Loading...
ENGR RQMNTS - 5 Lot Short Plat-Woodway Court 2.xlsx CITY OF EDMONDS 121 - 5TH AVENUE NORTH, EDMONDS, WA 98020 PUBLIC WORKS DEPARTMENT - ENGINEERING DIVISION REQUIREMENTS FOR SHORT PLATS File Number: Planning DivisionPLN20160023 To: JoAnne Zulauf, Engineering Technician From: Engineering Division Date:September 26, 2016 Project:Woodway Court 2 -- 4 Lot Short Plat 23800 104th Ave W Address: Required as a Required as a Requirement Condition of Condition of Already Building Permit SubdivisionSatisfied Right-of Way Dedication for Public Streets: 1. a) N/A 2.Public Street Improvements & Access (Asphalt, curb, gutter and sidewalks): a)N/A 3.Private Access Requirements & Improvements: a)Lots 1 through 5 shall take access from 104th through private access easement crossing the adjacent Woodway Court short plat to the east and X off private access road, Tract 999. i. Private access road shall be paved to 20-feet in width, plus 18" asphalt thickened edge or 6-inch concrete extruded curb may be used to direct storm flows. ii. Slope of driveway shall not exceed 14% and shall be noted as such on the civils. iii. Cross slope of private access road shall not exceed 2% b)Individual driveway access points shall meet sight distance requirements set forth by the American Association of State Highway and X Transportation Officials (AASHTO). c)Provide on-site turnaround between Lot 1 and Lot 2 to Fire Dept. standards. c)Provide asphalt or concrete driveway approaches on each lot per City X Code. 4.Street Turnaround: X a)N/A Easements 5. (City utilities, private access, other utilities): X a) Provide all easements as required - access, utility, etc. b)Provide easement to City of Edmonds for the portion of Fire Access Road X encroaches on Lots 1 and 2. c)Provide all easements for access, utilities etc. crossing the adjacent X Woodway Court sp to the east. 6.Street Lights: N/A ENGR RQMNTS - 5 Lot Short Plat-Woodway Court 21 of 3 form revised Dec.2014printed 6/29/2017 Required as a Required as a Requirement Condition of Condition of Already Building Permit SubdivisionSatisfied 7.Planting Strip: a)N/A 8.Water System Improvements ): a)Applicant must meet requirements set forth by the Olympic View Water & X Sewer District for connection to public water system. X b)Public hydrant spacing shall meet requirements of ECDC 19.25. c)Provide water service stub to all Lots X X d)Connect to public water system.X e)X Install storz adapter on existing fire hydrant, as required. 9.Sanitary Sewer System Improvements : a)Applicant must meet requirements set forth by the Olympic View Water & X Sewer District for connection to public sewer system. b)Provide new side sewers stubs to all lots with a cleanout at property line. X X c)Connect to public sewer system.X 10.Stormwater System Improvements: a)Provide a Stormwater Management Report and Site Plan that shows compliance with ECDC 18.30, Stormwater Supplement and 2005 X Department of Ecology Stormwater Manual. X X b)Manage stormwater on site where feasible. c)Construct privately owned and maintained stormwater management system sized to provide adequate capacity for proposed future single X X family dwellings, and associated impervious areas in accordance with ECDC 18.30. i. Stormwater management system to be located on private property. ii. Construction of storm facility may be deferred to coincide with construction of a single family residence on each lot if the required short plat improvements create less than 2000sf of impervious surface area and the site disturbs less than one acre. If applicant chooses to defer construction of the stormwater management system, the stormwater system will need to be designed to the code in effect at the time of building permit application. X X d)Connect all new impervious surfaces to storm system as required. 11.Underground Wiring (per Ord. 1387): X a)Required for all new services.X 12.Excavation and Grading (per IBC) X a)Submit a grading plan as part of engineered site plan.X X b)Submit grading plan for foundations with building permit. 13.Signage and Striping (per City Engineer): a)Provide fire and aid address signage.X 14.Survey Monumentation (per Ord., Sect. 12.10.120): a)N/A 15.As-built Drawings (per City Engineer): a)Provide an as-built drawing of all street and utility improvements both in X X electronic format as well as a hard copy. 16.Other Requirements: X a)Plat showing lots, easements, legals, survey information X ENGR RQMNTS - 5 Lot Short Plat-Woodway Court 22 of 3 form revised Dec.2014printed 6/29/2017 Required as a Required as a Requirement Condition of Condition of Already Building Permit SubdivisionSatisfied b)Legal documents for each lot X c)Field stake lot corners (by professional surveyor)X d)Field stake utility stubs at property lines X e)Mailbox location per Postmaster X f)Maintenance agreements X X g)Traffic Impact Fee Analysis 17.Engineering Fees: X a)Storm system development charge (each new lot)$799.00* b)Storm system development charge (short plat imps)per ESU*X X b)Sewer connection fee (each new lot)OVWSD* X c)Water connection fee OVWSD* X d)Water meter fee OVWSD* X e)Traffic mitigation fee per each new SFR$1,196.33 * X f)Parks impact feesPer Ord. 3934 X g)Short Plat civil plan review fee$2,570.00 * X h)Right-of-Way Construction PermitTBD X i)Inspection feesTBD * Fees provided are an estimate only and reflect rates current as of the date of this document. Actual fees to be paid will be reflective of those in effect at time of civil plan submittal and/or approval and building permit issuance. ENGR RQMNTS - 5 Lot Short Plat-Woodway Court 23 of 3 form revised Dec.2014printed 6/29/2017