pln20100018-Saffold-Civil_Review-E3.pdfof EflV0� CITY OF EDMONDS d CIVIL PLAN REVIEW COMMENTS T ENGINEERING DIVISION (425) 771-0220 Est. i s9° City Website: www.d.edmonds.wa.us DATE: January 12, 2011 TO: Jeff Haynes jsh@cspengineering.com FROM: Jeanie McConnell, Engineering Program Manager RE: Subdivision File #: pin20100018 Project: Saffold — 3-lot Short Plat Project Address: 19327-88th Ave W During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to an Engineering Technician. City of Edmonds handouts and standard details can be referenced on the City website under Public Works Department, Engineering Division. Comments 1 — September 28, 2010 Comments 2 — November 23, 2010 Comments 3 — January 12, 2011 GENERAL 1. 1/12/11— Bond amount for ROW improvements only = $45,506.96. Bond amount for all required improvements = $153,131.85. A performance bond shall be submitted to the City prior to issuance of the approved civil construction plans. 11123110 — Response letter states estimate will be provided under separate cover. 9/28/10 comment - Please provide separate itemized cost estimates, including units and unit prices, for both on -site and off -site (right-of-way) improvements, including traffic control. a. A bond is required to be placed for all right-of-way improvements. The amount of the bond will be based on 120% of the City approved estimate for all right-of-way improvements. The City will inform you of the appropriate bond amount after review of the cost estimate. Bond forms can be obtained from Megan Cruz - 425-771-0220 or meizan.cruz@ci.edmonds.wa.us b. If you intend to post a bond in order to record the subdivision, the bond amount will be based on the entire scope of the project. c. Inspection fees for this project will be calculated at 2.2% of the 120% City approved estimate for all improvements. 2. 1/12/11- Thank you for providing a traffic control plan. Please revise to show the intersection of 194th St with appropriate construction warning signage. In addition, please add "End Road Work" signage at each end of the project area. 11123110 - Response letter states traffic control and haul route plans will be provided by the contractor. Please note, plans shall be submitted for review and approval prior to receiving civil plan approval. 9/28/10 comment - Please submit a traffic control and haul route plan for review and 3. Edmonds Way. ok 4. ok DRAINAGE REPORT - The following comments are provided from Jerry Shuster, Stormwater Program Manager. Specific questions regarding these comments should be directed to Jerry by phone at 425.771.0220 or by e-mail at shuster@ci.edmonds.wa.us 1. ok 2. 1/12/11 comment - The revised drainage report correctly calculated the 100-yr event flow into pond #3. However, it does not calculate the flow out of pond #3. Please include the now out of pond #3 at the projected maximum water level elevation. If this outflow is greater than the inflow, then the pond won't overtop. Please include the same calculations for ponds #1 and #2. 11123110 comment - The design of the water quality ponds is adequate for the 6-month event. The Drainage Report needs to include, however, calculations of the maximum water surface elevations in these ponds during the 2-yr, 10-yr and 100-yr events to ensure no overtopping occurs, with the designed 0.5 foot of freeboard. This design routes all the flows from all events off of the driveways/access road to these ponds without by-passing the larger events. 3. ok C4.1- STORMWATER MANAGEMENT PLAN 1. ok 2. ok 3. ok 4. ok 5. 1/12/11- Please review the invert elevations provided. The i.e. at WQ cell #1 is stated to be 368.50. The i.e. at the downstream CB is stated to be 368.65, which is higher than the outfall at WQ cell N. 11123110 comment - The invert elevations at each of the CB's are still not shown. The invert for the cleanout on the east end of the storm run has been provided, and an ie at WQ cell #3 is noted, although it doesn't actually match the bottom elevation shown in the table. The bottom elevation provided in the table appears to represent the bottom elevation of the water quality cell. Please revise accordingly. 9/28/10 comment - Provide RIM and invert elevations at all yard drains. 6. ok 7. ok 8. ok 9. ok Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. Page 2 of 2