TRAFFIC IMPACT ANALYSIS
YORK SHEET
Name of Proposed Project. Hill Lake Ballinger
Owner/Applicant:
Kathy Hill
Name
24223 76th Ave. W
StreetMailing Address
Edmonds, WA 98026
City State zip
Telephone: (206) 330-1936
Applicant Contact Person:
Tobiason & Company, Inc.
Laurey Tobiason
Name
20434 10th PL SW
StreetUailing Address
Seattle, WA 983.66-4106
City
Telephone: (206) 429-2875
State zip
Traffic Engineer who prepared the Traffic impact Analysis:
Tobiason & Company, Inc. Laurey Tobiason (206) 429-2875
Pizm Name Contact Name Telephone
Under 25 PHT. (Note: we are not Traffic Engineers)
1. PROJECT DESCRIPTION
& Street address(ifknawn): 24223 76th, Ave. W - Edmonds, WA 98026
b. Location: East of 76th Ave_ W. approximately 4551 north of the intersection with SR104.
(Attach a vicinity map and site plan.)
c_ Specify existing land use: 3 single-family residences
d. Specify proposed type and size of development: 8 single-family residences
e. When will the project begin construction and when will it he completed? 2009-10
f Define proposed access locations: Access will be from a new public road that will connect to
76th Ave. W.
g. Define proposed sight distance at Site egress locations: Good: 76th Ave. W. is straight & topography
does not create blind spots.
Page 1 EXHIBIT 15
P-08-46 & SM -08-47
2. TRIP GENERATION N/A project is under 25 PHT
a. Existing Site Trip Generation Table:
Land Use
Daily {ADT}
PM Peak -Hour Trips
IN OUT
b. Proposed Project Trip Generation Table:
Land Use
Daily (ADT)
PM Peak -Hour Trips
IN. OUT
c. Net New Project Trip Generation Table:
Land Use
Daily {ADT}
PM Peak -Hour Trips
IN OUT
d. State assumptions and methodology for internal, link -diverted or passby trips:
Page 2
Prepare and attach a graphic showing project trip distribution percentages and assignments.
4. SITE ACCESS ROADWAYIDRIVEWAYS AND SAFETY NIA Project is under 25 PUT.
a. Have sight distance requirements at egress location been met per AASHTO requirements?
b. Intersection Level of Service Analysis
• Existing Conditions
LOS Delays
• Year of Opening
LOS Delays
* Five Years Beyond Change of Land Use
LOS . Delays
(Intersections to be evaluated shall be determined by the City of Edmonds Traffic Engineer.)
c. Describe channelization warrants:
d. Vehicle Stomge/Queuing Analysis (calculate 50% and 95 % queuing lengths):
50%
• Existing Conditions
• Year of Opening
• Five Years Beyond
Change of Land Use
e. If appropriate, state stop sign and signal warrants:
f Summarize local accident history:
Page 3
(Attach striping plan.)
95%
S. TRAFFIC VOLUMES N/A Project is under 25 PHT.
a_ Describe existing ADT and peak -hour counts, including turning xnoverrzents, on street adjacent to and
directly impacted by the project
b_ Describe the estimated ADT and peak -hour counts, including turning movements, the year the project is
fully open (with and without project traffic).
c. Describe the estimated ADT and peak -hour taunts, including turning movements, five years after the
project has been fully open (with and without project traffic).
d. State annual background traffic growth factor and source:
5. LEVEL OF SERVICE ANALYSIS N/A Project is under 2s PHT.
Summarize Level of Service Analysis below and attach supporting LOS analysis documentation. Provide
the following documentation for each arterial street or arterial intersection impacted by ten or more peak -
hour trips. Other City -planned developments must also be factored into the LOS calculations.
Exisfin LOS
Existing Condition:
Year of Op enin LOS:
With Project:
Without Project:
Page 4
Five Years After O egin LOS:
With Project:
Without Project_
Note any assumptions/variations to standard analysis default values and justifications:
7. NUTIGATION RECOMMMATIONS
State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact
fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130.
Existing use: 3x SFR- 3 x $840.72 = $2,522.16
Proposed use: 8x SFR- 8 x $840.72 = X56,725.76
Net mitigation rernzirement: $4,203.60