Loading...
Exhibit 15 - Traffic Impact Analysis.pdfRECEJ�SD JUL 1 7 2008 _ CITY OF EDMONDS .�eN TRAFFIC IMPACT ANALYSIS YORK SHEET Name of Proposed Project. Hill Lake Ballinger Owner/Applicant: Kathy Hill Name 24223 76th Ave. W StreetMailing Address Edmonds, WA 98026 City State zip Telephone: (206) 330-1936 Applicant Contact Person: Tobiason & Company, Inc. Laurey Tobiason Name 20434 10th PL SW StreetUailing Address Seattle, WA 983.66-4106 City Telephone: (206) 429-2875 State zip Traffic Engineer who prepared the Traffic impact Analysis: Tobiason & Company, Inc. Laurey Tobiason (206) 429-2875 Pizm Name Contact Name Telephone Under 25 PHT. (Note: we are not Traffic Engineers) 1. PROJECT DESCRIPTION & Street address(ifknawn): 24223 76th, Ave. W - Edmonds, WA 98026 b. Location: East of 76th Ave_ W. approximately 4551 north of the intersection with SR104. (Attach a vicinity map and site plan.) c_ Specify existing land use: 3 single-family residences d. Specify proposed type and size of development: 8 single-family residences e. When will the project begin construction and when will it he completed? 2009-10 f Define proposed access locations: Access will be from a new public road that will connect to 76th Ave. W. g. Define proposed sight distance at Site egress locations: Good: 76th Ave. W. is straight & topography does not create blind spots. Page 1 EXHIBIT 15 P-08-46 & SM -08-47 2. TRIP GENERATION N/A project is under 25 PHT a. Existing Site Trip Generation Table: Land Use Daily {ADT} PM Peak -Hour Trips IN OUT b. Proposed Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN. OUT c. Net New Project Trip Generation Table: Land Use Daily {ADT} PM Peak -Hour Trips IN OUT d. State assumptions and methodology for internal, link -diverted or passby trips: Page 2 Prepare and attach a graphic showing project trip distribution percentages and assignments. 4. SITE ACCESS ROADWAYIDRIVEWAYS AND SAFETY NIA Project is under 25 PUT. a. Have sight distance requirements at egress location been met per AASHTO requirements? b. Intersection Level of Service Analysis • Existing Conditions LOS Delays • Year of Opening LOS Delays * Five Years Beyond Change of Land Use LOS . Delays (Intersections to be evaluated shall be determined by the City of Edmonds Traffic Engineer.) c. Describe channelization warrants: d. Vehicle Stomge/Queuing Analysis (calculate 50% and 95 % queuing lengths): 50% • Existing Conditions • Year of Opening • Five Years Beyond Change of Land Use e. If appropriate, state stop sign and signal warrants: f Summarize local accident history: Page 3 (Attach striping plan.) 95% S. TRAFFIC VOLUMES N/A Project is under 25 PHT. a_ Describe existing ADT and peak -hour counts, including turning xnoverrzents, on street adjacent to and directly impacted by the project b_ Describe the estimated ADT and peak -hour counts, including turning movements, the year the project is fully open (with and without project traffic). c. Describe the estimated ADT and peak -hour taunts, including turning movements, five years after the project has been fully open (with and without project traffic). d. State annual background traffic growth factor and source: 5. LEVEL OF SERVICE ANALYSIS N/A Project is under 2s PHT. Summarize Level of Service Analysis below and attach supporting LOS analysis documentation. Provide the following documentation for each arterial street or arterial intersection impacted by ten or more peak - hour trips. Other City -planned developments must also be factored into the LOS calculations. Exisfin LOS Existing Condition: Year of Op enin LOS: With Project: Without Project: Page 4 Five Years After O egin LOS: With Project: Without Project_ Note any assumptions/variations to standard analysis default values and justifications: 7. NUTIGATION RECOMMMATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. Existing use: 3x SFR- 3 x $840.72 = $2,522.16 Proposed use: 8x SFR- 8 x $840.72 = X56,725.76 Net mitigation rernzirement: $4,203.60 s: ru w mem rrCq=bATJAcd&amCMmsT9azWywks-o4.&C Page 5