Loading...
Echelbarger Plans.pdfNovember 26, 2013 KernenUen City ofEdmonds 121S=Avenue North Edmonds, VVA9OO2O RE: Cover letter for Eche|borgartwo lot Short Plat 23911104 th Street West ° Eche|borQerInvestments, LLCp,oposostooubdivideone26,24Oaquarefoot lot into two. We are proposing one access point via a shared driveway, as Well as frontage improvements consisting of curb, gutter and five foot asphalt sidewalk. Drainage for the driveway and the two residences will behandled through infiltration. The existing single family home will bedemolished; however wewould like the option ofkeeping the detached two car garage located onlot 1. All utilities are available tothe site. Water and Sewer |swill beprovided bvOlympic View. Power ioon- site Sincerely, 1:13 ,*N ----------- --- -------- - - - ------- n U tl R'1 cr 0 ,I '3 'n M of q 1 1 zw 0 C3 z W � D (f) 0 < u L/I cn 0 ffid X LIJ 1:13 ,*N ----------- --- -------- - - - ------- w HN en 6 x P w IP'l gbffid 'nii P np to °3b3 jig glqa 5 g.2 Q N ql� NpW n cr 0 7 CD z z '3 'n M of 0 L 0 C3 z W � D (f) 0 < u L/I cn 0 X LIJ w HN en 6 x P w IP'l gbffid 'nii P np to °3b3 jig glqa 5 g.2 Q N ql� NpW M- ryve3g RR o An IF YJr — --------- --------------- -------------- --------------------- ----- No i g �W ,q1I &OR -11 ------------------------ - - ------------ as, N a- NO --- ------- 104th AVENUE W. - - - - - - Un --- - - - - - - - - - - - - - - - - - - -------=z - - - �.g W 6- 4 n N, Ug z 0 IL7 L IZ 0 z z I —= 6j z L'i cn cn < 0 L P -2 Br �WuJ 0 Hold W. tt �5 z t� g 2 'p 4 Li YJr — --------- --------------- -------------- --------------------- ----- No i g �W ,q1I &OR -11 ------------------------ - - ------------ as, N a- NO --- ------- 104th AVENUE W. - - - - - - Un --- - - - - - - - - - - - - - - - - - - -------=z - - - �.g W 6- 4 n N, IY "X" #E28 - W VICE5 e,,JUNTER on Ufififies Coorfim U C A coordhiatezi ittilio, environment which inaximizesjoint utility opportunities to provide quality service for the citizens ol'Ethnowls YOU WILL BE GIVEN A CONFIRMATION NUMBER BY EACHUTILITY ONCE YOU HAVE INFORMED THEM OF YOUR PROJECT. SITE ADDRESS: I J 04 -AAA Avev\06 W. a4wA 31 D Mary McAllister — 425.670-32-16 You will need to provide PUD with a site plan and a completed Ne -'v Service Questionnaire. PUGET SOUND ENERGY ivwu New Customer Construction Call to verify gas availability and to coordinate service install. You will need to Department - 1-888-321-7779 provide parcel number, contact phone number and mailing address. o b- w ro -'?_7 1 :2-'o You will need to provide Frontier Nvith the location of your project, total line Jeremy Fallt - 425-263-4024 requirement, and the date in which service is required. A copy of your You will need to provide Comcast with the location of your project, a copy of Mike. Fontenot 425-263.5482 your development and site plan (digital copy if available.) The date in which service is required and a list of contact names, phone numbers & mailing 0/ Steve Dunphy - 425.774-7769 ext. 110 You will need to provide OVWSD with the survey map of your site and For customers in Olympic View Service Area complete a development information form. THIS FORM MUST BE COMPLETED AND GIVEN TO DEVELOPMENT SERVICES STAFF AT THE TIME OF PERMITSUBMITTAL . ....... ...... W.). 005��16)0000700 ~� l)k et-..�-f rJ�i City of Edmonds ,f Traffic Impact Analysis Worksheet NOV 2 2) 2013 Name of Proposed Project: Echelbarger Investments, LLC Short Subdivision OEVE-LOPS gEiiT S RVVlOE,� COUNTER Owner/Applicant Applicant Contact Person: Todd Echelbarger Jeffrey T. Treiber Echelbarger Investments, LLC Lovell-Sauerland & Associates, Inc. Name Name 4001 198th Street S.W., Suite 2 19217 36th Avenue W., Suite 106 Street/Mailing Address Street/Mailing Address Lynnwood WA 98036 Lynnwood WA 98036 City State Zip City State Zip Telephone: 425-673-1100 Telephone: 425-775-1591 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Contact Name Telephone: E-mail: THRESHOLD LEVELS OF ANALYSIS Project Traffic Levels Sections to Complete I. Less than 25 peak -hour trips generated 1 and 7 only (Worksheet/Checklist) II. More than 25 peak -hour trips generated All sections 1. PROJECT DESCRIPTION a. Location - Street address: 23911 104th Avenue W (Attach a vicinity map and site plan.) b. Specify existing land use: One existing single family residence c. Specify proposed type and size of development: Two lot short subdivision (# of residential units and/or square footage of building) Revised on 6124110 E82 - Traffic Impact Analysis Worksheet Page 1 of 5 d. Date construction will begin and be completed: Spring/summer 2014 e. Define proposed access locations: Joint driveway at the north property line f. Define proposed sight distance at site egress locations: Greater than 200 ft. 2. TRIP GENERATION Source shall be the Eighth Edition of the Institute of Transportation Engineers (ITE) Trip Generation manual. For independent fee calculations, the current edition of the ITE manual may be used. ADT = Average Daily Traffic PM Peak -hour trips (AM, noon or school peak may also apply as directed by the City Engineer) a. Existing Site Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT b. Proposed Project Trip Generation Table: PM Peak -Hour Trips Land Use Daily (ADT)I IN OUT c. Net New Project Trip Generation Table: PM Peak -Hour Trips Land Use Daily (ADT) IN OUT d. State assumptions and methodology for internal, link -diverted or passby trips: Revised on 6/24/10 E82 - Traffic Impact Analysis ii'orksheet Page 2 of 5 3. TRIP DISTRIBUTION Prepare and attach a graphic showing project trip distribution percentages and assignments. For developments that generate over 75 peak -hour trips, the City Engineer reserves the right to require trip distribution to be determined through use of the City traffic model.' 4. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY a. Have sight distance requirements at egress location been met per AASHTO requirements? b. Intersection Level of Service (LOS) Analysis: Intersections to be evaluated shall be determined by the City of Edmonds Trac Engineer Existing Conditions LOS Delays Year of Opening LOS Delays Five Years Beyond Change of LOS Delays Land Use c. Describe channelization warrants: (Attach striping plan.) d. Vehicle Storage/Queuing Analysis (calculate 50% and 95 % queuing lengths): 50% 1 95% Existing Conditions Year of Opening IFive Years Beyond Change of I Land Use e. If appropriate, state traffic control warrants (e.g. stop sign warrants, signal warrants): f. Summarize local accident history (only required for access to principal and minor arterials): Available upon request at City of Edmonds Development Services Department 2 Available upon request at City of Edmonds Police Department Revised on 6/24/10 E82 - Trak Impact Analysis JVorksheet Page 3 of 5 5. TRAFFIC VOLUMES Provide the following and other planned development traffic within the city. I a. Describe existing ADT and peak -hour counts (less than two years old), including turning movements, on street adjacent to and directly impacted by the project. b. Describe the estimated ADT and peak -hour counts, including turning movements, the year the project is fully open (with and without project traffic). c. Describe the estimated ADT and peak -hour counts, including turning movements, five years after the project has been fully open (with and without project traffic). d. State annual background traffic growth factor and source: 6. LEVEL OF SERVICE (LOS) ANALYSIS a. Summarize Level of Service Analysis below and attach supporting LOS analysis documentation. Provide the following documentation for each arterial street or arterial intersection impacted by ten or more peak -hour trips. Other City -planned developments) must also be factored into the LOS calculations. Existing Conditions Year of Opening LOS ( I LOS Existing I I Delays With Project I I Without Project IFive Years Beyond Change ofI With Project I I Without Project Land Use b. Note any assumptions/variations to standard analysis default values and justifications: 1 A list of planned developments are available at the City upon request for public records Revised on 6/24/10 E82 - Traffic Impact Analysis Yi'orksheet Page 4 of 5 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. ITE Land Use Category New Use 210 Prior Use 1 210 Fee New Use Fee: $ 2,392.66 - Prior Use Fee: $ 1, 196.33 = $ 1,196.33 1 _: ❑ NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, of , etc. New Use $ X = MITIGATION FEE RECOMMENDATION: INDEPENDENT FEE CALCULATION: $200.00 + consultant fee $ TOTAL TRAFFIC IMPACT FEE $ City of Edmonds, Engineering Division Approval Date 'No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. Revised on 6/24/10 E82 - Traffic Impact Analysis K'orksheet Page 5 of 5 Units in Per Unit square feet, Fee Rate # of dwelling, of , etc. X 2 = $1,196.33 $ 1,196.33 X 1 = Fee New Use Fee: $ 2,392.66 - Prior Use Fee: $ 1, 196.33 = $ 1,196.33 1 _: ❑ NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, of , etc. New Use $ X = MITIGATION FEE RECOMMENDATION: INDEPENDENT FEE CALCULATION: $200.00 + consultant fee $ TOTAL TRAFFIC IMPACT FEE $ City of Edmonds, Engineering Division Approval Date 'No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. Revised on 6/24/10 E82 - Traffic Impact Analysis K'orksheet Page 5 of 5