May IDRs.pdfSwedish Hospital Parking Structure, Edmonds WA IDR Sheet: 1 of 2 INSPECTOR'S DAILY REPORT inspector: Jason McArdel I Date: 05/05/14 Weather: 580 F, Overcast A. Contractor (Prime): Gre co Excavating Foreman: And Subcontractor or Agent Representative / Title B. C. Contractor's Work Activity Description & Location: Trench and pipe installation, Sta. 10+68 to 10+60 (Sheet C-500) Replaced 12" gate valve at north leg of Tee at Sta. 10+68 Pipe In Pipe Type 12" DI Manuf. US Pipe Com an ,Class 52 Excavation/Backfill Info Surface Cond. Gravel fill / asphalt : Fnd Cond. Sand and gravel --- - Mat'I Excay. Gravel barrow fill / Native sand and gravel _ _ Bedding___ sand and gravel ___ Backfill Mat'I sand and gravel Compaction Method jumping jack & hoe- ac Materials Delivered Nonconforming Materials or Work Field Problems/items of Note ----------------------------------------------------------------- Follow-Up Inspections on Previous Items ------------------------------------------------------------------------------------ ------------ Pay Items Contractor's EaulDment ID No. I Contractor's Equipment Operating Standby Down Idle A Bobcat small excavator Hitachi mini excavator with hoepac 8 8 Contractor's Workforce Number/Hours ID No. Laborers Operators Truck Drivers Flaggers Electrician Apprrrree A ---- 2/8 ---- ----------------------- 1/8 - -- - - - --------- - ---- -- - ---- -- - --- - - - Inspector's Shift Hours From: 8:00 AM To: 1:30 PM Swedish Hosaital Parkina Structure, Edmonds WA IDR Sheet: 2 of 2 INSPECTOR'S DAILY REPORT Inspector: Jason McArdel Date: 05/05/14 8:00 AM Inspector on site. Inspection for Swedish Hospital (Parking Structure and Main Extension water main projects were performed Simultaneously. No work on Main Extension project today. Gre co continued trench and 12-inch pipe installation along west side of the parking structure, stations 10+68 to 10+60 were completed today. Contractor had completed work on Saturday. 5-3, consisting of 12-inch water main installation on west side from —13+00 to 10+68, and along the north side from 34+09 to 35+00 (=10+68). 12-inch Tee and 3) 12-inch gate valves were also placed at Sta. 10+68. The connection at 34+09 was exposed and visually verified. Joint had magalug fitting. Contractor was working at 10+68 and was exposed for inspection. Tee was flanged. Valves were flange joint to the Tee and inegalug joint to the DI 12-inch pipe. Cover was 4.0-ft to existing asphalt surface from top of pipe 8:30 AM Talked with Andy regarding schedule. Gre co plans to fill and pressure test on Wed., flush main on Thur., and take pUrity samples on Monday 5-12 . 1 checked with Kris K. at COE and confirmed that the City is OK with proposed schedule. I checked with JoAnne (COE) and scheduled City Sewer Dept. for monitoring of water main flush into local SSMH. Andy also asked whether OK to pressure test into hydrant. I informed him that this is not allowed. FH must be in normal operating condition during pressure test (valve open, hydrant closed). Pressure test will have to be conducted at blowoff fitting at end of main. 9:00 AM Started to lay 12-inch main. First stick of pipe not fitting into valve on north leg of the Tee at 10+68. A second pipe was test fit but also not working . Andy informed me that valve appears to have bad casting. He called Supplier HD Fowler and ordered replacement. 10:00 AM 12-inch GV removed. 11:15 AM New 12-inch GV delivered by FID Fowler and installed in place of bad unit. One partial stick of 12-inch pipe was then laid heading north out of this valve. Stations 10+68 to 10+60. No pipe bedding or trench backfill was done today. 12:15 PM Thrust block prepped and poured on west side of Tee, 10+68. Block was POUred to COE specifications. Plastic sheeting laced between fitting and concrete. Concrete was hand -mixed and placed into forms. West side of the block was poured against undisturbed soil. Contractor had also used field -lock gasket on the first stick of pipe heading east from this Tee. 1:30 PM Off -site c+..... A:.." LJ..rs r. a% i D�rlrinn I=f1mr%rlfIQ WA IDR Sheet: 1 of 2 INSPECTOR'S DAILY REPORT inspector: Jason McArdel Date: 05/06/14 Weather: 60' F, Partly Cloud A. Contractor (Prime): Gre co Excavating Foreman: And Subcontractor or Agent Representative / Title B. --- --- -- ----- --- - C. Contractor's Work Activity---- -- Description & Location: Trench and pipe installation, Sta. 10+60 to 10+10 (Sheet C-500) ------ Pipe In Pi e Type 12" DI :Manuf. US Pipe Company !Class 52 Excavation/Backfill Info !SurfaceCond. Gravel fill asphalt !FndCond. Sandandgravel ___ ______ ____ Mat'I Excay. Gravel barrow fill / Native sand and_gravel Bedding__ sand and_gravel _- _----------- —_____- Backfill Mat'I sand and gravel Compaction Method jumping 'ack & hoe- ac Materials Delivered Nonconforming Materials or Work Field Problems/Items of Note Follow -Up Inspections on Previous Items Pay Items t.onuactors ID No. E ut nwna Contractor's Equipment Operating Standby Down Idle A Bobcat small excavator Hitachi mini excavator with hoepac 10 10 ,bar I Hours t.ontrautors Hours ID No. YYVrR1umv, Laborers Operators Truck Drivers Flaggers Electrician Appr/Tree A 3/10 2/10 .......... / - J— Inspector's Shift Hours From: 7:30 AM To: 5:30 PM Cwarliah Hncnital Parkinn Strnr-ture_ Edmonds WA IDR Sheet: 2 of 2 INSPECTOR'S DAILY REPORT Inspector: Jason McArdel Date: 05/06/14 7:30 AM Inspector on site. Inspection for Swedish Hospital (Parking Structure and Main Extension water main projects were performed simultaneously. No work on Main Extension proiect today Gre co continued trench and 12-inch pipe installation along west side of the parking structure, stations 10+60 to 10+10 were completed today. Trench was extended north and then west toward tie-in point with Water Main Extension project (Station 10+10). Several utilities were crossed including private irrigation sleeves, illumination conduit, and 4-inch communication conduits. Trench was routed below each utility with greater than 12-inch clearance to top of the new water main. 8.30 AM First stick of pipe installed. 1:30 PM Small piece of pipe and 45 degree bend placed at Sta. 10+33. 2:30 PM Laying ioe with 45 degree fitting at Sta. 10+19. 3:30 PM Finish laying last stick of pipe with blowoff assembly to station 10+10. 4:00 PM Pipe bedded Using native sand soil. Jumping ack compactor was used along sides of pipe and at top of initial 6-inch lift backfill above pipe. Trench backfilled LISilig native. Hoe ac compaction was done at 6 to 12-inch lifts. 5:00 PM Thrust blocking was placed on outside of each bend. Concrete was hand -mixed and placed into forms with dimensions per COE detail. 5:15 PM Brian Landau Associates. Geotech on site to perform compaction testing He used steel probe to check firmness of soil at trench surface. Soil did not have satisfactory compaction. Contractor was told to perfrom additional compaction. Soil remained soft after re -corn actin . I talked with Brian and Andy. Contractor was instructed to remove and replace the trench backfill. This work will not be done today. None of the trench work for today has met compaction requirements. Started to lay 12-inch main. First stick of pipe not fitting into valve on north leg of the Tee at 10+68. A second pipe was test fit but also not working . Andy informed me that valve appears to have bad casting. He called su lier (HD Fowler) and ordered replacement. 5:45 PM Off -site Cwnrlich I-Incnifal Parkinn Sfrimfure- Edmonds WA IDR Sheet: 1 of 2 INSPECTOR'S DAILY REPORT Inspector: Jason McArdel Date: 05/07/14 Weather: 65° F, Sunny A. Contractor (Prime): Gre co Excavating Foreman: And Subcontractor or Agent Representative i Title B. C. Contractor's -Work- Activity --------- --- - Description & Location: Fill and pressure test 12-inch main ------------------------- ----- --------- Pipe In Pipe Type 12" DI Manuf. US Pipe Company !Class 52 Excavation/Backfill Info Surface Cond. ----------------• - - -- - -- M_at'I Excay. Gravel barrow fill / Native sand a_n_d_gravel___ Backfill Mat'I sand and gravel Gravel fill / asphalt j Fnd Cond. Sand and gravel ______ Bedding _ _ sand and gravel Compaction Method jumping ack & hoe-pac Materials Delivered Nonconforming Materials or Work Field Problems/Items of Note Follow -Up Inspections on Previous Items Pay Items ra,a.a•..,..•.a.�e c....s.a..as..t vvID No.av Contractor's Equipment Operating Standby Down Idle A ra....•. .a•.a .a 1111.a.Li.a KI—hn. / 41n ID No. Laborers Operators Truck Drivers Flaggers Electrician Apprrrree A 3/8 - 2/8 Inspector's Shift Hours From: 8:00 AM To: 4:45 PM Swedish Hospital Parkins Structure. Edmonds WA IDR Sheet: 2 of 2 INSPECTOR'S DAILY REPORT Inspector: Jason McArdel Date: 05/07/14 8:00 AM Inspector on site. Inspection for Swedish Hospital (Parking Structure and Main Extension water main projects were performed simultaneously. All pipe and trenching for water main has been completed on Gre co's contract. Contractor performed fill and preSSUre test tocia 8:10 AM Start filling main. Meter and double check assembly connected blowoff to blowoff at Sta. 0+45 Sheet C-501). Filling rate was estimated at 350 GPM. Maximum rate per spec is 360 GPM. 8:50 AM Filling complete. Approx. 1100 cubic feet water metered into the pipe. After main filled and brow ht to line preSSLIre. contractor found leeking ball valve at blowoff (Not part of permanent s stern). 9:30 AM Main between 0+00 and 3+75 was isolated and partially drained to remove the bad ball valve. Draining was done to sewer. 11:00 AM Valve replaced. Main refilled and brought back to line pressure. All valves rep end to test entire main. Hydrants were per ed to remove air. 11:20 AM PLIMP started and pressure brou ht to 235 psi. Pressure held steady. 1:20 PM No clean a noted on gauge ressure: 235 psi. I gave OK to contractor for satisfactory ressure test. Flush operation scheduled for tomorrow at 8:00 AM. 4:45 PM Off -site QtAinfuch Nncnifnl Parkinn S+rimfimp-- Fdmnnds WA IDR Sheet: 1 of 2 INSPECTOR'S DAILY REPORT inspector: Jason McArdel I Date: 05/12/14 Weather: 75° F, Sunny A. Contractor (Prime): Gre co Excavating Foreman: And Subcontractor or Agent Representative / Title B. C. Contractor's Work Activity Description & Location: Water Purity Sampling on 12-inch main ---- Pipe In Pipe Type :Manuf. Class Excavation/Backfill Info Surface Cond. Mat'] Excay. -.,-Bedding____ Backfill Mat'I ! Fnd Cond. Compaction Method Materials Delivered Nonconforming Materials or Work Field Problems/Items of Note Follow -Up Inspections on Previous Items Pay Items C tractor's E ui ment on ID No. Contractor's Equipment Operating Standby Down Idle A -------------- f`....kb..�c 111/...4fn�nn Number / Holim vV ID,V No. , ^Laborers Operators Truck Drivers Flaggers Electrician Appr/Tree A / / /- ------------ Inspector's Shift Hours From: 7:45 AM To: 1:30 PM Swarlich Hncnital Parkinn Structure. Edmonds WA IDR Sheet: 2 of 2 INSPECTOR'S DAILY REPORT Inspector: Jason McArdel Date: 05/12/14 7:45 AM Inspector on site. Inspection for Swedish Hospital (Parking Structure and Main Extension water main projects were performed simultaneously. 8:00 AM I talked with Andy and Kris 'COE Water). 12-inch main was scheduled for purity sampling at 8:00 AM this morning. Kris will be on site for sample at 9:00 AM. Andy will be ready at that time. 9:00 AM Kris on site for water purity sampling. One sample was taken at FH Sta. 30+15, SE comer of parking structure). A second sample was drawn from the temporary 2-inch blowoff at 0+45 Sheet C-501, 350-ft north of the parking structure). Samples will take approximately 1 day to process. Kris will inform me and Andy of results. Gre co did not perform an other work on the waters stem today. 1:30 PM Off -site Swedish Hospital Parking Structure, Edmonds WA IDR Sheet: 1 of 2 INSPECTOR'S DAILY REPORT Inspector: Jason McArdel I Date: 05/13/14 Weather: 80' F, Sunny A. Contractor (Prime): Gre co Excavating Foreman: And Subcontractor or Agent Representative I Title B. C. Contractor's Work Activity _ Description & Location: Excavate and re -compact trench backfill near Sta. 10+25 Pi a Info lPipeType Manuf. Class Excavation/Backfill Info f Surface Cond. If --------- ---------- ....... Mat'I Excay. Bedding Backfill Mat'I Compaction Method Materials Delivered Nonconforming Materials or Work Field Problems/Items of Note Follow -Up Inspections on Previous Items Pay Items Contractor's Eauioment ID No. Contractor's Equipment Operating Standby Down Idle A ---------------- Contractor's Workforce Number/Hours ID No. Laborers Operators Truck Drivers Flaggers Electrician Appr/Tree A - Inspector's Shift Hours From: 7:30 AM To: 1:00 PM Swedish Hosnital Parkina Structure. Edmonds WA IDR Sheet: 2 of 2 INSPECTOR'S DAILY REPORT Inspector: Jason McArdel Date: 05/13/14 7:30 AM Inspector on site. Inspection for Swedish Hospital (Parking Structure and Main Extension) water main projects were performed simultaneously. 8:30 AM I called Kris (COE Water). Water purity sample from 5-12 was OK. Contractor was given verbal approval to go ahead with connection at 0+45 Sheet C-501 . Gre co did not perform connection work today. 11:00 AM Water main trench at Sta. 10+15 to 10+35 was excavated to about 3-ft depth. This section of trench had problems with compaction of native backfill (See report on 5-6-14). Soft material was removed and replaced using import crushed rock. Landua Associates visited site and performed inspection of trench material/com paction. Andy informed me that he is planning to perform the 12-inch main connection at 0+45 tomorrow. 1 00 PM Off -site Swedish Hospital Parkina Structure, Edmonds WA IDR Sheet: 1 of 2 INSPECTOR'S DAILY REPORT Inspector: Jason McArdel Date: 05/15/141 Weather: 80° F, Sunny A. Contractor (Prime): Greqco Excavating Foreman: And Subcontractor or Agent Representative Title B. C. Co-ntractor's-Work Activity- ___ . . ......... .. Description & Location: Water main connection at 0+45, Sheet C-501 ------- - - -- ------------ — --------- — --------- Pipe Info Pipe Type :Manuf. Class Excavation/Backfill Info !Surface Cond. MaVI Excay. Backfill Mat'l Fnd Cond. Bedding ---------- Compaction Method Materials Delivered — -- -- -------------------- - -------- ----- Nonconforming Materials or Work Field Problems/items of Note ----------------------------------------------------------------------------------------------- --------------------------- - -- - --------- --------- ­.- ---------------------------------------------------------------------- -------------------- ----------------------------------- -------------------- ------- -­----------------------- - ----- ---------- - . -------------­-- . ------------ ------- --------------- I -------------------­- ------------------------------------------------ ----......................... ------- Follow-Up Inspections on Previous Items -- ---- ------- . ............ . --------- ------ - ---------------------- ------ ------------------ ------------------------------------- ------------------------------------------------------- - ------------------- ----- ------ -- --- -- ---- - -- ------------------------------------------------------------- ------------------- ­- - ------------ ................... -------------------- [_ay Items -------------------------------------- - --------- --- ------------------------ ---­----­­­-­- — ------- .. ............... rnnfrarfnr'Q Fnijinnnarif ID No. Contractor's Equipment Operating Standby Down Idle A. .... ...... — ----------------- ------------------------------ - ----------------- rnnfrnd-fnr'a Wnrkfnrga Nnmhpr I Hmim ID No. Laborers Operators Truck Drivers Flaggers Electrician Apprrrree .A 2/10 1/10 Inspector's Shift Hours From: 6:00 AM To: 2:30 PM Swedish Hospital Parkina Structure. Edmonds WA IDR Sheet: 2 of 2 INSPECTOR'S DAILY REPORT Inspector: Jason McArdel Date: 05/15/14 6:00 AM Inspector on site. Inspection for Swedish Hospital (Parking Structure and Main Extension) water main projects were performed simultaneously. 6:00 AM Gre co on site. Setup for water main connection at 0+45. Sheet C-501. 6:30 AM Drain 12-inch main between 0+45 and 3+75 to allow removal of temp cap w/BO. 7:20 AM Hot -swab pipe ends in excavation. 8:15 AM Cut 3.0-ft length of 12-inch DI spool for connection. All parts swabbed with chlorine -- 12-inch spool and (2) 12-inch sleeves. 8:30 AM Placespool and sleeves. Begin bolting Megalug fittings. See attached as -built diagram. 10:30 AM Finish bolting me alu s. Reactivate water main. Kris (COE Water Dept) on site. Kris performed flush of the system to FH at SW corner of the parking structure. Flush was performed for approximately 20 minutes. Flush was performed as a precaution to avoid stagnant water. I performed visual check of fittings at connection. No leaks observed. Backfill excavation at connection with CSBC. Jumping ack used to compact pipe bedding and backfill around conduits Hoe ac used to compact trench backfill in upper part of the trench. This location is in planter area. 12,30 PM Subcontractor, Superior Tapping. on site to perform hot tap for 1-inch service, Station 34+76. gregco had previously exposed the main at this location. Cover to main was 3.0-ft. Cover to finished grade at this location expected to be 3.5-ft. 1-inch saddle and corp stop were oriented at approximately 40 from horizontal. 12:45 PM 1-inch tap completed. Saddle and corp visually inspected and no leaks observed. 2:30 PM Off Site. E3JA / c397 2013 Waterline Replacement As -built sketch attachment INSPECTOR'S DAILY REPORT Inspector: ,Jason Mr-Ardel Dale: _ ^, SlelioNOlfsel: 0 + - (Plan Set Page Number: Design Sketch: 6.,.l o+cn ;w alb sr sw PmnQus% car-sFru.r-464 w'lk 54uL s6,.ai, 4 0-9;S As -built Sketch: 12" Dl 51&E, MS 12-'M WA 1 i2„DI � I � „ A, wA 5Z4MA-P 1 1 �_56j�,Ek I � I i , 2" P_ J 17'cW N (1) qN pVG, 36'"oVfK(2) PVG J 3.. ezvO 5 new 5 S