Loading...
NortonSpecInspStruct.pdf� ��,�► �� CITY OF EDMONDS INSPECTION AND TESTING AGREEMENT The project at issued under building permit number 2,00(12 requires special inspection and/or testing per IBC Chapter 17. The complete list of special inspections is attached: to tbis-document. BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgements. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Budding Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification when performing special inspections on site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector I. Observe Work . The special Inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings nay be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis ---meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each'special inspector shall complete and sign both the special inspection, record,aind the daily report forms for each d'ay's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: a Description of daily inspections and tests made with applicable locations a List of all hon -conforming items • Report on status of non -conforming items (resolved or unresolved) • Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. S. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best. of L:kTEUT\BIJI INGlSpeciallnspectionAgreementIBC.doc 7104 his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable,workmanship provisions of the IBC. Items not in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection when continuous inspections were regWred, etc.) shall be specifically itemized in. this report. B. Contractor Res onsibilities T 1. Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the item misted on .the. attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at,the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Department Responsibilities 1. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection. requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. IfislHer approval roust be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupaucy after all weekly special inspection reports including the final report have been submitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as tbe.owner's agent shall fund special inspection services. E. Engineer or Architect of Record_Resnonssililitfes The engineer or architect of record sball include special inspection requirements on the plans and specifications. ACY{NOWLEDGEMENTS cad and agree to comply with the terms and conditions of this agreement. Owner / �.� - Date Special Insp5Sne `�"CX-� r r Date Gelne�ral ConDate zf City BuildinDate q(9 i,:1TFW\BUtionAmr=n=tMBC_doc 7104 SPECIALINSPEC17ON AND TESTING SCMDULE �. :w . �► �s!'�+n+sz'>:cssnrt,tcprtc�rast�tat, RENFORCED CONCRETE, GIiNiM GROUT AND -MORTAR: STRUCI'i3� S'TI* 'VELDINGs Co;sesett: Cswte Groat Mortar—Sampk=WTesiong)lciitcsncnbembeloa} . - A rrsu .� slwpMatatial7dentilitatioa . a>e� Trsss ...._ vVekYis�laspeetioa ttsbrp ©Find mikutsms ftmbnie Inspection f3shv Q Field Rieiatfcw Plumcn . }liglrs�eaR $oltias8 BtitcbPlarttlnsgeet5on ltapertion Usmp Urkm 1]A375 D ox - OF Cast DA490 M Samples—MaxiDai[V1►cMu*Inspectim ortTars — itewa ft Sici weldiugfnspoetion 1 . - - � Adetat 5tnd wehling Iaspmtiotr PRECAMPREMESSED CONCRETE: — COXTM insert web&Z luspcctian FBes PM-Ttm Prc-TI= Cladft a� Testi • - RclafoxingTcsea . Te++donTests l+iitc Desi as Eg!f"CIM Placement ' insert Placsmerrt conareBu - ConetetrPlxenxnt " Installarioa I ' n Cast irs P;ck- Sam 1cs Com ion Tests MASONRY Special Imspectioa Stresses Used - _ Pt EmInny Acceptance Tests fi mwv Units. Wall Prisms)' — 5n55epcatTens (lomat Gswt. Firld WaliPbsmt) Placemm laspection of Elnin ADDITIONAL INSTRUCTIONS OR OTHER TFMS AND INSPECTIONS: * Concrete construction '-- * Masanury construction • Anchor bolts �^ * Expansion bolts • Expansion inserts Epoxy grouted installations • ? Sheri wall nailing • Diaphragm nailing roan twmpined by:. * Holdown installation TelephvneNo.; ' ' FI4FJ% OFING: Phcement Inapectiast ' Dernity Tens . Thi *omTcw Imspoct Baichin$ INSM ATING CONCRETE: " � 5ampk andTat ' — Placement Ittspectioi► _ Unit wriAls EXLL MATMUAL: Acmpw=Tau y Placam m Inspection ,`t FieldDensity SMUCTFJItAL WOOD-- ,G� shear VYall l�FadiaZe Iaspdction _iaspecttuAofGltc-1smFab. ' —. Inspation of'iltuss lobi Fab. ...._ 5a+apk and Test Compositnts . pair.