Plat The Engineering Division has found that the subject 4-lot short plat meets the requirements established for civil subdivision improvements in accordance with Edmonds Community Development Code (ECDC) 20.75. Preliminary plat approval was issued by the Planning Division on January 29, 2016 and included engineering conditions of approval in Attachment 12 of the staff report. Civil construction plans were submitted to the Engineering Division on March 17, 2016 consistent with the conditions of approval and ECDC 20.75.120. The plans were approved for construction on May 20, 2016. While most of the improvements have been installed and inspected, the plat construction has yet to be completed in its entirety. On February 28, 2017, the Engineering Division received a Performance Bond in the amount of $48,516.00 reflecting the total cost to construct the remaining improvements consistent with ECDC 20.75.130. Consistent with ECDC 18.30.090, a permanent access easement has been granted to the City of Edmonds for access to the private stormwater facility located on Lot 4. Access is for inspection purposes to ensure that stormwater facilities are properly operated and maintained in accordance with City of Edmonds Code. The subject development did not include street dedications to the City. City of Edmonds