Loading...
pln20080046-Shoreshire-engr final inspection-04.17.2015.pdfCITY OF EDMONDS OF E11,o CORRECTION NOTICE ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov Est. 1890 DATE: pal 2" ,,� 4/17/2015 PERMIT NUMBER: PLN20080046 OWNER: Ardsley Homes SITE CONTACT: Lyle Landrie ADDRESS: 24223 76" Ave W TYPE OF INSPECTION: FINAL INSPECTION — PLAT IMPROVEMENTS ❑ WORK DESCRIBED BELOW HAS BEEN INSPECTED AND APPROVED ❑ APPROVED PLANS AND PERMIT JOB CARD MUST BE AVAILABLE TO INSPECTOR ON SITE ® CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE APPROVED AND/OR THE NEXT PHASE OF WORK IS STARTED. ® RECALL FOR INSPECTION ❑ REINSPECTION FEE MUST BE PAID PRIOR TO NEXT INSPECTION REQUEST. ❑ STOP WORK UNTIL AUTHORIZED TO CONTINUE BY CITY INSPECTOR 1. 4/17/2015 complete 2 Remove s^*- ewan4fTiofn r & of way 4/17/2015 complete 3. Pefmanently stabilize expesed sei 4/17/2015 complete 4 PlafA s4eet t."... *r1� 4/17/2015 complete 5. Install wetland signage 4/17/2015 signs installed, however the Planning Division will need to give final approval. Notification and photos have been given to Planning. 6. sidewalk t „tilit . pole (o 76th Ave 4,,,,4age) ., well as t the no Ah of the „ plat road. Retaining walls pr-epesed te be leeated within the City right ef way Must first be appr-eved thfotigh an ener-eaek pr-oeess. Refer- to City handetA E26 for- more infoFmation. 4/17/2015 — Retaining wall was not installed. Concrete extruded curb was used along the steeper slope areas. City standard requires vertical curb within the City ROW. Inspections of the curb have been done and a decision was made by the City Engineer and Public Works Director to allow submittal of a performance bond, to be held for a period of 5 years, ensuring the integrity of the curb. If at any point within the 5-year period the curb fails, it shall be replaced with vertical curb. 7. The step sip,.. emwflf-emain in the leeatien it was at time ef inspeefien. While appr-eval te leeate Ed _ , _th __ fop of the stop sign has been eonfifmed, the leeation of the stop the stfeet signs 243 faf to the east that it weiald prevent the stfeet signage ftem being eempletelyvisible € th Ave. Therefore, please l a4e the sit o the s „t side 2 n 1F4= 4/17/2015 - complete. However, it was noted the City has not yet installed the 243rd Street sign. This request has been submitted to the appropriate staff. 8. . 4/17/2015 complete 9. Clean/add quarry spalls at storm system outfall to lake. Rock shall be free of sediment. 4/17/2015 — rock has been installed. Debris remains around the rock and in the wetland/buffer areas. Please remove. 10. Please provide documentation/confirmation that stormwater drywell was installed in the right- of-way, adjacent to Lot 1. 4/17/2015 — not addressed. 11. Please provide documentation confirming filter installation for storm filter. 4/17/2015 — not addressed. 12. The City Sewer- Division has been notified to r-e TAL the sewer- main. Results of this will follow this eeffeefien .,efie0 4/17/2015 — complete 13. , . 4/17/2015 - complete 14. The fellowing items hm,e not yet been eempleted. The developer- has r-e"ested this wE)Fk be shall be hold for- this work. 4/17/2015 - complete a. Final lift ef asphalt en the plat read-. bye—inspeet stfeet menuments after- final asphalt ft. plans.e. Genstfflefien ef an asphalt thiekened edge aleng the nefffi side ef the plat FE)ad. f Gfass r-ead pm,er-s-ever-sewer-easement. 15. 4/17/2015 — Please remove filter socks from catch basins within the ROW so inspection of the CB's can be performed. Depending on the status of the single family site improvements, the filter socks may need to be placed back in the CB's post inspection. 16. 4/17/2015 - All manhole lids at the vault shall be exposed, accessible and at grade. One manhole was completely covered and another could not be opened due to the sod placement. 17. 4/17/2015 - Install stop bar near crosswalk, in accordance with plans. 18. 4/17/2015 — The front entry wall/fence, development sign and irrigation system appear to be wholly or partially located within the City right-of-way. Encroachments into the City right-of- way require approval through an encroachment permit process. Please refer to City handout E26 for additional information on this process and required documentation. 19. 4/17/2015 — Sewer flows out of the manhole in front of 7542 243rd appear to be slow/blocking up. Has normal usage of the homes (dishwasher, laundry, etc.) at this end of the main occurred? If not, then future normal flows should address the situation. If the homes are being used to full capacity then this situation will need to be further assessed. 20. 4/17/2015 — Confirm all sewer manhole risers have been mudded. 21. 4/17/2015 — Stainless steel bolts are required on the drop bowl in the sewer manhole at the east end of the project. Please call for a re -inspection once the above corrections have been addressed. As the entire storm system was not accessible, additional comments may follow the re -inspection. The actions or corrections indicated above are required to be corrected prior to final civil construction approval for the subdivision. For re -inspection call 425-771-0220, ext. 1326 or schedule through the on-line permit system. Page 2 of 2