CREwarehouse2.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: May 29, 2008 TO: Mike Adams FAX: 425-774-7803 FROM: Ann Bullis, Assistant Building Official RE: Permit Application: 2008-0065 Project: CRE Properties – Office/Warehouse th Project Address: 21030 70 Ave W During re-review of the plans for the above noted project, it was found that the following information, clarifications or changes are still needed. Please provide written responses to each comment as to how it has been addressed (support with code sections where applicable), and where changes can be found on the plans. Please submit revised plans/documents to Theresa Umbaugh, Senior Permit Coordinator. Nonstructural comments: Ok. Plumbing and Water Meter were added to list with a redline 1). 2)Site plan: The plan notes that the easement is abandoned. Please provide copy of recorded a) document showing that this easement is now abandoned. This also needs to be noted on the Civil plans with correct recording date and number. Also, on the Civil plans the length of the easement needs to be coordinated with the survey and site plan. It appears to extend longer than 114’ and as shown the building would encroach into the easement. Show, label, and dimension the 10 foot existing drainage easement along the north property line. Clearly show that no portion of the building, including the footing, will encroach into the drainage easement. Ok b). Ok c). Revise width of parking stall access aisle on site and parking plans to 5 feet minimum. d) Coordinate civil plans with parking plan for accessible stall, landscape area adjacent to the stall, etc. Show location of accessible parking stall (1 required) and provide dimensioned detail with sign. Ok e). Ok f). Add new short retaining wall at west side of building that is shown on structurals and g) civils. Note the top and bottom wall elevation. Ok 3) Ok 4) Ok 5) Ok 6) Ok 7) Ok 8) Ok 9) Ok 10) Please note on the plans that you are using IBC 704.11 exception 4 in lieu of exterior wall 11) parapets. On the roof plan note that no openings are within 10 feet of the interior side of the exterior walls; reference the correct detail (7/A8.00) for the 1-hour roof-ceiling assembly on the plan. Also, provide opening percentage calculations for east wall of warehouse. Exterior wall and opening protection: a)The west, east and north exterior walls must be 2-hour rated due to close proximity to the property line. IBC Table 602. A parapet is required unless an exception is used. If an exception will be used, clearly note all requirements on the plans (IBC 704.11). The east exterior wall of the B occupancy is required to be 1-hour fire rated as you are showing on the floor plan. b)Reference 1-hour exterior wall assembly for the south wall at the second floor (IBC Table 602). A parapet is required unless an exception is used. If an exception will be used, clearly note all requirements on the plans (IBC 704.11). Ok 12) Ok 13) Ok 14) Ok 15) Ok 16) Ok 17) Ok 18) Ok 19) Ok 20) Deferred Submittal 21) We received the special inspection agreement from Krazan for the structural inspections 22) (concrete and wood), but still need one signed by the geotech of record for the soil and foundation drainage inspections. Special Inspections are required for: a)Excavation, grading and site preparation b)Soil bearing verification c)Placement of fill and compaction d)Foundation drainage e)Concrete construction (placement of reinforcement, anchor bolts, holdown placement, test specimens, adhesive anchors, expansion anchors) f)Wood construction (shearwall/diaphragm nailing with fasteners4” o.c. or less, drag strut installation) Complete the enclosed Special Inspection and Testing Agreement. Have all parties sign the form and return for City approval prior to permit issuance. One special inspection form is required for each special inspection firm. Still waiting for this to be submitted. 23)Provide written/signed contractors responsibility statement per IBC 1706, prior to permit issuance. Ok 24) Ok 25) Page 2 of 3 Revise special inspection information on Sheet R1.00 to be applicable to this project. 26) Since type of construction was changed to VB, revise height and story information for each 27) occupancy on coversheet per IBC Table 503. Provide Envelope Summary form (and calculations if not prescriptive) for Energy 28) compliance and note the minimum insulation R-values and U-values on the plans/sections, including slab insulation. Revise detail 1/A8.00 to show a 1-hour rated attic access hatch. 29) No additional structural comments Page 3 of 3