Loading...
ENG20170037-REVISED.pdf THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 1/18/172/17/171/18/17 DATE 1/5 ...PAGE SAP Sup Order Nbr Drawing Number CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG 109098145 EDMONDS 109098145 N office 206-517-3404425-429-5486425-424-6426425-424-6549206-517-3404425-766-1307N/AN/AN/A PHONE NO PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200. 1"=20' MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400. NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYSTO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY N/A INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY Owner / Developer Contact Info For contacts below dial 1-888-CALL PSE (225-5773) PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS PERMIT NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX. SCALE DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE. ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TOTHE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION ISINSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES. INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 AND SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARDS 2525.2100 FOR INSERTIONS AND 2525.3600 FOR INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICES G.VUKOSAV INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSEMAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300, 2525.3400 NOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED STANDARD GAS CONSTRUCTION NOTES:CONTACT P.INDORFP.INDORF N.MARTIN K.ANSON D.DAO PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATING NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS). PSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS. TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811 EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. REAL ESTATE/EASEMENT REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS. REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300. REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED.N/AN/AN/A REPLACEMENT CONSTRUCTION NOTES RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. N/A WORK 1-1/4" MPE AND 6" STW IP MAIN RELOCATE PROJECT MANAGER TO MAKE EGOR RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION. SITE Vicinity Map 76TH AVE W & 212TH ST SW REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985. PROJECT MGRAPPROVED BY CP APPROVAL JOINT FACILITIES ARRANGEMENTS CHECKED BY N/A ENGR - GAS GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED. DRAWN BY BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300. FUNCTION 16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH.MAPPING ATTN: N/A N/AN/AN/A STANDARD IP & LP GAS EDMONDS, WA 98026 ___________________________, PHONE______________. Manufacturer THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. TESTED BYTESTED BY WATERWATER N/AN/AN/A 109098145108592084 SYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIG CSPNSGPM PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700. AND 2525.1200, AND PSE GAS FIELD PROCEDURE 4700.1500.Order #163.069 ##### GAS WK CTR TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 45 425-766-1307 NITROGENNITROGEN PLAT MAP Act Lgth ACTIVE SERVICES TO BE REPLACED DENOTED BY: GAS MAIN INSTALLATION/RETIREMENT FF PER PSE GAS OPERATING STANDARD 2550.1600. 45 PSIG GAS MAIN PRESSURE & TESTING PP DESCRIPTION GAS OPERATING STANDARD 2525.2300. OPERATING STANDARD 2525.2500. Est Length STANDARDS 2525.2100 AND 2525.3600. BOX (TEST LEAD) INSTALLATION. FOOTAGE BETWEEN FITTINGS.ABANDONMENT OR DEACTIVATION.24'12' 8'4'TEST RESULTSTEST RESULTS INFORMATION ON D-4 CARD) START TIMESTART TIME AIRSTOP TIMEAIRSTOP TIMESYS MAOP N/AN/AN/A 160.068 Notification # Yes NoYes No Project Manager Contact Information: 5 11093022Emer Sect KEVIN ANSON Type MPEMPE parker.indorf@pse.com STWSTW OP MAP BY PARKER INDORF SOAPSOAP / / / / / / / / OUTAGE.425-463-6802 Pipe Size 60CONTACTPHONE# 1-1/4"UTILITIES Service/MeterService/MeterService/MeterService/Meter SAP Superior Dis. Reg. / FT DATE 6"2"6"HP Svc/MSA Ind. ServicePSE Retirement "Flagging Required" "Locates Required" PROJECT PHASE SNOHOMISH Ind. MSASE 19-27-04 Relocate 10.11.12.13.14.15.17.10.11.12.13.DESIGN PRESS 18.14.15.DESIGNED BY 1.2.3.4.5.6.7.8.9. 1.2.3.4.5.6.7.8.9. Type/Work TYPE TESTTYPE TESTPRESSURE PRESSURE INSTALLINSTALL 2023 03/10 DATE OFFDATE OFF RETIRERETIRE Cell Phone: DATE ONDATE ON REV# Manager:COUNTY 1/4 SEC 1 32 E-Mail: GAS RETIREMENT LENGTH OF LENGTH ACTUAL Completed post installation inspection per GOS 2525.1200 and 2525.2700. (CHECK BOX TO CONFIRM COMPLETION) Recorded all required information on the as-built per GOS 2500.1700. Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: InfraSource Construction Date ______________ Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 RETIREMENT LENGTH OF SAP BATCH YEAR & FOOTAGE PROPOSED DEPTH Reviewed and complied with all construction notes. Left the work area in a clean and safe condition. HOLE HOG TABLE ORIGINAL YEAR LOCATION FITTER'S CHECKLIST ORIGINAL JOB 4680 06/11 MATERIAL RETIRED STARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTART ENDENDENDENDENDENDENDENDENDEND CALLOUT RETIRED SIZE OF MAIN BP10BP11BP12BP13BP14BP15BP16BP17BP18BP19BP20 BP1BP2BP3BP4BP5BP6BP7BP8BP9 CLEARANCE 1' MIN. LEGEND FROM OTHER UTILITIES: MINIMUM CLEARANCE HORIZONTAL: 5' VERTICAL: 1' Scale: NONE Scale: NONE ROADWAY CROSS SECTION ROADWAY CROSS SECTION 3 B 3 C THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 1/18/172/17/171/18/17 DATE 2/5 ...PAGE SAP Sup Order Nbr Drawing Number CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG EDMONDS 109098145 206-517-3404425-429-5486425-424-6426425-424-6549206-517-3404425-766-1307N/AN/AN/A PHONE NO 1"=20' For contacts below dial 1-888-CALL PSE (225-5773) PERMIT SCALE G.VUKOSAV CONTACT P.INDORFP.INDORF N.MARTIN K.ANSON D.DAO REAL ESTATE/EASEMENT N/AN/AN/A N/A 1-1/4" MPE AND 6" STW IP MAIN RELOCATE 76TH AVE W & 212TH ST SW PROJECT MGRAPPROVED BY CP APPROVAL JOINT FACILITIES ARRANGEMENTS CHECKED BY ENGR - GAS DRAWN BY FUNCTION MAPPING EDMONDS, WA 98026 Scale: NONE ROADWAY CROSS SECTION N/AN/AN/A CSPNSGPM 163.069 GAS WK CTR PLAT MAP DESCRIPTION N/AN/AN/A 160.068 Yes NoYes No Project Manager Contact Information: 5 Emer Sect parker.indorf@pse.com Scale: NONE OP MAP BY TIE-IN DETAIL PARKER INDORF 425-463-6802 CONTACTPHONE# UTILITIES DATE PSE "Flagging Required" "Locates Required" SNOHOMISH SE 19-27-04 DESIGNED BY Cell Phone: REV# Manager:COUNTY A 1/4 SEC 1 32 E-Mail: 2 TAM ENIL HC EES A-A 3 TEEHS IP GAS FLOW 2 SCALE: 1" = 20'-0" 20'PLOT PLAN 35' 6' - A 212TH ST 17' 15' 35' 5' D Y L IC U B A B D M L L R A I U A T BH N P E1 3 D 1 6 3 1 7 6 3 7 6 7 Scale: NONE TIE-IN DETAIL 1 IP GAS FLOW 1 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 1/18/172/17/171/18/17 DATE 3/5 ...PAGE SAP Sup Order Nbr Drawing Number CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG EDMONDS 109098145 206-517-3404425-429-5486425-424-6426425-424-6549206-517-3404425-766-1307N/AN/AN/A PHONE NO 1"=20' LEGEND For contacts below dial 1-888-CALL PSE (225-5773) 4' PERMIT SCALE 19' 22' 21' G.VUKOSAV CONTACT P.INDORFP.INDORF N.MARTIN K.ANSON D.DAO 1 B REAL ESTATE/EASEMENT N/AN/AN/A N/A 1-1/4" MPE AND 6" STW IP MAIN RELOCATE 76TH AVE W & 212TH ST SW PROJECT MGRAPPROVED BY CP APPROVAL JOINT FACILITIES ARRANGEMENTS CHECKED BY ENGR - GAS DRAWN BY FUNCTION MAPPING EDMONDS, WA 98026 N/AN/AN/A CSPNSGPM 163.069 3 GAS WK CTR PLAT MAP DESCRIPTION 212TH ST N/AN/AN/A 160.068 Yes NoYes No Project Manager Contact Information: 5 Emer Sect IP GAS FLOW parker.indorf@pse.com OP MAP BY PARKER INDORF 425-463-6802 CONTACTPHONE# UTILITIES DATE PSE "Flagging Required" "Locates Required" SNOHOMISH NE 30-27-04 DESIGNED BY Cell Phone: M 7 REV# 44 Manager:COUNTY 5 P1/4 SEC 1 32 E-Mail: 3 E 0 I C1 5' 76TH AVE 4' 20' 21' 17' 15' 44 SCALE: 1" = 20'-0" PLOT PLAN 28' 76TH AVE W TAM ENIL HC EES A-A 4 2 TEEHS Scale: NONE TIE-IN DETAIL Scale: NONE TIE-IN DETAIL 3 4 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 1/18/172/17/171/18/17 DATE 4/5 ...PAGE SAP Sup Order Nbr Drawing Number CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG EDMONDS 109098145 206-517-3404425-429-5486425-424-6426425-424-6549206-517-3404425-766-1307N/AN/AN/A PHONE NO 1"=20' For contacts below dial 1-888-CALL PSE (225-5773) PERMIT SCALE G.VUKOSAV CONTACT P.INDORFP.INDORF N.MARTIN K.ANSON D.DAO REAL ESTATE/EASEMENT N/AN/AN/A N/A 1-1/4" MPE AND 6" STW IP MAIN RELOCATE 76TH AVE W & 212TH ST SW PROJECT MGRAPPROVED BY CP APPROVAL JOINT FACILITIES ARRANGEMENTS CHECKED BY ENGR - GAS DRAWN BY FUNCTION MAPPING EDMONDS, WA 98026 N/AN/AN/A CSPNSGPM 163.069 GAS WK CTR PLAT MAP DESCRIPTION N/AN/AN/A 160.068 Yes NoYes No Project Manager Contact Information: 5 Emer Sect parker.indorf@pse.com OP MAP BY PARKER INDORF 425-463-6802 CONTACTPHONE# UTILITIES DATE PSE "Flagging Required" "Locates Required" SNOHOMISH SE 19-27-04 DESIGNED BY Cell Phone: REV# Manager:COUNTY 1/4 SEC 1 32 E-Mail: THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 1/18/172/17/171/18/17 DATE 5/5 ...PAGE SAP Sup Order Nbr Drawing Number CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG EDMONDS 109098145 206-517-3404425-429-5486425-424-6426425-424-6549206-517-3404425-766-1307N/AN/AN/A PHONE NO 1"=20' For contacts below dial 1-888-CALL PSE (225-5773) PERMIT SCALE G.VUKOSAV CONTACT P.INDORFP.INDORF N.MARTIN K.ANSON D.DAO REAL ESTATE/EASEMENT N/AN/AN/A N/A 1-1/4" MPE AND 6" STW IP MAIN RELOCATE 76TH AVE W & 212TH ST SW PROJECT MGRAPPROVED BY CP APPROVAL JOINT FACILITIES ARRANGEMENTS CHECKED BY ENGR - GAS DRAWN BY FUNCTION MAPPING EDMONDS, WA 98026 N/AN/AN/A CSPNSGPM 163.069 GAS WK CTR PLAT MAP DESCRIPTION N/AN/AN/A 160.068 Yes NoYes No Project Manager Contact Information: 5 Emer Sect parker.indorf@pse.com OP MAP BY PARKER INDORF 425-463-6802 CONTACTPHONE# UTILITIES DATE PSE "Flagging Required" "Locates Required" SNOHOMISH SE 19-27-04 DESIGNED BY Cell Phone: REV# Manager:COUNTY 1/4 SEC 1 32 E-Mail: SECTION 5-05 OF THE WSDOT/APWA SPECIFICATIONS.