PLN20120035OMp ED °�a CITY OF EDMONDS 12151h Avenue North • Edmonds, WA 98020 Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.edmondswa.gov DEVELOPMENT SERVICES DEPARTMENT: PLANNING DIVISION ADMINISTRATIVE DESIGN REVIEW FINDINGS, CONCLUSIONS, AND DECISION, TO: Seavue Condo Homeowners Association c/o John Warlikowski FROM: Jennifer Machuga, Associate Planner DATE: October 16, 2012 PLN20120035: The applicant is proposing to remove two existing evergreen trees from the southeastern corner of the Seavue Condominiums site, located at 1130 5th Avenue South. Replacement planting is required. A. Introduction The applicant is proposing to remove two existing evergreen trees located adjacent to the southern property line of the site addressed 1130 5th Ave. S, near the southeastern corner of the site. Both trees were indicated as existing when the site was developed in the late 1970s with what is now referred to as the Seavue Condominiums. A rockery is located between the building and the southern property line, and both of the trees are located on the south side of the rockery. One of the trees appears to be getting too large for its location adjacent to the rockery, and the other tree appears to be in poor health. While trees on individual lots are regulated through ECDC 18.45, changes to landscaping on multifamily -zoned and commercially - zoned sites are subject to design review according to ECDC 20.13. The subject application does not trigger SEPA review; therefore, the proposal may be approved by staff as a Type I Decision, subject to the requirements of ECDC 20.01.003. Page 1 of 4 • • File No. PLN20120035 Seavue Condominiums Landscape Plan Modification B. Critical Areas A Critical Areas Checklist for the subject site was reviewed in 2012 under File No. CRA20120058. It was found that a stream may be located adjacent to the southwestern side of the site; however, it is undetermined if it is in fact a tributary of Willow Creek or if it is simply a "drainage ditch." As a result, a "Study Required" determination was issued in order to ensure compliance of future projects on the site with the applicable critical areas regulations.of ECDC 23.40 through 23.90. However, even if this feature qualifies as a stream, the trees proposed for removal are located over 100 feet away (the maximum potential stream buffer under ECDC 23.90.040), so no additional critical areas study is required for the subject application. C. Findings and Conclusions 1. The applicant submitted a land use application, cover letter, photographs and site plan on August 27, 2012 (Attachments 1 through 4, respectively). 2. The application became complete pursuant to ECDC 20.02.003 on September 24, 2012. 3. The Seavue Condominiums are located at 1130 5th Ave. S. The site is zoned Residential Multifamily, R,M-1.5. (Attachment 5) 4. The applicant is proposing to remove two existing evergreen trees located near the southeast corner of the site (Attachments 2, 3, and 4). 5. One of the subject trees appears to be growing too large for its current location adjacent to the top of a rockery, and the other tree appears to be in poor health. Photos of these trees provided by the applicant are included in Attachment 3. 6. Design review for the site was conducted by the Architectural Design Board in 1978 under File No. PLN197800010. A building permit for the original construction of the Seavue Condominiums building was issued under Permit No. BLD19780360. Both of the subject trees were indicated as existing on the original permit plans. . 7. There is very limited space for plantings between the southern property line and the existing rockery. The applicant has proposed replacement of the two trees proposed for removal with a weeping blue atlas cedar (Attachments 2 and 3). 8. Current landscaping requirements are contained within ECDC Chapter 20.13. Although the current landscaping requirements are different than the landscaping requirements that were in place at the time of original development of the site, any proposed changes to existing landscaping are subject to the current code requirements of ECDC 20.13. As such, Type II landscaping is required along the southern property line of the site. 9. Type II landscaping calls for evergreen and deciduous trees, with no more than 30 percent being deciduous, a minimum of six feet in height, and planted at intervals no greater than 20 feet on center. The two trees proposed for removal are spaced at approximately 20 feet on center from the other existing trees at the southeastern corner of the site. As such, two replacement trees are necessary in order to comply with the current landscaping requirements for spacing of trees along this portion of the southern property line. 10. Both of the trees proposed for removal are surrounded by ivy, and have ivy growing up the trunks. In order to minimize the potential of the ivy choking out the replacement Page 2 of 4 • File No. PLN20120035 Seavue Condominiums Landscape Plan Modification trees and any other existing plants, the applicant needs to maintain the ivy and prevent it from growing up the trunks of the replacement trees. D. Public Comments Administrative design review is a Type I decision subject to the requirements of ECDC 20.11 (General Design Review) and 20.01 (Staff Decision — No Notice Required). Therefore, no public notice was required for the subject application. ' E. Technical Review The subject proposal was reviewed by the Engineering Division, who recommended several conditions (Attachment 6). The Engineering Division's comments have been added as conditions to this approval. F. Decision Based on.the findings, conclusions and,attachments to this report, staff finds that the design review for file number PLN20120035 is APPROVED with the following conditions: 1. Trees shall be fell onto private property. 2. Vehicles and equipment shall be located on private property. Should it be necessary to utilize the City right-of-way to perform any of this work then the contractor shall apply for and obtain aright -of -way construction permit in advance of starting work. 3. Contractor/owner is responsible for keeping all debris on site and preventing any silt laden runoff from leaving the site and/or entering the city storm system. 4. Due to the proximity of the subject trees to the existing rockery, the applicant should leave the stumps and roots in place. If the applicant wishes to remove the stumps and roots, it is recommended that the applicant contact a geotechnical engineer to ensure that it would not cause issues to the stability of the rockery. 5. Two replacement trees shall be installed very near the locations of the removed trees. The replacement trees may be weeping blue atlas cedars or similar evergreen trees appropriate for the site. Both replacement trees shall be a minimum of six feet in height and shall be planted at spacing as close as possible to 20 feet on center from each other and from the existing trees to be retained. 6. The ivy growing on the subject site must be maintained so that is does not negatively impact the health of the trees and other vegetation on the site. G. Attachments' 1. Land Use Application Form 2. Applicant's Cover Letter 3. Photos of Trees Proposed for Removal and Replacement 4. Site Plan ' 5. Zoning and Vicinity Map 6. Engineering Division Comments Page 3 of 4 J • • File No. PLN20120035 Seavue Condominiums Landscape Plan Modification H. Parties of Record Mr. John Warlikowski Mr. Jay Grant Seavue Condo Homeowners Association 1130 — 5th Ave. S, #200 1130 — 5th Ave. S, #202 Edmonds, WA 98020 Edmonds, WA 98020 I. Appeals Per ECDC 20.07.006, appeal of this decision must be filed within 21 days after the issuance of the decision with the Snohomish County superior court. Page 4 of 4 City of Edmonds Land Use Application 1 ARCHITECTURAL DESIGN REVIEW • • • 0 COMPREHENSIVE PLAN AMENDMENT ❑ CONDITIONAL USE PERMIT FILE # PLN 2017- DO35 ZONE Q-M - t - S ❑ HOME OCCUPATION DATE Og- Zl - 12 REC'D BY ❑ FORMAL SUBDIVISION ❑ SHORT SUBDIVISION FEE 3 q �-� RECEIPT # 0 LOT LINE ADJUSTMENT HEARING DATE ❑ PLANNED RESIDENTIAL DEVELOPMENT 0 OFFICIAL STREET MAP AMENDMENT ❑ HE STAFF ❑ PB ❑ ADB ❑ CC ❑ STREET VACATION ❑ REZONE ❑ SHORELINE PERMIT ❑ VARIANCE / REASONABLE USE EXCEPTION OTHER: _Ty ec rY m ova i pta" ff-o5iov1 PROPERTY ADDRESS OR LOCATION PROJECT NAME (IF APPLICABLE) PROPERTY n ADDRESS OWNER `Y /U l�UAM. HONE # �O G v y - �9y� 1,941, E-MAIL J���LJ���g"'A �rrKA �FAAX # TAX ACCOUNT # UMGD •*K7EC. TWP. RNG. DESCRIPTION OF PROJECT OR PROPOSED USE (ATTACH COVER LETTER AS NECESSARY) 41 DESCRIBE HOW THE PROJECT MEETS APPLICABLE CODES (ATTACH COVER LETTER AS NECESSARY) APPLICANT.14,h 1/nv'i JGI,tCi -_S UU� NdB/PHONE #aiO�o99 69�fS �J ��- ADDRESS U -5 #7/-)yl s"A �U� /lrnn/r�I1 Y,90o2c1 E-MAILGli I lrx?@ 94 mL 7.d/L-,gei FAX # // CONTACT PERSON/AGENT L LIQ �Ii ew6 --V PHONE # -7OF -Z1 ll y b 9 ys ADDRESS//fQ ,qUC Sorlri�i aZvl ���z a ivd f ftAQ E-MA1L4W L-T JC2Co�Z&Z,,,r AlPi% FAX # The undersigned applicant, and his/her/its heirs, and assigns, in consideration on the processing of the application agrees to release, indemnify, defend and hold the City of Edmonds harmless from any and all damages, including reasonable.attorney's fees, arising from any action or infraction based in whole or part upon false, misleading, inaccurate or incomplete information furnished by the applicant, his/her/its agents or employees. By my signature, I certify that the information and exhibits herewith submitted are true and correct to the best of my knowledge and that I am authorized to file this application on the behalf of the owner as listed below. SIGNATURE OF APPLICANT/AGENT DATE Oi / Property Owner's Authorization ' I, j1 If Gl a 1 // 446t I � , certify under the penalty of perjury under the.laws of the State of Washington that the following is a nd correct statement: I have authorized the above Applicant/Agent to apply for the subject land use application, an ant m permission for the public officials and the staff of the City of Edmonds to enter the subject property for the pure es of insp do fri d endant to thi application. 7 SIGNATURE OF OWNER i DATE ®� Questions? Call (425) 771-0220. �t t 0 Yi � I t p5 r E f a p ,i - Revised on 9/14Rir B - Land Use Applicationdoc Page I of i Attachment 1 Scope of Work' SEAVUE Condominiums 1130 511 Ave South Edmonds, WA 98020 -RECEIVED AUG 2 7 2012 DEVELOPMENT SERVICES As marked on plans and shown in photos. • Remove Tree marked T-1. The tree has grown so large that it is starting to move the rockery retaining wall and we are concerned that it will fall into the building. Additionally, it is dropping excessive needles on the roof causing constant clogged gutters. This causes ponding on the roof. • Remove Tree marked T-2. The tree is dying. • Install Tree marked T-3 a Weeping Blue Atlas Cedar. This type of tree will give needed privacy and allow for winter sun light, but will not grow to the size of the current trees. Submitted by, John C Warlikowski, Board Director, SEAVUE Condominiums 1130 5th Ave South, Unit 202, Edmonds, WA 98020 Contact Cell 206 484 6945 Email: warliic2@earthlink.net l Attachment 2 r lit tip- M t bey u � .C. iY fi',�''� r } r � t -ta J t. '. '. d.. a`f." 1�. • _ _ ,t rr d ) - _ U G i� Y{�m Bt-•rpL.�,'��„�y.' •,) ��.In� S riA•./I�l. . ! i ,•�� �a } Sk�;? * r ���tE��r�r t � f 'v - !� .. - � � � •. f �IY71 1N r�_ _ ,'•i �' � �S �i l � ! ''a° r.�Y ti•#.\J�: i; �'.`F'F� m � © �IY•;]r�11�.}_ - � - `}c- s� '�i'i. � f O °°- sort 1 t MV .�y 8 . :➢ .ute'9 fdt _'71 so-1r37.. (� tl •:4' Yw . h' `TY-0� _ - �y}r�i�-to dt4.41 :PhL�g2'y'tT•'9A i}� ldt r 9 j'Qd %%-803 j". ' •f d -1•'F'. (t+>fl+li?+> �� wa ¢`.mr rr, t. �!. r °dm i wc �+otlovt "'�pv'NO • '�757� � 4 r .ryanaac �>.vM •.taata#�r-s . i y �{.n +atptln t�wWu Am- 'Q'e'*p 0 ?'� •� O • Rrt3F � � �wim, ... X- i.;f ri",jyl{\ - ..,,� J�•` ° �s ,®�p� � � ��� �' fti f t1�}�: ' �f� �a' a ..- >"•yej w<�,'yo?d'�'#datl,�le,�S-c;n�.rM' - , r�>id a ,�°o 0° ,� , '`�. �, �•' °Faze :,":r}` ,fit �� t . 'je7owvri.��'6 � �.� �� �ti�i '!fl i`�.�. •m 'ffi %F<.i iy �,`.�'t��� t, 4., , _ chi _�4�, .�' �..r,.�� �S.rvn.�� �'�il ! •s. °a l },},, i'f 0 5 _' '. hTm'4dzU•/ �s�! 8b NM�ic�.rFe7 .� u, ` F f '3c1r; 1 ••r ..° 0'�. r ) � g`°g - ,� �is�al;�Tsf4 +a�.,�.��, - �.j•��i�dChi '7 - , D •t'�,�+}'�-. f ', 7•� .� r ;s�^� gJ �o ,zt lam Iw r�ni*zij t'�Tra �trmil �Paz�l.. � ° arnr 'tcl - I ..`1 _ m y �9 Rye °$ ]M'Ptuis>+1>evf}Hvuf•q�,e ti 4xt4 o ` ItGy� q�M1 aka r f Ir�a� �- 8° xs "a+13 M3C7-i, :�+11'IU l4: o°� A -1 IL.�� m ;,;r><' ..c. ' + ° Q°.. ! > °ae . ° c ®° •� $fit � �• t t f-.�OLL�di.3�i �: �I:-I..cl �� z �. 1.+4 ' ��- '`e- -Fts•S44n.;u?-.wwnvtran.•�311e1:J - 11t*1rl,�i�•'I''.,' e ,�- �� m�d �. 9V' b°y� 0 ,. 1 ^�'�'.a;QM1*ah:7 '•a-itrka�+r rn+tY�sv. .. .. t:1 �. & k �x1° „ °m dQ 'o$ $ ° s,•,p� 0°e�' ! �,- i {��e� ?e'„`� ° �°�w °33'''' � �� 3r-u ��S,i+ i*-•n*iral I}'eas.'+a`e: fr*�-`-t I _ � ° _ •`° 'I .44' vW91•. ,k t •,..'�`�. T'fl a, '� a�J"�' Q• tp ° �4¢f ., vy� I , `. > • � �e�A. JJ9 ' � !..' bt)D ��° �,� ,�.m�, "'�' � .Iy�dMt°+'.ah��"q•.+fnan �.ld>3'�tt+�:ir - .- .. '�'� � �a �^f`e _ ! rrc�'i.-isdk�lrt�+� ., „grjl' a v�1.F �° • . 4Kf Ityao',sn�vl -ni�a °,rx•�a�i �I'� _ • e ►: ME I PI ►v 'I rR42001,1 ELM WAY RM-1.5 ELM WA kI3P'zA. 979-4 OF ED f Zoning a c* t y Map 0 75 150 300 File No. PLN20120035 Feet Attachment 5 0 Date: September 26, 2012 To: Jeri Machuga, Associate Planner From: Jeanie McConnell, Engineering Program Manager Subject: PLN20120035, Tree Removal Seavue Condo Assoc—1130-5th Ave S Engineering has reviewed and approved the subject application with the following conditions to be noted in the staff report. 1) Trees shall be fell onto private property. 2) Vehicles and equipment shall be located on private property. Should it be necessary to utilize the City right-of-way to perform any of this work then the contractor shall apply for and obtain a right-of-way construction permit in advance of starting work. 3) Contractor/owner is responsible for keeping all debris on site and preventing any silt laden runoff from leaving the site and/or entering the city storm system. Thank you. City of Edmonds Attachment 6 G 4Y gg y �i N AfJ 1 / �-�s .s i6� �s �'�',�o. �,,�,'� � �r • rt, w.l ,,� r- � �, .y _ . ae _ '. sO ��"� g q ' , f�� ra %�� ?' r 'r t�•i 1 j+� � s -:� r r'�` is 4N - , � - . T' }' . �, ai' ..h. , � e v � Jam„ i� Y '� �' � -.dry w. , r ! +'+ �++i`,vr,•��y� 'h�.i-�.,,.� �.ro..�` n,•-A: `�i►~''✓dKY •'�r _'���.�a1'tkw, e F'!,d+*�•i r•ai f 2 'u�-�� JI /��•• � %' �"�`,..ca' ♦ - �, P'� ,tom% w x ., •... CD' . s�' _ •'..� . , ^ . , �' "� +' ��� P� i ( i/ YY' .�'•�/ s`ta.r'�a' a�G` � si�c� � �,V!([�6 Vow, g rb . ow, s�.�,{ y lItR��•\fdtyi� R•' l -I'.t''1•$j�`}'� U� 4"7R' fiat 1S. s��(('h a /I ;¢'�•• %23n y ♦ --3: i �- a f •C� � w I i' rva.Ys4 r v tv < s c r .t, � l�s� { -• a , } i +I� jYa! R � � f �.' y ty. t ri` 1.•,�� ��1 \' ^v �• • �..��... rs '�s4 '`�'V k_:l• !rJ -- .I .1�?- .l ..:Aak ..k..-i ,, a. �' ? t L� fit, l '• 1 ar ,. . � •^ (�.+�.., ' — � � � L � '"sue 2;01'LV ` 5 s ppr ^ 3 i �.b I f'. )U2 RI 09/27/2012' 09 50 4b, �X 'Ar• u.. 6 ' 4�At Wz A 7 A I le Ilk, 09/27/2012 09:54 c`\.'aST'�� �`ffi`a7 ' 'a = tLA• icy � �j'�'i A.;j. ' �0. � �-. �' � C 8 .. �`'a -tom - � 't � �' i. � ! .:.r"'. . , �"1•:• $ I- �.= jv .gyp;• "1'. 8 �;. fJ(� iy7• - cy.�Asrr;. PO Al ?�,�?; ��� `te�a 4 �. •-''E � .." = r"-n-��>,-�'.: �§; is -ddr'f �, a�' � - l-[v n, `,y'(' r•" Qt{. 4 ��e�d}'Iq�L�`�T„f'Ji,�� /,L Q � r �tr r'P.P `,- L ,l r rFa ��'�',�•A, m4 uii w �a . •. '_ ? LO "� •` a: �� C a y r its 'Sj...5}{•fir r.� 1 ..> 7.7 r ,/� a,• n i"'t' Ayk'' k lsir ,,if � .sue ��5h� sA •.s.•• �i ..ay;'.^ o P` t `,�,,. ., T� •*"'ys„�14 oil ;'.!"�I� M t yam, a � r 1 � � �. E. � a, s�,A.:��,i',,.s :+Au'.M-1 Sti. �+ .r •.•,�J. z�e ..ti - :. • • Page 1 of 3 Machuga, Jen From: Jay Grant{jay.grant@leo.portpolice.us] Sent: Friday, October 05, 2012 9:11 AM To: Machuga, Jen Cc: Chave, Rob Subject: Fwd: Seavue Condo - Tree Removal I will cancel our scheduled removal later today based on your email of last night. It is unlikely we will be able to have our tree guy back our here for another 30 days, and will assume your work will be complete by then. We appreciate your efforts, but not sure why this process would take so long. We are not developing land and cutting down trees for profit or removing them to change any views. We are working to protect our building. I hope your department would consider prioritizing actions by homeowners in a different manner than a commercial development situation. I have lived in Edmonds off and on for forty years, 25 as a homeowner. I have worked many times with my house with the planning department including doing complete remodels. I must say this particular permit seems to be the most frustrating in all that time. No further reply is necessary. Sincerely, Jay Grant Seavue Association of Apartment Owners T: 202.351.9399 From: "Machuga, Jen" <Machuga(aci.edmonds.wa.us> Subject: RE: Seavue Condo - Tree Removal Date: October 4, 2012 4:18:54 PM PDT To: Jay Grant <jay.granta.1eo.portpo1ice.us> Cc: "Chave, Rob" <Chave _ci.edmonds.wa.us> Hi Jay, I understand your concerns, but unfortunately, we will not be able to issue the decision on your application prior to next Tuesday. I apologize that you were given a different impression on the timing of our application reviews when you were previously in at the counter. Although I mentioned the 120 day deadline on land use reviews, I certainly don't anticipate that this application will take that long, but it is typical for tree cutting permit applications to take approximately two months. The code does allow for removal of trees in emergency situations, but replanting would still be required. Sincerely, Jeri , 10/10/2012 • • Page 2 of 3 Jennifer Machuga, Associate Planner City of Edmonds, Planning Division 121 - 5th Avenue North Edmonds, WA 98020 (425) 771-0220 ext. 1224 Machuga(cr�,ci.edmonds.wa.us -----Original Message ----- From: Jay Grant[mailto.jay.grant@leo.portpolice.us] Sent: Thursday, October 04, 2012 3:46 PM To: Machuga, Jen Cc: Chave, Rob Subject: Seavue Condo - Tree Removal Ms. Machuga, RE: Application Number PLN20120035 Submitted August 27, 2012 I met with you this afternoon and cannot say I was happy with your answers in regard to our tree permit we are applying for at Seavue Condominiums. As I stated I normally take care of these matters and because of my work I have relied on another owner of Seavue to take care of this. It is my understanding we submitted the application nearly six weeks ago. We had scheduled to remove the trees before the end August and then found out the process was more extensive and not a simple process so cancelled the removal at that time. In my personal discussion with staff it was intimated a month was surely sufficient time based on our situation. We are now; again scheduled for removal of the two trees on October 8th, next Tuesday. You are advising us that we should not keep that day and you will not likely be issuing a permit that is timely to our action. It is also my understanding you have been to the property and seen the two trees we want to remove. As discussed after moving to this property last year during the late fall and winter I noticed the vulnerability of the several story and large pine tree growing in a •deep rockery that today you would require an engineered retaining wall. For this reason it is more than prudent to remove the tree. In addition the pine needles are causing problems with our roof and have backed up water and over the years caused considerable damage, even with removing the needles on a timely, periodic basis. The small tree adjacent to the big tree will in the end cause the same.problem over time and is currently contributing to the water damage. As far as the process, I understand things take time. You noted you have a 120 day cycle on this type of permit, we were unaware of this and 10/10/2012 • Page 3 of 3 J I do not believe thi is noted on the permit.. This is likely a reasonable amount of time on large projects like Point Edwards and others where there is substantial work and multiple trees. In this case there are two trees, at least one could pose an immediate threat to the property in a major wind storm. If however an event of this kind did take place and the tree did fall into the building, the City would just say that was unfortunate. For us it would me thousands of dollars of damage, assuming no one was hurt. Trees are important to the community and I support reasonable measures to ensure we are careful and do not indiscriminately cut or butcher trees. However not offering a timely method will frustrate individuals and put them in a position of avoiding the good rules. We would not wantthis tree process to get to that point and I hope you will take this into consideration as you manage the work flow of requests. We feel prevention is a prudent measure. We have made a suggested alternative type tree to put in place of the current trees as required. This particular tree will enhance the property and will likley ensure no potential damage to the structure in the future. I would ask your immediate consideration of this issue and issue the permit so we could continue with scheduled removal next Tuesday. If you do not it will likely take us another six weeks to reschedule. This puts is in a time when we will likely have rain and even windy weather. This could further delay finding a day that it is safe to remove the trees. In addition we have. had to work with our apartment neighbor that borders the tree line as we have made arrangements to have their parking area cleared for two days. Thank you.for your consideration in this matter. Jay Jay Grant Seavue Assocaition of Apartment Owners Building Committee T: 202.351.9399 10/10/2012 Machuga, Jen From: Jay Grant Day.grant@leo.portpolice.us] Sent: Thursday, October 04, 2012 3:46 PM To: Machuga; Jen Cc: Chave, Rob rSubject: Seavue Condo - Tree Removal Ms. Machuga, RE: Application Number PLN20120035 Submitted August 27, 2012 I met with you this afternoon and cannot say I was happy with your answers in regard to our tree permit we are applying for at Seavue Condominiums. As I stated I normally take care of t-hese matters and because of my work I have relied on another owner of Seavue to take care of this. It is my understanding we submitted the application nearly six weeks ago. We had scheduled to remove the trees before the end August and then found out the process was more extensive and not a simple process so cancelled the removal at that time. In my personal discussion with staff it was intimated a month was surely sufficient time based on our situation. We are now again scheduled for removal of the two trees on October 8th, next Tuesday. You are advising us that we should not keep that day and you will not likely be issuing a permit that is timely to our action. It is also my understanding you have been to the property and seen the two trees we want to remove. As discussed after moving to this property last year during the late fall and winter I noticed the vulnerability of the several story and large pine tree growing Tin a deep rockery that today you would require an engineered retaining wall. For this reason it is more than prudent to remove the tree. In addition the pine needles are causing problems with our roof and have backed up water and over the years caused considerable damage, even with removing the needles on a timely, periodic basis. The small tree adjacent to the big tree will in the end cause the same problem over time and is currently contributing to the water damage. As far as the process, I understand things take time. You noted you�have a 120 day cycle on this type of permit, we were unaware of this and I do not believe this is noted on the permit. This is likely a reasonable amount of time on large projects like Point Edwards and others where there is substantial work and multiple trees. In this case there are two trees, at least one could pose an immediate threat to.the property in a'major wind storm. If however an event of this kind did take place and the tree did fall into the building, the City would just say that was unfortunate. For us it would me thousands of dollars of damage, assuming no one was hurt. Trees are important to the community and I support reasonable measures to ensure we are careful and do not indiscriminately cut or butcher trees. However not offering a timely method will frustrate individuals and put them in a position of avoiding the good rules. We would not want this tree process to get to that point and I hope you will take this into consideration as you manage the work flow of requests. We feel prevention is a prudent measure. We have made a suggested alternative type tree to put in place of the current trees as required. This particular tree will enhance the property and will likley ensure no potential damage to t1he structure in the future. I would ask your immediate consideration of this issue and issue the permit so we could continue with scheduled removal next Tuesday. If you do not it will likely take us another six weeks to reschedule. This puts is in a'time when we will likely have rain and even windy weather. This could further delay finding a day that it is safe to remove the trees. In addition we have had to work with our apartment neighbor that borders the tree line as we have made arrangements to have their parking area cleared for two days. 1 � V i Thank you for your consideration in this matter. Jay Jay Grant Seavue Assocaition of Apartment Owners Building Committee T: 202.351.9399 2 _ C1*OF EDMO.NDS PLANNING DIVMN' COMMENT•FORM PW-Engineering ❑ Fire PW Maintenance ❑ Parks &Rec ❑r Building �� 3 u, EconomicDev . •nOnParks Maintenance - Project Number: PLN20120035 Applicant's Name: SEAVUE CONDO ASSOC. HOA/ JOHN WARLIKOWSKI Property Location: 1130 5T" AVE. S. Date of Application: 8/27/2012 Date Form Routed: 8/29/2012 Zoning: MULTI FAMILY (RM-1.5) Project Description: TREE REMOVAL *PER ECDC 20 02 005 ALL ;COMMENTS MUST;BE SUBMITTED 1WITHIWt bAYS OF THE DATE` THIS FORM WAS ROUTED 'DUFBY�9%14MJ2 . * ` , '=� 3 If you have any questions or need clarification on this project, please contact: Responsible Staff: JEN MACHUGA Ext. 1330 Name of Individual Submitting Comments: Title: r / &3/ r_ i? ❑ 1 have reviewed this land use proposal for my department and have concluded that IT WOULD NOT AFFECT MY DEPARTMENT, so 1 have no comments. My department may also review this project during the building permit process (if applicable) and reserves the right to provide additional comments at that time. have. reviewed this land use proposal for my department and have concluded that IT WOULD AFFECT MY DEPARTMENT, so I have provided comments or conditions below or attached. RECEIVED AUG 3 0 2012 Comments (please attach memo if additional space is needed): ENGINEERING DIVISION The following conditions should be attached to this permit to ensure compliance with the requirements of this department (please attach memo if additional space is needed): Date: Signatu Phone/I MEMORANDUM Date: September 26, 2012 To: Jen Machuga, Associate Planner From: Jeanie McConnell, Engineering Program Manager Subject: PLN20120035, Tree Removal Seavue Condo Assoc—1130-5`h Ave S Engineering has reviewed and approved'the subject application with the following conditions to be noted in the staff report. 1) Trees shall be fell onto private property. 2) Vehicles and equipment shall be located on private property. Should it be necessary to utilize the City right-of-way to perform any of this work then the contractor shall apply. for and obtain aright -of -way construction permit in advance of starting work. 3) Contractor/owner is responsible for keeping all debris on site and preventing any silt laden runoff from leaving the site and/or entering the city storm system. Thank you. City of Edmonds OF EDMONDS - PLANNING DI COMMENT FORM APW-Engineering ❑ Fire ❑ PW - Maintenance . ❑ Parks & Rec. 0-Building ❑ Economic Dev. ❑ Parks Maintenance Project Number: PLN20120035 Applicant's Name: SEAVUE CONDO ASSOC. HOA/ JOHN WARLIKOWSKI Property Location: 1130 5T" AVE. S. Date of Application: 8/27/2012 Date Form Routed: 8/29/2012 Zoning: MULTI FAMILY (RM-1.5) Project Description: TREE REMOVAL "PER ECDC 20.02.005 ALL COMMENTS MUST BE SUBMITTED WITHIN 15 DAYS OF THE DATE THIS FORM WAS ROUTED: DUE BY 9/13/2012 If you have any questions or need clarification on this project, please contact: Responsible Staff: JEN MACHUGA Ext. 1330 Name of Individual Submitting Comments: Title: ❑ I have reviewed this land use proposal for my department and have concluded that IT WOULD NOT AFFECT MY DEPARTMENT, so I have no comments. My department may also review this project during the building permit process (if applicable) and reserves the right to provide additional comments at that time. ❑ I have. reviewed this land use proposal for my department and have concluded that IT WOULD AFFECT MY DEPARTMENT, so I have provided comments or conditions below or attached. Comments (please attach memo if additional space is needed): The following conditions should be attached to this permit to ensure compliance with the requirements of this department (please attach memo if additional space is needed): Date: Signature:_ Phone/E-mail: City of Edmonds Land Use Application ARCHITECTURAL DESIGN REVIEW IOR OFFICIAL USE ONLY ❑ COMPREHENSIVE PLAN AMENDMENT ❑ CONDITIONAL USE PERMIT FILE # PLN 2012 0035 ZONE S ❑ HOME OCCUPATION DATE 09 • Zi - 1 2 REC'D BY ❑ FORMAL SUBDIVISION ❑ SHORT SUBDIVISION FEE i 3 o n RECEIPT # ❑ LOT LINE ADJUSTMENT HEARING DATE ❑ PLANNED RESIDENTIAL DEVELOPMENT ❑ OFFICIAL STREET MAP AMENDMENT ❑ HE STAFF ❑ PB ❑ ADB ❑ CC ❑ STREET VACATION ❑ REZONE ❑ SHORELINE PERMIT ❑ VARIANCE / REASONABLE USE EXCEPTION OTHER: T1(efi Y f M oVa I QI Ay1 Yev�S► �� PROPERTY ADDRESS OR LOCATION &2-0 S�t!@ . you ecll-fo,4 64 Y[7614? y PROJECT NAME (IF APPLICABLE) PROPERTY OWNER � , / VU CEO P ONE # QIQ �j _ ��9 - �9y�" ADDRESS sox/ (/ �.2 C, O f� E-MAIL WARL 1 J Clft& Fa/9 Iir � �/e J� FAX # TAxACCOUNT # 1L-M13D4CDEC. TWP. RNG. DESCRIPTION OF PROJECT OR PROPOSED USE (ATTACH COVER LETTER AS NECESSARY) �e� � w►� C2�uyo vk— DESCRIBE HOW THE PROJECT MEETS APPLICABLE CODES (ATTACH C VEER LETTER AS NECESSARY) / APPLICANT,L4 - .-/dv'�J G/,t]]L'i -�_S VUc. lk.8 PHONE # OPQ4o r T L 629 'S ADDRESS I-13U 50%dVC E-MAIL UIR I I9AM L TiI 4. Off;FAx # / CONTACT PERSON/AGENT %�� Q.- K�fJS�Ci� PHONE # �D,y -�� �I 6 99 E-MAIL/ LS J C2Q %1L�jJL,�: ,6�7 FAx # The undersigned applicant, and his/her/its heirs, and assigns, in consideration on the processing of the application agrees to release, indemnify, defend and hold the City of Edmonds harmless from any and all damages, including reasonable attorney's fees, arising from any action or infraction based in whole or part upon false, misleading, inaccurate or incomplete information furnished by the applicant, his/her/its agents or employees. By my signature, I certify that the information and exhibits herewith submitted are true and correct to the best of my knowledge and that I am authorized to file this application on the behalf of the owner as listed below. SIGNATURE OF APPLICANT/AGENT DATE Property Owner's Authorization 1, n� %q �/ �dGl�iL ` , certify under the penalty of perjury under the i laws of the State of Washington that the following is a tr nd correct statement: I have authorized the above Applicant/Agent to apply for the subject land use application, an ant in permission for the public officials and the staff of the City of Edmonds to enter the subject property for the purp es of insp do d i endant to thi application. SIGNATURE OF OWNER % DATE Questions? Call (425) 771-0220. Revised on 9/144e B - Land Use Application. doc Page I of I • Scope of Work' SEAVUE Condominiums RECEIVED 1130 5ch Ave South AUG 2 7 2012 Edmonds, WA 98020 DEVELOPMENT SERVICES As marked on plans and shown in photos. • Remove Tree marked T-1. The tree has grown so large that it is starting to move the rockery retaining wall and we are concerned that it will fall into the building. Additionally, it is dropping excessive needles on the roof causing constant clogged gutters. This causes ponding on the roof. • Remove Tree marked T-2. The tree is dying. • Install Tree marked T-3 a Weeping Blue Atlas Cedar. This type of tree will give needed privacy and allow for winter sun light, but will not grow to the size of the current trees. Submitted by; John C Warlikowski, Board Director, SEAVUE Condominiums 1130 51h Ave South, Unit 202, Edmonds, WA 98020 Contact Cell 206 484 6945 Email: warliic2@earthlink.net Cr+Y t�� � �,t�,b�r � ft a �► s � r,+ a _ �_-� ,.. ' + v. � t `� � �' > , �'� � • ( r ``� '� Army .f / � + S 1 1 s 14. � � ~'r•� t�i , �S t} � y:�P{ 4 t F v-� � .,�Jrr � �, j. i erg �� �� � � �i�y`��' � e Y _•>� �-�`• +� � �g':`;� '`° r+: Y� ��f ,.. S ��I�'D tc� ., ..♦ :V/\ � C 5� fi u e< -G,Nc' 4 ✓ r `"`�f w--•"! p . --. � Y�� , A 41 ; t "s - f : r Rh-�."l' '�Ti'+l{�••* �R'+li �` I�'-+'t`D y f y ; -Y �/ C L a.rsti- :t• � - i �Li a 7� t U.'`S n t l �1 � '� •y �"� �1 Y tim..5 , �.A - « - +Stt'' Ott o,� VA•+V' -.' .. ti '.LLc � t �' t � ��p. s' ``�^"ram r i �..J .l ♦ :.. ft � � w Wue w Vk «'- ; ., - _ - '� �4tPyr 3 �, � ! ..•- 'yam t r� `f+i. � ,9 3L.��s _ • � .. z `• -'w` •y Y' 1 • . Mkt .' xrw• 10 • [ :\ , .�. � 1 (} ,S`I F'r .ter / t/ .. !r � .fit E �y_ I'y " �r�( '� �Pe.•, R4 • !1' Ai v �. ��yf• mart �!' t y p&� � {,�,. �. .�•. a1i1, •f H.. � s - �:y OFJ �s r� f a1�y � �x�ti: + 'L _ ,�'n L ",:: ry .f y .:vftq< .,+, �.. • 4 j , C}�•� d`�; c - 1'i t4".i tY�_ ".,Tjr '�-r•.�.i� ` `'44'�' 7r.a ^ _!a., 1 ji R x `' s F tJ ,..` 4./ ' �+ s �• � ~ t . t'• .xl �'; { ' - • -�a `� �9t.♦ .ems �t F.1' ,ir Flo j M? � � ♦ �h c.'�1/ . E r f .y t,r. ,T. �.i- • a /,,, � � _ M� -. a• � fir' '♦. IV '�C fj PP i ,a � t, i, N r 1�1 1 0 171 Moll 41,At2tP -f4 RWW 1W ot Wlt.`-On of V41 .4 Name BILUS TREE TOPPING & REMOVAL UBI No. 601121442 Phone No. (360) 659-9623 Status Active Address 11904 84Th St Ne License No. 81LLSTT904OW Suite/Apt. License Type Construction Contractor City Lake Stevens Effective Date 9/16/2010 State WA Expiration Date 9/16/2014 Zip 982S8 Suspend Date , County Snohomish Specialty 1 Tree Removal Service Business Type Individual Specialty 2 i1 Unused Parent Company © Business Owner Information 0 We All Name Role i Effective Date Expiration Date EYLANDER,WILLIAMD000LAS_—_]O! er^ 09/16/2010`�_._ �— 8 Bond Information Bond � Bond Company Name Bond Account 'Effective Expiration Cancel Impaired Bond Received Number Date Date Date Date Amount Date DEVELOPERS SURETY & 109109/2010 Until I I 275908C ( I $6,000.00 I 09/16/2010 INDEM CO Cancelled RECEIVED AUG 2 7 2012 DEVELOPMENT SERVICES