Loading...
IncompleteLetter2.pdf June 18, 2007 Jeffery Phillips th 301 4 Avenue North Edmonds WA 98020 Tim Stensland PO Box 925 Kingston WA 98346 Victoria Cargile VIC Associates, Inc. PO Box 2215 Bothell WA 98041 SUBJECT: PHILLIPS ADB APPLICATION (ADB-2006-138). Dear Applicant(s): You have submitted an application for design review by the Architectural Design Board (ADB) th for the property at 301 4 Avenue North, which is located in the new Downtown Business zone (BD5 – “Downtown Arts Corridor”). Originally, you had proposed an 8-unit condo project when the zoning was Multiple Residential (RM-1.5). Now that the zoning has changed (to BD5) and now that the ADB process has changed, I’d like to summarize what is required. This letter is a re-cap of our recent meetings and details what is needed in order to turn in a “complete” ADB application. Several items are enclosed as well, including the new Downtown Business code language (ECDC 16.43), the new design review process for the downtown district (ECDC 20.12), and the handout on the District- Based Design Review Application Checklist. Please provide the following items in order to have a “complete” application: Pursuant to ECDC 20.12.020.A.2, “Prior to scheduling Phase 1 of the public hearing, the applicant shall submit information necessary to identify the scope and context of the proposed development, including any site plans, diagrams, and/or elevations sufficient to summarize the character of the project, its site, and neighboring property information. At a minimum, an applicant shall submit the following information for consideration during Phase 1 of the public hearing:” Page 1 of 3 1.Vicinity Plan – Showing all significant physical structures and environmentally critical areas within a 200 foot radius of the site including, but not limited to, surrounding building outlines, streets, driveways, sidewalks, bus stops, and land use. Aerial photographs may be used to develop this information (ECDC 20.12.020.A.2.a). 2.Conceptual Site Plan(s) – Showing topography (minimum 2-foot intervals), general location of building(s), areas devoted to parking, streets and access, existing open space and vegetation. All concepts being considered for the property should be submitted to assist the ADB in defining all pertinent issues applicable to the site (ECDC 20.12.020.A.2.b). 3.Conceptual Sketches or Elevations – Three-dimensional sketches, photo simulations, or elevations that depict the volume of the proposed structure in relation to the surrounding buildings and improvements (ECDC 20.12.020.A.2.c). Please provide the following additional information to better support your proposal: 4.SEPA Environmental Checklist – Please revise the SEPA Checklist that was originally submitted to reflect the details of your new proposal. If you would like a new blank checklist, please let me know. If you would like to redline the answers on your original checklist, please let me know. One question, #B.1.e asks the applicant to estimate the approximate grading involved with this project. Please submit an estimate, which should cover the underground parking proposed. If you plan to grade close to 500 cubic yards, please let me know so I can make sure that the Environmental Checklist will cover the future building permit as well as this land use application. Please note the following items that have changed under the new zoning: 5.Zoning – The project is now zoned BD5 “Downtown Arts Corridor” and is subject to Edmonds Community Development Code (ECDC) chapter 16.43 (enclosed). 6.Design Review – The project is now under the new “District-Based” design review process and is subject to ECDC 20.12 (enclosed).Also, please note the new two-phase public hearing process. A “District-Based Design Review Application Checklist” has been enclosed for your convenience. 7.Ground Floor Commercial Height – There is now a minimum height for the ground floor, pursuant to ECDC 16.43.030. 8.Setbacks – The setbacks were adjusted in your favor, see ECDC 16.43.030 for details. 9.Height – The maximum height is 25’ pursuant to ECDC 16.43.030.C.1 and also 16.43.030.C.3. 10.Parking – The parking requirement has changed, and this site is subject to ECDC 16.43.030.D 11.Open Space – Now there is an open space requirement, pursuant to ECDC 16.43.030.E. 12.Density – The density has changed in your favor, see ECDC 16.43.030.G for details. Page 2 of 3 If staff finds that additional information is needed; we will notify you in writing that additional information is needed. While this information-request is pending, the 120-day clock for processing the application will stop running. When the additional information is submitted, staff will review it to insure that it responds fully to the information request. When the request for additional information has been satisfied, the 120-day clock will start running again. If you have further questions, please do not hesitate to contact me at 425.771.0220, extension 1778. Thank you for your interest in development in the City of Edmonds – I look forward to working with you on this project. Sincerely, Gina Coccia Planner cc: File ADB-2006-138 File BLD-2007-140 enc: ECDC 16.43 “Downtown Business” ECDC 20.12 “District-Based Design Review” District-Based Design Review Application Checklist Page 3 of 3