Loading...
Engineering Decision-Final_Plat.pdfCITY OF EDMONDS ENGINEERING DIVISION Date: September 21, 2018 To: Mike Clugston, Planning Division From: Jennifer Lambert, Engineering Division Subject: PLN20170033, Fairwinds - Final Short Plat 921 Pine St — 3 lot Short Plat The Engineering Division has found that the subject 3-lot short plat meets the requirements established for civil subdivision improvements in accordance with Edmonds Community Development Code (ECDC) 20.75. Preliminary plat approval was issued by the Planning Division on March 1, 2018 and included engineering conditions of approval. Civil construction plans were submitted to the Engineering Division on March 19, 2018 consistent with the conditions of approval and ECDC 20.75.120. The plans were approved for construction on August 1, 2018. The improvements shown on the approved plans have not yet been constructed. Consistent with ECDC 20.75.130, a performance bond has been posted as surety that these improvements will be completed within 12 months following recording of the plat. A performance bond was submitted by the developer and accepted by the City on September 11, 2018 reflecting the total cost to construct all required improvements in the amount of $96,262.99. Consistent with ECDC 18.30.090, a permanent access easement has been granted to the City of Edmonds for access to the private stormwater facility located on Lots 1, 2 and 3. Access is for inspection purposes to ensure that stormwater facilities are properly operated and maintained in accordance with City of Edmonds Code. The subject development did not include street dedications to the City. City of Edmonds